You are on page 1of 1

SEMIEMPERICAL ESTIMATE OF PILE CAPACITY CONFORMING AASHTO LRFD-2007

PROJECT: DHAKA MAWA BHANGA HIGHWAY PROJECT


GWT:
γw:
0
9.8
m
kN/m 3
CLIENT:
OWNER: BANGLADESH ARMY
HPCP & DICL DMB BH- 12
CATEGORY OF PILE: BORED PILE Pile Capacity (kN)

Rel. Density/

Resistance, qp
Consistency
Thickness

Diameter of

Diameter of

Diameter of
Resistance;fs
Noncohesive

(Corrected)
Stress, σz0'
Cohesive/

Unit Skin
Effective

Unit Tip
Graphical

Pile(m)

Pile(m)

Pile(m)
Layer
Layer

SPT
Depth (m) γt SPT SPT Representation of
N-Value

N-VALUE
# Start End (m) Type kN/m3 (kPa) N N60 N160 (kPa) (kPa) 0 10 20 30 40 50 60 1 1.2 1.5
1
1 0 1.45 1.45 C 17 5.2 4 5 11 18.6 0 28.23 33.87 42.34
2 1.45 2.45 1 C 17 14.0 6 8 13 28.5 0 49.29 59.15 73.94
3 2.45 3.45 1 C 17 21.2 3 4 6 13.6 0 63.58 76.30 95.37
4 3.45 4.45 1 C 17 28.4 6 8 11 28.5 0 93.40 112.08 140.11
5 4.45 5.45 1 C 17 35.6 9 12 16 43.3 0 138.76 166.51 208.14
6 5.45 6.45 1 C 17 42.8 11 15 19 53.2 0 194.47 233.36 291.71
7 6.45 7.45 1 C 17 50.0 9 12 15 43.3 0 239.83 287.79 359.74
8 7.45 8.45 1 C 17 57.2 6 8 9 28.5 0 269.65 323.58 404.47
9 8.45 9.45 1 C 17 64.4 12 16 18 58.1 0
11
330.54 396.65 495.81
10 9.45 10.95 1.5 C 17 73.4 15 20 22 73.0 0 610.44 732.53 915.66
11 10.95 12.45 1.5 C 17 84.2 12 16 17 58.1 0 701.77 842.13 1052.66
12 12.45 13.95 1.5 C 17 95.0 11 15 15 53.2 0 785.34 942.41 1178.01
13 13.95 15.45 1.5 C 17 105.8 13 17 17 63.1 0 884.44 1061.33 1326.66
14 15.45 16.95 1.5 C 17 116.6 6 8 7 28.5 0 929.17 1115.01 1393.76
15 16.95 18.45 1.5 C 17 127.4 9 12 11 43.3 0 997.21 1196.65 1495.81
16 18.45 19.95 1.5 C 17 138.2 11 15 13 53.2 0 1080.77 1296.93 1621.16
17 19.95 21.45 1.5 C 17 149.0 15 20 17 73.0 0 1195.41 1434.49 1793.11
18 21.45 22.95 1.5 C 17 159.8 8 11 9 38.4 0 21 1255.67 1506.81 1883.51
19 22.95 24.45 1.5 C 17 170.6 9 12 10 43.3 0 1323.71 1588.45 1985.56
20 24.45 25.95 1.5 C 17 181.4 15 20 16 73.0 0 1438.34 1726.01 2157.51
21 25.95 27.45 1.5 C 17 192.2 18 24 18 87.8 0 1576.27 1891.53 2364.41
22 27.45 28.95 1.5 C 17 203.0 11 15 11 53.2 0 1659.84 1991.81 2489.76
23 28.95 30.45 1.5 C 17 213.8 13 17 13 63.1 0 1758.94 2110.72 2638.41
24 30.45 31.95 1.5 C 17 224.6 14 19 13 68.0 0 1865.80 2238.96 2798.70
25 31.95 33.45 1.5 C 17 235.4 14 19 13 68.0 0 1972.67 2367.20 2959.00
26 33.45 34.95 1.5 C 17 246.2 15 20 14 73.0 0 2087.30 2504.76 3130.95
27 34.95 36.45 1.5 C 17 257.0 16 21 14 77.9 0 31 2209.70 2651.64 3314.55
28 36.45 37.95 1.5 C 17 267.8 28 37 25 122.3 0 2401.78 2882.13 3602.67
29 37.95 39.45 1.5 C 17 278.6 35 47 30 131.2 0 2607.93 3129.52 3911.90
. 30 39.45 40.45 1 C 17 287.6 40 53 34 150.1 0 1895.82 2274.99 2843.74
0
Note:
Notes:
Analysed By: Priodeep Chowdhury
»Sub soil up to depth (10 x diameter of pile) below tip, consistency and composition shall be compatible and
confirmed by test.
»Pile length is evaluated from existing river bed level or ground level.
Checked By: Md. Roknuz Zaman
»Where Factor of Safety against Liquefaction is less than one, skin resistance is ineffective. DEVELOPMENT CONSTRUCTIONS LTD.
»Factor of Safety against Skin Resistance and Tip Resistance has been considered as 3.0.
»Structural Capacity of 1.0m, 1.2m & 1.5 m diameter piles are 6500 kN, 9500 kN & 14500 kN respectively. HOUSE 11, ROAD 19/A, SECTOR 4, UTTARA, DHAKA 1230

You might also like