Import place and 300 311,550 0.2 62,310 200 days [28weeks]
compact ground
stabilization material
[cement]
*This might not be necessary especially if the water table is very high. Grading normally
helps to create the platform for grid placement.
• Time saved is approximately 50%.
Enhanced Geotechnical Engineering Properties
𝑈
The AASHTO method , which considers the 𝑊18 = 𝟏𝟏𝟒𝟎𝟖𝟖 𝑬𝑺𝑨𝑳 𝒄𝒚𝒄𝒍𝒆𝒔
pavement as a multi-layer elastic system with 𝑠/𝑟
𝑊18 = 𝟔𝟔𝟖𝟎𝟑𝟔𝟐 𝑬𝑺𝑨𝑳 𝒄𝒚𝒄𝒍𝒆𝒔
an overall structural number (SN) that reflects
the total pavement thickness and its resiliency 𝑁𝑠/𝑟 25𝑚𝑚
𝑇𝐵𝑅 = 𝑁𝑈 25𝑚𝑚
= 𝟓𝟖. 𝟓𝟔
to repeated traffic loading, is employed.
𝑊18 𝑟𝑒𝑖𝑛𝑓𝑜𝑟𝑐𝑒𝑑 = 𝑇𝐵𝑅 × 𝑊18 𝑢𝑛𝑟𝑒𝑖𝑛𝑓𝑜𝑟𝑐𝑒𝑑 =
𝟔𝟔𝟖𝟎𝟗𝟗𝟑 𝑬𝑺𝑨𝑳 𝒄𝒚𝒄𝒍𝒆𝒔
VERIFICATION OF TRAFFIC
BENEFIT RATIO (TBR) AND BASE
COURSE REDUCTION (BCR)
Determination of TBR and BCR based on Base Course remaining life structural thickness
Scenario Remaining Life Base Course Structural Thickness
• No. filtrations/separation/reinforcement geosynthetics in unreinforced
• Loss in base course structural thickness predominantly due to black cotton soil ingression
• Reinforced pavement structure includes geotextile for filtration/separation and stress mobilization of black cotton soil
Thickness Structural
250
Depreciation Curves
Remaining Life Base Course Structural
200mm Premature
FAILURE due to Unreinforced
BCS subgrade EXTRAPOLATED
Curve
Thickness, fscXTD2
152mm
125mm
Terminal Thickness
Geosynthetics Reinforced Legend 102.0mm
• = Remainig Life Layer Coefficient Ratio • = Unreinforced Design Thickness
Unreinforced • = Design Thickness • = Reinforced Structural Capacity Factor
• = Reinforced Design Thickness • = Unreinforced Structural Capacity Factor
0
0.0 1.0 2.0 3.0 4.0 5.0 6.0
No. ESAL Load Cycles (Traffic Passes) X106
Enhanced Geotechnical Engineering Properties
Capping Layer
THANK YOU
Bugiri – Jinja Road [2004]