IDENTIFICATION CODE PAG1OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS
REVISIONS:

TITLE

PROVISION BY CONTRACTOR.

PROVISION OF 3000 HP SWAMP BARGE DRILLING RIG

DISTRIBUTION LIST

Eni Headquarters’ Drilling, Completion & Production Optimization Depts.

Tenderers

Date of issue: 10/09/2017

Issued by A. Pedro A. R. Ianiro A. Pasquale


1

REVISIONS PREPARED CHECKED APPROVED

NCDMB TECH ITT CERTIFICATION NO.:CERTES/NCDMB/CERT/NAOC-ITT/09/01/17/TSD/3000HP AND 1500PSI SWAMP RIG

The present document is CONFIDENTIAL and it is the property of eni . It shall not be shown to third parties nor shall it be used
for reasons different from those owing to which it was given.
IDENTIFICATION CODE PAG2OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

RIG AVAILABILITY.
DESCRIPTION UNIT CONTRACTOR'S DATA
Actual Location(Mandatory : only Rigs within Africa is required) +
Duration of actual Contract (if any) Date
Estimated Time to carry out Upgrading Work / Refurbishment (if any). NOTE : No Rig Months
under construction is acceptable
Estimated Time for Mobilization of Rig from its last location to Port Harcourt Months
(if Outside Nigeria)
Estimated Time to Rig Up (including standard acceptance tests) on first NAOC Location Weeks
DUE UPGRADING/REFURBISHMENT/MOBILISATION TIME: (Mandatory) May
2018
IDENTIFICATION CODE PAG3OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN.
ITEM DESCRIPTION CONTRACTOR'S DATA
REQUIREMENTS
A. UNIT Specifications
A.1. Unit general data
Owner +
Rig Operation manager +
Owner Head Office address +
Management head office address +
Owner Head office telephone +
Management head office telephone +
Unit Name +
Unit Type SWAMP BARGE DRILLING UNIT
Registered Number +
Unit Classification As per IMO MODU code (Where
App.)
Rated drilling depth 30.000 ft with 5" DP
Year of construction Not before 1995
Construction yard +
Actual status +
Actual location (December 2007) +
Availability
No. of Engines 6
Engines power 1500 HP
Average fuel consumption in normal drilling +
operation (Bbl’s)
A.1.1 Main dimension of Hull
Light Ship Weight [MT]

Main Deck width [ft]


Main Deck length [ft]
Main Deck Depth [ft]
Cantilever
A.1.2 Cranes (See - K 1.1 – K.5.6- K.5.7.)
Total number of cranes 2
Type of crane [Diesel/Hydraulic] Sea Trax
Hoisting capacity at 30 ft Radius 1 (one) x 60 M/Ton Minimum
Hoisting capacity at 30 ft Radius 1 (one) x 60 M/Ton Minimum
IDENTIFICATION CODE PAG4OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION COMPANY MIN. CONTRACTOR'S DATA


REQUIREMENTS
A.2 Unit operational capability
A.2.1 Operating depth
Max. Designed water depth capability [ft] 26
Max. Outfitter water depth capability [ft] 25
Min. outfitter water depth capability [ft] 7
Min. transit water depth capability [ft] 8
Max. Rig Height (from Floating/Water Line) 80 ft
in transit mode
A.2.2 Variable Deck Load
Variable Deck Load in Transit Mode [MT]
Variable Deck Load in Drilling Mode [MT]
A.2.3 Preload Capacity
Max Preload Capacity [MT]
A.2.4 Environmental Limits (when applicable) Drilling
Max. Designed water depth [ft]
Max. Wave height [ft]
Related wave period [sec]
Max. Wind velocity [knots]
Max. Current velocity [knots]
IDENTIFICATION CODE PAG5OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


A.3 Storage Capacities
Fuel for 20 days of autonomy min. 2500bbls
Drilling water 500 m3
Potable water 400 m3
Active liquid mud 400 m3
Reserve liquid mud 400 m3
Oil-based mud storage [m3] +
Base oil storage [m3] +
Brine storage [m3] +
Waste liquid (mud and washing water) 50m3
Bulk bentonite/barite [ ft3 ] 5000
Bulk cement [ ft3 ] 4000
Sack storage No 5000
Pipe racks x area [ MT / m2] 900 / +
Casing joints racking capacity [No./ft] +
DP/DC racking capacity [No./ft]
Miscellaneous storage area Sq./ Mt +
A.3.1 Cement Silos:
Location port/stb
Quantity No. 4
Each capacity 1,000 ft3
Total Capacity 4,000 ft3
Surge tank Quantity / Capacity + No. / ft370
Weight indicator Requested
Loading Hoses Quantity 2 ( Two for both sides )
Loading Hoses Size 4”
Length From rig to the boat ( Meters) Minimum 30 m
Loading Hoses Connection Camlock
A.3.2 Barite / Bentonite Silos:
Location port/stb
Quantity No. 5
Each capacity 1,000 ft3
Total Capacity 5,000 ft3
Surge tank Quantity / Capacity [No. / m3] Min. 10 m3
Weight indicator Requested
Loading Hoses Quantity 2 ( Two for both sides )
Loading Hoses Size 4”
Length From rig to the boat ( Meters) Minimum 30 m
Loading Hoses Connection Camlock
A.3.3 Drilling Water Tanks:
Location port/stb
Quantity [No.] +
Each capacity [bbls] +
Total Capacity [bbls] 4,000 bbls
Loading Hoses Quantity 2 ( Two for both sides )
Loading Hoses Size Minimum 3”
Length From rig to the boat ( Meters) Minimum 30 m
Loading Hoses Connection Camlock
IDENTIFICATION CODE PAG6OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


A.3.4 Potable Water Tanks:
Location port/stb
Quantity [No.] +
Each capacity [bbls] +
Total Capacity [bbls] +
Loading Hoses Quantity 2 (one each side)
Loading Hoses Size Minimum 3”
Length From rig to the boat ( Meters) Minimum 30 m
Loading Hoses Connection Camlock

ITEM DESCRIPTION COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


A.3.5 Diesel Fuel Oil Tanks:
Location port/stb
Quantity [No.] +
Size [Inch] +
Each capacity [bbls] +
Total Capacity Minimum 2,500 bbls
Loading Hoses Quantity 2 (one each side)
Loading Hoses Size Minimum 3”
Length From rig to the boat ( Meters) Minimum 30 m
Loading Hoses Connection Camlock
A.3.6 OBM and Base Oil Tanks:
Location port/stb
Quantity [No.] 2 X 2 Side
Each capacity [m3] +
Total Capacity [m3] +
Loading Hoses Quantity 2 ( Two for both sides )
Length From rig to the boat ( Meters) Minimum 30 m
Loading Hoses Size Minimum 4”
Loading Hoses Connection Camlock
A.3.7 Brine Tanks:
Location port/stb
Quantity [No.] 2 X 2 Side
Each capacity [m3] +
Total Capacity [m3] +
Loading Hoses Quantity 2 ( Two for both sides )
Loading Hoses Size Minimum 4”
Length From rig to the boat ( Meters) Minimum 30 m
Loading Hoses Connection Camlock
IDENTIFICATION CODE PAG7OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

1.1 GENERAL RIG SPECIFICATIONS.


COMPANY MIN. CONTRACTOR'S
ITEM DESCRIPTION
REQUIREMENTS DATA
B. General Rig Specifications
B.1. Mast and substructure
B.1.1 Mast
Make type Mast Type Required
Build as per rules API 4 E
Maximum API Rated static hook load with full setback for wind 1550000 lbs
speed [Km/h] and max. number of line strung
Height [ft] +
Clear height 152 ft
Width of base [m x m] +
Width of top [m x m] +
Gross nominal capacity [lbs] 2.000.000
Number of lines 12 /14 1 5/8’’
Static Hook Load Capacity with max. number of lines [lbs] Minimum 1.550.000
Ladders with safety cages and rest platform Required
Counter balance, system for rig tongs, pipe spinning tong and Required
inside BOP valve
Upper Part of Mast painted for day signaling to Air-Navigation Required
Red lights as per Regulation on top of Mast Required
Flare line up to top of crown block +-
Flare line outside of hull (tender to specify port/stb) Required
Lightning system explosion proof Required
Copy of Mast certification to be submitted:
Derrick mast to be fitted with heavy duty, tight, fluorescent lighting system, certified for use in division 1 or division 2 areas as
required by IP, API or other national codes.
IDENTIFICATION CODE PAG8OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
B.1.2. Racking platform.
Make/type Oil Tech (Canrig)
Racking platform capacity of 5" DP 25.000 Ft.
Racking platform capacity of 3½" DP [ft]
Racking platform capacity of 8" and 9¼"DC stands 6 x 8” + 2 x 9” ½
Stand length 27 m
Height from rig floor m
B.1.3 Casing Stabbing Board REQUESTED
Make +
Type +
Adjustable from - to height +
B.1.4 Substructure / Rig Floor
Build as per rules API 4 - E
Make +
Type +
Height [ft] +
Width [ft x ft] +
Setback capacity [MT] 350
Simultaneous setback-hook/rotary capacity [MT] 900 + 350
Clear height below Rotary Table beams +
B.1.5 Weather Proofing
Rig floor windbreaks type and height [ft] +
Derrickman windbreaks type and height [ft] +
B.1.6 Drainage System
Drip pan under rotary table Required
Enclosed drill floor drainage system c/w connection to Required
separate tank with oil/water separator
Return line to mud system Required
Monitoring system below 100 ppm on water discharge line Required
B.1.7 Drill floor
Rig Floor Dimensions [ft x ft] +
Safety Pad II (Custom Safety Products) [Yes/No] +
Mouse hole size [Inch] +
Rat hole size [Inch] +
Counter balance system for manual Tong Required
Counter balance system Air powered [Yes/No] +
B.1.8 Derrickman Platform
Escape device Required
IDENTIFICATION CODE PAG9OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
B.2. Drawworks And Associated Equipment
B.2.1. Drawworks
Electric motor driven Make and Type +
Input power continuous [Hp] 3.000 minimum
Input power maximum [Hp] +
Spinning cathead make and type +
Breakout cathead make and type +
Crown block safety device make and type +
Crown block safety device mode Required
Main Drum type Required
Main Drum dimension (OD x Length) [inch x m] +
Main Drum brake type (Band or disc) +
Main Drum rated maximum line pull with: +
- 14 lines [MT] 700
- 12 lines [MT] 600
- 10 lines [MT] 500
Maximum pull on traveling block with maximum nr. of lines / +
number of lines [MT / 12 or 14 lines] 1 5/8’’
Low Speed Main Drum clutch make and type [MT] +
Low Speed Main Drum clutch rated pull [MT] +
Independent fresh water cooling system for drawwork and +
Auxiliary Brake [Yes / No]
B.2.2 Drawworks Power
Number of electric/hydraulic motors [No.] 3
Electric/hydraulic motor make +
Electric/hydraulic motor model +
Output power continuous 1.000 HP
Output power intermittent (max.) (HP) +
Each motor maximum Output Torque (ft.lbs) +
Motor cooling system type +
Coiling system air intake point (if applicable) (kW) +
B.2.3 Drawworks Brake
B.2.3.1 Brake Mechanism
Make
Model + (preferable disk type)
Rated brake capacity at 50 RPM +
Independent emergency battery backup system (Yes/No) +
B.2.3.2 Auxiliary Brake
Make Elmago 7038 or equivalent
Model 100.000 ft.lbs
Independent back-up system [Yes/No] Required
B.2.4 Automatic Driller
Make/Type +
IDENTIFICATION CODE PAG10OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
B.3 Derrick Hoisting Equipment
B.3.1 Crown Block
Make/Type +
Builded as per rules: API 8 C
Rated capacity [MT] 900
No. of sheaves +
Sheave diameter [Inch] +
Sheave grooved for line size [Inch] +
B.3.2 Travelling Block
Make/Type +
Builded as per rules: API 8 C
Rated capacity [MT] 900
No. of sheaves +
Sheave diameter [inch] +
Sheaves grooved for line size [Inch] +
Upper limit switch type (In addition to Crown Block Saver). Required
Lower limit switch type Required
B.3.3.1 Hook
Make/Type +
Builded as per rules: API 8 C
Rated capacity [mt] 900
Complete with spring assembly/hook locking device Required
B.3.3.2 Link Elevators (Bails) [refer to Item E.2.4]
Make/Type
Builded as per rules:
Nominal size OD [Inch]
Rated capacity Requested [MT] Min. 680 tones
Length (Min. req. 1 set for standard operations 132” length, 132
for running DP’s) [Inch]
B.3.3.2 Link Elevators (Bails) [refer to Item E.2.4] Continue +
Make/Type +
Builded as per rules: +
Nominal size OD +
Rated capacity [MT] Min. 900
Length [Inch] One extended set of min.
180” length for running
casing
B.3.4 Swivel Head
Make/Type
Builded as per rules: API 8 C
Rated capacity 680 MT
Test / working pressure 7.500PSI
Completed with gooseneck and wash pipe, minimum ID [Inch] +
Size of reg left-hand pin connection [Inch] +
Completed with access fitting for wireline entry on top of Required
gooseneck
IDENTIFICATION CODE PAG11OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
B.3.5 Kelly Spinner ( as spare to top drive ) [Ref. To Item E.2.5.]
Make/Type
Left/Right hand rotation Required
Above with hand control, filler, lubricator assembly, control Required
hoses, 6⅝" Reg LH pin x box connections

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
B.3.6 Drilling Line
Builded as per rules: API 9A
Certified by Required
Certified No Required
Type +
Size [Inch] +
Breaking strength (MT) +
Length (approx. left on drum) – meters +
Completed with support frame for drum/cover [Yes/No] +
Drilling line drum power driven [Yes/No] +
Anchor Deadline Block Guidance System. [Yes/No] +
Spare reel of drilling line Required
(approx. length available on spare reel) [meters]
B.3.7 Anchor Dead Line
Make/Type +
Location +
Builded as per rules: API 8-C
Rated capacity (MT) +
Completed with weight sensor. [Yes/No] If Yes specify type.
B.3.8 Block Guidance System Required
Make/Type +
Completed with dolly/rails [Yes/No] +
B.3.9 Retraction System For Traveling Block (If fitted) Required
Make/Type +
B.3.10 Top Drive Guidance System Required
Make/Type +
Two rail beams Required
Torque Tube [Yes/No] +
Traveling Block guided [Yes/No] +
IDENTIFICATION CODE PAG12OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN.
ITEM DESCRIPTION CONTRACTOR'S DATA
REQUIREMENTS
B.4 Rotation System
B.4.1 Rotary Table
Make/Type +
Maximum opening 37” ½
Rated static capacity [MT] 900
Rated rotation capacity (@100 RPM) [MT] +
Driven by an independent electric motor. [Yes/No] +
- Type +
- Make +
- Output power [kW] +
Maximum continuous torque [ft.lbs] +
Two speed gearbox. [Yes/No] +
Emergency chain drive electric motor [Yes/No] +
Anti slipping pad [Yes/No] Required
Soft Torque Rotary System [Yes/No] +
B.4.2 Master Bushings
Make +
Type +
Full range of inserts blows to suit running all casing sizes 24” - 20 “- 18”⅝ - 16”
COMPANY MIN.
ITEM DESCRIPTION CONTRACTOR'S DATA
REQUIREMENTS
B.4.4 Top Drive
Make Varco or equivalent
Type +
Builder as per rules: API 8 C
Static rated load capacity [MT] 680
Working pressure [psi] 10.000
At related rotary speed [RPM] 150
Maximum rotary speed [RPM] 250
Driven by electric/hydraulic motor +
- Make +
- Type +
- Output power [HP] 1,200.
- Output torque [Lbs/ft] Range at …100 RPM 48,000
Electric motor cooling system (if applicable) +
Cooling system air intake (if applicable) +
System Certified by Required
Link Tilted System Required Hydraulic type
Two-speed gearbox [Yes/No] +
Specify lower connection size of main shaft [inch] +
B.4.4.1 Top Drive Inside BOP:
a. Hydraulic Remote operated Inside BOP make and type +
Hydraulic Remote operated [No.] 1 + 1 Spare
For DP sizes [Inch) 5” - 3”½
Inside diameter [Inch] 3” 1/16
Outside Diameter [Inch] +
IDENTIFICATION CODE PAG13OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN.
ITEM DESCRIPTION CONTRACTOR'S DATA
REQUIREMENTS
Maximum working pressure [] 15,000
Builded as per rules: API 8C
b. Manual operated Inside BOP make and type +
Manual operated [No] 1 + 1 Spare
For DP sizes [Inch] 5” - 3”½
Inside diameter [Inch] 3” 1/16
Outside Diameter [Inch] +
Maximum working pressure [PSI] 15,000
Builded as per rules: API 8C
B.4.4.2 Top Drive Pipe Handler System
Unit fitted with pipe handler for make up and break out +
[Yes/No]
Make +
Type +
Maximum Break-Out Torque [ft.lbs] 85.000
NOTE: Copy of manufacturer drawings of line components and calculations on load capacity of shaft to be submitted.
B.4.4.3 Top Drive Saver sub
For Dp’s 5” and 5 ½’’
Quantity 4 NEW
Top connection type +
Bottom connection type NC 50
Builded as per rules: API 8 C
Top Drive Saver sub (continue )
For Dp’s 3” ½
Quantity 4 NEW
Top connection type +
Bottom connection type NC 38
Builded as per rules: API 8 C
B.4.4.4 Top Drive Wire Line accessories
Accessories Kit Required
Spare parts list for one year activity Required
B.4.4.5 Top Drive Link Elevators [refer to Item E.2.4]
IDENTIFICATION CODE PAG14OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN.
ITEM DESCRIPTION CONTRACTOR'S DATA
REQUIREMENTS
B.4.4.6 Top Drive Video Camera
Video Camera installed at derrick-man platform, including pan and tilt unit complete with cable, hoist, sheaves, ecc.
two monitors, of which one at the driller's doghouse, and specific spare.
TV camera:
Quantity [No] Required
Make +
Type +
Quantity of TV monitors [No] 2
Monitors Make +
Monitors Type +
Located at +
Certified to be installed in hazardous area Requested
IDENTIFICATION CODE PAG15OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

B.5 Hoisting Winches


B.5.1 Rig Floor Hoisting Winches
Quantity 3 ( three)
Make +
Type (Air or Hydraulic) +
Rated Capacity [MT] 5/6
Wire diameter [Inch] +
Automatic brakes [Yes/No] Required
Overload protection [Yes/No] Required
Safety Guard [Yes/No] Required
Automatic spooling [Yes/No] Required
Certified man-riding [Yes/No] Required
B.5.2 Rig Floor Hoisting Winch man lift
Quantity 1 (one)
Make +
Type (Air or Hydraulic) +
Rated Capacity [MT] 1.5
Wire diameter [Inch] +
Automatic brakes [Yes/No] Required
Overload protection [Yes/No] Required
Safety Guard [Yes/No] Required
Automatic spooling [Yes/No] Required
Certified man-riding [Yes/No] Required
B.5.3 Main Deck Hoisting Winches
Quantity 2 (Two)
Make +
Type (Air or Hydraulic) +
Rated Capacity [MT] 5/6
Wire diameter [Inch] +
Automatic brakes [Yes/No] Required
Overload protection [Yes/No] Required
Safety Guard [Yes/No] Required
Automatic spooling [Yes/No] Required
Certified man-riding [Yes/No] Required
B.5.4 Derrickman Platform Work-Winch
Quantity 1 [one]
Make +
Type (Air or Hydraulic) +
Rated pull Capacity [MT] Required
Safety Guard [Yes/No] Required
Wire diameter [Inch] +
Automatic brakes [Yes/No] Required
Overload protection [Yes/No] Required
B.5.4 Utility Winch
B.5.4.1. Substructure / Moon pool Hoisting Winch
Quantity 3 [three]
Make +
IDENTIFICATION CODE PAG16OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

Type (Air or Hydraulic) +


Rated Capacity [MT] 4/6
Wire diameter [inch] +
Automatic brakes [Yes/No] Required
Overload protection [Yes/No] Required
Safety Guard [Yes/No] Required
Automatic spooling [Yes/No] Required
Automatic spooling [Yes/No] Required

B.5.4.2. BOP Handling System inside The Substructure (See D.1.5 - K.1.4 )

Quantity 1 [one] Set


Make +
Type (Air or Hydraulic) +
Rated Capacity (to handle BOP stack in 1 one piece ) Tenderer to specify BOP
Stack MT
Wire / chain diameter [Inch] +
Max. vertical traveling stroke [ft] Required
Max. Horizontal traveling stroke [ft] Required
Handling system certified [Yes/No] Required

1.2 POWER SUPPLY SYSTEM.


COMPANY MIN. CONTRACTOR'S
ITEM DESCRIPTION
REQIREMENTS DATA
C. Power Supply Systems
All installed electrical equipment shall be in accordance with the MODU Code and I.P. code, (where the two conflict then the higher
standard shall apply), selected for Division I or Division II areas, as the case may be and also taking into account the tropical marine
environment under which the equipment shall continually operate. Only cranes and cement pumps may have independent power
source. Contractor to have and maintain for inspection on request, engine logbooks detailing dates, type and frequency of
maintenance/overhaul schedules.
C.1 Rig Power Plant
Complete power system comprising of diesel driven generator sets supplying DC and AC power at SCR system
Minimum power available for drilling operations [KW/HP] 8,000 HP ( 6 x 1500 HP)
C.1.1. Engine Room
Engine room type Fire proof
Engine room location +
C.1.2. Diesel Engines
Quantity 6
Make +
Type +
Continuous power [HP] 1,500
At rotation speed of [RPM] +
Water proof type [Yes/No] Required
Air intake point outside hazardous area [Yes/No] Required
IDENTIFICATION CODE PAG17OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQIREMENTS DATA
Exhaust discharge outside hazardous area [Yes/No] Required
C.1.3 Generator
In the drilling mode sufficient power must be available to control and power simultaneously three mud pumps and TDS / Rotary
Table both at full load and the drawworks at half load with one diesel engine generator as a stand-by.
AC or DC +
Quantity [No] 6
Make +
Type +
Continuous power of each [KVA] +
At a rotation speed of [RPM] +
Frequency (if AC) [Hz] 50/60
Output Voltage [Volts] +
C.1.4 AC VFD
Quantity of VFD Drives [No] 7
Make +
Type +
Maximum continuous power [KW / HP] +
VFD Output Amperage [Amps] +
VFD Output Voltage [Volts] +
No. of motors that can run simultaneously + Kw each
Contractor to submit power systems general line diagram of power distribution system as required.
C.1.5 Transformer System
Quantity [No] +
Make +
Type +
Maximum continuous power [kW] +
Maximum Output Voltage [Volts] +
Maximum Output Amperage [Amps] +
Frequency [Hz] +
Transformer System (Continue)
Quantity [No] +
Make +
Type +
Maximum continuous power [kW] +
Maximum Output Voltage [Volts] +
Maximum Output Amperage [Amps] +
Frequency [Hz] +
COMPANY MIN. CONTRACTOR'S
ITEM DESCRIPTION
REQIREMENTS DATA
C.1.6 Emergency Shutdown System
Required emergency shutdown switches for the complete Required
power system (AC and DC), located at the driller's position
and Rig Manager office.
Shut down switch for complete power system [Yes/No] Yes
Located at: Rig Floor [Yes/No] YES
Located at: VFD [Yes/No] +
IDENTIFICATION CODE PAG18OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQIREMENTS DATA
Shut down switch for DC power [Yes/No] +
Located at: Rig Floor [Yes/No] +
Located at: VFD [Yes/No] +
Shut down switch for AC power [Yes/No] +
Located at: Rig Floor [Yes/No] +
Located at: VFD [Yes/No] +
C.1.7 Auxiliary Power Supply Required
Provision for power supply for third party equipment
(Mud Logging, Centrifuges, cutting treatment, directional unit, etc.)
Power available for third party Equipments [kW] +
Output Voltage [Volt] +380
Output Amperage [Amps] As requested
Frequency [Hz] +50
COMPANY MIN. CONTRACTOR'S
ITEM DESCRIPTION
REQUIREMENTS DATA
C.2 Emergency Generator Requested
One (1) – Diesel engine, independent battery or black start and all standard equipment, spark arresting muffler, driving one
generator, marine type, which starts automatically on tripping of the main A.C. circuit breakers. Battery sets and chargers
shall be in a well-ventilated area. The supplied power to be continuously available and capable of simultaneously operating
main users as specified below.
Location +
Output Voltage [Volt] +
Output Amperage [Amps] +
Frequency [Hz] +
Starting automatically in case of main power failure [Yes/No] YES
Start systems Tender to describe
C.2.1 Diesel Engine
Continuous Output Power [hp] 1500
At a rotation speed of [RPM] +
Manufacturer +
Type +
At rotation speed of [RPM] +
Water proof type [Yes/No] Required
Air intake point outside hazardous area [Yes/No] Required
Exhaust discharge outside hazardous area [Yes/No] Required
C.2.1.1 Diesel Engine Fuel tank
Fuel tank capacity [bbls] +
Time of feeding of all main users specified below 24 Hr Minimum
C.2.2 AC Generator
Manufacturer +
Make and Type +
Quantity [No.] 1
Continuous output power [KW / HP] 900/1200
At a rotation speed of [RPM] +
Voltage [Volt] +
Frequency [Hz] +
IDENTIFICATION CODE PAG19OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQIREMENTS DATA
Main Users: +
a) Emergency Lighting REQUIRED
At every Embarkation Station [Yes/No] Yes
In Living Quarters [Yes/No] Yes
On Helicopter deck [Yes/No] Yes
Escape way [Yes/No] Yes
On Rig Floor [Yes/No] Yes
Around diesel Engine plant [Yes/No] Yes
In SCR Control Rooms [Yes/No] Yes
On Mud Barge Yes
Data unit Yes
Mud pit Yes
On Mast [Yes/No] Yes
b) Navigation Signals REQUIRED
Navigation Lights [Yes/No] Yes
Sound Signals [Yes/No] Yes
Red light On top of mast [Yes/No] Yes
c) Communication System REQUIRED
Radio- telecommunications [Yes/No] Yes
Internal telecommunication equipment [Yes/No] Yes
d) Equipment related to Drilling Operations REQUIRED
BOP control system [Yes/No] Yes
BOP accumulator recharging pump [Yes/No] Yes
e) Safety Monitoring and alarm system REQUIRED
Fire Monitoring and alarm system [Yes/No] Yes
Gas Monitoring and alarm system [Yes/No] Yes
H2S Monitoring and alarm system [Yes/No] Yes
d) Other Safety Systems. REQUIRED
Electrical air compressors [Yes/No] Yes
One mud transfer pump [Yes/No] Yes
Co man office Yes
OIM office Yes
Other Users [Yes/No] Yes

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
C.3. Batteries Powered / Battery System REQUIRED
The supplied power to be continuously available and capable
of simultaneously operating main users as specified below
Location +
Starting automatically in case of main power failure [Yes/No] Required
Start systems +
Main Users Connected with:
IDENTIFICATION CODE PAG20OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
a) Emergency Lighting
At every Embarkation Station [Yes/No] +
In Living Quarters (escape way) [Yes/No] +
On Helicopter deck [Yes/No] +
Around diesel Engine plant (escape way) [Yes/No] +
In Control Rooms [Yes/No] +
In all other essential areas [Yes/No] +
b) Navigation Signals
Navigation Lights [Yes/No] +
Sound Signals [Yes/No] +
Red light On top of mast [Yes/No] +
c) Communication System
Radio- telecommunications [Yes/No] +
Internal telecommunication equipment [Yes/No] +
d) Equipment related to Drilling Operations
BOP control system [Yes/No] +
e) Safety Monitoring and alarm system
Fire Monitoring and alarm system [Yes/No] Required
Gas Monitoring and alarm system [Yes/No] Required
H2S Monitoring and alarm system [Yes/No] Required
f) Time of feeding of all the above Users 6 Hr min.
IDENTIFICATION CODE PAG21OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
C.4 Electric Motors.
C.4.1 Motors
Manufacturer +
Type +
Quantity [No.] +
Maximum Output Power each [KW/HP] +
C.4.2 Drilling Equipment Motors
C.4.2.1 Drawworks
Manufacturer +
Type +
Quantity [No.] 3
Maximum Output Power each [HP] 1,000
Location +
C.4.3.2 Each Mud Pumps
Manufacturer +
Type +
Quantity [No.] Two (2)
Maximum Output Power each [HP] 800
C.4.3.3 Rotary Table
Manufacturer +
Type +
Gear ratio High/low speed +
Gear box single or dual speed +
Quantity [No.] (one) 1
Maximum Output Power each [HP] 1.000
C.4.3.4 Top Drive
Manufacturer +
Type +
Motor /main shaft gear ratio +
Gear box single or dual speed +
Quantity [one] 1
Maximum Output Power each [Hp] 1000
C.4.3.5 Cementing Unit (Contractor Supplay)
Manufacturer +
Type +
Quantity [No.] +
Maximum Output Power each [KW/HP] +
C.4.4 Air Compressor Motors
Manufacturer +
Type +
Quantity for rig use [No.] [three] 3
Electrical – diesel engine +
Working pressure (Psi ) 125-150
Rated flow capacity ( scfm) 450
Maximum Output Power each [KW/HP] +
C.4.4a Air Compressor Motors
IDENTIFICATION CODE PAG22OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
Manufacturer +
Type +
Quantity for independent bulk system use [No.] [Two] 2
Electrical – Diesel engine
Working pressure (Psi ) +
Rated flow capacity ( scfm) +
Maximum Output Power each [KW/HP] +
C.4.5 Unit Service And Lighting
Maximum Total Power [kW] +

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
C.5 Electric Auxiliary Equipment
C.5.1 Water Distillation Unit and Water filter Unit with Sterilizer system (Ref K.8.1) REQUIRED
Manufacturer +
Type +
Quantity [No.] +
Min Output Water production [m3/day] 25 ( Tuentyfive)
C.5.2 Boilers REQUIRED
Manufacturer +
Type +
Quantity [No.] +
Capacity (each/total) +
C.5.3 Air Conditioning REQUIRED
Manufacturer +
Type +
Quantity [No.] +
Capacity each [kW/hr] +
C.5.4 Bulk Fuel Filtration System REQUIRED
Manufacturer Caterpillar or Similar
Type +
Quantity [No.] 1(one)
Min Output Fuel filtered [gpm] 200
Prefilter Element Yes
Coalescer Element Yes
IDENTIFICATION CODE PAG23OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
C.6 Air/Hydraulic Auxiliary Equipment
C.6.3 Rig Service Air System
C.6.3.1 Rig Service Air Diesel Motor System
Rig Air compressors: REQUIRED
Quantity [No.] (One)1
Make +
Model +
Rated flow capacity [scfm] 450
Air vessel total capacity [scfm] 1350
Working pressure [PSI] 125-150
Powered by Diesel motor +
- Make +
- Type +
Maximum continuous power [KW or HP] +
C.6.3.2 Rig Service Air Electrical System REQUIRED
Rig Air compressors:
Quantity [No.] (two) 2
Make +
Model +
Rated flow capacity [scfm] 450
Air vessel total capacity [scfm] 1350
Working pressure [PSI] 125-150
Powered by electric motor +
- Make +
- Type +
C.6.3.3 Rig Air Dryers REQUIRED
Quantity [No.] [one] 1
Make +
Type +
Capacity [cf] As Required
Maximum service pressure [PSI] +
C.6.3.4 Rig Air Vessel REQUIRED
Quantity [No.] +
Capacity [cf] AS Required
Maximum service pressure [PSI] +
Location +
Certified by Requested
C.6.3.5 Bulk Service Air Independent Electrical System REQUIRED
Bulk Air compressors:
Quantity [No.] 2 (Two)
Make +
Model +
Rated flow capacity [scfm] 450
Air vessel total capacity [scfm] 1350
IDENTIFICATION CODE PAG24OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
Working pressure [PSI] 125-150
Powered by electric motor +
- Make +
- Type +
C.6.3.6 Bulk Air Dryers REQUIRED
Quantity [No.] 1 [one]
Make +
Type +
Capacity [cf] As Required
Maximum service pressure [PSI] +

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
C.7 Electrical Light System
C.7.1 Fixed Lighting System REQUIRED
Lighting around well location [Type/No] +
Lighting around shale shaker area [Type/No] +
Lighting around mud pumps [Type/No] +
Lighting around pipe rack area [Type/No] +
Lighting on mud tanks [Type/No] +
Lighting on rig tanks [Type/No] +
Lighting on derrick-man platform [Type/No] +
Lighting along the mast [Type/No] +
Red lights on top of mast [Type/No] +
C.7.2 Portable flood lights REQUIRED
Quantity 12
Type Explosion Proof Requested
IDENTIFICATION CODE PAG25OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

1.3 BLOWOUT PREVENTION EQUIPMENT AND ACCESSORIES.


COMPANY MIN. CONTRACTOR'S DATA
ITEM DESCRIPTION
REQUIREMENTS
D. Well Control Equipment
D.1 Blow Out Prevention Equipment And Accessories.
All equipment shall be in accordance with the standards specified in Applicable Standards, Part 2, Annex A.
General Data 30” Diverter
BOP stack size 30” Inch x 500psi
DIVERTERi
Builded as per: API 16A
Last BOP periodical inspection [Date] Date
Last BOP Overhaul Inspection [Date] Date
Spare BOP stack [Yes/No] Yes/No
D.1.1 Diverter BOP 30” 500 Psi WP System
Model +
Size [Inch] 30”
Working Pressure [PSI] 500
OD outlets [Inch] 12
Insert packer size [Inch] 29”1/2
Top connection Type and Size [ - / Inch] STUDDED 29”1/2
Bottom connection Type and Size [Inch] FLANGED 29”1/2
D.1.1.1 Diverter Spool
Quantity [No] +
Top connection Type and Size [Inch] FLANGED 29”1/2
Bottom connection Type and Size FLANGED 29”1/2
Last Overhaul Inspection [Date] +
Outlets size & Wp [inch – psi] 12” – 5.000 FL
Outlets [No] [two] 2

D.1.1.2 Diverter Flow Lines


Quantity [No] [two] 2
Type Steel rigid
Flow lines size running from diverter to valves [Inch] +
Flow lines size running from valves to end of lines [Inch] +
Diverter lines running to Starboard +
Diverter lines running to Portside +
Control valves Type and Make Ball Type
Valves size [inch – psi] 12” – 2.000
Remote controlled panel automatic open flow line & close Yes
diverter from rig floor
D.1.1.3 Diverter Spool
Quantity [No] 1 ( one)
Top connection Type and Size [Inch] FLANGED 29”1/2
Bottom connection Type and Size 30” x 1” Conductor Pipe
Weld
Last Overhaul Inspection [Date] +
IDENTIFICATION CODE PAG26OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.1.2 General Data Nominal 20” BOP Stack
BOP stack size 21” ¼ - 5.000
Builded as per: API 16A
Last BOP periodical inspection [Date] Requested
Last BOP Overhaul Inspection [Date] Requested
Spare BOP stack [Yes/No] Yes/No
D.1.2.1 BOP Stack 21”¼ 5.000 Psi WP
One 21” ¼ BOP stack, 5,000psi WP comprising: REQUESTED
a) One adapter to fit the well. +
b) Two ram type preventers with ram locks. +
c) The Top and Bottom Rams shall be suitable to fit pipe rams +
(standard or variable) and the rams shall be capable to
shearing rig’s drill pipe.
The ram type preventer to be provided with two side outlets. In total min two are to be blanked off.
- Two 4”1/16 dedicated choke and two 2"1/16 dedicated kill +
line outlets with each one hydraulic and one manual
valves, solid block;
BOP control system (with dedicated UPS, if applicable) state reaction time in seconds (time between
operating control unit and BOP closed).
-Annular [Sec.] +
-Ram [Sec.] +
Stack complete with guide frame, pick-up attachment and +
transport base
One test stump for testing BOP stack +
Up-dated drawing of BOP stack and control system to be +
submitted
D.1.2.2 20” Bag preventer
Make +
Model +
Size [Inch] 20”
Working pressure [psi] 5.000
H2S service [Yes/No] +
Top connection type STUDDED
Top connection size [inch] 21” ¼
Working pressure [psi] 5.000
Bottom connection type FLANGED
Bottom connection size [inch] 21” ¼
Working pressure [psi] 5.000
Ring Joint type and No +
Built as per rules: API 16A
IDENTIFICATION CODE PAG27OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.1.2.3 20” Ram preventer
Make +
Model +
Size [inch] 21” ¼
Single/Double DOUBLE
Working pressure [psi] 5.000
H2S service [Yes/No] Requested
Ram lock Type +
Top connection type FLANGED
Top connection size [inch 21” ¼
Working pressure [psi] 5.000
Bottom connection type FLANGED
Bottom connection size [inch] 21” ¼
Working pressure [psi] 5.000
Ring Joint type and No +
Outlets [No] [two] 2
Outlets connection Type FLANGED
Outlets connection size [inch] 3” 1/16
Working pressure [psi] 5.000
Shear Rams can be installed in any Rams cavity [Yes/no] +
Built as per rules: API 16A
D.1.2.4 Pipe Rams Available (incl. Spares as required)
Shearing blind rams sets quantity [No] [two]2
5" DP rams sets quantity [No] [three]3
13”3/8 rams sets quantity [No] [three]3
16” rams sets quantity [No] [one]1
18 5/8” rams sets quantity [No] [one]1
D.1.2.5 Drilling – Spacer – Riser spool
Quantity +
Make +
Type +
Size [inch] 21” ¼
Working pressure [psi] 5.000
H2S service [Yes/No] yes
Last Overhaul Inspection [Date] Requested
Top connection type FLANGED
Top connection size [inch] 21” ¼
Working pressure [psi] 5.000
Bottom connection type FLANGED
Bottom connection size [inch] 21” ¼
Working pressure [psi] 5.000
Ring Joint type and No +
Outlets [No] 2 (Two)
Outlets connection Type FLANGED
IDENTIFICATION CODE PAG28OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
Outlets connection size [No] 4” 1/16
Working pressure [psi] 5.000
Total Height [Ft] +
IDENTIFICATION CODE PAG29OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.1.3 General Data 13”⅝ 15.000 Psi BOP Stack
BOP stack size 13”⅝ 15,000psi WP
H2S Service
Built as per: API 16A
Last BOP periodical inspection Date Requested
Last BOP Overhaul Inspection Date Requested
Spare BOP stack Requested
D.1.3.1 BOP Stack 13” ⅝ 15.000 Psi WP
Requested one 13” ⅝ BOP stack, 15,000psi WP - H2S service comprising:
a) One adapter to fit the well. Yes/No
b) Two ram type preventers with ram locks. Yes/No Yes
c) One ram type preventers with ram locks. Yes/No Yes
The Top and Bottom Rams shall be suitable to fit pipe rams
(standard or variable) and the rams shall be capable to shearing
rig’s drill pipe. Yes/No Yes
Each ram type preventer to be provided with two side outlets.
In total min two are to be blanked off.
d) Two 3”1/16 dedicated choke and two 2"1/16 dedicated kill line
outlets with each one hydraulic and one manual valves, solid block;
(Two outlets each ram configuration:)
e) BOP control system (with dedicated UPS, if applicable) state
reaction time in seconds
(time between operating control unit and BOP closed).
Annular (Sec) +
Ram (Sec) +
f) Stack complete with guide frame, pick-up attachment and
transport base. Yes/No Yes
g) One test stump for testing BOP stack Yes/No Yes
h) Up-dated drawing of BOP stack and control system to be
submitted. Yes/No Yes
D.1.3.2 13” ⅝ 10K Bag preventer
Make +
Model +
Size [inch] 13” ⅝
Working pressure [psi] 10.000
Last Overhaul Inspection [Date] Requested
H2S service [Yes/No] +
Top connection type 13” ⅝
Top connection size [inch] BOP Stack
Configuration
Working pressure [psi] 10.000
Bottom connection type Flanged
Bottom connection size [inch] BOP Stack
Configuration
Working pressure [psi] BOP Stack
Configuration
IDENTIFICATION CODE PAG30OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
Ring Joint type and No +
Built as per rules: API 16A

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.1.3.3 13” ⅝Ram preventer
Quantity [No] 2 ( Two)
Make +
Model +
Size [inch] 13” ⅝
Double Double
Working pressure [psi] 15.000
H2S service [Yes/No] +
Last Overhaul Inspection [Date] Requested
Ram lock Type +
Top connection type Flanged
Top connection size [inch] 13” ⅝
Working pressure [psi] 15.000
Bottom connection type Flanged
Bottom connection size [inch] 13” ⅝
Working pressure [psi] 15.000
Ring Joint type and No +
Outlets [No] 4
Outlets connection Type FLANGED
Outlets connection size [inch] 3” 1/16
Working pressure [psi] 15.000
Shear Rams can be installed in any Rams cavity [Yes/No] +
Built as per rules: API 16A
IDENTIFICATION CODE PAG31OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.1.3.4 13” ⅝Ram preventer
Quantity [No] 2(Two) if one
double is not
available
Make +
Model +
Size [inch] 13” ⅝
Singe Single
Working pressure [psi] 15.000
H2S service [Yes/No] +
Last Overhaul Inspection [Date] Requested
Ram lock Type +
Top connection type Flanged
Top connection size [inch] 13 ⅝
Working pressure [psi] 15.000
Bottom connection type Flanged
Bottom connection size [inch] 13 ⅝
Working pressure [psi] 15.000
Ring Joint type and No +
Outlets [No] 4
Outlets connection Type FLANGED
Outlets connection size [inch] 3” 1/16
Working pressure [psi] 15.000
Shear Rams can be installed in any Rams cavity [Yes/No] +
Built as per rules: API 16A
IDENTIFICATION CODE PAG32OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.1.3.5 Pipe Rams Available (incl. Spares as required)
Shearing blind rams sets quantity Two (2)
2" 3/8 rams sets quantity Two (2)
2" 7/8 rams sets quantity Two (2)
3" 1/2 DP rams sets quantity Four (4)
5" DP rams sets quantity Four (4)
7" DP rams sets quantity Two (2)
9"5/8 DP rams sets quantity Two (2)
2" 7/8 – 5” Variable rams sets quantity One (1)
41/2 " – 7” Variable rams sets quantity One (1)
2” 3/8 x 2” 3/8 Dual rams set quantity Two (2)
2” 7/8 x 2” 7/8 Dual rams set quantity Two (2)
3” ½ x 3” ½ Dual rams set quantity Two (2)
2” 7/8 – 3” ½ Dual rams set quantity Two (2)
Ram packer Type Oil Resistant

D.1.3.6 13” ⅝ Drilling – Spacer – Riser spool


Quantity [No] [One] 1
Make +
Type +
Size [inch] 13” ⅝
Working pressure [psi] 15.000
Last Overhaul Inspection [Date] Requested
H2S service +
Top connection type Flanged
Top connection size [inch] 13” ⅝
Working pressure [psi] 15.000
Bottom connection type Flanged
Bottom connection size [inch] 13” ⅝
Working pressure [psi] 15.000
Ring Joint type and No +
Outlets [No] 2
Outlets connection Type Flanged
Outlets connection size [inch] 3” 1/16
Working pressure [psi] 15.000
Total Height [ft] +
Notes For Used Equipment:
a) Spacer and drilling spool to be inspected by Tuboscope, Vetco or equivalent. All pipe
welds (circumferential or longitudinal) and coupling welds are to be ultrasonically or
magnetic particle inspected. Spot checks are to be made on used spacer and drilling
spool to determine wall thickness and to verify whether here has been any excessive
internal wear. All couplings are to be cleaned and inspected. Yes
(Yes/No).
The frequency of inspection must be as per API regulation.
IDENTIFICATION CODE PAG33OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
b) Choke and kill lines to be pressure tested certificate as per API regulation
(Yes/No).

c) Used blow-out preventers to be completely dismantled, inspected by a Company approved


established inspection party and re-assembled. They are to be shop tested by blanking off
the top and bottom and the body tested to the original body test pressure (normally 1.5
time the WP). Rams and bag type preventer to be tested to their working pressure.
(Yes/No).
The frequency of inspection must be as per API regulation.

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.1.4 BOP Stack Control Hose
D.1.4.1 BOP Rigid Control hose
Quantity +
Make +
Type +
Size [inch] +
Working Pressure [psi] 15000
Spare connector same type +
D.1.4.2 BOP Flexible Control hose
Quantity [No] +
Make +
Type +
Size [inch] +
Single or double +
Size and working Pressure [inch/psi] 15000
Note: All Control Hose should be certified Fire Resistant as per API 16 C
D.1.5 BOP Stack Handling System (Ref. B.5.4.2 and K.1.4)
Description: Required
General remarks:
1. All necessary clamps, bolts, nuts and gaskets for above BOPs
(Yes/No)
2. Submit drawing giving detailed data on pressure ratings and dimensions of BOP stacks
and its components
(Yes/No)
3 Contractor to supply hydraulic/air power operated “SLEC OR TORQUE” wrenches
complete with Torque indicator and sockets for BOP bonnet and flange bolts. Sockets to
be supplied for all size of nuts
(Yes/No)
4 Contractor to supply complete set of Hammer wrenches for BOP bonnet and flange bolts
and for all size of nuts.
(Yes/No)
IDENTIFICATION CODE PAG34OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.2 BOP Control System
- One automatic pump accumulator unit with control manifold, two air/driven pumps (50:1 ratio), two 22,5 kW electrically
driven pump, the fluid reservoir.
- The unit to be capable of closing, opening and closing again all preventers and kill and choke hydraulic valves without
recharging and holding them closed against rated working pressure of the preventers as per API requirement
- The Bop Control system has to be conforming to the Api specifications.
D.2.1 General Data
BOP Control System (Hydraulic-Electric/Pneumatic) (Yes/No) Yes
Pressure assisted (if hydraulic) (Yes/No) Yes
D.2.2 Accumulator Unit [As per AGIP Well Control Police Req.]
Make Koomey or Equivalent
Model/type +
Last Overhaul Inspection [Date] Required
Installation site +
Oil reservoir capacity [litres] +
Maximum working pressure [psi] 3.000
No. of bottles installed / Capacity each bottle [No / gal] +
Total bottles capacity [gal] +
Bottle working pressure [psi] 3.000
D.2.3 Triplex Pumps
Quantity Two (2)
Make / Type +
Model +
Each driven by motor of [KW/Hp] +
Flow rate of each pump [gpm] +
At maximum operating pressure [psi] 3.000
Emergency electric power supplied from (specify sources): Requested
D.2.4 Air Pumps (with back up air supply system with dedicated Diesel Air Compressor)
Quantity Two (2)
Make / Type +
Model +
Flow rate of each pump [gpm] +
At maximum operating pressure [psi] +
Air supplying flow rate [gpm] +
Air supplying pressure [psi] +
Air supplied from (specify source(s)) +
D.2.5 Accumulator Unit control manifold
Four-way control valves Minimum Nine (9)
Manifold pressure regulator type +
Bag BOP pressure regulator type +
1,500 - 3,000 PSI by-pass valve type +
D.2.6 Driller's Control Panel
Graphic control panel at driller's position (all electrical part certified explosion proof) showing BOP functions with controls for
the following functions of the BOP stack:
- Make / Type Yes
- bag type BOP; [Yes/No] Yes
IDENTIFICATION CODE PAG35OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
- two ram type BOPs; [Yes/No] Yes
- two ram type BOPs; [Yes/No] Yes
- up kill and choke line valves [Yes/No] Yes
- down kill and choke line valves [Yes/No] Yes
- light for activated functions [Yes/No] Yes
- air function valves [Yes/No] Yes

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.2.6.1 Low Pressure Alarm Signal Requested
D.2.6.2 Control Panel Alarms Requested
Make +
Model +
Low oil accumulator pressure warning [Yes/No] +
Low oil reservoir level warning [Yes/No] +
Low rig air pressure warning [Yes/No] +
Pressure regulator for bag [Yes/No] +
D.2.7 Remote Control Panel
The remote panel is to operate the main closing unit valves direct and not through the rig floor unit so that should the latter
be destroyed by a blow-out and fire the remote unit can still be used. The main closing unit should be located in a safe area.
Quantity [No] 1 (one)
Make +
Model +
Location site +
With lights for BOP and valves status [Yes/No] Yes
With pressure gauges [Yes/No] Yes
D.2.8 Graphic Panel
Make +
Model +
Graphic display of BOP configuration [Yes/No] Yes
With indicator lights to show status of BOP position in Yes
Toolpusher’s office [Yes/No]
IDENTIFICATION CODE PAG36OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.3 Kill Manifold
D.3.1 Kill manifold 15.000 Psi description
Make +
Type +
Location +
Size [inch] 3
Working pressure [psi] 15.000
Valves [No] 8
Valves make +
Valves Type +
Valves Size [inch] +
Four pressure gauge ports (15,000psi) Required as needed
Nr 2 Outlet Connected with standpipe Required
Nr 2 Outlet Connected with well ( bop) +
Nr 2 Outlet Connected with Cement unit
Nr 2 Outlet Weco Union ready to connected for contingency +
D.3.2 Kill lines running Stand pipe to Kill Manifold and well head
Quantity Two (2)
Make +
Type Steel Rigid
Inside Size [inch] 2” 1/16
Working Pressure [psi] 15,000
H2S Service [Yes/No] yes
D.3.3 Reverse Circulating line running from Rig Floor to Choke Manifold
Quantity 1 ( one)
Inside Size [inch] 2” 1/16
Working Pressure [psi] 15,000
H2S Service [Yes/No] Yes
Rig floor end connection type Flanged
With pressure gauges [Yes/No] Yes
IDENTIFICATION CODE PAG37OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.4 Choke/Kill System
D.4.1 Choke Manifold
One 15,000psi WP choke manifold. Drawing giving detailed data on pressure ratings and dimensions of the choke manifold to
be submitted.
Make / Assembled +
Size [inch] 4” 1/16
Working Pressure [psi] 15.000
H2S service [Yes/No] +
Last Overhaul Inspection [Date] Requested
Model +
Quantity of choke valves [No] +
Inlet points [No] 2 ( Two)
Built as per rules: API 16C
Equipped with temperature sensor Yes/No
Equipped with pressure sensor Yes/No
All connection ends glanged
D.4.2 Power chokes
Chokes sizes [inch] 4” 1/16
Working Pressure [psi] 15,000
Make Cameron or Equivalent
Type Drilling Choke positive
Quantity [No] Two (2)
D.4.3 Manual adjustable chokes
Chokes sizes [inch] 4” 1/16
Working Pressure [psi] 15,000
Make Cameron or Equivalent
Type Drilling Choke positive
Quantity [No] Two (2)
Stand pipe pressure gauge in front off each manual choke Two (2)
D.4.4 Valve Upstream each choke valve
Hydraulic Operator Quantity [No] 2
Manual operator Quantity {No] 3
Make type Cameron F or equivalent
Size [inch] 3” 1/16
Working pressure [psi] 15,000
D.4.5 Choke Manifold Outlet Connections
Inside size [inch] 4” 1/16
Working Pressure [psi] 10,000
Outlet line to Mud Gas separator One (1)
Type and Size [inch] 4” 1/16
Working Pressure [psi] 10,000
Outlet line to Flare Line One (1)
Type and Size [inch] 4” 1/16
Working Pressure [psi] 10,000
Outlet line to Waste barge One (1)
Type and Size [inch] 4” 1/16
IDENTIFICATION CODE PAG38OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
Working Pressure [psi] 10,000
Outlet line to Shale shaker One (1)
Type and Size [inch] 4” 1/16
Working Pressure [psi] 10,000
Outlet line spare One (1)
Type and Size [inch] 4” 1/16
Working Pressure [psi] 10,000
Each with exclusion valve [Yes/No] Yes
Type and Size [inch] 4” 1/16
Working Pressure [psi] 10,000

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.4.6 Choke Manifold Outlet Flare lines
Quantity One (1)
Lines OD size [inch] +
Lines ID size [inch] +
Working Pressure [psi] 10.000
Lines length [ft] +
Testing valve +
Remote Ignition system +
Ignition system type +
D.4.7 Choke Manifold Instrumentation
Quantity of pressure sensors outlets Four (4)
Size and working pressures [inch/psi] 15,000
Quantity of pressure transmitters outlets Four (4)
Size and working pressures [inch/psi] +
Mud Logging pressure outlet (size and working pressure) 15,000
[inch/psi]
Temperature sensor outlets [No.] Yes
Independent exclusion valve [Yes/No] Yes
D.4.8 Choke Manifold Remote Control Panel (one for each power choke) Requested
Location: Rig floor
Make +
Type +
Power choke Open/Close Hydraulic Operated [Yes/No] +
Power choke Open/Close displays [Yes/No] +
Pressure displays (Quantity and Range) [No. / psi] +
Mud Pump Stroke counters one for each pump [Yes/No] +
Mud Pump Stroke Totalizes one for each pump [Yes/No] +
Emergency extra Nitrogen bottles Two (2)
IDENTIFICATION CODE PAG39OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.5 Surface BOP Test and Wellhead facilities.
D.5.1 Hydraulic BOP Test Stump Requested
Size / Pressure rating [inch/psi] 20” – 5.000
Size / Pressure rating [inch/psi] 13” ⅝ – 15.000
D.5.1.1 Power Operator
Quantity Two(2)
Make +
Model +
Pressure rating [psi] 15,000
High flow rate [Gal/min] +
Low flow rate [Gal/min] +
Chart recorder Requested
D.5.1.2 Manual operator
Quantity One (1)
Make +
Model +
Pressure rating [psi] 15,000
High flow rate [Gal/min] 4-5
Low flow rate [Gal/min] 0,25
Different connection type +
High pressure flexible line length and WP ( psi ) 10 x 15000
Chart recorder [Yes/No] Yes
IDENTIFICATION CODE PAG40OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.6 Spool Adapters
D.6.1 Adapter spool for Casing head 11” – 15K to 13” ⅝ BOPREQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 11”
Bottom connection working pressure [psi] 15.000
D.6.2 Adapter spool for Casing head 11” – 10K to 13” ⅝ BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 11”
Bottom connection working pressure [psi] 10.000
D.6.3 Adapter spool for Casing head 11” - 5K to 13” ⅝ BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 11”
Bottom connection working pressure [psi] 5.000
D.6.4 Adapter spool for Casing head 11” - 3K to 13”5/8 BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 11”
Bottom connection working pressure [psi] 3.000
D.6.5 Adapter spool for Casing head 7 1/16” – 15K to 13” ⅝ BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 7” 1/16
Bottom connection working pressure [psi] 15.000
D.6.6 Adapter spool for Casing head 7 1/16” - 10K to 13” ⅝ BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 7” 1/16
Bottom connection working pressure [psi] 10.000
D.6.7 Adapter spool for Casing head 7”1/16 - 5K to 13” ⅝ BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
IDENTIFICATION CODE PAG41OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 7” 1/16
Bottom connection working pressure [psi] 5.000
D.6.8 Adapter spool for Casing head 7”1/16 - 3K to 13” ⅝ BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] + One (1)
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 7” 1/16
Bottom connection working pressure [psi] 3.000
D.6.9 Adapter spool for Casing head 13”⅝ -10K to 13” ⅝ BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 13” ⅝
Bottom connection working pressure [psi] 10.000
Note: For NAOC policy to provide at No 1 Adapter spool spare for each connection

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.6.10 Adapter spool for Casing head 13”⅝ - 5K to 13” ⅝ BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 13” ⅝
Bottom connection working pressure [psi] 5.000
D.6.11 Adapter spool for Casing head 13” ⅝ - 3K to 13”⅝ BOP REQUESTED
Type Studded or Flanged FLANGED
Quantity [No] [see Note] +
Top connection size [inch] 13” ⅝ BOP
Top connection working pressure [psi] 15.000
Bottom connection size [inch] 13” ⅝
Bottom connection working pressure [psi] 3.000
D.6.12 Adapter spool for Casing head 20”¾ - 3K to 21”¼ -5 k BOP REQUESTED
Quantity [No] [see Note] +
Top connection size [inch] 21” ¼ BOP
Top connection working pressure [psi] 5.000
Bottom connection size [inch] 20” ¾
Bottom connection working pressure [psi] 3.000
H2S service [Yes/No] yes
Note: For NAOC policy to provide at No 1 Adapter spool spare for each type YES YES/NO
IDENTIFICATION CODE PAG42OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.7 Choke and Kill lines and valves to BOP Stack
D.7.1 Kill Valves Hydraulic Operator
Quantity Two (2)
Make +
Type +
Connection type Flanged
Size [Inch] 4” 1/16
Working Pressure [psi] 15,000
D.7.2 Kill Valves Manual Operator
Quantity Two (2)
Make +
Type +
Connection type Flanged
Size [inch] 4” 1/16
Working Pressure [psi] 15,000
D.7.3 Choke Valves Hydraulic Operator
Quantity Two (2)
Make +
Type +
Connection type Flanged
Size [inch] 4” 1/16
Working Pressure [psi] 15,000
D.7.4 Choke Valves Manual Operator
Quantity Two (2)
Make +
Type +
Connection type Flanged
Size [inch] 4” 1/16
Working Pressure [psi] 15,000
IDENTIFICATION CODE PAG43OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.8 Kill and Choke Lines
D.8.1 Kill lines from BOP outlets to kill manifold
Flexible Rigid
Quantity 2 2
Make + +
Type + +
Connection type + +
H2S Service [Yes/No] Requested Requested
Last Overhaul Inspection Date + +
Inside Size [inch] 3” 1/16 3 1/16
Working Pressure [psi] 15,000 15,000
Built as per rules: API 16C Api 16C
D.8.2 Choke lines from BOP outlets
Quantity 2 2
Make + +
Type +
Connection type + +
H2S Service [Yes/No] Requested Requested
Last Overhaul Inspection Date + +
Inside Size [inch] 4” 1/16 4 1/16
Working Pressure [psi] 15,000 15,000
Built as per rules: API 16C Api 16C

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.9 Drop In Valves a. b. a. b.
For nominal Outside Diameter drill pipe [inch] 5 3½
Minimum inside Drill string size [inch] + +
Max. OD of Dart [inch] + +
Make + +
Type + +
DP Connection NC 50 NC 38
Quantity [No] One (1) One (1)
Landing sub Two (2) Two (2)
Retrieving tool + +
IDENTIFICATION CODE PAG44OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.10 Kelly Cocks
D.10.2 Lower Kelly Cocks to have ready on rig floor a. b. a. b.
For nominal Outside Diameter drill pipe [inch] 5 3½
Make + +
Type + +
Connection NC 50 NC 38
Max. OD of Body [inch] + +
Min. ID of Body [inch] + +
Working Pressure [psi] 15,000 15,000
Quantity [No] 3 2
D.10.3 Drill Pipe Fast Shut-Off (Regan or Similar) a. b. a. b.
For nominal Outside Diameter drill pipe [inch] 5 (Contractor’s DP) 3½ (Contractor’s
DP)
Make + +
Type + +
Working Pressure [psi] + +
Quantity [No] [one] 1 [one]1
D.10.4 Inside BOP (Float Type) and Releasing Tool a. b. a. b.
For nominal Outside Diameter drill pipe 5 (Contractor’s DP) 3 ½ (Contractor’s
DP)
Make Gray or Similar Gray or
Similar
Type NC 50 NC 38
DP Connection + +
Quantity [No] [one]1 [one]1

CONTRACTOR'
COMPANY MIN.
ITEM DESCRIPTION UNIT S
REQUIREMENTS
DATA
E.1.10.5 DP’s Circulating Head a. b. a. b.
For DP outside diameter Inch 5 3 1/2
Quantity No. 1 + 1 Spare 1+ 1 Spare
Make + +
Type + +
Valve name Low - Torque Low - Torque
Valve type + +
Valve size Inch 2 2
Valve working pressure PSI 15.000 15.000
Bottom connection NC 50 NC 38
Top connection 2” Weco 1502 2” Weco 1502
IDENTIFICATION CODE PAG45OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION
REQUIREMENTS DATA
D.11 Documentation
Contractor is required to have available on the unit and at shore base the copies of:
a) The manufacturer's complete documentation of the drilling equipment. This must cover
engineering specifications, operating and maintenance instructions, weights and dimensions
spare parts lists. Particular attention is to be paid to ensuring that the manufacturer of the BOP
control equipment produce detailed operating and maintenance instructions for their equipment
including illustrated parts lists with numbers and description of parts.
b) Test and inspection reports:
1) BOP stacks;
2) running and testing tools;
3) Dp’s, DC’s and Drilling Equipment
4) Wellhead Adapters and Equipment;
Company shall have the opportunity to review the final specification selected by Contractor
to ensure the equipment is technically acceptable. MODU Spec. is recognized third party by
Company for BOP inspection.
c) Rig operating manuals covering such subjects as towing, anchoring, stability, safety instruction
and regulations, storm procedure, operating limits, abandonment and Company policy, blow-out
procedures, etc., shall be available on the unit at all times.

1.4 DRILL STRING AND HANDLING TOOLS.


COMPANY MIN. CONTRACTOR'S
ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
E Drill String and Handling Tools
E.1 Tubulars
All tubulars, tools, subs, etc. to be provided with thread protectors.
E.1.1 Kellies (Not requested)
Nominal size OD inch 5” ¼ x 3” 1/4
Quantity No. [one]1
Type +
Total/working length feet +
Connection +
API classification +
Mud Saver sub with 4½" IF connections Yes/No +
One (1) each Kelly cock, upper and lower for each Kelly above. Yes/No +
E.1.2 Kelly Saver Subs(Not requested)
E.1. 1 Kelly Saver Subs For 5¼" Nom. Kelly
Quantity No. Two (2)
Connection +
API classification +
E.1.2.2 Kelly Saver Subs For 4¼" Nom. Kelly (Not requested)
Quantity No. Two (2)
Connection +
API classification +
IDENTIFICATION CODE PAG46OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
E.1.3 Drillpipe (Drillpipe wipers shall be available for each size drill pipe when required)
E.1.3.1 5" Drillpipe a. b. a. b.
Grade S 135
Total length meters 8.000
Range 2
Weight mandatory lb/ft 25.6
Internally plastic coated Yes/No Requested
Tool joint OD inch 6” 5/8
Tool joint ID inch 2.3/4”
Tool joint pin length inch +
Tapered shoulder tool joints deg. 18o
Type of connections NC 50
Type of hard facing None
Actual API classifications (Agip M – 1 – SS – 5710 ) New
Date of last inspection Date Requested
E.1.3.2 3½" OD Drill pipe a. b. a. b.
Grade S 135
Total length meters 8.000
Range 2
Weight lb/ft 15.5
Internally plastic coated Yes/No Requested
Tool joint OD inch 4” 3/4
Tool joint ID inch 2” 7/16
Tool joint pin length inch +
Tapered shoulder tool joints deg. 18o
Type of connections NC 38
Type of hard facing None
Actual API classifications (Agip M – 1 – SS – 5710 ) New
Date of last inspection Date Requested
E.1.3.3 S 135 - 5" OD Drillpipe Pup Joints a. b. c. a. b. c.
Quantity No. 2 2 2
Joint Length ft 5 10 15
Weight lb/ft 25.6 25.6 25.6
Type of connection NC 50 NC 50 NC
50
Date of last inspection Date Requeste
d
E.1.3.4 S 135 - 3½" OD Drillpipe Pup Joints a. b. c. a. b. c.
Quantity No. 2 2 2
Joint Length ft 3 10 15
Weight lb/ft 15.5 15.5 15.5
Type of connection NC38 NC 38 NC
38
Date of last inspection Date Requested Yes
E.1.4 Hevi-wate Drill Pipe a. b. a. b.
Quantity No. 45 45
Nominal size OD Inch 5” 3” 1/2
IDENTIFICATION CODE PAG47OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
E Drill String and Handling Tools
Weight lb/ft 50 26
API steel grade + +
Range 2 2
Tool joint OD Inch 6” 1/2 4” 3/4
Tool joint ID Inch 3” 2” 3/16
Tapered shoulder tool joints deg. 18o 18o
Type of hardfacing None None
Internally plastic coated Yes/No Requeste Requeste
d d
Type of connections NC 50 NC 38
Actual API classifications (Agip M – 1 – SS – 5710 ) Premium Premium
Date of last inspection Requested
ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA
E.1.5 Drill Collars
E.1.5.1 Drill Collars a. b. c. d. a. b. c. d.
Quantity of joints No. 6 18 18 18
API steel grade + + + +
OD Body Inch 9” ½ 8” 1/4 6” ½ 4” 3/4
ID Body Inch 3” 2” 13/16 2” 13/16 2” 1/4
Length of each joint ft 31 31 31 31
Drill collar body (slick/spiral) Spiral Spiral Spiral Spiral
Internally plastic coated Yes/No + + + +
With recess for elevator Yes/No + + + +

With recess for slips Yes/No + + + +


With stress relief pin groove Yes/No Yes Yes Yes Yes
With boreback on box Yes/No Yes Yes Yes Yes
Type of connections 7” 5/8 6” 5/8 NC 50 NC 38
Actual API classifications Requested Requested Requested Requested
Date of last inspection Requested Requested Requested Requested
E.1.5.2 Short Drill Collars a. b. c. d. a. b. c.. d.
Quantity No. 2 2 2 2
API steel grade + + + +
OD Body Inch 9” ½ 8” 1/4 6” 1/2 4” 3/4
ID Body Inch 3” 2” 13/16 2” 13/16 2” 1/4
Length of each joint ft 6 6 6 6
Drill collar body (slick/spiral) Spiral Spiral Spiral Spiral
With recess for elevator Yes/No + + + +
With recess for slips Yes/No + + + +
With stress relief pin groove Yes/No Requested Requested Requested Requested
With boreback on box Yes/No Requested Requested Requested Requested
Type of connections 7” 5/8 R 6” 5/8 R NC 50 NC 38
Actual API classifications Requested Requested Requested Requested
Date of last inspection Requested Requested Requested Requested
IDENTIFICATION CODE PAG48OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
E Drill String and Handling Tools

TEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.1.7 Stabilizers (Range of blade sizes available suitable for build, drop-off and tangent assemblies)
E.1.7.1 For 26" hole size Near String Near String
OD blades Inch 25” 29/32 25” 29/32
Quantity No. 1 2
Type of blades Integral blade Integral blade
Type of blades hard facing T.C.I. T.C.I.
OD body or fishing neck Inch 9” ½ 9” ½
Length of fishing neck ft 6< 6<
ID body Inch 3” 3”
Connection UP 7” 5/8 R Box 7” 5/8 R Box
Connection DOWN 7” 5/8 R Box 7” 5/8 R Pin
Float valve receptacle Yes/No Requested Requested
E.1.7.2 For 24" hole size Near String
OD blades Inch 23” 29/32 23” 29/32
Quantity No. 1 1
Type of blades Integral blade Integral blade
Type of blades hard facing T.C.I. T.C.I.
OD body or fishing neck Inch 9” ½ 9” ½
Length of fishing neck ft 6< 6<
ID body Inch 3” 3”
Connection UP 7” 5/8 R Box 7” 5/8 R Box
Connection DOWN 7” 5/8 R Box 7” 5/8 R Pin
Float valve receptacle Yes/No Requested Requested
E.1.7.3 For 16" hole size Near String Near String
OD blades Inch 16” 16”
Quantity No. 1 2
Type of blades Integral blade Integral blade
Type of blades hard facing T.C.I. T.+C.I.
OD body or fishing neck Inch 8” ½ 8” ½
Length of fishing neck ft 6< 6<
ID body Inch 3” 3”
Connection UP 6” 5/8 R Box 6” 5/8 R Box
Connection DOWN 6” 5/8 R Box 6” 5/8 R Pin
Float valve receptacle Yes/No Requested Requested
E.1.7.4 For 12¼" hole size Near String Near String
OD blades Inch 12” 3/16 12” 3/16
Quantity No. 1 2
Type of blades Integral blade Integral blade
Type of blades hard facing T.C.I. T.C.I.
OD body or fishing neck Inch 8” 1/4 8” 1/4
Length of fishing neck ft 6< 6<
IDENTIFICATION CODE PAG49OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
E Drill String and Handling Tools
ID body Inch 3” 3”
Connection UP 6” 5/8 R Box 6” 5/8 R Box
Connection DOWN 6” 5/8 R Box 6” 5/8 R Pin
Float valve receptacle Yes/No Requested Requested
E.1.7.5 For 8½" hole size Near String Near String
OD blades Inch 8” 15/32 8” 15/32
Quantity No. 2 3
Type of blades Integral blade Integral blade
Type of blades hard facing T.C.I. T.C.I.
OD body or fishing neck Inch 6” 1/2 6” 1/2
Length of fishing neck ft 6+ 6+
ID body Inch 2” 13/16 2” 13/16
Connection UP NC50 Box NC 50 Box
Connection DOWN 4” 1/2 R Box NC50 Pin
Float valve receptacle Yes/No Requested Requested
E.1.7.6 Three-point caliper a. b. c. d. a. b. c. d.
For O.D. blade stabilizers Inch 24” 29/32 16” 8” 15/32 8” 15/32
Quantity No. 1 1 1 1
Accuracy Inch 1/64” 1/64” 1/64” 1/64”
IDENTIFICATION CODE PAG50OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.1.8 Float Subs a. b. c. d. a. b. c. d.
For OD drill collar Inch 9” 1/2 8” ¼ 6” 1/2 4” 3/4
Quantity No. 1 1 2 2
Connection (box-box) 7” 5/8 6” 5/8 NC 50 NC 38
Reg. Reg.
E.1.9 Float Valves a. b. c. d. a. b. c. d.
Quantity No. 1 1 2 2
Make + + + +
Type + + + +
Suitable for Connection 7” 5/8 6” 5/8 NC 50 NC 38
Reg. Reg.
E.1.12 Circulating Head ( Top Drive Use )
E.1.12.1 Circulating Head
Casing O.D. 20 - 16” 13” 3/8 11” 3/4
Quantity No. 1 - 1 2 2
Make + - + + +
Type + - + + +
Top connection 2” Weco Fig 1502
Dress kits Yes/No Requested
Circulating Head 9” 5/8 7” 5”
(Continued)
Quantity No 2 2 2
Make + + +
Type + + +
Top Connection 2” Weco Fig 1502
Dress kits No. Requested YES
E.1.12.2 DP’s Circulating Head a. b. a. b.
For DP outside diameter Inch 5” 3” 1/2
Quantity No. 1 + 1 Spare 1+ 1 Spare
Make + +
Type + +
Total High + +
Valve type Lo - Torc Lo - Torc
Valve size Inch 2” 2”
Valve working pressure PSI 15.000 15.000
Bottom connection NC 50 NC 38
Top connection 2” Weco Fig. 1502
E.1.13 Cross-Over Subs
Sufficient certified crossover subs to make up all possible drill, scraper and fishing string configurations. The crossover will
include as a minimum the following:
1. Short X-over from drill collar connections to inside blow-out preventers (1ft.);Yes
2. At least two X – overs for each size. Yes
3. At least three X-overs from drill collar connections to drill pipe connections; Yes
4. Near bit subs of at least 2.5ft. length for fishing operation and receptacle
for float valve for the 9½", 8"1/4 DC sizes; Yes
5. X-over subs from drill pipe to 3½", 2⅞" and 2⅜" VAM and Hydril tubing; Yes
IDENTIFICATION CODE PAG51OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


6. X-over subs to Make up tandem scraper assemblies, between drill pipe,
Drill Collars and or Tubing. Yes
7. Double pin-pin & box-box is requested for each type Yes

Connection a. b. c. d. a. b. c. d.
X-Over OD Inch + + + +
X-Over ID Inch + + + +
Quantity No. + + + +
Connection + + + +

Connection e. f. g. h. e. f. g. h.
X-Over OD Inch + + + +
X-Over ID Inch + + + +
Quantity No. + + + +
X-Over OD Inch + + + +
X-Over ID Inch + + + +
e. f. g. h.
X-Over OD Inch + + + +
X-Over ID Inch + + + +
Quantity No. + + + +
X-Over OD Inch + + + +
X-Over ID Inch + + + +
e. f. g. h.
X-Over OD Inch + + + +
X-Over ID Inch + + + +
Quantity No. + + + +
X-Over OD Inch + + + +
X-Over ID Inch + + + +
e. f. g. h.
X-Over OD Inch + + + +
X-Over ID Inch + + + +
Quantity No. + + + +
X-Over OD Inch + + + +
X-Over ID Inch + + + +
e. f. g. h.
X-Over OD Inch + + + +
X-Over ID Inch + + + +
Quantity No. + + + +
X-Over OD Inch + + + +
X-Over ID Inch + + + +
e. f. g. h.
X-Over OD Inch + + + +
X-Over ID Inch + + + +
Quantity No. + + + +
IDENTIFICATION CODE PAG52OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


X-Over OD Inch + + + +
X-Over ID Inch + + + +
e. f. g. h.
X-Over OD Inch + + + +
X-Over ID Inch + + + +
Quantity No. + + + +
X-Over OD Inch + + + +
X-Over ID Inch + + + +
e. f. g. h.
X-Over OD Inch + + + +
X-Over ID Inch + + + +
Quantity No. + + + +
X-Over OD Inch + + + +
X-Over ID Inch + + + +

All the description will be up


date By contractor

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.1.14 Cementing Kelly Cock
Suitable for use in cementing operations, internal pressure integrity is not required.
Nominal size OD Inch +
Total length feet +
Working length feet +
Connection +
E.1.15 Casing Scraper a. b. c. a. b. c.
Body Quantity No. 1 1 1
Make + + +
Type + + +
Sizes Inch 9” 5/8 7” 5”
Casing Weight Lbs/ft 53,5 - 47 - 43,5 35- 32- 29 - 26 25.5 - 18 - 15
( Spear parts for redressing ) Yes Requested
IDENTIFICATION CODE PAG53OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.2 Drill pipe/Drill collars Handling Tools
E.2.1. Drill pipe/Drill collars Elevators
E.2.1.1 Drill pipe Elevators (Center latch elevators for 18o tapered tool joints) API classifications 8C
a. b. a. b.
Drill pipe size Inch 5” 3” 1/2
Quantity No. 2 2
Make VARCO BJ or Equivalent
Model GG MGG
Rated capacity MT 450 350
E.2.1.2 Drill collar Lifting Subs a. b. c. d. a. b. c. d.
Drill collar size Inch 9” 1/2 8” 1/4 6” 1/2 4” 3/4
Quantity No. 2 6 6 6
Bottom Connection + + + +
Rated capacity MT + + + +
E.2.2 Drillpipe and Drillcollars Slips and Safety Clamps.
E.2.2.1 Drill pipe Hand Slips a. b. a. b.
API extra long Yes/No
For O.D. Drill pipe size Inch 5” 3” 1/2
Quantity No. 2 2
Make VARCO BJ or Equivalent
Type SDXL SDXL
E.2.2.2 Drill pipe Power Slips
For O.D. Drill pipe size Inch 5” - 3” 1/2 5” - 3” 1/2
Make VARCO VARCO
Quantity No. 1+1 1+1
Type PS 15 PS 15
E.2.2.3 Drill Collar Slips a. b. c. d. a. b. c. d.
For O.D. Drill collars Size Inch 9” 1/2 8” 1/4 6” 1/2 4” 3/4
Quantity No. 2 2 2 2
Make VARCO BJ or Equivalent
Type + + + +
E.2.2.4 Drill Collars Safety Clamps a. b. a. b.
Quantity No. 2 2
Make VARCO BJ or Equivalent
Type MP-S MP-S
O.D. Range 3” ¾ - 10” ¾ 2” 3/8 – 3” ½

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.2.3 Bit Breakers a. b. c. a. b. c.
Quantity No. 1 + 1 1 1
For Bit Size Inch 26” + 24” 17” 1/2 16”
Bit Breakers (Continue) d. e f. d. e. f.
Quantity No. 2 2 2
For Bit Size Inch 12” 1/4 8” 1/2 5” 7/8
IDENTIFICATION CODE PAG54OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.2.4 Elevator Links (Bails) [ref. Item B.3.3.2] For running Dp’s For run Casing For running Dp’s For run Casing
Quantity of sets No. 1 1
Make +
Type +
Size Inch 3” 3” 1/2
Length Inch 140” 220”
Rated capacity MT 450 450
E.2.5 Kelly Spinner [Ref. To Item B.3.5.] as spare to Top drive REQUESTED
Make +
Type +
E.2.6 Kelly Spinner saver Subs [Ref. To Item B.3.5.] as spare to Top drive REQUESTED
Make
Type
Quantity No.
Size range Inch
E.2.7 Spinning Wrench REQUESTED
Make +
Type Hydraulic 950 h
For O.D. Tool Joints 2 3/8 to 9 ½
E.2.7 Mud Saver Bucket with line to Trip TankREQUESTED
Make +
Drillpipe size range Inch 5“+3½“
E.2.8 Hydraulic Cathead (Ezy Torque) REQUESTED
Make +
Type +
Maximum line pull MT 35
E.2.9 Rotary Rig Tongs
E.2.9.1 Manual extra heavy tongs designed for use with drill pipe up to 5" and capable of handling 6⅝" reg. Connector
Quantity No. 2
Make VARCO BJ or Equivalent
Type HT - 65
Range size Inch 3” ½ - 13” 3/8
Max. rated Torque ft.lbs 65.000
E.2.9.2 Manual extra heavy tongs with a torque rating of 100,000 ft*lb.
Quantity No. 2
Make VARCO BJ or Equivalent
Type HT - 100
Range size Inch 4” – 17”
Max. rated Torque ft.lbs 100.000
E.2.9.3 Manual tongs primarily designed for use with 3½" DP, 3½" Tbg and 2⅞" Tbg.
Quantity No. 2
Make VARCO BJ or Equivalent
Type +
Range size Inch +
Max. rated Torque ft.lbs +
E.2.9.4 Counter Balance System for Manual tongs REQUESTED
Counter balance system for manual Tong Yes/No +
IDENTIFICATION CODE PAG55OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Counter balance system Air powered Yes/No +

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.3 Casing/Tubing (running) Equipment
Casing/Tubing (running) equipment as required to run (as per drilling program):
E.3.1. Casing Elevators
E.3.1.1 Side Door Casing Elevators a. b. c a. b. c
Casing size Inch 20” 18” 5/8 16” 13” 5/8 16” 13 5/8”
Quantity No. 1 1 1 1
Make VARCO – BJ or Equivalent
Model LIFTING SUB
Type +
Rated capacity MT 350 350 250 250
Side Door Casing Elevators (continue) d. e. f. d. e. f.
Casing size Inch 11” 3/4 9” 5/8 7” 9 5/8” 7”
Quantity No. 1 1 1
Make VARCO – BJ or Equivalent
Model LIFTING SUB
Type +
Rated capacity MT 135 135 135
Side Door Casing Elevators (continue) g. h. i. g. h. i.
Casing size Inch 5”
Quantity No. 1
Make VARCO – BJ or Equivalent
Model LIFTING SUB
Type +
Rated capacity MT 135
E.3.1.2 Casing Elevator/Spider a. b. c. d. a. b. c. d.
Casing size Inch 20” – 13” 3/8 11” 3/4 9” 5/8
18” 5/8 16”
Quantity No. 1+ 1 Spare for all size
Make VARCO – BJ or Equivalent
Model +
Type +
Rated load capacity MT 500 for all size
Casing Elevator/Spider (Continue) e. f. e. f.
Casing size Inch 7” 5”
Quantity No. 1+ 1 Spare
Make VARCO – BJ or Equivalent
Model
Type
Rated load capacity MT 500 for all size
E.3.1.3 Single Joint Casing Elevators a. b. c. d. a. b. c. d.
Casing size Inch 20” 16” 13 3/8 11” 3/4
18 5/8
IDENTIFICATION CODE PAG56OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Quantity No. 1 + 1 spare for all size
Make +
Model +
Type +
Rated load capacity MT +
E.3.1.3 Single Joint Casing Elevators (continue) e. f. g. h. e. f. g. h.
Casing size Inch 9” 5/8 7” 5”
Quantity No. 1 + 1 spare for all size
Make +
Model +
Type +
IDENTIFICATION CODE PAG57OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.3.2. Tubing Elevators
E.3.2.1 Tubing Elevators
Tubing size Inch 3” ½ - 2” 7/8
Quantity No. 2 for each size
Make BJ or Equivalent
Model SLIPS
Type HYT
Rated capacity MT 175
E.3.2.2 Tubing Spiders ( Hydraulic )
Tubing size (mandatory 3½”, 2”7/8 ) Inch 3” ½ - 2” 7/8
Quantity No. 1 for each size
Make BJ or Equivalent
Model +
Type +
Rated capacity MT 200
E.3.2.3 Tubing Single Joint Elevators
Tubing size (mandatory 3½”, 2”7/8 ) Inch 3” ½ - 2” 7/8
Quantity No. 1 for each size
Make +
Model +
Type +
Rated capacity MT +
E.3.2.4 Safety Clamp
Tubing size (mandatory 3½”, 2”7/8 ) Inch 3” ½ - 2” 7/8 2 3/8
Quantity No. 2 for each size
Make +
Model +
Type +
Rated capacity MT +
E.3.2.5 Tubing Slips for rotary table E.4.3.3 Tubing Slips for rotary table
Tubing Size Inch 3” ½ - 2” 7/8 – 2” 3/8
Quantity No. 2
Make +
Type +

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.3.3 Casing and Tubing Slips and Safety Clamps.
E.3.3.1. Casing Slips for Rotary Table. Complete with circular buttons and bowls (see E.3.3.2.) to fit rotary.
a. b. c. d. a. b. c. d.
For OD casing Inch 20” -18 5/8 16” 13 3/8” 11 ¾”
Quantity No. 1 1 2 2
Make VARCO - BJ
Type CMXL
IDENTIFICATION CODE PAG58OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Casing Slips for Rotary Table. Complete with circular buttons and bowls (see E.3.3.2.) to fit rotary.
e. f. g. e. f. g.
For OD casing Inch 9”5/8 7” 5”
Quantity No. 2 2 2
Make VARCO – BJ or Equivalent
Type CMXL
E.3.3.2. Casing Bowls
Quantity No. 1 1 1 1
For OD casing Inch 20” 18 5/8
Make + +
Type + +
IDENTIFICATION CODE PAG59OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.3.4 Casing and Tubing Tongs.
E.3.4.1 Manual Casing Tongs (not suitable for metal seal casing)
Quantity No. 2
With jaws for OD casing. Inch 20”-18” ⅝ -16”-13”⅜ -11”¾ -9”⅝ - 7” - 5”
Make VARCO – BJ or Equivalent
Type H 65 EXTENDED
Max. Rated Torque .lbs/ft +
E.3.4.2 Extended head casing tongs
Quantity No. 2
With jaws for OD casing. Inch See E.3.4.1
Make VARCO – BJ or Equivalent
Type H 65 EXTENDED
Max. Rated Torque .lbs ft +
E.3.4.3 Power Casing Tongs (not suitable for Metal Seal casing)
Quantity No. 1
With jaws for OD casing Inch 20”-18” ⅝ -16”-13”⅜ -11”¾ -9”⅝ - 7” - 5”
Make VARCO – BJ – WEATHERFORD or Equivalent
Type +
Max. Rated Torque lbsft 90.000
Torque Indicator Yes/No Yes
Back up Arm Yes/No Yes
E.3.4.4 Manual Tubing tongs
Quantity No. 2
O.D. tubing range size Inch 3” ½ - 2” ⅞ - 2” ⅜
(complete with dies to fit couplings).
Make VARCO – BJ or Equivalent
Type +
Max. rated torque ft.lbs +
E.3.4.5 Power Tubing tongs
Quantity No. 1
O.D. tubing range size Inch 3” ½ - 2” ⅞ – 2” ⅜
(complete with dies to fit couplings).
Make ECKEL or Equivalent
Type +
Max. rated torque ft.lbs +
Torque Indicator Yes/No +
Back up Arm Yes/No +
E.3.4.6 Power Unit for Casing Tong and Tubing Tong (not suitable for Metal Seal casing)
Quantity No. 1 1
Make +
Driven by electric motor and + Yes
hydraulic system
E.3.5 Casing Circulating Head (Swedge) a. b. c. d. a. b. c. d.
For OD casing Yes/No 20” 16” 13 ⅜” 11” ¾
Top connection 2” LP 2” LP 2” LP 2” LP
Bottom connection BTC BTC BTC Prem.
Casing Circulating Head (Swedge) - Continue
IDENTIFICATION CODE PAG60OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


c. d. e. c. d. e.
For OD casing Yes/No 9 ⅝” 7” 5”
Top connection 2” LP 2” LP 2” LP
Bottom connection Premium Premium Premium

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.3.6 Cup Tester and Crossover to test BOP – Casing - Pipe Rams and Kelly Cock
E.3.6.1 Casing X-Over for Ram Tester a. b. c. d. a. b. c. d.
Size inch 20”- 18 ⅝” 13” ⅜ -16” 9” ⅝ 7”
Quantity No 2 2 2 2
Top Connection Box NC 50 Box NC 50 Box NC 50 Box NC 50
Bottom Connection To be advised
Casing Cup Tester Body a. b. c. a. b. c.
Quantity No 2 2 1
Top Connection Box NC 50 Box NC 48 Box NC 50
Bottom Connection Pin NC 50 Pin NC 48 Pin NC 48
Casing Packer Cup Tester a. b. c. d. a. b. c. d.
Size inch 20”– 18”⅝ 13” ⅜- 16’ 9” ⅝ 7”
Casing Weight Lbs/ft 106.5 - 96.5 72/68/61 - 94,5 53.5/47/43.5 35/32/29/26
Quantity No 2 2 2 2
Make Cameron Cameron Cameron Cameron
Type + + + +
E.3.6.2 Lower Kelly Cock X-over Test
Quantity No 1 1
Top Connection Box NC 50 Box NC 38
Bottom Connection Weco Union Weco Union
IDENTIFICATION CODE PAG61OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.3.7 Clamp-on Type Casing Thread Protectors
a. b. c. d. a. b. c. d.
Quantity No. 3 3 3 3
For O.D. Casing Inch 20” 16” 13” ⅜ 11” ¾
Make KLEPO KLEPO KLEPO KLEPO
Type air air air air
Clamp-On (Continua) d. e. f. d. e. f.
Quantity No. 3 3 3
For O.D. Casing Inch 9” ⅝ 7” 5
Make KLEPO KLEPO KLEPO
Type air air air
E.3.8 API Casing Drifts a. b. c. d. a. b. c. d.
Quantity No. 1 2 2+2 2
For O.D. Casing Inch 20” 18 ⅝- 16” 13 ⅜” 11” 3/4
Casing nominal weight lbs/ft 106.5/133 96.5 -82,5/94,5 72 / 68/61 65
Type + + + +
Casing Drifts - Continue e. f. g. e. f. g.
Quantity No. 2+2 2+2 2
For O.D. Casing Inch 9 ⅝” 7” 5”
Casing nominal weight lbs/ft 53,5 / 47/43.5 35/32/29/26 18 / 15
Type
IDENTIFICATION CODE PAG62OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.4 Fishing Equipment
Fishing equipment as required, find below the minimum requirement:
E.4.1 Overshots and Spears
Overshots for all Contractor down hole tubular size body and tool joint, Contractor Statements:
tools and equipment, also all tubing and couplings 4½”, 3½”; 2⅜” and 2⅞”.
a) Pack offs Yes-No
b) Spiral and basket grapples Yes-No
c) Extension subs 1.2m long Nr 2 each size Yes-No
d) Oversized and regular lipped guides for all the various hole sizes Yes-No
e) Short catch for all size Yes-No
f) Loch Ring Yes-No
g) For all catch size spiral /basket/ pack off for down hole diameters equipment ,
tubing and collar need Back up Yes-No
h) It also request catch 1/8 less for all size nominated above Yes-No
i) All Size must upgrade from contractor Yes-No
E.4.1.1 Overshots
Quantity No. 1 1 1
Make Bowen Bowen Bowen
Type FS-150 SH-150 SH-150
Overshot OD Inch 11” 1/4 7” 3/4 5” 5/8
Oversize guide quantity No. 1+1 1 1
Max catch size Inch 9 5/8 6 5/8 4 5/8
Oversize guide O.D. Inch 20”/15” 11” 5 5/8
Extension sub size (O.D. x length) Inch/ft 2”x 30” 2”x 30” 2”x 30”
Top sub connection NC 50 NC 50 NC 38
Top sub lock-ring Yes/No Yes Yes Yes
Overshot accessories:
To catch size Inch 9 1/2 6 5/8 5
To catch size Inch 9 3/8 6 1/2 4 7/8
To catch size Inch 8 1/4 6 3/8 4 3/4
To catch size Inch 8 1/8 5 4 1/2
To catch size Inch 6 5/8 4 7/8 4 3/4
To catch size Inch 6 1/2 4 3/4 4 5/8
To catch size Inch 6 3/8 4 1/2 4 3/8
To catch size Inch 5 4 3/4 3 7/8
To catch size Inch 4 7/8 4 5/8 3 3/4
To catch size Inch 4 3/4 4 3/8 3 1/2
To catch size Inch 4 1/2 3 7/8 3 3/8
To catch size Inch 4 3/8 3 1/4
To catch size Inch 3 1/8
2 7/8
2 3/4
Spiral / Basket Grapples per size No 3 each 3each 3 each
E.4.1.2 Die Collar
Quantity No. 1 1 1
Make Bowen Bowen Bowen
Type + + +
Spear OD Inch 6 6 7/8 7 1/2
IDENTIFICATION CODE PAG63OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Diam of largest wicker Inch 5 5 3/4 6 3/8
Diam of smallest wicker Inch 3 7/8 4 3/4 5
E.4.1.3 Taper Mill
Quantity No. 1 + 1 1 + 1 1 + 1
Type + + +
OD Body mm 311.4 – 212.8 216.5 – 147.2 151.6 – 149.0
ID Body Inch + + +

ITEM Connection + + +
Inch
E.4.2.1 Hydraulic Fishing Jar
Quantity No 1 1 2
Make Bowen Bowen Bowen
Model Z Z Z
OD body Inch 8” 6” 1/2 4” 3/4
Minimum ID Inch + + +
Connection NC 50 NC 50 NC 38

E.4.2.3 Surface Jar


Quantity No 2 2 2
Make Bowen Bowen Bowen
Model + + +
OD body Inch 8” 6” 1/2 4” 3/4
Minimum ID Inch + + +
Connection NC 50 NC 50 NC 38
E.4.3. Fishing Bumper Subs
Quantity No. 1 1 2
Make Bowen Bowen Bowen
Model Z Z Z
OD body Inch 8” 6”1/2 4”3/4
Minimum ID Inch + + 2”1/4
Connection NC 50 NC 50 NC 38
E.4.4 Bumper Sub Safety joints
Quantity No. 1 1 2
Make Bowen Bowen Bowen
Model + + +
OD body Inch 8” 6”1/2 4”3/4
Minimum ID Inch + + 2”1/4
Connection NC 50 NC 50 NC 38
E.4.5 Safety joints
Quantity No. 1 1 2
Make Bowen Bowen Bowen
Model Z Z Z
OD body Inch 8” 6”1/2 4”3/4
Minimum ID Inch + + 2”1/4
Connection NC 50 NC 50 NC 38
IDENTIFICATION CODE PAG64OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.4.6 Reverse Circulating Junk Baskets
Quantity No. 1 1 1
For hole sizes Inch 12” 1/4 8” 1/2 5” 7/8
Make Bowen Bowen Bowen
Type + + +
OD body Inch 12” 8” 5”
ID Body Inch + + +
Inside Magnet Yes/No + + +
Mill Shoes Type C C C
Connection
IDENTIFICATION CODE PAG65OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


E.4.7 Junk Subs
Quantity No. 2 2 2
For hole sizes Inch 12” 1/4 8” 1/2 5” 7/8
Make + + +
Type + + +
OD body Inch + + +
ID Body Inch + + +
Connection + +
E.4.8 Junk Mills
Quantity No. 2 2 2
Make
Type SJM SJM SJM
OD Body Inch 11 3/4 ” 8” 5” 1/2
ID Body Inch + + +
Connection + + +
Fishing neck Inch 24 24 24
E.4.9 Flat Bottom Mills
Quantity No. 2 2 2
Make
Type + + +
OD Body Inch 11 3/4 ” 8” 5” 1/2
ID Body Inch + + +
Connection + + +
Fishing neck Inch 24 24 24
E.4.10 Fishing Magnet
Quantity No. 2 1 1
Make Bowen Bowen Bowen
For hole size Inch + + +
OD body Inch 11” 1/2 7” 5”
ID Body Inch + + +
Connection + + +
E.4.11 Taper Taps
Quantity No. 1 1 1
Make + + +
Minimum Taper O.D. Inch 2 1/2 2 1 3/4
Maximum Taper O.D. Inch 4 3/4 4 3” 3/8
Length feet +
Maximum body O.D. Inch + + +
Connection 6 5/8 Reg NC 50 Box 4 ½ Reg Box
Box
E.4.12 Lead Impression Blocks
Quantity No. 1 1 1
Hole Size Inch 12 ¼ 8½ 5 7/8
O.D. Body Inch 11” 8“ 5”
Connection + + +
IDENTIFICATION CODE PAG66OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
E.4.13 Miscellaneous Items (quantities as required).
Small store for Company use: Yes/No Yes
Baffle plates (Totco rings) for each drill collar size Yes/No Yes
Bit gauge rings, one each of above size rock bits Yes/No Yes
Derrick tapes 25 m Quantity 3 min Yes/No Yes
Calipers for all pipe ODs and IDs Yes/No Yes
Calipers Homco type: 6" - 24" Yes/No Yes
Two (2) ditch magnets Yes/No Yes
Drill pipe wipers (5" and 3½") Yes/No Yes
Drill pipe drift (5" and 3½") Yes/No Yes
Adequate storage facilities for all equipment and Yes/No Yes
necessary spare parts, and sufficient small tools, such as
chain tongs, etc., consistent with good oilfield practice to
ensure continuous operations. On the mechanic,
electrician workshop, mud area and Rig floor Every crew
one complete tool Box
E.4.14 Drill pipe Lifting Caps ( Certified ) REQUESTED
Quantity No. As Required
Connection All connections
NOTE:
All used equipment shall be inspected by recognized oilfield tubular inspection company at Contractor's expense
before the start of the first well and certified as a minimum to premium grade after inspection as per API RP7G.The
Tubular and Handling equipment must be re-inspected every six months. the inspection to include as a minimum as
follows:
- All drill pipes to be electro-magnetically inspected including electronic end-area inspection. Plastic lining to be
inspected by mechanical-optical instrument. Tool joints to be cleaned, shoulders visually inspected and
threads checked with a profile gauge.
- All drill collar connections are to be checked by magnetic particle inspection, visual inspection of shoulders
and thread profile gauge (comb).
- Any drill collar connections showing defects shall be re-cut or replaced by new collars. Thread cutting is only
to be done by reputable manufacturer who manufactures rotary drill stem elements and is API authorized.
- For all connections, including pup joints and crossovers, all pins are to have stress relief grooves and all
boxes to have bore-backs. Stress relief grooves and all threads to be cold-worked. All threads are to receive
anti-galling treatment.
- Stabilizers, substitutes and reamers, etc. which are used in the drilling string are to have connections to the
same quality as drill collar connections. All bodies to be inspected for cracks.
- All equipment to be provided with thread protectors for pin and box.
IDENTIFICATION CODE PAG67OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

1.5 BULK MUD AND CEMENT, MUD TREATING AND CIRCULATING


SYSTEM.

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
F Bulk Mud & Cement, Mud Treating and Circulating Systems
F.1 High Pressure Mud System.
All components of the high-pressure mud system must have a working pressure of at least 7,500 PSI and be designed and
constructed in accordance with ANSI B31.3. Screwed connections are not allowed.
F.1.1 Mud Pumps
Three triplex pumps, each equipped with an independent driven centrifugal charging pump. Working pressure 7,500psi.
a) Forged steel fluid ends Yes/No Yes
b) Quick change system for liners and pistons Yes/No Yes
c) Quick change valve covers Yes/No Yes
d) Cooling/lube oil system for liners Yes/No Yes
e) High pressure pulsation dampeners (Make/Type) Yes/No Yes
f) Reset relief valve (Make/Type) Yes/No Yes
g) Suction and discharge filter Yes/No Yes
h) Full range of liners and pistons to operate at the optimum Yes/No Yes
Volume/pressure as required by the drilling programs
i) Each pump equipped with a pressure gauge before isolation Yes/No Yes
valve.
F.1.1.1. Mud Pumps No: 3 No. 1 No. 2 No. 3
Make +
Model +
Rated Input Power HP 1600 each
Mud pump motors:
- Quantity No 1 each
- Make +
- Type +
- Continuous rating power of each HP 1600
Liner sizes available Inch 7-6½–6- 5½-5
-4½
Surcharging pump type No 3
- Impeller Diameter Inch 10
- Stuffing box seal type Mechanical
- Driven by motor (make and type) +
- Output Power KW 75
- at RPM RPM +
Fluid end Type +
Cylinders/valve cover motor Type +
Pump stroke counter type Yes/No +
Suction line quantity No +
Suction line diameter (OD x ID) Inch 12”
Discharge line Flexible section ( ID ) No –Inch 3 x 3 ½”
Discharge line Rigid section ( ID ) No - 2 x 4”
Inch
Mud Pumps - Rig floor mud manifold line diameter (OD x ID) Inch +
IDENTIFICATION CODE PAG68OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
F Bulk Mud & Cement, Mud Treating and Circulating Systems
Working pressure Psi 7500 7500
F.1.2 Auxiliary Pumps
F.1.2.1 Transfer Pumps
Number No. 4
Make +
Model +
Type +
Driven by motor Type Electrical
Power output HP 100
IDENTIFICATION CODE PAG69OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
F.1.3 Standpipe Manifold 4” x 7,500 psi W.P.
All Connection ends welded or flanged. Two standpipes with goosenecks connected to a H-type standpipe manifold
c/w:
Rigid Section Flex. Section
Standpipe Line number No. 2 2
Dimensions ID Inch 4 1/16 4” 1/2
Working pressure Psi 7500 7500
Test pressure Psi + +
Kill line outlet Yes/No + +
Fill-up/bleed-off line outlet (i.e. manual choke) Yes/No + +
three 2" outlets c/w hammer Lug wing unions (Fig. 1502) type Yes/No Requested Requested
connections
F.1.3.1 Standpipe Manifold valves
Quantity No. 8
Make +
Type +
Size Inch 5”
Working Pressure PSI 10.000
Standpipe Manifold valves (Continue)
Quantity No. +
Make +
Type +
Size Inch +
Working Pressure +
F.1.3.2 Standpipe Manifold Outlets
All outlets complete with isolation valve 8
Fill-up well outlet (Size/Working pressure) Inch/psi 2” 10000
Casing fill-up outlet (Size/Working pressure) Inch/psi 2” 10000
Bleed-off line outlet (Size/Working pressure) Inch/psi 2” 10000
Choke manifold outlet connection Inch/psi 2” 10000
Cementing line Outlet Connection Inch/psi 2” 10000
Pressure sensors outlets quantity No. 4
Pressure sensors outlets sizes and working pressure Inch/psi 2 -10000
Pressure transmitters outlets quantity No. 3
Pressure sensors transmitters sizes and working pressure Inch/psi +
Mud Logging Pressure outlets (No./size/working pressure) Inch/psi 2” 10000 X 2
No
Exclusion valve size Inch +
MWD/LWD pressure outlet (No./size/working pressure) Inch/psi 2” 10000
Exclusion valve size Inch +
F.1.4 Rotary Hoses (Threaded connections not acceptable)
Make +
Quantity No. 2 Plus 1 Spare
Type +
Inside Diameter x length inch x ft 3”1/2 x 45 ft
Working pressure Psi 10000
Test pressure certificate required ( yes / no ) +
IDENTIFICATION CODE PAG70OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
Date of Manufacture Year REQUESTED

Complete with snubbing lines Yes/No REQUESTED

F.1.5 Casing fill up hose


Type 1
Inside Diameter Inch 2”
Length feet +
Valve type Lo - Torque
Valve size inch 2”
Working pressure Psi 5.000

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
F.1.6 Chicksan Steel Hoses
Sufficient chicksans Weco Fig. 1502 (Min. 20 pieces), Male x Male & female x female Connections and T-pieces, elbows for all
required hook-ups. The chicksans must be of an integral non-screwed type and all to be certified. All chicksans to be complete
with clamps and safety lines. Sufficient low torque valves, tee pieces, X-overs swings and adapters to accommodate varied
hook-ups.
All welded connections.
Quantity No. As per list below
Make/size Inch +
Length/sections feet/No. +
Make sweep swivels +
Type/nominal size Inch 2”
Lo-torque valve 15,000psi connection fig 1502 no 8
Working pressure psi 15.000
Suitable for H2S service Yes/No +

Chicksan list requested ( F.1.6)

Description Quantities Available


2” Straight (rigid) 1502 Chicksans 10ft
2” Straight (rigid) 1502 Chicksans 5ft
2” Loops (flexible) 1502 Chicksans
2” 1502 Longsweep Elbow Chicksans
2” 1502 Block Elbow Chicksans
2” 1502 T Chicksans M × F × F
2” 1502 Block Wye - Chicksans
3” Wing × 2” Thrd 1502 Chicksan Crossover
3” Thrd × 2” Wing 1502 Chicksan Crossover
2” Male × Male 1502 Chicksan Connection
2” Female × Female 1502 Chicksan Connection
IDENTIFICATION CODE PAG71OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

2” 1502 Male × Female Chicksan Adapter


2” 1502 Female Chicksan Plug
2” 1502 Chicksan Plug (Male or Female)
2” 1502 Lo-Torque Valve
2” 1502 Gasket Rubber Spares
3” 1502 Gasket Rubber Spares
Swivel Joint Repair Kit

All the above is rated at 15,000 Psi


IDENTIFICATION CODE PAG72OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
F.2 Low Pressure Mud System
A line diagram to be submitted of the HP/LP mud system showing tanks, mixing facilities and the various treating systems.
F.2.1 Mud Pits (Active, Reserve and Mixing) System.
At least four main mud tanks (F.2.1.1 and F.2.2.2 below) with a total capacity of 350m 3. Each tank equipped with a No. 2 bottom
guns and No. 2 electrical agitator. Mud mixer hopper independent suction and discharge line for each tank. The charge and
discharge hose from/to the barge to the rig board/Side & starboard/Side 4” with quick connection. Mud tanks to be
sectionalized for a series treatment by solids removal equipment (e.g. shaker, D-gas, D-sand, D-silt, suction tanks).
a) Mud system to be capable of mixing/treating/maintaining mud up to 2.2 kg/lt. at circulation rates in the well.
b) All mud equipments and storage tanks to be roofed to ensure that water does not enter during rain and does not contaminate the
oil base mud. The following is required:
Tanks covered Yes/No Yes
1st Shale shaker covered Yes/No Yes
2nd Shale shaker covered Yes/No Yes
Desilter covered Yes/No Yes
Mud cleaner unit covered Yes/No Yes
Mud Hopper covered Yes/No Yes
c) Storage space to be available for contaminated/waste mud for Yes/No Yes
transport.
ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA
F.2.1.1 Active Mud Tanks (total cap 350 m3 )
Tank Number No. 1 2 3
Capacity cubic m. + + +
Height meters + + +
Total capacity cubic m. + + +
Electric agitator: Requested Requested Requested
Quantity No. 2 2 2
Make and type + + +
Motor Output Power HP 20 20 20
at RPM RPM + + +
Bottom Guns (Type and quantity) No. 2 2 2
Active Mud Tanks
Tank Number No. 4 5 6
Capacity cubic m. + + +
Height meters + + +
Total capacity cubic m. + + +
Electric agitator: Requested Requested Requested
Quantity No. 2 2 2
Make and type + + +
Motor Output Power HP 20 20 20
at RPM RPM + + +
Bottom Guns (Type and quantity) No. 2 2 2
IDENTIFICATION CODE PAG73OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


F.2.1.2 Reserve Mud Tanks (total cap 400 m3) if not available on the rig with dedicated Mud Barge
REQUESTED
Tank Number No. 1 2 3 4
Capacity cubic m. + + + +
Height meters + + + +
Total capacity cubic m. + + + +
Electric agitator: Requested Requested Requested
Quantity No. 2+2 2+2 2+2
Make and type + + +
Motor Output Power HP 15 + 15 15 + 15 15 + 15
at RPM RPM + + +
Max Dead Volume admissible cubic m. 5 5 5 5
for each tank.
Bottom Guns (Type and quantity) No. 2+2 2+2 2+2
F.2.1.3 Drill Water Tanks(total cap 500 cm)
Capacity (single drill water tank) cubic m. + +
Total capacity cubic m. + +
Height meters + +
F.2.1.4 DMA (Low Toxicity Base Oil) Tanks
Capacity (single tank) cubic m. 50 +
Total capacity cubic m. 100 +
Height meters + +
F.2.1.5 Brine Tanks for Completion
Capacity (single tank) cubic m. + +
Total capacity cubic m. 500 +
Height meters + +
Electric agitator: + +
- Quantity No. + +
- Make and type + +
- Motor Output Power kW + +
- at RPM RPM + +
Bottom Guns (Type and quantity) No. 2 2
F.2.1.6 Settling Tank (One setting tank of about 15m3 capacity with sloping bottom and two quick acting dump valves& lines to the cutting barge)
Capacity (single tank) cubic m. + +Yes
Total capacity cubic m. + +Yes
F.2.1.7 Pill/Slug Tank
Drillwater, sea water and (base oil) supply lines complete with one paddle mixer. C/w mud mixer as detailed in F.2.1
Capacity cubic m. + 20 +20
F.2.1.8 Trip Tank
Complete with centrifugal pump and mud level indicator readable from the Driller's position and console, with the ability to isolate
trip tank system from mud return system. Able to handle mud gradient up to 2,2 kg/lt.
Location +
Capacity m3 10
Linear Capacity lts / cm 160 / 5 (0.5bbl/ 1 inc)
Level indicator Type Mechanical
Level indicator Location Driller's side
Alarm Requested
Electric pump make Requested
IDENTIFICATION CODE PAG74OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


- Model/type +
- Power output HP 15
To fill the tank in less than : Min. +
Facility for casing fill-up Requested
F.2.1.9 Stripping Tank (to be used for returns during stripping operations)
Location +
Capacity cubic m. +
Linear Capacity m3 / m +
Equalizing facility with trip tank Yes +
Transfer pump make and type Yes +

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


F.2.2 Fluids Transfer Facilities.
F.2.2.1 Drill Water Tanks 1 2
Dedicated transfer facility to Yes/No Active, Reserve Pill/Slug Tank
Dedicated line to Shale shakers Yes/No Requested +
Transfer throughput m3 / hr + +
F.2.2.2 Potable Water Tanks 1 2
Dedicated transfer facility to Yes/No Active +
Dedicated line to Shale shakers Yes/No + +
Transfer throughput m3 / hr + +
F.2.2.3 DMA (Low Toxicity Base Oil) Tanks 1
Dedicated transfer facility to Yes/No + Active, Reserve Pill/Slug Tank
Dedicated line to Shale shakers Yes/No + +
Transfer throughput m3 / hr + +
Certified flowmeter to mud and pill tanks Requested Requested
F.2.2.4 Brine Tanks 1 2
Dedicated transfer facility to Yes/No Active, Reserve Pill/Slug Tank
Dedicated line to Shale shakers Yes/No + +
Transfer throughput m3 / hr + +
Certified flow meter to mud and pill tanks Requested Requested
Maximum brine weight capacity kg/lt + +
IDENTIFICATION CODE PAG75OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


F.2.3. Mud Return Treatment System
F.2.3.1 Bell Nipple
Quantity No 30” Diverter 20” BOP 13” 5/8 BOP
Size Inch + + +
Flow Line
Size Inch 12” 12” 12”
Shape m3 / hr + + +
Equipped with Gumbo Trap Yes/No Requested
Gumbo trap capacity bbls + + +
F.2.3.2 Sand Trap reference F.2.1.6(with quick
acting dump valves & lines to the cutting barge)
Quantity No. 1 +
Capacity bbls 100 +
Bottom stopped Yes/No + +
Quick cuttings discharging device to Yes/No + +
cutting barge with line or conveyer
F.2.3.3 Shale Shaker
Independently driven linear motion shale shakers capable of handling 4.5m3/min. of 50/60 secs. March Funnel viscosity mud
through API mesh 60 screens. A full range (40mesh - 250 mesh inclusive) of screens must be available by the Contractor at all
times. Contractor to maintain at least Company approved minimum consumables (screens, etc.) stocking levels.
a. Primary Shale Shakers (Dual tandem – Retrofine Basket)
Make Brandt or Equivalent
Type Retrofine Basket
Driven by No. of electric motors No. +
Maximum flowrate per shaker lt/min +
Screens Make Same Manufacturer of Shale Shaker
Screens type S
Screens Size 20
Screens type BL
Screens Size 50
Screens type BXL
Screens Size 50– 60 – 80 – 110
Screens type BLS
Screens Size mesh 120
b. Secondary Shale Shakers (Single deck – Linear Motion)
Connected mode to primary shale shakers (cascade…. Etc.)
To process the underflow of the primary Shale Shakers, De-sander and De-silter.
Make Derrick or Equivalent
Type Single Deck – Linear Motion
Driven by No. of electric motors No. +
Maximum flowrate per shaker lt/min +
Screens Make Same Manufacturer of Shale Shaker
Screens type Pyramid
Screens Size mesh 50 – 70 – 84 – 110 – 140 -180 - 200
IDENTIFICATION CODE PAG76OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Drilling cuttings directly discharge with
lines or conveyer system to the
Cutting Barge
F.2.3.4 Desanderunit + Desilter unit
Quantity No. 1+ 1
Make and Type +/ +
Number of cones x sizes + /+
Centrifugal pump make and type Harrisburg – Mission or equivalent
- Impeller diameter Inch 11
- Stuffing box seal type Mechanical
- Driven by electric motor type Requested
- Rated power HP 75
- At RPM RPM +
Max. flowrate lt/min
With solids dump lines or conveyer to the YES
cutting barge
ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA
F.2.3.5 Mud Cleaner Unit
Full range of screens 50 mesh - 250 mesh to be available from Contractor.
Contractor to maintain at least Company approved minimum stocking levels.
Quantity No. 1
Make and Type SWACO Or Equivalent
Centrifugal pump make and type Harrisburg – Mission or equivalent
- Impeller diameter Inch 11
- Stuffing box seal type Mechanical
- Driven by electric motor type Requested
- Rated power kW 75
- At RPM RPM +
Max. flow rate lt/min 2000
Type and Size of screens mesh 150 – 180 – 200 – 250
Solids dump lines or conveyer to the YES
cutting barge
F.2.3.6 Mud/Gas Separator (Poor Boy)
Make and type + / Poor Boy
Outside Diameter size Inch 48
Height feet +
Mud inlet connection (from choke) Inch/psi 3 / +
size and working pressure
Mud outlet connection (from choke) Inch/psi 8 / +
size and working pressure
Mud liquid seal height Ft 10
Gas discharge line OD Inch 5
Gas discharge line running to Yes Top of Derrick
Manufactory company and date Yes
Last full inspection certificate Yes
Equipped with pressure sensor Yes/No +
Equipped with temperature sensor Yes/No +
F.2.3.7 Mud Gas Separator
IDENTIFICATION CODE PAG77OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Quantity 1
Make SWACO or Equivalent
Type HORIZONTAL
Centrifugal pump make and type Harrisburg – Mission or equivalent
- Impeller diameter Inch 11
- Stuffing box seal type Mechanical
- Driven by electric motor type +
- Rated power HP 75
- At RPM RPM +
Discharge line running to top of derrick Yes Top of Derrick
Discharge line O.D./I.D. Inch +
Vacuum pump make Requested
- Type +
- Max. flow rate lt/min 2000
Location of degasser suction tank +
F.2.3.8 Mud Centrifuge. The centrifuge(s) will operate in barites recovery, or solids removal, mode.
Quantity 2
Make Harrisburg – Mission or equivalent
Type +
Treatment flow rate lt/min +
Solids dump lines or conveyer to the YES
cutting barge
Note: In case that the centrifuges are provided from Company's third Contractor, Contractor has to provide power, space discharge solids line and hook up facility up
to two centrifuges and accessories.
F.2.3.10 Ditch Magnets Yes/No Two (2), to be used with all pipe
Pulling/running/drilling, etc.
F.2.3.11 Mud Saver Sub Yes/No Two (2), to be used with all pipe
pulling/running/drilling, etc
F.2.3.12 Mud Saver Bucket
Quantity No. +
Pipe size Inch +
Complete with 4" return hose to flow line / Yes/No +
flow nipple
IDENTIFICATION CODE PAG78OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


F.2.4. Mud Mixing System REQUESTED
Mud Mixing system shall allow simultaneously mixing, weighting and chemical in the same pit, or mix new mud in active and
reserve pit while circulate in the well . YES
F.2.4.1 Mud Hopper REQUESTED
The three mud hopper system to be able working simultaneously in the all active mud pit to add barite and chemical while
circulating in the well with rig pump, or mixing a pill or reserve mud whilst not interfering with the mud pump and charging pump
operation 6" piping with a minimum velocity in the lines of 10 ft/sec. YES
Output of pumps 30 - 40bbl/min at 27 psi.
Quantity No. 2 + 1 (on hopper on main deck to mix
brine and barite with big-bag)
Make +
Model +
Feed pump make +
Model. +
F.2.4.2 Mixing Pumps
Number No 3 one each hopper
Make Harrisburg – Mission or equivalent
Model +
Type +
Impeller Diameter Inch +
Stuffing box seal type Mechanical
Driven by motor Type Electrical
- Power output Hp 100
- at speed RPM +
F.2.4.3 Chemical Mixing Tank
Number No 1
Capacity m3 1 (one)
Completed with electrical mixer Yes REQUESTED
IDENTIFICATION CODE PAG79OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


F.3 Bulk Storage
F.3.1 Barites / Bentonite Silos
Quantity No 6
Capacity Each Ft3 1.000
Total capacity Ft3 6.000
Installation site +
Type Weight load cell Requested
Last internal inspection (Type and Date) Requested
Manufacturer +
Pressure rating Psi +
Hoses for load and offload bulk from/ to ft 100
the barge and connections
Relief valve(s) installed Yes Requested
F.3.2 Cement Silos (to be supplied by Other Contractor)
Quantity No. 4
Capacity storage of each MT 1.000
Total Capacity storage MT 4.000
Installation site +
Type Weight load cell Requested
Last internal inspection (Type and Date) Requested
Manufacturer +
Pressure rating psi +
Relief valve(s) installed Yes/No Requested
F.3.3 Surge Tank for Barite / Bentonite
Capacity of each m3 +
Total Capacity m3 12 / 6
Type Weight load cell Requested
Last internal inspection (Type and Date) Requested
Manufacturer +
Pressure rating psi +
Relief valve(s) installed Yes/No Requested
F.3.4 Surge Tank for Cement (to be supplied by Other Contractor)
Capacity of each m3 +
Total Capacity m3 6
Type Weight load cell Requested
Last internal inspection (Type and Date) Requested
Manufacturer +
Pressure rating psi +
Relief valve(s) installed Yes/No Requested
F.3.5 Bulk Transfer System
Independent air system for the storage bulk and surge tanks system is requested consisting of a high-volume low-pressure
compressor and air dryer. (Ref C.6.3.5- C.6.3.6) Yes
Barite transfer feed rate ft3/min +
Cement transfer feed rate ft3/min +
Air compressor make and type +
Air compressor quantity No. 2
Working pressure Psi +
IDENTIFICATION CODE PAG80OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Driven by electric motor type and make Requested
- Power output HP +
- at RPM RPM +
Air vessel capacity Cu. m. +
C/w chemical drier/dehydration unit Yes/No +

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


F.3.6 Air Compressor for Dry System high-volume low-pressure compressor and air dryer.
Diesel Driven Yes
Quantity No 2 (two)
Make +
Type +
Driven by Motor Power HP +
Max Flow rate Capacity Ft3/min As Required

F.3.7 Air Dryer System for Bulk System


Quantity No 1
Make +
Type +
Driven by Motor Power HP +
Max Flow rate Capacity Ft3/min As Required
Max Service Pressure psi As Required
F.3.8 H.P. Mud shearing device
Quantity No 1
Make +
Type +
IDENTIFICATION CODE PAG81OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


F.4 Cementing Equipment
F.4.1 Cementing Unit (to be supplied by Other Contractor)
Cementing system to be capable to kill a well at 15,000psi and to be able of mixing and pumping slurries with a density up to 2.4
kg/lt
Owner of unit currently installed +
Make +
Type +
No. of triplex pumps No. +
Maximum working pressure psi +
Mixing/cementing flowrate at 3,000psi bbl/min +
Unit powered by (electric or diesel) +
Re-circulating mixing system Yes/No +
Capacity bbl +
Motor power kW +
Liquid additive system Yes/No +
No. of tanks No. +
No. of measuring tanks No. +
No. of transfer pumps No. +
Rated capacity of each bbl/min +
Premix/batch tank Yes/No +
Capacity bbl +
Pressure recorder range psi +
Batch mixer type/capacity bbl +
Pump rate at 15,000psi bbl/min +
Certified relief valve(s) type Yes/No +
F.4.2 High pressure Cement lines Two fixed line 3" x15,000psi WP is requested from the cement unit area to the Cement
manifold on rig floor with. The system shall be separate from the normal standpipe
F.4.2.1 High Pressure Cement Lines
Rigid Lines from Cementing Unit No. 2
to Rig Floor Cementing Manifold
Outside Diameter inch +
Min. Inside Diameter inch 3
Working pressure psi 15.000
WECO 1502 type discharge connection Yes Requested
F.4.2.2 High Pressure kill Mud Lines
H.P. Fixed line running from Cementing Unit area Rig Floor Mud Manifold to Kill manifold
Rigid Lines from Cementing Unit No. 2
to Kill Manifold
Inside Size Inch 2”
Working Pressure psi 15.000
End connection Type Weco +
F.4.2.3 Low Pressure Water Supply Lines
Hoses water supply line to Cementing Unit No 1
Area from the rig
Inside Size Inch 4”
Working Pressure psi +
IDENTIFICATION CODE PAG82OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


End connection Type Weco +
F.4.2.4 Low Pressure Mud Supply Lines
Hoses supply line to Cementing Unit Area 1
from the rig
Inside Size 4”
Working Pressure +
End connection Type Weco +
F.4.2.5 Rig Floor Cementing Manifold Rigid line to connect stand pipe and choke manifold with isolated valve
Make +
Type +
Inside diameter Inch 3”1/16
Working pressure psi 15.000
ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA
F.4.2.6 Cementing hose
Quantity No. 1 + 1+1
Make +
Inside diameter Inch 2”
Working pressure Psi 10.000 + 5.000
Length ft 70 + 100
F.4.2.7 Rig Floor Cementing Manifold valves
Quantity No. 7
Make +
Type +
Size Inch 3 1/16
Working Pressure Psi 15.000
F.4.2.8 Rig Floor Cementing Manifold Outlets
All outlets complete with isolation valve Yes/No +
Outlet connected Kill line nr 2 Inch/psi +
Outlet connected to the stand pipe Inch/psi
manifold
Outlet Weco Union wash overboard Inch/psi +
Outlet Weco Union spare Inch/psi +
Pressure sensors outlets quantity No. 2
Pressure sensors outlets. Inch/psi +
Sizes and working pressure
Pressure gauge No/psi 2” + 1 / 10.000 + 15.000

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'SDATA


F.5 Miscellaneous Additional Requirements
F.5.1 Wellsite Laboratory (Pressurized)
Fully air conditioned for zone 2 area with lighting, electric wall sockets, fresh water (hot Mud laboratory installed on the mud pit
and cold), compressed air supply, furnished with desk, executive chair, lockers, area.
stainless steel sinks, wall cupboards, drawers, spark proof air conditioner, adequate
lock benches, telephone, power 110-250 volts, toilet and shower.
F.5.2 Mud Testing Equipment
One sets of mud testing equipment each consisting of:
mud balances No. 2 (two)
IDENTIFICATION CODE PAG83OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


marsh funnel No. 2 (two)
filtration kit No. 1 (one)
sand content kit No. 2 (two)
stopwatches No. 2 (two)
F.5.3 Mud Tester Scope of Work
Mud Tester shall, as a minimum, performs mud tests when required. In addition, the
Mud Tester shall be capable of performing all relevant water based and oil based mud
tests to verify the basic mud condition e.g. density, viscosity, etc.

The Mud Tester shall, on behalf of the Company, be responsible for supervising the
performance monitoring, reporting and maintenance of the equipment specified herein
and the condition monitoring, reporting and maintenance of the mud properties.

The Mud Tester shall be responsible for the safe storage and handling of all
materials (bulk and palletized), chemicals and bulk liquid used in conjunction
with the above equipment specified herein.
IDENTIFICATION CODE PAG84OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

1.6 INSTRUMENTATION.
ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA
G Instrumentation
G.1 Drilling Instrumentation
G.1.1 Instruments at Driller's Position REQUESTED
G.1.1.1 Weight Indicator (10 or 12 Lines Strung)
Make Martin-Decker
Type +
Sensor Range Tons +
G.1.1.2 Standpipe Pressure Gauges
Quantity No. 2
Make +
Type +
Pressure range psi a range of all gauges shall be adequate
G.1.1.3 Choke Manifold Pressure Gauge
Quantity No. 2
Make +
Type +
Pressure range psi a range of all gauges shall be adequate
G.1.1.4 Rotary Speed Tachometer Rotary Table Top Drive Rotary Table Top Drive
Make 1 1
Type + +
Capacity range RPM + +
G.1.1.5 Rotary Torque Indicator Rotary Table Top Drive Rotary Table Top Drive
Make 1 1
Type + +
Torque Range + +
G.1.1.6 Pump Stroke indicator and Stroke counter
Consisting of stroke indicator and cumulative pump stroke counter of each one pump.
Make
Type +
Indicator sensor Analog or Digital Yes/No Requested
G.1.1.7 Tong Torque Indicator
Make 2 +1 Backup
Type +
Capacity range lb*ft +
G.1.1.8 Pit Volume Totaliser
Complete with floats in active mud tanks and on reserve tank complete with loss gain indicator and alarm (audio and visual)
Tanks were installed +
Make +
Model +
Pit Volume Gain/Loss Alarm Yes/No Requested
G.1.1.9 Mud Flow Indicator
Make +
Model +
High/low alarm (audio/visual) Yes/No Requested
G.1.1.10 Trip Tank mechanical Indicator and pneumatic/electronic indicator
Make +
IDENTIFICATION CODE PAG85OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Model +
Chart recorder Requested
G.1.1.11 General Alarm System Yes/No Requested
G.1.1.12 Automatic Driller Yes/No Requested
G.1.1.13 Instruments Hook Indicator
Hook position indicator Yes/No Requested
Make /Type +
Maximum rated load lbs +
Pull indicator sensor Requested
ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA
G.1.1.14 Remote Choke Control Unit
Make
G.1.2 Instruments In Driller's Doghouse (Ref. Item K.9) REQUESTED
G.1.2.1 Drilling Parameter Recorder
Make +
Type +
Quantity of pens No. 10
Parameter recorder: ROP Requested
Parameter recorded: Weight on Bit Requested
Parameter recorded: Weight on hook Requested
Parameter recorded: Rotary speed Requested
Parameter recorded: Top drive speed Requested
Parameter recorded: Rotary torque Requested
Parameter recorded: Top drive torque Requested
Parameter recorded: SPM Pump No 1 Requested
Parameter recorded: SPM Pump No 2 Requested
Parameter recorded: SPM Pump No 3 Requested
Parameter recorded: to be confirmed +
Pressure gauge cement manifold No 1
G.1.2.2 Pit Volume Recorder Yes Requested
G.1.2.3 Flowrate Recorder Yes Requested
G.1.2.4 Trip Tank Recorder Yes/No Requested
G.1.3 Instrumentation at Choke Manifold REQUESTED
G.1.3.1 Standpipe Pressure Gauges
Quantity No 2
Make +
Type +
Pressure range Psi 10.000
G.1.3.2 Choke Manifold Pressure Gauge
Make 2
Type +
Pressure rating psi +
Remarks:
Above combined on one panel and visible from choke operating position.
G.1.4 Instrumentation at Standpipe Manifold REQUESTED
G.1.4.1 Standpipe Pressure Gauge
IDENTIFICATION CODE PAG86OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Make 2
Type +
Pressure rating psi 5.000 – 10.000
Visible from driller's position. Yes/No Requested
G.1.5 Deviation EquipmentREQUESTED
G.1.5.1 Measuring Device
Quantity No. 1
Make/Type Single Shot
Deviation range Deg. 0–8
Deviation range Deg. 0 - 16
G.1.5.2 Wireline Unit Slick line REQUESTED
Make Mathey Unit or Equivalent
Model Hydraulic
Depth counter Yes Requested
Wire size inch 0,108”
Wire length feet 25.000
Pull indicator Yes Requested
Wire line breaking strength lbs +
Spare spool of wire Yes/No

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


G.1.6 General Instruments
Totco Ring Inch Requested Tenderer to specify sizes available
Tri-point calipers (e.g. HOMCO) Inch Requested Tenderer to specify range size
Internal/external calipers Inch Requested Tenderer to specify range size
Derrick tapes meter Requested
G.1.7 Calibrated Pressure Gauges
Contractor shall provide calibrated pressure gauges as required, in various ranges from 0 to 15,000psi.
Including facilities to install gauges on standpipe manifold, choke manifold and cement unit.
Make +
Type of instrument gauge +
Size Inch +
Connection +
Range psi +
Quantity No. +
Range psi +
Quantity No. +
Range psi +
Quantity No. +
Etc. up to 15,000psi. +
IDENTIFICATION CODE PAG87OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


G.2 Additional Instruments at Choke Control Panel (for each power choke)
G.2.1 Drill Pipe Pressure Indicator
Quantity No 2
Make Cameron or Equivalent
Type +
Pressure Transducer Type +
Pressure Reading range +
Pressure accuracy +
G.2.2 Annulus Pressure Indicator
Quantity No 2
Make +
Type +
Pressure Transducer Type +
Pressure Reading range +
Pressure accuracy +
G.2.3 Mud Pump Stroke Counter Indicator
Quantity No One for each pump
Make +
Type +
Display Analog/Digital +
G.2.4 Mud Pump Stroke Totalizer Indicator
Quantity No One for each pump
Make +
Type +
Display Analog/Digital +
G.2.5 Power Choke Opening Indicator
Quantity No 2
Make +
Type +
Display Analog/Digital +
IDENTIFICATION CODE PAG88OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
G.3 Environmental Instruments
Required proper instruments to provide and collect on board detailed weather information.
G.3.1 Anemograph
Electrical anemograph giving continuous recording of wind Yes/No Requested
speed and direction. (Accuracy: Speed - 1 knot; direction - 10o)
Make +
Type +
G.3.2 Wave rider
Wave profile recorder, giving recordings over 10 to 15 minutes Yes/No +
by automatic clock device, at three-hourly intervals with
provision to switch to continue recording. Recorder speeds 1"
and 2" per minute. Accuracy: within 5% of true water heights.
G.3.3 Current Meter
Current meter giving direct reading or record of speed and Yes/No Requested
direction. (Accuracy: speed - 0.1 knot, dir. 10o)
Depth Intervals meters +
Make +
Type +
G.3.4 Thermometer (Meteorologically approved) Yes/No Requested
G.3.5 Barometer (Meteorologically approved) Yes/No Requested
G.3.6 Hand-Held Anemometer Yes/No Requested
G.3.7 Other Equipment (Tenderer to specify if any)
IDENTIFICATION CODE PAG89OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACT


ITEM DESCRIPTION UNIT
REQUIREMENTS OR'S DATA
G.4 Navigational
G.4.1 Magnetic compass Yes/No
G.4.2 Navigation lights, other lights and signals
As per 'International Regulations for Prevention of Collisions at Sea (COLREG). Yes/No

G.4.3 Distress signals for use by day and night Yes/No


(including at least 12 parachute signals)
G.4.4 Radio-telephone station. Yes/No
(Complying with SOLAS 1974, Chapter 4, where applicable, and certified.)
G.4.5 Radio-Beacon Trasmitter. Yes/No
G.4.6 VHF radio-telephone station Yes/No
(in control room plus one in radio room)
G.4.7 Satellite Communication System Yes/No
G.4.8 Emergency position indicating radio beacon (EPIRB). Yes/No
(At least one, appropriate to the area of operation).
G.4.9 Helicopter radio communications equipment. Yes/No
G.4.10 Helicopter facilities Yes/No
(To comply with MODU code aviation requirements)
G.4.11 Helicopter homing beacon. Yes/No
G.4.12 GPS for positioning Yes/No
IDENTIFICATION CODE PAG90OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

1.7 WELL TESTING EQUIPMENT.


COMPANY MIN. CONTRACTOR'S
ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
H Well Testing
H.1 Burner Booms and Burner
H.1.1 Burner Booms (to be supplied by Company's Other Contractor)
To accommodate 6,000 BPD burners each boom Yes/No +
Type +
Quantity No. 2
Size +
Length feet +
Horizontal Yes +
Working pressure psi +
Height above water level feet +
Connection +
Maximum wind speed knots +
Burner platform size ft x ft +
Burner mounting table Yes +
Walkway and handrails Yes +
H.1.2 Burner (to be supplied by Company's Other Contractor)
Type
Quantity No.
Size
Capacity bbls/day
Weight MT
Working pressure psi
Height above water level feet
Water requirement at 100psi bbl/hr
Maximum wind speed knots
Air requirement at 100psi cuft/min
H.1.3 Rig Air System to Burners (to be supplied by Company's Other Contractor)
Air line Yes +
Quantity No. 2
Size Inch +
Working pressure psi +
Non-return valve fitted Yes +
ITEM DESCRIPTION UNIT COMPANY MIN. EQUIREMENTS CONTRACTOR'S DATA
H.2 Fixed Lines To The Point Where The Burner Booms Are Positioned
All lines to have ½" NPT pressure gauge connections at barge end of booms.
H.2.1 Oil Line (to be supplied by Company's Other Contractor)
Size Inch +
Working pressure Psi +
Connection at burner end +
Sour service Yes/No +
IDENTIFICATION CODE PAG91OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
H Well Testing
H.2.2 Gas Line (to be supplied by Company's Other Contractor)
Size Inch +
Working pressure Psi +
Extended beyond burner by Feet +
Connection at burner end +
Sour service Yes/No +
H.2.3 Water Line (to be supplied by Company's Other Contractor)
Size Inch +
Working pressure Psi +
Connection at burner end +
H.2.4 Air Line (to be supplied by Company's Other Contractor)
Size Inch +
Working pressure Psi +
Connection at burner end +
H.2.5 Pilot Gas Line (to be supplied by Company's Other Contractor)
Size Inch +
Working pressure Psi +
ITEM DESCRIPTION UNIT COMPANY MIN. CONTRACTOR'S
REQUIREMENTS DATA
H.3 Sprinkler System
Sufficient to give protection to rig and personnel against heat Yes/No
radiation damage from the burners at maximum expected flow rate.
ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA
H.4 Fixed Lines for Well Testing
H.4.1 Drill floor To Separator Area ( not request)
Quantity No. +
Size Inch +
Working pressure Psi +
Connection on drill floor +
Connection at separator +
Sour service Yes/No +
H.4.2 Separator Area To Both Burner Booms ( not request)
H.4.2.1 Gas Line
Valves to be installed near separator area for switching gas to either burner.
Quantity No. +
Inside diameter Inch +
Working pressure Psi +
Connection at separator +
Number of valves No. +
Size inch +
Working pressure Psi +
Sour service Yes/No +
H.4.2.2 Oil Line ( not request)
IDENTIFICATION CODE PAG92OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
H Well Testing
Valves to be installed near separator area for switching oil to either burner.
Quantity No. +
Inside diameter Inch +
Working pressure Psi +
Connection at separator +
Number of valves No. +
Size inch +
Working pressure Psi +
Sour service Yes/No +
H.4.3 Mud Pumps to Both Burner Booms (Water Line)
Quantity No. +
Number of valves required No. +
Size inch +
Working pressure Psi +
Connected to fire-fighting pumps Yes/No +
Rated line capacity at 300psi. bbl/hr +
H.4.4 Separator to Vent Stack of Rig ( not request)
RIGID pipe Yes/No +
Quantity No. +
Size inch +
Working pressure Psi +
Connection at separator area +

H.4.5 Oil Storage Tank line To Overboard ( not request)


RIGID pipe Yes/No +
Quantity No. +
Size inch +
Working pressure Psi +
Connection at Storage Tank +

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


H.4.6 Power Requirement
H.4.6.1 For Field Laboratory
Quantity No. +
Voltage Volts +
Frequency Hz +
H.4.6.2 For Crude Transfer Pump
Quantity No. +
Voltage Volts +
Frequency Hz +
H.4.6.3 For Electric Heater (If Used)
Quantity No. +
Voltage Volts +
IDENTIFICATION CODE PAG93OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

1.8 ACCOMMODATION.
ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA
I Accommodation: With full climate control for Nigeria weather conditions
I.1 Offices
I.1.1. Company drilling Supervisor's and Operations engineer's office.
Requested complete with desk, filing cabinets, No 2 personal computer with Windows and Microsoft Office installed, Laser Jet or
color printer, photocopier, and all necessary furniture.( See K.10 )
Unrestricted View to Drill Floor Requested
Quantity No. 1
Size +
Telephone facility Yes Requested
Living room Yes/No. Requested
Toilet and shower Yes/No. +
I.1.2. Company Geologist and Directional drilling engineer’ office
Requested complete with desk, filing cabinets, No 1 personal computer with Windows and Microsoft Office installed, Desk-Jet or
color printer, photocopier, and all necessary furniture.
Unrestricted View to Drill Floor Requested
Quantity No. 1
Size +
Telephone facility Yes Requested
Living room Yes/No. Requested
Toilet and shower Yes/No. +
I.1.3 Contractor Toolpusher office
Requested complete with desk, filing cabinets and all necessary furniture.
Unrestricted View to Drill Floor Requested
Quantity No. 1
Size +
Telephone facility Yes +
Living room Yes/No. +
Toilet and shower Yes/No. +
I.1.4 Dressing Room for Contractor and Company use
Requested complete with all necessary furniture.
Quantity No. 1
Size +
Toilet and shower Yes +
I.1.5 Office Room for contractor Company’s use
Requested complete with all necessary furniture, telephone power connection one computer with internet connection, spare
internet line.
Quantity No. +
Size +
Toilet and shower Yes +
IDENTIFICATION CODE PAG94OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


I.1.6 Mechanical Workshop REQUESTED
Size +
Location +
Completed with (main machines) +
I.1.7 Warehouse for Company store REQUESTED
Quantity No. 1
Size mt 5x3
Location +
I.1.8 Warehouse with cooled store for rubbers & Electronics spare parts
Quantity No. 1
Size +
I.1.9 Radio room No. Requested
I.1.10 Hospital room (see J.6.3 / 6.4 / 6.5/ 6.7)
Beds No. +
Hospital room containing, wash basin, medical cabinet, two stretchers (one for helicopter
transportation), ecc. [Tenderer Statement]
Hospital room access for a Yes/No +
stretchers
Resuscitators No. 2
I.1.11 Space for Well Logging Unit and Tools Requested
Size +
Location +
I.1.12 Space for Mud Logging Unit and Tools Requested
Size +
Location +
I.1.13 Space for Cementing Unit and Tools
Size +
Location +
I.1.14 Space for Cement Batch Mixer Tank
Size +
Location +
I.1.15 Space for Decanting Centrifuges to Treat Mud Requested
Size +
Location +
I.1.16 Space for Directional Drilling UnitRequested
Size +
Location
I.1.17 Space for other Third party Unit and Tools
Size +
Location +
I.1.11 Utility Services for above Spaces
Fresh Water Yes Requested
Air Compressed Yes Requested
Electrical power Yes Requested
IDENTIFICATION CODE PAG95OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Interphone Yes Requested
General Alarm Yes Requested
IDENTIFICATION CODE PAG96OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
I.2 Accommodation & Living Quarters
Living quarters with full climate control for Nigeria weather conditions Yes/No Required
Living Quarters comply with International Safety Rules Yes/No Required
(IMO MODU CODE)
Living Quarters are Positive pressurized Yes/No Required
Living Quarters has a direct access way connected with machinery deck Yes/No Required
Total accommodation for Personnel No. Minimum 115
(Company Pers. Min. 48)
I.2.1 Accommodation
Separate accommodation for Company staff No. 4 single bed
(Company Man, Night Company Man, Engineer,Geologist).
Complete with own shower/bathroom, TV & DVD Player & Satellite Yes
Accommodation for Company's Other staff No. 4 Double beds
Complete with own shower/bathroom Yes
Accommodation for Company's Other Contractor personnel No. 10 Four beds
Accommodation for Contractor staff No. +
Accommodation for Contractor’s personnel No. +
Galley local + Galley continental No. 1 +1
Local staff mess room for No of peoples No. 50
Local contractor mess room for No of peoples No. 20
Continental mess room for No of peoples No. 10
Senior Recreation room complete with ( TV & DVD Player & Satellite ): No. Requested
Junior Recreation room for No of peoples( TV & DVD Player & Satellite ): No. Requested
Contractor Company’s Recreation room for No of peoples( TV & DVD No. Requested
Player & Satellite ):
Laundry room complete with: No 3 washing machine, No 2 drier No. Requested
Dry food store No. Requested
Mineral & water store No. Requested
Refrigerator vegetable store No. Requested
Refrigerator meat room No. Requested
Refrigerator fish room No. Requested
Accommodation for Catering Contractor’s personnel No. +
Accommodation for Other’s Contractor’s personnel No. +
Showers & Toilets for No of peoples No. +
Potable water maker No. Requested
Potable water maker make / type +
Potable water maker capacity m3/hr +
Potable water tank capacity m3 +
Smoke detector alarm system with sensor in all rooms Yes
Fire detector alarm system with sensor in all rooms Yes
Desalinization and water filter Unit No. Requested
Desalinization and water filter Unit capacity m3 day +
Sterilized adequate supplied system for Kitchen water Yes Requested
Adequate Circulation pressure pump with automatically Yes Requested
IDENTIFICATION CODE PAG97OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
low press. start & stop

I. 2.2 Electric Semisubmersible Pump to supply potable water from the water wells ( Ref K.8. 4.)
Quantity No 3
Make +
Type +
Power kw 3
Frequency Hz +
Electric Board Yes +
Flow rate m3/hr +
PVC hose to connect pump to the rig Ft As it is requested
Electrical cable and switch to power the pumps Ft As it is requested
I.3 House –Boat Accommodation Required
House Boat with full climate control for Nigeria weather conditions Yes/No Required
House Boat comply with International Safety Rules Yes/No Required
(IMO MODU CODE)
Living Quarters are Positive pressurized Yes/No Required
Total accommodation for Personnel No. Minimum 100
(Company Pers. Min. 50)
I.3.1 Accommodation
Separate accommodation for Company staff No. 10 single bed
Complete with own shower/bathroom, TV & Satellite Yes
Accommodation for Company's Other staff No. 40 Double beds
Complete with own shower/bathroom Yes
Accommodation for Company's Other Contractor personnel (Army) No. 15 Four beds
Yes
Galley local + Galley continental No. 1 +1
Local staff mess room for No of peoples No. 50
Local contractor mess room for No of peoples No. 20
Continental mess room for No of peoples No. 10
Senior Recreation room complete with ( TV & DVD Player & Satellite ): No. Requested
Junior Recreation room for No of peoples( TV & DVD Player & Satellite ): No. Requested
Contractor Company’s Recreation room for No of peoples( TV & DVD No. Requested
Player & Satellite ):
Water Distillation Unit and Water filter Unit with Sterilizer system No. Requested
Laundry room complete with: No 3 washing machine, No 2 drier No. Requested
Dry food store No. Requested
Mineral & water store No. Requested
Refrigerator vegetable store No. Requested
Refrigerator meat room No. Requested
Refrigerator fish room No. Requested
Accommodation for Catering & cleaning Contractor’s personnel No. 10
Accommodation for house boat Contractor’s personnel No. 10
Water Boiler for shower and kitchen No. 2
IDENTIFICATION CODE PAG98OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
Showers & Toilets for No of peoples No. +
Sterilized adequate supplied system for Kitchen water Yes Requested
Adequate Circulation pressure pump with automatically Yes Requested
low press. start & stop
Smoke detector alarm system with sensor in all rooms Yes
Fire detector alarm system with sensor in all rooms Yes
Storage capacity: fuel for 30 days of autonomy m3
Storage capacity: potable water 30 days of autonomy m3
Electrical Generator with power at 70 % with all utility on No. 2
IDENTIFICATION CODE PAG99OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

1.9 SAFETY EQUIPMENT.


ITEM DESCRIPTION UNIT COMPANY MIN. CONTRACTOR'S DATA
REQUIREMENTS
J Safety Equipment
J.1 Safety Equipment
Following specifies in general the safety items required on offshore units. Regulations in the country of operations may require
more specified items. Contractor to submit details of fire-fighting and safety equipment on Company's request.
J.1.1 General Safety Equipment To Be Provided By The Contractor
Safety equipment shall meeting applicable standards.
Safety hats Yes/No +
Safety boots Yes/No +
Safety overalls Yes/No +
Ear protection Yes/No +
Rubber gloves Yes/No +
Rubber aprons Yes/No +
Full face visors Yes/No +
Eye shields (for grinding machines, etc.) Yes/No +
Rubber gloves - elbow length for chemical handling Yes/No +
'No Smoking' signs Yes/No +
'Hard Hat' signs Yes/No +
Explosion proof hand torches c/w batteries Yes/No +
Safety belts c/w lines Yes/No +
General alarm & muster point Yes/No +
Warning signs (HP-testing, radioactivity, etc) Yes/No +
Approved safety helmets for visitors Yes/No 15
J.1.2 Eye Wash And Emergency Shower Stations
Quantity No. 4
Make/Model +
Located at +
J.1.3 Derrick Safety Equipment REQUESTED
Derrick escape chute (rem chute) No. +
Type +
Derrick safety belts No. 5
J.1.4 Derrick Climbing Assistant (Required)
Make +
Certification (Last Date) Requested
J.1.5 Fresh Air Blowers REQUESTED
Quantity No. 4
Make +
Type +
Located at Rig Floor
IDENTIFICATION CODE PAG100OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN.
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
REQUIREMENTS
J.2 Gas Detection
Responsible person(s) for repairing/testing/maintaining gas detection equipment:
Responsible Person Qualifications YES
J.2.1 H2S Monitoring System REQUESTED
Make +
Type +
Calibration Kit No. 3
H2S Monitoring Main Panel Location Radio room
H2S Monitoring Repeat Panel Location Rig Floor
H2S Sensor Installed No. 15
Sampling points at:
Bell nipple Yes Requested
moon Pool Area Yes Requested
Drill floor Yes Requested
shale shaker Yes Requested
Mud tanks room Yes Requested
Mud pump room Yes Requested
engine room Yes Requested
All suction point air conditions for area Yes Requested
living quarter and for all the pressurized
unit.
machinery deck air intake Yes Requested
Others Yes +
C/w general alarm Yes Requested
Alarm points (A = Audible; L = Light):
Driller's console A+L
Engine room A+L
Active mud tanks room A+L
Shale shaker room A+L
Others: main deck, contractors cabin A+L
control room, mechanic & electrical
work shop, moon pool & pump area.
H2S signs Requested
Windsocks Requested
Training video Requested
J.2.2 Combustible Gas Monitoring System REQUESTED
Make +
Type +
Calibration Kit No. Requested
Gas Monitoring Main Panel Location Radio room
Gas Monitoring Repeat Panel Location Rig Floor
Gas Sensor Installed No. +
Sampling points at:
bell nipple Yes/No Requested
IDENTIFICATION CODE PAG101OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN.
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
REQUIREMENTS
moon Pool Area Yes/No Requested
drill floor Yes/No Requested
shale shaker Yes/No Requested
mud tanks room Yes/No Requested
mud pump room Yes/No Requested
engine room Yes/No Requested
All suction point air conditions for area Yes/No Requested
living quarter and for all the pressurized
unit.
machinery deck air intake Yes/No Requested
Others: main deck, contractors cabin Yes/No +
control room, mechanic & electrical
work shop, moon pool & pump area,
C/w general alarm Yes/No Requested
Alarm points (A = Audible; L = Light):
Driller's console A+L
Engine room A+L
Active mud tanks room A+L
Shale shaker room A+L
Others: main deck, contractors cabin A+L
control room, mechanic & electrical
work shop, moon pool & pump area.
IDENTIFICATION CODE PAG102OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN.
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
REQUIREMENTS
J.2.3 Portable H2S Detector
Quantity ( Minimum) No. 3
Make +
Type +
Phials for H2S measuring range
from 1 to 20 ppm No. 50
from 20 to 100 ppm No. 50
from 100 to 600 ppm Yes/No 30
J.2.3.1 Electronic portable H2S detectors YES
Quantity ( Minimum) No. 4
J.2.4 Portable CO2 Detector
Quantity (Minimum) No. 2
Make +
Type +
Store sites +
Phials for CO2 measuring range
from 1 to 20 ppm No. 30
from 100 to 600 ppm No. 15
Zone 1 Classification Yes/No Requested
J.2.5 Gas Detector
Quantity No. 4
Make/Type +
Store sites +
J.2.6 Personal Electronic H2S Detectors
Quantity ( Minimum) No. 4
Make +
Type +
IDENTIFICATION CODE PAG103OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.3 Fire Fighting Equipment
All equipment shall meet the requirement of chapter 9.4 of IMO Code for the Construction and Equipment of MODU's except for
any additional requirements below.
J.3.1. Smoke / Heat / Fire Monitoring System
Make +
Type +
Sensor Type +
Engine room Area monitored Requested
Living Quarter Area monitored Requested
Machinery deck Area monitored Requested
Other Area monitored +
Other Area monitored +
Other Area monitored +
Monitor Panel Controls installed at: Requested
J.3.2 Fire Fighting Pumps
Each fire pump shall supply all off take points (I.e. all hydrants, deluge systems, etc). Each fire pump shall be capable of
feeding two hoses at full capacity, whilst supplying the largest single user system and maintaining a pressure of 100psi at any
off take point. This requirement can take the required pump size above the 180m3/hr specified in the MODU code.
Quantity No. 2 2
Make +
Model +
Flow rate of each m3/hr +
Located at Requested
Power supply available 1 Electrical / 1 Diesel
J.3.3. Hydrants And Hoses
Hydrants shall be positioned such that any point may be reached by a single hose Tenderer Statement
length from two separate hydrants
Quantity No. As Required
Hose connections/hydrants
Hose maximum diameter Inch
Length meters
J.3.4 Fire Extinguishers
J.3.4.1 Portable
Quantity [To be mounted adjacent No. As Required
to access ways and escape routes[
Make +
CO2 No. +
Dry chemical No. +
Water No. +
J.3.4.2 Fixed Foam Extinguishing System Installed
Type +
Capacity Gpm +
Helideck Yes Requested
Well head Yes +
Komey BOP unit Yes +
IDENTIFICATION CODE PAG104OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Engine room Yes +
Paint store Yes/No +
Automatic Sprinkler System in Yes Requested
Living Quarters
J.3.4.3 Fixed Co2 Extinguishing System Installed
Type +
Capacity Gpm +
Kitchen Yes Requested
SCR room Yes/No +
Emergency generator room Yes/No +
IDENTIFICATION CODE PAG105OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.3.5. Fire Fighting System Locations
J.3.5.1 Rig Floor
Hydrants Yes/No As Required
Water Deluge +
Portable extinguishers Yes/No As Required
Capacity lbs +
Extinguishing material +
J.3.5.2 Shale Shaker Area
Hydrants Yes/No As Required
Water Deluge +
Portable extinguishers Yes/No As Required
Capacity lbs +
Extinguishing material +
J.3.5.3 Mud Tank
Hydrants Yes/No As Required
Water Deluge +
Portable extinguishers Yes/No As Required
Capacity lbs +
Extinguishing material +
J.3.5.4 Mud Pump Area
Hydrants Yes/No As Required
Water Deluge +
Portable extinguishers Yes/No As Required
Capacity lbs +
Extinguishing material +
J.3.5.5 Engine room
Hydrants Yes/No As Required
Water Deluge +
Portable extinguishers Yes/No As Required
Capacity lbs +
Extinguishing material +
J.3.5.5 Diesel fuel storage area
Hydrants Yes/No As Required
Water Deluge +
Portable extinguishers Yes/No As Required
Capacity lbs +
Extinguishing material +
J.3.5.6 SCR room
Hydrants Yes/No As Required
Water Deluge +
Portable extinguishers Yes/No As Required
Capacity lbs +
Extinguishing material +
J.3.5.7 BOP Accumulator area
Hydrants Yes/No As Required
IDENTIFICATION CODE PAG106OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


Water Deluge +
Portable extinguishers Yes/No As Required
Capacity lbs +
Extinguishing material +
J.3.5.8 Living Quarters area
Hydrants Yes/No As Required
Water Deluge +
Portable extinguishers Yes/No As Required
Capacity lbs +
Extinguishing material +

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.3.5.9 Helideck area
Fire monitors No. +
Hydrants Yes/No As Required
Water Deluge Yes/No Yes
Portable extinguishers Yes/No C
Capacity lbs +
Extinguishing material +
J.3.6 Fire Blankets (See J.6.2)
Location +
Quantity No. 6
Make +
J.3.7 Foam To be automatically injected into fixed fire water system at central point with remote manual control
Make/Type +
Quantity No. Requested
Inductor tube Yes/No +
Foam nozzles Sizes Inch +
Located at Helideck
Located at +
J.3.8 Helideck Foam System
Dedicated system adequate for at least 10 minutes fire fighting at the rate quoted in the Tenderer Statement:
MODU code.
Make/Type +
Quantity No. As Required
Foam type +
Foam monitor Yes/No +
Total rate gpm +
Submit drawing of layout fire fighting plan
At each access point, hand branch with instantaneous coupling in quick access locker. Tenderer Statement:
Hose size/Coupling +
IDENTIFICATION CODE PAG107OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.4 Personnel Protective Equipment
J.4.1 Breathing Apparatus
J.4.1.1 Air Breathing Apparatus
Quantity No. 30
Make +
Type +
Duration min. 30
Spare bottles per back-pack No. 3
Quantity located at fire lockers, drill floor, No. +
pump room
Quantity located at mechanic workshop No. +
Quantity located at helideck, office No. +
J.4.1.2 Escape Breathing Apparatus
Quantity No. 110
Make +
Type E.L.S.A. with hood +
Duration min. 10
J.4.2 Shower Stations
Quantity No. 4
Make/Type +
Location +
J.4.3 Breathing Air Recharge Compressor
Quantity No. 1
Make/Type +
Location +
J.4.4 Compressed Air Breathing Apparatus
Trolley Unit Yes/No 1
J.4.5 Air Purity Test Equipment
Make 2
Type +
J.4.6 Escape Masks (H2S)
Quantity No. 120
Make +
Type +
Locations +
Spare filters No. 60
J.4.7 Escape Masks (Smoke Hoods) see J.4.6
Quantity No. +
Make +
Type +
Locations +
Spare filters No. +
IDENTIFICATION CODE PAG108OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.5 Ventilation Into Enclosed Hazardous Areas REQUESTED
J.5.1 Air Blowers
Quantity No. 18
Make +
Type +
Blowing Rate ft3/min. +
Classified for hazardous areas Yes/No Requested
J.5.2 Shale Shaker Room Yes/No Requested
Air Change Rate No./m. +
J.5.3 Mud Pit Room Yes/No 6
Air Change Rate No./m. +
J.5.4 Mud Pump Room Yes/No 3
Air Change Rate No./m. +
J.5.5 Engine Room Yes/No 5
Air Change Rate No./m. +
J.5.6 Rig floor Yes/No 4
Air Change Rate No./m. +

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.6. First Aid Equipment
At all main work and accommodation areas.
J.6.1 First Aid Kits
Quantity. No 5
Location As Required
J.6.2 Burn Kits/Fire Blankets (Ref. Item J.3.6)
Quantity No. 6
Locations
J.6.3 Resuscitators (c/w spare charged, oxygen cylinders)(see I.1.10)
Quantity No. +
Locations +
J.6.4 Stretchers (see I.1.10)
Quantity No. 2
Type +
Locations +
J.6.5 Sick Bay – with attached list equipment, medicines and drugs (see I.1.10)
Quantity No. 1
Private Bath Room Yes/No +
Beds No. 1
Refrigerator Yes/No 1
Sink and draining area Yes/No +
Hot and Cold Water Supply Yes/No Yes
J.6.6 Difibrillaor Yes +
Quantity No 1
Manufactory
IDENTIFICATION CODE PAG109OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.6.7 Supplies
All necessary medicines, drugs, Yes/No Requested
equipment.

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.7 Helideck Data & Rescue Equipment
J.7.1 Landing Deck Data
Designed and certified for helicopter (DAUPHIN – N 3/SIKOSKY 76 C+ or similar )
Dimension ft x ft +
Perimeter safety Net type +
Perimeter safety Net width ft +
J.7.1 Storage Boxes
Quantity No. +
Construction +
Max. height open cm +
J.7.2 Equipment
Aircraft axe No. 2
Large fireman’s rescue axe No. 2
Crowbar 75 cm No. 2
Heavy duty hacksaw No. 3
Grapple hook with 5m wire rope No. 2
attached
Quick release knife No. 2
Bolt croppers 60cm No 2
Wind socks No 2+2
Close proximity fire suit No. sets Requested
complete with helmet, boots and
gloves
Fire blanket (non asbestos) No. 3
Battery operated headlamp No. 3
(3hrs duration-explosion proof)

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
J.8 Rig Safety Store
Sufficient equipment to repair and recharge safety equipment
- Foam concentrate Kg Yes
- Dry chemical charges No Yes
- CO2 charges for Dry chemical extinguishers No Yes
- CO2 charges for Water extinguishers No Yes
- CO2 charges for Foam extinguishers No Yes
- Discharge hoses, control nozzles and horns and washers for dry No + Yes
chemical extinguishers
- Fire man Suit No Yes
IDENTIFICATION CODE PAG110OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
- Fire Blankets No Yes
- Fireproof gloves No Yes
- Rubber gloves - elbow Length No Yes
- Rubber aprons No Yes
- Rubber boots No Yes
- Full face visors No Yes
- Eye shields (for grinding machines, etc). No Yes
- Dust masks No Yes
- Spare safety helmet, boots, overalls No Yes
- Gloves, hand torches, batteries, etc. No Yes
- Fresh Air Blowers/inductors for ventilating enclosed spaces No Yes
- Safety belts complete with line No Yes
- Full safety harnesses No Yes
- Spare derrick man’s safety belts No Yes
- Batteries for Exp. Proof electrical lights No Yes
- Batteries for Exp. Proof for walking Talking Radio No Yes
- Spare SCBA bottles, charged (Ref: J.4.1) No Yes

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S


DATA
J.9 Emergency Warning Signal
An efficient system to give warning of an emergency audible to all personnel in all locations
General emergency (fire, blowout, etc.) Yes/No +
Prepare to abandon ship Yes/No +
An independent audible alarm for H2S Yes/No +
IDENTIFICATION CODE PAG111OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.10 Survival equipment to comply with any regulation IMO MODU CODE & Solas 1974 and
amendments (1983 Amendments to apply)
J.10.1 Survival Craft
Company requires that with any one launching station inoperable the craft at the remaining stations can accommodate the
maximum number of people on board the installation at any time.
Make +
Type +
Quantity No. +
Certified by: +
Capacity (person/craft) No./No. +
Fire protection Yes/No +
Launch/release system Yes/No +
J.10.2 Life Rafts
Make / Type +
Quantity No. +
Certified by: +
Capacity (person/Rafts) No./No +
Launch/release system Yes/No +
J.10.3 Rescue Boat, Diesel Not required
Powered
Make/Type +
Capacity No. +
J.10.4 Work Vests
Company requires 50 percent excess over number of people working in exposed locations.
Make/Type +
Quantity No 50
J.10.5 Life Jackets
Minimum number is twice maximum POB. One life jacket to be at every berth and one for each life boat (seat, stored at the
muster station). Emergency lighting shall be provided at muster station.
Make/Type +
Quantity No. 200
J.10.6 Survival Suits Not required
Quantity No. +
Make +
Type +
Certified by: +
J.10.7 Life Buoys Not required
At least 4 to include self-igniting lights and self activating smoke signals. All to have buoyant life-lines of length at least 1.5
times the distance from deck to waterline.
Quantity No. +
Make/Type +

J.10.8 Portable Radio Apparatus walking talking


Make/Type +
Explosion proof Yes
Quantity No. 15
IDENTIFICATION CODE PAG112OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.10.9 Distress Signals
Type/ Quantity +

COMPANY MIN. CONTRACTOR


ITEM DESCRIPTION UNIT
REQUIREMENTS 'S DATA
J.10.10 Life line quantity No. + Yes
(throwing appliance complying with Regulation 49 of SOLAS
Chapter III 1983)

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.11 Emergency Lighting and Generator
Lighting to be fed from emergency generator. To come into service automatically in event of main failure.
Emergency lights location: Specify the Locations
Rig floor Yes +
Diesel Engine plant Yes +
Red Lights on top of mast Yes +
Accumulator Unit for BOP Yes +
Radio communication system Yes +
Company Office
Contractor Office
Mud pit area
Shaker area
Control room
Electrical air compressor Yes +
J.11.1 Emergency Lights
Explosion Proof Electrical light No 20
IDENTIFICATION CODE PAG113OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


J.12 Miscellaneous
J.12.1 Emergency Escape Rigid Ladders
Available Yes/No +
Quantity No. +
Type +
J.12.2 Emergency Escape Knotted lines
Available Yes/No +
Quantity No. +
Type +
J.12.3 Emergency Escape line for derrickman Requested
Available Yes/No +
Quantity No. +
Type +
J.12.4 Emergency Storing Area for Explosive Container Requested
Available Yes/No +
Location +
J.12.5 Emergency Storing Area for Radioactive Sources Requested
Available Yes/No +
Location +
IDENTIFICATION CODE PAG114OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

1.10 MISCELLANEOUS EQUIPMENT.


COMPANY MIN. CONTRACTO
ITEM DESCRIPTION UNIT
REQUIREMENTS R'S DATA
K Miscellaneous Equipment
K.1 Materials Handling/Cranes (Company's minimum requirement)
Revolving cranes, with a sufficient length boom, fast and load lines and drums of sufficient capacity to reach the water line.
Cranes shall be in accordance with API standard 2C and preferably be provided with the API monogram and conform to the
requirements of Government regulatory bodies.
All cranes to be tested prior to the "Commencement Date" 10% above their full working load or in accordance with local
requirements, whichever is greater.
Tests to be witnessed by Certifying Authority and copies to be forwarded to Company.
K.1.1. Pedestal Cranes ( See A 1.2 ) Portside Starboar Portside Starboa
d rd
Quantity No. 1 1
Certification (API 2C, ABS,etc.) + +
Manufacturer + +
Type + +
Minimum capacity and hoisting speeds MT-m/sec + +
Boom Length feet 70 100
Line length feet
Maximum Rated Capacity at 30 ft radius MT 40 60
Maximum Rated Capacity at maximum radius MT + +
Low gear speed ft/m + +
Driving system (electric, hydraulic, diesel, etc.) + +
Cranes to be fitted with:
a) Hook load indicator with visual or audible overload warning device Yes/No + +
automatically corrected for boom angle.
b) Hook fitted with safety latch. Yes/No + +
c) Automatic brake (deadman's handle). Yes/No + +
d) Crown savers Yes/No + +
K.1.2. Pipe Rack Overhead Crane
Quantity No. +
Certification (API, etc.) +
Manufacturer +
Type +
Rated capacity MT +
K.1.4. Basket for cargo handling for Company material
All material lifting and hoisting equipment to be marked showing the date of test
inspection and the SWL. Test/inspection dates valid for the Contract duration. Cranes will
be tested as per ABS annual requirements.
Quantity No 8
Manufacturer +
Type open
K.1.5 Basket for cargo handling for contractor material.
All material lifting and hoisting equipment to be marked showing the date of test
inspection and the SWL. Test/inspection dates valid for the Contract duration. Cranes will
be tested as per ABS annual requirements.
Quantity No As Requested
IDENTIFICATION CODE PAG115OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTO


ITEM DESCRIPTION UNIT
REQUIREMENTS R'S DATA
K Miscellaneous Equipment
Manufacturer +
Type open
K.1.6 Basket for Personnel Transshipment.
All material lifting and hoisting equipment to be marked showing the date of test Yes 1
inspection and the SWL. Test/inspection dates valid for the Contract duration. Cranes will
be tested as per ABS annual requirements.
K.1.6 Slings for cargo handling.
All material lifting and hoisting equipment to be marked showing the date of test Yes/No As Requested
inspection and the SWL. Test/inspection dates valid for the Contract duration. Cranes will
be tested as per ABS annual requirements.
K.1.7 Pipe Racks
Area sq. meters +
Capacity MT +

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
K.2 Welding Equipment
Two electric welding sets 400 AMP capacity. Yes/No +
Two oxygen and acetylene cutting torches. Yes/No +
Hoses and cables to allow operation anywhere on the Yes/No +
installation. Purpose built rack for oxygen and acetylene.
Bottles quantity No. As Required
Electric welding machines quantity and Make No. 3
Oxy-propane cutting gear quantity No. 2
IDENTIFICATION CODE PAG116OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
K.3 Communications
A radio room approx. 5m x 4m complete with benches drawers, Yes/No + yes
electrical supplies and aerial feeders for the installation of
Company supplied radio and communications equipment.
K.3.1 Main Single Side Band (SSB) Radio Telephone
Manufacturer & type +
Output Power W +
Transmit frequencies Hz +
Battery capacity +
K.3.2 Watch keeping Receiver REQUESTED
Manufacturer & type +
Frequency Hz +
K.3.3 VHF-FM Radio Telephone REQUESTED
Manufacturer & type +
Output Power W +
Channels (Hague frequencies) +
K.3.4 VHF-AM Helicopter Transceiver REQUESTED
Manufacturer & type +
Output Power W +
Channels +
K.3.5 PA System REQUESTED
Covering Principal areas of the Drilling unit, explosion proof Yes +
where necessary
Company office Yes +
Company room Yes +
Contractor office Yes +
Rig floor Yes +
SCR barack Yes +
Mud mixing Area Yes +
Shale shaker Yes +
Mud Pumps area Yes +
BOP Yes +
.Other points Yes/No +
K.3.6 Aeronautical Non-Directional Helicopter Beacon REQUESTED
Type +
Frequency Hz +
Range +
Transmitted Signal +
K.3.7 Satellite Communication System REQUESTED
'Inmarsat A' terminal for voice with two wire in co. man office, Yes/No +
interface suitable for dial-up PC and mail. for Company use
K.3.8 Satellite Communication System
Internet connection in Co. man, geologist offices and rooms
interface suitable for dial-up PC connection and Skype
System . for Company use
IDENTIFICATION CODE PAG117OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
Connection quantity No 4
IDENTIFICATION CODE PAG118OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
K.3.8 Portable walkie-talkie (intrinsically safe) ( See J.10.8) REQUESTED
Quantity No. 15
Make/Model Motorola or Equivalent
Suitable for hazardous area Yes/No +
Frequencies compatible with VHF-FM RadioTelephones above Yes/No +
Supplied with external microphone / ears phone / laryngophone Min. No. 10
Spare battery Min No 15
K.3.9 Life Boat Radio (Not requested)
Quantity (min. 1/lifeboat) Yes/No +
Mobile phones for Company duty personnel (min. 2) to be Yes/No +
operational through out Nigeria International line required. All
charges related to use are for Company's account at cost.
K.3.10 Pagers for Company and Contractor No. +
Notes: - Radio Telephone station to comply with SOLAS 1974, Chapter 4, where applicable and certified. Helicopter facilities to
comply with MODU code, Chapter 13.
- An internal telephone system with extensions to the moon pool area, Well-site, Laboratory, logging unit, cementing unit,
all pontoons, company staterooms, offices, shaker area, drill floor, directional unit, mud pit, engine room,
- drill floor and radio room in addition to the principal compartments of the drilling rig. Explosion proof extensions to be
provided where necessary.
- Bell system for alarm as per MODU.
- 2 Pieces Portable loud hailers
- Public address system covering principal areas of the drilling rig, explosion proof where necessary. Hands off system to
be available for communications between
- driller/derrickman/rig crew.
- All mandatory marine radio equipment such as HF, VHF-FM, etc. VHF-FM channels to be fitted: 6, 15, 16, 17,19, 73,
77,HF synthesized min. frequencies;
- 4028.5, 4400.0, 4393.1,4512.0 kHz.
- Inmarsat A' Terminal for voice and telex with two wire interface suitable for dial-up PC and Fax transmission
ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA
K.4 Scales
Weighing scale in connection with helicopter operations, capacity 360kg.
Scales No.
K.5 Miscellaneous Facilities
K.5.1 Portable transferring water pump
Rig site quantity No 2
Make +
Type +
Driven by motor type Electric & Diesel
Motor power Hp +
Hose m As required from the barge to the rig
Their main use for Mud / Brine & Rig cleaning
K.5.2 Water supply line
Contractor supply the water manifold and lines for connected the Water System to the facility
Manifold valves No +
Valves size Inch +
IDENTIFICATION CODE PAG119OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
Line OD size Inch +
Line total length m + Yes
K.5.3 Portable transferring Mud Transfer Pump
Contractor supplies Three electrical or air pump with 8 m. minimum of prevalence and capable to reach 40 m 3/hr with 50m of
4”hoses for Rig operations use.
Quantity No 2
Make +
Type +
Driven by motor +
Motor power Hp +
K.5.4 Pile Driving Hydrohammer (from 30” to 13”⅜ pipes)
Complete to operate with Power unit, Hydraulic control set, hydraulic hoses and carrying cradle.
Make / Type
Piling hammer Operartor No 2
Welders to well conductor No 6
pipe
K.5.6 Cranes (Rig Operations see A 1.1)
One of 40 Tons Hoist Capacity for rig operation on Nigeria swamp environment
Manufacturer/type +
K.5.7 Cranes (Rig Operations see A1.2)
One of 60 Tons Hoist Capacity for rig operation on Nigeria swamp environment
Manufacturer/type +
K.5.8 Forklift or Pallet lifter
FIVE (4) Tons Electrical Forklift or Pallet lifter, handling palletized and other materials to/from and within sack storage area.
Prime mover to be explosion proof and rated for IP zone 1 area
Manufacturer/type Requested
k. 5.9 Mud Barge (Requested )
Quantity No 2
Mud Capacity m3 500
Closed Tank with hatch on top No 10
Suction line Inc 8”
discharging line inc 4
Isolating valve one each tank yes/ no Inc/No 8” / 10
Electrical agitator each tank N0 /Hp 2 / 20
Transferring pump to the rig ( diesel engine ) No 2
Flow rate with 2,0 s.g. mud minimum Lit/min 700
Out let connection on the suction line No / Size 4 / 4”
Valve on the out let connection on the suction line No / Size 4 / 4”
Flexible rubber hose size 4”, Working pressure 750 psi with camlock mt 80
connections.
Minimum dead volume each tank m3 5
Electrical Generator able to powered all utility at 70%
Diesel tank for generator 15 days working m3
Vacuum diesel / electrical engine pump 2” for completely drain the No 1
tank
IDENTIFICATION CODE PAG120OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


K.6 Cleaning Facilities
K.6.1 HP Washing Diesel Machine REQUESTED
Quantity No. +
Make +
Electric +
Use Diesel / Base oil ( using to clean shakers Yes +
with OBM)
K.6.2 HP Washing Water Machine REQUESTED
Make +
Type +
Quantity No 2 min
With self closing valve Yes/No Requested
K.6.3 Steam Cleaning Machine REQUESTED
Make
Type HEAVY DUTY
Quantity No. 2 min.
Location Rig floor
Location Mud tanks
IDENTIFICATION CODE PAG121OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


K.7 Air Compressors and Dryers
K.7.1 Air Compressors (Ref: C.6.3).
Quantity No. 2 + 1
Make +
Type Two Electrical + 1 Diesel Engine P.
Output scfm +
Note : Independent compressor system is
requested for the Bulk System.(Ref: F.3.5).
K.7.2 Air Dryers (Ref: C.6.3).
This supply for rig air service supply only. All necessary beat exchangers, air dryers, filters, oil traps, pressure relief valves,
lubrication pumps, safety and other equipment to operate the system at 125psi. Emergency cold start two-stage air compressor
driven by a diesel engine. Specify in accordance with K.7.1 above.
Quantity No. 3
Make +
Type +
Output scfm +
Note : Independent Dryer system is requested
for the Bulk System.(Ref: F.3.5).
K.7.3 Bulk Fuel Filtration REQUIRED
System
Manufacturer Caterpillar or Similar
Type +
Quantity [No.] 1(one)
Min Output Fuel filtered [gpm] 200
Prefilter Element Yes
Coalescer Element Yes
IDENTIFICATION CODE PAG122OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

ITEM DESCRIPTION UNIT COMPANY MIN. REQUIREMENTS CONTRACTOR'S DATA


K.8 Water and Food
K.8.1 Water Distillation Unit and Water filter Unit with Sterilizer system (ref C.5.1.)
Manufacturer +
Type +
Quantity No 1
Capacity m3/Day As Required [50]
K.8.2 Water Maker unit using river water (with water filter) REQUESTED
Quantity No 2
Make +
Type +
Capacity m3 / h 2
Potable water tank No
Capacity (Total) m3/Day 48
K.8.3 Frozen Food Store
Quantity No. 1
Capacity m3. +
Certification +
K.8.4 Electric Semi submersible Pump ( Ref to I.2.2)
Quantity No 3
Make +
Type +
Power KVA +
Frequency Hz +
Electric Board Yes +
Capacity m3/hr +
Location +
Manifold Yes/No +
K.9 Driller’s Dog House (Ref. Item G.1.2)
Dimensions L – W - H +
Complete with: +
Tendered To Specify +
………………………….
………………………….
IDENTIFICATION CODE PAG123OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
K.10 Computers for Company's Engineers and Drilling Supervisor's see I.1.1
(Acceptable manufacturers: Compaq, Dell, Gateway, Hewlett Packard, IBM, Toshiba) Desktop system with (minimum
specifications):
- 20" Flat monitor W con led ,
- Latest (top of the Range) processor available at time of purchase/replacement.
- Minimum 4 Gb memory
- Minimum 320 Gb hard disk
- Minimum CD /DVD R/RW or Combo
- Sound card (16 bit minimum) and, speakers (20 Watt minimum)
- Camera 10000 pixel
- Zip Disk (or similar) back up device
- HP LaserJet printer or HP Inkjet, scanner photocopy (color) printer.
Quantity (2 sets) Connected by LAN, or wire-lessSystem No. 2
IDENTIFICATION CODE PAG124OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

1.11 ENVIRONMENTAL EQUIPMENT.


COMPANY MIN. CONTRACTOR'S
ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
L Environmental Equipment
L.1 Environmental Equipment Provided and Systems in place
L.1.2 Closed Drilling Fluids Drainage System Required
Draining fluids collected from:
Rotary Table Yes/No +
Rig Floor Yes/No +
Main deck Yes/No +
Sand Traps Yes/No +
Trip Tank Yes/No +
Mud Tank Yes/No +
Rate and Mouse hole Yes/No +
Wellhead Yes/No +
Helideck Yes/No +
L.1.3 OBM Handling Equipment
Cutting chutes, 12" oil resistant hoses, 40' below the water line, +
from cascade and shale shakers
Anti-spill metal walls for pumps and valve areas. +
2 oil water separators for spider deck. +
Foam system in Pit Room, Mud Pump Room and Mixing Pump area +
Boot washing station as required +
Manual pit volume indicator in active tank +
Mechanical pit volume indicator in the trip tank visible from driller
position
Kick plates in front of shakers +
Dump box with piping for centrifuges +
Proper isolation of water system in mud pit room. +
Drill pipe and drill collar rack draining system on Drill Floor. +
Kick plate around stripping tank ,rig pump, trip tank. +
L.1.4 Collection System of drilling Cuttings
Cuttings collected from:
Gambo Trap Yes/No +
Shale Shakers Yes/No +
Desander / Desilter Yes/No +
Mud Cleaners Yes/No +
Mud Centrifuges Yes/No +
Cuttings Discharging into: to the cutting barge +
L.1.5 Drill Floor Drip Pan Yes/No
L.1.6 Waste Oil Back Loading And Disposal System Yes/No
L.1.7 Waste Liquid Collection Tanks
Quantity No. +
Tanks Capacity m3 30 min
Equipped with electric agitator Yes/No +
IDENTIFICATION CODE PAG125OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
L Environmental Equipment
Location +
L.1.8 Waste Liquid Transfer Pumps
Quantity No. 2
Make +
Type +
IDENTIFICATION CODE PAG126OF126

naoc PROVISION OF 3000HP 15000PSI SWAMP BARGE


DRILLING RIG Appendix ‘’C’’
PART 2: PROVISION BY CONTRACTORS REVISIONS:

COMPANY MIN. CONTRACTOR'S


ITEM DESCRIPTION UNIT
REQUIREMENTS DATA
L.2 Waste Treatment Facilities
L.2.1 Sewage Storage and Treatment Equipment
Sufficient to comply with the international convention "MARPOL", Yes +
Annex IV (International Conference on Marine Pollution 1973).
Make +
L.2.2 Garbage Storage And Processing Equipment
Sufficient to comply with MARPOL Annex V. Yes +
L.2.2.1 Garbage Incinerator Basket Yes/No +
L.2.2.2 Garbage Compactor
One garbage compactor complete with Contractor supplied Yes +
appropriate bags or containers for back-loading compacted garbage.
One waste food macerator, capable of processing the waste food in Yes +
accordance with Marpol annex V to a particle size of less than
10mm
L.2.2.3 Waste Skips c/w Slings
Quantity No. +
Certification +
Capacity sq. m. +
L.2.2.4 Skimmer tanks
Quantity No. +
Certification +
Capacity m3. +
L.2.2.5 Bilge system
Engine room Yes/No +
Mud Pumps room Yes/No +
Cementing room Yes/No +
Other room Yes/No +
Other room Yes/No +
Other room Yes/No +
L.2.2.6 Water Oil Separator
Quantity No. +
Make +
Type +
L.2.2.7 Treatment System of Black and Grey waters discharging from accommodation Requested
Quantity No. +
Make +
Type +