You are on page 1of 3

Mech.

installation RPS TL Cooling service room

Check room for sufficient cooling


Possibilities:
1.Cooling with air ducts
Recommended by Bonfiglioli Vectron
Mech. installation RPS TL Cooling service room

2.Cooling without air ducts


• Better to install the outlets above
the solar inverters
• No water should access through the
outlets
Mech. installation RPS TL Cooling service room

3.Cooling with bulkhead plates


• Advantage: the service room is not
heated by the solar inverters
• More outlets than shown are better

The needed cooling air has to be


available in any installed
cooling system.

The rate of coolant air required can be


found in the manual