You are on page 1of 10

Project Bank and Office Building (Raya)

FCU- Code FCU-01

Design Air Flow (cfm) 200

Total Air Flow (CFM) /


200 >>>>>> 94.39 L/S
Fan

Critical Critical Supply


Duct Volume External Safety
Critical Duct Length Duct Friction / Duct Airoutlet
Fittings Damper SP +25%
(mt.) Length 100 ft Friction Outlet
(in.W.G.) (in.W.G.) (in.W.G.) (in.W.G.)
(ft) (in.W.G.) (in.W.G.)
12 39.36 0.087 0.034 0.010 0.0052 0.036 0.086 0.107

External Static
0.107 >>>>>> 26.83 Pa
Pressure (in.W.G.)
Project Bank and Office Building (Raya)

FCU- Code FCU-01

Design Air Flow (cfm) 200

Total Air Flow (CFM) /


200 >>>>>> 94.39 L/S
Fan

Critical Critical Supply


Duct Volume
Critical Duct Length Duct Friction / Duct Airoutlet
Fittings Damper
(mt.) Length 100 ft Friction Outlet
(in.W.G.) (in.W.G.)
(ft) (in.W.G.) (in.W.G.)
3 9.84 0.105 0.010 0.000 0 0.042

External Static
0.100 >>>>>> 25.10 Pa
Pressure (in.W.G.)
g (Raya)

Return
External Safety
Airoutlet
SP +25%
Outlet
(in.W.G.) (in.W.G.)
(in.W.G.)
0.028 0.080 0.100
Project Bank and Office Building (Raya)

FCU- Code FCU-02

Design Air Flow (cfm) 300

Total Air Flow (CFM) /


300 >>>>>> 141.59 L/S
Fan

Critical Critical Supply


Duct Volume
Critical Duct Length Duct Friction / Duct Airoutlet
Fittings Damper
(mt.) Length 100 ft Friction Outlet
(in.W.G.) (in.W.G.)
(ft) (in.W.G.) (in.W.G.)
5.5 18.04 0.08 0.014 0.009 0.1 0.08

External Static
0.254 >>>>>> 63.57 Pa
Pressure (in.W.G.)
g (Raya)

External Safety
SP +25%
(in.W.G.) (in.W.G.)

0.203 0.254
Project " Engineers House "

FCU- Code FCU-01

Design Air Flow (cfm) 3800

Total Air Flow (CFM) /


3800 >>>>>> 1793.47 L/S
Fan

Critical Critical Supply


Duct Volume
Critical Duct Length Duct Friction / Duct Airoutlet
Fittings Damper
(mt.) Length 100 ft Friction Outlet
(in.W.G.) (in.W.G.)
(ft) (in.W.G.) (in.W.G.)
30 98.40 0.1 0.098 0.010 0.05 0.06

External Static
0.240 >>>>>> 60.06 Pa
Pressure (in.W.G.)
e"

External Safety
SP +10%
(in.W.G.) (in.W.G.)

0.218 0.240
Project Bank and Office Building (Raya)

FCU- Code FCU-04

Design Air Flow (cfm) 600

Total Air Flow (CFM) /


600 >>>>>> 283.18 L/S
Fan

Critical Critical Supply


Duct Volume External Safety
Critical Duct Length Duct Friction / Duct Airoutlet
Fittings Damper SP +25%
(mt.) Length 100 ft Friction Outlet
(in.W.G.) (in.W.G.) (in.W.G.) (in.W.G.)
(ft) (in.W.G.) (in.W.G.)
1 3.28 0.089 0.003 0.000 0.1 0.022 0.125 0.156

External Static
0.156 >>>>>> 39.04 Pa
Pressure (in.W.G.)
Project Bank and Office Building (Raya)

FCU- Code FCU-05

Design Air Flow (cfm) 800

Total Air Flow (CFM) /


800 >>>>>> 377.57 L/S
Fan

Critical Critical Supply


Duct Volume External Safety
Critical Duct Length Duct Friction / Duct Airoutlet
Fittings Damper SP +25%
(mt.) Length 100 ft Friction Outlet
(in.W.G.) (in.W.G.) (in.W.G.) (in.W.G.)
(ft) (in.W.G.) (in.W.G.)
1 3.28 0.1 0.003 0.000 0.1 0.022 0.125 0.157

External Static
0.157 >>>>>> 39.15 Pa
Pressure (in.W.G.)
Project Bank and Office Building (Raya)

FCU- Code FCU-06

Design Air Flow (cfm) 1000

Total Air Flow (CFM) /


1000 >>>>>> 471.97 L/S
Fan

Critical Critical Supply


Duct Volume External Safety
Critical Duct Length Duct Friction / Duct Airoutlet
Fittings Damper SP +25%
(mt.) Length 100 ft Friction Outlet
(in.W.G.) (in.W.G.) (in.W.G.) (in.W.G.)
(ft) (in.W.G.) (in.W.G.)
11 36.08 0.065 0.023 0.095 0.1 0.035 0.253 0.316

External Static
0.316 >>>>>> 79.05 Pa
Pressure (in.W.G.)

You might also like