You are on page 1of 58

S-CURVE TIME SCHEDUL

JEMBATAN HD7
UNIT PRICE AMOUNT
NO DESCRIPTION UNIT QUANTITY BOBOT
IDR IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000 900,000,000 2.78
2 Safety health and welfare LS 1 175,000,000 175,000,000 0.54
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000 145,000,000 0.45
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000 390,000,000 1.21
5 All testing requires cost and tools LS 1 187,500,000 187,500,000 0.58
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000 1,750,000,000 5.41
2 crawler rent 40 ton (crane support) month 5 250,000,000 1,250,000,000 3.87
B BRIDGE CONSTRUCTION WORK EARTH WORK 0.00
1 Soil exccavation m3 300.00 60,000 18,000,000.00 0.06
2 Supply and instlation geoteknik m2 1,900.00 4,150 7,885,000.00 0.02
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000 2,425,231,900.00 7.50
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000 895,086,010.00 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000 116,160,000.00 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000 1,149,711,750.00 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000 348,964,000.00 1.08
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667 5,262,920,520.00 16.28
2 Driving and jointing steel pile m3 1,560.00 1,100,000 1,716,000,000.00 5.31
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000 18,200,000.00 0.06
4 Pile head treatment (K-300) m3 73.48 5,950,000 437,182,200.00 1.35
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000 84,579,000.00 0.26
6 PDA Test for Bridge ea 3.00 25,000,000 75,000,000.00 0.23
7 Gabion m3 180.00 1,950,000 351,000,000.00 1.09
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625 352,312,750.13 1.09
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625 281,168,552.70 0.87
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000 40,500,000.00 0.13
4 Instal pedestrian metal railing m' 102.00 350,000 35,700,000.00 0.11
5 Supply and install drainage spots ls 34.00 750,000 25,500,000.00 0.08
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000 18,000,000.00 0.06
2 Supply and instlation geoteknik m2 1,900.00 4,150 7,885,000.00 0.02
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000 2,425,231,900.00 7.50
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000 895,086,010.00 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000 116,160,000.00 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000 1,149,711,750.00 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000 348,964,000.00 1.08
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667 5,262,920,520.00 16.28
2 Driving and jointing steel pile m3 1,560.00 1,100,000 1,716,000,000.00 5.31
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000 18,200,000.00 0.06
4 Pile head treatment (K-300) m3 73.48 5,950,000 437,182,200.00 1.35
5 Reinforced lining protection/soil embakment protection (K 300, form work + support m3 13.98 6,050,000 84,579,000.00 0.26
6 PDA Test for Bridge ea 3.00 25,000,000 75,000,000.00 0.23
7 Gabion m3 180.00 1,950,000 351,000,000.00 1.09
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625 352,312,750.13 1.09
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625 281,168,552.70 0.87
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000 40,500,000.00 0.13
4 Instal pedestrian metal railing m' 102.00 350,000 35,700,000.00 0.11
5 Supply and install drainage spots ls 34.00 750,000 25,500,000.00 0.08
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000 253,000,000.00 0.78
TOTAL 32,332,703,365.66 100.00
BOBOT RENCANA PER MINGGU
KUMULATIF BOBOT RENCANA PER MINGGU
DEVIASI
HEDULE CONSTRUCTION
AN HD785 BMO
Des JANUARI FEBRUARI MARET APRIL MEI JUNI
21-24 25-31 1-7 8-14 15-21 22-28 29-4 5-11 12-18 19-25 26-4 5-11 12-18 19-25 26-1 2-8 9-15 16-22 23-29 30-6 7-13 14-20 21-27 28-3 4-10 11-17 18-24 25-28

0.06 0.10 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.03 0.04 0.04 0.08 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11

0.01 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02165 0.00721666 0.08

0.22 0.22

0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

0.04 0.04 0.0414 0.0414 0.08 0.08 0.08 0.08 0.08

0.90 0.90 0.90 0.90 0.90 0.90 -

0.32 0.32 0.32 0.32 0.64 0.64 0.64 0.64

0.01 0.01 0.01 0.01

0.01 0.01 0.01 0.01

0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

0.55 0.55 0.55 0.55 0.55

0.09 0.09 0.09 0.09

0.89 0.89 1.78

0.54 0.54

3.26 1.63 3.26 1.63


1.63 1.63 1.63 1.63

1.06 1.06 1.06 1.06 1.06

0.01 0.01 0.01 0.01

0.27 0.27 0.27 0.27 0.27

0.07 0.07 0.07 0.07

0.08 0.08 0.08

0.54 0.54

0.54 0.54

0.43 0.43

0.06 0.06

0.06 0.055207

0.083
0.01 0.01 0.01 0.01 0.01 0.01

0.00 0.01 0.01 0.00

0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

0.55 0.55 0.55 0.55 0.55

0.09 0.09 0.09 0.09

1.78 1.78

0.539645 0.53965

3.26 3.26 3.26


1.63 1.63 1.63 1.63

1.06 1.06 1.06 1.06 1.06

0.01 0.01 0.01 0.01

0.27 0.27 0.27 0.27 0.27

0.07 0.07 0.07 0.07

0.08 0.08 0.08

0.54 0.54

0.54 0.54

0.434805 0.434805

0.06263 0.06263

0.055207 0.055207

0.08

0.78

3.79 3.83 3.85 3.85 7.47 6.07 7.70 3.65 3.40 5.00 4.66 5.35 4.50 4.30 2.09 2.42 3.15 2.37 2.09 2.16 2.71 1.76 1.47 1.58 3.12 3.09 2.99 1.71

3.79 7.61 11.46 15.32 22.79 28.86 36.55 40.20 43.60 48.59 53.26 58.60 63.11 67.40 69.49 71.91 75.06 77.42 79.51 81.67 84.38 86.14 87.61 89.18 92.30 95.39 98.38 100
KETERANGAN Progres / Day
190 hari kalender 24 25 26 27 28 I 29 30 1 2
1 Jan - 9 juli 2018 0.61 0.72 0.72 0.72 0.72 0.72
0.10 0.12 0.12 0.12 0.12 0.12
0.22 0.26 0.26 0.26 0.26 0.26
0.40 0.70 0.70 0.70 0.70 0.70
0.17 0.41 0.41 0.41 0.41 0.41
2.21

100

80

60
3 4 5 II
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO

Owner : PT. Beraucoal WEATHER


Kontraktor : PT. Bornes Citanusa Time Sunny
Projec Name : Pembangunan Jembatan Hd 785 blok 5-6 7:30 - 09:00 v
09:00 - 10:00 v
Date : 28 Januari 2018 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy

AMOUNT Quantity
BOBOT
IDR HARI INI

900,000,000 2.78 0.72


175,000,000 0.54 0.12
145,000,000 0.45 0.26
390,000,000 1.21 0.70
187,500,000 0.58 0.41

1,750,000,000 5.41
1,250,000,000 3.87

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09

352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

253,000,000.00 0.78
32,332,703,365.66 100.00 2.21
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO

Owner : PT. Beraucoal WEATHER


Kontraktor : PT. Bornes Citanusa Time Sunny
Projec Name : Pembangunan Jembatan Hd 785 blok 5-6 7:30 - 09:00 v
09:00 - 10:00 v
Date : 27 Januari 2018 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy

AMOUNT Quantity
BOBOT
IDR HARI INI

900,000,000 2.78 0.72


175,000,000 0.54 0.12
145,000,000 0.45 0.26
390,000,000 1.21 0.70
187,500,000 0.58 0.41

1,750,000,000 5.41
1,250,000,000 3.87

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09

352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

253,000,000.00 0.78
32,332,703,365.66 100.00 2.21
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO

Owner : PT. Beraucoal WEATHER


Kontraktor : PT. Bornes Citanusa Time Sunny
Projec Name : Pembangunan Jembatan Hd 785 blok 5-6 7:30 - 09:00
09:00 - 10:00
Date : 26 Januari 2018 10:00 - 11:00
11:00 - 12:00
12:00 - 13:00
14:00 - 15:00
15:00 - 16:00
16:00 - 17:00

UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy
v
v
v
v
v
v
v
v

AMOUNT Quantity
BOBOT
IDR HARI INI

900,000,000 2.78 0.72


175,000,000 0.54 0.12
145,000,000 0.45 0.26
390,000,000 1.21 0.70
187,500,000 0.58 0.41

1,750,000,000 5.41
1,250,000,000 3.87

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09

352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

253,000,000.00 0.78
32,332,703,365.66 100.00 2.21
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO

Owner : PT. Beraucoal WEATHER


Kontraktor : PT. Bornes Citanusa Time Sunny
Projec Name : Pembangunan Jembatan Hd 785 blok 5-6 7:30 - 09:00 v
09:00 - 10:00 v
Date : 25 Januari 2018 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy

AMOUNT Quantity
BOBOT
IDR HARI INI

900,000,000 2.78 0.33


175,000,000 0.54 0.06
145,000,000 0.45 0.06
390,000,000 1.21 0.40
187,500,000 0.58 0.25

1,750,000,000 5.41
1,250,000,000 3.87

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09
352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09

352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

253,000,000.00 0.78
32,332,703,365.66 100.00 1.11
LAPORAN HARIAN
JEMBATAN HD 785 BLOK 5-6 BMO

Owner : PT. Beraucoal WEATHER


Kontraktor : PT. Bornes Citanusa Time Sunny
Projec Name : Pembangunan Jembatan Hd 785 blok 5-6 7:30 - 09:00
09:00 - 10:00
Date : 24 Januari 2018 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

UNIT PRICE
NO DESCRIPTION UNIT QUANTITY
IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000
2 Safety health and welfare LS 1 175,000,000
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000
5 All testing requires cost and tools LS 1 187,500,000
II Equipment rent
1 crawler rent 90 ton (crane support) month 5 350,000,000
2 crawler rent 40 ton (crane support) month 5 250,000,000
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3 300.00 60,000
2 Supply and instlation geoteknik m2 1,900.00 4,150
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667
2 Driving and jointing steel pile m3 1,560.00 1,100,000
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000
4 Pile head treatment (K-300) m3 73.48 5,950,000
5 Reinforced lining protection/soil embakment protection (K 300, form work + support m3 13.98 6,050,000
6 PDA Test for Bridge ea 3.00 25,000,000
7 Gabion m3 180.00 1,950,000
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000
4 Instal pedestrian metal railing m' 102.00 350,000
5 Supply and install drainage spots ls 34.00 750,000
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000
TOTAL
WEATHER
Cloudy Drizzly Rainy

AMOUNT Quantity
BOBOT
IDR HARI INI

900,000,000 2.78 0.61


175,000,000 0.54 0.10
145,000,000 0.45 0.22
390,000,000 1.21 0.40
187,500,000 0.58 0.17

1,750,000,000 5.41
1,250,000,000 3.87

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09

352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

18,000,000.00 0.06
7,885,000.00 0.02

2,425,231,900.00 7.50
895,086,010.00 2.77
116,160,000.00 0.36
1,149,711,750.00 3.56
348,964,000.00 1.08

5,262,920,520.00 16.28
1,716,000,000.00 5.31
18,200,000.00 0.06
437,182,200.00 1.35
84,579,000.00 0.26
75,000,000.00 0.23
351,000,000.00 1.09

352,312,750.13 1.09
281,168,552.70 0.87
40,500,000.00 0.13
35,700,000.00 0.11
25,500,000.00 0.08

253,000,000.00 0.78
32,332,703,365.66 100.00 1.49
NO DESCRIPTION UNIT
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS
2 Safety health and welfare LS
3 Temporary working, strorage and workshop, contractor office facilities LS
4 Desighn analysis, drawing, administration cost adn other cost LS
5 All testing requires cost and tools LS
II Equipment rent
1 crawler rent 90 ton (crane support) month
2 crawler rent 40 ton (crane support) month
B BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3
2 Supply and instlation geoteknik m2
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3
2 Pier (form work, concrete and reinforcemenet) K-3000 m3
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m'
2 Driving and jointing steel pile m3
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea
4 Pile head treatment (K-300) m3
5 Reinforced lining protection/soil embakment protection m3
6 PDA Test for Bridge ea
7 Gabion m3
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg
3 Expansion joint = seal rubber (include erection method) for span 24m' m'
4 Instal pedestrian metal railing m'
5 Supply and install drainage spots ls
F BRIDGE CONSTRUCTION WORK EARTH WORK
1 Soil exccavation m3
2 Supply and instlation geoteknik m2
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3
2 Pier (form work, concrete and reinforcemenet) K-3000 m3
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m'
2 Driving and jointing steel pile m3
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea
4 Pile head treatment (K-300) m3
5 Reinforced lining protection/soil embakment protection (K 300, form work + support m3
6 PDA Test for Bridge ea
7 Gabion m3
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg
3 Expansion joint = seal rubber (include erection method) for span 24m' m'
4 Instal pedestrian metal railing m'
5 Supply and install drainage spots ls
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea
TOTAL
BOBOT RENCANA PER MINGGU
KUMULATIF BOBOT RENCANA PER MINGGU
DEVIASI
S-CURVE TIME SCHEDULE CONSTRUCTION
JEMBATAN HD785 BMO
UNIT PRICE AMOUNT JANUARI FEBRUARI
QUANTITY BOBOT
IDR IDR 1-7 8-14 15-21 22-28 29-4 5-11 12-18

1 2 3 4 5 6 7
1 900,000,000 900,000,000 2.78 0.11 0.11 0.11 0.11 0.11 0.11 0.11

1 175,000,000 175,000,000 0.54 0.02 0.02 0.02 0.02 0.02 0.02 0.02

1 145,000,000 145,000,000 0.45 0.22 0.22

1 390,000,000 390,000,000 1.21 0.20 0.20 0.20 0.20 0.20 0.20

1 187,500,000 187,500,000 0.58 0.08 0.08 0.08 0.08 0.08 0.08 0.08

5 350,000,000 1,750,000,000 5.41 0.90

5 250,000,000 1,250,000,000 3.87 0.64 0.64 0.64 0.64 0.64 0.64

300.00 60,000 18,000,000.00 0.06


1,900.00 4,150 7,885,000.00 0.02

407.60 5,950,000 2,425,220,000.00 7.50 0.83

144.95 6,175,000 895,066,250.00 2.77


19.20 6,050,000 116,160,000.00 0.36
190.04 6,050,000 1,149,742,000.00 3.56
57.68 6,050,000 348,964,000.00 1.08

1,560.00 3,373,667 5,262,920,520.00 16.28 3.26 3.26 3.26 1.63 3.26 1.63

1,560.00 1,100,000 1,716,000,000.00 5.31 1.06 1.06

52.00 350,000 18,200,000.00 0.06 0.01

73.48 5,950,000 437,206,000.00 1.35 0.27

13.98 6,050,000 84,579,000.00 0.26


3.00 25,000,000 75,000,000.00 0.23
180.00 1,950,000 351,000,000.00 1.09

134,214.38 2,625 352,312,747.50 1.09


107,111.83 2,625 281,168,553.75 0.87
54.00 750,000 40,500,000.00 0.13
102.00 350,000 35,700,000.00 0.11
34.00 750,000 25,500,000.00 0.08

300.00 60,000 18,000,000.00 0.06


1,900.00 4,150 7,885,000.00 0.02

407.60 5,950,000 2,425,220,000.00 7.50


144.95 6,175,000 895,066,250.00 2.77
19.20 6,050,000 116,160,000.00 0.36
190.04 6,050,000 1,149,742,000.00 3.56
57.68 6,050,000 348,964,000.00 1.08

1,560.00 3,373,667 5,262,920,520.00 16.28 3.26 3.26 3.26 3.26 3.26

1,560.00 1,100,000 1,716,000,000.00 5.31


52.00 350,000 18,200,000.00 0.06
73.48 5,950,000 437,206,000.00 1.35
13.98 6,050,000 84,579,000.00 0.26
3.00 25,000,000 75,000,000.00 0.23
180.00 1,950,000 351,000,000.00 1.09

134,214.38 2,625 352,312,747.50 1.09


107,111.83 2,625 281,168,553.75 0.87
54.00 750,000 40,500,000.00 0.13
102.00 350,000 35,700,000.00 0.11
34.00 750,000 25,500,000.00 0.08

44.00 5,750,000 253,000,000.00 0.78


32,332,748,142.50 100.00
7.57 7.57 7.57 6.17 7.80 3.75 3.30

7.6 15.1 22.7 28.9 36.7 40.4 43.7


FEBRUARI MARET APRIL MEI JUNI JULI
19-25 26-4 5-11 12-18 19-25 26-1 2-8 9-15 16-22 23-29 30-6 7-13 14-20 21-27 28-3 4-10 11-17 18-24 25-1

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.04 0.04

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02165 0.007217 0.007217

0.90 0.90 0.90 0.90 0.90 -

0.01 0.01 0.01 0.01

0.01 0.01 0.01 0.01

0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

0.55 0.55 0.55 0.55 0.55

0.09 0.09 0.09 0.09

0.89 0.89 1.78

0.54 0.54

1.06 1.06 1.06

0.01 0.01 0.01

0.27 0.27 0.27 0.27

0.07 0.07 0.07 0.07

0.08 0.08 0.08

0.54 0.54

0.54 0.54

0.43 0.43

0.06 0.06

0.06 0.055207

0.083

0.01 0.01 0.01 0.01 0.01 0.01

0.00 0.01 0.01 0.00

0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

0.55 0.55 0.55 0.55 0.55

0.09 0.09 0.09 0.09

1.78 1.78

0.539645 0.54

1.06 1.06 1.06 1.06 1.06


0.01 0.01 0.01 0.01

0.27 0.27 0.27 0.27 0.27

0.07 0.07 0.07 0.07

0.08 0.08 0.08

0.54 0.54

0.54 0.54

0.434805 0.434805

0.06263 0.06263

0.055207 0.055207

0.08

4.90 4.56 5.25 4.50 4.30 2.17 2.49 3.22 2.40 2.09 2.16 2.71 1.76 1.47 1.58 3.12 3.09 2.92 0.78

48.6 53.2 58.4 62.9 67.2 69.4 71.9 75.1 77.5 79.6 81.8 84.5 86.2 87.7 89.3 92.4 95.5 98.4 99.2
JULI Quantity
UNIT QUANTITY
2-8 9 24-Jan
27 28
0.09 0.06 LS 1 0.33
0.007217 LS 1 0.06
LS 1
LS 1 0.40
LS 1 0.25

month 5
month 5

m3 300.00
m2 1,900.00

m3 407.60
m3 144.95
m3 19.20
m3 190.04
m3 57.68

m' 1,560.00
m3 1,560.00
Ea 52.00
m3 73.48
m3 13.98
ea 3.00
m3 180.00

kg 134,214.38
kg 107,111.83
m' 54.00
m' 102.00
ls 34.00

m3 300.00
m2 1,900.00

m3 407.60
m3 144.95
m3 19.20
m3 190.04
m3 57.68

m' 1,560.00
m3 1,560.00
Ea 52.00
m3 73.48
m3 13.98
ea 3.00
m3 180.00

kg 134,214.38
kg 107,111.83
m' 54.00
m' 102.00
ls 34.00

0.78 Ea 44.00
1.05
0.88 0.06

100.1 100.1
Quantity
25-Jan 26-Jan 27-Jan 28-Jan

0.33
0.06
0.06
0.40
0.25
1.11
MINGGU KE : 1

DAILY ACTIVITY REPORT


PEMBANGUNAN JEMBATAN HD 785 BLOK 5-6
WE
Time Sunny
Owner : PT. Berau Coal 7:30 - 09:00
Contractor : PT. Bornes Ciiranusa 09:00 - 10:00
Project Name : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Rabu,24 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

NO ACTI VITY
1 Penentuan titik BM

Stock Material
1 Wood

MAN POWER EQUIPME


Description Qty Hour Total Description
Quantity Enginer 1 8 8 Hammer
Surveyor 1 8 8 Chain saw
Driver 1 8 8 Nail
Foreman 1 9 9 Waterpas Sokia
workers 6 8 6 Total station

Total 10 39

Prepared by, Acknowladge by,


PT.Bornes Citranusa PT. Berau Coal

Signature : Signature
Name : Ronaldo Name
Position : Site Engineer Position

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Lokasi pembangunan jembatan HD 785 blok 5-6 Penentuan ti

Titik BM Jalan masuk ke lokasi pembangu


REPORT NO. : 1

ACTIVITY REPORT
JEMBATAN HD 785 BLOK 5-6
WEATHER
Cloudy Drizzly Rainy

TIME
VITY
FROM TO
10:00 17:00

EQUIPMENT & TOOL


Description Amount Unit
Hammer 3 Unit
Chain saw 2 Unit
Nail 1 ea
Waterpas Sokia 1 Unit
Total station 1 Unit
:
: Arif Rahman Putranto
: Supervisor

Penentuan titik BM

Jalan masuk ke lokasi pembangunan jalan HD 785 blok 5-6


MINGGU KE : 1 REPORT NO. : 2

DAILY ACTIVITY REPORT


PEMBANGUNAN JEMBATAN HD 785 BLOK 5-6

WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Kamis, 25 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00

Stock Material
1 Wood

MAN POWER EQUIPMENT & TOOL


Description Qty Hour Total Description Amount Unit
Quantity Enginer 1 8 8 Hammer 3 Unit
Surveyor 1 8 8 Chain saw 2 Unit
Driver 1 8 8 Nail 1 ea
Foreman 1 9 9 Waterpas Sokia 1 Unit
workers 6 8 6

Total 10 39

Prepared by, Acknowladge by,


PT.Bornes Citranusa PT. Berau Coal

Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Sebelum melaksanakan kegiatan di lokasi proyek terlebih dahulu Material kayu untuk pembangunan direksi keet
dilaksanakan P5m

Mendirikan kuda - kuda untuk direksi keet Pekerja direksi keet selalu mengutamakan safety dengan
menggunakan tangga dan body harnes
MINGGU KE : 1 REPORT NO. : 3

DAILY ACTIVITY REPORT


PEMBANGUNAN JEMBATAN HD 785 BLOK 5-6

WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Jumat, 26 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00

Stock Material
1 Wood

MAN POWER EQUIPMENT & TOOL


Description Qty Hour Total Description Amount Unit
Site Enginer 1 8 8 Hammer 3 Unit
Quantity Enginer 1 8 8 Chain saw 3 Unit
Surveyor 1 8 8 Nail 1 ea
Driver 1 8 8 Waterpas Sokia 1 Unit
Foreman 1 9 9
workers 6 8 6

Total 11 47

Prepared by, Acknowladge by,


PT.Bornes Citranusa PT. Berau Coal

Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Sebelum melaksanakan kegiatan di lokasi proyek terlebih dahulu Material kayu untuk pembangunan direksi keet
dilaksanakan P5m

Mendirikan kuda - kuda untuk direksi keet Pekerja direksi keet selalu mengutamakan safety dengan
menggunakan tangga dan body harnes
MINGGU KE : 1 REPORT NO. : 4

DAILY ACTIVITY REPORT


PEMBANGUNAN JEMBATAN HD 785 BLOK 5-6

WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Sabtu, 27 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00

Stock Material
1 Wood
2 Seng
3 Pasir
4 Sement

MAN POWER EQUIPMENT & TOOL


Description Qty Hour Total Description Amount Unit
Site Enginer 1 8 8 Hammer 3 Unit
Quantity Enginer 1 8 8 Chain saw 3 Unit
Surveyor 1 8 8 Nail 1 ea
Driver 1 8 8 Waterpas Sokia 1 Unit
Foreman 1 9 9
workers 6 8 6

Total 11 47

Prepared by, Acknowladge by,


PT.Bornes Citranusa PT. Berau Coal

Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Tampak belakang pengerjaan pembuatan partisi untuk kantor Tampak samping pengerjaan direksi keet

Tampak depan penegrjaan partisi Dalam setiap proses pengerjaan direksi keet , tampak spanduk
daerah wajib memakai safety.
MINGGU KE : 1 REPORT NO. : 5

DAILY ACTIVITY REPORT


PEMBANGUNAN JEMBATAN HD 785 BLOK 5-6

WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Minggu , 28 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00

Stock Material
1 Wood
2 Seng
3 Pasir
4 Sement

MAN POWER EQUIPMENT & TOOL


Description Qty Hour Total Description Amount Unit
Quantity Enginer 1 8 8 Hammer 3 Unit
Surveyor 1 8 8 Chain saw 3 Unit
Driver 1 8 8 Nail 1 ea
Foreman 1 9 9 Waterpas Sokia 1 Unit
workers 6 8 6

Total 10 39

Prepared by, Acknowladge by,


PT.Bornes Citranusa PT. Berau Coal

Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Sebelum melaksanakan kegiatan di lokasi proyek terlebih dahulu Tampak depan pengerjaan partisi telah selesai
dilaksanakan P5m

Tampak samping kiri Pengerjaan Partisi telah selesai Tampak belakang pengerjaan partisi telah selesai
MINGGU KE : 1 REPORT NO. : 5

DAILY ACTIVITY REPORT


PEMBANGUNAN JEMBATAN HD 785 BLOK 5-6

WEATHER
Description Sunny Cloudy Drizzly Rainy
OWNER : PT. Beraucoal 7:30 - 09:00 v
CONTRACTOR : PT. Bornes Citanusa 09:00 - 10:00 v
PROJECT NAME : Pembangunan Jembatan Hd 785 blok 5-6 10:00 - 11:00 v
11:00 - 12:00 v
12:00 - 13:00 v
Date : Senin , 29 Januari 2018 14:00 - 15:00 v
15:00 - 16:00 v
16:00 - 17:00 v

TIME
NO ACTI V ITY
FROM TO
1 Pembangunan direksi keet 7:30 17:00

Stock Material
1 Wood
2 Seng
3 Pasir
4 Sement

MAN POWER EQUIPMENT & TOOL


Description Qty Hour Total Description Amount Unit
Quantity Enginer 1 8 8 Hammer 3 Unit
Surveyor 1 8 8 Chain saw 3 Unit
Driver 1 8 8 Nail 1 ea
Foreman 1 9 9 Waterpas Sokia 1 Unit
workers 6 8 6

Total 10 39

Prepared by, Acknowladge by,


PT.Bornes Citranusa PT. Berau Coal

Signature : Signature :
Name : Ronaldo Name : Arif Rahman Putranto
Position : Site Engineer Position : Supervisor

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Sebelum melaksanakan kegiatan di lokasi proyek terlebih dahulu Tampak depan pengerjaan atap direksi keet
dilaksanakan P5m

Pengerjaan tanah untuk penimbunan lantai Penegerjaan partisi untuk ruangan kantor.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

1
2
3
4
5
6
7
8
9
10
11
12
13
14

1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14

1
2
3
4
5
6
7
8
9
10
11
12
13
14

You might also like