Professional Documents
Culture Documents
BASIS REPORT
FOR
Tower crane.
1. INTRODUCTION:
The requirement includes design loading criteria, rules governing structural form, and
a factor of safety.
2. SCOPE:
The specification covers the requirement for the design foundation pile cap
4. MATERIALS OF CONSTRUCTIONS.
Fc= 40 Mpa
FY=460 Mpa.
5. Loads: From crane manufacturer Attached along with report, additional mast load is
added to vertical loads.
Base size
Min spacing of pile cap is determined by ability to construct piles and avoid clashing between
angles, anchors, and pile reinforcement
= 3x600=1800mm
= 2000+800+(600-2*75) = 3250 mm
S =3300 mm
= 2788+41.13*1.7
= 2858KNm.
W = 1572+755=2327 KN.
Method i.e. consider reinforcement within 1.5 times (BS 8110 3.11.4)
For compression pile loads, vertical loading is adverse so Ƴf= 1.4 for both vertical and overturning
moment
For tensile pile loads, vertical load is beneficial so Ƴf =1 for vertical load and Ƴf= 1.4 for overturning
moment
M = 1130 KNm
As = M/0.95FyZ
2) Top reinforcement
Additional requirement: Area of longitudinal reinforcement per pile must be sufficient to carry a
Ultimate tension load of 420 KN.