INTERVIEW-QUESTIONS
1. Define ITP.
Answer:
All inspections shall be done on the basis of
approved ITP (Inspection Test Plan) which consists of
the following sections;
Activity Description
Responsible Person
Quality Inspection Activity
Reference Drawings and Specifications
Acceptance Criteria
Verifying Documents (ITR’s)
Intervention Points
http://www.engineerhammad.com/2016/02/quality-assurance-interview-questions.html 4/8
1/25/2018 Quality Assurance Interview Questions | Qc Interview Questions
Instrumentation Questions:
1. What you knows about explosion proof
areas/zones ?
Answer:
Zone 0, 1 & 2 for Gases and vapours. Zone 20, 21 &
22 for Dust protection.