heliexpower.com
Recent Projects:
Our client operates a number of sites This steam goes through the Heliex
across the UK where clinical waste is GenSet, where it generates electricity,
incinerated at temperatures of as high before being condensed to water and
as 1000°C. They have installed Heliex then returned to the waste heat boiler
GenSets at two of their facilities, with to start the process again.
plans to roll out to a further seven by
2018. The estimated value to our customer,
based on supply and install costs:
The first installation was at their facility in
the North of England. A Heliex GenSet Electrical value per year: £110,000
was incorporated into the existing process Electrical fan saving: £11,000
for cooling the incineration flue gases. A Total savings per year: £121,000
waste heat steam boiler is used to absorb C02e savings: 700 tonnes/CO2e
the heat from the incineration flue gases Years until payback: 2
to heat water, which is turned into steam.
The newly installed waste heat recovery use Scotland’s medical waste as an energy
system involved the integration of two source. The Heliex GenSet will generate
waste heat recovery boilers generating electricity to improve the overall
up to 5 t/h of steam, at a boiler pressure performance of the plant.
of 15 barg being reduced via a Pressure
Reduction Valve (PRV) to an autoclave The estimated value to our customer,
inlet pressure of 5 barg. based on supply and install costs:
The Heliex GenSet was installed as a Electrical savings per year: £57,000
part of a newly developed, state of the C02e savings: 352 tonnes/CO2e
art, £10m facility that will recycle and Years until payback: 3