Item description Unit of Quantity of Unit price
поз. Measure works (USD) Total
CONSTRUCTION WORKS
PREPARATORY WORKS
Dislocating existing installations prior to
commencement of any of the bridge demolition
works. Identifying and staking out the alignment
of both registered and unregistered existing
installations, in presence of the appointed
representatives of the installations' owners'
authorized departments, and dislocating,
protecting and securing the installations during
the bridge construction works.
1.
Calculation per lump sum for the entire scope of
works, materials, tools, equipment or
mechanization. lump sum 1
Preparing and organizing construction site: site
registration, connecting to electrical power grid,
transporting containers and equipment,
organising guard service (60 days)
2.
Calculation per lump sum for the entire scope of
works, materials, tools, equipment or
mechanization. lump sum 1
Careful demolition of the existing bridge including
sidewalls. Exercising due diligence and conducting
preventative measures concerning the health and
safety (H&S) of the labourers, temporary
structures, mechanization and equipment on site.
Cleaning and disposing all usable construction
materials at site landfill or disposing it at landfill
chosen by the Employer. Cleaning the area by
loading and transporting the waste to a landfill
within 10 km radius. The Contractor to adjust the
bridge demolition technology to the available
mechanization.
3.
Calculation per lump sum for the entire scope of
works, materials, tools, equipment or
mechanization. lump sum 1
lump sum 1
Taking photos during the construction. Price to
7. include preparation, work on the site, results
V-7 processing and report drafting.
Calculation per lump sum.
lump sum 1
Manufacturing and installing the plaque
containing the year of constuction. Plaque to be
8.
made of brass of dimensions 210х300х4mm
V-8
Calculation per lump sum.
lump sum 1
Procuring and laying down the bituminous filling
strips alongside the curbs before concreting the
9. pedestrian walkways and asphalt paving the
V-9 roadway.
Calculation per m1, including the entire labour,
materials and transport.
ТЕБМ 10/10: 27.5*2 m1 55.00
1
ТЕБМ 10/30: 27.5*2 m 55.00
Installing the PVC pipes of 110 cm in diameter
into the bridge pedestrian walkways and side
walls for running the installations.
10.
Calculation per m1, including the entire labour,
materials and transport.
27.5*4*2 m1 220.00
lump sum 1
Total V:
пауш./
lump-sum 18.00
TOTAL CONSTRUCTION OF THE TEMPORARY
RIVER CROSSING
1 m1 70.00
Ripping off the asphalt 4-6 cm thick for fitting into
the existing roadway surface over the entire
2 intervention area. м3 15.60
Preparing working joints for continuation of the
3 asphlt-paving м 12.00
Constructing the buffer layer made of stone
material 0/31, according to the elevations from
the Design, in layers up to 50 cm thick at the
bridge integration spot. Calculating per m3 of
4 layer. м3 115.20
Asphalt-paving the roadway surface BNS 22cA, 8
cm thick. Calculation per m2 of the paved layer.
5 м2 260.00
Asphalt-paving the roadway using asphalt
6 concrete AB 11c, 5 cm thick. м2 260.00
Constructing the earth embankment made of
earth procured at the nearest borrow pit within 8
7 km in distance. Calculation per m3. м3 21.50
TOTAL WORKS:
1 m1 65.00
Clearing out the terrain on place of the temporary
detour road including bush and tree cutting and
waste removal and transporting to a landfill.
2 м2 250.00
Constructing the buffer layer of stone material
0/31 mm according to the Design elevations, in
layers 20 cm thick. Calculation per m3.
3 м3 49.30
Constructing the buffer layer of stone material
0/63 mm according to the Design elevations.
4 Calculation per m3. м3 820.50
Constructing the gabion wall of 0.5х0.5х1.0 m in
dimensions, 31 pieces in total, fully in accordance
5 with technical conditions. м3 15.50
Maintaining the road during the construction
6 works. lump sum 1
Removing temporary detour road following the
completion of construction works and bringing
7 the terrain to its initial state. lump sum 1
2.3.
a) work in naturally moist grounds (70%) м³ 105.16
b) work in wet grounds (30%) м³ 45.07
Manual excavation of the II and III earth category
for construction of the stabilization sleepers.
Material to be transported to a landfill designated
by the Engineer. Calculation to include removal of
excess water during the construction. Payments
per m3 of excavated earth.
2.4. м³ 16.69
Manual unearthing with coarse and fine levelling
of the riverbed. Following completed mechanical
excavation, manual unearthing of the bottom of
the riverbed slopes. Excavated material to be
transported to a landfill or used for constructing
the embankments. Levelling to be done with
precision of 2 cm within the designed elevation.
Price to include manual removal of excess water
during the construction. Calculation per m3.
2.5.
a) work in naturally moist grounds (70%) м³ 68.14
b) work in wet grounds (30%) м³ 29.20
3.1. м³ 98.00
Constructing footing of the regulated riverbed
slopes of treated, semi-hewn stone 40 cm thickin
cement mortar in mix of 1:3 ratio. Footings
(1,00x1,00м) to be made of quality limestone tiles
of parallel face edges, joints filled in cement
mortar in mix ratio of 1:2. Payment per m3 of
installed stone.
3.2. м³ 97.99
Constructing slopes of the regulated riverbed of
treated semi-hewn stone 40 cm thick in cement
mortar in mix ratio of 1:3. Slopes to be made of
quality limestone of parallel face edges, joints
filled in cement mortar in mix ratio of 1:2.
Payment per m3 of installed stone.
3.3. м³ 138.82
Constructing stabilising sleepers of 40 cm thick
stone in cement mortar, in dimensions of 1.5x1.5
m according to the attached design drawings.
Payment per m3 of installed stone.
3.4. м³ 159.72
Stone backfilling over the riverbed bottom 30 cm
thick as protection of the upstream and
downstream sleeper. Payment per m3 of stone.
3.5. м³ 15.07
TOTAL STONE WORKS
УКУПНО 2.
3 TRAFFIC EQUIPMENT
Protective fence
Continuous fencing ЈDО/2.00, H1-W5 м 16.00
Continuous fencing SUPER RAIL/1.33, H2-W4 м 144.00
I PREPARATORY WORKS
1 Mounting and dismounting of the metal pipe
scaffold, fully according to standing regulations and
PP measures. The scaffold shall be structurally
stable, and properly grounded. Working platforms
made of 5cm boards shall be placed at 2.00m of
height. From the exterior, 5cm boards shall be
placed vertically as guards. The scaffold shall be
used throughout the montage of the signboard and
untill concrete foundation reaches70% of its load
bearing capacity.Same scaffold is to be used for
mantage of all signboards.
Calculated per m2 of vertical projection of the
assembled scaffold.
m2 10.00
TOTAL
II EARTH WORKS
Manual excavation of 3rd category soil for
signboard foundations. The excavation shall be
executed and levelled according to the design and
provided elevation points. The sides shall be clean
and verticaly cut and the bottom levelled.
Excavated soil shall be wheelbarrowed, poured and
the terrain levelled or loaded onto a lorry and
transported to the town landfill. Calculated per m3
of soil, measured in autochthonous state.
m3 0.30
TOTAL
m3 0.22
TOTAL
IV MONTAGE WORKS
Installation of steel plates for marking of
donor.Table is rectangular in shape, dimensions
and materialization according to the sketch ,
mounted on a steel substructure consisting of steel
profiles 80x80x4mm , and metal sheet d = 1mm .
The total height of the table is 3m, of which 60cm is
anchored into the concrete, and the lower angle of
table is at a height of 1.4m above ground level.
Calculated per peace of installed signboard
pcs 1.00
TOTAL
1. ЕЛЕМЕНТИ
1. VERTICAL
ВЕРТИКАЛНЕ
SIGNAGE ELEMENTS
СИГНАЛИЗАЦИЈЕ
1.1. Standard traffic signage
Warning signs class 2
I-5 Triangular side 900mm pcs 2
I-5.1 Triangular side 900mm pcs 1
I-5.2 Triangular side 900mm pcs 1
I-19 Triangular side 900mm pcs 4
I-20 Triangular side 900mm class 2 pcs 2
I-38 Triangular side 900mm 2
Direction signs class 2
II-3 Rectangle, sides 600x800mm pcs 2
II-22(3,5т) Round, diameter 600mm - fluorescent base
with signage sides 900x900mm pcs 2
II-22(3,5т) Round, diameter 600mm 4
II-28 Round, diameter 600mm 2
II-30(40) Round, diameter 600mm 2
II-30(20) Round, diameter 600mm 2
II-45 Round, diameter 400mm 1
II-45.1 Round, diameter 400mm 1
Informative signs class 2
TS-2 9.00
pcs
TS-3 -set of 5 lights with control device (yellow light,
diameter 180mm, order of lights' turning on in lump sum 2.00
direction of the vehicles course)
Construction
BRIDGE OVER THE RIVER ROGACICA on
the state road IIA class no 174 at km
61+096
HYDRO-TECHNICAL STRUCTURES
TRAFFIC SIGNALISATION
VISIBILITY SIGNBOARDS
TOTAL WORKS (USD)