S.NO.

DATE OIL CONSUMPTION UNIT OIL CONSUMED (KL)


1 1/18/2015 BOILER COLD START UP AND UNIT STABALISATION 1 164.8
OIL CONSUMED DURING LOW LOAD AND FLAME STABALISATION
DURING ID FAN TRIPPING
2 1/19/2015 1 16.78
OIL CONSUMED DURING LOW LOAD AND FLAME STABALISATION
3 1/20/2015 1 3.53
OIL CONSUMED FOR LOW LOAD OPERATION DURING
CURTAILMENT
4 1/21/2015 1 12.5
5 1/21/2015 OIL CONSUMED FOR UNIT-4 ACTIVITY 4 20
6 1/21/2015 RECEIPT ERROR IN TANK-3 2.82
7 1/22/2015 OIL CONSUMED FOR UNIT-4 ACTIVITY 4 20.5
OIL CONSUMED FOR LOW LOAD OPERATION DURING
CURTAILMENT
8 1/22/2015 1 6.24
9 1/23/2015 OIL CONSUMED FOR UNIT-4 ACTIVITY 4 41.68
10 1/24/2015 OIL CONSUMED FOR UNIT-4 ACTIVITY 4 6.4
11 1/29/2015 OIL CONSUMED FOR UNIT-1 1 0.09
14 2/1/2015 BOILER COLD START UP 2 119.925
15 2/2/2015 OIL CONSUMED FOR UNIT-2 LIGHT UP 2 40.446
16 2/3/2015 OIL CONSUMED FOR UNIT-2 LIGHT UP 2 40.042
17 2/4/2015 OIL CONSUMED FOR UNIT-1 HOT START UP 1 15.141
18 2/5/2015 OIL CONSUMED FOR UNIT-1 HOT START UP 1 15.297
19 2/9/2015 OIL CONSUMPTION FOR UNIT-4 STEAM BLOWING 4 203.113
20 2/10/2015 OIL CONSUMPTION FOR UNIT-4 STEAM BLOWING 4 198.2
21 2/11/2015 OIL CONSUMPTION FOR UNIT-4 STEAM BLOWING 4 192.6
22 2/12/2015 OIL CONSUMPTION FOR UNIT-4 STEAM BLOWING 4 190.7
23 2/13/2015 TURBINR TRIM BALANCING WORK OF UNIT-2 2 95.8
24 2/14/2015 OIL CONSUMED FOR UNIT-2 HOT START UP 2 30.2
25 2/18/2015 OIL CONSUMPTION FOR UNIT-4 STEAM BLOWING 4 208.8
26 2/19/2015 OIL CONSUMPTION FOR UNIT-4 STEAM BLOWING 4 199.7
27 2/19/2015 OIL CONSUMED FOR UNIT-2 START UP 2 15
28 2/20/2015 OIL CONSUMPTION FOR UNIT-4 STEAM BLOWING 4 151.1
29 2/23/2015 OIL CONSUMPTION FOR UNIT-4 STEAM BLOWING STAGE-2 4 143.9
30 3/23/2015 OIL CONSUMPTION FOR UNIT-4 STEAM DUMPING 4 201.62
31 OIL CONSUMPTION FOR UNIT-4 STEAM DUMPING
397.96
32 3/24/2015 OIL CONSUMED FOR UNIT-1 COLD START UP 4&1
33 3/25/2015 OIL CONSUMPTION FOR UNIT-4 STEAM DUMPING 4 225.43
OIL CONSUMPTION FOR UNIT-4 STEAM DUMPING &
SYNCHRONIZATION
34 3/26/2015 4 140.76
35 3/27/2015 OIL CONSUMPTION FOR UNIT-4 SYNCHRONIZATION 4 152.4
36 3/28/2015 OIL CONSUMED FOR UNIT-4 ACTIVITY 4 143.24
37 3/29/2015 OIL CONSUMED FOR UNIT-4 ACTIVITY 4 93.78
38 3/30/2015 OIL CONSUMED FOR UNIT-4 SAFETY VALVE FLOATING 4 21.64
39 4/3/2015 OIL CON. ID FAN-A CHANNEL-2 PROBLEM ATTENDING WORK 1 2.47
40 4/5/2015 OIL CONSUMED FOR UNIT HOT START UP 1 14.84
41 4/25/2015 OIL CONSUMED DUE TO LOW SCHEDULE 1 6
42 4/30/2015 OIL CONSUMED DUE TO LOW SCHEDULE i.e. 290 MW 1 2.4
43 5/5/2015 OIL CONSUMED FOR UNIT-2 LIGHT UP 2 105
44 5/8/2015 OIL CONSUMED FOR UNIT HOT START UP 2 19
45 5/11/2015 OIL CONSUMED FOR UNIT HOT START UP 2 12.8
46 5/13/2015 OIL CONSUMED FOR UNIT-1 LIGHT UP 1 125.6
47 5/13/2015 OIL CONSUMED FOR UNIT-2 SHUT DOWN 2 20.2
48 5/17/2015 OIL SUPPORT DURING GRID FREQUENCY MORE THAN 50.1 HTZ 1 4
49 6/6/2015 OIL CONSUMED FOR UNIT-2 LIGHT UP 2 113
50 6/13/2015 OIL CONSUMED DURING FD FAN-A TRIPPING 2 1.41
51 6/14/2015 OIL CONSUMED FOR FLAME STABILITY 2 1.77
52 6/14/2015 OIL GUN TAKEN DURING LOW BUNKER LEVEL 2 1.41
53 6/28/2015 OIL GUN TAKEN DURING MILL-C TRIPPING 2 3.89
54 7/2/2015 OIL CONSUMED FOR UNIT-1 LIGHT UP 1 100
55 7/2/2015 OIL CONSUMED FOR UNIT HOT START UP 2 30
56 7/2/2015 PA FAN-A SERVO MOTOR PROBLEM 2 31.61
57 7/3/2015 OIL CONSUMED DUE TO CURTAILMENT 1 33.91
58 7/8/2015 OIL CONSUMED FOR ID FAN-A CHANNEL-1 RESTORATION 1 2.67
59 7/9/2015 OIL GUN TAKEN FOR MAINTAINING SCHEDULE 1 4.42
60 7/10/2015 OIL CONSUMED FOR UNIT -2 START UP 2 61
61 7/10/2015 UNIT-4 TDBFP-B STEAM ROLLING 4 27.62
62 7/23/2015 OIL CONSUMED DUE TO LOW SCHEDULE 1 20.7
DUE TO LOW SCHEDULE ANDOIL LEAKAGE FROM PA FAN-A SERVO
63 7/28/2015 MECHANISM 2 3.2
64 7/29/2015 OIL CONSUMED DUE TO LOW SCHEDULE 2 1.2
65 7/31/2015 OIL CONSUMED DUE TO LOW SCHEDULE 2 7.1
66 8/3/2015 OIL CONSUMED FOR UNIT HOT START UP 1 8.65
67 8/8/2015 OIL CONSUMED FOR MAINTAINING SCHEDULE 1 4.06
68 8/20/2015 OIL CONSUMED FOR UNIT HOT START UP 1 31.79
69 8/21/2015 OIL CONSUMED FOR UNIT HOT START UP 1 48.22
70 9/8/2015 OIL CONSUMED FOR UNIT COLD START UP 2 38.5
71 9/9/2015 OIL CONSUMED FOR UNIT COLD START UP 2 120.42
72 9/13/2015 OIL CONSUMED FOR UNIT COLD START UP STEAM DUMPING 3 66.38
73 9/14/2015 OIL CONSUMED FOR UNIT COLD START UP STEAM DUMPING 3 120.63
74 9/15/2015 OIL CONSUMED FOR UNIT HOT START UP 3
109.84
75 9/15/2015 OIL CONSUMED FOR UNIT HOT START UP 3
76 9/16/2015 UNIT TRIPPED ON GT-Y PHASE PRV OPERATED HOT START UP 3 34.21
77 9/17/2015 3 20.84
78 9/23/2015 OIL CONSUMED FOR UNIT COLD START UP 1 85.06
79 10/4/2015 OIL CONSUMED FOR UNIT COLD START UP 2 54.92
80 10/5/2015 OIL CONSUMED FOR UNIT HOT START UP 2
81.6
81 10/6/2015 OIL CONSUMED FOR UNIT COLD START UP 3
82 10/7/2015 OIL CONSUMED FOR UNIT-3 DUE TO ID FAN-A TRIPPING 3 8.83
83 10/10/2015 OIL CONSUMED FOR UNIT-3 SHUT DOWN 3 2.44
84 10/16/2015 OIL CONSUMED FOR ID FAN-B TRIPPING 1 2.12
85 11/12/2015 OIL CONSUMED DUE TO BUNKER-B LEVEL LOW 1 1.06
86 11/24/2015 OIL CONSUMED FOR UNIT-1 START UP 60
1
87 11/25/2015 60.23
88 12/2/2015 OIL CONSUMED DUE TO LOW SCHEDULE 1 11.66
89 12/3/2015 OIL CONSUMED FOR UNIT SHUT DOWN 3 1.59
90 12/6/2015 84.71
OIL CONSUMED FOR UNIT-2 START UP 2
91 12/7/2015 62.35
92 12/11/2015 OIL CONSUMED FOR UNIT HOT START UP 2 23.14
93 12/20/2015 OIL CONSUMED FOR UNIT-2 IDFAN-A CHANNEL PROBLEM 2 3.89
94 12/24/2015 OIL CONSUMED FOR UNIT HOT START UP 2 18.37
95 1/2/2016 OIL CONSUMED FOR FLAME STABILITY 2 29.32
96 1/3/2016 OIL CONSUMED FOR FLAME STABILITY 2 9.54
97 1/5/2016 OIL CONSUMED FOR FLAME STABILITY 2 7.06
98 1/6/2016 OIL CONSUMED FOR FLAME STABILITY 2 3.18
99 1/7/2016 OIL CONSUMED FOR FLAME STABILITY 2 4.59
100
101
102
OIL CONSUMED (KL) START UP
164.8 COLD

16.78

3.53

12.5
20
2.82
20.5

6.24
41.68
6.4
0.09
119.925
40.446 COLD
40.042
15.141 HOT
15.297 HOT
203.113 STEAM BLOWING
198.2 STEAM BLOWING
192.6 STEAM BLOWING
190.7 STEAM BLOWING
95.8 TRIM BALANCING
30.2 HOT
208.8 STEAM BLOWING
199.7 STEAM BLOWING
15 HOT
151.1 STEAM BLOWING
143.9 STEAM BLOWING
201.62 STEAM DUMPING
STEAM DUMPING
397.96
COLD
225.43 STEAM DUMPING

140.76 COLD
152.4 COLD
143.24
93.78
21.64 SV FLOATING
2.47
14.84 HOT
6
2.4
105 COLD
19 HOT
12.8 HOT
125.6 COLD
20.2
4
113 COLD
1.41
1.77
1.41
3.89
100 COLD
30 HOT
31.61
33.91
2.67
4.42
61
27.62
20.7

3.2
1.2
7.1
8.65 HOT
4.06
31.79 HOT
48.22 HOT
38.5 COLD
120.42 COLD
66.38 COLD
120.63 COLD
109.84 HOT

34.21 HOT
20.84
85.06 COLD
54.92 COLD
HOT
81.6
COLD
8.83
2.44
2.12
1.06
60
COLD
60.23
11.66
1.59
84.71
COLD
62.35
23.14 HOT
3.89
18.37 HOT
29.32
9.54
7.06
3.18
4.59
TRIPPED OR
DESYNCHRONIZATION SYNCHRONIZATION DURATION
S.NO. TRIP DATE
TIME(HRS) TIME (HRS) (HRS)

1 2/4/2015 19:31 21:00 1:29


2 2/5/2015 10:15 11:58 1:43
3 2/14/2015 17:03
4 2/14/2015 19:25 20:32 1:07
5 2/14/2015 21:01 21:38 0:37
6 2/19/2015 23:34 23:34
7 3/24/2015 9:31
8 3/26/2015
9 4/5/2015 16:02 18:20 2:18
10 5/5/2015 21:40
11 5/5/2015 18:27

12 5/11/2015 2:06 3:22 1:16


13 5/13/2015 20:25
14 5/13/2015 0:18
15 6/6/2015 2:53
16 6/6/2015 7:58
17 7/2/2015 18:46
18 7/2/2015 4:53 6:29 1:36
19 7/5/2015 6:00
20 7/10/2015 4:41
21 7/31/2015 23:58
22 8/3/2015 0:07 1:35 1:28

23 8/20/2015 19:04 23:11 4:07


24 8/21/2015 3:58 8:05 4:07
25 9/9/2015 6:08
26 9/14/2015 1:08

27 9/14/2015
28 9/15/2015 7:17 9:56 2:39
29 9/15/2015 21:03 22:37 1:34
30 9/16/2015 0:08
31 9/16/2015 13:01 15:41 2:40
32 9/19/2015 0:00
33 9/23/2015 9:31
34 9/23/2015
35 10/5/2015 0:59
36 10/5/2015 17:16
37 10/6/2015 2:57
38 10/10/2015
39 11/16/2015 19:53 0:00
40 11/24/2015 3:10
41 12/3/2015 19:56
42 12/6/2015 3:12
43 12/11/2015
44 12/24/2015 15:33 18:37
45
46
47
48
49
50
51
REASON OF TRIPPING OR DESYNCHRONIZATION UNIT

TURBINE GOT TRIPPED DUE TO GENERATOR MAIN BUSHING LIQUID 1


LEVEL HIGH
TURBINE PROTECTION
GOT MALFUNCTIONED
TRIPPED DUE TO GENERATOR MAIN BUSHING LIQUID 1
LEVEL HIGH PROTECTION MALFUNCTIONED
DUE TO LOW SCHEDULE & ASH EVACUTION PROBLEM 1
DUE TO DRUM LEVEL TRANSMITTER MALFUNCTIONING 2
DUE TO TURBINE TRIPPING 2
UNIT -2 SYNCHRONISED 2
UNIT SYNCHRONIZED AFTER SHUT DOWN 1
UNIT SYNCHRONIZATION 4
UNIT GOT TRIPPED ON GENERATOR PROTECTION 1
UNIT SHUT DOWN TAKEN 1
UNIT SYNCHRONIZED AFTER SHUT DOWN 2
BOILER MFT OCCURRED ON FLAME FAILURE DUE TO TRIPPING OF
BASE MILL-B 2
UNIT SYNCHRONIZED AFTER SHUT DOWN 1
UNIT TAKEN IN TO SHUT DOWN DUE TO COAL FEEDING PROBLEM 2
UNIT GOT TRIPPED ON FLAME FAILURE 1
UNIT SYNCHRONIZED AFTER SHUT DOWN 2
UNIT SYNCHRONIZED AFTER SHUT DOWN 1
UNIT GOT TRIPPED DUE TO PA FAN-A ACTUATOR PROBLEM 1
UNIT SHUT DOWN TAKEN DUE TO LOW LOAD 2
UNIT SYNCHRONIZED AFTER SHUT DOWN 2
UNIT SHUT DOWN TAKEN DUE TO LOW LOAD 2
GENERATOR TRIPPED ON SPR MALFUNCTIONING 1
GENERATOR TRIPPED ON AVR POWER SUPPLY MODULE CARD FAILURE
1
GENERATOR TRIPPED ON AVR POWER SUPPLY MODULE CARD FAILURE 1
UNIT SYNCHRONIZED AFTER SHUT DOWN 1
UNIT SYNCHRONIZED 3
UNIT GOT TRIPPED DUE TO BOTH ID FAN OFF ON ELECTRICAL
PROBLEM 1

UNIT GOT TRIPPED ON FIRE PROTECTION 3


UNIT GOT TRIPPED DUE TO TURBINE LUBE OIL HEADER PRES. LOW 3
UNIT MANUALLY TRIPPED DUE TO PROBLEM IN SV-7 1
UNIT GOT TRIPPED ON GT-Y PHASE PRV OPERATED 3
UNIT -3 SHUT DOWN TAKEN 3
UNIT SYNCHRONIZED AFTER SHUTDOWN 1
SHUT DOWN TAKEN FOR TURBINE TRIM BALANCING WORK BY BHEL 2
UNIT SYNCHRONIZED AFTER SHUT DOWN 2
UNIT GOT TRIPPED ON GENERATOR PROTECTION 2
UNIT SYNCHRONIZED AFTER SHUT DOWN 3
UNIT-3 SHUT DOWN TAKEN.FD FAN-3B BLADE PITCH IS IN LOCKED
CONDITION 3

UNIT SHUT DOWN TAKEN DUE TO BOILER TUBE LEAKEGE 1


UNIT SYNCHRONIZED 1
UNIT SHUT DOWN TAKEN DUE TO CHP PROBLEM 1
UNIT SYNCHRONIZED AFTER SHUT DOWN 2
UNIT HOT START UP 2
UNIT GOT TRIPPED DUE TO FLASH OVER IN LV DUCT OF UT-B 2