1. All project requirements must comply with Dubai Green Building 10.Credit 403.01: Acoustical Control: The acoustic performance relating to 21.Credit 502.04: The average Lighting Power Density for the interior 29. Credit 601.01: A:Water-conserving fixtures must be installed 34.Credit 701.01: Thermal and Acoustic Insulation Materials: Insulation
Regulations and Specifications Internal Noise Criteria from External Noise Sources. Internal Noise connected lighting load for specific building types must be no more meeting the following criteria : materials to be incorporated into the building must:
Criteria from Mechanical Services Noise, Internal Airborne Sound than the watts per square metre of gross floor area given in Table
2. All materials and equipment used to comply with Dubai Green Building Insulation Guidance Values, and Internal Impact Sound Pressure Levels 502.04 (1) of Dubai Green Building Regulations and Specifications. Fixture Type Maximum Flow Rate 1. Be manufactured without the use of Chlorofluorocarbons (CFC's).
Regulations and Specifications must be certified / accredited by Dubai meet the control requirements set out in Table 403.01(1) of Dubai Green 2. Be non-toxic and not release toxic fumes during combustion.
Showerheads 8 Liters Per Minute
Municipality. Building Regulations and Specifications. 22.Credit 502.05: The average Lighting Power Density for the exterior 3. Have 0.05 parts per million (ppm) or less of added formaldehyde.
Hand wash basins 6 Liters Per Minute
connected lighting load for specific building types must be no more 4. Have a threshold limit value (TLV) OF 0.1 or less of individual Volatile
Kitchen sinks 7 Lliters per minute
3. All specialized companies required to verify any requirement for the Dubai 11.Credit 404.01: All paints and coatings used in the building should not than the watts per square metre of gross floor area given in Table Organic Compound (VOC).
Green Building Regulations and Specifications must be approved by exceed the allowed limits of Volatile Organic Compound (VOC), these Dual Flush Toilets 6 Liters Full flush, 3 Liters 5. Be a fire resistant in accordance with the requirements of Dubai Civil
502.05 (1) of Dubai Green Building Regulations and Specifications. Part flush
Dubai Municipality paints and coatings must be accredited / certified from Dubai Central Lab Defence.
or any source approved by DM. Urinal 1 Liter per flush or waterless 6 . Be accredited / certified from Dubai Central Lab.
23.Credit 502.06: Lighting Controls : For all new buildings other than
4. Credit 303.01: All permanently installed exterior lighting must comply with 7 . Achieve all the requirements of the approved specifications by DM.
villas and industrial buildings: B. Dual Flush toilets must be used.
the following: 12.Credit 404.02: All adhesives, adhesive bonding primers, adhesive
1. all exterior light fixtures on the building site, other than architectural primers, sealants and sealant primers used in the building should not C. Automatic (proximity detection) / push button faucets must be All thermal and acoustical insulation must be installed as per the
accent lighting and civil aviation safety lighting, must be shielded so exceed the allowed limits of Volatile Organic Compound (VOC). These A.Occupant Lighting Controls must be provided so as to allow lighting installed in all public facilities. manufacturer's instructions after approval from DM.
that all of the light emitted by the fixture, either directly or indirectly by materials must be accredited / certified from Dubai Central Lab or any to be switched off when daylight levels are adequate or when
reflection or refraction from any part of the fixture, is projected below source approved by DM. spaces are unoccupied and to allow occupants control over lighting D. Cisterns serving single or multiple urinals in public, commercial, 35.Credit 701.02: Certified / Accredited Timber: At least twenty five (25%) by
the horizontal plane passing through the lowest part of the fixture; levels. and industrial buildings must be fitted with manual or automatic volume of the timber and timber-based products used during construction
2. Architectural accent lighting must be aimed or shielded to prevent the 13.Credit 404.03: Each new carpet system used in public and commercial flush controls that are responsive to usage patterns. Only sanitary and permanently installed in the building must be from certified /
lighting of the night sky. wall washing lights must spill no more than buildings must be certified / accredited from Dubai Central Lab or any B. Common areas which are not regularly occupied, such as corridors flushing is acceptable during building closure or shutdown accredited sources approved by DM.
10% of the lighting past the building facade; other source approved by DM. Carpets are not allowed to be used in and lobbies, should reduce lighting levels to no more than twenty (including overnight); and
3. Downward directed lighting must be used for lighting of signage; and labour accommodation, educational facilities or any other determined by five percent (25%) of normal when unoccupied. 36.Credit 701.03: Asbestos Containing Materials: The maintenance, addition
4.All exterior lighting must be fitted with automatic controls to ensure that DM. E. Faucets installed as a component of a specialized application or alteration of existing buildings, materials containing asbestos must not
lights do not operate during daylight hours C. In offices and education facilities all lighting zones must be fitted may be exempt from the flow rates upon application to Dubai be used in buildings.
14.Credit 406.01: Legionella Bacteria and Building Water Systems: The DM with occupant sensor controls capable of switching the electrical Municipality.
5. Credit 305.01: The project must comply with all related regulations, local technical guidelines shall be applied as follows: lights on and off, according to occupancy unless lighting is required 37.Credit 701.04: Lead or Heavy Metals Containing Materials: The
orders and their executive orders, technical guidelines and guides applied for safety purposes. maintenance, addition or alteration of existing buildings, paints, or other
30. Credit 601.02 Condensate Drainage : All points where condensate is
in the emirate and the following is required: A. All water systems and networks which creates a water spray or aerosol materials containing lead or other heavy metals with percentage more
including but not limited to cooling towers, evaporative condensers, hot
produced by the operation of air conditioning equipment, there must than the approved specifications by DM must not be used in buildings
1. Neither the construction activity nor the operation of the building may D. In offices, if the average design lighting power density is less than
cause land disturbances, surface runoff, soil erosion or sedimentation and cold water systems, showers, evaporative air coolers, spas, be a means of collecting and disposing of the water. Condensate unless the metal is encapsulated in a system such as a photovoltaic cell.
six (6) Watts per square meter of gross floor area (GFA), the control collection pans and drainage pipes must be installed to prevent
on any other property beyond the boundary of the plot . fountains, misters, must be periodically maintained, cleaned,
requirements of parts C and D of this regulation need not apply. standing water and to provide drainage. A minimum air break of
2. Drainage must avoid pollution of watercourses and groundwater. disinfected and checked periodically in accordance with the technical All paints and materials containing lead or other heavy metals must be
Discharges made directly to ground, storm or marine waters guidelines issued by DM regarding the control of Legionella bacteria in twenty five (25) mm must be provided between the condensate accredited / certified from Dubai Central Lab or any source approved by
E. It is recommended (optional) that, in offices, the artificial lighting in piping and the wastewater pipe. If the condensate is not to be
must comply with the requirements of Dubai Municipality water systems. DM.
spaces within six (6) meters in depth from exterior windows must be reused, it must be discharged to the wastewater system through a
3. Dust suppression techniques must ensure that dust generated by
construction and demolition activities must meet the requirements of B. All water systems equipment and accessories including but not limited fitted with lighting controls incorporating photocell sensors capable properly sized water trap. 38.Credit 701.05: Ozone Depletion Potential (ODP) Material Management:
Code of Construction Safety Practice issued by Dubai Municipality. to potable water network, hot and cold water systems, water tanks, of adjusting the level of electric lighting to supplement natural The following shall be applied for all new buildings:
4. Construction waste materials generated on site must be segregated pumps, pipes and fittings, must be maintained, cleaned and disinfected. daylight only when required. The combined artificial and daylight 31.Credit 601.04 Water Efficient Irrigation : One hundred percent A. Installation of HVAC and refrigeration equipment must contain
and stored on site prior to collection. Segregation must, at a minimum, must provide an illumination level at the working plane between (100%) of the total exterior landscaping refrigerants with zero ozone depletion potential (ODP) or with global
include labelled storage for inert aggregates, metals, timber, dry C. Sampling and testing must be carried out for the presence of bacteria / four hundred (400) and five hundred (500) lux. When there is a must be irrigated using non-potable water or drip or subsoil water warming potential (GWP) less than 100, with the exception of equipment
recyclables and hazard material. germs and Legionella bacteria. hundred percent (100%) daylight, the lux levels may exceed five delivery systems. containing less than 0.23 kilograms (kg) of refrigerant;
5. For the disposal of hazardous waste, permit must be prepared and hundred (500) lux. The landscaping includes green roofs.
obtained from Dubai Municipality Environment Department . The D. All equipment and devices of swimming pools, spa pools, whirlpool All irrigation systems must incorporate, at any point that they connect B. Fire suppression systems must not contain any ozone-depleting
hazardous waste must be transported in accordance with the baths, hydrotherapy pools and Jacuzzi must be maintained, cleaned, 24.Credit 502.07: Electronic Ballast: High frequency electronic ballasts to a portable substances (Chlorofluorocarbons - CFCs, Hydrochlorofluorocarbons-
requirements of DM Technical Guidelines and DM Code of disinfected and checked periodically. must be used with fluorescent lights and metal halide of 150 W and water supply, backflow prevention devices which must be checked HCFs, or Halons).
Construction Safety Practice. less. High frequency electronic ballasts must be labeled as every twelve (12)
6. With the exclusion of drinking,toilet activities and concrete works, E. All equipment and devices of irrigation system must be maintained, conforming to an international standard approved by DEWA / Dubai For existing equipment:
months. Testing must be in line with the
potable water cannot be used for construction activities on any project cleaned, disinfected, and checked periodically. Municipality. A. CFC and halon-based materials are not to be used for any purposes;
recommended practice for
site
Specialized companies approved by DM must do water tests and field testing or any other testing regime approved by Dubai B. From 1 January 2030, HCFC based materials or any other material
7. Construction and demolition noise must be no greater than that 25.Credit 502.11: Pipe and Duct Insulation: All pipes carrying refrigerant,
sampling. All test results must be recorded and kept along with the Municipality. having any
detailed in DM Technical Guidelines and DM Code of Construction hot water or chilled water and ducts, including prefabricated ducts,
Safety Practice. records of maintenance and remedial works at site to be checked by DM. ODP are not to be used for any purposes;
supplying conditioned air must be insulated to minimize heat loss 32.Credit 602.01 Water Metering: Meters must be fitted to measure and
8. Chemicals, fuels, solvents or hazardous wastes must be stored in
and prevent condensation. record water demand and
accordance DM Technical Guidelines and DM Code of Construction 15.Credit 406.02: Water Quality of Water Features: all Water Features with a C. The venting or direct discharging of any refrigerants during equipment
water storage volume of over 1,000 liters and which creates a water
1. Pipes and ducts passing through conditioned spaces must be consumption of the facility as a whole and to provide accurate
Safety Practice. maintenance is strictly prohibited; and
spray or aerosol including but not limited to waterfalls, ponds, streams, insulated in accordance with BSI British Standard BS 5422:2009 or records of consumption
8. Chemicals, fuels, solvents or hazardous wastes must be stored in
...etc must be maintained, cleaned, disinfected and checked periodically other insulation standards approved by Dubai Municipality. (tariff class meters): D. The recovery, reclamation, recycling and reuse of refrigerants must be
accordance DM Technical Guidelines and DM Code of Construction
Safety Practice. to minimize the risk of Legionella bacteria or germs contamination and 2. Pipes passing through outside or unconditioned spaces must be practiced at all times.
9. Light pollution from the construction site must be minimized by not exceed the maximum limits outlined in the technical guidelines issued insulated with the minimum insulation thickness specified in Table
502.11 (1) of Dubai Green Building Regulations and Specifications.
A. For all buildings with a cooling load of at least 1 megawatt (MW) NO. REVISION DATE APP.
ensuring that light sources are directed inwards and angled down so by Dubai Municipality.: or gross floor area of 5,000 sq m or greater , additional water
that no light is emitted above the horizontal plane. Lux levels should 3. Ducts passing through outside or unconditioned spaces must be metering must be installed to record consumption data for major 39.Credit 701.06: The recycled content in building must account for at least
meet the DM Code of Construction Safety Practice . 16.Credit 501.03: Air-conditioned buildings, the heat load must be calculated insulated with the minimum insulation thickness specified in Table five percent (5%) of the total volume of materials used in the construction
in accordance with the design parameters set out in credit 501.03 of DM 502.11 (2) of Dubai Green Building Regulations and Specifications.
water use of the building and major water uses in and around the
of the building.
CONSULTANT
building.
6. Credit 401.02: Building occupant and systems must be protected from green building regulations.Dubai Green Building Regulations and
airborne contaminants which are generated or spread during construction Specifications. Insulation materials used must meet the requirements of regulation B. The building operator shall be responsible for recording water 40.Credit 701.07: The building materials available regionally must comprise
or renovation inside the buildings. Including toxic substances or 701.01, Thermal and Acoustical Insulation Materials or BS consumption for each individual meter. Records must be kept for five at least five percent (5%) of the total volume of materials used in the
substances harmful to the human body, such as asbestos, lead, 17. Credit 501.05: Air Leakage: Air-conditioned buildings with a cooling load 5422:2009, whichever is the more stringent. construction of the building.
(5) years.
pesticides, heavy metals, mold, dust, fumes, paint, ...etc of 1 megawatt (MW) or greater must be tested to demonstrate that air All insulation installations must have a suitable vapor barrier and
Unless it is required to provide ventilation during construction, the supply leakage does not exceed ten (10) cubic metres of air per hour for each protection from Ultra Violet (UV) light. 41.Credit 701.08: The composite wood products used in the interior of the
C .Each individual tenancy in the building must have a sub-meter
and return heating, ventilation, and air conditioning (HVAC) system square meter of building envelope (10m3/hr/m2) into or out of the building must not contain added urea-formaldehyde resins.
building, at an applied pressure difference of fifty (50) Pascal (Pa). Work installed when a building tariff meter is not present.
openings must be closed and protected from contamination. All duct and 26.Credit 502.13: Ductwork Air Leakage: Air ductwork in buildings must
other related air distribution component openings must be covered with must be carried out by a company approved by Dubai Municipality. be designed, built and installed to ensure that air leakage is 42. Credit 702.01: Construction and Demolition Waste: For all new buildings
tape, plastic, sheet metal or other methods to prevent dust or debris from D. Where a Building Management System (BMS) or Central Control except buildings in CBD area, at least fifty percent (50%) by volume or
minimized. Ductwork, with equipment attached to it, with an external and Monitoring System (CCMS) is installed, metering must be
collecting in the system. 18.Credit 502.01: Energy Efficiency HVAC Equipment and Systems: Air weight of waste material generated during the construction and / or
static pressure exceeding two hundred and fifty (250) Pascal (Pa) integrated into the system to allow real time profiling and
If the HVAC system is used during construction or renovation, temporary conditioned buildings, heating, ventilating and air conditioning equipment demolition of buildings must be diverted from disposal in landfills.
and all ductwork exposed to external ambient conditions or within management of water demand and consumption.
return air filters must be installed with a Minimum Efficiency Reporting and systems must comply with the minimum energy efficiency Diverted materials must be recycled or reused.
requirements and test procedures listed in Reference Tables 502.01(1)
unconditioned spaces must be pressure tested prior to occupancy in This should be done through the following three paths:
Value (MERV) in accordance with ASHRAE Standard 52.2-2007 or an
and 502.01(2) of Dubai Green Building Regulations and Specifications or accordance with a method approved by Dubai Municipality (DM) and E. All meters must be capable of remote data access and must have A. Concrete waste must be diverted to Construction Waste
equivalent standard.
Immediately prior to occupancy, the temporary return air filters must be any test procedure approved by Dubai Municipality a compliant amount of air leakage achieved. data logging capability and complying with DEWA specifications. All Treatment Plant.
removed and replaced with permanent filters having Minimum Efficiency Ductwork leakage testing must be carried out by a company meters should be approved by DEWA. B. Excavated soil, land-clearing debris and hazardous waste must be
Reporting Value (MERV) in accordance with ASHRAE Standard 19.Credit 502.02: Demand Controlled Ventilation: Air conditioned buildings approved by DM to conduct commissioning of buildings. diverted to places designed by the Concern Department of Dubai
52.2-2007 or an equivalent standard meet the DM Code of Construction with mechanical ventilation, Demand Controlled Ventilation (DCV) using a F. Virtual meters using run-hours are not acceptable as sub-meters. Municipality.
Safety Practice . concentration of Carbon Dioxide (CO2), or other means to measure 27.Credit 502.14: Maintenance of Mechanical Systems: The mechanical, C. Other recyclable materials such as woods plastics and metals can
occupancy, must be used in spaces larger than one hundred (100) electrical and plumbing systems in buildings must be serviced and G.The sub-meters should be used for demand management and cost be used at site.
7. Credit 401.06: Indoor Air Quality: Suitable ventilation shall be provided for
the building occupants in accordance with the minimum requirements of
square metres (m2) and having a maximum design occupancy density
greater than or equal to twenty five (25) people per hundred meter
maintained regularly:
1. To allow the mechanical services to be maintained, they must be
allocation purposes. The following materials are exempt from the calculation of the percentage
of waste diverted form disposal at landfill facilities:
P-397
ASHRAE Standard 62-2007. Air quality shall be in accordance with the squares (100m2). The default occupancy density values in ASHRAE installed so that adequate access is available to allow regular - Excavated soil and land-clearing debris; and
32. Credit 603.01 Wastewater Reuse: if a system is installed for the
technical guidelines issued by Dubai Municipality. 62.2-2007 Table 6.1 should be used when the actual occupancy is not inspection, maintenance and cleaning of the equipment without the - Hazardous waste.
collection and reuse of greywater
The buildings which optionally apply the following procedures will be known. need to remove or dismantle any building components.
awarded indoor air quality certificate by Dubai Municipality:
produced within the building or for the use of Treated Sewage
The CO2 concentration should be kept below eight hundred (800) parts
A. Indoor air quality testing must be carried out prior to occupancy. The Effluent (TSE) from an external source, the following is required:
per million(ppm). 2. The building owner must ensure that a maintenance manual and
maximum limit for indoor air contaminants included in Table 401.6(1) An alarm must be triggered if CO2 concentration rises above hundred schedule is developed for the building based on the instructions for
of Dubai Green Building Regulations and Specifications must not be (1000) ppm. This alarm is to be either automatically monitored by a
A. TThe building must be dual-plumbed for the collection and
preventive maintenance or service from the manufacturers or recycled use of drainage
exceeded. A report which shows compliance with these requirements central control system, if available, or give a local audible or visual suppliers of equipment of according to ASHRAE 62.1-2007 or water (greywater). Any pipes which transport greywater must be
must be submitted to Dubai Municipality indication when activated. equivalent as approved by DM. colour-coded
All buildings, with DCV, the CO2 sensors and systems must be checked
B. Air quality testing must be carried out by an air testing company or and recalibrated as per manufacturer recommendations but not to exceed differently from pipes that are used for potable (drinking standard)
laboratory accredited by Dubai Municipality (DM), and the compliant 3. The building owner must enter into a service contract with a water and be
twelve (12) months by a contractor approved by Dubai Municipality
test results must be submitted to DM. maintenance company approved by DM or provide evidence that
equipment will be properly maintained by competent members or B. There must be a minimum air break of twenty five (25) mm
C. Air quality testing equipment must have initial and periodical calibration 20.Credit 502.03: Elevators and Escalators: their own staff. between any potable water sources and greywater collection
certificate as per manufacturer requirement from an external A. Escalators - Escalators must be fitted with controls to reduce speed or systems.
calibration facility accredited by DM or at least annual calibration to stop when no traffic is detected. Escalators shall be designed with 4. Service records in the form of a service log book including details
certificate. The initial and periodical calibration must be saved in a energy savings features as described below: of both preventive and corrective maintenance must be kept onsite C. Greywater must not be used for purposes where it will come into
special register to be checked by DM in order to ensure the accuracy 1. Reduced speed control: The escalator shall change to a slower and be readily available for inspection by DM. contact with the
of the readings as condition of renewal the indoor air quality certificate. speed when no activity has been detected for a period of a maximum human body. It must be treated to the standard required by Dubai
of three (3) minutes. Detection shall be by photocell activation at the 28. Credit 503.01: Commissioning and Management: For buildings with Municipality
8. Credit 401.08: Thermal Comfort: The cleanness of HVAC equipment and top and bottom landing areas. cooling load of one megawatt (1 MW) or greater, other than villas,
systems must be maintained in the building and all its parts must be For all new commercial car washing facilities, they must recover and
2. Use on demand: The escalator shall shut down when no activity the commissioning of air distribution systems, water distribution reuse at least fifty percent( 50%) of their wastewater .
inspected and cleaned in accordance with the standard specifications has been detected for a period of a maximum of fifteen (15) minutes. systems, lighting, central control and building management
approved by Dubai Municipality and in accordance with the technical Use on demand escalators must be designed with energy efficient systems, refrigeration systems and boilers must be carried out
guidelines issued by DM. While specialized maintenance companies soft start technology. The escalator shall start automatically when before a completion certificate will be issued. 33. Credit 603.02 Water Consumption for Heat Rejection Including
approved by DM must carry out inspection and cleaning or provide a
proof that maintenance shall be done by building operator if he has a
qualified personnel and equipment to do the job.
required; the activation shall be by photocells installed in the top and
bottom landing areas.
1. Commissioning must be carried out in accordance with the CIBSE
Codes or any other commissioning standard of code approved by
Cooling Towers
Potable water supplied by Dubai Electricity and Water Authority
Green Building General Notes
DM. (DEWA) must not be used for heat rejection purposes.
B. Elevators (lifts) - Elevators (lifts) must be provided with controls to
9. Credit 402.01: The heating, ventilating and air conditioning(HVAC) reduce the energy demand. To meet this requirement, the following
system in the building must be capable of providing the following range of 2. Work must be carried out by a company approved by DM to Where cooling towers are used, Treated Sewage Effluent (TSE),
features must be incorporated in traction drive elevators:
conduct commissioning of buildings.
conditions for 95% of the year: seawater or recycled water must be used to meet the water demand JABAL ALI FIRST-591
1. Use of AC Variable-Voltage and Variable-Frequency (VVVF) drives for all heat rejection purposes. Secondary water sources must be
Lower Limit Upper Limit on non-hydraulic elevators. 3.Commissioning results must be recorded and available for approved by Dubai Municipality or DEWA.
Dry bulb Temperature
Relative humidity RH: 30 % (min) RH: 60 % (max)
inspection by Dubai Municipality. AFECVTH016
2. Energy efficient lighting inside the elevator including controls to turn A separate totalizing meter must be fitted on the water supply to
lights off when the elevator has been inactive for a period of a 4. A system manual, documenting the information required to allow individual cooling towers and a daily log of water use must be kept.
For occupant comfort, normal occupied spaces should have an average maximum of five (5) minutes. future operations staff to understand and optimally operate the
air velocity between (0.2 - 0.3) m/s. commissioned services, must be developed and provided to the
building owner or f acilities operator following commissioning.

13 JUNE 2016