There is a line outage and the line from 1 to 2 is removed. Using the method of building
algorithm determine the new bus impedance matrix. (12M)
(OR)
4. Determine Z bus by a building algorithm. (12M)
UNIT-III
5. (a) What is load flow studies and discuss Gauss-Seidal power flow solution. (6M)
(b) Compare G.S, NR and Fast decoupled power flow methods of load flow solution. (6M)
(OR)
6. Perform one iteration of Newton Raphson load flow method and determine power flow solution
for the given system. Take base MVA as 100. (12M)