1 Coverage Test

1) The criteria of coverage test for isolated sites can be applied by rural standard for 2G RX_Level
and 3G RSCP (95% samples>-104 dbm)
2) If the coverage in some roads is blocked by mountain/hills which the coverage test didn’t pass
the criteria, it should be justified and agreed as per the justification stated in the “comment
column” and accepted by ET.

2 Drive Test KPI

2.1 Drive Test KPI

Optimized
Service Items Threshold Comment
Value
Coverage RX_ Level for 95% of samples >-104 dbm for rural

2017-12-28 Page 2 of 6
Network Optimization Report of New-build

2.2 Re_Lev Coverage Plot

2017-12-28 Page 3 of 6
Network Optimization Report of New-build

2.3 RX_Qual Coverage Plot

2017-12-28 Page 4 of 6
Network Optimization Report of New-build

3 OSS KPI

KPIs
Day Busy Night Busy
Name Comment
Threshold Hour (10:00- Hour
11:00) (21:00-22:00)

CS
K3014:Traffic Volume on TCH(Erl)

2G Call Setup Success Rate_SLA >98%

2G Call completion rate_SLA (>97%) >97%

2G Call Drop Rate for continuous


<=1%
calls_SLA

2G SDCCH_
≤0.5%
SETUP_BLOCKING_RATE_SLA

2G SDCCH_DROP_RATE_SLA ≤0.5%

PS
2G Call Setup Success Rate - Data_SLA ≥ 97%

2G Average EDGE throughput per data


≥38Kbps
TS - DL_SLA

2G Average GPRS throughput per data


≥12Kbps
TS - DL_SLA

2G Lost connections Rate – Data_SLA ≤5%

2G PS Session Termination Success


>98%
Rate_SLA

The 7 continuous days detailed KPIs,Please check the attachment:

Note:
1. The OSS KPIs will be checked the day busy hour average for 7 continuous days.
2. The OSS KPIs are applicable when the counters are more than 500 in busy hour.
3. If the optimized value doesn’t reach the threshold value, it should be justified and agreed as per the
justification (e.g. coverage, traffic model, etc.) stated in the “comment column” and accepted by ET.
4. Both day busy hour and night busy hour OSS KPI will be put in the above table. The day busy hour is
used for acceptance. The night busy hour is used for optimization reference.

2017-12-28 Page 5 of 6
Network Optimization Report of New-build

4 Acceptance Signature

On behalf of Huawei On behalf of Ethio Telecom

Originator:…………………………. Approved by:…………………………..

Signature:………………………….. Signature:………………………………..

Date: ………………………….. Date: ………………………………..

2017-12-28 Page 6 of 6

You might also like