How to Show the Critical Path in P6


DECEMBER 9, 2013 BY MICHAEL LEPAGE 34 COMMENTS   Share on Facebook     Share on Twitter  

Can’t find your Critical Path in Primavera


P6? Don’t worry, it might be hiding. Here
are 4 easy ways you can laser-in on your
project’s Critical Path in P6.

4 Easy Ways to Show


the Critical Path in P6
1. Check the Gantt Chart
By default, the P6 Gantt chart will show
your project’s Critical Path activities in
bright red. This makes it easy to have a
quick glance at the Gantt Chart et voila!, your Critical Path stands-out like a safety
vest.

https://www.planacademy.com/show-critical-path-in-p6/ 1/5
12/29/2017 How to Show the Critical Path in P6

Hey! It’s not working! I don’t see any red Critical Path
activities on my project. What gives?
Glad you asked.    Maybe your Gantt chart looks like this instead.

Primavera P6, by default, uses Total Float to decide if an Activity is Critical or not.
Activities with a Total Float value of 0 (or less) usually show red on the Gantt. If
you have no red Activities, you may have a Must Finish By date set on your
project. If your project is finishing earlier than the Must Finish By deadline, then
you may not have any activities with 0 or less Float values which means there are
no Critical activities.

If that’s the case, tell P6 to show Critical Path by the Longest Path rather than by
Total Float.

1. Press F9, and then click the Optionsbutton.


2. Find the setting “Define Critical Activities as”. Choose Longest Path.
3. Reschedule your Project.
4. Notice the Gantt chart now. You should see a red Critical Path now.

You can always read more about the Critical Path vs Longest Path.
https://www.planacademy.com/show-critical-path-in-p6/ 2/5
12/29/2017 How to Show the Critical Path in P6

2. Use the Critical Path / Longest Path Columns


Edit your columns and go digging for one called “Critcal” and another
called “Longest Path”. Add one or both of these nifty columns to your Activity
Layout to show clearly which activities are Critical.

3. Turn On a Filter
Using a Filter can also be a quick and effective way to manifest your Critical Path.
Click the Filters button to turn on the Critical Path filter. This will show only the
Critical Activities. There’s also a filter for the Longest Path.

https://www.planacademy.com/show-critical-path-in-p6/ 3/5
12/29/2017 How to Show the Critical Path in P6

4. Check the Schedule Log


Lastly, you can always check the P6 Schedule Log.  The Schedule Log is a log file
that gets updated every time your project is scheduled. Press F9 and make sure
the box labeled “Log to File” is checked on. Then, click the “View Log”button to
open the Schedule Log.

Once you have the log file open in Notepad, you’ll have to scroll down to the
section labeled “Exceptions”. But you should see in the log a list of your project’s
Critical Activities.

What Do You Think?

https://www.planacademy.com/show-critical-path-in-p6/ 4/5
12/29/2017 How to Show the Critical Path in P6

Which method works best for you in Primavera P6? Do you have your own
method for finding your project’s Critical Path? Drop us a line in the comments.