0 BTS Installation Tests

measure result
Item Remarks
attached

Indoor cabinets (including BTS, DC distribution


0.1
cabinet and AC distribution cabinet)

0.2 Cable trays


0.3 Layout, Binding and identity of all cables
0.4 Power Cable and Grounding Cable
0.5 E1 Cable
0.6 Sensors
0.7 Connections inside a Cabinet
0.8 Indoor 1/2" Jumper
0.9 Lightning Arrester
0.10 Lightning Arrester Rack
0.11 Main Feeder and GPS Feeder
0.12 Outdoor Grounding and Feeder Grounding Clip
Feeder Windows and Waterproof Bend of the Main
0.13
Feeder
0.14 Three-way Feeder Card
0.15 Outdoor 1/2" Jumpers
0.16 Antenna
0.17 Indoor/Outdoor Environment

1 Reliability Test
measure result
Item Remarks
attached
1.1 Power Supply
1.2 Power-off test
1.3 Transmission interruption test
1.4 Switchover test
Switchover test for CCM
1.5 Board plug/unplug, reset test
Plug/unplug test of CCM
Reset test of CHM
Reset test of TRX

2 OMC Test ( to be tested in OMC)

measure result
Item Remarks
attached
2.1 Alarm management
Historical alarms inquiry
Current alarms inquiry

3 Call Test

measure result
Item Remarks
attached

3.1 Rls A part


RlsA voice call/release test
RlsA data call/release test

4 Handover Test Record


measure result
Item Remarks
attached

4.1 Handover Test


Voice handover test
Data handover test

5 DIP Switch Test Record


measure result
Item Remarks
attached
5.1 BDS_ID
5.2 BTSNO_ID
5.3 Mode Abis0
5.4 Mode Abis1
5.5 S1 of RFE layer
5.6 S2 of RFE layer
5.7 S3 of RFE layer
5.8 S4 of RFE layer
5.9 S5 of RFE layer
5.10 S6 of RFE layer

6 Software Version Test ( to be tested i


measure result
Item Remarks
attached
6.1 Querying active/standby boards
6.2 Querying the storage version information
6.3 Querying the running version information

7 BTS feeder cable VSWR test


measure result
Item Remarks
attached
Voltage standing wave ratio (VSWR) of antenna pls. see technical
7.1
feeder measurement records

8 RF transmiting power site configuration: S / /


measure result
Item Remarks
attached
pls. see technical
8.1 each frequency channel of each sector
measurement records

sector A

sector B

sector C

Representative of ZTE Representative of Subcontractor


Signature: Signature:

Date Date: