ENGINEERING : LECTURE 1 -
Introduction To Estimating Cost,
Time & Materials
Engr. O. Akinola
3 MY GOAL
▪ My goal is to ensure :
✓Later in practise
Engr. O. Akinola
4 RULES & ADVICE
Attendance (Class rep)
Punctuality
Mobile phones
Noise making
Respect
▪ akinola.op@unilorin.edu.ng
▪ 0706-734-6880
Engr. O. Akinola
6 TOPICS – this semester (CVE 581)
Introduction to estimating cost, time and materials
Planning and scheduling
Critical Path Methods
PERT (Programme Evaluation & Review Technique)
Quality management
Construction methods
Equipment selection
Health and safety in Construction
Economic financial problems in construction and in executing public
works
INTRODUCTION TO CONTRUCTION ENGINEERING
7
What is construction engineering about?
Who is an engineer?
What is an estimate?
An educated guess
Examples?
o party, function, transport costs, study, etc.
Preliminary estimates
✓ Preliminary set of drawings available
Detailed estimates
✓ Complete set of plans & specs available
11 TYPES OF ESTIMATES
12 CHARACTERISTICS OF A GOOD ESTIMATOR
Read contract documents well
Is knowledgeable about construction techniques
Is familiar with typical job conditions
Is familiar with construction products
Has good visualization skills
Follows instructions explicitly
Is creative, yet practical
13 CHARACTERISTICS OF A GOOD ESTIMATOR (cont.)
Is detail-oriented and thorough
Can meet deadlines and work under pressure
Is familiar with purchasing
Is familiar with computer applications
Works well with numbers and statistics
Is a perfectionist at the task level
Has very good organization skills
14 ESTIMATING – THE PROCESS
Accuracy & completeness fundamental.
Complex process
Many Variable factors
Not an easily acquired skill
Proper study, training &
experience needed for
proficiency
24 KEY FACTORS THAT AFFECT PROJECT COST
Project size
Project complexity
Site location
Time of construction
Quality of work
Market conditions
Management factors
25 CATEGORIES THAT INFLUENCE PROJECT COST
Similar projects Reputation of Engineer
Material costs Regulatory requirements
Wage rates Insurance requirements
Site conditions Size of project
Inflation factor Location of work site
Bid timing Value Engineering
Project schedule Contingency
Quality of plans & specs. Judgment
26 PROJECT COSTS
Involves more than materials & labour. Also involves:
✓Building permits,
✓supervision,
✓portable toilets,
✓scaffolding,
✓bonds,
✓insurance,
✓Security fencing
*make up bulk of Estimate* ✓Clean-up etc.
6 SUB-TOTAL 525,000
8 TOTAL 577,500
9 VAT 5% 28,875
PS Provisional sum
LOT Similar to lump sum. Whether used or not, must be paid
LS Lump sum
Identify the four preparation steps taken to start the estimating process.