SULTANTS
|J-7, PARSA.
project. :Simra Coleg Building First Floor Constrction
Location :Simra College Simra Bara
fan [Description of work fouantty [unit_[Rete Tamount __[Remari
{Site clearance including cutting of bushes and trees |
|before staring of Werks making sit in good
\condion after finishing the Works as per the |
lnstucton of ste ncharge
4
Aljobs +10000.00| _ 1000.09]
esmcom sat inal siareate et es per a pe
east epusteaions and nctuctone of ste |
incharge |
2 “ 80.74|oumn_ 12144.00| _ 980565.23|
j
|
| eames TTS for ROC workin
|
Form works including supplying, making, centering
ind shuttering in footing, column, beam, slab,
intel staircase etc. as per 28 per drawing,
|_| specificatioris end instructions of site incharge all
complete.
31 882.00|sqm 484.59] 320794.89)
‘Supalying, cutting, Bending, placing n positon and T
|pinding of diferent dia Tor steel bars for structural |
[steel and tor steel for stirups all complete job as
5 per as per crawing, specifications and instructions of |
‘site incharge all complete. | |
4 7923,08659)ka 114.31] 905683.47
5 First class brck masonary works in 14 cement sand
t Imortar as per drawing, specifications anc |
instructions of site incharge. |
sl 107.25|eum, 9958.99, 1003778.14|
Salwood work
7 TSyppiving,titing and tng of salwood Frames T 1
|{ehaukhates) in doors, windows and ventilation of
|wood size "x3" with necessary materials & labour)
jall complete job as per design, crawing, | |
| specification and instruction of site incharge. | |
6! | 2.49|cum 209177.07| _521720.83)
| |Suppiving, fting and tring of S8mm thik Shiga | t ]
| (fully panelled shutters in doors and windows | |
j including all necessary materials(hinge, tower bolt,
‘handle and lock) & labour all complete job as per | |
Idesign, drawing, specification and instruction of site |
incharge : |
Lal L 1g.7osqm | 9954.66] _ 136360.15
Ss
: s
&
Prepared by Checked by1
MAHAVIR RQ pJ-7, PARSA.
Abs
project. :Simra Colleg Building First Floor Construction
Location ‘Simra College Simra Bara
favantty _[unit_|Rete Tamount [Remarks
—
[Sn [Desexption of work
Trang, fing and fing of Ser thick Shisart y
| Fay panei shuters in doors and windows |
| nluding all necessary materas(ringe, owe" Bot, |
| JRancte anc oes) & labour al complete 28 Pe
| WSetign drawing, specication and instruction of ste |
| fincharge | | \
al sats zosesa| 51167680)
Ta Th, Paster work 1 | i
[Fiz mimic piacter 7 Fooment sandra | rT Y
| Mt and eof esng, ete a8 Pe rowing, |
_Spectteations and insrucone of ste incharge
9 1461.13}sam 243.53|__355826.77|
[ e, Sappiying and fixing of ron grill using ron 1
| iat of size 4.5 mm x 20 mm for windows ane
| |ventiations all complete job as per design, drawing, \
Spectication and instruction of site incharge |
| |
10) 44.13|sqm 2596,13|__114734.07;
7 [Floor work it _—_
T
[ToC (1:24) i Roaring works a5 per craw, |
| specifications and instructions of site incharge
a4 38.10/cum. 9703.13| 17558461
t
ES Tan ER aster TH carver sand aon
Pe rar ine oper drawing, specfeations and
szlnsrustons of ste ncharse. gsscalsqm | __ 243.80] __ s8849.09 5
| ps ‘mm thick cement punning as per design. ‘drawing, T Y
| EfzGreaton and insvuctin of st incrarse
| ia 366.63|sam, te50s| 659852
(9 Sarnang works on aired ura by apDIITS
ea of write coment and two coats of
met Coain(enowcer) a2 por specicaons and
14|instructions of site incharge. 1461.13|sam_| e214] 134633.93] _
Painting works on wooden surface ‘of doors, “|
aiming wd vention, by appving primer coat
_ | MPR eae of enamel pain as per specications
| sland instructions of site incharge 94,70\sam rezs4|__17923.74 j
| éjetaicease raving of squsre pipe S5|m 7500.00| 8968-79
{ ! |
Lt
Sab Total BSCR
Electrification @ 5% 25758473
Sanitation work @ 3% 154550.84
Contingincies 9% 15455084
Sub Total 571898082