UNIVERSITI TEKNOLOGI MARA

Outcome Based Education


Student Centered Learning

Code : QSD 381

Course : MEASUREMENT OF CONSTRUCTION WORKS V

Level : DIPLOMA

Credit Unit : 3

Contact Hour : Lecture – 3hrs/week


Tutorial – 1hr/week

Part : 6

Course Status : CORE


(Core/Non Core)

Prerequisite : QSD (previous semester)

Content : 1.0 Course Information


2.0 CO – PO Matrix
3.0 Course Contents
4.0 Scheme of Work
5.0 Assessment Information
6.0 Assessment Description and Outcomes
7.0 Assessment Breakdown and Rubrics
8.0 Teaching Methodology
9.0 Student Learning Time (SLT)
10.0 Course Entrance and Exit Survey

OBE-SCL AP114 QSD381 Page 1 of 24


1.0 COURSE INFORMATION
1.1 Course Outcomes

Upon completion, students should have the:

1. Ability to interpret drawings on demolition and alteration works,


underpinning and external works. (PO1, PO2, PO3, PEO1, PEO2, LO1,
LO2, LO3, LO5, LO8, CO2, CO3, P1, P2, P3, P4, P5, P6, CTPS1,
CTPS2, CTPS3, TS4, KK4)

2. Ability to compute demolition and alteration works, underpinning and


external works. (PO1, PO2, PO3, PEO1, PEO2, LO1, LO2, LO3, LO5,
LO8, CO2, CO3, P1, P2, P3, P4, P5, P6, CTPS1, CTPS2, CTPS3, TS1,
TS2, TS3, TS4, TS5, KK1, KK4)

3. Ability to analyse price of measured items. (PO1, PO2, PO3, PEO1,


PEO2, LO1, LO2, LO3, LO5, LO8, CO2, CO3, P1, P2, P3, P4, P5, P6,
CTPS1, CTPS2, CTPS3, TS1, TS2, TS3, TS4, TS5, KK1, KK4)

1.2 Course Description

A further understanding or measurement of building works with reference to


Malaysian Standard Method of Measurement of Building Works (SMM), for
demolition and alteration works, underpinning and external works.

This course is also designed to provide the students with a thorough


understanding of the theory and analysis of prices for the measured items.

1.3 Syllabus Content

Section A: Measurement of Building Works

1. Measurement of demolition and alteration works and underpinning.

2. Measurement of external works such as fencing and gates, turfing, road,


pavement, surface water drainage, soil drainage and water reticulation
works.

Section B: Analysis of Prices

1. Analysis of prices for the various works covered in Section A.

1.4 Teaching Methodology

Lecture
Tutorials

OBE-SCL AP114 QSD381 Page 2 of 24


1.5 Assessment

Examination
1. Measurement of Building Works : 40%
2. Analysis of Prices : 20%

Coursework
3. Assignments (8 Nos) : 40%

Total : 100%

1.6 Recommended Text

The Institution of Surveyors, Malaysia, (2000). Malaysian Standard Method of


Measurement of Building Works (2nd ed). Malaysia: ISM.

1.7 References

Ahamad Abdullah., & Khairuddin Abd. Rashid., (2004). Pengukuran kuantiti


bangunan (2nd ed). Malaysia: Pearson-Prentice Hall.

Atton W., (1985). Estimating applied to building. London: Longman.

Buchan R.D., Fleming F.W., et al, (2003). Estimating for builders and quantity
surveyors. London: Butterworth-Heinemann.

CIOB., (1997). Code of estimating practice. London: Berkshire.

Geddes S., & William J., (1996). Estimating for building & civil engineering works.
London: Architectural press.

Seeley I.H., (1998). Building quantities explained. London: Palgrave Macmillan.

Wilcox C., (1980). Measurement of construction work. London: Godwin.

Willis A.J. et. al, (1998). Elements of quantity surveying (9th ed.). London:
Blackwell Science (UK).

OBE-SCL AP114 QSD381 Page 3 of 24


2.0 CO – PO MATRIX

UNIVERSITI TEKNOLOGI MARA


COURSE OUTCOMES – PROGRAM OUTCOMES MATRIX

COURSE CODE QSD381 CENTRE OF STUDY UiTM Perak

COURSE NAME MEASUREMENT OF CONSTRUCTION WORKS V UPDATED BY RH, MMD, NAI

CREDIT HOURS 3 DATE 29 May 2009

PROGRAMME OUTCOME TEACHING ASSESSMENT


COURSE OUTCOME
PO 1 PO 2 PO 3 PO 4 PO 5 PO 6 PO 7 PO 8 PO 9 METHODOLOGY

CO 1 Ability to interpret drawings on demolition and Lecture, Tutorial Assignment, Examination


alteration works, underpinning and external works. 1 1

CO 2 Ability to compute demolition and alteration works, Lecture,Tutorial Assignment, Examination


underpinning and external works. 3 3 3 1 1

CO 3 Ability to analyse price of measured items. Lecture, Tutorial Assignment, Examination


3 3 3 1 1

OVERALL CO - PO 3 3 3 1 1

RATING ON OBJECTIVE IN RELATION TO PROGRAM OUTCOMES : (1) VERY SLIGHTLY (2) MODERATELY (3) SUBSTANTIVELY

OBE-SCL AP114 QSD381 Page 4 of 24


3.0 COURSE CONTENTS
NO TOPICS CONTENTS

1.0 INTRODUCTION TO SUBJECT  Course description


AND SYLLABUS  Course outcomes
 Course contents
 Teaching Learning methods
 Assessment methods
 References
 Class Etiquette
 Lecture Plan

2.0 DEMOLITION AND ALTERATION  Principle of measurement, preparation of


WORKS bills of quantities, writing of specifications
and preambles.
 Principle of analyzing prices for selected
items associated with the works.

3.0 UNDERPINNING AND SHORING  Principle of measurement, preparation of


WORKS bills of quantities, writing of specifications
and preambles.
 Principle of analyzing prices for selected
items associated with the works.

4.0 EXTERNAL WORKS - FENCING  Principle of measurement, preparation of


AND GATES bills of quantities, writing of specifications
and preambles.
 Principle of analyzing prices for selected
items associated with the works.

OBE-SCL AP114 QSD381 Page 5 of 24


NO TOPICS CONTENTS

5.0 EXTERNAL WORKS - SURFACE  Principle of measurement, preparation of


WATER DRAINAGE bills of quantities, writing of specifications
and preambles.
 Principle of analyzing prices for selected
items associated with the works.

6.0 EXTERNAL WORKS -  Principle of measurement, preparation of


LANDSCAPING bills of quantities, writing of specifications
and preambles.
 Principle of analyzing prices for selected
items associated with the works.

7.0 EXTERNAL WORKS –  Principle of measurement, preparation of


SEWERAGE RETICULATION bills of quantities, writing of specifications
and preambles.
 Principle of analyzing prices for selected
items associated with the works.

8.0 EXTERNAL WORKS – WATER  Principle of measurement, preparation of


RETICULATION bills of quantities, writing of specifications
and preambles.
 Principle of analyzing prices for selected
items associated with the works.

7.0 EXTERNAL WORKS – ROAD,  Principle of measurement, preparation of


PAVEMENT AND bills of quantities, writing of specifications
HARDSTANDING and preambles.
 Principle of analyzing prices for selected
items associated with the works.

OBE-SCL AP114 QSD381 Page 6 of 24


4.0 SCHEME OF WORK

WEEK TOPIC IMPLEMENTATION HOURS


1  Course briefing
 Course description
 Course outcomes
3+1
 Course contents
(3 hours
 Teaching Learning methods
Lectures lecture
 Assessment methods 1 hour
 References tutorial)
 Class Etiquette
 Lecture Plan

2 Principle of measurement,
preparation of bills of quantities,
3+1
writing of specifications and Lectures
preambles for Demolition Works.

3 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
preambles for Demolition Works Lectures
(cont'd) 3+1
Classroom Activities
Principle of analyzing prices for
selected items associated with
Demolition Works.

4 Principle of measurement,
preparation of bills of quantities,
Lectures 3+1
writing of specifications and
preambles for Alteration Works.

5 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
preambles for Alteration Works. Lectures
(cont'd) 3+1
Classroom Activities
Principle of analyzing prices for
selected items associated with
Alteration Works.

6 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
Lectures
preambles for Shoring Works
3+1
Classroom Activities
Principle of analyzing prices for
selected items associated with
Shoring Works

OBE-SCL AP114 QSD381 Page 7 of 24


WEEK TOPIC IMPLEMENTATION HOURS
7 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
Lectures
preambles for Fencing and Gates.
3+1
Classroom Activities
Principle of analyzing prices for
selected items associated with
Fencing and Gates.

8 MID SEMESTER BREAK

9 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
Lectures 3+1
preambles for Surface Water
Drainage.

10 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
preambles for Surface Water Lectures
Drainage. (cont’d) 3+1
Classroom Activities
Principle of analyzing prices for
selected items associated with
Surface Water Drainage.

11 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
preambles for Landscaping Works. Lectures
3+1
Principle of analyzing prices for Classroom Activities
selected items associated with
Landscaping Works.

12 Principle of measurement,
preparation of bills of quantities,
writing of specifications and Lectures 3+1
preambles for Sewerage Reticulation
Works.

13 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
preambles for Sewerage Reticulation Lectures
Works. (cont’d) 3+1
Classroom Activities
Principle of analyzing prices for
selected items associated with
Sewerage Reticulation Works.

OBE-SCL AP114 QSD381 Page 8 of 24


WEEK TOPIC IMPLEMENTATION HOURS
14 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
preambles for Water Reticulation Lectures
Works. 3+1
Classroom Activities
Principle of analyzing prices for
selected items associated with Water
Reticulation Works.

15 Principle of measurement,
preparation of bills of quantities,
writing of specifications and
preambles for Road, Pavement and Lectures
Hard standing Works. 3+1
Classroom Activities
Principle of analyzing prices for
selected items associated with Road,
Pavement and Hard standing Works.

16 STUDY WEEK

17 FINAL EXAM

OBE-SCL AP114 QSD381 Page 9 of 24


5.0 ASSESSMENT INFORMATION
NO ITEMS MARKS ASSESSMENT BREAKDOWN

ASSIGNMENT 1
1 (Demolition and
Alteration Works)

ASSIGNMENT 2
2
(Underpinning Works)

ASSIGNMENT 3
3
(Fencing and Gates)

Marks awarded based on :-


ASSIGNMENT 4
4 (Surface Water  Taking-Off (3 marks)
Drainage Works) 5% for each  Preparation of BQ (3 marks)
assignment  Specifications (2 marks)
 Preambles (2 marks)
ASSIGNMENT 5 TOTAL = 40%
5
(Landscaping Works) TOTAL MARKS = 10 marks
(The marks will be reduced to 5
marks)
ASSIGNMENT 6
6 (Sewerage Reticulation
Works)

ASSIGNMENT 7
7 (Water Reticulation
Works)

ASSIGNMENT 8
8 (Road, Pavement and
Hard standing Works)

Part A
Measurement of Building Works
(80 marks)
9 EXAMINATION 60% The marks will be reduced to 40%
PART B
Analysis of Prices (20 marks)
The marks is 20%

TOTAL 100%

OBE-SCL AP114 QSD381 Page 10 of 24


6.0 ASSESSMENT DESCRIPTION AND OUTCOMES

NO ITEMS DESCRIPTION OUTCOME

1 Assignment
 The assignments require It will measure students’ ability to prepare
students to reflect their acquired bills of quantities for demolition, alteration,
knowledge gained throughout underpinning and external works.
the course. (CO1, CO2, CO3, CLO1, CLO2, CLO3,
CLO4, CLO5, PO1, PO2, PO3, PEO1, PEO2,
 These assignments will help the LO1, LO2, LO3, LO5, LO8, CO2, CO3, P1,
students to interpret construction P2, P3, P4, P5, P6, CTPS1, CTPS2, CTPS3,
TS1, TS2, TS3, TS4, TS5, KK1, KK4)
drawings, measure quantities,
write specifications and
preambles for demolition,
alteration, underpinning and
external works.
 These assignments,
specification writing and pricing
will expose the students to
identifying opportunities to
involve in available construction
business.

2 Examination It will measure students’ ability to measure


 The final examination will the quantities of items associated with
determine on the understanding demolition, alteration, underpinning and
and application of measurement external works.
of selected items associated (CO1, CO2, CO3, CLO1, CLO2, CLO3,
CLO4, CLO5, PO1, PO2, PO3, PEO1, PEO2,
with demolition, alteration, LO1, LO2, LO3, LO5, LO8, CO2, CO3, P1,
underpinning and external P2, P3, P4, P5, P6, CTPS1, CTPS2, CTPS3,
KK4)
works.

OBE-SCL AP114 QSD381 Page 11 of 24


7.0 ASSESSMENT BREAKDOWN & RUBRIC
MARKS & ASSESSMENT
NO ITEM RUBRIC
DESCRIPTION

1 Assignments Assignment 1 (5%) Marks awarded based on:-


Assignment 2 (5%)
Assignment 3 (5%)  Taking-Off (3 marks)
Assignment 4 (5%)  Preparation of BQ
Assignment 5 (5%) (3 marks)
Assignment 6 (5%)  Specifications (2 marks)
Assignment 7 (5%)  Preambles (2 marks)
Assignment 8 (5%)
a) Taking-off (3 mark)
All covered for element
below: Excellent: 3 marks:
 Demolition and Applied all the basic
Alteration Works principles of taking off,
 Underpinning Works accurate dimension entry,
 Fencing and Gates comprehensive item
 Surface Water Drainage description, very tidy
Works presentation.
 Landscaping Works
 Sewerage Reticulation Good: 2 marks:
Works Applied all the basic
 Water Reticulation principles of taking off, very
Works few inaccurate dimension
 Road, Pavement and entries, very few incomplete
Hard standing Works item description, and tidy
presentation.
Total Marks (40%)
Average: 1 mark:
Few basic principles of
taking off not followed few
inaccurate dimension
entries, few incomplete item
descriptions, approaching
tidy presentation.

Poor: 0 marks:
Do not apply the basic
principles of taking off, many
inaccurate dimension
entries, many incomplete
item description, and sloppy
presentation.
OR
Non-submission.

OBE-SCL AP114 QSD381 Page 12 of 24


MARKS & ASSESSMENT
NO ITEM RUBRIC
DESCRIPTION

b) Preparation of BQ
(3 marks)

Excellent: 3 marks:
BQ items are accurately
arranged, adhere to BQ best
practice formatting, very tidy
presentation.

Good: 2 marks:
BQ items are accurately
arranged, less than 3
violations of the BQ best
practice formatting, a tidy
presentation.

Average: 1 mark:
Less than 3 BQ items are
inaccurately arranged, more
than 3 violations of BQ best
practice formatting,
approaching tidy
presentation.

Poor: 0 marks:
More than 3 BQ items are
inaccurately arranged more
than 3 violations of BQ best
practice formatting, sloppy
presentation.
OR
Non-submission.

OBE-SCL AP114 QSD381 Page 13 of 24


MARKS & ASSESSMENT
NO ITEM RUBRIC
DESCRIPTION

c) Specification writings (2
marks)

Excellent: 2 marks:
Clauses fully covered the
nature of work involved,
systematically arranged,
very tidy presentation.

Average: 1 mark:
Clauses outlined were
adequately covered,
systematically arranged, tidy
presentation.

Poor: 0 mark:
Clauses inadequately
covered, more than 3
irrelevant clauses were
presented, clauses poorly
arranged, and sloppy
presentation.
OR
Non-submission.

OBE-SCL AP114 QSD381 Page 14 of 24


MARKS & ASSESSMENT
NO ITEM RUBRIC
DESCRIPTION

d) Preambles writings
(2 marks)

Excellent: 2 marks:
Clauses fully covered the
nature of work involved,
systematically arranged,
very tidy presentation.

Average: 1 mark:
Clauses outlined were
adequately covered,
systematically arranged, tidy
presentation.

Poor: 0 marks:
Clauses inadequately
covered, more than 3
irrelevant clauses were
presented, clauses poorly
arranged, and sloppy
presentation.

TOTAL MARKS = 10 marks


(The marks will be reduced to
5 marks)

2 Examination Part A Marks awarded based on


Marking Scheme and/or Answer
Measurement of Building Scheme given.
Works (40%)

2 Questions (80 marks)

PART B

Analysis of Prices (20%)

2 Questions (20 marks)

OBE-SCL AP114 QSD381 Page 15 of 24


OBE-SCL AP114 QSD381 Page 16 of 24
8.0 TEACHING METHODOLOGY

8.1 Various Teaching Method(S)

TEACHING CLASSROOM
LECTURE
SOFTSKILLS ACTIVITIES
CRITICAL THINKING AND PROBLEM-
SOLVING SKILLS √ √
COMMUNICATION SKILLS √
TEAMWORK SKILLS √
VALUES PROFESSIONALISM MORALITY √ √
INFORMATION MANAGEMENT AND LIFE-
LONG LEARNING SKILLS √
ENTREPRENEURIAL SKILLS
LEADERSHIP SKILLS

8.2 Various Teaching and Learning


Activities

TEACHING CLASSROOM
LECTURE INDIVIDUAL
SOFTSKILLS ACTIVITIES
CRITICAL THINKING AND PROBLEM-
SOLVING SKILLS √ √ √
COMMUNICATION SKILLS √ √
TEAMWORK SKILLS √
VALUES PROFESSIONALISM MORALITY √ √
INFORMATION MANAGEMENT AND LIFE-
LONG LEARNING SKILLS √ √ √
ENTREPRENEURIAL SKILLS
LEADERSHIP SKILLS √

OBE-SCL AP114 QSD381 Page 17 of 24


8.3 Various Evaluation Method

EVALUATION
INDIVIDUAL FINAL EXAM
SOFTSKILLS
CRITICAL THINKING AND PROBLEM-
SOLVING SKILLS √ √
COMMUNICATION SKILLS √
TEAMWORK SKILLS
VALUES PROFESSIONALISM MORALITY √ √
INFORMATION MANAGEMENT AND LIFE-
LONG LEARNING SKILLS √ √
ENTREPRENEURIAL SKILLS
LEADERSHIP SKILLS

OBE-SCL AP114 QSD381 Page 18 of 24


9. 0 BREAKDOWN OF STUDENT LEARNING
LEARNING ACTIVITIESTIME
AND STUDENT LEARNING TIME FOR A COURSE

LEARNING ACTIVITIES AND STUDENT LEARNING TIME


FACULTY : Faculty of Architecture, Planning and Surveying COURSE : MEASUREMENT OF CONSTRUCTION WORKS V
PROGRAMME : Diploma in Quantity Surveying CODE : QSD381
CODE : AP114 CREDIT : 3.0
Copyright June 2009; TZN AP114 FSPU UiTM Perak SEMESTER : 6
CO 1 Ability to interpret drawings on demolition and alteration works, underpinning and external works.

CO 2 Ability to compute demolition and alteration works, underpinning and external works.

CO 3 Ability to analyse price of measured items.

No Learning Activities hr/unit frequency F2F Non F2F Total SLT

A Traditional Face to face Learning


1. Lecture 3 14 42 42
2. Class Exercise / Lesson Recap 1 14 14 14
B Self Learning
3. Preparation for class 1 14 14 14
4. Case study / Revision 1 14 14 14
C Assignments
5. Collecting information for assignment 1 14 14 14
6. Reporting report/doing slides 1 14 14 14
D Evaluation
7. Test 0 0
8. Quiz 0 0
9. Final examination 3 1 3 3
10. Seminar presentation 0 0
11. Revision for final examination 5 1 5 5
E Add Teaching and Learning (ATLA)
12. Project 0
13. Practical training 0
Total student learning time 56 64 120
Credit value 1.4 1.6 3

OBE-SCL AP114 QSD381 Page 19 of 24


10.0
COURSE ENTRANCE
AND EXIT SURVEY

OBE-SCL AP114 QSD381 Page 20 of 24


FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING
DIPLOMA UKUR BAHAN (AP114)

COURSE ENTRANCE SURVEY

QSD 381: MEASUREMENT OF CONSTRUCTION WORKS V

Name : _______________________________________
Student No. : _______________________________________
Date. : _______________________________________

Please complete this inventory by circling the appropriate ratings:


5 – Strongly Agree
4 – Agree
3 – Mixed Feeling (note: most of the time, you would have a stronger feeling)
2 – Disagree
1 – Strongly Disagree

CO NO. ITEMS Your Rating


I am able to interpret drawings on demolition
CO1 1 works, alteration works, underpinning works and 1 2 3 4 5
external works.
I am able to measure the quantities of items
associated with:
a) Demolition and alteration works. 1 2 3 4 5
2
b) Underpinning works. 1 2 3 4 5

c) External works. 1 2 3 4 5
CO2
I am able to prepare the bills of quantities for:
a) Demolition and alteration works. 1 2 3 4 5

3 b) Underpinning works. 1 2 3 4 5

c) External works. 1 2 3 4 5

OBE-SCL AP114 QSD381 Page 21 of 24


CO NO. ITEMS Your Rating
I am able to write the specifications and preambles
for:
a) Demolition and alteration works. 1 2 3 4 5
CO2 4
b) Underpinning works. 1 2 3 4 5

c) External works. 1 2 3 4 5

I am able to analyze the prices of items associated


with:
a) Demolition and alteration works. 1 2 3 4 5
CO3 5
b) Underpinning works. 1 2 3 4 5

c) External works. 1 2 3 4 5

OBE-SCL AP114 QSD381 Page 22 of 24


FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING
DIPLOMA UKUR BAHAN (AP114)

COURSE EXIT SURVEY

QSD 381: MEASUREMENT OF CONSTRUCTION WORKS V

Name : _______________________________________
Student No. : _______________________________________
Date. : _______________________________________

Please complete this inventory by circling the appropriate ratings:


5 – Strongly Agree
4 – Agree
3 – Mixed Feeling (note: most of the time, you would have a stronger feeling)
2 – Disagree
1 – Strongly Disagree

CO NO. ITEMS Your Rating


I am able to interpret drawings on demolition
CO1 1 works, alteration works, underpinning works and 1 2 3 4 5
external works.
I am able to measure the quantities of items
associated with:
d) Demolition and alteration works. 1 2 3 4 5
2
e) Underpinning works. 1 2 3 4 5

f) External works. 1 2 3 4 5
CO2
I am able to prepare the bills of quantities for:
d) Demolition and alteration works. 1 2 3 4 5

3 e) Underpinning works. 1 2 3 4 5

f) External works. 1 2 3 4 5

OBE-SCL AP114 QSD381 Page 23 of 24


CO NO. ITEMS Your Rating
I am able to write the specifications and preambles
for:
d) Demolition and alteration works. 1 2 3 4 5
CO2 4
e) Underpinning works. 1 2 3 4 5

f) External works. 1 2 3 4 5

I am able to analyze the prices of items associated


with:
d) Demolition and alteration works. 1 2 3 4 5
CO3 5
e) Underpinning works. 1 2 3 4 5

f) External works. 1 2 3 4 5

OBE-SCL AP114 QSD381 Page 24 of 24