You are on page 1of 116

Area a b c d e f g h i j k l m n o Total

C1 420 240 240 240 320 1460


340 240 240 240 240 320 1620
C2 480 360 360 360 360 360 360 2640
C3 500 240 240 240 240 240 240 400 2340
320 240 240 240 240 240 240 240 240 400 2640
C4 400 240 240 240 240 240 240 400 2240
400 240 240 240 240 240 240 400 2240
C5 320 200 200 200 200 200 200 200 200 200 360 2480
320 200 200 200 200 200 200 200 200 200 360 2480
C6 360 200 200 200 200 200 200 320 1880
360 200 200 200 200 200 200 320 1880
C7 320 200 200 200 200 200 200 200 200 200 320 2440
270 144 144 144 144 144 144 144 144 144 144 144 230 2084
C8 400 200 200 200 200 200 400 1800
252 144 144 144 144 144 144 144 320 1580
C9 300 144 144 144 144 144 144 144 144 144 144 144 288 2172
270 144 144 144 144 144 144 144 144 144 144 144 252 2106
C10 288 144 144 144 144 144 144 144 400 1696
252 144 144 144 144 144 144 144 400 1660
C11 252 144 144 144 144 144 144 144 144 144 144 144 144 252 2232
252 144 144 144 144 144 144 144 144 144 144 144 144 252 2232
C12 216 144 144 144 144 144 144 300 1380
216 144 144 144 144 144 288 1224
C14 144 144 198 234 144 144 144 240 1392
C15 240 144 144 144 144 144 144 144 144 144 144 274 144 144 180 2422
L
20
20
30
20
20
20
20
20
20
20
20
20
18
20
18
20
18
18
18
18
18
18
18
18
18
C Node Saluran L A Rumah A RTH A Jalan Atotal C Rumah C RTH
40-2 T27 623 3406.26 7476 10882.26 0.6 0.2
39-35 T26 136.8 2422 213.3333 820.8 3456.133 0.6 0.2
38-3 T25 471.8 1392 7038.803 2830.8 11261.6 0.6 0.2
37-34 T24 60.9 1053.57 182.7 1236.27 0.6 0.2
37-4 T23 372.6 2640 1453.14 1117.8 5210.94 0.6 0.2
36-35 T22 125.2 2232 0 375.6 2607.6 0.6 0.2
36-32 T21 161 2232 0 483 2715 0.6 0.2
33-34 T20 60.7 1224 0 182.1 1406.1 0.6 0.2
33-31 T19 131.4 1380 0 394.2 1774.2 0.6 0.2
30-29 T18 125.4 2106 0 376.2 2482.2 0.6 0.2
30-26 T17 171.7 2172 0 515.1 2687.1 0.6 0.2
27-28 T16 90.9 1660 0 272.7 1932.7 0.6 0.2
27-25 T15 138.5 1696 0 415.5 2111.5 0.6 0.2
Tersier 24-23 T14 129.2 2084 0 387.6 2471.6 0.6 0.2
24-20 T13 169.9 2440 0 509.7 2949.7 0.6 0.2
21-22 T12 97.4 1580 0 292.2 1872.2 0.6 0.2
21-19 T11 134.7 1800 0 404.1 2204.1 0.6 0.2
18-17 T10 128.5 2480 0 385.5 2865.5 0.6 0.2
18-14 T9 176 2480 0 528 3008 0.6 0.2
15-16 T8 96.6 1880 0 289.8 2169.8 0.6 0.2
15-13 T7 141.9 1880 0 425.7 2305.7 0.6 0.2
12-11 T6 134.4 2640 0 403.2 3043.2 0.6 0.2
12-8 T5 160.6 2340 0 481.8 2821.8 0.6 0.2
9-10 T4 107.4 2240 0 322.2 2562.2 0.6 0.2
9-7 T3 153.3 2240 0 459.9 2699.9 0.6 0.2
6-5 T2 90 1620 0 270 1890 0.6 0.2
6-3 T1 129 1460 0 387 1847 0.6 0.2
35-32 S24 41.2 4654 213.3333 1320 6187.333 0.6 0.2
32-29 S22 6.1 6886 213.3333 1821.3 8920.633 0.6 0.2
29-26 S20 36 8992 213.3333 2412.3 11617.63 0.6 0.2
26-23 S18 15 11164 213.3333 2972.4 14349.73 0.6 0.2
23-20 S16 38 13248 213.3333 3474 16935.33 0.6 0.2
20-17 S14 11 15688 213.3333 4016.7 19918.03 0.6 0.2
17-14 S12 36.6 18168 213.3333 4512 22893.33 0.6 0.2
14-11 S10 16.8 20648 213.3333 5090.4 25951.73 0.6 0.2
11-8 S8 37 23288 213.3333 324.3333 23825.67 0.6 0.2
8-5 S6 10.8 25628 213.3333 838.5333 26679.87 0.6 0.2
5-3 S4 43.9 27248 213.3333 1240.233 28701.57 0.6 0.2
3-1 S2 19 30100 7252.137 4515.033 41867.17 0.6 0.2
Sekunder
34-31 S23 41.7 1224 1053.57 489.9 2767.47 0.6 0.2
31-28 S21 5.9 2604 1053.57 901.8 4559.37 0.6 0.2
28-25 S19 37.5 4264 1053.57 1287 6604.57 0.6 0.2
25-22 S17 16 5960 1053.57 1750.5 8764.07 0.6 0.2
22-19 S15 35 7540 1053.57 2147.7 10741.27 0.6 0.2
19-16 S13 10 9340 1053.57 2581.8 12975.37 0.6 0.2
16-13 S11 40 11220 1053.57 2991.6 15265.17 0.6 0.2
13-10 S9 10 13100 1053.57 3447.3 17600.87 0.6 0.2
10-7 S7 44.9 15340 1053.57 3904.2 20297.77 0.6 0.2
7-4 S5 13.2 17580 1053.57 4403.7 23037.27 0.6 0.2
4-2 S3 50 20220 2506.71 5671.5 28398.21 0.6 0.2
2-1 S1 10.4 20220 5912.97 13178.7 39311.67 0.6 0.2
primer 1-0 P1 29 50320 13165.11 17780.73 81265.84 0.6 0.2
C Jalan Ctotal

0.8 0.612194
0.8 0.622808 6063.733
0.8 0.400263
0.8 0.28867
0.8 0.531357
0.8 0.628808
0.8 0.63558
0.8 0.625901
0.8 0.644437
0.8 0.630312
0.8 0.638339
0.8 0.62822
0.8 0.639356
0.8 0.631364
0.8 0.634559
0.8 0.631215
0.8 0.636668
0.8 0.626906
0.8 0.635106
0.8 0.626712
0.8 0.636926
0.8 0.626498
0.8 0.634148
0.8 0.62515
0.8 0.634068
0.8 0.628571
0.8 0.641906
0.8 0.628876
0.8 0.631268
0.8 0.634183
0.8 0.635481
0.8 0.635988
0.8 0.636048
0.8 0.63569
0.8 0.635942
0.8 0.599141
0.8 0.603087
0.8 0.605669
0.8 0.552281
0.8 0.483125
0.8 0.547127
0.8 0.575164
0.8 0.591861
0.8 0.600755
0.8 0.607316
0.8 0.611588
0.8 0.615228
0.8 0.617707
0.8 0.619938
0.8 0.604635
0.8 0.606882
0.8 0.578959
C Node Saluran L A Rumah L Rumah A RTH L RTH A Jalan L Jalan

40-2 T27 623 0 0 4559.4 7.8 7476 12


39-35 T26 136.8 2422 18 213.3333 11 820.8 3
38-3 T25 471.8 1392 18 7038.803 14 2830.8 3
37-34 T24 60.9 0 0 1053.57 182.7 3
37-4 T23 372.6 2640 30 300 30 1117.8 3
36-35 T22 125.2 2232 18 213.3333 9 375.6 3
36-32 T21 161 2232 18 0 483 3
33-34 T20 60.7 1224 18 0 182.1 3
33-31 T19 131.4 1380 18 0 394.2 3
30-29 T18 125.4 2106 18 0 376.2 3
30-26 T17 171.7 2172 20 0 515.1 3
27-28 T16 90.9 1660 18 0 272.7 3
27-25 T15 138.5 1696 18 0 415.5 3
Tersier 24-23 T14 129.2 2084 18 0 387.6 3
24-20 T13 169.9 2440 20 0 509.7 3
21-22 T12 97.4 1580 18 0 292.2 3
21-19 T11 134.7 1800 20 0 404.1 3
18-17 T10 128.5 2480 20 0 385.5 3
18-14 T9 176 2480 20 0 528 3
15-16 T8 96.6 1880 20 0 289.8 3
15-13 T7 141.9 1880 20 0 425.7 3
12-11 T6 134.4 2640 20 0 403.2 3
12-8 T5 160.6 2340 20 0 481.8 3
9-10 T4 107.4 2240 20 0 322.2 3
9-7 T3 153.3 2240 20 0 459.9 3
6-5 T2 90 1620 20 0 270 3
6-3 T1 129 1460 20 0 387 3
C Node Saluran L A Rumah L Rumah A RTH L RTH A Jalan L Jalan

Saluran T27
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02000 S= 0.02
L= 12.00 meter L= 0 meter L= 7.80
to= 1.50751338 menit to= 0 menit t0 = 1.87374

Area C
Rumah 0.00 m2 C Rumah 0.6
RTH 4559.40 m2 C RTH 0.2
Jalan 7476.00 m2 C Jalan 0.8
Total 12035.40 m2 C gab 0.572701
0.0120354 km2
Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.001 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.001 0.286 0.006 1.9
0.2 0.4 0.08 0.8 0.1 0.001 0.454 0.036 1.9
0.3 0.6 0.18 1.2 0.15 0.001 0.595 0.107 1.9
0.4 0.8 0.32 1.6 0.2 0.001 0.721 0.231 1.9
0.5 1 0.5 2 0.25 0.001 0.837 0.418 1.9
0.6 1.2 0.72 2.4 0.3 0.001 0.945 0.680 1.9
0.7 1.4 0.98 2.8 0.35 0.001 1.047 1.026 1.9
0.8 1.6 1.28 3.2 0.4 0.001 1.144 1.465 1.9
0.9 1.8 1.62 3.6 0.45 0.001 1.238 2.006 1.9
1 2 2 4 0.5 0.001 1.328 2.656 1.9

Saluran T25
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02
L= 3.00 meter L= 18 meter L= 14.00
to= 2.31259275 menit to= 5 menit t0 = 2.46232

Area C
Rumah 1392.00 m2 C Rumah 0.6
RTH 7038.80 m2 C RTH 0.2
Jalan 2830.80 m2 C Jalan 0.8
Total 11261.60 m2 C gab 0.400263
0.011261603 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.001 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.001 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.001 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.001 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.001 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.001 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.001 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.001 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.001 1.238 2.006 5.0
1 2 2 4 0.5 0.001 1.328 2.656 5.0

Saluran T23
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 30 meter L= 30.00
to= 2.31259275 menit to= 5 menit t0 = 3.51494

Area C
Rumah 2640.00 m2 C Rumah 0.6
RTH 300.00 m2 C RTH 0.2
Jalan 1117.80 m2 C Jalan 0.8
Total 4057.80 m2 C gab 0.625521
0.0040578 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0

Saluran T21
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 18 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0

Area C
Rumah 2232.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 483.00 m2 C Jalan 0.8
Total 2715.00 m2 C gab 0.63558
0.002715 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0
Saluran T19
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 18 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0

Area C
Rumah 1380.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 394.20 m2 C Jalan 0.8
Total 1774.20 m2 C gab 0.644437
0.0017742 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0

Saluran T17
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 20 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0

Area C
Rumah 2172.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 515.10 m2 C Jalan 0.8
Total 2687.10 m2 C gab 0.638339
0.0026871 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0

Saluran T15
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 18 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0

Area C
Rumah 1696.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 415.50 m2 C Jalan 0.8
Total 2111.50 m2 C gab 0.639356
0.0021115 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0

Saluran T13
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 20 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0

Area C
Rumah 2440.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 509.70 m2 C Jalan 0.8
Total 2949.70 m2 C gab 0.634559
0.0029497 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0

Saluran T11
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 20 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0

Area C
Rumah 1800.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 404.10 m2 C Jalan 0.8
Total 2204.10 m2 C gab 0.636668
0.0022041 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0

Saluran T9
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 20 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0

Area C
Rumah 2480.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 528.00 m2 C Jalan 0.8
Total 3008.00 m2 C gab 0.635106
0.003008 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0

Saluran T7
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 20 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0

Area C
Rumah 1880.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 425.70 m2 C Jalan 0.8
Total 2305.70 m2 C gab 0.636926
0.0023057 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0

Saluran T5
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 0 meter L= 20.00
to= 2.31259275 menit to= 0 menit t0 = 2.90859

Area C
Rumah 2340.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 481.80 m2 C Jalan 0.8
Total 2821.80 m2 C gab 0.634148
0.0028218 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 2.9
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 2.9
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 2.9
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 2.9
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 2.9
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 2.9
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 2.9
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 2.9
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 2.9
1 2 2 4 0.5 0.00100 1.328 2.656 2.9

Saluran T3
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 20 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0
Area C
Rumah 2240.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 459.90 m2 C Jalan 0.8
Total 2699.90 m2 C gab 0.634068
0.0026999 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0

Saluran T1
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02000 S= 0.02000 S= 0.02000
L= 3.00 meter L= 20 meter L= 0.00
to= 2.31259275 menit to= 5 menit t0 = 0

Area C
Rumah 1460.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 387.00 m2 C Jalan 0.8
Total 1847.00 m2 C gab 0.641906
0.001847 km2
Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006 5.0
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036 5.0
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107 5.0
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231 5.0
0.5 1 0.5 2 0.25 0.00100 0.837 0.418 5.0
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680 5.0
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026 5.0
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465 5.0
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006 5.0
1 2 2 4 0.5 0.00100 1.328 2.656 5.0
A Total C Rumah C RTH C Jalan Ctotal i Saluran

12035.4 0.6 0.2 0.8 0.572701 0.001 T27


3456.133 0.6 0.2 0.8 0.622808 0.001 T26
11261.6 0.6 0.2 0.8 0.400263 0.001 T25
1236.27 0.6 0.2 0.8 0.28867 0.001 T24
4057.8 0.6 0.2 0.8 0.625521 0.001 T23
2820.933 0.6 0.2 0.8 0.596379 0.001 T22
2715 0.6 0.2 0.8 0.63558 0.001 T21
1406.1 0.6 0.2 0.8 0.625901 0.001 T20
1774.2 0.6 0.2 0.8 0.644437 0.001 T19
2482.2 0.6 0.2 0.8 0.630312 0.001 T18
2687.1 0.6 0.2 0.8 0.638339 0.001 T17
1932.7 0.6 0.2 0.8 0.62822 0.001 T16
2111.5 0.6 0.2 0.8 0.639356 0.001 T15
2471.6 0.6 0.2 0.8 0.631364 0.001 T14
2949.7 0.6 0.2 0.8 0.634559 0.001 T13
1872.2 0.6 0.2 0.8 0.631215 0.001 T12
2204.1 0.6 0.2 0.8 0.636668 0.001 T11
2865.5 0.6 0.2 0.8 0.626906 0.001 T10
3008 0.6 0.2 0.8 0.635106 0.001 T9
2169.8 0.6 0.2 0.8 0.626712 0.001 T8
2305.7 0.6 0.2 0.8 0.636926 0.001 T7
3043.2 0.6 0.2 0.8 0.626498 0.001 T6
2821.8 0.6 0.2 0.8 0.634148 0.001 T5
2562.2 0.6 0.2 0.8 0.62515 0.001 T4
2699.9 0.6 0.2 0.8 0.634068 0.001 T3
1890 0.6 0.2 0.8 0.628571 0.001 T2
1847 0.6 0.2 0.8 0.641906 0.001 T1
A Total C Rumah C RTH C Jalan Ctotal i Saluran

meter
menit
Area = 0.0120354 km
C= 0.57
length of channel = 623.00 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
36.290 0.636 314.857901 0.6033197 -0.598 38.16328
22.861 0.412 408.430177 0.78261963 -0.746 24.73472
17.446 0.322 473.694825 0.90767746 -0.801 19.31993
14.402 0.271 525.031449 1.00604691 -0.775 16.27525
12.411 0.238 567.781625 1.0879633 -0.670 14.28459
10.990 0.214 604.607132 1.15852705 -0.478 12.86415
9.917 0.197 637.053746 1.22070012 -0.195 11.7908
9.072 0.182 666.109615 1.27637596 0.189 10.94613
8.387 0.171 692.449779 1.32684806 0.679 10.261
7.818 0.162 716.558448 1.37304425 1.283 9.692087

meter
menit

Area = 0.0112616 km
C= 0.40
length of channel = 471.80 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
27.482 0.541 346.828551 0.4346154 -0.429 32.48219
17.313 0.372 434.481016 0.5444538 -0.508 22.31269
13.212 0.304 490.7797 0.6150024 -0.508 18.21206
10.906 0.265 532.304676 0.6670379 -0.436 15.90631
9.399 0.240 565.075733 0.7081037 -0.290 14.39878
8.323 0.222 592.02401 0.7418730 -0.062 13.32307
7.510 0.209 614.813013 0.7704302 0.256 12.51022
6.871 0.198 634.482376 0.7950781 0.670 11.87055
6.352 0.189 651.726792 0.8166873 1.189 11.35169
5.921 0.182 667.033964 0.8358689 1.820 10.92086

meter
menit

Area = 0.0040578 km
C= 0.63
length of channel = 372.60 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
21.704 0.445 390.083833 0.2752551 -0.270 26.70382
13.673 0.311 483.481444 0.3411594 -0.305 18.67255
10.434 0.257 542.01719 0.3824640 -0.275 15.43411
8.613 0.227 584.421912 0.4123861 -0.182 13.61317
7.423 0.207 617.411116 0.4356643 -0.017 12.4226
6.573 0.193 644.217765 0.4545798 0.226 11.57308
5.931 0.182 666.657761 0.4704142 0.556 10.93113
5.426 0.174 685.855271 0.4839605 0.981 10.42596
5.016 0.167 702.554949 0.4957444 1.510 10.0162
4.676 0.161 717.275373 0.5061315 2.150 9.675946

meter
menit

Area = 0.002715 km
C= 0.64
length of channel = 161.00 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
9.378 0.240 565.560914 0.2713091 -0.266 14.37819
5.908 0.182 667.509565 0.3202156 -0.284 10.90789
4.509 0.158 724.824712 0.3477106 -0.241 9.508565
3.722 0.145 763.378891 0.3662057 -0.135 8.721739
3.207 0.137 791.738737 0.3798104 0.039 8.207297
2.840 0.131 813.776417 0.3903822 0.290 7.840218
2.563 0.126 831.555503 0.3989111 0.627 7.562834
2.345 0.122 846.29725 0.4059830 1.059 7.344549
2.167 0.119 858.779472 0.4119709 1.594 7.167492
2.020 0.117 869.525364 0.4171259 2.239 7.020471
9

meter
menit

Area = 0.0017742 km
C= 0.64
length of channel = 131.40 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
7.654 0.211 610.611816 0.1940855 -0.188 12.654
4.822 0.164 710.868789 0.3410157 -0.305 9.821721
3.680 0.145 765.59717 0.3672698 -0.260 8.679661
3.037 0.134 801.732717 0.3846047 -0.154 8.037494
2.618 0.127 827.961182 0.3971869 0.021 7.617633
2.318 0.122 848.135168 0.4068647 0.273 7.318041
2.092 0.118 864.277963 0.4146087 0.611 7.091655
1.914 0.115 877.572834 0.4209864 1.044 6.913501
1.769 0.113 888.765953 0.4263560 1.579 6.768997
1.649 0.111 898.354994 0.4309560 2.225 6.649005

7
meter
menit

Area = 0.0026871 km
C= 0.64
length of channel = 171.70 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
10.001 0.250 551.342895 0.2629067 -0.257 15.00147
6.301 0.188 653.495712 0.3116180 -0.275 11.30053
4.808 0.163 711.456454 0.3392565 -0.232 9.808203
3.969 0.149 750.67704 0.3579587 -0.127 8.969084
3.420 0.140 779.651856 0.3717753 0.047 8.420453
3.029 0.134 802.242799 0.3825477 0.298 8.028978
2.733 0.129 820.517445 0.3912620 0.635 7.733159
2.500 0.125 835.704049 0.3985037 1.066 7.500366
2.312 0.122 848.587386 0.4046471 1.601 7.311543
2.155 0.119 859.696779 0.4099446 2.246 7.15475

meter
menit
Area = 0.0021115 km
C= 0.64
length of channel = 138.50 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
8.068 0.218 598.942255 0.2247830 -0.219 13.06758
5.082 0.168 699.789443 0.2626310 -0.226 10.08225
3.878 0.148 755.263733 0.2834505 -0.176 8.878486
3.202 0.137 792.067522 0.2972629 -0.067 8.20162
2.759 0.129 818.872161 0.3073227 0.111 7.759072
2.443 0.124 839.542934 0.3150805 0.365 7.443293
2.205 0.120 856.117519 0.3213009 0.705 7.204674
2.017 0.117 869.79125 0.3264327 1.139 7.016894
1.865 0.114 881.319829 0.3307593 1.675 6.864582
1.738 0.112 891.208376 0.3344705 2.322 6.738107

meter
menit

Area = 0.0029497 km
C= 0.63
length of channel = 169.90 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
9.897 0.248 553.667994 0.2881007 -0.282 14.89662
6.234 0.187 655.798271 0.3412442 -0.305 11.23448
4.758 0.163 713.659305 0.3713521 -0.264 9.757797
3.927 0.149 752.774357 0.3917056 -0.161 8.927475
3.385 0.140 781.650728 0.4067314 0.012 8.384595
2.997 0.133 804.152529 0.4184402 0.262 7.997224
2.705 0.128 822.346972 0.4279077 0.598 7.704506
2.474 0.125 837.461339 0.4357724 1.029 7.474154
2.287 0.121 850.27937 0.4424423 1.563 7.28731
2.132 0.119 861.329455 0.4481922 2.208 7.132161

meter
menit

Area = 0.0022041 km
C= 0.64
length of channel = 134.70 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
7.846 0.214 605.11318 0.2360618 -0.230 12.84623
4.943 0.166 705.661465 0.2752869 -0.239 9.942814
3.772 0.146 760.747699 0.2967767 -0.190 8.772073
3.114 0.135 797.201539 0.3109978 -0.080 8.113778
2.683 0.128 823.703413 0.3213365 0.097 7.683372
2.376 0.123 844.112561 0.3292983 0.351 7.376257
2.144 0.119 860.459391 0.3356754 0.690 7.144185
1.962 0.116 873.933043 0.3409316 1.124 6.961557
1.813 0.114 885.284291 0.3453599 1.660 6.813424
1.690 0.112 895.014387 0.3491557 2.307 6.690419

meter
menit

Area = 0.003008 km
C= 0.64
length of channel = 176.00 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
10.252 0.254 545.892288 0.2899186 -0.284 15.25194
6.458 0.191 648.08131 0.3441903 -0.308 11.45832
4.929 0.165 706.266663 0.3750920 -0.268 9.928618
4.068 0.151 745.729218 0.3960502 -0.165 9.068485
3.506 0.142 774.931437 0.4115593 0.007 8.506114
3.105 0.135 797.729201 0.4236670 0.257 8.104835
2.802 0.130 816.190488 0.4334716 0.593 7.801608
2.563 0.126 831.545578 0.4416265 1.023 7.562985
2.369 0.123 844.581504 0.4485498 1.557 7.369432
2.209 0.120 855.829675 0.4545236 2.202 7.208713

meter
menit

Area = 0.0023057 km
C= 0.64
length of channel = 141.90 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
8.266 0.221 593.560987 0.2423270 -0.237 13.26563
5.207 0.170 694.644603 0.2835954 -0.247 10.20702
3.974 0.150 750.44542 0.3063766 -0.199 8.973698
3.280 0.138 787.547942 0.3215241 -0.091 8.280216
2.827 0.130 814.612949 0.3325736 0.086 7.826804
2.503 0.125 835.509783 0.3411050 0.339 7.503273
2.259 0.121 852.281833 0.3479523 0.678 7.258796
2.066 0.118 866.129488 0.3536057 1.111 7.066406
1.910 0.115 877.812538 0.3583755 1.647 6.910355
1.781 0.113 887.839349 0.3624690 2.294 6.780775
meter
menit

Area = 0.0028218 km
C= 0.63
length of channel = 160.60 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
9.355 0.204 622.205144 0.3095249 -0.304 12.26349
5.893 0.147 759.204682 0.3776772 -0.341 8.801807
4.497 0.123 842.079839 0.4189047 -0.312 7.405957
3.712 0.110 900.62599 0.4480293 -0.217 6.621085
3.199 0.102 945.29182 0.4702490 -0.052 6.107922
2.833 0.096 981.013976 0.4880195 0.192 5.741755
2.556 0.091 1010.52025 0.5026978 0.523 5.46506
2.339 0.087 1035.47501 0.5151119 0.950 5.247317
2.162 0.085 1056.9665 0.5258031 1.480 5.0707
2.015 0.082 1075.74375 0.5351441 2.121 4.924044

meter
menit
Area = 0.0026999 km
C= 0.63
length of channel = 153.30 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
8.930 0.232 576.417905 0.2743252 -0.269 13.92967
5.625 0.177 678.103949 0.3227190 -0.286 10.62534
4.293 0.155 734.869388 0.3497345 -0.243 9.292938
3.544 0.142 772.881833 0.3678251 -0.137 8.543743
3.054 0.134 800.752121 0.3810890 0.037 8.053905
2.704 0.128 822.35496 0.3913700 0.289 7.704382
2.440 0.124 839.748017 0.3996476 0.626 7.440264
2.232 0.121 854.145551 0.4064996 1.058 7.232418
2.064 0.118 866.319053 0.4122932 1.593 7.06383
1.924 0.115 876.786387 0.4172747 2.239 6.923839

meter
menit
Area = 0.001847 km
C= 0.64
length of channel = 129.00 m

Hydrology Calculation
tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
7.514 0.209 614.695494 0.2026017 -0.197 12.51421
4.734 0.162 714.720906 0.2355697 -0.199 9.733653
3.612 0.144 769.176259 0.2535180 -0.146 8.612453
2.982 0.133 805.071571 0.2653490 -0.035 7.982014
2.570 0.126 831.094849 0.2739262 0.144 7.569822
2.276 0.121 851.093004 0.2805175 0.400 7.275703
2.053 0.118 867.083651 0.2857880 0.740 7.053451
1.879 0.115 880.24548 0.2901261 1.175 6.878551
1.737 0.112 891.32112 0.2937766 1.712 6.736686
1.619 0.110 900.805511 0.2969026 2.359 6.618886
Saluran T26
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.0200 S= 0.0200 S=
L= 3.00 meter L= 18 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 2422.00 m2 C Rumah 0.6
RTH 213.33 m2 C RTH 0.2
Jalan 820.80 m2 C Jalan 0.8
Total 3456.13 m2 C gab 0.622808
0.003456133 km2
Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.001 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.001 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.001 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.001 0.721 0.231
0.5 1 0.5 2 0.25 0.001 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.001 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.001 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.001 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.001 1.238 2.006
1 2 2 4 0.5 0.001 1.328 2.656

Saluran T24
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 0 meter L=
to= 2.312592749 menit to= 0 menit t0 =

Area C
Rumah 0.00 m2 C Rumah 0.6
RTH 1053.57 m2 C RTH 0.2
Jalan 182.70 m2 C Jalan 0.8
Total 1236.27 m2 C gab 0.28867
0.00123627 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.001 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.001 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.001 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.001 0.721 0.231
0.5 1 0.5 2 0.25 0.001 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.001 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.001 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.001 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.001 1.238 2.006
1 2 2 4 0.5 0.001 1.328 2.656

Saluran T22
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 18 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 2232.00 m2 C Rumah 0.6
RTH 213.33 m2 C RTH 0.2
Jalan 375.60 m2 C Jalan 0.8
Total 2820.93 m2 C gab 0.596379
0.002820933 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656

Saluran T20
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 18 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 1224.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 182.10 m2 C Jalan 0.8
Total 1406.10 m2 C gab 0.625901
0.0014061 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656
Saluran T18
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 18 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 2106.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 376.20 m2 C Jalan 0.8
Total 2482.20 m2 C gab 0.630312
0.0024822 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656

Saluran T16
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 18 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 1660.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 272.70 m2 C Jalan 0.8
Total 1932.70 m2 C gab 0.62822
0.0019327 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656

Saluran T14
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 18 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 2084.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 387.60 m2 C Jalan 0.8
Total 2471.60 m2 C gab 0.631364
0.0024716 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656

Saluran T12
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 18 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 1580.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 292.20 m2 C Jalan 0.8
Total 1872.20 m2 C gab 0.631215
0.0018722 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656

Saluran T10
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 20 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 2480.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 385.50 m2 C Jalan 0.8
Total 2865.50 m2 C gab 0.626906
0.0028655 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656

Saluran T8
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 1.87 meter L= 20 meter L=
to= 1.856261597 menit to= 5 menit t0 =

Area C
Rumah 1880.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 289.80 m2 C Jalan 0.8
Total 2169.80 m2 C gab 0.626712
0.0021698 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656

Saluran T6
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 20 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 2640.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 403.20 m2 C Jalan 0.8
Total 3043.20 m2 C gab 0.626498
0.0030432 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656

Saluran T4
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 20 meter L=
to= 2.312592749 menit to= 5 menit t0 =

Area C
Rumah 2240.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 322.20 m2 C Jalan 0.8
Total 2562.20 m2 C gab 0.62515
0.0025622 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656

Saluran T2
Tersier
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02000 S= 0.02000 S=
L= 3.00 meter L= 20 meter L=
to= 2.312592749 menit to= 5 menit t0 =
Area C
Rumah 1620.00 m2 C Rumah 0.6
RTH 0.00 m2 C RTH 0.2
Jalan 270.00 m2 C Jalan 0.8
Total 1890.00 m2 C gab 0.628571
0.00189 km2

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.00100 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.00100 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.00100 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.00100 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.00100 0.721 0.231
0.5 1 0.5 2 0.25 0.00100 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.00100 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.00100 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.00100 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.00100 1.238 2.006
1 2 2 4 0.5 0.00100 1.328 2.656
an T26
rsier

0.2
0.02
11.00 meter
2.20005 menit
Area = 0.00345613 km
C= 0.62
length of channel = 136.80 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 7.969 0.216 601.682098 0.360044674 -0.354 12.9686
5.0 5.020 0.167 702.400236 0.420314091 -0.384 10.0199
5.0 3.831 0.147 757.704015 0.453407698 -0.346 8.83088
5.0 3.162 0.136 794.35339 0.475338569 -0.245 8.16232
5.0 2.725 0.129 821.024146 0.491298266 -0.073 7.72521
5.0 2.413 0.124 841.579068 0.503598266 0.177 7.4133
5.0 2.178 0.120 858.052698 0.513456034 0.513 7.17761
5.0 1.992 0.117 871.637674 0.521585241 0.943 6.99214
5.0 1.842 0.114 883.087541 0.528436805 1.477 6.8417
5.0 1.717 0.112 892.90572 0.534311973 2.122 6.71677

an T24
rsier

0.2
0.02
0.00 meter
0 menit

Area = 0.00123627 km
C= 0.29
length of channel = 60.90 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
2.3 3.547 0.098 969.088799 0.0961442 -0.090 5.86
2.3 2.235 0.076 1128.36302 0.1119460 -0.076 4.54732
2.3 1.705 0.067 1215.33387 0.1205745 -0.013 4.01801
2.3 1.408 0.062 1272.76888 0.1262726 0.104 3.72038
2.3 1.213 0.059 1314.46277 0.1304091 0.288 3.52579
2.3 1.074 0.056 1346.53543 0.1335911 0.547 3.38694
2.3 0.969 0.055 1372.20134 0.1361374 0.890 3.28201
2.3 0.887 0.053 1393.34065 0.1382347 1.327 3.19944
2.3 0.820 0.052 1411.13908 0.1400005 1.866 3.13247
2.3 0.764 0.051 1426.38756 0.1415133 2.515 3.07686

an T22
rsier

0.2
0.02
9.00 meter
2.00324 menit

Area = 0.00282093 km
C= 0.60
length of channel = 125.20 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 7.293 0.205 621.312806 0.2905833 -0.285 12.2929
5.0 4.594 0.160 720.935503 0.3371760 -0.301 9.59421
5.0 3.506 0.142 774.935485 0.3624314 -0.255 8.50604
5.0 2.894 0.132 810.434724 0.3790341 -0.148 7.89417
5.0 2.494 0.125 836.121791 0.3910478 0.027 7.49412
5.0 2.209 0.120 855.832998 0.4002666 0.280 7.20867
5.0 1.993 0.117 871.576071 0.4076295 0.618 6.99296
5.0 1.823 0.114 884.521903 0.4136841 1.051 6.82321
5.0 1.686 0.111 895.407157 0.4187751 1.587 6.68553
5.0 1.571 0.110 904.722202 0.4231317 2.233 6.5712

an T20
rsier

0.2
0.02
0.00 meter
0 menit

Area = 0.0014061 km
C= 0.63
length of channel = 60.70 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 3.536 0.142 773.315759 0.1892012 -0.183 8.53575
5.0 2.227 0.120 854.502355 0.2090645 -0.173 7.22739
5.0 1.700 0.112 894.261175 0.2187919 -0.112 6.69981
5.0 1.403 0.107 918.893504 0.2248185 0.006 6.40316
5.0 1.209 0.103 936.009266 0.2290061 0.189 6.20921
5.0 1.071 0.101 948.754358 0.2321244 0.448 6.07082
5.0 0.966 0.099 958.697783 0.2345571 0.792 5.96624
5.0 0.884 0.098 966.720923 0.2365201 1.228 5.88394
5.0 0.817 0.097 973.361735 0.2381449 1.767 5.81718
5.0 0.762 0.096 978.969396 0.2395168 2.417 5.76176
an T18
rsier

0.2
0.02
0.00 meter
0 menit

Area = 0.0024822 km
C= 0.63
length of channel = 129.20 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 7.526 0.209 614.352404 0.2672112 -0.261 12.5259
5.0 4.741 0.162 714.397769 0.3107257 -0.274 9.74099
5.0 3.618 0.144 768.876297 0.3344210 -0.227 8.61805
5.0 2.987 0.133 804.791916 0.3500424 -0.119 7.98664
5.0 2.574 0.126 830.832502 0.3613687 0.057 7.57381
5.0 2.279 0.121 850.845467 0.3700733 0.310 7.27923
5.0 2.057 0.118 866.848916 0.3770339 0.649 7.05663
5.0 1.881 0.115 880.02193 0.3827635 1.082 6.88146
5.0 1.739 0.112 891.107441 0.3875851 1.618 6.73938
5.0 1.621 0.110 900.60062 0.3917142 2.264 6.6214

an T16
rsier

0.2
0.02
0.00 meter
0 menit

Area = 0.0019327 km
C= 0.63
length of channel = 90.90 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 5.295 0.172 691.080882 0.2332650 -0.228 10.2949
5.0 3.336 0.139 784.405609 0.2647655 -0.228 8.33557
5.0 2.546 0.126 832.699901 0.2810666 -0.174 7.54552
5.0 2.101 0.118 863.574909 0.2914880 -0.061 7.10128
5.0 1.811 0.114 885.486698 0.2988841 0.119 6.81083
5.0 1.604 0.110 902.057991 0.3044775 0.376 6.60358
5.0 1.447 0.107 915.142525 0.3088940 0.717 6.44697
5.0 1.324 0.105 925.802341 0.3124921 1.152 6.32372
5.0 1.224 0.104 934.695976 0.3154940 1.690 6.22376
5.0 1.141 0.102 942.256481 0.3180459 2.338 6.14075

an T14
rsier

0.2
0.02
0.00 meter
0 menit
Area = 0.0024716 km
C= 0.63
length of channel = 129.20 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 7.526 0.209 614.352404 0.2665143 -0.261 12.5259
5.0 4.741 0.162 714.397769 0.3099154 -0.274 9.74099
5.0 3.618 0.144 768.876297 0.3335489 -0.226 8.61805
5.0 2.987 0.133 804.791916 0.3491295 -0.118 7.98664
5.0 2.574 0.126 830.832502 0.3604263 0.058 7.57381
5.0 2.279 0.121 850.845467 0.3691082 0.311 7.27923
5.0 2.057 0.118 866.848916 0.3760507 0.650 7.05663
5.0 1.881 0.115 880.02193 0.3817653 1.083 6.88146
5.0 1.739 0.112 891.107441 0.3865744 1.619 6.73938
5.0 1.621 0.110 900.60062 0.3906927 2.265 6.6214

an T12
rsier

0.2
0.02
0.00 meter
0 menit

Area = 0.0018722 km
C= 0.63
length of channel = 97.40 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 5.674 0.178 676.265893 0.2221731 -0.216 10.6735
5.0 3.574 0.143 771.239265 0.2533747 -0.217 8.57409
5.0 2.728 0.129 820.875256 0.2696816 -0.163 7.72754
5.0 2.252 0.121 852.793681 0.2801677 -0.049 7.25154
5.0 1.940 0.116 875.536939 0.2876395 0.131 6.94032
5.0 1.718 0.112 892.788391 0.2933071 0.387 6.71824
5.0 1.550 0.109 906.441752 0.2977927 0.728 6.55044
5.0 1.418 0.107 917.585993 0.3014539 1.164 6.41838
5.0 1.311 0.105 926.89838 0.3045133 1.701 6.31127
5.0 1.222 0.104 934.825397 0.3071175 2.349 6.22232

an T10
rsier

0.2
0.02
0.00 meter
0 menit

Area = 0.0028655 km
C= 0.63
length of channel = 128.50 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 7.485 0.208 615.555459 0.3074079 -0.302 12.4851
5.0 3.574 0.143 771.239265 0.3851563 -0.349 8.57409
5.0 2.728 0.129 820.875256 0.4099444 -0.303 7.72754
5.0 2.252 0.121 852.793681 0.4258845 -0.195 7.25154
5.0 1.940 0.116 875.536939 0.4372424 -0.019 6.94032
5.0 1.718 0.112 892.788391 0.4458578 0.234 6.71824
5.0 1.550 0.109 906.441752 0.4526763 0.573 6.55044
5.0 1.418 0.107 917.585993 0.4582417 1.007 6.41838
5.0 1.311 0.105 926.89838 0.4628923 1.543 6.31127
5.0 1.222 0.104 934.825397 0.4668511 2.189 6.22232

ran T8
rsier

0.2
0.02
0.11 meter
0.25297 menit

Area = 0.0021698 km
C= 0.63
length of channel = 96.60 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 5.627 0.177 678.043618 0.2563246 -0.251 10.6269
5.0 3.545 0.142 772.82796 0.2921564 -0.256 8.54474
5.0 2.705 0.128 822.306449 0.3108610 -0.204 7.70514
5.0 2.233 0.121 854.101243 0.3228806 -0.092 7.23304
5.0 1.924 0.115 876.745444 0.3314409 0.087 6.92438
5.0 1.704 0.112 893.915563 0.3379318 0.342 6.70413
5.0 1.538 0.109 907.500717 0.3430675 0.683 6.5377
5.0 1.407 0.107 918.586747 0.3472584 1.118 6.40673
5.0 1.300 0.105 927.848727 0.3507598 1.655 6.3005
5.0 1.212 0.104 935.731562 0.3537398 2.302 6.21228

ran T6
rsier

0.2
0.02
0.00 meter
0 menit

Area = 0.0030432 km
C= 0.63
length of channel = 134.40 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 7.829 0.214 605.607604 0.3209864 -0.315 12.8288
5.0 4.932 0.166 706.130658 0.3742660 -0.338 9.93181
5.0 3.764 0.146 761.185177 0.4034462 -0.296 8.76367
5.0 3.107 0.135 797.610644 0.4227525 -0.192 8.10684
5.0 2.677 0.128 824.088071 0.4367862 -0.018 7.6774
5.0 2.371 0.123 844.476152 0.4475924 0.233 7.37096
5.0 2.139 0.119 860.804676 0.4562469 0.570 7.13941
5.0 1.957 0.116 874.26227 0.4633797 1.002 6.95719
5.0 1.809 0.113 885.599303 0.4693886 1.536 6.80938
5.0 1.687 0.111 895.31671 0.4745391 2.182 6.68665

ran T4
rsier

0.2
0.02
0.00 meter
0 menit

Area = 0.0025622 km
C= 0.63
length of channel = 107.40 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 6.256 0.188 655.045168 0.2916846 -0.286 11.256
5.0 3.941 0.149 752.088831 0.3348971 -0.299 8.94104
5.0 3.008 0.133 803.528548 0.3578026 -0.251 8.00758
5.0 2.483 0.125 836.887309 0.3726569 -0.142 7.4827
5.0 2.140 0.119 860.796228 0.3833033 0.035 7.13953
5.0 1.895 0.115 879.011327 0.3914143 0.289 6.89465
5.0 1.710 0.112 893.47692 0.3978557 0.628 6.70962
5.0 1.564 0.109 905.317098 0.4031280 1.062 6.564
5.0 1.446 0.107 915.234041 0.4075439 1.598 6.44589
5.0 1.348 0.106 923.692357 0.4113103 2.245 6.34782

ran T2
rsier

0.2
0.02
0.00 meter
0 menit
Area = 0.00189 km
C= 0.63
length of channel = 90.00 m

Hydrology Calculation
to (min) tf (min) tc (jam) I (mm/jam) Q Delta Tc Pakai
5.0 5.242 0.171 693.201037 0.2289393 -0.223 10.2425
5.0 3.303 0.138 786.276225 0.2596787 -0.223 8.30255
5.0 2.520 0.125 834.373178 0.2755634 -0.168 7.52032
5.0 2.080 0.118 865.096495 0.2857102 -0.055 7.08048
5.0 1.793 0.113 886.888236 0.2929073 0.125 6.7929
5.0 1.588 0.110 903.361792 0.2983479 0.382 6.5877
5.0 1.433 0.107 916.364872 0.3026423 0.723 6.43264
5.0 1.311 0.105 926.955511 0.3061400 1.159 6.31062
5.0 1.212 0.104 935.789479 0.3090576 1.696 6.21164
5.0 1.129 0.102 943.297857 0.3115373 2.345 6.12946
C Node Saluran L A Rumah L Rumah A RTH L RTH A Jalan
35-32 S24 41.2 4654 0 213.3333 0 1320
32-29 S22 6.1 6886 0 213.3333 0 1821.3
29-26 S20 36 8992 0 213.3333 0 2412.3
26-23 S18 15 11164 0 213.3333 0 2972.4
23-20 S16 38 13248 0 213.3333 9.5 3474
20-17 S14 11 15688 0 213.3333 9.5 4016.7
17-14 S12 36.6 18168 0 213.3333 9.5 4512
14-11 S10 16.8 20648 0 213.3333 0 5090.4
11-8 S8 37 23288 0 213.3333 0 324.3333
8-5 S6 10.8 25628 0 213.3333 0 838.5333
5-3 S4 43.9 27248 0 213.3333 0 1240.233
3-1 S2 19 30100 0 7252.137 0 4515.033
Sekunder
34-31 S23 41.7 1224 0 1053.57 0 489.9
31-28 S21 5.9 2604 0 1053.57 0 901.8
28-25 S19 37.5 4264 0 1053.57 0 1287
25-22 S17 16 5960 0 1053.57 0 1750.5
22-19 S15 35 7540 0 1053.57 9.5 2147.7
19-16 S13 10 9340 0 1053.57 9.5 2581.8
16-13 S11 40 11220 0 1053.57 9.5 2991.6
13-10 S9 10 13100 0 1053.57 0 3447.3
10-7 S7 44.9 15340 0 1053.57 0 3904.2
7-4 S5 13.2 17580 0 1053.57 0 4403.7
4-2 S3 50 20220 0 2506.71 0 5671.5
2-1 S1 10.4 20220 0 5912.97 0 13178.7

Saluran S24
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 3.00 meter L= 0 meter L=
to= 2.31259275 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T22


Rumah 4654.00 m2 C Rumah 0.6 7.4941218387 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 1320.00 m2 C Jalan 0.8 Nilai Tc Kiri
Total 6187.33 m2 C gab 0.628876 Nilai Tc Kanan
0.006187333 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.0010 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.0010 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.0010 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.0010 0.721 0.231
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656

Saluran S22
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 3.00 meter L= 0 meter L=
to= 2.31259275 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T21


Rumah 6886.00 m2 C Rumah 0.6 8.2072972527 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 1821.30 m2 C Jalan 0.8 Nilai Tc Kiri
Total 8920.63 m2 C gab 0.631268 Nilai Tc Kanan
0.008920633 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.0010 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.0010 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.0010 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.0010 0.721 0.231
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656

Saluran S20
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 3.00 meter L= 0 meter L=
to= 2.31259275 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T18


Rumah 8992.00 m2 C Rumah 0.6 7.2792310492 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 2412.30 m2 C Jalan 0.8 Nilai Tc Kiri
Total 11617.63 m2 C gab 0.634183 Nilai Tc Kanan
0.011617633 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.001 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.001 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.001 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.001 0.721 0.231
0.5 1 0.5 2 0.25 0.001 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.001 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.001 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.001 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.001 1.238 2.006
1 2 2 4 0.5 0.001 1.328 2.656
Saluran S18
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 3.00 meter L= 0 meter L=
to= 2.31259275 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T17


Rumah 11164.00 m2 C Rumah 0.6 8.4204530328 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 2972.40 m2 C Jalan 0.8 Nilai Tc Kiri
Total 14349.73 m2 C gab 0.635481 Nilai Tc Kanan
0.014349733 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.0010 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.0010 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.0010 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.0010 0.721 0.231
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656

Saluran S16
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 6.00 meter L= 0 meter L=
to= 3.19654018 menit to= 0.0 menit t0 =
Area C Nilai TC Dari Saluran T14
Rumah 13248.00 m2 C Rumah 0.6 7.5738062425 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 3474.00 m2 C Jalan 0.8 Nilai Tc Kiri
Total 16935.33 m2 C gab 0.635988 Nilai Tc Kanan
0.016935333 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.1 0.2 0.02 0.4 0.05 0.0010 0.286 0.006
0.2 0.4 0.08 0.8 0.1 0.0010 0.454 0.036
0.3 0.6 0.18 1.2 0.15 0.0010 0.595 0.107
0.4 0.8 0.32 1.6 0.2 0.0010 0.721 0.231
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656

Saluran S14
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 6.00 meter L= 0 meter L=
to= 3.19654018 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T13


Rumah 15688.00 m2 C Rumah 0.6 8.3845950511 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 4016.70 m2 C Jalan 0.8 Nilai Tc Kiri
Total 19918.03 m2 C gab 0.636048 Nilai Tc Kanan
0.019918033 km2 Nilai To
Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515

Saluran S12
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 6.00 meter L= 0 meter L=
to= 3.19654018 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T10


Rumah 18168.00 m2 C Rumah 0.6 6.7182438405 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 4512.00 m2 C Jalan 0.8 Nilai Tc Kiri
Total 22893.33 m2 C gab 0.63569 Nilai Tc Kanan
0.022893333 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515

Saluran S10
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 6.00 meter L= 0 meter L=
to= 3.19654018 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T9


Rumah 20648.00 m2 C Rumah 0.6 8.5061137669 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 5090.40 m2 C Jalan 0.8 Nilai Tc Kiri
Total 25951.73 m2 C gab 0.635942 Nilai Tc Kanan
0.025951733 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515

Saluran S8
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 3.00 meter L= 0 meter L=
to= 2.31259275 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T6


Rumah 23288.00 m2 C Rumah 0.6 9.9318055392 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 324.33 m2 C Jalan 0.8 Nilai Tc Kiri
Total 23825.67 m2 C gab 0.599141 Nilai Tc Kanan
0.023825667 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515

Saluran S6
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 3.00 meter L= 0 meter L=
to= 2.31259275 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T5


Rumah 25628.00 m2 C Rumah 0.6 6.1079220612 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 838.53 m2 C Jalan 0.8 Nilai Tc Kiri
Total 26679.87 m2 C gab 0.603087 Nilai Tc Kanan
0.026679867 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515

Saluran S4
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 3.00 meter L= 0 meter L=
to= 2.31259275 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T2


Rumah 27248.00 m2 C Rumah 0.6 6.7928990853 Menit
RTH 213.33 m2 C RTH 0.2
Jalan 1240.23 m2 C Jalan 0.8 Nilai Tc Kiri
Total 28701.57 m2 C gab 0.605669 Nilai Tc Kanan
0.028701567 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515

Saluran S2
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd =
S= 0.02 S= 0.02 S=
L= 3.00 meter L= 0 meter L=
to= 2.31259275 menit to= 0.0 menit t0 =

Area C Nilai TC Dari Saluran T25


Rumah 30100.00 m2 C Rumah 0.6 13.3230743731 Menit
RTH 7252.14 m2 C RTH 0.2
Jalan 4515.03 m2 C Jalan 0.8 Nilai Tc Kiri
Total 41867.17 m2 C gab 0.552281 Nilai Tc Kanan
0.04186717 km2 Nilai To

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006
1 2 2 4 0.5 0.0010 1.328 2.656
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515
L Jalan A Total C Rumah C Taman C Jalan Ctotal i

3 6187.33 0.6 0.2 0.8 0.628876 0.001


3 8920.63 0.6 0.2 0.8 0.631268 0.001
3 11617.6 0.6 0.2 0.8 0.634183 0.001
3 14349.7 0.6 0.2 0.8 0.635481 0.001
6 16935.3 0.6 0.2 0.8 0.635988 0.001
6 19918 0.6 0.2 0.8 0.636048 0.001
6 22893.3 0.6 0.2 0.8 0.63569 0.001
6 25951.7 0.6 0.2 0.8 0.635942 0.001
3 23825.7 0.6 0.2 0.8 0.599141 0.001
3 26679.9 0.6 0.2 0.8 0.603087 0.001
3 28701.6 0.6 0.2 0.8 0.605669 0.001
3 41867.2 0.6 0.2 0.8 0.552281 0.001
3 2767.47 0.6 0.2 0.8 0.483125 0.001
3 4559.37 0.6 0.2 0.8 0.547127 0.001
3 6604.57 0.6 0.2 0.8 0.575164 0.001
3 8764.07 0.6 0.2 0.8 0.591861 0.001
6 10741.3 0.6 0.2 0.8 0.600755 0.001
6 12975.4 0.6 0.2 0.8 0.607316 0.001
6 15265.2 0.6 0.2 0.8 0.611588 0.001
6 17600.9 0.6 0.2 0.8 0.615228 0.001
3 20297.8 0.6 0.2 0.8 0.617707 0.001
3 23037.3 0.6 0.2 0.8 0.619938 0.001
3 28398.2 0.6 0.2 0.8 0.604635 0.001
3 39311.7 0.6 0.2 0.8 0.606882 0.001

S24
der

0.2
0.02
0.00 meter
0 menit

Dari Saluran T22 Nilai TC Dari Saluran T26


7.41330346 Menit

7.494122 TO Saluran Sekunder


7.413303 7.4941218387
2.31259

Area = 0.0061873 km
C= 0.63
length of channel = 41.20 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
7.5 2.400 0.165 707.748 0.765583 -0.760 9.894008
7.5 1.512 0.150 748.83154 0.810023 -0.774 9.005955
7.5 1.154 0.144 767.28482 0.829985 -0.723 8.647867
7.5 0.952 0.141 778.20746 0.8418 -0.611 8.44652
7.5 0.821 0.139 785.57685 0.849771 -0.431 8.314871
7.5 0.727 0.137 790.9504 0.855584 -0.175 8.220935
7.5 0.656 0.136 795.07654 0.860047 0.166 8.149953
7.5 0.600 0.135 798.36423 0.863604 0.601 8.094093
7.5 0.555 0.134 801.05773 0.866517 1.139 8.048784
7.5 0.517 0.134 803.31282 0.868957 1.787 8.011162

S22
der

0.2
0.02
0.00 meter
0 menit

Dari Saluran T21 Nilai TC Dari Saluran S24


8.4465171 Menit

8.207297 TO Saluran Sekunder


8.446517 8.4465171038
2.31259

Area = 0.0089206 km
C= 0.63
length of channel = 6.10 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
8.4 0.355 0.147 759.20299 1.188535 -1.183 8.80184
8.4 0.224 0.145 766.09005 1.199316 -1.163 8.670356
8.4 0.171 0.144 768.91459 1.203738 -1.097 8.617339
8.4 0.141 0.143 770.51504 1.206244 -0.976 8.587527
8.4 0.122 0.143 771.56626 1.207889 -0.790 8.568036
8.4 0.108 0.143 772.3187 1.209067 -0.529 8.554128
8.4 0.097 0.142 772.88858 1.20996 -0.184 8.543618
8.4 0.089 0.142 773.33783 1.210663 0.254 8.535348
8.4 0.082 0.142 773.70275 1.211234 0.794 8.528639
8.4 0.077 0.142 774.00611 1.211709 1.444 8.523069

S20
der

0.2
0.02
0.00 meter
0 menit

Dari Saluran T18 Nilai TC Dari Saluran S22


8.55412786 Menit

7.279231 TO Saluran Sekunder


8.554128 8.5541278577
2.31259

Area = 0.0116176 km
C= 0.63
length of channel = 36.00 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
8.6 2.097 0.178 677.1189 1.38689 -1.381 10.65112
8.6 1.321 0.165 708.55872 1.451286 -1.415 9.875147
8.6 1.008 0.159 722.38017 1.479595 -1.372 9.562254
8.6 0.832 0.156 730.47412 1.496174 -1.265 9.386318
8.6 0.717 0.155 735.89858 1.507284 -1.089 9.271287
8.6 0.635 0.153 739.83547 1.515348 -0.835 9.189208
8.6 0.573 0.152 742.84792 1.521518 -0.495 9.127184
8.6 0.524 0.151 745.24167 1.526421 -0.061 9.078375
8.6 0.485 0.151 747.19847 1.530429 0.475 9.038784
8.6 0.452 0.150 748.83378 1.533778 1.122 9.00591
S18
der

0.2
0.02
0.00 meter
0 menit

Dari Saluran T17 Nilai TC Dari Saluran S20


9.12718397 Menit

8.420453 TO Saluran Sekunder


9.127184 9.1271839665
2.31259

Area = 0.0143497 km
C= 0.64
length of channel = 15.00 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
9.1 0.874 0.167 703.19827 1.782663 -1.777 10.00093
9.1 0.550 0.161 717.20145 1.818162 -1.782 9.677609
9.1 0.420 0.159 723.06174 1.833018 -1.726 9.547237
9.1 0.347 0.158 726.41348 1.841515 -1.611 9.47393
9.1 0.299 0.157 728.62743 1.847128 -1.429 9.426
9.1 0.265 0.157 730.21824 1.85116 -1.171 9.391801
9.1 0.239 0.156 731.42649 1.854223 -0.828 9.365957
9.1 0.218 0.156 732.38108 1.856643 -0.392 9.34562
9.1 0.202 0.155 733.15781 1.858612 0.147 9.329124
9.1 0.188 0.155 733.80445 1.860252 0.796 9.315427

S16
der

0.2
0.02
9.50 meter
2.05447 menit
Dari Saluran T14 Nilai TC Dari Saluran S18
9.34562016 Menit

7.573806 TO Saluran Sekunder


9.34562 9.3456201635
3.19654

Area = 0.0169353 km
C= 0.64
length of channel = 38.00 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
9.3 2.213 0.193 644.68479 1.930344 -1.925 11.55911
9.3 1.394 0.179 673.74989 2.017372 -1.981 10.74003
9.3 1.064 0.173 686.49554 2.055536 -1.948 10.40975
9.3 0.878 0.170 693.95034 2.077858 -1.847 10.22404
9.3 0.757 0.168 698.94263 2.092806 -1.674 10.10262
9.3 0.670 0.167 702.56395 2.103649 -1.423 10.01598
9.3 0.605 0.166 705.33383 2.111943 -1.086 9.950513
9.3 0.553 0.165 707.53416 2.118531 -0.654 9.898992
9.3 0.512 0.164 709.33239 2.123915 -0.118 9.857202
9.3 0.477 0.164 710.83488 2.128414 0.528 9.822501

S14
der

0.2
0.02
9.50 meter
2.05447 menit

Dari Saluran T13 Nilai TC Dari Saluran S16


9.89899186 Menit

8.384595 TO Saluran Sekunder


9.898992 9.8989918627
3.19654
Area = 0.019918 km
C= 0.64
length of channel = 11.00 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
9.9 0.219 0.169 698.29992 2.459366 -2.041 10.11812
9.9 0.194 0.168 699.34052 2.463031 -1.783 10.09304
9.9 0.175 0.168 700.12959 2.46581 -1.440 10.07409
9.9 0.160 0.168 700.75223 2.468003 -1.003 10.05918
9.9 0.148 0.167 701.25834 2.469785 -0.464 10.04708
9.9 0.138 0.167 701.67934 2.471268 0.185 10.03704
9.9 0.130 0.167 702.03606 2.472525 0.952 10.02854
9.9 0.122 0.167 702.34289 2.473605 1.846 10.02124
9.9 0.116 0.167 702.61014 2.474546 2.872 10.01488
9.9 0.110 0.167 702.84541 2.475375 4.040 10.0093

S12
der

0.2
0.02
9.50 meter
2.05447 menit

Dari Saluran T10 Nilai TC Dari Saluran S14


10.0212371 Menit

6.718244 TO Saluran Sekunder


10.02124 10.0212370753
3.19654

Area = 0.0228933 km
C= 0.64
length of channel = 36.60 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
10.0 0.729 0.179 673.36175 2.724255 -2.306 10.75035
10.0 0.646 0.178 676.51747 2.737022 -2.057 10.6669
10.0 0.583 0.177 678.92842 2.746776 -1.721 10.60384
10.0 0.533 0.176 680.8419 2.754518 -1.290 10.55422
10.0 0.493 0.175 682.40456 2.76084 -0.755 10.51397
10.0 0.459 0.175 683.70943 2.766119 -0.110 10.48055
10.0 0.431 0.174 684.81863 2.770607 0.654 10.45227
10.0 0.407 0.174 685.77535 2.774477 1.545 10.42798
10.0 0.386 0.173 686.61067 2.777857 2.569 10.40684
10.0 0.367 0.173 687.34756 2.780838 3.734 10.38826

S10
der

0.2
0.02
0.00 meter
0 menit

Dari Saluran T9 Nilai TC Dari Saluran S12


10.4279802 Menit

8.506114 TO Saluran Sekunder


10.42798 10.4279802373
3.19654

Area = 0.0259517 km
C= 0.64
length of channel = 16.80 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
10.4 0.335 0.179 672.89972 3.087299 -2.669 10.76265
10.4 0.296 0.179 674.34072 3.093911 -2.414 10.72435
10.4 0.267 0.178 675.43509 3.098932 -2.073 10.69541
10.4 0.245 0.178 676.29963 3.102898 -1.638 10.67263
10.4 0.226 0.178 677.00305 3.106126 -1.101 10.65415
10.4 0.211 0.177 677.58863 3.108812 -0.453 10.63881
10.4 0.198 0.177 678.08512 3.11109 0.314 10.62583
10.4 0.187 0.177 678.51242 3.113051 1.206 10.61468
10.4 0.177 0.177 678.88478 3.114759 2.232 10.60498
10.4 0.168 0.177 679.2127 3.116264 3.399 10.59645

n S8
der

0.2
0.02
0.00 meter
0 menit

Dari Saluran T6 Nilai TC Dari Saluran S10


10.6049804 Menit

9.931806 TO Saluran Sekunder


10.60498 10.6049804219
2.31259

Area = 0.0238257 km
C= 0.60
length of channel = 37.00 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
10.6 0.737 0.189 652.05886 2.587651 -2.169 11.34206
10.6 0.653 0.188 654.98621 2.599268 -1.919 11.2577
10.6 0.589 0.187 657.22165 2.608139 -1.582 11.19395
10.6 0.539 0.186 658.99519 2.615177 -1.150 11.14379
10.6 0.498 0.185 660.44316 2.620923 -0.615 11.1031
10.6 0.464 0.184 661.65197 2.625721 0.030 11.06931
10.6 0.436 0.184 662.6793 2.629797 0.795 11.04073
10.6 0.411 0.184 663.56526 2.633313 1.686 11.01617
10.6 0.390 0.183 664.33868 2.636383 2.711 10.9948
10.6 0.371 0.183 665.02087 2.63909 3.876 10.97601

n S6
der
0.2
0.02
0.00 meter
0 menit

Dari Saluran T5 Nilai TC Dari Saluran S8


11.0161689 Menit

6.107922 TO Saluran Sekunder


11.01617 11.0161688643
2.31259

Area = 0.0266799 km
C= 0.60
length of channel = 10.80 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
11.0 0.215 0.187 655.90899 2.933948 -2.516 11.23132
11.0 0.191 0.187 656.77333 2.937814 -2.258 11.20669
11.0 0.172 0.186 657.42849 2.940744 -1.915 11.18809
11.0 0.157 0.186 657.94529 2.943056 -1.478 11.17344
11.0 0.145 0.186 658.36528 2.944935 -0.939 11.16157
11.0 0.136 0.186 658.71456 2.946497 -0.290 11.1517
11.0 0.127 0.186 659.01046 2.947821 0.477 11.14336
11.0 0.120 0.186 659.26494 2.948959 1.370 11.13619
11.0 0.114 0.185 659.48657 2.94995 2.397 11.12995
11.0 0.108 0.185 659.68165 2.950823 3.564 11.12447

n S4
der

0.2
0.02
0.00 meter
0 menit

Dari Saluran T2 Nilai TC Dari Saluran S6


11.1299547 Menit
6.792899 TO Saluran Sekunder
11.12995 11.1299546973
2.31259

Area = 0.0287016 km
C= 0.61
length of channel = 43.90 m

Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
11.1 0.875 0.200 630.22517 3.045661 -2.627 12.00449
11.1 0.774 0.198 633.39919 3.061 -2.381 11.9044
11.1 0.699 0.197 635.8261 3.072729 -2.047 11.82876
11.1 0.639 0.196 637.75348 3.082043 -1.617 11.76924
11.1 0.591 0.195 639.32831 3.089654 -1.084 11.72097
11.1 0.551 0.195 640.6439 3.096011 -0.440 11.68088
11.1 0.517 0.194 641.76261 3.101418 0.323 11.64696
11.1 0.488 0.194 642.72784 3.106082 1.213 11.61782
11.1 0.463 0.193 643.57081 3.110156 2.237 11.59247
11.1 0.440 0.193 644.31461 3.113751 3.401 11.57018

n S2
der

0.2
0.02
0.00 meter
0 menit

Dari Saluran T25 Nilai TC Dari Saluran T1


7.56982202 Menit

13.32307 TO Saluran Sekunder


7.569822 13.3230743731
2.31259

Area = 0.0418672 km
C= 0.55
length of channel = 19.00 m
Hydrology Calculation
to (min) tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
13.3 0.379 0.228 582.15642 3.742126 -3.324 13.70158
13.3 0.335 0.228 583.26357 3.749243 -3.069 13.65826
13.3 0.302 0.227 584.10393 3.754645 -2.729 13.62552
13.3 0.277 0.227 584.76752 3.75891 -2.294 13.59976
13.3 0.256 0.226 585.30725 3.76238 -1.757 13.57887
13.3 0.238 0.226 585.75643 3.765267 -1.109 13.56152
13.3 0.224 0.226 586.13718 3.767715 -0.343 13.54684
13.3 0.211 0.226 586.4648 3.769821 0.549 13.53423
13.3 0.200 0.225 586.75025 3.771655 1.575 13.52325
13.3 0.191 0.225 587.0016 3.773271 2.742 13.5136
Saluran S23
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 3.00 meter L= 0 meter L= 0.00
to= 2.3125927 menit to= 0.0 menit t0 = 0

Area C Nilai TC Dari Saluran T24


Rumah 1224.00 m2 C Rumah 0.6 3.720381 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 489.90 m2 C Jalan 0.8 Nilai Tc Kiri 3.720381
Total 2767.47 m2 C gab 0.483125 Nilai Tc Kanan 6.403165
0.00276747 km2 Nilai To 2.31259

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm
/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.0010 0.286 0.006 6.4
0.2 0.4 0.08 0.8 0.1 0.0010 0.454 0.036 6.4
0.3 0.6 0.18 1.2 0.15 0.0010 0.595 0.107 6.4
0.4 0.8 0.32 1.6 0.2 0.0010 0.721 0.231 6.4
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 6.4
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 6.4
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 6.4
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 6.4
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 6.4
1 2 2 4 0.5 0.0010 1.328 2.656 6.4

Saluran S21
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 3.00 meter L= 0 meter L= 0.00
to= 2.3125927 menit to= 0.0 menit t0 = 0

Area C Nilai TC Dari Saluran S23


Rumah 2604.00 m2 C Rumah 0.6 7.933346 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 901.80 m2 C Jalan 0.8 Nilai Tc Kiri 7.933346
Total 4559.37 m2 C gab 0.547127 Nilai Tc Kanan 7.617633
0.00455937 km2 Nilai To 2.31259

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.0010 0.286 0.006 7.9
0.2 0.4 0.08 0.8 0.1 0.0010 0.454 0.036 7.9
0.3 0.6 0.18 1.2 0.15 0.0010 0.595 0.107 7.9
0.4 0.8 0.32 1.6 0.2 0.0010 0.721 0.231 7.9
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 7.9
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 7.9
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 7.9
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 7.9
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 7.9
1 2 2 4 0.5 0.0010 1.328 2.656 7.9

Saluran S19
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 3.00 meter L= 0 meter L= 0.00
to= 2.3125927 menit to= 0.0 menit t0 = 0

Area C Nilai TC Dari Saluran S21


Rumah 4264.00 m2 C Rumah 0.6 8.069732 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 1287.00 m2 C Jalan 0.8 Nilai Tc Kiri 8.069732
Total 6604.57 m2 C gab 0.575164 Nilai Tc Kanan 6.810828
0.00660457 km2 Nilai To 2.31259

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.0010 0.286 0.006 8.1
0.2 0.4 0.08 0.8 0.1 0.0010 0.454 0.036 8.1
0.3 0.6 0.18 1.2 0.15 0.0010 0.595 0.107 8.1
0.4 0.8 0.32 1.6 0.2 0.0010 0.721 0.231 8.1
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 8.1
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 8.1
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 8.1
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 8.1
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 8.1
1 2 2 4 0.5 0.0010 1.328 2.656 8.1
Saluran S17
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 3.00 meter L= 0 meter L= 0.00
to= 2.3125927 menit to= 0.0 menit t0 = 0

Area C Nilai TC Dari Saluran S19


Rumah 5960.00 m2 C Rumah 0.6 8.731274 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 1750.50 m2 C Jalan 0.8 Nilai Tc Kiri 8.731274
Total 8764.07 m2 C gab 0.591861 Nilai Tc Kanan 7.759072
0.00876407 km2 Nilai To 2.31259

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.0010 0.286 0.006 8.7
0.2 0.4 0.08 0.8 0.1 0.0010 0.454 0.036 8.7
0.3 0.6 0.18 1.2 0.15 0.0010 0.595 0.107 8.7
0.4 0.8 0.32 1.6 0.2 0.0010 0.721 0.231 8.7
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 8.7
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 8.7
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 8.7
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 8.7
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 8.7
1 2 2 4 0.5 0.0010 1.328 2.656 8.7

Saluran S15
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 6.00 meter L= 0 meter L= 9.50
to= 3.1965402 menit to= 0.0 menit t0 = 2.05447
Area C Nilai TC Dari Saluran S17
Rumah 7540.00 m2 C Rumah 0.6 9.013532 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 2147.70 m2 C Jalan 0.8 Nilai Tc Kiri 9.013532
Total 10741.27 m2 C gab 0.600755 Nilai Tc Kanan 6.940315
0.01074127 km2 Nilai To 3.19654

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.1 0.2 0.02 0.4 0.05 0.0010 0.286 0.006 9.0
0.2 0.4 0.08 0.8 0.1 0.0010 0.454 0.036 9.0
0.3 0.6 0.18 1.2 0.15 0.0010 0.595 0.107 9.0
0.4 0.8 0.32 1.6 0.2 0.0010 0.721 0.231 9.0
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 9.0
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 9.0
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 9.0
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 9.0
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 9.0
1 2 2 4 0.5 0.0010 1.328 2.656 9.0

Saluran S13
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 6.00 meter L= 0 meter L= 9.50
to= 3.1965402 menit to= 0.0 menit t0 = 2.05447

Area C Nilai TC Dari Saluran S15


Rumah 9340.00 m2 C Rumah 0.6 9.570669 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 2581.80 m2 C Jalan 0.8 Nilai Tc Kiri 9.570669
Total 12975.37 m2 C gab 0.607316 Nilai Tc Kanan 7.683372
0.01297537 km2 Nilai To 3.19654
Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 9.6
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 9.6
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 9.6
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 9.6
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 9.6
1 2 2 4 0.5 0.0010 1.328 2.656 9.6
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425 9.6
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319 9.6
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347 9.6
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515 9.6

Saluran S11
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 6.00 meter L= 0 meter L= 9.50
to= 3.1965402 menit to= 0.0 menit t0 = 2.05447

Area C Nilai TC Dari Saluran S13


Rumah 11220.00 m2 C Rumah 0.6 9.688439 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 2991.60 m2 C Jalan 0.8 Nilai Tc Kiri 9.688439
Total 15265.17 m2 C gab 0.611588 Nilai Tc Kanan 8.544735
0.01526517 km2 Nilai To 3.19654

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 9.7
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 9.7
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 9.7
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 9.7
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 9.7
1 2 2 4 0.5 0.0010 1.328 2.656 9.7
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425 9.7
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319 9.7
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347 9.7
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515 9.7

Saluran S9
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 6.00 meter L= 0 meter L= 0.00
to= 3.1965402 menit to= 0.0 menit t0 = 0

Area C Nilai TC Dari Saluran S11


Rumah 13100.00 m2 C Rumah 0.6 10.15952 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 3447.30 m2 C Jalan 0.8 Nilai Tc Kiri 10.15952
Total 17600.87 m2 C gab 0.615228 Nilai Tc Kanan 7.826804
0.01760087 km2 Nilai To 3.19654

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 10.2
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 10.2
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 10.2
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 10.2
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 10.2
1 2 2 4 0.5 0.0010 1.328 2.656 10.2
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425 10.2
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319 10.2
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347 10.2
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515 10.2

Saluran S7
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 3.00 meter L= 0 meter L= 0.00
to= 2.3125927 menit to= 0.0 menit t0 = 0

Area C Nilai TC Dari Saluran S9


Rumah 15340.00 m2 C Rumah 0.6 10.27065 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 3904.20 m2 C Jalan 0.8 Nilai Tc Kiri 10.27065
Total 20297.77 m2 C gab 0.617707 Nilai Tc Kanan 6.709617
0.02029777 km2 Nilai To 2.31259

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 10.3
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 10.3
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 10.3
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 10.3
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 10.3
1 2 2 4 0.5 0.0010 1.328 2.656 10.3
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425 10.3
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319 10.3
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347 10.3
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515 10.3

Saluran S5
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 3.00 meter L= 0 meter L= 0.00
to= 2.3125927 menit to= 0.0 menit t0 = 0

Area C Nilai TC Dari Saluran S7


Rumah 17580.00 m2 C Rumah 0.6 10.76963 Menit
RTH 1053.57 m2 C RTH 0.2
Jalan 4403.70 m2 C Jalan 0.8 Nilai Tc Kiri 10.76963
Total 23037.27 m2 C gab 0.619938 Nilai Tc Kanan 8.053905
0.02303727 km2 Nilai To 2.31259

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 10.8
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 10.8
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 10.8
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 10.8
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 10.8
1 2 2 4 0.5 0.0010 1.328 2.656 10.8
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425 10.8
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319 10.8
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347 10.8
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515 10.8

Saluran S3
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 3.00 meter L= 0 meter L= 0.00
to= 2.3125927 menit to= 0.0 menit t0 = 0

Area C Nilai TC Dari Saluran S5


Rumah 20220.00 m2 C Rumah 0.6 10.91632 Menit
RTH 2506.71 m2 C RTH 0.2
Jalan 5671.50 m2 C Jalan 0.8 Nilai Tc Kiri 10.91632
Total 28398.21 m2 C gab 0.604635 Nilai Tc Kanan 12.4226
0.02839821 km2 Nilai To 2.31259

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 12.4
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 12.4
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 12.4
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 12.4
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 12.4
1 2 2 4 0.5 0.0010 1.328 2.656 12.4
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425 12.4
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319 12.4
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347 12.4
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515 12.4

Saluran S1
Sekunder
Jalan Rumah RTH
nd= 0.013 nd= 0.02 nd = 0.2
S= 0.02 S= 0.02 S= 0.02
L= 3.00 meter L= 0 meter L= 0.00
to= 2.3125927 menit to= 0.0 menit t0 = 0

Area C Nilai TC Dari Saluran S3


Rumah 20220.00 m2 C Rumah 0.6 12.94939 Menit
RTH 5912.97 m2 C RTH 0.2
Jalan 13178.70 m2 C Jalan 0.8 Nilai Tc Kiri 12.94939
Total 39311.67 m2 C gab 0.606882 Nilai Tc Kanan 11.7908
0.03931167 km2 Nilai To 2.31259

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope = 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
0.5 1 0.5 2 0.25 0.0010 0.837 0.418 12.9
0.6 1.2 0.72 2.4 0.3 0.0010 0.945 0.680 12.9
0.7 1.4 0.98 2.8 0.35 0.0010 1.047 1.026 12.9
0.8 1.6 1.28 3.2 0.4 0.0010 1.144 1.465 12.9
0.9 1.8 1.62 3.6 0.45 0.0010 1.238 2.006 12.9
1 2 2 4 0.5 0.0010 1.328 2.656 12.9
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425 12.9
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319 12.9
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347 12.9
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515 12.9
1.05 2.1 2.205 4.2 0.525 0.0010 1.372 3.025 12.9
meter
menit

Nilai TC Dari Saluran T20


6.403165 Menit

TO Saluran Sekunder
6.4031648687

Area = 0.00276747 km
C= 0.48
length of channel = 41.70 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
2.429 0.147 757.637359 0.28161 -0.276 8.832175
1.530 0.132 808.031269 0.300342 -0.264 7.933346
1.168 0.126 831.0231 0.308888 -0.202 7.570911
0.964 0.123 844.740672 0.313986 -0.083 7.367118
0.831 0.121 854.042336 0.317444 0.101 7.233875
0.736 0.119 860.848839 0.319974 0.360 7.138799
0.664 0.118 866.089157 0.321921 0.704 7.066955
0.607 0.117 870.273306 0.323477 1.141 7.010417
0.561 0.116 873.707022 0.324753 1.681 6.964559
0.523 0.115 876.585872 0.325823 2.330 6.926479

meter
menit

Nilai TC Dari Saluran T19


7.617633 Menit

TO Saluran Sekunder
7.9333456052

Area = 0.00455937 km
C= 0.55
length of channel = 5.90 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.344 0.138 787.730452 0.54628 -0.541 8.277019
0.217 0.136 795.082786 0.551379 -0.515 8.149846
0.165 0.135 798.099623 0.553471 -0.446 8.098566
0.136 0.134 799.80942 0.554657 -0.324 8.069732
0.118 0.134 800.932611 0.555436 -0.137 8.05088
0.104 0.134 801.736637 0.555993 0.124 8.037428
0.094 0.134 802.345631 0.556415 0.470 8.027263
0.086 0.134 802.825744 0.556748 0.908 8.019264
0.079 0.134 803.215737 0.557019 1.449 8.012775
0.074 0.133 803.539958 0.557244 2.099 8.007388

meter
menit

Nilai TC Dari Saluran T16


6.810828 Menit

TO Saluran Sekunder
8.0697323057

Area = 0.00660457 km
C= 0.58
length of channel = 37.50 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
2.184 0.171 692.729382 0.731552 -0.726 10.25409
1.376 0.157 727.710945 0.768494 -0.732 9.445794
1.050 0.152 743.205602 0.784857 -0.678 9.119864
0.867 0.149 752.313214 0.794475 -0.564 8.936597
0.747 0.147 758.43118 0.800936 -0.383 8.816774
0.662 0.146 762.87859 0.805632 -0.125 8.731274
0.597 0.144 766.285775 0.80923 0.217 8.666666
0.546 0.144 768.995745 0.812092 0.653 8.615823
0.505 0.143 771.212726 0.814433 1.191 8.574583
0.471 0.142 773.066638 0.816391 1.840 8.540339
meter
menit

Nilai TC Dari Saluran T15


7.759072 Menit

TO Saluran Sekunder
8.7312738254

Area = 0.00876407 km
C= 0.59
length of channel = 16.00 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.932 0.161 717.83986 1.035138 -1.029 9.663268
0.587 0.155 733.66426 1.057957 -1.022 9.318394
0.448 0.153 740.313044 1.067545 -0.960 9.17933
0.370 0.152 744.122827 1.073038 -0.842 9.101136
0.319 0.151 746.64217 1.076671 -0.658 9.050011
0.282 0.150 748.453808 1.079284 -0.399 9.013532
0.255 0.150 749.830576 1.081269 -0.055 8.985965
0.233 0.149 750.918776 1.082838 0.382 8.964272
0.215 0.149 751.804539 1.084115 0.921 8.946677
0.201 0.149 752.542167 1.085179 1.571 8.932066

meter
menit
Nilai TC Dari Saluran T12
6.940315 Menit

TO Saluran Sekunder
9.0135315405

Area = 0.01074127 km
C= 0.60
length of channel = 35.00 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
2.039 0.184 662.26395 1.188035 -1.182 11.05227
1.284 0.172 690.96159 1.239515 -1.203 10.29786
0.980 0.167 703.505333 1.262017 -1.155 9.993654
0.809 0.164 710.830377 1.275158 -1.044 9.822605
0.697 0.162 715.730936 1.283949 -0.866 9.71077
0.617 0.161 719.283282 1.290322 -0.610 9.63097
0.557 0.160 721.999011 1.295193 -0.269 9.570669
0.510 0.159 724.155462 1.299062 0.166 9.523216
0.471 0.158 725.917276 1.302222 0.703 9.484725
0.439 0.158 727.388942 1.304862 1.351 9.452764

meter
menit

Nilai TC Dari Saluran T11


7.683372 Menit

TO Saluran Sekunder
9.5706694241
Area = 0.01297537 km
C= 0.61
length of channel = 10.00 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.199 0.163 713.129566 1.562241 -1.144 9.76988
0.176 0.162 714.129971 1.564432 -0.884 9.74708
0.159 0.162 714.888416 1.566094 -0.540 9.729852
0.146 0.162 715.486783 1.567405 -0.102 9.716294
0.135 0.162 715.973113 1.56847 0.437 9.705296
0.125 0.162 716.377616 1.569356 1.087 9.696164
0.118 0.161 716.720321 1.570107 1.855 9.688439
0.111 0.161 717.015079 1.570753 2.748 9.681801
0.105 0.161 717.271802 1.571315 3.776 9.676027
0.100 0.161 717.497784 1.57181 4.943 9.670948

meter
menit

Nilai TC Dari Saluran T8


8.544735 Menit

TO Saluran Sekunder
9.6884385764

Area = 0.01526517 km
C= 0.61
length of channel = 40.00 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.797 0.175 683.524219 1.774023 -1.356 10.48528
0.706 0.173 687.116357 1.783346 -1.103 10.39408
0.637 0.172 689.864388 1.790478 -0.764 10.32517
0.582 0.171 692.047654 1.796145 -0.331 10.27094
0.539 0.170 693.832143 1.800776 0.205 10.22695
0.502 0.170 695.323281 1.804646 0.852 10.19042
0.471 0.169 696.59155 1.807938 1.617 10.15952
0.445 0.169 697.686026 1.810779 2.508 10.13297
0.421 0.168 698.642034 1.81326 3.534 10.10987
0.401 0.168 699.485705 1.81545 4.700 10.08955

meter
menit

Nilai TC Dari Saluran T7


7.826804 Menit

TO Saluran Sekunder
10.1595151856

Area = 0.01760087 km
C= 0.62
length of channel = 10.00 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.199 0.173 688.522568 2.072686 -1.654 10.35873
0.176 0.172 689.43345 2.075428 -1.395 10.33593
0.159 0.172 690.123895 2.077506 -1.051 10.3187
0.146 0.172 690.668535 2.079146 -0.614 10.30514
0.135 0.172 691.111148 2.080478 -0.075 10.29414
0.125 0.171 691.479253 2.081586 0.575 10.28501
0.118 0.171 691.791097 2.082525 1.342 10.27728
0.111 0.171 692.059294 2.083332 2.236 10.27065
0.105 0.171 692.292869 2.084036 3.263 10.26487
0.100 0.171 692.498464 2.084654 4.431 10.25979

meter
menit

Nilai TC Dari Saluran T4


6.709617 Menit

TO Saluran Sekunder
10.2706471971

Area = 0.02029777 km
C= 0.62
length of channel = 44.90 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.894 0.186 658.240066 2.294351 -1.876 11.1651
0.792 0.184 661.888043 2.307067 -1.627 11.06273
0.715 0.183 664.680668 2.316801 -1.291 10.98538
0.654 0.182 666.900528 2.324538 -0.860 10.9245
0.604 0.181 668.715694 2.330865 -0.325 10.87512
0.563 0.181 670.232997 2.336154 0.320 10.83412
0.529 0.180 671.523901 2.340653 1.084 10.79943
0.499 0.179 672.638194 2.344537 1.975 10.76963
0.473 0.179 673.611724 2.347931 2.999 10.7437
0.450 0.179 674.471026 2.350926 4.164 10.7209
meter
menit

Nilai TC Dari Saluran T3


8.053905 Menit

TO Saluran Sekunder
10.7696299286

Area = 0.02303727 km
C= 0.62
length of channel = 13.20 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.263 0.184 662.972541 2.632203 -2.214 11.03259
0.233 0.183 664.060032 2.636521 -1.956 11.00249
0.210 0.183 664.88496 2.639796 -1.614 10.97975
0.192 0.183 665.536056 2.642381 -1.177 10.96185
0.178 0.182 666.065426 2.644483 -0.639 10.94734
0.166 0.182 666.50585 2.646232 0.010 10.93528
0.155 0.182 666.879078 2.647714 0.777 10.92509
0.147 0.182 667.200153 2.648988 1.670 10.91632
0.139 0.182 667.479846 2.650099 2.697 10.9087
0.132 0.182 667.726086 2.651076 3.864 10.902

meter
menit

Nilai TC Dari Saluran T23


12.4226 Menit
TO Saluran Sekunder
12.4226022133

Area = 0.02839821 km
C= 0.60
length of channel = 50.00 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.996 0.224 589.490154 2.813879 -2.396 13.41866
0.882 0.222 592.515575 2.82832 -2.148 13.30466
0.796 0.220 594.829394 2.839365 -1.813 13.21851
0.728 0.219 596.667271 2.848138 -1.383 13.15072
0.673 0.218 598.169185 2.855307 -0.850 13.09574
0.627 0.218 599.424012 2.861297 -0.205 13.05008
0.589 0.217 600.491154 2.866391 0.558 13.01145
0.556 0.216 601.411965 2.870786 1.448 12.97826
0.527 0.216 602.216203 2.874625 2.472 12.94939
0.501 0.215 602.925879 2.878013 3.637 12.92399

meter
menit

Nilai TC Dari Saluran T27


11.7908 Menit

TO Saluran Sekunder
12.949388477

Area = 0.03931167 km
C= 0.61
length of channel = 10.40 m
Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.207 0.219 596.508209 3.956281 -3.538 13.15657
0.183 0.219 597.154188 3.960565 -3.280 13.13286
0.166 0.219 597.643563 3.963811 -2.938 13.11494
0.151 0.218 598.029427 3.96637 -2.501 13.10084
0.140 0.218 598.342898 3.968449 -1.963 13.0894
0.131 0.218 598.603526 3.970178 -1.314 13.0799
0.122 0.218 598.824267 3.971642 -0.547 13.07187
0.116 0.218 599.014074 3.972901 0.346 13.06497
0.110 0.218 599.179349 3.973997 1.373 13.05896
0.104 0.218 599.324803 3.974962 2.540 13.05368
0.126 0.218 598.71825 3.970939 -0.946 13.07573
C Node Saluran L A Rumah L Rumah A RTH L RTH A Jalan L Jalan

primer 1-0 P1 29 50320 0 13165.11 3 17780.73 12

Saluran P1
Primer
Jalan Rumah RTH
nd= 0.02 nd= 0.02 nd = 0.2
S= 0.0200 S= 0.0200 S= 0.0200
L= 12.00 Meter L= 0 Meter L= 3.00
to= 5.4029461 Menit to= 0.0 Menit t0 = 1.1992718

Area C Nilai TC Dari Saluran S2


Rumah 50320.00 m2 C Rumah 0.6 26.842 Menit
Taman 13165.11 m2 C RTH 0.2
Jalan 17780.73 m2 C Jalan 0.8 Nilai Tc S1 11.274166
Total 81265.84 m2 C gab 0.578959 Nilai Tc S2 26.841998
0.0812658 km2 Nilai To 5.4

Trial and Error for Channel dimension calculation

Rectangular channel A = b*h V = 1/n R^(2/3) *i^0.5


Channel width = 2*water depth P = b+2h Q = A*V
Concrete material, n = 0.015 R=A/P ISherman = 240 mm/jam
Design channel slope 0.0010 Tc0.6

Hydraulic calculation
h b=2h A P R Sc V (m/s) Q (m3/s) to (min)
1 2 2 4 0.5 0.0010 1.328 2.656 26.8
1.1 2.2 2.42 4.4 0.55 0.0010 1.415 3.425 26.8
1.2 2.4 2.88 4.8 0.6 0.0010 1.500 4.319 26.8
1.3 2.6 3.38 5.2 0.65 0.0010 1.582 5.347 26.8
1.4 2.8 3.92 5.6 0.7 0.0010 1.662 6.515 26.8
1.5 3 4.5 6 0.75 0.0010 1.740 7.831 26.8
1.6 3.2 5.12 6.4 0.8 0.0010 1.817 9.302 26.8
1.7 3.4 5.78 6.8 0.85 0.0010 1.892 10.934 26.8
1.8 3.6 6.48 7.2 0.9 0.0010 1.965 12.734 26.8
1.9 3.8 7.22 7.6 0.95 0.0010 2.037 14.709 26.8
A Total C Rumah C Taman C Jalan Ctotal i

81265.84 0.6 0.2 0.8 0.578959 0.001

Meter
Menit

Nilai TC Dari Saluran S1


11.27417 Menit

TO Saluran Sekunder
26.8419981469

Area = 0.08126584 km
C= 0.58
length of channel = 29.00 m

Hydrology Calculation
tf (min) tc (hour) I (mm/hour) Q Delta tc (min)
0.364 0.453 385.7481121 5.045505 -2.389 27.20593
0.342 0.453 385.9388451 5.047999 -1.623 27.18353
0.322 0.453 386.1028999 5.050145 -0.731 27.16428
0.306 0.452 386.24579 5.052014 0.295 27.14753
0.291 0.452 386.371574 5.053659 1.462 27.13281
0.278 0.452 386.4833114 5.055121 2.776 27.11973
0.266 0.452 386.5833564 5.05643 4.245 27.10804
0.256 0.452 386.6735524 5.057609 5.876 27.0975
0.246 0.451 386.7553652 5.058679 7.676 27.08795
0.237 0.451 386.8299767 5.059655 9.650 27.07924
NAMA h saluran Tinggi
i NODE C L (m) S Jagaan
SALURAN
(m) (m)
0.002151 40-2 T27 623 0.001 0.70 0.20
0.001696 39-35 T26 136.8 0.001 0.50 0.20
0.002541 38-3 T25 471.8 0.001 0.60 0.20
0.00087 37-34 T24 60.9 0.001 0.40 0.20
0.002456 37-4 T23 372.6 0.001 0.50 0.20
0.000375 36-35 T22 125.2 0.001 0.60 0.20
0.001211 36-32 T21 161 0.001 0.50 0.20
0.000494 33-34 T20 60.7 0.001 0.50 0.20
0.001393 33-31 T19 131.4 0.001 0.50 0.20
0.000582 30-29 T18 125.4 0.001 0.60 0.20
0.001171 30-26 T17 171.7 0.001 0.50 0.20
0.000847 27-28 T16 90.9 0.001 0.50 0.20
0.001394 27-25 T15 138.5 0.001 0.50 0.20
0.000867 24-23 T14 Tersier 129.2 0.001 0.50 0.20
0.001418 24-20 T13 169.9 0.001 0.50 0.20
0.000739 21-22 T12 97.4 0.001 0.50 0.20
0.001455 21-19 T11 134.7 0.001 0.50 0.20
0.001113 18-17 T10 128.5 0.001 0.50 0.20
0.001517 18-14 T9 176 0.001 0.50 0.20
0.000528 15-16 T8 96.6 0.001 0.60 0.20
0.001339 15-13 T7 141.9 0.001 0.50 0.20
0.001205 12-11 T6 134.4 0.001 0.50 0.20
0.001781 12-8 T5 160.6 0.001 0.50 0.20
0.000177 9-10 T4 107.4 0.001 0.70 0.20
0.00107 9-7 T3 153.3 0.001 0.50 0.20
0.000833 6-5 T2 90 0.001 0.50 0.20
0.000775 6-3 T1 129 0.001 0.50 0.20
0.023811 35-32 S24 41.2 0.001 0.40 0.20
0.003607 32-29 S22 6.1 0.001 0.60 0.20
0.003556 29-26 S20 36 0.001 0.70 0.20
0.0024 26-23 S18 15 0.001 0.80 0.20
0.003395 23-20 S16 38 0.001 0.80 0.20
0.003364 20-17 S14 11 0.001 1.20 0.20
0.003388 17-14 S12 36.6 0.001 1.20 0.20
0.002976 14-11 S10 16.8 0.001 1.30 0.20
0.003351 11-8 S8 37 0.001 1.20 0.20
0.003333 8-5 S6 10.8 0.001 1.30 0.20
0.003349 5-3 S4 43.9 0.001 1.30 0.20
0.003421 3-1 S2 19 0.001 1.40 0.20
Sekunder
0.003669 34-31 S23 41.7 0.001 0.40 0.20
0.006441 31-28 S21 5.9 0.001 0.40 0.20
0.003093 28-25 S19 37.5 0.001 0.60 0.20
0.00275 25-22 S17 16 0.001 0.60 0.20
0.003543 22-19 S15 35 0.001 0.70 0.20
0.0035 19-16 S13 10 0.001 1.10 0.20
0.003475 16-13 S11 40 0.001 1.10 0.20
0.0024 13-10 S9 10 0.001 1.20 0.20
0.003229 10-7 S7 44.9 0.001 1.20 0.20
0.003333 7-4 S5 13.2 0.001 1.20 0.20
0.0034 4-2 S3 50 0.001 1.30 0.20
0.002212 2-1 S1 10.4 0.001 1.05 0.20
0.002345 1-0 P1 primer 29 0.001 1.10 0.20
0.002603
Tanah Elevasi Tanah Elevasi Muka Elevasi Muka
Total tinggi Elevasi Elevasi Dasar
Air Saluran Air Saluran
Hulu Hilir Saluran Hulu
Hulu Hilir
(m) (m) (m) (m) (m) (m)
1.29 11.501 10.161 11.30 10.678 10.60
1.00 11.416 11.184 11.22 11.0792 10.72
1.15 11.402 10.203 11.20 10.7302 10.60
0.85 11.246 11.193 11.05 10.9851 10.65
1.00 11.246 10.331 11.05 10.6734 10.55
1.15 11.231 11.184 11.03 10.9058 10.43
1.00 11.231 11.036 11.03 10.87 10.53
1.00 11.223 11.193 11.02 10.9623 10.52
1.00 11.223 11.04 11.02 10.8916 10.52
1.15 11.087 11.014 10.89 10.7616 10.29
1.00 11.087 10.886 10.89 10.7153 10.39
1.00 11.079 11.002 10.88 10.7881 10.38
1.00 11.079 10.886 10.88 10.7405 10.38
1.00 10.962 10.85 10.76 10.6328 10.26
1.00 10.962 10.721 10.76 10.5921 10.26
1.00 10.914 10.842 10.71 10.6166 10.21
1.00 10.914 10.718 10.71 10.5793 10.21
1.00 10.827 10.684 10.63 10.4985 10.13
1.00 10.827 10.56 10.63 10.451 10.13
1.15 10.734 10.683 10.53 10.4374 9.93
1.00 10.734 10.544 10.53 10.3921 10.03
1.00 10.672 10.51 10.47 10.3376 9.97
1.00 10.672 10.386 10.47 10.3114 9.97
1.29 10.539 10.52 10.34 10.2316 9.64
1.00 10.539 10.375 10.34 10.1857 9.84
1.00 10.45 10.375 10.25 10.16 9.75
1.00 10.45 10.35 10.25 10.121 9.75
0.85 11.184 10.203 10.98 10.9428 10.58
1.15 11.036 11.014 10.84 10.8299 10.24
1.29 11.014 10.886 10.81 10.778 10.11
1.00 10.886 10.85 10.69 10.671 9.89
1.00 10.85 10.721 10.65 10.612 9.85
1.40 10.721 10.684 10.52 10.51 9.32
1.40 10.684 10.56 10.48 10.4474 9.28
1.50 10.56 10.51 10.36 10.3432 9.06
1.40 10.51 10.386 10.31 10.273 9.11
1.50 10.386 10.35 10.19 10.1752 8.89
1.50 10.35 10.203 10.15 10.1061 8.85
1.60 10.203 10.138 10.00 9.984 8.60
0.60 11.193 11.04 10.99 10.9513 10.59
0.60 11.04 11.002 10.84 10.8341 10.44
0.80 11.002 10.886 10.80 10.7645 10.20
0.80 10.886 10.842 10.69 10.67 10.09
0.90 10.842 10.718 10.64 10.607 9.94
1.30 10.718 10.683 10.52 10.508 9.42
1.30 10.683 10.544 10.48 10.443 9.38
1.40 10.544 10.52 10.34 10.334 9.14
1.40 10.52 10.375 10.32 10.2751 9.12
1.40 10.375 10.331 10.18 10.1618 8.98
1.50 10.331 10.161 10.13 10.081 8.83
1.25 10.161 10.138 9.96 9.9506 8.91
1.30 10.138 10.07 9.94 9.909 8.84
Elevasi Dasar Delta H Delta H Asumsi Tinggi Jumlah
Delta H Bangunan Terjun Bangunan Bangunan
Saluran Hilir Terjun Terjun
(m) Tanah Saluran
9.98 1.34 0.623 0.8 Butuh 0.5 -1
10.58 0.232 0.1368 0.1 Tidak Butuh 0.5 0
10.13 1.199 0.4718 0.8 Butuh 0.5 -1
10.59 0.053 0.0609 -0.1 Tidak Butuh 0.5 0
10.17 0.915 0.3726 0.6 Butuh 0.5 -1
10.31 0.047 0.1252 -0.1 Tidak Butuh 0.5 0
10.37 0.195 0.161 0.1 Tidak Butuh 0.5 0
10.46 0.03 0.0607 -0.1 Tidak Butuh 0.5 0
10.39 0.183 0.1314 0.1 Tidak Butuh 0.5 0
10.16 0.073 0.1254 -0.1 Tidak Butuh 0.5 0
10.22 0.201 0.1717 0.1 Tidak Butuh 0.5 0
10.29 0.077 0.0909 -0.1 Tidak Butuh 0.5 0
10.24 0.193 0.1385 0.1 Tidak Butuh 0.5 0
10.13 0.112 0.1292 -0.1 Tidak Butuh 0.5 0
10.09 0.241 0.1699 0.1 Tidak Butuh 0.5 0
10.12 0.072 0.0974 -0.1 Tidak Butuh 0.5 0
10.08 0.196 0.1347 0.1 Tidak Butuh 0.5 0
10.00 0.143 0.1285 0.1 Tidak Butuh 0.5 0
9.95 0.267 0.176 0.1 Tidak Butuh 0.5 0
9.84 0.051 0.0966 -0.1 Tidak Butuh 0.5 0
9.89 0.19 0.1419 0.1 Tidak Butuh 0.5 0
9.84 0.162 0.1344 0.1 Tidak Butuh 0.5 0
9.81 0.286 0.1606 0.2 Tidak Butuh 0.5 0
9.53 0.019 0.1074 -0.1 Tidak Butuh 0.5 0
9.69 0.164 0.1533 0.1 Tidak Butuh 0.5 0
9.66 0.075 0.09 -0.1 Tidak Butuh 0.5 0
9.62 0.1 0.129 -0.1 Tidak Butuh 0.5 0
10.54 0.981 0.0412 1 Butuh 0.5 1
10.23 0.022 0.0061 0.1 Tidak Butuh 0.5 0
10.08 0.128 0.036 0.1 Tidak Butuh 0.5 0
9.87 0.036 0.015 0.1 Tidak Butuh 0.5 0
9.81 0.129 0.038 0.1 Tidak Butuh 0.5 0
9.31 0.037 0.011 0.1 Tidak Butuh 0.5 0
9.25 0.124 0.0366 0.1 Tidak Butuh 0.5 0
9.04 0.05 0.0168 0.1 Tidak Butuh 0.5 0
9.07 0.124 0.037 0.1 Tidak Butuh 0.5 0
8.88 0.036 0.0108 0.1 Tidak Butuh 0.5 0
8.81 0.147 0.0439 0.2 Tidak Butuh 0.5 0
8.58 0.065 0.019 0.1 Tidak Butuh 0.5 0
10.55 0.153 0.0417 0.2 Tidak Butuh 0.5 0
10.43 0.038 0.0059 0.1 Tidak Butuh 0.5 0
10.16 0.116 0.0375 0.1 Tidak Butuh 0.5 0
10.07 0.044 0.016 0.1 Tidak Butuh 0.5 0
9.91 0.124 0.035 0.1 Tidak Butuh 0.5 0
9.41 0.035 0.01 0.1 Tidak Butuh 0.5 0
9.34 0.139 0.04 0.1 Tidak Butuh 0.5 0
9.13 0.024 0.01 0.1 Tidak Butuh 0.5 0
9.08 0.145 0.0449 0.2 Tidak Butuh 0.5 0
8.96 0.044 0.0132 0.1 Tidak Butuh 0.5 0
8.78 0.17 0.05 0.2 Tidak Butuh 0.5 0
8.90 0.023 0.0104 0.1 Tidak Butuh 0.5 0
8.81 0.068 0.029 0.1 Tidak Butuh 0.5 0
NODE Elevasi

0 10.07
1 10.138
2 10.161
3 10.203
4 10.331
5 10.35
6 10.45
7 10.375
8 10.386
9 10.539
10 10.52
11 10.51
12 10.672
13 10.544
14 10.56
15 10.734
16 10.683
17 10.684
18 10.827
19 10.718
20 10.721
21 10.914
22 10.842
23 10.85
24 10.962
25 10.886
26 10.886
27 11.079
28 11.002
29 11.014
30 11.087
31 11.04
32 11.036
33 11.223
34 11.193
35 11.184
36 11.231
37 11.246
38 11.402
39 11.416
40 11.501
OUTLET
El. Dasar Saluran Hilir = 8.8
h= 1.1
el. Muka Air = 9.9
W= 0.2
El. Tanah Hilir = 10.1

DANAU
El. Muka Tanah 10.1
Kedalaman Air = 1.0
El. Muka air = 9.1

KONTROL BACKWATER
9.909 > 9.109 TIDAK ADA BACKWATER
C Node Saluran L Aatap Ataman Ajalan Atotal Catap Ctaman

40-2 T27 623 3406.26 7476 10882.26 0.6 0.2


39-35 T26 136.8 2422 213.3333 820.8 3456.133 0.6 0.2
38-3 T25 471.8 1392 7038.803 2830.8 11261.6 0.6 0.2
37-34 T24 60.9 1053.57 182.7 1236.27 0.6 0.2
37-4 T23 372.6 2640 1453.14 1117.8 5210.94 0.6 0.2
36-35 T22 125.2 2232 0 375.6 2607.6 0.6 0.2
36-32 T21 161 2232 0 483 2715 0.6 0.2
33-34 T20 60.7 1224 0 182.1 1406.1 0.6 0.2
33-31 T19 131.4 1380 0 394.2 1774.2 0.6 0.2
30-29 T18 125.4 2106 0 376.2 2482.2 0.6 0.2
30-26 T17 171.7 2172 0 515.1 2687.1 0.6 0.2
27-28 T16 90.9 1660 0 272.7 1932.7 0.6 0.2
27-25 T15 138.5 1696 0 415.5 2111.5 0.6 0.2
Tersier 24-23 T14 129.2 2084 0 387.6 2471.6 0.6 0.2
24-20 T13 169.9 2440 0 509.7 2949.7 0.6 0.2
21-22 T12 97.4 1580 0 292.2 1872.2 0.6 0.2
21-19 T11 134.7 1800 0 404.1 2204.1 0.6 0.2
18-17 T10 128.5 2480 0 385.5 2865.5 0.6 0.2
18-14 T9 176 2480 0 528 3008 0.6 0.2
15-16 T8 96.6 1880 0 289.8 2169.8 0.6 0.2
15-13 T7 141.9 1880 0 425.7 2305.7 0.6 0.2
12-11 T6 134.4 2640 0 403.2 3043.2 0.6 0.2
12-8 T5 160.6 2340 0 481.8 2821.8 0.6 0.2
9-10 T4 107.4 2240 0 322.2 2562.2 0.6 0.2
9-7 T3 153.3 2240 0 459.9 2699.9 0.6 0.2
6-5 T2 90 1620 0 270 1890 0.6 0.2
6-3 T1 129 1460 0 387 1847 0.6 0.2
35-32 S24 41.2 4654 213.3333 1320 6187.333 0.6 0.2
32-29 S22 6.1 6886 213.3333 1821.3 8920.633 0.6 0.2
29-26 S20 36 8992 213.3333 2412.3 11617.63 0.6 0.2
26-23 S18 15 11164 213.3333 2972.4 14349.73 0.6 0.2
23-20 S16 38 13248 213.3333 3474 16935.33 0.6 0.2
20-17 S14 11 15688 213.3333 4016.7 19918.03 0.6 0.2
17-14 S12 36.6 18168 213.3333 4512 22893.33 0.6 0.2
14-11 S10 16.8 20648 213.3333 5090.4 25951.73 0.6 0.2
11-8 S8 37 23288 213.3333 324.3333 23825.67 0.6 0.2
8-5 S6 10.8 25628 213.3333 838.5333 26679.87 0.6 0.2
5-3 S4 43.9 27248 213.3333 1240.233 28701.57 0.6 0.2
3-1 S2 19 30100 7252.137 4515.033 41867.17 0.6 0.2
Sekunder
34-31 S23 41.7 1224 1053.57 489.9 2767.47 0.6 0.2
31-28 S21 5.9 2604 1053.57 901.8 4559.37 0.6 0.2
28-25 S19 37.5 4264 1053.57 1287 6604.57 0.6 0.2
25-22 S17 16 5960 1053.57 1750.5 8764.07 0.6 0.2
22-19 S15 35 7540 1053.57 2147.7 10741.27 0.6 0.2
19-16 S13 10 9340 1053.57 2581.8 12975.37 0.6 0.2
16-13 S11 40 11220 1053.57 2991.6 15265.17 0.6 0.2
13-10 S9 10 13100 1053.57 3447.3 17600.87 0.6 0.2
10-7 S7 44.9 15340 1053.57 3904.2 20297.77 0.6 0.2
7-4 S5 13.2 17580 1053.57 4403.7 23037.27 0.6 0.2
4-2 S3 50 20220 2506.71 5671.5 28398.21 0.6 0.2
2-1 S1 10.4 20220 5912.97 13178.7 39311.67 0.6 0.2
primer 1-0 P1 29 50320 13165.11 17780.73 81265.84 0.6 0.2
Elevasi Elevasi
Tinggi h Tanah Tanah
Cjalan Ctotal i NODE L (m) S Jagaan w saluran Hulu Hilir
(m) (m) (m) (m)
0.8 0.612194 0.002151 40-2 623 0.003 0.2 0.2
0.8 0.622808 0.001696 39-35 136.8 0.003 0.2 0.2
0.8 0.400263 0.002541 38-3 471.8 0.003 0.2 0.2
0.8 0.28867 0.00087 37-34 60.9 0.003 0.2 0.2
0.8 0.531357 0.002456 37-4 372.6 0.003 0.2 0.2
0.8 0.628808 0.000375 36-35 125.2 0.003 0.2 0.2
0.8 0.63558 0.001211 36-32 161 0.003 0.2 0.2
0.8 0.625901 0.000494 33-34 60.7 0.003 0.2 0.2
0.8 0.644437 0.001393 33-31 131.4 0.003 0.2 0.2
0.8 0.630312 0.000582 30-29 125.4 0.003 0.2 0.2
0.8 0.638339 0.001171 30-26 171.7 0.003 0.2 0.2
0.8 0.62822 0.000847 27-28 90.9 0.003 0.2 0.2
0.8 0.639356 0.001394 27-25 138.5 0.003 0.2 0.2
0.8 0.631364 0.000867 24-23 129.2 0.003 0.2 0.2
0.8 0.634559 0.001418 24-20 169.9 0.003 0.2 0.2
0.8 0.631215 0.000739 21-22 97.4 0.003 0.2 0.2
0.8 0.636668 0.001455 21-19 134.7 0.003 0.2 0.2
0.8 0.626906 0.001113 18-17 128.5 0.003 0.2 0.2
0.8 0.635106 0.001517 18-14 176 0.003 0.2 0.2
0.8 0.626712 0.000528 15-16 96.6 0.003 0.2 0.2
0.8 0.636926 0.001339 15-13 141.9 0.003 0.2 0.2
0.8 0.626498 0.001205 12-11 134.4 0.003 0.2 0.2
0.8 0.634148 0.001781 12-8 160.6 0.003 0.2 0.2
0.8 0.62515 0.000177 9-10 107.4 0.003 0.2 0.2
0.8 0.634068 0.00107 9-7 153.3 0.003 0.2 0.2
0.8 0.628571 0.000833 6-5 90 0.003 0.2 0.2
0.8 0.641906 0.000775 6-3 129 0.003 0.2 0.2
0.8 0.628876 0.023811 35-32 41.2 0.003 0.2 0.2
0.8 0.631268 0.003607 32-29 6.1 0.003 0.2 0.2
0.8 0.634183 0.003556 29-26 36 0.003 0.2 0.2
0.8 0.635481 0.0024 26-23 15 0.003 0.2 0.2
0.8 0.635988 0.003395 23-20 38 0.003 0.2 0.2
0.8 0.636048 0.003364 20-17 11 0.003 0.2 0.2
0.8 0.63569 0.003388 17-14 36.6 0.003 0.2 0.2
0.8 0.635942 0.002976 14-11 16.8 0.003 0.2 0.2
0.8 0.599141 0.003351 11-8 37 0.003 0.2 0.2
0.8 0.603087 0.003333 8-5 10.8 0.003 0.2 0.2
0.8 0.605669 0.003349 5-3 43.9 0.003 0.2 0.2
0.8 0.552281 0.003421 3-1 19 0.003 0.2 0.2
0.8 0.483125 0.003669 34-31 41.7 0.003 0.2 0.2
0.8 0.547127 0.006441 31-28 5.9 0.003 0.2 0.2
0.8 0.575164 0.003093 28-25 37.5 0.003 0.2 0.2
0.8 0.591861 0.00275 25-22 16 0.003 0.2 0.2
0.8 0.600755 0.003543 22-19 35 0.003 0.2 0.2
0.8 0.607316 0.0035 19-16 10 0.003 0.2 0.2
0.8 0.611588 0.003475 16-13 40 0.003 0.2 0.2
0.8 0.615228 0.0024 13-10 10 0.003 0.2 0.2
0.8 0.617707 0.003229 10-7 44.9 0.003 0.2 0.2
0.8 0.619938 0.003333 7-4 13.2 0.003 0.2 0.2
0.8 0.604635 0.0034 4-2 50 0.003 0.2 0.2
0.8 0.606882 0.002212 2-1 10.4 0.003 0.2 0.2
0.8 0.578959 0.002345 1-0 29 0.003 0.2 0.2
Elevasi Elevasi Tinggi Tipe n
Saluran Saluran Delta H Delta H Banguna Banguna Banguna Banguna
n Terjun n Terjun n Terjun n Terjun
Hulu Hilir
(m) (m) Tanah Saluran
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

You might also like