QA/QC DEPARTMENT
TABLE OF CONTENTS
SECTION DESCRIPTION
I INTRODUCTION
II INCREASING QC INSPECTOR BUILDING
III INCREASE DAILY SURVEILLANCE INSPECTION
IV CONTINUOUS PRE-JOB MEETING/TOOL BOX TALK
V LIST OF QUALITY OPR OPEN AND IMMEDIATE
ACTION
VI CORRECTIVE ACTION
VII PREVENTIVE ACTION
20
QA/QC DEPARTMENT
I. INTRODUCTION
The primary purpose of Quality Improvement Plan is to provide excellence in Client satisfaction
through continuous improvements of products and processes by the total involvement and
dedication of each individual who is in any way a part of that projects. It is a structured
approach to improvement. If correctly applied, it will assist a construction works in improving its
performance. It involves a strong commitment to two guiding principles: customer satisfaction
and continuous improvement. Understanding this reason KCS shall plan, organize, control and
execute of all works in accordance of Project approved quality plan, Inspection and Test Plan
(ITP) and documented procedure.
Continuous improvement of controlling the quality of its work to meet the contract plan
specification and related requirement and KCS will increase its quality personnel to achieved
customer satisfaction. New inspector will be mobilized for more controlling daily inspection
activity. Please see the below QA/QC area assignment and quality organization chart:
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
3. Works methodology
4. Concrete Works
5. Concrete finishing Works
6. Backfilling
7. Painting works
The purpose of the pre-Job briefing is to ensure that the Person-in-Charge (PIC) and potential
workers understand the scope of the work to be performed by discussing the tasks involved.
This will provide an understanding of the stimulate critical thinking and discussion.KCS QA/QC
Department already did lot of pre-job meeting and it will continue for next every finishing item
to attend its ultimate improvement and goal. KCS will perform more pre-job training below
items for full understanding work sequences with Quality.
1. Basic Concrete Repaired Method
2. Concrete Defects and Repaired Method
3. Concrete Crack Measurement Analysis Monitoring And Repaired Method
4. Concrete Pouring vibrations and proper consolidation technique
5. Concrete Surface preparation and Paining
6. Materials Preservation process
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
KCS has received some OPR for Civil works activity from DOSSAN Quality Department which is
still in open .KCS will close this OPR that mention on remarks column as per site project
management team.
20
QA/QC DEPARTMENT
20
QA/QC DEPARTMENT
Preventive action will be discussed and implemented to eliminate the potential cause of non-
conformity.
The required changes to the development process, product specifications or to tile quality
system will be made to prevent such nonconformities.
The preventive action taken will be suitable to the magnitude of the problem.
The analysis of preventive action taken will be reviewed in the subsequent management review
meeting
20