With extensive international project experiences in Telecommunication GSM Wireless Network infrastructures project such
as Greenfield, Rooftop and In-building solution on the following operators and vendors, Roshan Telecom, Paktel, MTN,
Digicel and Ericsson, Nokia Network Siemens, Huawei for the following field experience; Site Technical Survey (TSS),
Site Acquisition, Site Build Supervision, Site Inspection and Auditing, Civil Works Quality Control (QC) and Quality
Assurance (QA), Tower Warehousing, Project Management in Network Rollout & Expansion and Project Planning and
Scheduling.
Aside in telecommunication infrastructure project, OSP, High Voltage Power Transmission Line and Solar infrastructure
and installation project are also part of my field knowledge that I gained during my previous field involvement.

Work History:

 Position: 3rd Party Consultant / Site Supervisor Company: Huawei Myanmar / Tianbo
Date: September 8, 2016 – January 30, 2017
Project: MPT Phase 3 and 4 Rollout Project
Duties and Responsibilities:
 Full time on site QEHS supervision on construction and erection of GMT, SST
and Mono Pole sites, as well as tower rectification works.
 Ensure erection installation procedure are based on given Standard Operating
Procedure and contractor / workers comply EHS rules and requirement
specially workers PPE, EHS site warning signage and other requirements
 Conduct daily tool box meeting, daily checking of site EHS documents such as
Safety equipment checklist, Health Check List with corresponding daily photos
to upload in data base (ISDP).
 Conduct site/actual tower materials inventory based on tower checklist and
perform site and tower QA inspection (Torque, Verticality, Earhting and Test
site construction workmanship in Preparation for RFI and PAT).
 Report to immediate project manager any site activity fail to comply the target
schedule, standard requirements of QA and site rules imposed by Huawei.

 Position: 3rd Party Consultant / Site Supervisor Company: Huawei Myanmar /


Date: March 01, 2016 – August 17, 2016 Likusasa / Magcom
Project: MPT Phase 3 and 4 Rollout Project
Duties and Responsibilities:
 Full time on site QEHS supervision on construction and erection of GMT, SST
and Mono Pole sites, as well as tower rectification works.
 Ensure erection installation procedure are based on given Standard Operating
Procedure and contractor / workers comply EHS rules and requirement
specially workers PPE, EHS site warning signage and other requirements
 Conduct daily tool box meeting, daily checking of site EHS documents such as
Safety equipment checklist, Health Check List with corresponding daily photos
to upload in data base (Smart QC).
 Conduct site/actual tower materials inventory based on tower checklist and
perform site and tower QA inspection (Torque, Verticality, Earhting Test and
site construction workmanship in Preparation for RFI and PAT).
 Report to immediate project manager any site activity fail to comply the target
schedule, standard requirements of QA and site rules imposed by Huawei.

 Position: Site Acquisition Supervisor Company: DMTC Digicel Myanmar


(Naypyitaw, Bago East and Shan State) Tower Co / Magcom
Date: January 17, 2014 – July 15, 2015
Project: Ooredoo Phase 1, 2, 2A, 3 and 4 Rollout Project
Duties and Responsibilities:
 Re-activate previously acquired candidate to match the client network plan
coordinates. Re-activate existing (SAR) Site Acquisition Report for client
submission.
 Perform site hunting for the new sites and re-hunting on those sites not match
on client network plan.
 Supervise / monitor site hunters performance on acquiring new sites based on
the recommended search ring, evaluate and validate SAR submitted/prepared
by hunters to classify priority candidate or option for client submission.
 Coordinate to client RF and TX planer representative any site hunting issue
encountered at site to adjust the recommended search ring or for re-engineering
especially nominals falls on congested areas.
 Coordinate with legal team on the process to secure land ownership documents
application as well as the changes in land ownership name, lease area
renegotiation for re-issuance of new lease agreement, lease contract
registration also with TSS team for any changes in lease area, lease amount,
site relocation, setback distances of the identified significant structures and
changes in active option.
 Conduct actual site hunting on some sites to assist hunters to acquire candidate.
Assist implementation team in resolving site problems related to SA issues.
 Prepare High Rental Request for those sites whose lease amount more than the
requirement for client approval.
 Prepare Justification report for those non acquirable sites,
 Perform payment to landlord for the advance lease payment.
 Upload and extract report on database for daily monitoring and update.

 Position: Site Hunter Coordinator Company: Digicel Myanmar / Magcom


(Magway, Mandalay & Chin State)
Date: October 04, 2012 – October 31, 2013
Project: Digicel Project
Duties and Responsibilities:
 Train newly hired site hunters on the process of acquiring Rooftop, Greenfield
and Colocation sites base on the given criteria.
 Help to build their moral, self-confidence, encouragement and positive advice.
Evaluate hunters (SAR) Site Acquisition Report and quality of option acquired
if it is within the required criteria as well as the ownership legal documents and
proposed lease amount. Perform (SAR) Site Acquisition Reports selection of
priority options or candidates in preparation for lease contract signing.
 Close coordination with RAN Team for the option acquire outside the search
ring for re-engineering.
 Coordinate with legal team on the process to secure land ownership documents
application as well as the changes in land ownership name and lease area
renegotiation for re-issuance of new lease agreement.
 Coordinate with TSS team for any changes in lease area, site relocation,
setback distances of the identified significant structures and changes in active
option.
 Assist Marketing /Commercial Department to perform retail survey.
 Upload and extract report on database for daily monitoring and update.
 Position: Site Quality Engineer Company: Eaton Towers Ghana Ltd
Date: January 05, 2012 – August 30, 2012
Project: Vodafone Project
Duties and Responsibilities:
 Establish Quality Assurance processes for the Projects.
 Develop Quality Assurance processes to interface with Vodafone.
 Develop and manage Quality Assurance tracking database to be implemented
within Service Management Centre environment.
 Establish Quality Assurance and EHS standards for Civil and
Telecommunications Infrastructure (which must align with Vodafone and
Eaton Towers policies).
 Ensure the strict adherence to civil build hold points.
 Create documentation management processes through Administration for
records keeping.
 Develop standard Quality Assurance field reporting format.
 Train and mentor all Operations staff on Quality Assurance

 Position: Project Manager Company: Huawei Technologies (GH)


Date: September 12, 2011 – January 04, 2012
Project: ATC/MTN Site Refurbishment Project
Duties and Responsibilities:
 Prepare project plan and schedule base on the timeline required by client.
 Conduct pre-evaluation for qualified subcontractors for final selection.
 Supervise sub-contractors performed the Technical Site Survey on identified
sites given by client for refurbishment works.
 Evaluate subcontractor technical site survey report and site drawings to ensure
all required refurbish item identified on the BOQ and project cost.
 Assist procurement department to evaluate bidding cost submitted by
subcontractor to award the project on qualified lowest bidder base on the
clustered sites per region.
 Conduct weekly meeting on subcontractor to monitor the site progress activity
within the given time line
 Supervising site engineers designated to each region and monitored
subcontractors performed the refurbishment works.
 Monitor materials supplied by subcontractor and works is according to client
plan and specification.
 Evaluate subcontractors as built plan/drawings and final BOQ base on the
actual completed works
 Attend weekly update meeting with the client.
 Direct reporting to project director on a daily basis to update the development
of the project.

 Position: CME Supervisor Company: Nokia Siemens Network


Date: May 03, 2011 – August 30, 2011
Project: Construction of Belltel GSM Sites Phase 1
Duties and Responsibilities:
 Supervise sub-contractors performed the Technical Site Survey for the new
identified sites acquired by site acquisition with the coordination of
Transmission and RF planner.
 Perform feasibility studies on friendly sites prioritized by client for a chance to
be one of the BTS, Link and Repeater sites.
 Check and evaluate technical site survey report submitted by sub-contractors in
preparation for client submission.
 Position: Zone Head Company: MTN Communication
Date: October 17, 2009 – December 31, 2010
Project: Construction of MTN Communication GSM BTS Sites
Phase 20, 21and 22 Project
Duties and Responsibilities:
 Assist Site Acquisition Department to identify site location on lands acquired
by the survey team and in preparation for site plans /design.
 Supervises site controllers / supervisor oversees the construction of sites and
ensure all sites necessary information, documents (site plans, spec’s and safety
instruction and manuals) are relayed or given to site controllers for immediate
application and action.
 Conduct weekly meeting with subcontractors in view of site construction
progress and any site concerns that will affect the expected completion date.
 Ensure appropriate materials are being sent to sites based on issued and
approved materials reservation forms prepared by Head of section.
 Ensure the acceptable quality of work at sites under construction and
installation and randomly visit of sites under installation or construction.
 Coordinate with RF and Tx planning department for the early preparation of
CDD and Routing Data’s for the sites schedule for integration.
 Ensure all scheduled sites for integration meet the target date.
 Raise periodical reports about work progress to head of section and assist the
head of section in acceptance tests preparation and execution as well as the
final submission of site documents binder.

 Position: Civil Works Field Supervisor Company: Ericsson Vietnam


Date: January 05, 2009 – September 30, 2009
Project: Construction of Vietnam Mobile (HTC-EGSM Project) Sites
Duties and Responsibilities:
 Perform technical site survey (TSS) with site acquisition, RF and Transmission
Planning team in every candidate sites acquired by site acquisition team.
 Perform actual site hunting for those sites fails on the specified requirements or
criteria sets for Greenfield and Rooftop sites.
 Prepare final technical site survey and evaluation report for client approval.
 Conduct site quality audit on completed sites in preparation for site acceptance.
 Prepare and upload daily progress report on Ericsson Database (site handler).

 Position: Production Supervisor – Zone Head Company: MTN Communication


Date: January 04, 2007 – December 31, 2008
Project: Construction of MTN Communication GSM BTS Sites
Phase 15, 16, 17, 17.5and 18_Q1 to Q3
Duties and Responsibilities:
 Assist Site Acquisition Department to identify site location on lands acquired
by the survey team and in preparation for site plans /design.
 Supervises site controllers / supervisor oversees the construction of sites and
ensure all sites necessary information, documents (site plans, spec’s and safety
instruction and manuals) are relayed or given to site controllers for immediate
application and action.
 Conduct weekly meeting with subcontractors in view of site construction
progress and any site concerns that will affect the expected completion date.
 Ensure appropriate materials are being sent to sites based on issued and
approved materials reservation forms prepared by Head of section.
 Ensure the acceptable quality of work at sites under construction and
installation and randomly visit of sites under installation or construction.
 Coordinate with RF and Tx planning department for the early preparation of
CDD and Routing Data’s for the sites schedule for integration.
 Ensure all scheduled sites for integration meet the target date.
 Raise periodical reports about work progress to head of section and assist the
head of section.
 Managing tower warehouse, daily monitoring on incoming and outgoing tower
stocks, conduct materials audit on every set of tower based on the packing list
and tower drawing, resolving issue of missing and fabrication error of tower
parts, coordinate with logistics department and supplier any discrepancy on
the tower supplied.
 Reports directly to the Production Manager on a day to day basis any
development of the project.

 Position: In-Building & GF Civil Works Site Coordinator Company: Ericsson System and Services
Date: June 17, 2006 – December 18, 2006
Project: Mobile Company of Iran (MCI)
Duties and Responsibilities:
 Reports directly to the Civil Works Manager on a day to day base on project
related issues and are mainly responsible for sufficient monitoring and
inspection of the construction work on the field to ensure that the construction
services are carried through and within Ericsson’s standards of quality leading
to ensure that the site acceptance is carried out within the allocated time scale
and budget.
 Develop and maintain a strong relationship with both internal engineering staff
and service providers in order to achieve an effective management of the
inspection activities.
 Co-ordinate the activities of site inspectors, who will represent the project
organization on the field.
 Issue Progress reports regarding site construction quality and performance of
the service providers.
 Ensure implementation of the project health and safety plan are implemented.
 Compile and maintain a documented record of the sites ready for radio
equipment installation.
 Provision acceptance inspection of the sites in conjunction with the installation
engineer and Civil Works contractors.
 Issue lists of outstanding items together with plans of action. Arrange final site
inspection.
 Prepare and upload daily progress report on Ericsson Database (site handler).
 Issue completion certificates on completed sites.

 Position: Site Audit Consultant Company: Paktel / AlanDick Pakistan Ltd.


Date: August 2004 – October 2005
Project: Pakistan Telecom Phase 2, 3 & 4 (Paktel Ltd.) Project
Duties and Responsibilities:
 Quality assurance of contractors of civil and construction works.
 Inspect and assess the quality and workmanship of contractors and staff in
preparing existing and new sites, ready for equipment installation.
 Inspect and assess staff in installation technique and general quality of
installation workmanship for new equipment and Hardware Acceptance Test
 Responsible for the site preliminary and final inspection.
 Work area conducted around Central Region of Pakistan and Lahore.
 Report to the project manager any consistencies.

 Position: Site Engineer / Maintenance Engineer Company: Development Company


Date: November 2003 – February 2004 Afghanistan Ltd. T/A Roshan
Project: Construction of TDCA Ltd New GSM Sites (TDCA Ltd.)
Duties and Responsibilities:
A. Site Engineer:
 Responsible for the monitoring and coordination of contractor’s
performing the civil works of new GSM cell sites such as construction
and installation of self-supporting or guyed towers, shelters and other
GSM facilities.
 Conduct final inspection of completed sites to insure all works is carried
out in accordance with the project plans and specification.
 Report to Deployment Director and Project Manager at all times for the
development of project.

B. Maintenance Engineer:
 Responsible for the monitoring and coordination of contractors and suppliers
performing the operation and maintenance of Generators, Air Condition,
suppliers of consumable spare parts and new equipment.
 Prepare monthly preventive maintenance and refueling schedule of all
equipment for all sites and other facilities includes monthly reports for fuel
consumption and other consumable materials.
 Evaluates contractors and supplier proposed quotation, billing and invoices.
 Prepare monthly inventory report of equipment purchased and delivered by
the supplier base on the approved purchase order.
 Conduct test and commissioning of newly purchased equipment.
 Report to Deployment Director at all times for the development of the
operation and maintenance of the equipment.

 Position: Site Engineer Company: Magna Restu Philippines Inc.


Date: May 2000 – November 2003
Project: 1. Expansion of GSM Cell Sites for Nokia – Globe Telecom Phase 9 Project Full
Turnkey (North Luzon Area)
2. Expansion of GSM Cell Sites for Ericsson – Globe Telecom Phase 8A & 8B
Project Full Turnkey (South Luzon and Visayas Area)
3. Expansion of GSM Cell Sites for Nokia – Globe Telecom Phase 7 Project Full
Turnkey (North and South Luzon Area)
Duties and Responsibilities:
 Conduct joint Technical Site Survey with LOS and RNE in every candidate
sites selected by site acquisitions agent for the evaluation of any work variation
involved and topographic plan base on the typical site price template.
 Supervises and monitoring sub-contractor performing the civil works, such as
construction and erection of 4-legged self-support towers and other facilities
(Green Field and Roof Top Sites) to ensure all works is carried out in
accordance with the client project plan and specification.
 Conduct close monitoring of site construction schedule specifically for the
target date of telecom installation, site on air and project completion with the
allowed schedule.
 Prepare site redline drawing in preparation for as-built drawings.
 Attend and facilitate materials testing requirements of the client to promote
quality assurance.
 Assist sub-contractor facilitating application of permanent commercial power
and application of occupancy permit.
 Conduct quantity survey with the client representative for the actual quantity or
variation item of the constructed sites.
 Coordinate with the client representative any development of the project.
 Coordinate with project engineer in resolving problems encountered by sub-
contractor on site.
 Prepare and submit daily progress report to project engineer for the
development of project.

 Position: Technical Officer Company: Total Solution Technology Inc.


Date: August 1998 – February 2000
Project: Municipal Solar Infrastructure Project (MSIP) of the Department of Interior and
Local Government (DILG) through Australian Aid
Duties and Responsibilities:
 Conduct site survey and data gathering for the installation of solar power
system particularly assigned in mountain area of Eastern Samar in (3)
Municipalities consisting of (37) Barangay and (88) allocated PV system.
 Organized local government and communities allocated by the project.
 Plan and supervises construction and installation of solar power system such as
hauling of materials, foundation, erection of steel structures, testing and
commissioning.
 Conduct technical training to barangay technical team for the operation and
maintenance of solar system.
 Coordinate to client representative any development of project.
 Responsible for the materials take off and operation budget.
 Submit weekly progress report to project manager for the development of
project.

 Position: OSP Field Supervisor Company: Meralco Industrial Engineering


Date: August 1997 – March 1998 Services Corporation
Project: Installation of (Philippine Long Distance Telephone Co.)
X-6 (Ericsson) Manhole and Conduit, Poles and Anchors
Duties and Responsibilities:
 Conduct re-staking with client representative for the proposed location of sites.
 Supervises construction and operation of PLDT manhole and conduit, poles
and anchors such as foundation and trench excavation, installation of
reinforcement bars, manhole accessories, laying of pipes, concreting, pole
erection and installation of anchors and concrete or asphalt pavement
restoration.
 Conduct final measurement and quantity with the client representative on the
complete constructed sites in preparation for final BOQ.
 Monitoring of materials, tools and equipment in warehouse, motor pool and
scheduling of equipment assignment.
 Submit weekly progress report to project manager for the development of
project.

 Position: Field Supervisor Company: Meralco Industrial Engineering


Date: September 1996 – July 1997 Services Corporation
Project: Stringing of (NATIONAL POWER CORPORATION) Leyte – Cebu 138 KV
HVAC (2) Two Bundle Double Circuit Transmission Line Interconnection Project
Duties and Responsibilities:
 Responsible for the site survey to identify location, accessibility and position
of stringing equipment.
 Prepare bill of quantity of conductor and line hardware for stringing and final
sag.
 Prepare and submit stringing operation pland and schedule to the client for
approval.
 Supervises and monitoring operation of stringing, final sag works and
installation of line hardware.
 Monitoring of materials, tools and equipment in warehouse, motor pool and
scheduling of equipment assignment.
 Submit weekly progress report to project manager for the development of
project.

 Position: Field Supervisor Company: Meralco Industrial Engineering


Date: January 1996 – August 1996 Services Corporation
Project: Installation and Erection of (NATIONAL POWER CORPORATION) Bontoc – St.
Bernard 69 Kv Wood Pole Transmission Line Project
Duties and Responsibilities:
 Conduct line check survey and line re-routing. Prepare red line on plan and
profile to reflect any deviation base on the plan provided by the client for
approval.
 Supervises and monitoring operation of installation and erection 69 KV
transmission line project, such as lay-out of pole lines, pole dragging, pole
erection and dressing, installation of guy and anchors, line clearing, stringing
and final sag.
 Monitoring of materials tools and equipment in warehouse and motor pool and
scheduling of equipment assignment.
 Assist road right of way representative for negotiation to land owner affected
by the project.
 Conduct reconciliation with the client representative for the materials used on
the project base on the BOQ provided.
 Coordinate with the client representative any development of the project.
 Prepare as built plan (plan and profile).
 Report directly to the project manager any development of project.

 Position: OSP Field Supervisor Company: KCJ Construction and


Date: September 1995 – December 1995 Development Corporation
Project: Installation of (Philippine Long Distance Telephone Co.) X-5 (Alcatel) Manhole
and Conduit in Mactan Area.
Duties and Responsibilities:
 Conduct re-staking with client representative for the proposed location of site.
 Supervises subcontractors perform civil works, such trench and manhole
foundation excavation, re-enforcement bars installation, concreting, pipe
laying, fiber optic cabling (direct buried) and pavement restoration.
 Coordinate to client representative any development of the project.
 Responsible of deploying site road safety equipment and personnel to meet the
standard safety requirement of the local government and client.
 Report directly to Project Manager any development of project.

 Position: Field Supervisor Company: Energo Konstruct and


Date: February 1995 – August 1995 Development Corporation
Project: Installation and Erection of (NATIONAL POWER CORPORATION)
Leyte Cebu 138 and 230 Kv HVAC Transmission Line Project
Duties and Responsibilities:
 Supervises line check survey, line re-routing and site topographic plan.
 Prepare plan and profiling for the approval of client. Supervises operation and
construction of tower foundation excavation, re-enforcement bars fabrication
and installation, stub angle setting concreting, construction of access roads and
hauling of construction materials (manually or with equipment).
 Coordinate to the client any development of the project.
 Prepare and submit weekly accomplishment report to project manager.

 Position: Field Supervisor Company: Energo Konstruct and


Date: September 1994 - January 1995 Development Corporation
Project: Installation and Erection of (ABS-CBN) 95.0 M Communication Tower
Duties and Responsibilities:
 Responsible for the site survey, layout of the proposed site and dismantling of
existing tower.
 Supervises subcontractor performed the civil works, such as demolition of
existing foundation, re-enforcement bars fabrication and installation for new
foundation, stub angle setting, foundation concreting, tower erection,
installation of earthing and electrical system, installation of TV and FM
antenna.
 Prepare and submit weekly accomplishment report to project director.

 Position: Field Supervisor Company: Meralco Industrial Engineering


Date: March 1993 – April 1994 Services Corporation
Project: Installation and Erection of (NATIONAL POWER CORPORATION)
Naga – Suba 138 KV Transmission Line Project
Duties and Responsibilities:
 Conduct line check survey to the proposed project site.
 Assist right of way personnel for the negotiation of landowner affected in
project.
 Supervises and monitoring subcontractor perform the civil works such as site
lay-out, foundation excavation, re-enforcement bars installation, stub angle
setting and concreting.
 Supervises operation of tower erection and dressing, stringing, final sag and
installation of line hardware.
 Coordinate to client representative any development of the project.
 Evaluate subcontractors billing prior approval of project manager.
 Prepare and submit weekly report to project supervisor for the accomplishment
of project.

TRAINING AND SEMINARS ATTENDED

 TELECOMMUNICATIONS COMPETENT CLIMBER for INSTALLATION &


MAINTENANCE WORKERS
Conducted by: Towertech Professional Height Safety Training & Fall Arrest Equipment
Certificate validity: February 17, 2016 – February 17, 2018

 POST-INSTALLED ANCHOR TECHNOLOGY SEMINAR


Nokia Siemens Network (Belltel Project)
Conducted by: Hilti Philippines June 21, 2011

 FALL PROTECTION (FOR TOWER CLIMBING)


Ericsson Vietnam, Construction of Vietnam Mobile (HTC-EGSM Project) Sites
Conducted by: NASP (National Association of Safety Professionals) September 12, 2009

 SAFETY TRAINING APPLICATION ON TOWER CONSTRUCTION /GSM Project


Development Company Afghanistan Ltd T/A Roshan (TDCA Ltd.),
Conducted by: Altitude Formation in Kabul, Afghanistan, February 06-08, 2004

 TOT BASIC ORGANIZATION & LEADERSHIP TRAINING (AT3s)


Municipal Solar Infrastructure Project
Conducted by: John Holland Phil’s, January 05-08, 1999

 BARANGAY TECHNICAL ORIENTATION TRAINING (BTT TRAINERS)


Municipal Solar Infrastructure Project
Conducted by: John Holland Phil’s, November 17-19, 1998

 BASIC TECHNICAL ORIENTATION TRAINING (AT3s)


Municipal Solar Infrastructure Project
Conducted by: John Holland Phil’s, July 27-31, 1998

 PROJECT PLANNING AND SCHEDULING


Conducted by: Construction Manpower Development Foundation (CMDF), November 22-23, 1996

 OCCUPATIONAL SAFETY AND HEALTH SEMINAR


Conducted by: Safety Organization of the Philippines (SOPI), December 16-20, 1991

You might also like