You are on page 1of 2
SULTANTS |J-7, PARSA. project. :Simra Coleg Building First Floor Constrction Location :Simra College Simra Bara fan [Description of work fouantty [unit_[Rete Tamount __[Remari {Site clearance including cutting of bushes and trees | |before staring of Werks making sit in good \condion after finishing the Works as per the | lnstucton of ste ncharge 4 Aljobs +10000.00| _ 1000.09] esmcom sat inal siareate et es per a pe east epusteaions and nctuctone of ste | incharge | 2 “ 80.74|oumn_ 12144.00| _ 980565.23| j | | eames TTS for ROC workin | Form works including supplying, making, centering ind shuttering in footing, column, beam, slab, intel staircase etc. as per 28 per drawing, |_| specificatioris end instructions of site incharge all complete. 31 882.00|sqm 484.59] 320794.89) ‘Supalying, cutting, Bending, placing n positon and T |pinding of diferent dia Tor steel bars for structural | [steel and tor steel for stirups all complete job as 5 per as per crawing, specifications and instructions of | ‘site incharge all complete. | | 4 7923,08659)ka 114.31] 905683.47 5 First class brck masonary works in 14 cement sand t Imortar as per drawing, specifications anc | instructions of site incharge. | sl 107.25|eum, 9958.99, 1003778.14| Salwood work 7 TSyppiving,titing and tng of salwood Frames T 1 |{ehaukhates) in doors, windows and ventilation of |wood size "x3" with necessary materials & labour) jall complete job as per design, crawing, | | | specification and instruction of site incharge. | | 6! | 2.49|cum 209177.07| _521720.83) | |Suppiving, fting and tring of S8mm thik Shiga | t ] | (fully panelled shutters in doors and windows | | j including all necessary materials(hinge, tower bolt, ‘handle and lock) & labour all complete job as per | | Idesign, drawing, specification and instruction of site | incharge : | Lal L 1g.7osqm | 9954.66] _ 136360.15 Ss : s & Prepared by Checked by 1 MAHAVIR RQ pJ-7, PARSA. Abs project. :Simra Colleg Building First Floor Construction Location ‘Simra College Simra Bara favantty _[unit_|Rete Tamount [Remarks — [Sn [Desexption of work Trang, fing and fing of Ser thick Shisart y | Fay panei shuters in doors and windows | | nluding all necessary materas(ringe, owe" Bot, | | JRancte anc oes) & labour al complete 28 Pe | WSetign drawing, specication and instruction of ste | | fincharge | | \ al sats zosesa| 51167680) Ta Th, Paster work 1 | i [Fiz mimic piacter 7 Fooment sandra | rT Y | Mt and eof esng, ete a8 Pe rowing, | _Spectteations and insrucone of ste incharge 9 1461.13}sam 243.53|__355826.77| [ e, Sappiying and fixing of ron grill using ron 1 | iat of size 4.5 mm x 20 mm for windows ane | |ventiations all complete job as per design, drawing, \ Spectication and instruction of site incharge | | | 10) 44.13|sqm 2596,13|__114734.07; 7 [Floor work it _—_ T [ToC (1:24) i Roaring works a5 per craw, | | specifications and instructions of site incharge a4 38.10/cum. 9703.13| 17558461 t ES Tan ER aster TH carver sand aon Pe rar ine oper drawing, specfeations and szlnsrustons of ste ncharse. gsscalsqm | __ 243.80] __ s8849.09 5 | ps ‘mm thick cement punning as per design. ‘drawing, T Y | EfzGreaton and insvuctin of st incrarse | ia 366.63|sam, te50s| 659852 (9 Sarnang works on aired ura by apDIITS ea of write coment and two coats of met Coain(enowcer) a2 por specicaons and 14|instructions of site incharge. 1461.13|sam_| e214] 134633.93] _ Painting works on wooden surface ‘of doors, “| aiming wd vention, by appving primer coat _ | MPR eae of enamel pain as per specications | sland instructions of site incharge 94,70\sam rezs4|__17923.74 j | éjetaicease raving of squsre pipe S5|m 7500.00| 8968-79 { ! | Lt Sab Total BSCR Electrification @ 5% 25758473 Sanitation work @ 3% 154550.84 Contingincies 9% 15455084 Sub Total 571898082 Prepared by

You might also like