Professional Documents
Culture Documents
JEMBATAN HD7
UNIT PRICE AMOUNT
NO DESCRIPTION UNIT QUANTITY BOBOT
IDR IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000 900,000,000 2.78
2 Safety health and welfare LS 1 175,000,000 175,000,000 0.54
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000 145,000,000 0.45
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000 390,000,000 1.21
5 All testing requires cost and tools LS 1 187,500,000 187,500,000 0.58
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000 1,750,000,000 5.41
2 crawler rent 40 ton (crane support) month 5 250,000,000 1,250,000,000 3.87
B BRIDGE CONSTRUCTION WORK EARTH WORK 0.00
1 Soil exccavation m3 300.00 60,000 18,000,000.00 0.06
2 Supply and instlation geoteknik m2 1,900.00 4,150 7,885,000.00 0.02
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000 2,425,231,900.00 7.50
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000 895,086,010.00 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000 116,160,000.00 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000 1,149,711,750.00 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000 348,964,000.00 1.08
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667 5,262,920,520.00 16.28
2 Driving and jointing steel pile m3 1,560.00 1,100,000 1,716,000,000.00 5.31
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000 18,200,000.00 0.06
4 Pile head treatment (K-300) m3 73.48 5,950,000 437,182,200.00 1.35
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000 84,579,000.00 0.26
6 PDA Test for Bridge ea 3.00 25,000,000 75,000,000.00 0.23
7 Gabion m3 180.00 1,950,000 351,000,000.00 1.09
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625 352,312,750.13 1.09
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625 281,168,552.70 0.87
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000 40,500,000.00 0.13
4 Instal pedestrian metal railing m' 102.00 350,000 35,700,000.00 0.11
5 Supply and install drainage spots ls 34.00 750,000 25,500,000.00 0.08
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000 18,000,000.00 0.06
2 Supply and instlation geoteknik m2 1,900.00 4,150 7,885,000.00 0.02
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000 2,425,231,900.00 7.50
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000 895,086,010.00 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000 116,160,000.00 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000 1,149,711,750.00 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000 348,964,000.00 1.08
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667 5,262,920,520.00 16.28
2 Driving and jointing steel pile m3 1,560.00 1,100,000 1,716,000,000.00 5.31
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000 18,200,000.00 0.06
4 Pile head treatment (K-300) m3 73.48 5,950,000 437,182,200.00 1.35
5 Reinforced lining protection/soil embakment protection (K 300, form work + support m3 13.98 6,050,000 84,579,000.00 0.26
6 PDA Test for Bridge ea 3.00 25,000,000 75,000,000.00 0.23
7 Gabion m3 180.00 1,950,000 351,000,000.00 1.09
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625 352,312,750.13 1.09
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625 281,168,552.70 0.87
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000 40,500,000.00 0.13
4 Instal pedestrian metal railing m' 102.00 350,000 35,700,000.00 0.11
5 Supply and install drainage spots ls 34.00 750,000 25,500,000.00 0.08
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000 253,000,000.00 0.78
TOTAL 32,332,703,365.66 100.00
BOBOT RENCANA PER MINGGU
KUMULATIF BOBOT RENCANA PER MINGGU
DEVIASI
HEDULE CONSTRUCTION
AN HD785 BMO
Des JANUARI FEBRUARI MARET APRIL MEI JUNI
21-24 25-31 1-7 8-14 15-21 22-28 29-4 5-11 12-18 19-25 26-4 5-11 12-18 19-25 26-1 2-8 9-15 16-22 23-29 30-6 7-13 14-20 21-27 28-3 4-10 11-17 18-24 25-28
0.06 0.10 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.03 0.04 0.04 0.08 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11
0.01 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02165 0.00721666 0.08
0.22 0.22
0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
0.54 0.54
0.54 0.54
0.54 0.54
0.43 0.43
0.06 0.06
0.06 0.055207
0.083
0.01 0.01 0.01 0.01 0.01 0.01
1.78 1.78
0.539645 0.53965
0.54 0.54
0.54 0.54
0.434805 0.434805
0.06263 0.06263
0.055207 0.055207
0.08
0.78
3.79 3.83 3.85 3.85 7.47 6.07 7.70 3.65 3.40 5.00 4.66 5.35 4.50 4.30 2.09 2.42 3.15 2.37 2.09 2.16 2.71 1.76 1.47 1.58 3.12 3.09 2.99 1.71
3.79 7.61 11.46 15.32 22.79 28.86 36.55 40.20 43.60 48.59 53.26 58.60 63.11 67.40 69.49 71.91 75.06 77.42 79.51 81.67 84.38 86.14 87.61 89.18 92.30 95.39 98.38 100
KETERANGAN Progres / Day
190 hari kalender 24 25 26 27 28 I 29 30 1 2
1 Jan - 9 juli 2018 0.61 0.72 0.72 0.72 0.72 0.72
0.10 0.12 0.12 0.12 0.12 0.12
0.22 0.26 0.26 0.26 0.26 0.26
0.40 0.70 0.70 0.70 0.70 0.70
0.17 0.41 0.41 0.41 0.41 0.41
2.21
100
80
60
3 4 5 II
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO
UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy
AMOUNT Quantity
BOBOT
IDR HARI INI
1,750,000,000 5.41
1,250,000,000 3.87
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
253,000,000.00 0.78
32,332,703,365.66 100.00 2.21
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO
UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy
AMOUNT Quantity
BOBOT
IDR HARI INI
1,750,000,000 5.41
1,250,000,000 3.87
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
253,000,000.00 0.78
32,332,703,365.66 100.00 2.21
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO
UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy
v
v
v
v
v
v
v
v
AMOUNT Quantity
BOBOT
IDR HARI INI
1,750,000,000 5.41
1,250,000,000 3.87
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
253,000,000.00 0.78
32,332,703,365.66 100.00 2.21
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO
UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy
AMOUNT Quantity
BOBOT
IDR HARI INI
1,750,000,000 5.41
1,250,000,000 3.87
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
253,000,000.00 0.78
32,332,703,365.66 100.00 1.11
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO
UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection (K 300, form work + support m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy
AMOUNT Quantity
BOBOT
IDR HARI INI
1,750,000,000 5.41
1,250,000,000 3.87
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
18,000,000.00 0.06
7,885,000.00 0.02
2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08
5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08
253,000,000.00 0.78
32,332,703,365.66 100.00 1.49
NO DESCRIPTION UNIT
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS
2 Safety health and welfare LS
3 Temporary working, strorage and workshop, contractor office facilities LS
4 Desighn analysis, drawing, administration cost adn other cost LS
5 All testing requires cost and tools LS
II Equipment rent
1 crawler rent 90 ton (crane support) month
2 crawler rent 40 ton (crane support) month
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3
2 Supply and instlation geoteknik m2
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3
2 Pier (form work, concrete and reinforcemenet) K-3000 m3
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m'
2 Driving and jointing steel pile m3
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea
4 Pile head treatment (K-300) m3
5 Reinforced lining protection/soil embakment protection m3
6 PDA Test for Bridge ea
7 Gabion m3
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg
3 Expansion joint = seal rubber (include erection method) for span 24m' m'
4 Instal pedestrian metal railing m'
5 Supply and install drainage spots ls
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3
2 Supply and instlation geoteknik m2
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3
2 Pier (form work, concrete and reinforcemenet) K-3000 m3
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m'
2 Driving and jointing steel pile m3
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea
4 Pile head treatment (K-300) m3
5 Reinforced lining protection/soil embakment protection (K 300, form work + support m3
6 PDA Test for Bridge ea
7 Gabion m3
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg
3 Expansion joint = seal rubber (include erection method) for span 24m' m'
4 Instal pedestrian metal railing m'
5 Supply and install drainage spots ls
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea
TOTAL
BOBOT RENCANA PER MINGGU
KUMULATIF BOBOT RENCANA PER MINGGU
DEVIASI
S-CURVE TIME SCHEDULE CONSTRUCTION
JEMBATAN HD785 BMO
UNIT PRICE AMOUNT JANUARI FEBRUARI
QUANTITY BOBOT
IDR IDR 1-7 8-14 15-21 22-28 29-4 5-11 12-18
1 2 3 4 5 6 7
1 900,000,000 900,000,000 2.78 0.11 0.11 0.11 0.11 0.11 0.11 0.11
1 175,000,000 175,000,000 0.54 0.02 0.02 0.02 0.02 0.02 0.02 0.02
1 187,500,000 187,500,000 0.58 0.08 0.08 0.08 0.08 0.08 0.08 0.08
1,560.00 3,373,667 5,262,920,520.00 16.28 3.26 3.26 3.26 1.63 3.26 1.63
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.04 0.04
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02165 0.007217 0.007217
0.54 0.54
0.54 0.54
0.54 0.54
0.43 0.43
0.06 0.06
0.06 0.055207
0.083
1.78 1.78
0.539645 0.54
0.54 0.54
0.54 0.54
0.434805 0.434805
0.06263 0.06263
0.055207 0.055207
0.08
4.90 4.56 5.25 4.50 4.30 2.17 2.49 3.22 2.40 2.09 2.16 2.71 1.76 1.47 1.58 3.12 3.09 2.92 0.78
48.6 53.2 58.4 62.9 67.2 69.4 71.9 75.1 77.5 79.6 81.8 84.5 86.2 87.7 89.3 92.4 95.5 98.4 99.2
JULI Quantity
UNIT QUANTITY
2-8 9 24-Jan
27 28
0.09 0.06 LS 1 0.33
0.007217 LS 1 0.06
LS 1
LS 1 0.40
LS 1 0.25
month 5
month 5
m3 300.00
m2 1,900.00
m3 407.60
m3 144.95
m3 19.20
m3 190.04
m3 57.68
m' 1,560.00
m3 1,560.00
Ea 52.00
m3 73.48
m3 13.98
ea 3.00
m3 180.00
kg 134,214.38
kg 107,111.83
m' 54.00
m' 102.00
ls 34.00
m3 300.00
m2 1,900.00
m3 407.60
m3 144.95
m3 19.20
m3 190.04
m3 57.68
m' 1,560.00
m3 1,560.00
Ea 52.00
m3 73.48
m3 13.98
ea 3.00
m3 180.00
kg 134,214.38
kg 107,111.83
m' 54.00
m' 102.00
ls 34.00
0.78 Ea 44.00
1.05
0.88 0.06
100.1 100.1
Quantity
25-Jan 26-Jan 27-Jan 28-Jan
0.33
0.06
0.06
0.40
0.25
1.11
MINGGU KE : 1
NO ACTI VITY
1 Penentuan titik BM
Stock Material
1 Wood
Total 10 39
Signature : Signature
Name : Ronaldo Name
Position : Site Engineer Position
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ACTIVITY REPORT
JEMBATAN HD 785 BLOK 5-6
WEATHER
Cloudy Drizzly Rainy
TIME
VITY
FROM TO
10:00 17:00
Penentuan titik BM
WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Kamis, 25 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v
TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00
Stock Material
1 Wood
Total 10 39
Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Sebelum melaksanakan kegiatan di lokasi proyek terlebih dahulu Material kayu untuk pembangunan direksi keet
dilaksanakan P5m
Mendirikan kuda - kuda untuk direksi keet Pekerja direksi keet selalu mengutamakan safety dengan
menggunakan tangga dan body harnes
MINGGU KE : 1 REPORT NO. : 3
WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Jumat, 26 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v
TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00
Stock Material
1 Wood
Total 11 47
Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Sebelum melaksanakan kegiatan di lokasi proyek terlebih dahulu Material kayu untuk pembangunan direksi keet
dilaksanakan P5m
Mendirikan kuda - kuda untuk direksi keet Pekerja direksi keet selalu mengutamakan safety dengan
menggunakan tangga dan body harnes
MINGGU KE : 1 REPORT NO. : 4
WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Sabtu, 27 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v
TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00
Stock Material
1 Wood
2 Seng
3 Pasir
4 Sement
Total 11 47
Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Tampak belakang pengerjaan pembuatan partisi untuk kantor Tampak samping pengerjaan direksi keet
Tampak depan penegrjaan partisi Dalam setiap proses pengerjaan direksi keet , tampak spanduk
daerah wajib memakai safety.
MINGGU KE : 1 REPORT NO. : 5
WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Minggu , 28 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v
TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00
Stock Material
1 Wood
2 Seng
3 Pasir
4 Sement
Total 10 39
Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Sebelum melaksanakan kegiatan di lokasi proyek terlebih dahulu Tampak depan pengerjaan partisi telah selesai
dilaksanakan P5m
Tampak samping kiri Pengerjaan Partisi telah selesai Tampak belakang pengerjaan partisi telah selesai
MINGGU KE : 1 REPORT NO. : 5
WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Senin , 29 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v
TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00
Stock Material
1 Wood
2 Seng
3 Pasir
4 Sement
Total 10 39
Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Sebelum melaksanakan kegiatan di lokasi proyek terlebih dahulu Tampak depan pengerjaan atap direksi keet
dilaksanakan P5m
Pengerjaan tanah untuk penimbunan lantai Penegerjaan partisi untuk ruangan kantor.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14