Professional Documents
Culture Documents
measure result
Item Remarks
attached
1 Reliability Test
measure result
Item Remarks
attached
1.1 Power Supply
1.2 Power-off test
1.3 Transmission interruption test
1.4 Switchover test
Switchover test for CCM
1.5 Board plug/unplug, reset test
Plug/unplug test of CCM
Reset test of CHM
Reset test of TRX
measure result
Item Remarks
attached
2.1 Alarm management
Historical alarms inquiry
Current alarms inquiry
3 Call Test
measure result
Item Remarks
attached
sector A
sector B
sector C
Date Date: