You are on page 1of 7

SITE ACCEPTANCE TEST FORMAT FOR (NXPLUS C) 11/0.

415kV AUXILIARY TRANSFORMER FEEDER REMOTE INTERLOCK CHECKS FROM SCS


CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 12 SUBSTATIONS – Contract No. : GTC/643A/2014
PACKAGES S1, S2, S6 & S7 Date : 14.12.2017
Name of Substation : AL JAHHANIYA-3 Bay Number : A20
Name of Equipment : AUX TRANSFORMER Manufacturer : Siemens

List of Content

S.No Description Page No

1. 2
Purpose of Test……………………………………………………………………………………………………………………………………………………………………………
2. Reference Drawing and Documents………………………………………………………………………………………………………………………………………….. 2
3. Initial Checks……………………………………………………………………………………………………………………………………………………………………………… 2
4 List of Schematic Drawings…….………………………………………………………………………………………………………………………………………………… 2
5 BCU Mimic Commands….………………………………………………………………………………………………………………………………………………… 3
6 Interlock Scheme Checks 4
6.1. CB Close From Remote Interlock…………………………………………………………………………………………………………………………. 4
6.2. No Voltage Condition CB Close from Remote Interlock ………………………………………………………………………………………………………. 5
6.3. CB Open From Remote Interlock …………………………………………………………………………………………………………………………….. 6
7 Instruments Used……………………………………………………………………………………………………………………………………………………………………… 7
8 Remarks…………………………………………………………………………………………………………………………………………………………………………………….. 7

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA

Signature Signature

Name Razvan R. Name Saleem T.


Date 14.12.2017 Date 14.12.2017
Doc.No. PH12-3A-10-40-P004 Rev. A Annexure 1 Page No. 1 of 7
SITE ACCEPTANCE TEST FORMAT FOR (NXPLUS C) 11/0.415kV AUXILIARY TRANSFORMER FEEDER REMOTE INTERLOCK CHECKS FROM SCS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 12 SUBSTATIONS – Contract No. : GTC/643A/2014
PACKAGES S1, S2, S6 & S7 Date : 14.12.2017
Name of Substation : AL JAHHANIYA-3 Bay Number : A20
Name of Equipment : AUX TRANSFORMER Manufacturer : Siemens

1. PURPOSE OF TEST:
These tests are intended to check the Proper Closing & Opening of equipments with interlock Condition and Blocking Scheme.
2. REFERENCE DRAWING AND DOCUMENTS:

Electrical drawing for 11kV Switchgear and Relay Panel.

3. INITIAL CHECKS: Checked ( )


11kV Switchgear & Relay Panel Aux.Tx feeder Internal and External Wiring Tightness Checked :

Confirm that all Equipments Electrical and Mechanical indications are working properly :

Confirm that all Auxiliary AC/DC supply switched ON :

Confirm that all cables Wiring & dressing work completed :

Confirm that BCU Synch Check completed :


4.LIST OF SCHEMATIC DRAWINGS: Drawing No. Category
11kV Switchgear Aux.Tx Feeder Drawing PH12-3A-10-15-0010-RA I
11kV Relay Panel Aux.Tx Feeder Drawing PH12-3A-10-35-0010-RA I
11kV Relay panel Busbar protection Drawing PH12-3A-10-35-0001-RA I
11kV Switchgear Bus Section Drawings PH12-3A-10-15-0012-RA I

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA

Signature Signature

Name Razvan R. Name Saleem T.


Date 14.12.2017 Date 14.12.2017
Doc.No. PH12-3A-10-40-P004 Rev. A Annexure 1 Page No. 2 of 7
SITE ACCEPTANCE TEST FORMAT FOR (NXPLUS C) 11/0.415kV AUXILIARY TRANSFORMER FEEDER REMOTE INTERLOCK CHECKS FROM SCS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 12 SUBSTATIONS – Contract No. : GTC/643A/2014
PACKAGES S1, S2, S6 & S7 Date : 14.12.2017
Name of Substation : AL JAHHANIYA-3 Bay Number : A20
Name of Equipment : AUX TRANSFORMER Manufacturer : Siemens

5. BCU Mimic Commands


Note: Check device operation from BCU Mimic and confirm actual close/open result. All interlocking conditions to be normalized before this test.

Device Test Test BCU Mimic


No. Name Close Open Verification
1 A200
2

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA

Signature Signature

Name Razvan R. Name Saleem T.


Date 14.12.2017 Date 14.12.2017
Doc.No. PH12-3A-10-40-P004 Rev. A Annexure 1 Page No. 3 of 7
SITE ACCEPTANCE TEST FORMAT FOR (NXPLUS C) 11/0.415kV AUXILIARY TRANSFORMER FEEDER REMOTE INTERLOCK CHECKS FROM SCS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 12 SUBSTATIONS – Contract No. : GTC/643A/2014
PACKAGES S1, S2, S6 & S7 Date : 14.12.2017
Name of Substation : AL JAHHANIYA-3 Bay Number : A20
Name of Equipment : AUX TRANSFORMER Manufacturer : Siemens

6. INTERLOCK SCHEME CHECKS:


6.1. CB Close from Remote Interlock Normal Operation

switch Open A201

CB Drive Healthy/
SWGR L/R Switch

MCB- TCS Supply


Bus bar trip relay
Bus Earth Switch

Not Operated-96

Line VT MCB ON
Close Command

Expected Action
connector Close

Spring Charged

Supply Healthy
BCU in Remote

TCS Healthy -
relay(86) Not

MCB- Control
SCS in Local

Feeder Earth

A20RP-F120

A20RP-F113
Feeder Dis-

Master Trip

(K87Z2.A)
in Remote
From SCS
Condition

Operated

Healthy
Open
A204

K312

Test
1 1 1 1 1 1 1 1 1 1 1 1 1 1 Close
1 0 1 1 1 1 1 1 1 1 1 1 1 1 No Close
1 1 0 1 1 1 1 1 1 1 1 1 1 1 No Close
1 1 1 0 1 1 1 1 1 1 1 1 1 1 No Close
1 1 1 1 0 1 1 1 1 1 1 1 1 1 No Close
1 1 1 1 0 0 1 1 1 1 1 1 1 1 No Close
A200
Circuit Breaker 1 1 1 1 1 1 0 1 1 1 1 1 1 1 No Close
Close command 1 1 1 1 1 1 1 0 1 1 1 1 1 1 No Close
from Remote
1 1 1 1 1 1 1 1 0 1 1 1 1 1 No Close
1 1 1 1 1 1 1 1 1 0 1 1 1 1 No Close
1 1 1 1 1 1 1 1 1 1 0 1 1 1 No Close *
1 1 1 1 1 1 1 1 1 1 1 0 1 1 No Close
1 1 1 1 1 1 1 1 1 1 1 1 0 1 No Close
1 1 1 1 1 1 1 1 1 1 1 1 1 0 No Close
* Circuit Breaker will be closed for single time closing and will not close again after CB Spring Charge is discharged.

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA

Signature Signature

Name Razvan R. Name Saleem T.


Date 14.12.2017 Date 14.12.2017
Doc.No. PH12-3A-10-40-P004 Rev. A Annexure 1 Page No. 4 of 7
SITE ACCEPTANCE TEST FORMAT FOR (NXPLUS C) 11/0.415kV AUXILIARY TRANSFORMER FEEDER REMOTE INTERLOCK CHECKS FROM SCS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 12 SUBSTATIONS – Contract No. : GTC/643A/2014
PACKAGES S1, S2, S6 & S7 Date : 14.12.2017
Name of Substation : AL JAHHANIYA-3 Bay Number : A20
Name of Equipment : AUX TRANSFORMER Manufacturer : Siemens

6.2. No Voltage Condition CB Close from Remote Interlock:

TCS Supply Healthy


TCS Healthy -K312

A20RP-F120 MCB-

A20RP-F113 MCB-
Line VT MCB ON

CB Drive Healthy/
SWGR L/R Switch

Bus bar trip relay


Not Operated-96
Close Command

Expected Action
connector OPEN

Line VT Isolator

Spring Charged
BCU in Remote

Control Supply
Feeder Earth
Switch Open

relay(86) Not
SCS in Local

Feeder Dis-

Master Trip
No Voltage

(K87Z2.A)
in Remote
From SCS

Condition

Operated

Healthy
A201

Close
A204

Test
Condition

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Close
1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 No Close
1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 No Close
1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 No Close
1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 No Close
1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 No Close
1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 No Close
No Voltage Condition 1
1 1 1 1 1 1 1 0 1 1 1 1 1 1 No Close
CB Close Command
from Remote 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 No Close
1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 No Close
1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 No Close
1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 No Close
1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 No Close *
1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 No Close
1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 No Close
* Circuit Breaker will be closed for single time closing and will not close again after CB Spring Charge is discharged.

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA

Signature Signature

Name Razvan R. Name Saleem T.


Date 14.12.2017 Date 14.12.2017
Doc.No. PH12-3A-10-40-P004 Rev. A Annexure 1 Page No. 5 of 7
SITE ACCEPTANCE TEST FORMAT FOR (NXPLUS C) 11/0.415kV AUXILIARY TRANSFORMER FEEDER REMOTE INTERLOCK CHECKS FROM SCS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 12 SUBSTATIONS – Contract No. : GTC/643A/2014
PACKAGES S1, S2, S6 & S7 Date : 14.12.2017
Name of Substation : AL JAHHANIYA-3 Bay Number : A20
Name of Equipment : AUX TRANSFORMER Manufacturer : Siemens

6.3. CB Open from Remote Interlock:

BCU in Remote

Open Command
SCS in Local

TCS Healthy
SWGR L/R

in Remote

Expected
from SCS
Switch

Action

Test
Condition

1 1 1 1 1 Open

0 1 1 1 1 No Open
A200 CB Open
Command From 1 0 1 1 1 No Open
Remote
1 1 0 1 1 No Open

1 1 1 0 1 No Open

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA

Signature Signature

Name Razvan R. Name Saleem T.


Date 14.12.2017 Date 14.12.2017
Doc.No. PH12-3A-10-40-P004 Rev. A Annexure 1 Page No. 6 of 7
SITE ACCEPTANCE TEST FORMAT FOR (NXPLUS C) 11/0.415kV AUXILIARY TRANSFORMER FEEDER REMOTE INTERLOCK CHECKS FROM SCS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 12 SUBSTATIONS – Contract No. : GTC/643A/2014
PACKAGES S1, S2, S6 & S7 Date : 14.12.2017
Name of Substation : AL JAHHANIYA-3 Bay Number : A20
Name of Equipment : AUX TRANSFORMER Manufacturer : Siemens

Note: CB Service Position Line Earth Switch cannot be closed.

Circuit Breaker will be closed for one complete close /open and will not close again after CB spring charge is discharged

1 Condition fulfilled 0 Condition not fulfilled Not applicable

7. INSTRUMENT USED:

Sl.No Equipments Make Sl.No Calibration date Calibration due date

1 Secondary Voltage Injection Kit

8. REMARKS:

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA

Signature Signature

Name Razvan R. Name Saleem T.


Date 14.12.2017 Date 14.12.2017
Doc.No. PH12-3A-10-40-P004 Rev. A Annexure 1 Page No. 7 of 7