NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
46/64,
62/64 76/80 79/80;
ESP FIELDS IN SERVICE 1A11, 2C11, D pass 23.04.17 - 3270
1A2, 1C22 short 1B2, 2B2 1A2 1D1Short 8A2, short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
5.5 5.5 6.9 6.1 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 265 280 280 278 03.12.17 -3590
3K - AUTO; Other Not in
MRHS in AUTO AUTO AUTO Not in AUTO 02.12.17 -3650
AUTO
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
B -Attended ; H- damper
5 C&I Mill- H - HAD and CAD hunting in auto. 12.02.18
freeness checking req; 103180242
6 TMD Cond pit dewatering pump-2 mechanically jammed. 12.02.18 under permit
103181066
suction vv of s/by pp
7 TMD Vacume pump -B abnormal sound/ice formation.; ejector vv not opening 12.02.18 16.02.18
passing; 103178681
UNIT -2
3 C&I 2CCA08 2.33 PR05/DATA FAULT COMING FREQUENTLY 09.02.18 15.02.18 under obseravtion
103170588
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD Mill-3F short travel Hoist GB damaged 15.02.18 under permit 103183688
4 TMD SCS-B Flushing Man v/v Flange leakage. 11.02.18 16.02.18 103177045
UNIT 4
2 C&I CW p/p-3 motor DE vib-X point spikes observed. 15.02.18 under permit
103184886
3 C&I C&I cables are hanging in between Mill-H 15.02.18
103184383
permit not able to clean due to
4 TMD AHU-8 & 11 cooling coils choked 13.02.18 required; chiller water line passing. To
16.02.18 day night esp ac to stop 103136976
Approx- 15L for 12 hrs.; will
5 TMD CFT level dropping due to IPSV-2 test valve . 12.02.18 i/p
diverted to tank 103181090
Oprn to prov ide mill for tes t with tes t
conditions; Mill B attended; DPT to
6 OPRN Mill-B & F coal pipe velocity deviation high 05.02.18 be done ; F attended; DPT to be 103161008
done; ; 43136
OFFSITES
3 AHD Stg-1 Slurry drain water p/p-1 tripping on o/l 08.02.18 18.02.18 under permit; OH
10317611
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (three out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
8 TMD Condenser vacuum pump-2 ejector valve not opening. 12.02.18 16.02.18
103180998
5 C&I IP Rotor expansion hunting from 13.9 mmto 15.3 mm 14.02.18 Attended
103183527
2 C&I Con. Vacuum pp-1 ejector valve not opening at -0.960 Ksc 13.02.18 att 103182355
2 C&I CD-4 oil gun flame is OK but scanner is not sensing 14.02.18 att gun changed;
103183649
6 C&I Mill-H LOP-B EPB MCC disturbance not coming in MMI. 12.02.18 attended permit required 103179932
Present values:
1 AB-Elevation scanners intensity showing very less at part load 13.02.18 attended AB1:33,AB2:52,AB-3:58,
AB-4:42
2 BMD/ C&I CD-1 oil gun not proving 13.02.18 attended flame is OK, but intensity not 103181879
improving
oil top up done. Under
3 BMD FD Fan-A & PAPH-B lub oil mechanical impurities are more 13.02.18 FD 1a ok observation; chem to check
103182341
1 C&I PAF-B Fan NDE bearing temperature hunting from 48 deg C to 7 Deg C 14.02.18 att Protection kept bypassed
103183524
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
DRY ASH EVACUATION
FILLED H2 CYLINDERS 15.2.18 48 06.11.16 - 2850 T
STATUS FOR HIGHEST ACHIEVED on
15-Feb-18 2870 TONS 09.01.18 : 4180 Tons STAGE - I / II TRUCKS /
14/02/18 13.11.16 - 3050 T
TONNAGE
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
6.9 7 9 6.1 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 265 280 271 278 03.12.17 -3590
3K - AUTO; Other Not in
MRHS in AUTO AUTO AUTO Not in AUTO 02.12.17 -3650
AUTO
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
6 TMD Cond pit dewatering pump-2 mechanically jammed. 12.02.18 under permit
103181066
suction vv of s/by pp
7 TMD Vacume pump -B abnormal sound/ice formation. 10.02.18 15.02.18
passing; 103178681
8 TMD Condenser vacuum pump-2 ejector valve not opening. 12.02.18 15.02.18 103180998
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I Cond. Pass-B RHS DP showing bad 14.02.18 103182414
2 C&I Con. Vacuum pp-1 ejector valve not opening at -0.960 Ksc 13.02.18 14 103182355
3 C&I 2CCA08 2.33 PR05/DATA FAULT COMING FREQUENTLY 09.02.18 15.02.18 under obseravtion
103170588
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD Mill-C Shaft seal leakage increased 14.02.18 under permit 103183620
3 TMD SCS-B Flushing Man v/v Flange leakage. 11.02.18 16.02.18 103177045
UNIT 4
5 AHD Stg-1 Slurry drain water p/p-1 tripping on o/l 08.02.18 under permit 17 ; Slurry will be cleared
10317611
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (three out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
oil top up done. Under
3 BMD FD Fan-A & PAPH-B lub oil mechanical impurities are more 13.02.18 FD 1a ok
observation; chem to check 103182341
1 C&I PAF-B Fan NDE bearing temperature hunting from 48 deg C to 7 Deg C 14.02.18 att Protection kept bypassed
103183524
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
48/64,
62/64 76/80 79/80;
ESP FIELDS IN SERVICE 1A11,,b pass under 23.04.17 - 3270
1A2, 1C22 short 1B2, 2B2 1A2 1D1Short 8A2, short
permit, 2C11, Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
5.8 6 8 5.5 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 265 276 274 278 03.12.17 -3590
3K - AUTO; Other Not in
MRHS in AUTO AUTO AUTO Not in AUTO 02.12.17 -3650
AUTO
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
Condensor water box DP ( PassA / PassB) 3655/3499 3572 6318/6454 3579 / 3424
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
oil top up done. Under
1 BMD FD Fan-A & PAPH-B lub oil mechanical impurities are more 13.02.18 observation 103182341
2 AHD Eco Hopper-3 flushing chamber bottom leakage 13.02.18 attended Gate kept closed 103182329
HRH metal temeperatures are maintaning on higher side with Mill 1F in
3 13.02.18
service
5 TMD Cond pit dewatering pump-2 mechanically jammed. 12.02.18 under permit
103181066
suction vv of s/by pp
6 TMD Vacume pump -B abnormal sound/ice formation. 10.02.18 14
passing; 103178681
7 TMD Condenser vacuum pump-2 ejector valve not opening. 12.02.18 14.02.18 103180998
work will be taken up on
8 TMD PAC-2 Element Temprature Maintains High. 09.02.18 under permit 12.02.18 byService engr
UNIT -2
4 C&I 2CCA08 2.33 PR05/DATA FAULT COMING FREQUENTLY 09.02.18 15.02.18 under obseravtion
103170588
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD HPH-5A level is not maintaining with normal drip. 12.02.18 103179469
to be checked
2 C&I MOT filter DP local indication not working. 12.02.18 14 103181095
3 TMD CF recircultaion pump-1 not developing pressure. 12.02.18 under permit 103118015
4 TMD SCS-B Flushing Man v/v Flange leakage. 11.02.18 16.02.18 103177045
UNIT 4
1 C&I Sea water electrolyser 1 cell - 2 and 3 flow low. 12.02.18 Attended; oprn to check
1031812018
on Opportunity ; conductivity
3 OFS Sea water pump-3 discharge valve is not closing fully. 12.02.18
to reduce ; 103177465
on Opportunity ; conductivity
4 OFS Sea water s/by line ARV leakage; 12.02.18
to reduce ; 103180272
5 CIVIL Rawwater p/p house Service Water tank over flowing. 10.02.18 FLOAT MISSING
103179145
6 AHD Stg-1 Slurry drain water p/p-1 tripping on o/l 08.02.18 under permit Slurry will be cleared
10317611
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 O&M -CIVIL of eight pedestals Completed 27.12.17
CHEMISTRY
COMPLETED JOBS
2 AHD Fire water line to BAHP interconnection line flange heavy leakage 13.02.18 Attended
103182021
5 C&I Flue gas O2 RHS Tx-2 showing zero. 12.02.18 Attended 12 103180455
3 C&I ESP #1 compressor-1, 50% and 100% solenoids not working. 12.02.18 Attended 103179549
UCR AC Screw chiller compressor-A2 tripping on loss of connection at
4 EMD 13.02.18 Attended
board 103181668
6 EMD TDBFP-B gland steam supply bypass MOV not operating from remote 12.02.18 attended
103179571
5 EMD ESP field 1C22 DC voltage low. 12.02.18 short Manual rapping done
103179894
O&M DAILY PLANNING MEETING
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
60/64,
63/64 76/80 79/80;
ESP FIELDS IN SERVICE 1A11, B21, 5B21 23.04.17 - 3270
1A2, 1C22 short 1B2, 2B2 1A2 1D1Short 8A2, short
2C11, Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
drum level) KG/CM2 5.8 6.2 5.8 5.5 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 270 270 279 281 03.12.17 -3590
3K - AUTO; Other Not in
MRHS in AUTO AUTO AUTO Not in AUTO 02.12.17 -3650
AUTO
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
Condensor water box DP ( PassA / PassB) 3435/3318 3530/- 6418/6437 3579 / 3424
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
3 OFS St 1 CW pit dewatering pump 1 not available
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD FD Fan-A & PAPH-B lub oil mechanical impurities are more 13.02.18 Under permt FDF-A:188 & PAPH-B :1260
103182341
2 AHD Eco Hopper-3 flushing chamber bottom leakage 13.02.18 Gate kept closed 103182329
HRH metal temeperatures are maintaning on higher side with Mill 1F in
3 13.02.18
service
damper freeness checking
4 C&I Mill-B & H - HAD and CAD hunting in auto. 12.02.18
req; 103180242
5 TMD Cond pit dewatering pump-2 mechanically jammed. 12.02.18 under permit
103181066
suction vv of s/by pp
6 TMD Vacume pump -B abnormal sound/ice formation. 10.02.18 103178681
passing;
7 TMD Condenser vacuum pump-2 ejector valve not opening. 12.02.18 13 103180998
work will be tken up on
8 TMD PAC-2 Element Temprature Maintains High. 09.02.18 under permit
12.02.18 byService engr
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I LOT level low switch not working 13.02.18 103182408
2 C&I Con. Vacuum pp-1 ejector valve not opening at -0.960 Ksc 13.02.18 103182355
Under
3 C&I FG O2 TRx LHS Dev (T1-7.13, T2-4.18). 10.02.18 Observation 103179039
4 C&I 2CCA08 2.33 PR05/DATA FAULT COMING FREQUENTLY 09.02.18 15.02.18 103170588
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
Present values:
AB1:33,AB2:52,AB-3:58,
1 AB-Elevation scanners intensity showing very less at part load 13.02.18
AB-4:42
2 BMD/ C&I CD-1 oil gun not proving 13.02.18 in progress flame is OK, but intensity not 103181879
improving
Normal drip CV DR-15
3 TMD HPH-5A level is not maintaining with normal drip. 12.02.18 103179469
opening full.
4 C&I MOT filter DP local indication not working. 12.02.18 103181095
5 TMD CF recircultaion pump-1 not developing pressure. 12.02.18 under permit 103118015
5 TMD SCS-B Flushing Man v/v Flange leakage. 11.02.18 16.02.18 103177045
UNIT 4
1 OFS / C&I Sea water electrolyser 1 cell - 2 and 3 flow low. 12.02.18 Attended; oprn to check
1031812018
on Opportunity ; conductivity
3 OFS Sea water pump-3 discharge valve is not closing fully. 12.02.18 to reduce ; 103177465
on Opportunity ; conductivity
4 OFS Sea water s/by line ARV leakage; 12.02.18
to reduce ; 103180272
5 CIVIL Rawwater p/p house Service Water tank over flowing. 10.02.18 FLOAT MISSING
103179145
6 AHD Stg-1 Slurry drain water p/p-1 tripping on o/l 08.02.18 under permit Slurry will be cleared
10317611
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
2 AHD Fire water line to BAHP interconnection line flange heavy leakage 13.02.18 Attended 103182021
5 C&I Flue gas O2 RHS Tx-2 showing zero. 12.02.18 Attended 12 103180455
3 C&I ESP #1 compressor-1, 50% and 100% solenoids not working. 12.02.18 Attended 103179549
UCR AC Screw chiller compressor-A2 tripping on loss of connection at
4 EMD 13.02.18 Attended
board 103181668
6 EMD TDBFP-B gland steam supply bypass MOV not operating from remote 12.02.18 attended
103179571
5 EMD ESP field 1C22 DC voltage low. 12.02.18 short Manual rapping done
103179894
1 C&I CW pit A pump-2 not taking start at high level. 12.02.18 attended Pump-1 is not available
103179848
8 AHM CG#4D Chamber Door leakage. 10.02.18 attended
103178696
5 BMD Mill-G Coal Pipe bend leakage. 09.02.18 attended 103177907
in progress
1 TMD Condener pass-B inlet duct having leakage. 12.02.18 attended PTW issued.
103180942
1 EMD ESP field 5B21 DC voltage zero. 12.02.18 short Manual rapping done.
103180973
R1 will be replaced on
7 C&I O2 Tx L 1, L2 and R2 Frequently varying. 10.02.18 i/p 12.02.18 103179088
2 OFS St-2 Raw water pump-1 having gland leakage. 12.02.18 attended
103180210
O&M DAILY PLANNING MEETING
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
60/64,
63/64 1A2 76/80 79/80;
ESP FIELDS IN SERVICE 1A11, B21, 5B21 23.04.17 - 3270
short 1B2, 2B2 1A2 1D1Short 8A2, short
2C11, Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR 2 3 choke 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
5.8 6.1 5.8 5.5 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 270 289 279 281 03.12.17 -3590
3K - AUTO; Other Not in
MRHS in AUTO AUTO AUTO AUTO Not in AUTO 02.12.17 -3650
Condensor water box DP ( PassA / PassB) 4840/4606 5841/ pass B isolated 6580 / 6547 3656 / 3542
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
3 OFS St 1 CW pit dewatering pump 1 not available
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I CW pit A pump-2 not taking start at high level. 12.02.18 under permit Pump-1 is not available
103179848
4 TMD COPU room floor grills in open condition at some areas. 12.02.18 103174958
5 TMD SCS-B Flushing Man v/v Flange leakage. 09.02.18 12.02.18 103177045
UNIT 4
1 OFS / C&I Sea water electrolyser 1 cell - 2 and 3 flow low. 12.02.18 under permit
1031812018
3 OFS Sea water pump-3 discharge valve is not closing fully. 12.02.18
103177465
4 OFS Sea water WL-1 leakage re-developed near creek. 12.02.18
103180272
5 CIVIL Rawwater p/p house Service Water tank over flowing. 10.02.18 FLOAT MISSING
103179145
6 AHD Stg-1 Slurry drain water p/p-1 tripping on o/l 08.02.18 Slurry will be cleared
10317611
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
1 EMD ESP field 5B21 DC voltage zero. 12.02.18 short Manual rapping done.
103180973
R1 will be replaced on
7 C&I O2 Tx L 1, L2 and R2 Frequently varying. 10.02.18 i/p
12.02.18 103179088
2 OFS St-2 Raw water pump-1 having gland leakage. 12.02.18 attended
103180210
greasing done ; Motor may
1 EMD CEP-B Motor DE & NDE temperature are maintaining high. 10.02.18
be kept i/s. 103178485
Chipping i/p; after chipping ,
4 OFS Electrolyser common outlet HDPE line leakage 06.02.18 Attended 2 days for line replacemet 103170680
5 EMD USS#4 SEC-A I/C - CB Close FB not coming. 10.02.18 attended
one supply i/s; Other supply 103178743
if ade ON CB tripping ;
2 C&I TSI all parameters became bad. 10.02.18 oK
voltage to be adjusted; SD 100437267
job
O&M DAILY PLANNING MEETING
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
DRY ASH EVACUATION
FILLED H2 CYLINDERS 12.2.18 48 06.11.16 - 2850 T
STATUS FOR HIGHEST ACHIEVED on
12-Feb-18 3760 TONS 09.01.18 : 4180 Tons STAGE - I / II TRUCKS /
11/02/18 13.11.16 - 3050 T
TONNAGE
61/64,
63/64 1A2 76/80 79/80;
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 23.04.17 - 3270
short 1B2, 2B2 1A2 1D1Short 8A2, short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR 2 3 choke 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
5.8 6.1 5.8 5.5 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 270 289 279 281 03.12.17 -3590
3K - AUTO; Other Not in
MRHS in AUTO AUTO AUTO Not in AUTO 02.12.17 -3650
AUTO
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
Condensor water box DP ( PassA / PassB) 4840/4606 5841/ pass B isolated 6580 / 6547 3656 / 3542
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 still leak is there
SAFETY PERMITS IN PROGRESS
Sl No DEPT DESCRIPTION TYPE FROM TO DATE
DATE
DEFECT STATUS SUMMARY - DAILY
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD ESP field 5B21 DC voltage zero. 12.02.18 Manual rapping done.
103180973
2 C&I CW pit A pump-2 not taking start at high level. 12.02.18 Pump-1 is not available
103179848
4 TMD COPU room floor grills in open condition at some areas. 12.02.18 103174958
UNIT 4
2 BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
Present vibrations: 15/7
1 BMD PA fan-B fan side having high vibration. 12.02.18
mm/s 103160941
2 EMD TDBFP-B gland steam supply bypass MOV not operating. 12.02.18
103179571
3 BMD Mill-B air flow velocity deviation high. 12.02.18 Corners:1/2/3: -6/-5/-13%
103178678
4 C&I Flue gas O2 RHS Tx-1 is not responding. 12.02.18
103179088
5 TMD CFT level dropping due to IPSV-2 test valve . 12.02.18 Approx- 15L for 12 hrs.
103181090
6 EMD Mill-H LOP-B EPB MCC disturbance not coming in MMI. 12.02.18
103179932
R1 will be replaced on
7 C&I O2 Tx L 1, L2 and R2 Frequently varying. 10.02.18 i/p
12.02.18 103179088
8 AHM CG#4D Chamber Door leakage. 10.02.18
103178696
Mill B permit cancelled; -6.5-5.9,
5 BMD Mill-B & F coal pipe velocity deviation high 05.02.18 12.02.18 -13.19, -0.78 , F will be checked;
103161008
43136
OFFSITES
1 EMD/C&I Sea water electrolyser-2 and 3 flow low. 12.02.18 C&I woc : 10318028
1031812018
2 OFS St-2 Raw water pump-1 having gland leakage. 12.02.18
103180210
3 OFS Sea water pump-3 discharge valve is not closing fully. 12.02.18
103177465
4 OFS Sea water WL-1 leakage re-developed near creek. 12.02.18
103180272
5 CIVIL Rawwater p/p house Service Water tank over flowing. 10.02.18 FLOAT MISSING
103179145
3 AHD Stg-1 Slurry drain water p/p-1 tripping on o/l 08.02.18 Slurry will be cleared
10317611
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
61/64, 79/80;
63/64 1A2 76/80
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 8A2 1B2 2C1short 23.04.17 - 3270
short 1B2, 2B2 1A2 1D1Short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
drum level) KG/CM2 6.95 7.03 6 6.4 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 268 288 290 260 03.12.17 -3590
3K - AUTO; Other Not in
MRHS in AUTO AUTO AUTO Not in AUTO 02.12.17 -3650
AUTO
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
Condensor water box DP ( PassA / PassB) 3240 / 3123 3825/3894 6612 / - 3357 / 3279
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 7.0 TP-6: 6.0 TP-21: 6.5
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 still leak is there
SAFETY PERMITS IN PROGRESS
FROM
Sl No DEPT DESCRIPTION TYPE TO DATE
DATE
1 CHP 13B seal plate replacement reqd. HWP 2/10/2018
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
greasing done ; Motor may
1 EMD CEP-B Motor DE & NDE temperature are maintaining high. 10.02.18 be kept i/s. 103178485
suction vv of s/by pp
2 TMD Vacume pump -B abnormal sound/ice formation. 10.02.18
passing; 103178681
work will be tken up on
3 TMD PAC-2 Element Temprature Maintains High. 09.02.18 13.02.18
12.02.18 byService engr
UNIT 4
2 BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
3 C&I O2 Tx L 1, L2 and R2 Frequently varying. 10.02.18 i/p R1 will be replaced;
103179088
4 AHM CG#4D Chamber Door leakage. 10.02.18
103178696
Mill B permit cancelled; -6.5-
6 BMD Mill-B & F coal pipe velocity deviation high 05.02.18 12.02.18 5.9, -13.19, -0.78 , F will be 103161008
checked;
43136
7 BMD Bunker-K DPT to be done 29.01.18 15.02.18
OFFSITES
1 CIVIL Rawwater p/p house Service Water tank over flowing. 10.02.18 FLOAT MISSING
103179145
2 AHM Stage-1 AWRC Line leakage at Railway gate. 09.02.18 under permit
103177905
3 AHD Stg-1 Slurry drain water p/p-1 tripping on o/l 08.02.18 Slurry will be cleared
10317611
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
Chipping i/p; after chipping ,
4 OFS Electrolyser common outlet HDPE line leakage 06.02.18 Attended
2 days for line replacemet 103170680
5 EMD USS#4 SEC-A I/C - CB Close FB not coming. 10.02.18 attended
one supply i/s; Other supply 103178743
if ade ON CB tripping ;
2 C&I TSI all parameters became bad. 10.02.18 oK
voltage to be adjusted; SD 100437267
job
3 EMD Hydrogen leakage at fill rack in H2 Room. 10.02.18 ok
100437183
3 BMD Mill- 4H LOP - A P/P Mechanical Jam. 09.02.18 under permit attended 103177468
6 Civil / AHD Stage-1 Ash slurry series-2 pedestal strenghtening to be done 05.02.18 attended
08.02.1
C&I FEEDER-2F GETTING TRIPPED AFTER START 08.02.18 attended
8 103176565
O&M DAILY PLANNING MEETING
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
61/64, 79/80;
63/64 1A2 76/80
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 8A2 1B2 2C1short 23.04.17 - 3270
short 1B2, 2B2 1A2 1D1Short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
6.4 6.5 6 6.4 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 276 275 290 260 03.12.17 -3590
3K - AUTO; Other Not in
MRHS in AUTO AUTO AUTO Not in AUTO 02.12.17 -3650
AUTO
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
Condensor water box DP ( PassA / PassB) 3400 / 3250 3962/3650 6612 / - 3357 / 3279
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 7.0 TP-6: 6.0 TP-21: 6.5
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
SAFETY PERMITS IN PROGRESS
FROM
Sl No DEPT DESCRIPTION TYPE TO DATE
DATE
1 CHP Conveyor- 8A to 10B M.Plate Repl HWP 2/9/2018
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I LPH-2 Alt Drip to condenser DR-37 Hunting. 09.02.18
2 BMD /EMD MILL-2F BUNKER O/L GATE PASSING 07.02.18 to be checked by operation
103174030
3 C&I 2CCA08 2.33 PR05/DATA FAULT COMING FREQUENTLY 07.02.18
103170588
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
3 BMD Mill- 4H LOP - A P/P Mechanical Jam. 09.02.18 103177468
4 AHD BAOF -B FC p/p tripping on O/L and BAOF-A under permit 08.02.18 Pp B will be cleared by 09.02.18 103175432
OFFSITES
8 CIVIL / OFS Drinking water not coming at St-1 AWRC pump house 06.02.18
103170683
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
6 Civil / AHD Stage-1 Ash slurry series-2 pedestal strenghtening to be done 05.02.18 attended
08.02.1
8 C&I FEEDER-2F GETTING TRIPPED AFTER START 08.02.18 attended
103176565
1 BMD Mill 3A abnormal sound even feed rate is 50TPH 07.02.18 ok 103174168
2 EMD PAPH-4B drawing more current (12A) 06.02.18 Current is normal 103172844
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
61/64,
76/80 79/80;
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 63/64 1A2 short 23.04.17 - 3270
1B2, 2B2 1A2 1D1Short 8A2 short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
6 7 9 6.4 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 260 289 280 270 03.12.17 -3590
MRHS in AUTO AUTO AUTO 3Kin AUTO; 3K ok Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 7.0 TP-6: 6.0 TP-21: 6.5
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
AC SYSTEM STATUS HEALTHINESS
UCB - 3 & 4
UCB Chiller Chiller water 11.3/6.9
1 ST-I water temp 15.5/12.5 DegC OFF LINE ST-II DegC OFF LINE
Temp 10/7.4
IN / OUT IN / OUT
ESP
ESP Chiller Chiller water Not
2 ST-I water temp 12.5/6.5 DegC OFF LINE ST-II DegC OFF LINE
Temp Applicable
IN / OUT
IN / OUT
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 still leak is there
SAFETY PERMITS IN PROGRESS
FROM
Sl No DEPT DESCRIPTION TYPE TO DATE
DATE
1 TMD Ventilation Duct Insulation at U-3 ARCW WHP 05.02.18 10.02.18
3 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 05.02.18 11.02.18
4 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 05.02.18 11.02.18
5 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 05.02.18 11.02.18
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
ELEVATION B VOTING NO FLAME INTERMITTENTLY EVEN MILL A
1 C&I 07.02.18 UNDER OBSERVATION
AND B ARE IN SERVICE. 103173432
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD Mill 3A abnormal sound even feed rate is 50TPH 07.02.18 103174168
2 BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
OFFSITES
CHEMISTRY
COMPLETED JOBS
2 EMD PAPH-4B drawing more current (12A) 06.02.18 Current is normal 103172844
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
DRY ASH EVACUATION
FILLED H2 CYLINDERS 7.2.18 48 06.11.16 - 2850 T
STATUS FOR HIGHEST ACHIEVED on
7-Feb-18 3650 TONS 09.01.18 : 4180 Tons STAGE - I / II TRUCKS /
06/02/18 13.11.16 - 3050 T
TONNAGE
61/64,
76/80 79/80;
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 63/64 1A2 short 23.04.17 - 3270
1B2, 2B2 1A2 1D1Short 8A2 short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
6 7 9 6.4 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 260 289 280 270 03.12.17 -3590
MRHS in AUTO AUTO AUTO 3Kin AUTO; 3K ok Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 7.0 TP-6: 6.0 TP-21: 6.5
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
AC SYSTEM STATUS HEALTHINESS
UCB - 3 & 4
UCB Chiller Chiller water 11.3/6.9
1 ST-I water temp 15.5/12.5 DegC OFF LINE ST-II DegC OFF LINE
Temp 10/7.4
IN / OUT IN / OUT
ESP
ESP Chiller Chiller water Not
2 ST-I water temp 12.5/6.5 DegC OFF LINE ST-II DegC OFF LINE
Temp Applicable
IN / OUT
IN / OUT
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 still leak is there
SAFETY PERMITS IN PROGRESS
FROM
Sl No DEPT DESCRIPTION TYPE TO DATE
DATE
1 TMD Ventilation Duct Insulation at U-3 ARCW WHP 05.02.18 10.02.18
3 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 05.02.18 11.02.18
4 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 05.02.18 11.02.18
5 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 05.02.18 11.02.18
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
3 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 06.02.18 Attended ;Oprn to check ;
###
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
Card Replaced, Under
1 C&I CJJ-11 fault alarm coming 06.02.18
Observation 103174030
Temporarily attended by
2 BMD ./ cni Mill-F feeder outlet gate Instrument air line damaged. 03.02.18 i/p applying M seal, Root V/v to
be replaced
103170588
Oil coming; bellow to be
changed;Lub oil mixing
3 TMD CF system leakage oil level high alarm 30.01.18 31.01.18 103165124
tfound ; will be be diverted to
tank;
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
Positioner will be adusted
1 C&I Burner tilt cor-2 opening fully at 80% demand. 06.02.18 103174168
accordingly
2 BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
4 BMD Mill-C under permit for attending coal pipe coupling gasket leakage 06.02.18 ATTENDED
5 C&I ECO O2 O/L RHS trnsmitter deviation high 06.02.18 (RHS- 4.06/2.07,LHS 2.72/2.27) 103174115
OFFSITES
5 OFS Stg-1 Raw water GRP Line leakage near NDCT 1 03.02.18 attended
103170093
will be taken up after one
6 OFS working Line-1 ARV leakage near Creek 01.02.18 07.02.18
pump kept in service
Offline readings: pp/2 : MNDE H
7 OFS Sea water pump-2 &3 parellel operation; 31.01.18 - 2.2 ; pp 3 PP A -3.1
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
2 EMD PAPH-4B drawing more current (12A) 06.02.18 Current is normal 103172844
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
DRY ASH EVACUATION
FILLED H2 CYLINDERS 6.2.18 48 06.11.16 - 2850 T
STATUS FOR HIGHEST ACHIEVED on
6-Feb-18 3520 TONS 09.01.18 : 4180 Tons STAGE - I / II TRUCKS /
05/02/18 13.11.16 - 3050 T
TONNAGE
61/64,
76/80 79/80;
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 1A2 short 23.04.17 - 3270
1B2, 2B2 1A2 1D1Short 8A2 short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
7.4 5 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 272 284 275 285 03.12.17 -3590
MRHS in AUTO AUTO AUTO 3Kin AUTO; 3K ok Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 7.0 TP-6: 6.0 TP-21: 6.5
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
AC SYSTEM STATUS HEALTHINESS
UCB - 3 & 4
UCB Chiller
Chiller water 11.3/6.9
1 ST-I water temp 15.5/12.5 DegC OFF LINE ST-II DegC OFF LINE
Temp 10/7.4
IN / OUT IN / OUT
ESP
ESP Chiller
Chiller water Not
2 ST-I water temp 12.5/6.5 DegC OFF LINE ST-II DegC OFF LINE
Temp Applicable
IN / OUT IN / OUT
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
SAFETY PERMITS IN PROGRESS
FROM
Sl No DEPT DESCRIPTION TYPE TO DATE
DATE
1 TMD Ventilation Duct Insulation at U-3 ARCW WHP 05.02.18 10.02.18
3 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 05.02.18 11.02.18
4 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 05.02.18 11.02.18
5 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 05.02.18 11.02.18
2 C&I Condenser vacuum pump-B ejector valve open feedback not coming 06.02.18 attended 6
103174052
5 BMD Mill-G coal pipe cor-1 velocity deviation found high in DPT. 27.01.18 09.02.18 ;will be done in PM 103161563
1 C&I CJJ-11 fault alarm coming 06.02.18 analog i/p card fault
103174030
2 BMD ./ cni Mill-F feeder outlet gate Instrument air line damaged. 03.02.18 i/p Root V/v to be replaced
103170588
Oil coming; bellow to be
changed;Lub oil mixing
3 TMD CF system leakage oil level high alarm 30.01.18 31.01.18 103165124
tfound ; will be be diverted to
tank;
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I Burner tilt cor-2 opening fully at 80% demand. 06.02.18 Positioner will be adusted acc 103174168
BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
JC : Oprn , TMD checked for
TMD Condenser air ingress more 220kg/hr ,DO 45ppb at part load 05.02.18 any leakages; No leakages
found; HPH parting plane issue 43136
Bunker-K DPT pending,Mill-B&F
1 BMD Mill-C under permit forattending coal pipe coupling gasket leakage 06.02.18 coal pipe deviation high.
3 C&I ECO O2 O/L RHS trnsmitter deviation high 06.02.18 (RHS- 4.06/2.07,LHS 2.72/2.27) 103174115
OFFSITES
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
2 EMD PAPH-4B drawing more current (12A) 06.02.18 Current is normal 103172844
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
61/64,
76/80 79/80; 8A2 short
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 23.04.17 - 3270
1B2, 2B2 1A2 1D1Short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
drum level) KG/CM2 6.3 5.8 10 7 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 290 284 273 280 03.12.17 -3590
MRHS in AUTO AUTO AUTO Not in AUTO Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 7.0 TP-6: 6.0 TP-21: 6.5
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
SAFETY PERMITS IN PROGRESS
FROM
Sl No DEPT DESCRIPTION TYPE TO DATE
DATE
DEFECT STATUS SUMMARY - DAILY
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
TDBFP-B turbine RJB vibration v-42 increased to 65 from 42 with in a NO change in feed water
1 TMD 05.02.18 ok 103172734
span of 10 minutes flow & load at that moment. 05/02/2018
2 BMD Mill-C,E,G,H reject O/H line choked 05.02.18 103170698
05/02/2018
3 EMD PAPH-A soot blowing is completing in 20 minutes. 05.02.18 attended 103172691
43136
joint check will be done with
4 BMD Mill-F bunker outlet gate is passing. 03.02.18
Operation
5 BMD Mill-G coal pipe cor-1 velocity deviation found high in DPT. 27.01.18 06.02.18 ; Purging Done; to take trial 103161563
1 BMD/C&I Burner tilt corner-2 got stuck up at 72% 05.02.18 attended 103172714
attended 43136
2 BMD Mill-G centre feed pipe leakage. 05.02.18 07.02.18 103152204
43119
3 BMD Mill-C&D mixed PA duct leakage increased 05.02.18 103099694
43443
4 C&I Bunkers-C and E levels are not showing correct value. 03.02.18 5.02.18
103169428
in service ; will be taken up after
5 BMD Mill D abnormal sound even at high feedrate(>50 TPH) 02.02.18 06.02.18 Mill 4B 103169402
6 BMD ESP Pass-B Pass inlet gate not operating 27.01.18 05.02.18
7 C&I Mill 3D Bowl DP Txr Not Responding. 25.01.18 06.02.18 internal poking to be done
103159025
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
Air flow may be maintained
Furnace disturbance occuring frequently 29.01.18 above noral value; 100 T extra ;
BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
F will be checked; B- checked
1 Mill-B & F coal pipe velocity deviation high 05.02.18 found OK 103161008
43136
JC : Oprn , TMD checked for
2 TMD Condenser air ingress more 220kg/hr ,DO 45ppb at part load 05.02.18 any leakages; No leakages
found 43136
4 BMD Bunker-K DPT to be done 29.01.18 09.02.18 4-5 days for scaffolding
OFFSITES
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
61/64,
76/80 79/80;
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 23.04.17 - 3270
1B2, 2B2 1A2 1D1Short 8A2 short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
6.3 5.8 10 7 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 290 284 273 280 03.12.17 -3590
MRHS in AUTO AUTO AUTO Not in AUTO Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
kg/cm2 T/H: 7.0 TP-6: 6.0 TP-21: 6.5
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
SAFETY PERMITS IN PROGRESS
FROM
Sl No DEPT DESCRIPTION TYPE TO DATE
DATE
DEFECT STATUS SUMMARY - DAILY
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
3 BMD Mill-G coal pipe cor-1 velocity deviation found high in DPT. 27.01.18 06.02.18 ; Purging Done; to take trial 103161563
6 C&I Mill 3D Bowl DP Txr Not Responding. 25.01.18 06.02.18 poking to be done
103159025
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
Air flow may be maintained
Furnace disturbance occuring frequently 29.01.18 above noral value; 100 T extra ;
BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
1 BMD Mill-B & F coal pipe velocity deviation high 05.02.18 F will be checked; 103161008
43136
JC : Oprn , TMD checked for
2 TMD Condenser air ingress more 220kg/hr ,DO 45ppb at part load 05.02.18 any leakages; No leakages
found 43136
4 BMD Bunker-K DPT to be done 29.01.18 09.02.18 4-5 days for scaffolding
OFFSITES
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
1 BMD/C&I Burner tilt corner-2 got stuck up at 72% 05.02.18 attended 103172714
attended 43136
2 C&I LPH-2 alternate drip control valve 0-40% hunting in manual continuously 05.02.18 attended line kept isolated
103172597 43135
3 TMD ESP# 2 CT fan- 1 fan touching guard. 03.02.18 attended Attended ;Oprn to check ;
103169869
3 EMD PAPH-A soot blowing is completing in 20 minutes. 05.02.18 attended 103172691
43136
TDBFP-B turbine RJB vibration v-42 increased to 65 from 42 with in a NO change in feed water
1 TMD span of 10 minutes 05.02.18 ok flow & load at that moment. 103172734
05/02/2018
3 BMD Mill-J LOP-A having abnormal sound. 03.02.18 05.02.18 ok
103164275
permit wll be given after coal
6 BMD Mill-B coal pipe cor-1 and 3 velocity deviation found high in DPT. 27.01.18 05.02.18 quantity increase 103161008
2 EMD Stg-2 AWRC pump-2 motor cable JB smoke. 03.02.18 att
103170253
2 BMD ID FAN-4A MOTOR cooling water inlet line vent lekage. 02.02.18 ok
103168454
3 TMD Condenser Pass -A I/L LINE DRAIN LKG. 02.02.18 att i/p
103169433
5-10 mm; HP inside is OK;
4 C&I HP casing expansion point hunting 01.02.18 ok outside issue will be
checked 103168238
O&M DAILY PLANNING MEETING
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
61/64,
76/80 79/80; 8A2 short
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 23.04.17 - 3270
1B2, 2B2 1A2 1D1Short
Short,
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
drum level) KG/CM2 6.3 5.8 10 7 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 290 284 273 280 03.12.17 -3590
MRHS in AUTO AUTO AUTO Not in AUTO Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 7.0 TP-6: 6.0 TP-21: 6.5
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
SAFETY PERMITS IN PROGRESS
FROM
Sl No DEPT DESCRIPTION TYPE TO DATE
DATE
DEFECT STATUS SUMMARY - DAILY
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
TDBFP-B turbine RJB vibration v-42 increased to 65 from 42 with in a NO change in feed water
1 TMD 05.02.18 ok 103172734
span of 10 minutes flow & load at that moment. 05/02/2018
2 BMD Mill-C,E,G,H reject O/H line choked 05.02.18 103170698
05/02/2018
3 EMD PAPH-A soot blowing is completing in 20 minutes. 05.02.18 attended 103172691
43136
joint check will be done with
4 BMD Mill-F bunker outlet gate is passing. 03.02.18
Operation
5 BMD Mill-G coal pipe cor-1 velocity deviation found high in DPT. 27.01.18 06.02.18 ; Purging Done; to take trial 103161563
1 BMD/C&I Burner tilt corner-2 got stuck up at 72% 05.02.18 attended 103172714
attended 43136
2 BMD Mill-G centre feed pipe leakage. 05.02.18 07.02.18 103152204
43119
3 BMD Mill-C&D mixed PA duct leakage increased 05.02.18 103099694
43443
4 C&I Bunkers-C and E levels are not showing correct value. 03.02.18 5.02.18
103169428
in service ; will be taken up after
5 BMD Mill D abnormal sound even at high feedrate(>50 TPH) 02.02.18 06.02.18 Mill 4B 103169402
6 BMD ESP Pass-B Pass inlet gate not operating 27.01.18 05.02.18
7 C&I Mill 3D Bowl DP Txr Not Responding. 25.01.18 06.02.18 internal poking to be done
103159025
UNIT 4
BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
F will be checked; B- checked
1 Mill-B & F coal pipe velocity deviation high 05.02.18 found OK 103161008
43136
JC : Oprn , TMD checked for
2 TMD Condenser air ingress more 220kg/hr ,DO 45ppb at part load 05.02.18 any leakages; No leakages
found 43136
4 BMD Bunker-K DPT to be done 29.01.18 09.02.18 4-5 days for scaffolding
OFFSITES
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 O&M -CIVIL of eight pedestals Completed 27.12.17
CHEMISTRY
COMPLETED JOBS
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
56/80
61/64,
1C1, 2C2, 1B2, 2B2 1A2 79/80; 8A2 short
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 23.04.17 - 3270
1D1Short Cpass
Short,
isolated
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
drum level) KG/CM2 5.9 5.8 7.4 5 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 287 284 274 276 03.12.17 -3590
MRHS in AUTO AUTO AUTO Not in AUTO Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 8.0 TP-6: 7.0 TP-21: 6.0
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
AC SYSTEM STATUS HEALTHINESS
UCB - 3 & 4
UCB Chiller Chiller water 11.3/6.9
1 ST-I water temp 15.5/12.5 DegC OFF LINE ST-II DegC OFF LINE
Temp 10/7.4
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water Not
2 ST-I water temp 12.5/6.5 DegC OFF LINE ST-II DegC OFF LINE
Temp Applicable
IN / OUT IN / OUT
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
BMD PA fan-4B fan side vibrations fan vibrations:- X-15 & Y-6 mm/s 27.01.18 Rotor made ready;
102744562
1 BMD Mill-J LOP-A having abnormal sound. 03.02.18
103164275
2 BMD ID FAN-4A MOTOR cooling water inlet line vent lekage. 02.02.18
103168454
4 BMD Bunker-K DPT to be done 29.01.18 03.02.18 4-5 days for scaffolding
1 OFS Stg-1 Raw water GRP Line leakage near NDCT 1 03.02.18 Under PTW
103170093
2 OFS Fire Hydrant line leakage near Stg-2 Silo-B trestle. 03.02.18
103170376
3 EMD Stg-2 AWRC pump-2 motor cable JB smoke. 03.02.18 i/p
103170253
6 OFS working Line-1 ARV leakage near Creek 01.02.18
8 OFS ST-2 FIRE WATER PH dewatering pump 2 Not Available 30.01.18 02.02.18 PP 1 made ready 103164665
Supply air fans approach not
9 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 31.01.18
availbale
10 EMD Cables are hanging in CT Area 19.12.17 10.02.18 in progress; grass to cut
Cable Laying Completed,
11 EMD Welding supply not available in CT Area 19.12.17 15.02.18
Dressing in progress
abnormal sound from
12 AHM\ Stage-2 AWRC Pump-4 Not Available 21.08.17 03.02.18 pump; suction choke
suspected
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 O&M -CIVIL of eight pedestals Completed 27.12.17
CHEMISTRY
COMPLETED JOBS
with block v/v opening SD
3 BMD SD24 opening 100% with 0% demand in auto 30.01.18 Att
24 driftng 103163202
5 C&I Generator Primary water treated water flow meter not working 03.02.18 ok
103169177
1 BMD Boiler side S-13 SH Vent valve having gland leakage. 03.02.18 att
103170586
Root valve also having
2 BMD Hydrastep LHS steam side valve 2nd valve having gland leakage 03.02.18 att
gland leakage 103167397
2 BMD PA fan A moisture/MI high 02.02.18 lw c taken MOIST-68; MI-88 PPM
103169182
line replacement i/p; B D
3 BMD Mill- G reject over head line choke 29.01.18 2.02.18
attended 103161878
Logic checked n found
3 C&I AOP-1 didnt trip on AUTO at TG >2850rpm 31.01.18 OK;events being analysed in
power replay
Under
5 C&I PW cooling control v/v going to manual 30.01.18 Observation Torque Switchobserved;
replaced; no strucking
103165115
; ok
4 TMD Lub oil lekage from speeder gear device 02.02.18 att
103168802
Chippng done; casting & curing
9 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 attended copleted ; perit wll be closed
02.02.18 ###
1 BMD Feeder-4F O/L chute leakage 01.02.18 temp attended
103168093
pass-B-2;pass-C-2,pass-D-
1 EMD ESP field 10C23 was not developing voltage 01.02.18 1;pass-A-1 103168159
Operating but air flow not
3 BMD/ C&I Mill-4F CAD not opening till 32% demand 30.01.18 ok
coming - BMD to check 103162773
scaffolfing in progress; planned
8 BMD MILL 3B MIX PA DUCT HOLE DEVELOPED 24.01.18 att for 31.01.18
drop wise leakage ; will be
7 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 under permit diverted; Insulation
removed. 103136946
O&M DAILY PLANNING MEETING
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
56/80
61/64,
1C1, 2C2, 1B2, 2B2 1A2 79/80; 8A2 short
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 23.04.17 - 3270
1D1Short Cpass
Short,
isolated
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
drum level) KG/CM2 5.9 5.8 7.4 5 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 270 284 273 276 03.12.17 -3590
MRHS in AUTO AUTO AUTO Not in AUTO Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 8.0 TP-6: 7.0 TP-21: 6.0
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD CBD sample valve heavy pasing at 5 th floor. 02.02.18 03.02.18
103169104
2 BMD PA fan A moisture/MI high 02.02.18 lw c taken MOIST-168; MI-221 PPM
103169182
line replacement i/p; B D
3 BMD Mill- G reject over head line choke 29.01.18 2.02.18
attended 103161878
4 BMD Mill-G coal pipe cor-1 velocity deviation found high in DPT. 27.01.18 06.02.18 Wlll be done during PM ;
103161563
Line laying done; machining
5 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 03.02.18 in progress ; Over ground to
be done; Acc OFS to plan ###
UNIT -2
UNIT 4
5 BMD Mill-B coal pipe cor-1 and 3 velocity deviation found high in DPT. 27.01.18 03.02.18 6.2%@ Cor-1 and 12.1%@ Cor-3
103161008
HT Aux PRDS header drain line pin hole leakage developed near AS10 May be c hecked by isolating; to be
7 TMD 19.01.18 seen that teperature is not dropping;
valve. 103143455
OFFSITES
3 OFS ST-2 FIRE WATER PH dewatering pump 2 Not Available 30.01.18 02.02.18 PP 1 made ready 103164665
4 AHM / EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 03.02.18 Alignent i/p
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 O&M -CIVIL of eight pedestals Completed 27.12.17
CHEMISTRY
COMPLETED JOBS
4 TMD Lub oil lekage from speeder gear device 02.02.18 att
103168802
Chippng done; casting & curing
9 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 attended copleted ; perit wll be closed
02.02.18 ###
1 BMD Feeder-4F O/L chute leakage 01.02.18 temp attended
103168093
pass-B-2;pass-C-2,pass-D-
1 EMD ESP field 10C23 was not developing voltage 01.02.18 1;pass-A-1 103168159
Operating but air flow not
3 BMD/ C&I Mill-4F CAD not opening till 32% demand 30.01.18 ok
coming - BMD to check 103162773
scaffolfing in progress; planned
8 BMD MILL 3B MIX PA DUCT HOLE DEVELOPED 24.01.18 att for 31.01.18
drop wise leakage ; will be
7 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 under permit diverted; Insulation
removed. 103136946
grass cutting required -
5 BMD Auxillary steam line drain leakage near Aux boiler area. 27.01.18 att
CIVIL by 31.01.18
103160088
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
56/80
61/64,
1C1, 2C2, 1B2, 2B2 1A2 79/80; 8A2 short
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 23.04.17 - 3270
1D1Short Cpass
Short,
isolated
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
5.9 5.8 7.4 5 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 270 284 273 276 03.12.17 -3590
MRHS in AUTO AUTO AUTO Not in AUTO Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
kg/cm2 T/H: 8.0 TP-6: 7.0 TP-21: 6.0
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
4 TMD/ C&I CF system leakage oil level high alarm 30.01.18 31.01.18 pot to be checked 103165124
block v/v Command above less
5 C&I PW cooling control v/v going to manual 30.01.18 v alue, 10% ; at 5% v/v strucking 103165115
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
Permit for
6 BMD Mill-B coal pipe cor-1 and 3 velocity deviation found high in DPT. 27.01.18 6.2%@ Cor-1 and 12.1%@ Cor-3
scaffolding 103161008
HT Aux PRDS header drain line pin hole leakage developed near AS10 May be c hecked by isolating; to be
7 TMD valve. 19.01.18 seen that teperature is not dropping;
103143455
OFFSITES
3 OFS ST-2 FIRE WATER PH dewatering pump 2 Not Available 30.01.18 01.02.18 PP 1 made ready 103164665
4 AHM / EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 31.01.18 Pump-Spares received
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
7 C&I ARCW Self cleaning strainer-B drain valve closing in auto 05.01.18 attended PLC problem;
###
2 AHM St-2 AWR p/p-3 heavy gland leakage. 31.01.18 attended
103166537
2 TMD IAC-1 FILTER DP MAINTAINING HIGH 30.01.18 att
103164456
C&I checked; running ; lamp
1 EMD condenserpit dwp-1 not taking start. 31.01.18
problem 103166177
No leakage found; Checked
10 CIVIL Boiler 4th floor corner-1 service water line having leakage. 27.01.18 30.01.18 with operation; 103160862
seal water pr switch
7 C&I Condenser pit Dewatering pump1 not taking start 09.01.18 attended
checked. Found OK. ###
6 C&I CW dewatering pit-A level switch malfunctioning intermittently 29.01.18 attended Under observation
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
DRY ASH EVACUATION
FILLED H2 CYLINDERS 1.2.18 48 06.11.16 - 2850 T
STATUS FOR HIGHEST ACHIEVED on
1-Feb-18 3220 TONS 09.01.18 : 4180 Tons STAGE - I / II TRUCKS /
31/01/18 13.11.16 - 3050 T
TONNAGE
61/64, 74 /80
79/80; 8A2 short
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 1C1, 2C2, 1B2, 2B2 1A2 23.04.17 - 3270
Short, 1D1Short
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
5.8 6.6 7.3 5.38 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 255 253 278 285 03.12.17 -3590
MRHS in AUTO AUTO AUTO Not in AUTO Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
kg/cm2 T/H: 8.0 TP-6: 7.0 TP-21: 6.0
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
DEFECT STATUS SUMMARY - DAILY
UNIT -1
3 TMD/ C&I CF system leakage oil level high alarm 30.01.18 31.01.18 pot to be checked 103165124
block v/v Command above less
4 C&I PW cooling control v/v going to manual 30.01.18 v alue, 10% ; at 5% v/v strucking 103165115
5 C&I ARCW Self cleaning strainer-B drain valve closing in auto 05.01.18 31.01.18 PLC problem;
###
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
Permit for
7 BMD Mill-B coal pipe cor-1 and 3 velocity deviation found high in DPT. 27.01.18 6.2%@ Cor-1 and 12.1%@ Cor-3
scaffolding 103161008
HT Aux PRDS header drain line pin hole leakage developed near AS10 May be c hecked by isolating; to be
9 TMD valve. 19.01.18 seen that teperature is not dropping;
103143455
OFFSITES
2 C&I Working line 2 flow meter not working 31.01.18 i/p cable cut
103165808
3 OFS / EMD ST-2 FIRE WATER PH dewatering pump 30.01.18 01.02.18 both pps not available 103164665
Supply air fans approach not
4 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 31.01.18
availbale
5 EMD Cables are hanging in CT Area 19.12.17 10.02.18 in progress; grass to cut
Cable Laying Completed,
6 EMD Welding supply not available in CT Area 19.12.17 15.02.18
Dressing in progress
7 AHM / EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 31.01.18 Pump-Spares received
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
FSSS-24V panel supply got failed. Alarm did not come in facie & alarm Alarm attended; not come in
5 C&I 27.01.18 att
display. facie willl be checked 103160489
will be checked ; for display
7 EMD ID -4B CH-1 &2 SPEED DEV HIGH 30.01.18 opp
only; 394 & 445 rpm
103162963
3 TMD ARCW INLET HEADER FLANGE LEAKAGE 30.01.18 att
103165177
O&M DAILY PLANNING MEETING
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
DRY ASH EVACUATION
FILLED H2 CYLINDERS 31.1.18 347 06.11.16 - 2850 T
STATUS FOR HIGHEST ACHIEVED on
31-Jan-18 3580 TONS
09.01.18 : 4180 Tons STAGE - I / II TRUCKS /
30/01/18 13.11.16 - 3050 T
TONNAGE
61/64, 57 /80
79/80; 8A2 short
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 1C1, 2C2, b pass1A2 23.04.17 - 3270
Short, Short
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
5.9 6.6 5.6 4 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 250 276 276 278 03.12.17 -3590
MRHS in AUTO AUTO AUTO Not in AUTO Not in AUTO 02.12.17 -3650
HYDROGEN DEW POINT 30.01.19 -18 -18 -17 -18 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 8.0 TP-6: 7.0 TP-21: 6.0
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
3 TMD/C&I CF system leakage oil level high alarm 30.01.18 31.01.18 pot to be checked 103165124
block v/v Command above less
4 C&I PW cooling control v/v going to manual 30.01.18 v alue, 10% ; at 5% v/v strucking 103165115
5 C&I ARCW Self cleaning strainer-B drain valve closing in auto 05.01.18 31.01.18 PLC problem;
###
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD ESP pass-B inlet gate -2 not closing fully 31.01.18
one pu mp be checked; OEM changed the
2 TMD TGECW-C & B NRV is passing 31.01.18 de sign for frequent failing;
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
C&I checked; running ; lamp
1 EMD condenserpit dwp-1 not taking start. 31.01.18
problem 103166177
No leakage found; Checked
10 CIVIL Boiler 4th floor corner-1 service water line having leakage. 27.01.18 30.01.18
with operation; 103160862
seal water pr switch
7 C&I Condenser pit Dewatering pump1 not taking start 09.01.18 attended
checked. Found OK. ###
6 C&I CW dewatering pit-A level switch malfunctioning intermittently 29.01.18 attended Under observation
FSSS-24V panel supply got failed. Alarm did not come in facie & alarm Alarm attended; not come in
5 C&I display. 27.01.18 att facie willl be checked 103160489
will be checked ; for display
7 EMD ID -4B CH-1 &2 SPEED DEV HIGH 30.01.18 opp only; 394 & 445 rpm
103162963
3 TMD ARCW INLET HEADER FLANGE LEAKAGE 30.01.18 att
103165177
6 TMD Ammonia Dozing P/p-B Stroke not varying 30.01.18 att in progress
103161549
5 C&I BC3 AND FG3 SHOWING NO FLAME 30.01.18 att approach problem - BMD
103164620
TDBFP-B booster pump DE side mechanical seal DP guage impulse line
6 C&I 27.01.18 30.01.18 attended
union joint leak. 103161560
submersible pp; MOTOR
2 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 attended
BURNT 103130662
1 OFS Fire water leakage 10.5m blr lift 30.01.18 att
103165120
2 C&I TDBFP-2B vibration point V-51 hunting. 30.01.18 att
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
DATE DESCRIPTION HIGHEST ACHIEVED
61/64, 75 /80
79/80; 8A2 short
ESP FIELDS IN SERVICE 1A11, B21, 2C11, 64/64 1C1, 2C2, 2B2,1b2 1A2 23.04.17 - 3270
Short, Short
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (at
5.9 6.6 8 5.5 23.11.17 -3500
drum level) KG/CM2
TURBINE SEAL STEAM TEMP-Deg C (I/L) 270 265 279 290 03.12.17 -3590
MRHS AUTO AUTO 02.12.17 -3650
HYDROGEN DEW POINT 09.01.19 -17 -19 -18 -17 17.12.17-4020
INSTRUMENT AIR DEW POINT 09.01.18 -39 09.01.18 -4180
CHP FH PR AT FARTHEST/ HIGHEST POINT
T/H: 8.0 TP-6: 7.0 TP-21: 6.0
kg/cm2
MAIN PLANT FH PR AT FARTHEST POINT
AT RAW WTR PH : 6.5 H2 PLANT AREA 11
kg/cm2
AC SYSTEM STATUS HEALTHINESS
UCB - 3 & 4
UCB Chiller
Chiller water 11.3/6.9
1 ST-I water temp 15.5/12.5 DegC OFF LINE ST-II DegC OFF LINE
Temp 10/7.4
IN / OUT IN / OUT
ESP
ESP Chiller
Chiller water Not
2 ST-I water temp 12.5/6.5 DegC OFF LINE ST-II DegC OFF LINE
Temp Applicable
IN / OUT IN / OUT
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM; but
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
still leak is there
UNIT -1
1 TMD/C&I CF system leakage oil level high alarm 30.01.18 pot to be checked
103165124
2 C&I BC3 AND FG3 SHOWING NO FLAME 30.01.18 approach problem - BMD
103164620
block v/v Command above
3 C&I PW cooling control v/v going to manual 30.01.18 less value, 5% ; at 5% v/v
strucking 103165115
FSSS-24V panel supply got failed. Alarm did not come in facie & alarm Alarm attended; not come in
3 C&I 27.01.18
display. facie willl be checked 103160489
4 AHM ESP Pass-B fields:- 1B2, 2B2 & Pass-C fields:- 1C1, 2C2 short. 27.01.18 will be taken one after the other
9 BMD Mill-B coal pipe cor-1 and 3 velocity deviation found high in DPT. 27.01.18 under permit 6.2%@ Cor-1 and 12.1%@ Cor-3
103161008
No leakage found; Checked
10 CIVIL Boiler 4th floor corner-1 service water line having leakage. 27.01.18 30.01.18
with operation; 103160862
Mechanical Seal Spares
11 TMD ARCW-C NDE gland leakage 20.01.18
issue. 103143455
May be checked by
HT Aux PRDS header drain line pin hole leakage developed near AS10
12 TMD 19.01.18 isolating; to be seen that
valve. 103143455
teperature is not dropping;
OFFSITES
1 OFS ST-2 FIRE WATER PH dewatering pump-not taking start. 30.01.18 both pps not available
103164665
Supply air fans approach not
2 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 31.01.18
availbale
3 EMD Cables are hanging in CT Area 19.12.17 10.02.18 in progress; grass to cut
Cable Laying Completed,
4 EMD Welding supply not available in CT Area 19.12.17 15.02.18 Dressing in progress
5 AHM / EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 30.01.18 Pump-Spares received
CHP
CHP MM & Conv 6 A /B support structure foundation strengthening works - (Two out
1 27.12.17
O&M -CIVIL of eight pedestals Completed
CHEMISTRY
COMPLETED JOBS
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by
Innovation and Agility.
PLANT DATA
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
seal replaced by OEM;
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16
but still leak is there
DEFECT STATUS SUMMARY - DAILY
UNIT -1
UNIT-3
43128 BMD Bunker-K DPT to be done 29.01.18 4-5 days for scaffolding
1 C&I Mill-K motor DE and NDE side bearing temperature became bad. 27.01.18 ip will be c hecked
103160386
2 BMD Mill-B coal pipe cor-1 and 3 velocity deviation found high in DPT. 27.01.18 29.01.18 6.2%@ Cor-1 and 12.1%@ Cor-3
103161008
3 Civil Boiler 4th floor corner-1 service water line having leakage. 27.01.18
103160862
Mechanical Seal Spares
4 TMD ARCW-C NDE gland leakage 20.01.18
issue. 103143455
HT Aux PRDS header drain line pin hole leakage developed near
5 TMD 19.01.18
AS10 valve. 103143455
OFFSITES
Stage-1 ash slurry series-4 is not available due it's ADL leakage Series-1& 3 are
43129 AHD 29.01.18
,series-5 is not available due to duke end rerouting connected to Lagoon-2
1 C&I Electrolyser-1 cell-3 flow is low. 27.01.18
103160922
2 EMD Sea water TWS screen-2 running in reverse direction. 27.01.18
103160925
3 AHM Stg-1 Ash handling IAC drier both towers bottom side leakage. 27.01.18
103158786
Stg-2 FOPH service water tank inlet line got punctured and heavy Water is not coming in
4 Civil/ ofs 27.01.18
leakage. FOPH control room. 103159045
EMD checked.
5 AHM Stg-1 Ash handling Vacuum pump 1A1 current hunting. 27.01.18 Mechanical decoupling
103161595
reqd.
6 AHM Stg-1 Ash slurry drain sump pump-1 having high vibrations. 27.01.18
103149650
7 AHM Stg-2 BAHP-B DE side bearing temperature high. 27.01.18
103160966
8 AHM Stg-2 LP seal water pump-B motor coupling spider damaged. 27.01.18
103160061
WORKING LINE -1 LEAKAGE AT SEA WATER PUMP HOUSE draining of line may be
9 OFS 24.01.18 27.01.18
END tried ;
submersible pp; MOTOR
10 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 27.01.18
BURNT 103130662
Supply air fans approach
11 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 31.01.18
not availbale
12 EMD Cables are hanging in CT Area 19.12.17 27.01.18 in progress; grass to cut
Cable Laying Completed,
13 EMD Welding supply not available in CT Area 19.12.17 27.01.18
Dressing in progress
Pump-Spares expected
14 AHM/ EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 29.01.18
by 22.01.18
CHP
CHP MM
Conv 6 A /B support structure foundation strengthening works -
1 & O&M 27.12.17
(one out of eight pedestals Completed
-CIVIL
CHEMISTRY (NIT
published on
MID LIFE R&M 14.10.17/
BOD-
26.12.17) PR : 300026983 dtd
1 TMD ARCW/ECW NRV replacement with duel plate check valves.
Under QR Fresh PR 27.06.17
Raised PR No:
(NIT
evaluation 400032491 dtd 24.10.17
2 C&I ASLD installation in units 1 & 2 : Published
(4 offerson ; PR vetted by F&A ,File
14.10.17)BO
received)
NIT BOD:30.11.17 To be
with Indenter
3 C&I Installation of cameras of CCTV in CHP area D-05.01.18. extended PR :
published
NIT on NIT to be released (As
BOD
14.10.17 400031050 dtd 14.06.17
4 EMD 33kv Sweet water Lines replacement Published
extended to 07.12.17) PR:
on11.01.201
17.01.18 400029999 dtd 20.03.17
Extd BOD:29.12.17 ; ;
BOD
8 Doc
5 EMD 33kV stage-1 MST swgr breakers replacement extended to PRID 0603383170121
: 400029277 dtd
NIT 09.01.17;
19.01.18 PR 300025252 dtd
0603383170004 ;
Published
on M/s-
6 AHD AWRC pu coated pipe line replacement 06.12.16;
on11.01.201
Siemens 0603367160155 ;
8
requestt
COMPLETED JOBS
1 C&I IPT diff exp and IPT rotor expansion point hunting. 27.01.18 OK
103160802
2 C&I CW pump house pit- A level switch malfunctioning intermittently. 27.01.18 27.01.18 Ok
103160156
saph 4bNRV passing;
3 BMD PAPH-B Guide bearing LOP-B not developing pressure. 27.01.18 ok both LOP stop required
103160490
for 30 min
6 EMD Mill-K Bunker O/L Gate not operating. 27.01.18 att Bunker made empty
103160789
Sea water pumps sump between TCM gate-2 one turtle got Kept Under Observation (
1 OFS 27.01.18 Attended
entangled. Vibrations are monitored 103160853
on regular basis,
7 BMD PAPH-4B main motor vibration high. 18.01.18
maintaining in the range 103143455
of 11 to 15 mm/s at Motor
O&M DAILY PLANNING MEETING NDE.
MTP/STP/001 DATE: 43127
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 61/64, SD 75 /80 79/80; 8A2 short 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR SD ALL CLEAR ALL CLEAR 15.07.17 -3430
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller15.5/12.5 DegC OFF LINE ST-II IN / OUT 11.3/6.9 1 DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller12.5/6.5 DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 BMD Auxillary steam line drain leakage near Aux boiler area. 27.01.18 grass cutting required - CI 103160088
2 BMD Mill-G coal pipe cor-1 velocity deviation found high in DPT. 27.01.18 30.01.18 6.4% at Cor-1 103161563
3 BMD Boiler Drum Safety valve (SV-4) passing. 24.01.18 attended may be checked at less lo 103157475
4 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 17.01.18/ Insulation to be removed. 103136946
6 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 29.01.18 Line Over ground to be d ###
UNIT-3
1 C&I SAPH-A Flue gas O/L damper-2 not operating. 27.01.18 will be checked 103160754
2 C&I FSSS-24V panel supply got failed. Alarm did not come in facie & al27.01.18 Alarm attended; not come 103160489
3 AHM ESP Pass-B fields:- 1B2, 2B2 & Pass-C fields:- 1C1, 2C2 short. 27.01.18 will be taken one after the 103123483
4 Civil 8.5m Operators room toilet water is not coming. 27.01.18 103160901
8 OFS CW sump level local measurement scale damaged below 6.3 m. 24.01.18 28.01.18 103158157
9 BMD/ C&I MILL 3K MRHS PV-1,3,4 not operating in AUTO 24.01.18 29.01.18 air pressure dropping les
11 EMD ESP Package 1 OUT OF 4 not working 13.01.18 02.02.18 NEAR U-3 ESP VFD ROOM, 103144062
12 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 30.01.18 Chippng done; casting & c ###
UNIT 4
1 C&I Mill-K motor DE and NDE side bearing temperature became bad. 27.01.18 ip will be c hecked 103160386
2 BMD Mill-B coal pipe cor-1 and 3 velocity deviation found high in DPT. 27.01.18 29.01.18 6.2%@ Cor-1 and 12.1%@ Cor-3 103161008
3 Civil Boiler 4th floor corner-1 service water line having leakage. 27.01.18 103160862
4 TMD ARCW-C NDE gland leakage 20.01.18 Mechanical Seal Spares is 103143455
5 TMD HT Aux PRDS header drain line pin hole leakage developed near 19.01.18 103143455
OFFSITES
3 EMD Sea water TWS screen-2 running in reverse direction. 27.01.18 103160925
4 AHM Stg-1 Ash handling IAC drier both towers bottom side leakage. 27.01.18 103158786
5 Civil/ ofs Stg-2 FOPH service water tank inlet line got punctured and heavy 27.01.18 Water is not coming in FO 103159045
6 AHM Stg-1 Ash handling Vacuum pump 1A1 current hunting. 27.01.18 EMD checked. Mechanical 103161595
7 AHM Stg-1 Ash slurry drain sump pump-1 having high vibrations. 27.01.18 103149650
9 AHM Stg-2 LP seal water pump-B motor coupling spider damaged. 27.01.18 103160061
11 OFS WORKING LINE -1 LEAKAGE AT SEA WATER PUMP HOUSE END 24.01.18 27.01.18 draining of line may be trie
4 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 27.01.18 submersible pp; MOTOR 103130662
5 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 31.01.18 Supply air fans approach n
6 EMD Cables are hanging in CT Area 19.12.17 27.01.18 in progress; grass to cut
7 EMD Welding supply not available in CT Area 19.12.17 27.01.18 Cable Laying Completed,
8 AHM/ EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 29.01.18 Pump-Spares expected by
CHP
CHEMISTRY
(NIT published on 14.10.17/
MID LIFE R&M
BOD-26.12.17)
Under QR evaluation
(4 offers received)
1 TMD ARCW/ECW NRV replacement with duel plate check valves. PR : 300026983 dtd 27.0
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement NIT Published on11.01.2 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
6 AHD AWRC pu coated pipe line replacement NIT Published on11.01.2 PR 300025252 dtd 06.12.1
COMPLETED JOBS
1 C&I IPT diff exp and IPT rotor expansion point hunting. 27.01.18 OK 103160802
2 C&I CW pump house pit- A level switch malfunctioning intermittently. 27.01.18 27.01.18 Ok 103160156
3 BMD PAPH-B Guide bearing LOP-B not developing pressure. 27.01.18 ok saph 4bNRV passing; both 103160490
6 EMD Mill-K Bunker O/L Gate not operating. 27.01.18 att Bunker made empty 103160789
1 OFS Sea water pumps sump between TCM gate-2 one turtle got entang27.01.18 Attended 103160853
7 BMD PAPH-4B main motor vibration high. 18.01.18 Kept Under Observation ( V 103143455
7 BMD SAPH-B LOP-B NRV passing ( reverse rotation observed). LOP C/o24.01.18 att saph 4bNRV passing; both 103158137
4 BMD PAPH-A main drive fluid coupling oil leakage. 27.01.18 att not from fluid coupling; 103157478
2C & I Seawater working line - 2 flow meter hunting . 25.01.18 Attended 103158785
5 TMD Condenser pass - A inlet line leakage observed after I/L valve. 24.01.18 27.01.18 attended 103158156
8 C&I Mill-F HAG open feedback not coming. 19.01.18 attended PTW REQD 103144062
2 TMD PHE- 4C ARCW line wooden plug got disturbed . 25.01.18 att
3 BMD Mill - K feeder inlet chute red hot and smoke. 24.01.18 att in progress; Mill kept i/s 103158277
6 TMD ESP AC AHU-11 cooling coils choked 20.01.18 Attended 103143455
1 BMD Mill - C High Coal in Reject. 24.01.18 att under permit 103156000
2 TMD Condenser Vacuum p/p-2 Ejector Valve Jam. 24.01.18 attended 103158122
4 EMD DMCW-B Motor DE Brg Temp Maintaining 70. 24.01.18 ok greasing done; Under obs 103158123
9 EMD/ C&I Debris filter pass-B discharge valve close feedback failing intermitt18.01.18 Attended EMD checked. Voltage dipp 103144062
4 C&I LP EXHAUST HOOD STEAM TEMP POINT-1 HUNTING 24.01.18 24.01.18 attended
7 C&I Stage-2 CWPH UPS-2 inverter got bypassed 20.01.18 att OEM will visit site on 24.0 103144062
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43125
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller15.5/12.5 DegC OFF LINE ST-II IN / OUT 11.3/6.9 1 DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller12.5/6.5 DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 BMD Boiler Drum Safety valve (SV-4) passing. 24.01.18 24.01.18 103157475
2 TMD Condenser Vacuum p/p-2 Ejector Valve Jam. 24.01.18 attended 103158122
4 EMD DMCW-B Motor DE Brg Temp Maintaining 70. 24.01.18 ok greasing done; Under obs 103158123
5 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 17.01.18/ Insulation to be removed. 103136946
UNIT-3
1 OFS CW sump level local measurement scale damaged below 6.3 m. 24.01.18 28.01.18 103158157
2 TMD Condenser pass - A inlet line leakage observed after I/L valve. 24.01.18 27.01.18 103158156
3 BMD/ C&I MILL 3K MRHS PV-1,3,4 not opearting in AUTO 24.01.18 24.01.18 air pressure dropping; BM
6 C&I DM MAKE UP P/P TRIP ALARM NOT COMING 24.01.18 to provide in Main CR; Av
7 C&I Mill-F HAG open feedback not coming. 19.01.18 PTW REQD 103144062
8 EMD ESP Package 1 OUT OF 4 not working 13.01.18 02.02.18 NEAR U-3 ESP VFD ROOM, 103144062
9 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 24.01.18 Work in progress. ###
UNIT 4
3 BMD SAPH-B LOP-B NRV passing ( reverse rotation observed). LOP C/o24.01.18 103158137
5 TMD HT Aux PRDS header drain line pin hole leakage developed near 19.01.18 103143455
OFFSITES
1 OFS WORKING LINE -2 LEAKAGE AT SEA WATER PUMP HOUSE END 24.01.18 24 plugging will be done ;in
2 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 27.01.18 submersible pp; MOTOR 103130662
3 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 31.01.18
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
(NIT published on 14.10.17/
MID LIFE R&M BOD-26.12.17)
Under QR evaluation
(4 offers received)
1 TMD ARCW/ECW NRV replacement with duel plate check valves. PR : 300026983 dtd 27.0
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement NIT Published
BOD extendedon11.01.2 NIT to be released (As 07
to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
6 AHD AWRC pu coated pipe line replacement NIT Published on11.01.2 PR 300025252 dtd 06.12.1
COMPLETED JOBS
9 EMD/ C&I Debris filter pass-B discharge valve close feedback failing intermitt18.01.18 Attended EMD checked. Voltage dipp 103144062
4 C&I LP EXHAUST HOOD STEAM TEMP POINT-1 HUNTING 24.01.18 24.01.18 attended
7 C&I Stage-2 CWPH UPS-2 inverter got bypassed 20.01.18 att OEM will visit site on 24.0 103144062
1 OFS SEA WATER PUMP-3 DE SIDE OIL GAUGE IS NOT ACCESIBLE 24.01.18 att guage will be replaced in
1 BMD Bunker A, & F bunker outlet gate passing. 18.01.18 att ###
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller15.5/12.5 DegC OFF LINE ST-II IN / OUT 11.3/6.9 1 DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller12.5/6.5 DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 BMD Boiler Drum Safety valve (SV-4) passing. 24.01.18 24.01.18 103157475
4 EMD DMCW-B Motor DE Brg Temp Maintaining 70. 24.01.18 greasing done ; UO 103158123
5 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 17.01.18/ Insulation to be removed. 103136946
6 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 25.01.18 Line Over ground to be d ###
UNIT-3
1 OFS CW sump level local measurement scale damaged below 6.3 m. 24.01.18 28.01.18 103158157
2 TMD Condenser pass - A inlet line leakage observed after I/L valve. 24.01.18 103158156
3 BMD/ C&I MILL 3K MRHS PV-1,3,4 NOT OPERATING 24.01.18 24.01.18 air pressure dropping; BM
6 C&I DM MAKE UP P/P TRIP ALARM NOT COMING 24.01.18 to provide in Main CR; Av
8 C&I Mill-F HAG open feedback not coming. 19.01.18 PTW REQD 103144062
9 EMD/ C&I Debris filter pass-B discharge valve close feedback failing intermitt18.01.18 24.01.18 EMD checked. Voltage dippi 103144062
10 EMD ESP Package 1 OUT OF 4 not working 13.01.18 02.02.18 NEAR U-3 ESP VFD ROOM, 103144062
11 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 24.01.18 Work in progress.23 ###
UNIT 4
3 BMD SAPH-B LOP-B NRV passing ( reverse rotation observed). LOP C/o24.01.18 103158137
4 TMD ESP AC AHU-11 cooling coils choked 20.01.18 103143455
5 TMD HT Aux PRDS header drain line pin hole leakage developed near 19.01.18 103143455
OFFSITES
1 OFS WORKING LINE -2 LEAKAGE AT SEA WATER PUMP HOUSE END 24.01.18 plugging will be done ;in
3 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
(NIT published on 14.10.17/
MID LIFE R&M
BOD-26.12.17)
Under QR evaluation
(4 offers received)
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published in Press on 11 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
4 C&I LP EXHAUST HOOD STEAM TEMP POINT-1 HUNTING 24.01.18 24.01.18 attended
7 C&I Stage-2 CWPH UPS-2 inverter got bypassed 20.01.18 att OEM will visit site on 24.0 103144062
1 OFS SEA WATER PUMP-3 DE SIDE OIL GAUGE IS NOT ACCESIBLE 24.01.18 att guage will be replaced in
1 BMD Bunker A, & F bunker outlet gate passing. 18.01.18 att ###
4 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 18.01.18 attended 103140497
8C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 att Work in progress.
6 C&I TDBFP-A balance leak off pressure gauge impulse line heavy leak13.01.18 att Isolated; Main Permit wil 103143695
5 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 Attedned Pass-D was isolated ,Atte 103123873
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller14.5/8.5 DegC OFF LINE ST-II IN / OUT 11.3/6.9 1 DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller15.5/12.5 DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
3 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 17.01.18/ Insulation to be removed. 103136946
4 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18/ 2 Line Over ground to be d ###
UNIT-3
5 C&I Stage-2 CWPH UPS-2 inverter got bypassed 20.01.18 24 OEM will visit site on 23.0 103144062
6 C&I Mill-F HAG open feedback not coming. 19.01.18 PTW REQD 103144062
7 EMD Debris filter pass-B discharge valve close feedback failing intermitt18.01.18 EMD checked. Voltage dippi 103144062
8 EMD ESP Package 1 OUT OF 4 not working 13.01.18 02.02.18 NEAR U-3 ESP VFD ROOM, 103144062
9 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 24.01.18 Work in progress.23 ###
10 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No ch 103119076
UNIT 4
2 BMD/ C&I MILL 3K MRHS PV-1,3,4 NOT OPERATING 24.01.18 air pressure dropping; BM
3 TMD ARCW-C NDE gland leakage 20.01.18 Mechanical Seal Spares is 103143455
5 TMD HT Aux PRDS header drain line pin hole leakage developed near 19.01.18 103143455
6 BMD PAPH-4B main motor vibration high. 18.01.18 Kept Under Observation ( V 103143455
OFFSITES
1 OFS SEA WATER PUMP-3 DE SIDE OIL GAUGE IS NOT ACCESIBLE 24.01.18 guage will be replaced in
2 OFS WORKING LINE -2 LEAKAGE AT SEA WATER PUMP HOUSE END 24.01.18 plugging will be done
15.01.18/
5 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 22.01.18 Supply is taken from lighti 103139955
6 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 25 submersible pp; MOTOR 103130662
7 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
8 EMD Cables are hanging in CT Area 19.12.17 05.01.18 / 2in progress; grass to cut
9 EMD Welding supply not available in CT Area 19.12.17 5.01.18 / 27Cable Laying Completed,
10 AHM/ EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 29.01.18 Pump-Spares expected by
CHEMISTRY
(NIT published on 14.10.17/
MID LIFE R&M
BOD-26.12.17)
Under QR evaluation
(4 offers received)
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published in Press on 11 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
4 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 18.01.18 attended 103140497
8C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 att Work in progress.
6 C&I TDBFP-A balance leak off pressure gauge impulse line heavy leak13.01.18 att Isolated; Main Permit wil 103143695
5 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 Attedned Pass-D was isolated ,Atte 103123873
1 C&I Mill-E lub oil pressure very low acting spuriously 19.01.18 ok Attended, under observati ###
2 BMD Mill-D roller abnormal sound even at coal flow of 52 TPH 11.01.18 under obser 103140443
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 attended permit req for 6 hrs . pro 103034882
5 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 attended ASS-3 not available due t 103138887
1 EMD 33KV colony feeder-2 tripped on over current &earth fault. 12.01.18 att 103142609
2 EMD 400KV Simhadri-Kalpaka line-4 isolation in progress for annual m 12.01.18 att
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43122
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 C&I Mill-E lub oil pressure very low acting spuriously 19.01.18 Attended, under observati ###
3 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 17.01.18/ Insulation to be removed. 103136946
4 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18/ 2 Line Over ground to be d ###
5 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 Pass-D was isolated ,Atte 103123873
UNIT -2
UNIT-3
1 C&I Stage-2 CWPH UPS-2 inverter got bypassed 20.01.18 OEM will visit site on 23.0 103144062
3 C&I Mill-F HAG open feedback not coming. 19.01.18 PTW REQD 103144062
4 EMD Debris filter pass-B discharge valve close feedback failing intermitt18.01.18 C&I side check and found 103144062
5 EMD ESP Package not working 13.01.18 19.01.18 /2 NEAR U-3 ESP VFD ROOM 103144062
6 C&I TDBFP-A balance leak off pressure gauge impulse line heavy leak13.01.18 Isolated; Main Permit wil 103143695
7 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 24.01.18 Work in progress. ###
8C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 13.01.18/ 2Work in progress.
9 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No ch 103119076
UNIT 4
1 TMD ARCW-C NDE gland leakage 20.01.18 Mechanical Seal Spares is 103143455
3 TMD HT Aux PRDS header drain line pin hole leakage developed near 19.01.18 103143455
4 BMD PAPH-4B main motor vibration high. 18.01.18 Kept Under Observation ( V 103143455
OFFSITES
1 CMP Wild grass growth near stage-1 desilting basin 11.01.18 25.01.18 Contract award pending 103141281
2 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 18.01.18 103140497
15.01.18/
3 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 22.01.18 Supply is taken from light 103139955
4 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp; MOTOR 103130662
5 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
7 EMD Welding supply not available in CT Area 19.12.17 5.01.18 / 27Cable Laying Completed,
8 AHM/ EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 29.01.18 Pump-Spares expected by
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published in Press on 11 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
2 BMD Mill-D roller abnormal sound even at coal flow of 52 TPH 11.01.18 under obser 103140443
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 attended permit req for 6 hrs . pro 103034882
5 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 attended ASS-3 not available due t 103138887
1 EMD 33KV colony feeder-2 tripped on over current &earth fault. 12.01.18 att 103142609
2 EMD 400KV Simhadri-Kalpaka line-4 isolation in progress for annual m 12.01.18 att
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 permit canccompressor OH;MP Air Comp: 103124162
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 C&I Flue gas O2 at Eco outlet (RHS) Txrs devn hi (8%,5.1%) 19.01.18 Deviation is more at Partia 103136946
2 C&I EHTC hunting at partial load. 12 MW hunting observed. 18.01.18 Observed at Partial Load 103136946
4 BMD Bunker A,F,J,H bunker outlet gate passing. 18.01.18 J AND H COMPLETED ###
5 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 17.01.18/ Insulation to be removed. 103136946
6 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18/ 2 Line Over ground to be d ###
7 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 Permit required.cake formin 103123873
UNIT -2
UNIT-3
1 C&I Mill-F HAG open feedback not coming. 19.01.18 PTW REQD 103144062
2 C&I Debris filter pass-B discharge valve close feedback failing intermitt18.01.18 EMD TO CHECK 103144062
3 C&I Mill-K MRHS seal fail persisting. 18.01.18 ATTENDED, OPERATION 103143695
5 EMD ESP Package not working 13.01.18 19.01.18 /2 NEAR U-3 ESP VFD ROOM 103144062
6 C&I TDBFP-A balance leak off pressure gauge impulse line heavy leak13.01.18 Isolated; TMD to do weldi 103143695
7 OFS Fire water sprinkler system leakage near 0 mtr cable gallery deluge09.01.18 19.01.18 ATTENDED 103138503
8 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 24.01.18 Work in progress. ###
9C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 13.01.18/ 2Work in progress.
10 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No ch 103119076
UNIT 4
1 TMD HT Aux PRDS header drain line pin hole leakage developed near 19.01.18 103143455
2 BMD PAPH-4B main motor vibration high. 18.01.18 Temporary Stiffeners prov 103143455
3 C&I SAPH-B air motor lubricator leakage 12.01.18 17.01.18 ATTENDED 103135386
4 OFS TDBFP mulsifier line lkg before deluge v/v @0mtrs 11.01.18 19.01.18 ATTENDED 103141206
10.01.18 /
5 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 19.01.18 ATTENDED 103130620
OFFSITES
1 CMP Wild grass growth near stage-1 desilting basin 11.01.18 25.01.18 Contract award pending 103141281
2 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 18.01.18 103140497
15.01.18/
3 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 22.01.18 Supply is taken from light 103139955
4 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp; MOTOR 103130662
5 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
7 EMD Welding supply not available in CT Area 19.12.17 5.01.18 / 27Cable Laying Completed,
8 AHM/ EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 29.01.18 Pump-Spares expected by
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published in Press on 11 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
2 BMD Mill-D roller abnormal sound even at coal flow of 52 TPH 11.01.18 under obser 103140443
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 attended permit req for 6 hrs . pro 103034882
5 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 attended ASS-3 not available due t 103138887
1 EMD 33KV colony feeder-2 tripped on over current &earth fault. 12.01.18 att 103142609
2 EMD 400KV Simhadri-Kalpaka line-4 isolation in progress for annual m 12.01.18 att
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 permit canccompressor OH;MP Air Comp: 103124162
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 C&I EHTC hunting at partial load. 12 MW hunting observed. 18.01.18 Observed at Partial Load 103136946
4 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 17.01.18/ Insulation to be removed. 103136946
5 C&I H2 drier inlet dew point temperature showing wrong value in mmi 06.01.18 12.01.18 sensor replaced still prob ###
6 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18/ 2 Line Over ground to be d ###
7 C&I CFT level in MMI/local having mismatch. 03.01.18 04.01.18/ 1 TMD local guage & Dipstic 103130538
8 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 Permit required.cake formin 103123873
UNIT -2
UNIT-3
1 C&I Debris filter pass-B discharge valve close feedback failing intermitt18.01.18 103144062
3 BMD Mill-K MRHS dome area approach not available. 18.01.18 103138503
4 EMD ESP Package not working 13.01.18 19.01.18 /2 NEAR U-3 ESP VFD ROOM 103144062
5 C&I TDBFP-A balance leak off pressure gauge impulse line heavy leak13.01.18 Isolated; TMD to do weldi 103143695
6 OFS Fire water sprinkler system leakage near 0 mtr cable gallery deluge09.01.18 19.01.18 103138503
7 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 24.01.18 Work in progress. ###
8C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 13.01.18/ 2Work in progress.
9 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No ch 103119076
UNIT 4
1 BMD PAPH-4B main motor vibration high. 18.01.18 Temporary Stiffeners prov 103143455
17.01.18 /
2 TMD VAM-1 purge tank vacuum deteriorating very fast 13.01.18 18.01.18 Work in progress. 103143455
4 OFS TDBFP mulsifier line lkg before deluge v/v @0mtrs 11.01.18 19.01.18 103141206
10.01.18 /
5 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 19.01.18 FW hdr iso req; 3 hrs job; 103130620
OFFSITES
1 CMP Wild grass growth near stage-1 desilting basin 11.01.18 25.01.18 Contract award pending 103141281
2 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 18.01.18 103140497
15.01.18/
3 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 22.01.18 Supply is taken from light 103139955
4 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp; MOTOR 103130662
5 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
7 EMD Welding supply not available in CT Area 19.12.17 5.01.18 / 27Cable Laying Completed,
8 AHM/ EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 29.01.18 Pump-Spares expected by
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published in Press on 11 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
2 BMD Mill-D roller abnormal sound even at coal flow of 52 TPH 11.01.18 under obser 103140443
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 attended permit req for 6 hrs . pro 103034882
5 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 attended ASS-3 not available due t 103138887
1 EMD 33KV colony feeder-2 tripped on over current &earth fault. 12.01.18 att 103142609
2 EMD 400KV Simhadri-Kalpaka line-4 isolation in progress for annual m 12.01.18 att
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 permit canccompressor OH;MP Air Comp: 103124162
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 TMD IAC-1 drier drain line punctured 10.01.18 17.01.18 / ATTENDED 103139956
2 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 17.01.18/ Insulation to be removed. 103136946
3 C&I H2 drier inlet dew point temperature showing wrong value in mmi 06.01.18 12.01.18 sensor replaced still prob ###
4 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18/ 2 Line Over ground to be d ###
5 C&I CFT level in MMI/local having mismatch. 03.01.18 04.01.18/ 1 TMD local guage & Dipstic 103130538
6 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 Permit required.cake formin 103123873
UNIT -2
UNIT-3
1 EMD ESP Package not working 13.01.18 19.01.18 NEAR U-3 ESP VFD ROOM 103144062
2 C&I TDBFP-A balance leak off pressure gauge impulse line heavy leak13.01.18 Isolated; TMD to do weldi 103143695
3 OFS Fire water sprinkler system leakage near 0 mtr cable gallery deluge09.01.18 19.01.18 103138503
4 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 24.01.18 Work in progress. ###
5C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 13.01.18/ 2Work in progress.
6 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No ch 103119076
UNIT 4
1 BMD SH Spray CV LHS (SD 9) body leakage. 16.01.18 Planned today, attended 103143455
2 BMD SH Spray CV RHS (SD 10) body leakage. 16.01.18 Planned today, attended 103135386
17.01.18 /
3 TMD VAM-1 purge tank vacuum deteriorating very fast 13.01.18 18.01.18 Work in progress. 103143455
5 OFS TDBFP mulsifier line lkg before deluge v/v @0mtrs 11.01.18 19.01.18 103141206
10.01.18 /
6 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 19.01.18 FW hdr iso req; 3 hrs job; 103130620
OFFSITES
1 CMP Wild grass growth near stage-1 desilting basin 11.01.18 25.01.18 Contract award pending 103141281
2 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 18.01.18 103140497
15.01.18/
3 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 22.01.18 Supply is taken from light 103139955
4 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp; MOTOR 103130662
5 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
7 EMD Welding supply not available in CT Area 19.12.17 5.01.18 / 27Cable Laying Completed,
8 AHM/ EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 29.01.18 Pump-Spares expected by
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published in Press on 11 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
2 BMD Mill-D roller abnormal sound even at coal flow of 52 TPH 11.01.18 under obser 103140443
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 attended permit req for 6 hrs . pro 103034882
5 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 attended ASS-3 not available due t 103138887
1 EMD 33KV colony feeder-2 tripped on over current &earth fault. 12.01.18 att 103142609
2 EMD 400KV Simhadri-Kalpaka line-4 isolation in progress for annual m 12.01.18 att
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 permit canccompressor OH;MP Air Comp: 103124162
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 TMD Condensor pit dewatering p/p-2 seal water pressure is not adequat10.01.18 17.01.18 ATTENDED 103130916
2 TMD IAC-1 drier drain line punctured 10.01.18 17.01.18 / Leakage observed from C& 103139956
3 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 17.01.18/ Insulation to be removed. 103136946
4 C&I H2 drier inlet dew point temperature showing wrong value in mmi 06.01.18 12.01.18 sensor replaced still prob ###
5 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18/ 2 Line Over ground to be d ###
6 C&I CFT level in MMI/local having mismatch. 03.01.18 04.01.18/ 1 TMD local guage & Dipstic 103130538
7 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 Permit required.cake formin 103123873
UNIT -2
UNIT-3
1 EMD ESP Package not working 13.01.18 19.01.18 NEAR U-3 ESP VFD ROOM 103144062
2 C&I TDBFP-A balance leak off pressure gauge impulse line heavy leak13.01.18 Isolated; TMD to do weldi 103143695
4 BMD Service water isolated for MRHS service water line choking clearing
11.01.18 17.01.18 ATTENDED 103117173
5 EMD Bunker-F O/L gate not closing fully. 10.01.18 11.01.18 ATTENDED 103139848
6 OFS Fire water sprinkler system leakage near 0 mtr cable gallery deluge09.01.18 19.01.18 103138503
7 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 24.01.18 Work in progress. ###
8C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 13.01.18/ 2Work in progress.
9 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No ch 103119076
10 Civil Seal air fans A foundation repair works 26.12.17 13.1.18 Completed 103118376
UNIT 4
2 TMD CEP-C rec valve gland leakage & Ammonia dosing pump-B dischar13.01.18 17.01.18 ATTENDED 103140355
4 OFS TDBFP mulsifier line lkg before deluge v/v @0mtrs 11.01.18 19.01.18 103141206
10.01.18 /
5 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 19.01.18 FW hdr iso req; 3 hrs job; 103130620
OFFSITES
1 OS Stage-2 sweet water lub water pumps recirculation flow is falling on13.01.18 attended 103144156
2 CMP Wild grass growth near stage-1 desilting basin 11.01.18 25.01.18 Contract award pending 103141281
3 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 18.01.18 103140497
15.01.18/
4 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 22.01.18 Supply is taken from light 103139955
5 OFS Stg-2 Fire water pump house dewatering pump starter panel is lying
10.01.18 attended 103133123
6 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp; MOTOR 103130662
7 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
9 EMD Welding supply not available in CT Area 19.12.17 5.01.18 / 27Cable Laying Completed,
10 AHM/ EMD Stage-2 AWRC Pump-4 Not Available 21.08.17 29.01.18 Pump-Spares expected by
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published in Press on 11 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
2 BMD Mill-D roller abnormal sound even at coal flow of 52 TPH 11.01.18 under obser 103140443
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 attended permit req for 6 hrs . pro 103034882
5 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 attended ASS-3 not available due t 103138887
1 EMD 33KV colony feeder-2 tripped on over current &earth fault. 12.01.18 att 103142609
2 EMD 400KV Simhadri-Kalpaka line-4 isolation in progress for annual m 12.01.18 att
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 permit canccompressor OH;MP Air Comp: 103124162
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 C&I CW dewatering pit-A level switch malfunctioning 13.01.18 pit cleaning to be done by 103144040
2 TMD Condensor pit dewatering p/p-2 seal water pressure is not adequat10.01.18 p wil be checked, attende 103130916
3 BMD Seal air duct punctured near Mill-1J. 10.01.18 will be attended temporari 103136945
4 TMD IAC-1 drier drain line punctured 10.01.18 p.wil be checked C&I 103139956
5 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 p. insulation to be remove 103136946
6 C&I H2 drier inlet dew point temperature showing wrong value in mmi 06.01.18 12.01.18 p.sensor replaced still pr ###
8 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18 p. Line Over ground to be ###
9 TMD/ C&I CFT level in MMI/local having mismatch. 03.01.18 04.01.18 p.TMD local guage & Dipst 103130538
10 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 p.cake forming ;suspecting 103123873
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
UNIT-3
1 C&I CW pumps inverters getting bypassed frequently 13.01.18 Perimt may be given p 103144062
2 C&I/ TMD TDBFP-A balance leak off pressure gauge impulse line heavy leak13.01.18 Islated; TMD to do weldin 103143695
3 C&I CW pump-5 sump level tx-1 showing wrong 12.01.18 attended 103142607
5 BMD Service water isolated for MRHS service water line choking clearing
11.01.18 ip under observation, 103117173
6 EMD Bunker-F O/L gate not closing fully. 10.01.18 11.01.18 wil be checked P 103139848
7 BMD BCW pump-B LP coolant flow maintaining low. 10.01.18 maintaining 22 LPM. Filte 103139566
8 OFS Fire water sprinkler system leakage near 0 mtr cable gallery deluge09.01.18 p 103138503
9 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 Checked; start of work fr ###
10 C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 13.01.18 scaffolding i/p to attend;
11 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No cha 103119076
12 Civil Seal air fans A foundation repair works 26.12.17 13.1.18 start of work from 06.01.18 103118376
UNIT 4
1 TMD VAM-1 purge tank vacuum deteriorating very fast 13.01.18 103143455
2 TMD CEP-C rec valve gland leakage & Ammonia dosing pump-B dischar13.01.18 103140355
4 OFS TDBFP mulsifier line lkg before deluge v/v @0mtrs 11.01.18 103141206
5 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 10.01.18 FW hdr iso req; 3 hrs job; 103130620
OFFSITES
1 OS Stage-2 sweet water lub water pumps recirculation flow is falling on13.01.18 103144156
2 CMP Wild grass growth near stage-1 desilting basin 11.01.18 Contract award pending 103141281
3 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 103140497
4 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 15.01.18 Supply is taken from light 103139955
5 OFS Stg-2 Fire water pump house dewatering pump starter panel is lying
10.01.18 103133123
6 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp; MOTOR 103130662
7 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
8 EMD Cables are hanging in CT Area 19.12.17 05.01.18 ip
9 EMD Welding supply not available in CT Area 19.12.17 5.01.18 cable to be layed;
10 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published in Press on 11 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
2 BMD Mill-D roller abnormal sound even at coal flow of 52 TPH 11.01.18 under obser 103140443
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 attended permit req for 6 hrs . pro 103034882
5 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 attended ASS-3 not available due t 103138887
1 EMD 33KV colony feeder-2 tripped on over current &earth fault. 12.01.18 att 103142609
2 EMD 400KV Simhadri-Kalpaka line-4 isolation in progress for annual m 12.01.18 att
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 permit canccompressor OH;MP Air Comp: 103124162
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 C&I CW dewatering pit-A level switch malfunctioning 13.01.18 pit cleaning to be done by 103144040
2 TMD Condensor pit dewatering p/p-2 seal water pressure is not adequat10.01.18 wil be checked 103130916
3 BMD Seal air duct punctured near Mill-1J. 10.01.18 will be attended temporari 103136945
4 TMD IAC-1 drier drain line punctured 10.01.18 wil be checked C&I 103139956
5 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 insulation to be removed. 103136946
6 C&I H2 drier inlet dew point temperature showing wrong value in mmi 06.01.18 12.01.18 sensor replaced still prob ###
8 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18 Line Over ground to be do ###
9 TMD/ C&I CFT level in MMI/local having mismatch. 03.01.18 04.01.18 TMD local guage & Dipstic 103130538
10 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 cake forming ;suspecting 103123873
UNIT -2
UNIT-3
1 C&I CW pumps inverters getting bypassed frequently 13.01.18 Perimt may be given 103144062
2 C&I/ TMD TDBFP-A balance leak off pressure gauge impulse line heavy leak13.01.18 Islated; TMD to do welding 103143695
3 C&I CW pump-5 sump level tx-1 showing wrong 12.01.18 Protection from TX-2 kept 103142607
5 BMD Service water isolated for MRHS service water line choking clearing
11.01.18 ip 103117173
6 EMD Bunker-F O/L gate not closing fully. 10.01.18 11.01.18 wil be checked 103139848
7 BMD BCW pump-B LP coolant flow maintaining low. 10.01.18 maintaining 22 LPM. Filte 103139566
8 OFS Fire water sprinkler system leakage near 0 mtr cable gallery deluge09.01.18 103138503
9 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 Checked; start of work fr ###
10 C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 13.01.18 scaffolding i/p to attend;
11 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No cha 103119076
12 Civil Seal air fans A foundation repair works 26.12.17 13.1.18 start of work from 06.01.18 103118376
UNIT 4
1 TMD VAM-1 purge tank vacuum deteriorating very fast 13.01.18 103143455
2 TMD CEP-C rec valve gland leakage & Ammonia dosing pump-B dischar13.01.18 103140355
4 OFS TDBFP mulsifier line lkg before deluge v/v @0mtrs 11.01.18 103141206
5 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 10.01.18 FW hdr iso req; 3 hrs job; 103130620
OFFSITES
1 OS Stage-2 sweet water lub water pumps recirculation flow is falling on13.01.18 103144156
2 CMP Wild grass growth near stage-1 desilting basin 11.01.18 Contract award pending 103141281
3 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 103140497
4 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 15.01.18 Supply is taken from light 103139955
5 OFS Stg-2 Fire water pump house dewatering pump starter panel is lying
10.01.18 103133123
6 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp; MOTOR 103130662
7 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
8 EMD Cables are hanging in CT Area 19.12.17 05.01.18 ip
9 EMD Welding supply not available in CT Area 19.12.17 5.01.18 cable to be layed;
10 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published in Press on 11 NIT to be released (As 07
BOD extended to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
2 BMD Mill-D roller abnormal sound even at coal flow of 52 TPH 11.01.18 under obser 103140443
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 attended permit req for 6 hrs . pro 103034882
5 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 attended ASS-3 not available due t 103138887
1 EMD 33KV colony feeder-2 tripped on over current &earth fault. 12.01.18 att 103142609
2 EMD 400KV Simhadri-Kalpaka line-4 isolation in progress for annual m 12.01.18 att
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 permit canccompressor OH;MP Air Comp: 103124162
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
3 TMD Condensor pit dewatering p/p-2 seal water pressure is not adequat10.01.18 wil be checked 103130916
4 BMD Seal air duct punctured near Mill-1J. 10.01.18 will be attended temporari 103136945
5 TMD IAC-1 drier drain line punctured 10.01.18 wil be checked C&I 103139956
6 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 insulation to be removed. 103136946
7 C&I H2 drier inlet dew point temperature showing wrong value in mmi 06.01.18 12.01.18 sensor replaced still prob ###
9 OFS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18 Line Over ground to be do ###
10 TMD/ C&I CFT level in MMI/local having mismatch. 03.01.18 04.01.18 TMD local guage & Dipstic 103130538
11 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 cake forming ;suspecting 103123873
UNIT -2
2 C&I Condenser pit Dewatering pump1 not taking start 06.01.18 seal water pr switch to be ###
3 TMD OLTC Balls vessel glass broken 05.01.18 9.01.18 Unsafe for sawdusting; Not ###
4 C&I ARCW Self cleaning strainer-B drain valve closing in auto 05.01.18 the problem persisting si ###
UNIT-3
1 CW pump-5 sump level tx-1 showing wrong 12.01.18 Protection from TX-2 kept 103142607
2 BMD Mill-D roller abnormal sound even at coal flow of 52 TPH 11.01.18 uo 103140443
4 BMD Service water isolated for MRHS service water line choking clearing
11.01.18 ip 103117173
6 EMD Bunker-F O/L gate not closing fully. 10.01.18 11.01.18 wil be checked 103139848
7 BMD BCW pump-B LP coolant flow maintaining low. 10.01.18 maintaining 22 LPM. Filte 103139566
10 OFS Fire water sprinkler system leakage near 0 mtr cable gallery deluge09.01.18 103138503
11 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 Checked; start of work fr ###
13 C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 13.01.18 scaffolding i/p to attend;
14 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No cha 103119076
15 Civil Seal air fans A foundation repair works 26.12.17 13.1.18 start of work from 06.01.18 103118376
UNIT 4
1 OFS TDBFP mulsifier line lkg before deluge v/v @0mtrs 11.01.18 103141206
4 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 10.01.18 FW hdr iso req; 3 hrs job; 103130620
OFFSITES
43112 EMD 33KV colony feeder-2 tripped on over current &earth fault. 12.01.18 103142609
1 CMP Wild grass growth near stage-1 desilting basin 11.01.18 103141281
2 OFS WL1/SB line indication & v/vs open/close marking to be given @ st-11.01.18 103140497
3 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 ASS-3 not available due t 103138887
5 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 15.01.18 Supply is taken from light 103139955
6 OFS Stg-2 Fire water pump house dewatering pump starter panel is lying
10.01.18 103133123
7 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp; MOTOR 103130662
8 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
9 EMD Cables are hanging in CT Area 19.12.17 05.01.18 ip
10 EMD Welding supply not available in CT Area 19.12.17 5.01.18 cable to be layed;
11 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 attended permit req for 6 hrs . pro 103034882
12 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 Conv 6 A will not be avl for
CHEMISTRY
3 C&I Installation of cameras of CCTV in CHP area (NIT Published on 14.10. BOD:30.11.17 To be extend
NIT published on 14.10.17
4 EMD 33kv Sweet water Lines replacement Published
BOD in Press
extended on 11 NIT to be released (As 07
to 19.01.18
on M/s-Siemens requestt
5 EMD 33kV stage-1 MST swgr breakers replacement Extd BOD:29.12.17 ; PR
QR approved Under Document Readiness & NIT Publication in next lot by15.01.18
6 AHD AWRC pu coated pipe line replacement PR 300025252 dtd 06.12.1
COMPLETED JOBS
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 permit canccompressor OH;MP Air Comp: 103124162
4 EMD Stg-2 RW pump house package AC not working. 10.01.18 12.01.18 103139758
2 C&I Burner tilt-2 feedback not increasing beyond 77%. 11.01.18 ok 103140454
2 BMD Boiler 55mtrs Elephant Door LHS became red hot 11.01.18 att 103140851
12 OFS Stage-2 CW Pump-2 discharge ARV leakage & Pump heavy gland 05.01.18 att to be planned by OFS; ARV ###
8 C&I LPH-3 emergency drip control valve open at local feed back show09.01.18 ok 11 103134504
1 TMD ARCW inlet header line puncture at trestle 11.01.18 ok plugged leak, increased 103140910
2 C&I Mill-D BIG corner-1 open feedback not coming/ simulated 11.01.18 ok 103141181
2 C&I ESP AHU-12 , 3-way v/v not operating. 10.01.18 att 103139525
4 BMD Mill - 4D and 4H coal coming in rejects 09.01.18 att 4d taken up ; 103137707
9 BMD Mill-D hot air duct developed leakage after hot air gate 08.01.18 att Minor; will be checked on 103135754
3 OFS CW pump-4 having gland leakage. 10.01.18 att gland will be tghtened 103139501
4 OFS Standby DG speed is not varying. 10.01.18 att EMD checked-ok. Party wil 103139939
1 BMD PAPH-A Soot blower puupet valve having round flange leakage. 10.01.18 att wil be checked 103138852
5 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 08.01.18 spare recived ; will be ta
1 stage-2 series-A suction and discharge line chocked 08.01.18 Attended will be checked the length
3 BMD Mill-E thurst bearing temp maintains high 08.01.18 att 80deg will be checked on
5 OFS Stage-2 CW Pump-5 high vibration 05.01.18 Attended Divers checked pump; tria
1 C&I Condenser vacuum breaker manual valve kept closed 08.01.18 OK defective card replaced u
2 C&I Fire protection for VB alarm coming 06.01.18 Ok C&I on job ###
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43110
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
CHP FH PR AT FARTHEST/ HIGHEST POINT/H: 8.0 TP-6: 7.0 TP-21: 6.0 09.01.18 -4180
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 BMD PAPH-A Soot blower puupet valve having round flange leakage. 10.01.18 wil be checked 103138852
2 civil Unit-1 All LVS brightness is inadequate. 10.01.18 20.01.18 tint film 103139539
3 OFS CW pump-4 having gland leakage. 10.01.18 under permigland will be tghtened 103139501
5 TMD Condensor pit dewatering p/p-2 seal water pressure is not adequat10.01.18 under permi wil be checked 103130916
6 BMD Seal air duct punctured near Mill-J. 10.01.18 wil be checked 103136945
7 TMD IAC-1 drier drain line punctured 10.01.18 wil be checked 103139956
8 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 insulation to be removed. 103136946
9 BMD Mill-D hot air duct developed leakage after hot air gate 08.01.18 under permiMinor; will be checked on 103135754
10 C&I H2 drier inlet and outlet dew point temperature showing wrong val 06.01.18 sensor replaced still prob ###
13 TMD/ C&I CFT level in MMI/local having mismatch. 03.01.18 04.01.18 TMD local guage to be ch 103130538
14 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 02.01.18 cake forming ;suspecting 103123873
UNIT -2
1 C&I Condenser pit Dewatering pump1 not taking start 06.01.18 seal water pr switch to be ###
2 TMD OLTC Balls vessel glass broken 05.01.18 9.01.18 Unsafe for sawdusting; Not ###
3 C&I ARCW Self cleaning strainer-B drain valve closing in auto 05.01.18 the problem persisting si ###
4 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 permit canccompressor OH;MP Air Comp: 103124162
UNIT-3
1 EMD Bunker-F O/L gate not closing fully. 10.01.18 11.01.18 wil be checked 103139848
2 BMD BCW pump-B LP coolant flow maintaining low. 10.01.18 maintaining 22 LPM. Filte 103139566
5 C&I LPH-3 emergency drip control valve open at local feed back show09.01.18 up 103134504
7 OFS Fire water sprinkler system leakage near 0 mtr cable gallery deluge09.01.18 103138503
8 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 Checked; start of work fr ###
10 C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 09.01.18 scaffolding i/p to attend;
11 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No cha 103119076
12 Civil Seal air fans A foundation repair works 26.12.17 13.1.18 start of work from 06.01.18 103118376
13 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 05.01.18 cables will be layed first, 103116156
UNIT 4
2 BMD Mill-H abn sound and hi vib at all loads, PF leakage from roller-3 08.01.18 Spring problem ; llr to Mil 103136665
3 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 10.01.18 FW hdr iso req; 3 hrs job; 103130620
OFFSITES
1 AHM Smoke observed from Stg-1 ASP-21 FC DE side bearing pedestal.10.01.18 ASS-3 not available due t 103138887
2 EMD Stg-2 RW pump house package AC not working. 10.01.18 12.01.18 103139758
3 EMD Stg-2 Fire hydrant diesel pump charger permanent supply is not ava
10.01.18 15.01.18 Supply is taken from light 103139955
4 OFS Stg-2 Fire water pump house dewatering pump starter panel is lying
10.01.18 103133123
6 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp; MOTOR 103130662
7 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
8 EMD Cables are hanging in CT Area 19.12.17 05.01.18 ip
9 EMD Welding supply not available in CT Area 19.12.17 5.01.18 cable to be layed;
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
CHEMISTRY
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
5 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 08.01.18 spare recived ; will be ta 103098730
1 stage-2 series-A suction and discharge line chocked 08.01.18 Attended will be checked the length
3 BMD Mill-E thurst bearing temp maintains high 08.01.18 att 80deg will be checked on 103136494
5 OFS Stage-2 CW Pump-5 high vibration 05.01.18 Attended Divers checked pump; tria
1 C&I Condenser vacuum breaker manual valve kept closed 08.01.18 OK defective card replaced u
2 C&I Fire protection for VB alarm coming 06.01.18 Ok C&I on job ###
2 TMD Condenser dewatering pump 1 & 2 seal water pressure low suspected line chocking; 1 103135000
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43108
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
UNIT -1
1 TMD GSC drain line to LPFT leakage at GSC. 08.01.18 insulation to be removed. 103136946
2 BMD Mill-D hot air duct developed leakage after hot air gate 08.01.18 Minor; will be checked on 103135754
3 C&I H2 drier inlet and outlet dew point temperature showing wrong val 06.01.18 sensor replaced still prob ###
5 OS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 15.01.18 Line Over ground to be do ###
6 TMD/ C&I CFT level in MMI/local having mismatch. 03.01.18 4.01.18 TMD local guage to be ch 103130538
7 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 02.01.18 cake forming ;suspecting 103123873
UNIT -2
1 C&I Condenser pit Dewatering pump1 not taking start 06.01.18 seal water pr switch to be ###
2 TMD OLTC Balls vessel glass broken 05.01.18 9.01.18 Unsafe for sawdusting; Not ###
3 C&I ARCW Self cleaning strainer-B drain valve closing in auto 05.01.18 the problem persisting si ###
4 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 09.01.18 compressor OH;MP Air Comp: 103124162
5 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 08.01.18 spare recived ; will be ta 103098730
UNIT-3
2 C&I LPH-3 emergency drip control valve open at local feed back show09.01.18 103134504
4 OFS Fire water sprinkler system leakage near 0 mtr cable gallery deluge09.01.18 103138503
6 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 to be seen on priority; will ###
7 OFS Stage-2 CW Pump-2 discharge ARV leakage & Pump heavy gland 05.01.18 9.01.18 to be planned by OFS; ARV ###
8C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 09.01.18 scaffolding i/p to attend;
9 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; No cha 103119076
6 Civil Seal air fans A foundation repair works 26.12.17 13.1.18 start of work from 06.01.18 103118376
7 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 05.01.18 cables will be layed first, 103116156
UNIT 4
2 BMD Mill-H abn sound and hi vib at all loads, PF leakage from roller-3 08.01.18 Spring problem ; llr to Mil 103136665
3 BMD Mill-E thurst bearing temp maintains high 08.01.18 att 80deg will be checked on 103136494
4 CIVIL 400 KV /11 KV Station transformer-2 side wall cracks developed 05.01.18 Checked; Minor problem ; ###
5 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 10.01.18 FW hdr iso req; 3 hrs job; 103130620
OFFSITES
1 stage-2 series-A suction and discharge line chocked 08.01.18 will be checked the length
2 AHD BH-4A,bag filters choked , not available. 04.01.18 08.01.18 under Permit; 3a att; 4a- 0
3 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 emd submersible pp; 103130662
4 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
5 EMD Cables are hanging in CT Area 19.12.17 05.01.18 ip
6 EMD Welding supply not available in CT Area 19.12.17 5.01.18 cable to be layed;
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
CHEMISTRY
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
5 OFS Stage-2 CW Pump-5 high vibration 05.01.18 Attended Divers checked pump; tria
1 C&I Condenser vacuum breaker manual valve kept closed 08.01.18 OK defective card replaced u
2 C&I Fire protection for VB alarm coming 06.01.18 Ok C&I on job ###
2 TMD Condenser dewatering pump 1 & 2 seal water pressure low suspected line chocking; 1 103135000
4 ESP AHU-11 module contacts burnt 05.01.18 att Two split Acs; AHUs may be
1 BMD Mill J high vibration & oil leakage from input shaft, High coal in reje06.01.18 att Mill tripped on PLOS due to ###
3 OFS FH RISER LINE TO TG GOT PUNCTURED AT MILL-1A 29.12.17 att chipping done ; under per 103123856
4 EMD Stage 2 AWRC PP-1 discharge MOV not operating. 27.12.17 att VV in open condn; up
5 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 att problem found in (Capilla
4 C&I ARCW discharge pressutre transmitter-1 becoming bad intermittenly. 04.01.18 att CABLE DAMAGED 07.01. ###
3 EMD ID Fan-A CH1 braker fault alarm appeared and got reset 05.01.18 ok ###
4 C&I Mill-H oulet temperature not maintaining in auto 05.01.18 OK Air flow tx dev; ###
5 TMD Heavy Water leakage from MDBFP Seal water cooler ( U4 side) unio
05.01.18 att cooler isolated; permit re ###
8 C&I Mill-F lub oil temp transmitter-2 hunting from 35 to 68◦C 04.01.18 att Protection from that point ###
6 OFS Fire hydrant valve at cor-4 (10th floor) heavy passing 04.01.18 att Root valve kept closed ;up
7 TMD Water is falling from MS horizontal line-1 05.01.18 att Before strainer; Oprn to c ###
10 TMD BFP-B horizontal strainer leakage 30.12.17 att permit planned on 03.01.1 103125578
4 EMD ID fan B VFD source breaker fault alarm coming. 03.01.18 att relay OK; o/c relay flag pr 103130535
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43106
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
4 BMD APH reciever tank approach platform work WHP 43103 43106
6 CHP TP-7 & 9 Cladding & Structure Repair HWP 43103 43106
7 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43102 43106
8 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43102 43106
9 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43102 43106
UNIT -1
1 C&I H2 drier inlet and outlet dew point temperature showing wrong val 06.01.18 sensor replaced still prob ###
3 EMD ID Fan-A CH1 braker fault alarm appeared and got reset 05.01.18 ###
5 OS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 Line Over ground to be do ###
UNIT -2
1 C&I Fire protection for VB alarm coming 06.01.18 C&I on job ###
3 C&I Condenser pit Dewatering pump1 not taking start 06.01.18 up seal water pr switch to be ###
4 TMD OLTC Balls vessel glass broken 05.01.18 Unsafe for sawdusting; Not ###
5 C&I ARCW Self cleaning strainer-B drain valve closing in auto 05.01.18 the problem persisting si ###
6 OFS Fire hydrant valve at cor-4 (10th floor) heavy passing 04.01.18 att Root valve kept closed ;up
7 AHM ECO hopper duct crack observed between hoppers-2 and 3. 02.01.18 03.01.18 Ash coming out. 103128751
8 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 04.01.18 compressor OH will be do 103124162
6 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 05.01.18 spare NA ; 103098730
UNIT-3
1 OFS Stage-2 CW Pump-5 high vibration 05.01.18 att Divers may be called to c
2 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 to be seen on priority ###
3 OFS Stage-2 CW Pump-2 discharge ARV leakage & Pump heavy gland 05.01.18 to be planned by OFS; ARV ###
5 TMD Heavy Water leakage from MDBFP Seal water cooler ( U4 side) unio
05.01.18 att cooler isolated; permit re ###
6 C&I ARCW discharge pressutre transmitter-1 becoming bad intermittenly. 04.01.18 att CABLE DAMAGED 07.01. ###
9C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 05.01.18 scaffolding i/p to attend;
12 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; 103119076
13 Civil Seal air fans A foundation repair works 26.12.17 07.1.18 start of work from 05.01.18 103118376
14 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 05.01.18 cables will be layed first, 103116156
UNIT 4
1 BMD Mill J high vibration & oil leakage from input shaft, High coal in reje06.01.18 Mill tripped on PLOS due to ###
5 ESP AHU-11 module contacts burnt 05.01.18 Two split Acs; AHUs may be
6 CIVIL 400 KV /11 KV Station transformer-2 side wall cracks developed 05.01.18 to be seen on priority ###
8 C&I Mill-F lub oil temp transmitter-2 hunting from 35 to 68◦C 04.01.18 att Protection from that point ###
9 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 FW hdr iso req; 3 hrs job; 103130620
10 CIVIL ESP- 3 & 4 AHU rooms back doors damaged. 01.01.18 13.01.18
OFFSITES
1 AHD BH-3B,3D,4A,4B bag filters choked , not available. 04.01.18 under Permit; 3a 4a- 04.01
2 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp 103130662
3 OFS FH RISER LINE TO TG GOT PUNCTURED AT MILL-1A 29.12.17 4.01.18 chipping done ; under per 103123856
4 EMD Stage 2 AWRC PP-1 discharge MOV not operating. 27.12.17 4.01.18 VV in open condn; up
5 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 4.01.18 problem found in (Capilla
6 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
10 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
CHEMISTRY
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
7 TMD Water is falling from MS horizontal line-1 05.01.18 att Before strainer; Oprn to c ###
10 TMD BFP-B horizontal strainer leakage 30.12.17 att permit planned on 03.01.1 103125578
4 EMD ID fan B VFD source breaker fault alarm coming. 03.01.18 att relay OK; o/c relay flag pr 103130535
2 AHM/ C&I CG-B1 feed gate opening and closing very slowly. 03.01.18 attended 103126140
7 C&I Mill-K CAD not operating 04.01.18 Att to be ch Chem dew point to be ch ###
11 C&I TGECW-C Dis.Pr. showing bad 29.12.17 attended i/p cable problem ; 6 p 103121544
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43105
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
1 BMD APH reciever tank approach platform work WHP 43103 43106
3 CHP 5A seal plate ,;27 28 Fire protection ; 8A to conv 30 plate welding HWP 43103 43106
4 CHP TP-7 & 9 Cladding & Structure Repair WHP 43102 43106
9 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43101 43107
10 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43101 43107
11 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43101 43107
UNIT -1
1 EMD ID Fan-A CH1 braker fault alarm appeared and got reset 05.01.18 ###
3 OS Mulsifier line of UT-A & B under ground leakage near GT-1B 05.01.18 Line Over ground to be do ###
5 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 02.01.18 cake forming ;suspecting 103123873
UNIT -2
1 TMD OLTC Balls vessel glass broken 05.01.18 Unsafe for sawdusting; Not ###
2 C&I ARCW Self cleaning strainer-B drain valve closing in auto 05.01.18 the problem persisting si ###
3 OFS Fire hydrant valve at cor-4 (10th floor) heavy passing 04.01.18 Root valve kept closed ;up
4 AHM ECO hopper duct crack observed between hoppers-2 and 3. 02.01.18 03.01.18 Ash coming out. 103128751
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 04.01.18 compressor OH will be do 103124162
6 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 05.01.18 spare NA ; 5 103098730
UNIT-3
2 CIVIL Stage-2 CW Pump-2 discharge duct foundation damaged 05.01.18 to be seen on priority ###
3 OFS Stage-2 CW Pump-2 discharge ARV leakage & Pump heavy gland 05.01.18 to be planned by OFS; ARV ###
5 TMD Heavy Water leakage from MDBFP Seal water cooler ( U4 side) unio
05.01.18 cooler isolated; permit re ###
6 C&I ARCW discharge pressutre transmitter-1 becoming bad intermittenly. 04.01.18 07.01.18 CABLE DAMAGED 07.01. ###
9C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 05.1.18 scaffolding i/p to attend;
10 TMD BFP-B horizontal strainer leakage 30.12.17 05.1.18 permit planned on 03.01.1 103125578
12 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; 103119076
13 Civil Seal air fans A foundation repair works 26.12.17 07.1.18 start of work from 05.01.18 103118376
14 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 05.01.18 cables will be layed first, 103116156
UNIT 4
3 ESP AHU-11 module contacts burnt 05.01.18 Two split Acs; AHUs may be
4 CIVIL 400 KV /11 KV Station transformer-2 side wall cracks developed 05.01.18 to be seen on priority ###
5 TMD Water is falling from MS horizontal line-1 05.01.18 Before strainer; Oprn to c ###
6 C&I Mill-F lub oil temp transmitter-2 hunting from 35 to 68◦C 04.01.18 Protection from that point ###
7 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 FW hdr iso req; 3 hrs job; 103130620
8 CIVIL ESP- 3 & 4 AHU rooms back doors damaged. 01.01.18 13.01.18
OFFSITES
1 AHD BH-3B,3D,4A,4B bag filters choked , not available. 04.01.18 under Permit; 3a 4a- 04.01
2 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp 103130662
3 OFS FH RISER LINE TO TG GOT PUNCTURED AT MILL-1A 29.12.17 4.01.18 chipping done ; under per 103123856
4 EMD Stage 2 AWRC PP-1 discharge MOV not operating. 27.12.17 4.01.18 VV in open condn; up
5 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 4.01.18 problem found in (Capilla
6 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
7 EMD Cables are hanging in CT Area 19.12.17 05.01.18 ip
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
10 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
CHEMISTRY
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
4 EMD ID fan B VFD source breaker fault alarm coming. 03.01.18 att relay OK; o/c relay flag pr 103130535
2 AHM/ C&I CG-B1 feed gate opening and closing very slowly. 03.01.18 attended 103126140
7 C&I Mill-K CAD not operating 04.01.18 Att to be ch Chem dew point to be ch ###
11 C&I TGECW-C Dis.Pr. showing bad 29.12.17 attended i/p cable problem ; 6 p 103121544
11 BMD Mill-E high coal in reject and current hunting. 19.12.17 Ok KEPT UNDER OBSERVATI
2 EMD logic modification for stg 1 conv for start pre warning during post p 20.12.17 04.01.18 att
3 EMD ID Fan-B VFD Ch-1&2 RPM mismatch (280/330). 02.01.18 03.01.18 30rpm; ok; speed adjustme 103128717
4 EMD U1,U2 ESP hoppers dual indication. 03.01.18 attended U#1: 101, 313, 403, 416 ; 103130487
1 AHD/C&I Stg-1 TAC-1 tripping immediately on element-2 temp high. 03.01.18 attended TAC-2 drier compr ANS/ ge 103130502
4 BMD Secondary air duct supports got corroded near ECO hoppers 27.12.17 attended Strengthening & painting
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43104
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
1 BMD APH reciever tank approach platform work WHP 43103 43106
4 CHP TP-7 & 9 Cladding & Structure Repair WHP 43102 43106
9 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43101 43107
10 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43101 43107
11 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43101 43107
UNIT -1
1 EMD ID fan VFD source breaker fault alarm coming. 03.01.18 relay rep wll be done; o/c 103130535
3 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 02.01.18 cake forming ;suspecting 103123873
UNIT -2
1 OFS Fire hydrant valve at cor-4 (10th floor) heavy passing 04.01.18 Root valve kept closed ;up
2 AHM/ C&I CG-B1 feed gate opening and closing very slowly. 03.01.18 4.01.18 103126140
4 AHM ECO hopper duct crack observed between hoppers-2 and 3. 02.01.18 03.01.18 Ash coming out. 103128751
5 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 04.01.18 compressor OH will be do 103124162
6 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 05.01.18 spare NA ; 5 103098730
UNIT-3
1 C&I ARCW discharge pressutre transmitter-1 becoming bad intermittenly. 04.01.18 CABLE DAMAGED 07.01. ###
2 C&I Mill-K CAD not operating 04.01.18 Chem dew point to be ch ###
4C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 05.1.18 scaffolding i/p to attend;
5 TMD BFP-B horizontal strainer leakage 30.12.17 05.1.18 permit planned on 03.01.1 103125578
6 C&I DMCW-C Dis.Pr. showing bad 29.12.17 06.01.18 i/p cable problem ; 6 p 103121544
7 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; 103119076
8 Civil Seal air fans A foundation repair works 26.12.17 07.1.18 start of work fro 05.01.18 103118376
9 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 05.01.18 cables will be layed first, 103116156
UNIT 4
1 C&I Mill-F lub oil temp transmitter-2 hunting from 35 to 68◦C 04.01.18 Protection from that point ###
2 C&I Feeder-D tripping on " Feeder not in remote". 03.01.18 UO Problem Persisting. 103130660
3 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 FW hdr iso req; 3 hrs job; 103130620
OFFSITES
1 AHD BH-3A,3D,4A,4B bag filters choked , not available. 04.01.18 under Permit; 3a 4a- 04.01
2 AHD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 submersible pp 103130662
7 OFS/ FH RISER LINE TO TG GOT PUNCTURED AT MILL-1A 29.12.17 4.01.18 chipping don ; 103123856
8 EMD Stage 2 AWRC PP-1 discharge MOV not operating. 27.12.17 4.01.18 VV in open condn;
9 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 4.01.18 problem found in (Capilla
10 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
CHEMISTRY
LMI POINTS for Inspection & testing of lifting tools and tackles
2 All the safety devices and actuating triggers (To be checked at least
4 Copy of test certificates of lifting tools are not available with MTP/sa
7 Record of checks for EOT Cranes before conducting load test not av
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
2 EMD logic modification for stg 1 conv for start pre warning during post p 20.12.17 04.01.18 att
3 EMD ID Fan-B VFD Ch-1&2 RPM mismatch (280/330). 02.01.18 03.01.18 30rpm; ok; speed adjustme 103128717
4 EMD U1,U2 ESP hoppers dual indication. 03.01.18 attended U#1: 101, 313, 403, 416 ; 103130487
1 AHD/C&I Stg-1 TAC-1 tripping immediately on element-2 temp high. 03.01.18 attended TAC-2 drier compr ANS/ ge 103130502
4 BMD Secondary air duct supports got corroded near ECO hoppers 27.12.17 attended Strengthening & painting
3 BMD Steam leakage from T joint near LRSB 117 . 03.01.18 attended 103129756
4 BMD FG elevation Corner-3 tracing steam line having leakage. 03.01.18 attended 103129189
5 C&I PHE outlet DMCW temp showing wrong. 03.01.18 attended showing 15 deg. 103130271
3 BMD Mills- B & C reject lines hole above trussel 02.01.18 attended Reject lines are in open c 103128826 Con-6A Trestle 16 pedestal 1 to be stren
1 C&I SH spray RHS isolation valve SD-7 not operating. 03.01.18 attended SD-3, SD-5 are also inope 103129843
2 C&I PAPH -A APH air side DP showing more( 285 mmwc). 03.01.18 ok 103130576
3 OFS Oil canal mulsifier line hole developed. 02.01.18 ok 103125645 PAINTNG WORKS U#4 BOILER TURBINE AREA
3 Civil/OFS Service water tank overflowing. 03.01.18 ok Flooding at SGECW pumps 103127914
5 OFS Sprinkler line filter-1 body leak near pump house 02.01.18 attended i/p 103129308
5 TMD Phosphate dosing pump-A stroke not varying. 02.01.18 attended 103126531
6 BMD Mill-D having MDV leakage 02.01.18 attended pm planned 03.01.18 103129170
1 EMD TG ECW tank makeup v/v not closing fully 02.01.18 attended Tank is overflowing. 103129281 PAINTNG WORKS U#3 BOILER TURBINE AREA
6 AHM Stg-2 AW R/c pump-2 DE side vibrations high - maintaining 14.6mm26.12.17 Attended P&i to be done before takin 103118302
2 TMD CFT oil level . To be topped up. 02.01.18 Attended Present Tank level = -30m 103127910
3 C&I ACW Discharge header Pressure Tx-1 hunting 02.01.18 Attended cable problem 103125642
4 EMD BCW pump - C motor ON feedback lost. 01.01.18 Attended permit to be taken ; pump
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43103
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
1 CHP TP-7 & 9 Cladding & Structure Repair WHP 43102 43106
2 CHP Con-6A Trestle 16 pedestal 1 to be stren WHP & HWP 43102 43106
6 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43101 43107
7 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43101 43107
8 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43101 43107
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS TP-7 & 9 Cladding & Structure Repair
1 EMD ID fan VFD source breaker fault alarm coming. 03.01.18 relay rep 103130535
3 BMD Mills- B & C reject lines hole above trussel 02.01.18 attended Reject lines are in open c 103128826 Con-6A Trestle 16 pedestal 1 to be stren
4 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 02.01.18 cake forming ; will be cl 103123873 CR-3 Body mother plate rep
5 C&I FD fans B blade pitch is varying continously by 3% . 26.12.17 under obserChecked ; FD B hunting re 103117019 TP 22 TO 24 CLADDING SHEETS REPLACEMENT
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS CNV 15B DISC CHUTE M-PLATE DAMAGED
1 AHM/ C&I CG-B1 feed gate opening and closing very slowly. 03.01.18 103126140
4 BMD FG elevation Corner-3 tracing steam line having leakage. 03.01.18 3 103129189
5 C&I PHE outlet DMCW temp showing wrong. 03.01.18 showing 15 deg. 103130271
8 AHM ECO hopper duct crack observed between hoppers-2 and 3. 02.01.18 3 Ash coming out. 103128751 CON-3A TO 3A AT TP-1 MOTHER PLATE DAMAGE
9 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 04.01.18 compressor OH will be do 103124162 DUCT INSULATION WORKS at ESP-4
10 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 05.01.18 spare NA ; 5 103098730 CONV-6B SNUB PULLY INSPECTION/DECK SHEET
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS PAINTING WORKS AT MAIN PLANT & OS AREA
1 C&I SH spray RHS isolation valve SD-7 not operating. 03.01.18 SD-3, SD-5 are also inope 103129843
2 C&I PAPH -A APH air side DP showing more( 285 mmwc). 03.01.18 103130576
3 OFS Oil canal mulsifier line hole developed. 02.01.18 3 103125645 PAINTNG WORKS U#4 BOILER TURBINE AREA
4C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 3 scaffolding i/p to attend;
5 TMD BFP-B horizontal strainer leakage 30.12.17 04.1.18 permit planned on 03.01. 103125578
6 C&I DMCW-C Dis.Pr. and Current showing bad 29.12.17 3 i/p 103121544
7 BMD Secondary air duct supports got corroded near ECO hoppers 27.12.17 05.01.18 Strengthening & painting
8 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; 103119076
9 Civil Seal air fans A & B foundation repair works 26.12.17 07.1.18 fan B foundation works c 103118376
10 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 05.01.18 cables will be layed first, 103116156
UNIT 4
1 C&I Feeder-D tripping on " Feeder not in remote". 03.01.18 Problem Persisting. 103130660
2 OFS 24 Metre Cable gallery fire sprinkler line having leakage. 03.01.18 103130620
3 Civil/OFS Service water tank overflowing. 03.01.18 Flooding at SGECW pumps 103127914
1 AHD/C&I Stg-1 TAC-1 tripping immediately on element-2 temp high. 03.01.18 TAC-2 drier compr ANS/ ge 103130502
3 EMD Stg-1 AWR/c pump house dewatering pump not taking start. 03.01.18 103130662
4 EMD U1,U2 ESP hoppers dual indication. 03.01.18 U#1: 101, 313, 403, 416 ; 103130487
5 OFS Sprinkler line filter-1 body leak near pump house 02.01.18 attended i/p 103129308
6 EMD Sweet water pump one lighting pole got uprooted and bent on one02.01.18 Civil to made approach ; T 103129339
7 OFS FH RISER LINE TO TG GOT PUNCTURED AT MILL-1A 29.12.17 i/p chip civil 103123856
8 EMD Stage 2 AWRC PP-1 discharge MOV not operating. 27.12.17 3 VV in open condn; pump i/
9 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 3 problem found in (Capilla
10 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18 103114810
13 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
14 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
2 EMD logic modification for stg 1 conv for start pre warning during post p 20.12.17 04.01.18
CHEMISTRY
LMI POINTS for Inspection & testing of lifting tools and tackles
1 Crane or forklift operators eyesight and colour vision examination r
2 All the safety devices and actuating triggers (To be checked at least
4 Copy of test certificates of lifting tools are not available with MTP/sa
7 Record of checks for EOT Cranes before conducting load test not av
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
1 EMD TG ECW tank makeup v/v not closing fully 02.01.18 attended Tank is overflowing. 103129281 PAINTNG WORKS U#3 BOILER TURBINE AREA
6 AHM Stg-2 AW R/c pump-2 DE side vibrations high - maintaining 14.6mm26.12.17 Attended P&i to be done before takin 103118302
2 TMD CFT oil level . To be topped up. 02.01.18 Attended Present Tank level = -30m 103127910
3 C&I ACW Discharge header Pressure Tx-1 hunting 02.01.18 Attended cable problem 103125642
4 EMD BCW pump - C motor ON feedback lost. 01.01.18 Attended permit to be taken ; pump
5 TMD ESP-2 CT-2 abnormal sound 29.12.17 Attended under permt 103124163 DUCT INSULATION AT ARCW PH#4
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43102
Last Updated 0.3958333333
NTPC Vision: To be the World's Leading Power Company, Energizing India's Growth.
NTPC Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
1 CHP TP-7 & 9 Cladding & Structure Repair WHP 43102 43106
2 CHP Con-6A Trestle 16 pedestal 1 to be stren WHP & HWP 43102 43106
6 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43101 43107
7 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43101 43107
8 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43101 43107
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS TP-7 & 9 Cladding & Structure Repair
1 BMD Mills- B & C reject lines hole above trussel 02.01.18 Reject lines are in open c 103128826 Con-6A Trestle 16 pedestal 1 to be stren
2 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 02.01.18 cake forming ; will be cl 103123873 CR-3 Body mother plate rep
3 C&I FD fans B blade pitch is varying continously by 3% . 26.12.17 under obserChecked ; FD B hunting re 103117019 TP 22 TO 24 CLADDING SHEETS REPLACEMENT
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS CNV 15B DISC CHUTE M-PLATE DAMAGED
2 AHM ECO hopper duct crack observed between hoppers-2 and 3. 02.01.18 Ash coming out. 103128751 CON-3A TO 3A AT TP-1 MOTHER PLATE DAMAGE
4 TMD UCR AC COMP-3 ABNORMAL SOUND 29.12.17 04.01.18 compressor OH will be do 103124162 DUCT INSULATION WORKS at ESP-4
6 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 05.01.18 spare NA ; 5 103098730 CONV-6B SNUB PULLY INSPECTION/DECK SHEET
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS PAINTING WORKS AT MAIN PLANT & OS AREA
2 OFS Oil canal mulsifier line hole developed. 02.01.18 103125645 PAINTNG WORKS U#4 BOILER TURBINE AREA
3C & I TGECW common discharge pressure transmitter-2 impulse line le 01.01.18 scaffolding i/p to attend;
4 TMD BFP-B horizontal strainer leakage 30.12.17 03.1.18 permit planned on 03.01. 103125578
5 C&I DMCW-C Dis.Pr. and Current showing bad 29.12.17 i/p 103121544
6 BMD Secondary air duct supports got corroded near ECO hoppers 27.12.17 05.01.18 Strengthening & painting
7 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 under observation; 103119076
8 Civil Seal air fans A & B foundation repair works 26.12.17 07.1.18 fan B foundation works c 103118376
9 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 31.12.17 cables will be layed first, 103116156
UNIT 4
1 OFS Sprinkler line filter-1 body leak near pump house 02.01.18 i/p 103129308
2 EMD Sweet water pump one lighting pole got uprooted and bent on one02.01.18 Civil to made approach ; T 103129339
4 EMD Stage 2 AWRC PP-1 discharge MOV not operating. 27.12.17 VV in open condn; pump i/
5 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 30.12.17 OPRN to show entry of byp
7 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18 103114810
8 EMD Cables are hanging in CT Area 19.12.17 05.01.18 ip
10 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
11 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
2 EMD logic modification for stg 1 conv for start pre warning during post p 20.12.17 04.01.18
CHEMISTRY
LMI POINTS for Inspection & testing of lifting tools and tackles
2 All the safety devices and actuating triggers (To be checked at least
4 Copy of test certificates of lifting tools are not available with MTP/sa
7 Record of checks for EOT Cranes before conducting load test not av
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
1 EMD TG ECW tank makeup v/v not closing fully 02.01.18 attended Tank is overflowing. 103129281 PAINTNG WORKS U#3 BOILER TURBINE AREA
6 AHM Stg-2 AW R/c pump-2 DE side vibrations high - maintaining 14.6mm26.12.17 Attended P&i to be done before takin 103118302
2 TMD CFT oil level . To be topped up. 02.01.18 Attended Present Tank level = -30m 103127910
3 C&I ACW Discharge header Pressure Tx-1 hunting 02.01.18 Attended cable problem 103125642
4 EMD BCW pump - C motor ON feedback lost. 01.01.18 Attended permit to be taken ; pump
5 TMD ESP-2 CT-2 abnormal sound 29.12.17 Attended under permt 103124163 DUCT INSULATION AT ARCW PH#4
3 C&I CEP- A MOT NDE BRG TEMP HUNTING 30.12.17 Attended 103125644 Cr-4 to 2B deflector plate rep
4 OFS TG side fire hydrant lines leakage at C row 02.01.18 Attended Valve isolated at 0 mtr. 103123856 CONV 5A SEAL PLATE DAMAGED
5 EMD Main turbine DC JOP showing 66A at MMI in pump off condition 01.01.18 Attended tx will be replace TP28: FIRE PROTECTION WORKS
1 BMD Mill-B LOP-A having oil leakage. 02.01.18 Attended 103128028 TP-7 & 9 Cladding & Structure Repair
2 C&I TDBFP-A Suction flow tx-1 & 2 having deviation 02.01.18 Attended Tx-1 vent line having leak 103128798 TP-27 FIRE PROTECTION WORKS
7 C&I COND VAC. PUMP-2 EJECTOR VALVE NOT OPENING 29.12.17 Attended switch changed; mech jam 103122944
5 EMD PHE PIT DEWATERING PUMP- NOT TAKING START 29.12.17 Attended 103122578
11 EMD NO LIGHTNING AT U#3 TG ENCLOSER 17 M 22.12.17 Attended 3 lights will be given; LED 103115359
3 C&I FLUE GAS O2 Xmts-2 (BOTH LHS&RHS) VARYING 29.12.17 OK lhs ok 103121243
1 AHM CG:B1 TAKING MORE CURRENT IN FORWARD DIR 30.12.17 Attended 103124820
5 C&I Generator cold gas temperature control valve operation sluggish. 26.12.17 ok SP changed 45 to 42 103117647
3 AHD BH-4C ALV UDG and LDG not opening, 28.12.17 Attended
5 AHD Stage-2 AHP vacuum pump-4D2 tripping on over load, 27.12.17 ok VP pump higher cap ; rep;
6 AHD BH-4D ash intake valve not operting ,corresponding platform repai27.12.17 Attended BH-4D under permit from 26/12/17.
28.12.1C&I CEP-C R/C VALVE FEEDBACK DISTURBANCE 29.12.17 Attended Problem repeating 103124198
5 EMD CW pump-4 , CW pump-3 Lub water pumps-A & B EPB covers dam26.12.17 Attended 103114446
PLANT DATA
MAIN PLANT FH PR AT HIGHEST POINT (a 6.3 6.7 8.6 6.1 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 300 270 275 278 03.12.17 -3590
HYDROGEN DEW POINT 17.11.17 -17 -19 -18 -17 02.12.17 -3650
INSTRUMENT AIR DEW POINT 17.11.17 -39 NO Provision for sample 17.12.17-4020
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
PRIORITY POINTS
UNIT -1
1 BMD Mills B,C rej line choked above trestle 30.12.17 103124308
3 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 103123873
4 C&I FD fans B blade pitch is varying continously by 3% . 26.12.17 under obserChecked ; FD B hunting 2 103117019
UNIT -2
5 EMD PHE PIT DEWATERING PUMP- NOT TAKING START 29.12.17 103122578
7 C&I COND VAC. PUMP-2 EJECTOR VALVE NOT OPENING 29.12.17 switch changed; 103122944
11 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 30.12.17 spare NA ; 103098730
UNIT-3
4 C&I FD FAN-B FAN NDE-X VIB POINT BEACAME BAD 29.12.17 sensor bad; SD 103122061
6 C&I Vacuum pump suction valve instrument air in common line leakage28.12.17 103122141
7 BMD Secondary air duct supports got corroded near ECO hoppers 27.12.17 05.01.18 Strengthening & painting
8 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 uo; 103119076
9 Civil Seal air fans A & B foundation repair works 26.12.17 07.1.18 completion of fan B found 103118376
10 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 31.12.17 cables will be layed first, 103116156
11 EMD NO LIGHTNING AT U#3 TG ENCLOSER 17 M 22.12.17 28 2 lights will be given; LED 103115359
UNIT 4
3 BMD PAPH-4A Main Motor man handle shaft oil lkg 29.12.17 103123058
5 C&I Generator cold gas temperature control valve operation sluggish. 26.12.17 uo SP changed 45 to 42 103117647
6 BMD Mill-E high coal in reject and current hunting. 19.12.17 uo ATTENDED, KEPT UNDER 103112034
OFFSITES
5 AHD Stage-2 AHP vacuum pump-4D2 tripping on over load, 27.12.17 29.12.17 VP 3d1 ok
6 AHD BH-4D ash intake valve not operting ,corresponding platform repai27.12.17 BH-4D under permit from 26/12/17.
8 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 30.12.17
9 AHM Stg-2 AW R/c pump-2 DE side vibrations high - maintaining 14.6mm26.12.17 UP 103118302
10 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18 103114810
13 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
14 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
2 EMD logic modification for stg 1 conv for start pre warning during post p 20.12.17 02.01.18
CHEMISTRY
LMI POINTS for Inspection & testing of lifting tools and tackles
2 All the safety devices and actuating triggers (To be checked at least
4 Copy of test certificates of lifting tools are not available with MTP/sa
7 Record of checks for EOT Cranes before conducting load test not av
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
28.12.1C&I CEP-C R/C VALVE FEEDBACK DISTURBANCE 29.12.17 Attended Problem repeating 103124198
5 EMD CW pump-4 , CW pump-3 Lub water pumps-A & B EPB covers dam26.12.17 Attended 103114446
PLANT DATA
MAIN PLANT FH PR AT HIGHEST POINT (a 6.3 6.7 8.6 6.1 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 300 270 275 278 03.12.17 -3590
HYDROGEN DEW POINT 17.11.17 -17 -19 -18 -17 02.12.17 -3650
INSTRUMENT AIR DEW POINT 17.11.17 -39 NO Provision for sample 17.12.17-4020
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
PRIORITY POINTS
4 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
5 AHD Mil reject hoppers in st 2 two ejector silos to be provided 08.12.17
6 AHD Interconnection of AWRC lines of st 1 & st2 to be done 06.12.17
7 OFS Make up Water connection of sweet water for st 2 CW forebay 08.12.17
UNIT -1
1 BMD Mills B,C rej line choked above trestle 30.12.17 103124308
3 AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 103123873
4 C&I FD fans B blade pitch is varying continously by 3% . 26.12.17 under obserChecked ; FD B hunting 2 103117019
UNIT -2
5 EMD PHE PIT DEWATERING PUMP- NOT TAKING START 29.12.17 103122578
7 C&I COND VAC. PUMP-2 EJECTOR VALVE NOT OPENING 29.12.17 switch changed; 103122944
11 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 30.12.17 spare NA ; 103098730
UNIT-3
4 C&I FD FAN-B FAN NDE-X VIB POINT BEACAME BAD 29.12.17 sensor bad; SD 103122061
6 C&I Vacuum pump suction valve instrument air in common line leakage28.12.17 103122141
7 BMD Secondary air duct supports got corroded near ECO hoppers 27.12.17 05.01.18 Strengthening & painting
8 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 uo; 103119076
9 Civil Seal air fans A & B foundation repair works 26.12.17 07.1.18 completion of fan B found 103118376
10 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 31.12.17 cables will be layed first, 103116156
11 EMD NO LIGHTNING AT U#3 TG ENCLOSER 17 M 22.12.17 28 2 lights will be given; LED 103115359
UNIT 4
3 BMD PAPH-4A Main Motor man handle shaft oil lkg 29.12.17 103123058
5 C&I Generator cold gas temperature control valve operation sluggish. 26.12.17 uo SP changed 45 to 42 103117647
6 BMD Mill-E high coal in reject and current hunting. 19.12.17 uo ATTENDED, KEPT UNDER 103112034
OFFSITES
5 AHD Stage-2 AHP vacuum pump-4D2 tripping on over load, 27.12.17 29.12.17 VP 3d1 ok
6 AHD BH-4D ash intake valve not operting ,corresponding platform repai27.12.17 BH-4D under permit from 26/12/17.
8 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 30.12.17
9 AHM Stg-2 AW R/c pump-2 DE side vibrations high - maintaining 14.6mm26.12.17 UP 103118302
10 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18 103114810
11 EMD Cables are hanging in CT Area 19.12.17 05.01.18 ip
13 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
14 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
2 EMD logic modification for stg 1 conv for start pre warning during post p 20.12.17 02.01.18
CHEMISTRY
LMI POINTS for Inspection & testing of lifting tools and tackles
2 All the safety devices and actuating triggers (To be checked at least
4 Copy of test certificates of lifting tools are not available with MTP/sa
7 Record of checks for EOT Cranes before conducting load test not av
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
28.12.1C&I CEP-C R/C VALVE FEEDBACK DISTURBANCE 29.12.17 Attended Problem repeating 103124198
5 EMD CW pump-4 , CW pump-3 Lub water pumps-A & B EPB covers dam26.12.17 Attended 103114446
1 BMD PA fan-B control oil pressure is hunting from 11ksc to 14 ksc. 26.12.17 ok uo ; cooler c/o done 103116588
12 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up 30.12.1 att
11 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17 Attended ip
28.12.1C&I LPBP CV-1 FEEDBACK SHOWING>2% 29.12.17 Attended PROTECTION ACTING 103124253
1 C&I/OS CW Pump-4 hydraulic power pack oil pump taking start frequently 27.12.17 Attended
28.12.1C&I Mill-E CAD not opening beyond 64 %@ 99% 29.12.17 Attended 103123925
2 C&I Feeder-D tripping frequently on "feeder not in remote" 28.12.17 ok Bunker-C emptied for insp 103114115
1 C&I MDBFP scoop not operating 28.12.17 ok under permit, MDBFP not a
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43098
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
PRIORITY POINTS
UNIT -1
28.12.1AHP U-1 ESP hopper 814 to be emptied (SUSPECTED CLINKERING) 29.12.17 103123873
1 C&I/OS CW Pump-4 hydraulic power pack oil pump taking start frequently 27.12.17 under obser
2 C&I FD fans B blade pitch is varying continously by 3% . 26.12.17 under obserChecked ; FD B hunting 2 103117019
UNIT -2
28.12.1EMD PHE PIT DEWATERING PUMP- NOT TAKING START 29.12.17 103122578
28.12.1C&I COND VAC. PUMP-2 EJECTOR VALVE NOT OPENING 29.12.17 switch changed; 103122944
UNIT-3
28.12.1C&I FD FAN-B FAN NDE-X VIB POINT BEACAME BAD 29.12.17 sensor bad; SD 103122061
1 C&I Vacuum pump suction valve instrument air in common line leakage28.12.17 103122141
2 BMD Secondary air duct supports got corroded near ECO hoppers 27.12.17 05.01.18 Strengthening & painting
3 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 uo; 103119076
4 Civil Seal air fans A & B foundation repair works 26.12.17 07.1.18 completion of fan B found 103118376
5 EMD CW pump-4 , CW pump-3 Lub water pumps-A & B EPB covers dam26.12.17 103114446
6 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 31.12.17 cables will be layed first, 103116156
7 EMD NO LIGHTNING AT U#3 TG ENCLOSER 17 M 22.12.17 28 2 lights will be given; LED 103115359
UNIT 4
28.12.1BMD PAPH-4A Main Motor man handle shaft oil lkg 29.12.17 103123058
1 BMD PA fan-B control oil pressure is hunting from 11ksc to 14 ksc. 26.12.17 UO uo ; cooler c/o done 103116588
2 C&I Generator cold gas temperature control valve operation sluggish. 26.12.17 SP changed 45 to 42 103117647
3 BMD Mill-E high coal in reject and current hunting. 19.12.17 uo ATTENDED, KEPT UNDER 103112034
OFFSITES
3 AHD Stage-2 AHP vacuum pump-4D2 tripping on over load, 27.12.17 29.12.17 VP 3d1 ok
4 AHD/BMD BH-3D bag filter cleaning under permit, 27.12.17 3d att BH-4D under permit from 26/12/17.
6 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 30.12.17
7 AHM Stg-2 AW R/c pump-2 DE side vibrations high - maintaining 14.6mm26.12.17 UP 103118302
11 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17 Attended ip
12 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up 30.12.1 att
13 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
14 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
2 EMD logic modification for stg 1 conv for start pre warning during post p 20.12.17
CHEMISTRY
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
2 C&I Feeder-D tripping frequently on "feeder not in remote" 28.12.17 ok Bunker-C emptied for insp 103114115
1 C&I MDBFP scoop not operating 28.12.17 ok under permit, MDBFP not a
3 TMD TG PHE-C ACW inlet line leakage developed. 26.12.17 Temp wooden plugged 103119116
1 AHM ESP pass-D fields 1D12 & 4D22 short. 26.12.17 UP 103120360
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43097
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
PRIORITY POINTS
1 C&I MDBFP scoop not operating 28.12.17 under permit, MDBFP not a
3 C&I/OS CW Pump-4 hydraulic power pack oil pump taking start frequently 27.12.17 under obser
4 C&I FD fans B blade pitch is varying continously by 3% . 26.12.17 under obserChecked ; FD B hunting 2 103117019
UNIT -2
3 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 30.12.17 spare NA ; 103098730
UNIT-3
1 C&I Vacuum pump suction valve instrument air line leakage 28.12.17 103122141
2 BMD Secondary air duct supports got corroded near ECO hoppers 27.12.17 05.01.18 Strengthening & painting
3 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 uo; 103119076
4 Civil Seal air fans A & B foundation repair works 26.12.17 07.1.18 completion of fan B found 103118376
5 EMD CW pump-4 , CW pump-3 Lub water pumps-A & B EPB covers dam26.12.17 103114446
6 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 31.12.17 cables will be layed first, 103116156
7 EMD NO LIGHTNING AT U#3 TG ENCLOSER 17 M 22.12.17 28 2 lights will be given; LED 103115359
UNIT 4
2 C&I Feeder-D tripping frequently on "feeder not in remote" 28.12.17 UO Bunker-C emptied for insp 103114115
4 BMD PA fan-B control oil pressure is hunting from 11ksc to 14 ksc. 26.12.17 UO uo ; cooler c/o done 103116588
5 C&I Generator cold gas temperature control valve operation sluggish. 26.12.17 at less loads; SP may be 103117647
6 BMD Mill-E high coal in reject and current hunting. 19.12.17 uo ATTENDED, KEPT UNDER 103112034
OFFSITES
3 AHD Stage-2 AHP vacuum pump-4D2 tripping on over load, 27.12.17 29.12.17 VP 3d1 ok
4 AHD/BMD BH-3D bag filter cleaning under permit, 27.12.17 3d i/p BH-4D under permit from 26/12/17.
6 C&I st 1 Restoration of Ash slurry series fluid coupling oil temperature p27.12.17 30.12.17
7 AHM Stg-2 AW R/c pump-2 DE side vibrations high - maintaining 14.6mm26.12.17 UP 103118302
8 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18 103114810
9 EMD Cables are hanging in CT Area 19.12.17 05.01.18 ip
11 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17 28.12.17 ip
12 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up 30.12.1 30
13 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
14 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHP
1 CHP MM &Conv 6 A /B support structure foundation strengthening works - (o 27.12.17 start from 0 Conv 6 A will not be avl for
2 EMD logic modification for stg 1 conv for start pre warning during post p 20.12.17
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
10 EMD HIGH MAST TOWER LIGHT@RAW PH NOT WORKING 15.12.17 22.12.17 temp supply given;ok
7 AHM Stg-2 ASS-A flushing valve passing heavily. 26.12.17 att 103116755
8 OFS CSSP-1 discharge line having leakage. 26.12.17 att 103117980
3 TMD TG PHE-C ACW inlet line leakage developed. 26.12.17 Temp wooden plugged 103119116
1 AHM ESP pass-D fields 1D12 & 4D22 short. 26.12.17 UP 103120360
8 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 att in progress;
4 C&I HP Bypass RHS Flow Tx-1 hunting. 26.12.17 under obser 103118382
2 When ever Mill-F is in service ,MS & RH metal temperature maintai27.12.17 Dirty pittoute test done ;
10 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 Completed work in progress; 21 com 103095979
6 TMD TDBFP B seal stm suply ctrl V/V gland LKG 23.12.17 atyt 103117171
5 EMD Station Transformer-1 oil seepage from radiator bank. 26.12.17 attended Very minor ; 103117919
3 TMD Control fluid recirulation pump-A not developing pressure. 26.12.17 ok 103118015
5 TMD GSC min R/C line body leakage-CD41 valve 14.12.17 att online injection will be do 103105313
3 EMD Generator Seal oil H2/Air side interconnection valve having gland 26.12.17 attended 103120218
1 ID Fan-B current hunting in both the channels by 250 A & Speed h 27.12.17 ok
1 EMD Stg-1 Ash water sump MU(blowdown) valve is not operating . 26.12.17 att 103120282
7 TMD TDBFP-3B RH spray vent line V/Vgland LKG 23.12.17 attended online injection will be do 103117168
9 TMD TDBFP-4A RH SPRAY LINE FIRST VENT V/V G/L 21.12.17 att 103114804
5 AHM Clinker grinder-D discharge gate not closing 26.12.17 att 103119437
6 C&I Soot blower control valve SD-24 position feedback hunting. 26.12.17 att 103118388
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43095
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
PRIORITY POINTS
UNIT -1
1 C&I FD fans A & B blade pitch is varying continously by 3% . 26.12.17 under obserChecked ; FD B hunting 2 103117019
7 OFS Potable water leak at unloading area and FOPH entrance. 18.12.17 up 21.12.17cables beneath area; with 103110757
UNIT -2
1 AHM ESP pass-D fields 1D12 & 4D22 short. 26.12.17 UP 103120360
2 C&I CEP-A tripping on flow low on starting. 26.12.17 uo C&I side OK; 103119591
3 EMD Generator Seal oil H2/Air side interconnection valve having gland 26.12.17 attended 103120218
5 TMD GSC min R/C line body leakage-CD41 valve 14.12.17 att online injection will be do 103105313
6 TMD MDBFP BP nde side cooling water lkg 13.12.17 27.12.17 PERMIT REQUIRED; 2 hrs; 103101658
7 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 29.12.17 spare NA ; 103098730
8 TMD TDBFP-B ACV by pass vv CRH-13 gland leakage 07.12.17 26.12.17 online injection will be d
UNIT-3
1 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 uo; 103119076
2 Civil Seal air fans A & B foundation repair works 26.12.17 completion of one founda 103118376
3 TMD Control fluid recirulation pump-A not developing pressure. 26.12.17 up 103118015
4 EMD CW pump-4 , CW pump-3 Lub water pumps-A & B EPB covers dam26.12.17 103114446
5 EMD Station Transformer-1 oil seepage from radiator bank. 26.12.17 attended Very minor ; 103117919
6 TMD TDBFP B seal stm suply ctrl V/V gland LKG 23.12.17 atyt 103117171
8 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 27.12.17 103116156
10 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 Completed work in progress; 21 com 103095979
12 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 28.12.17 in progress;
UNIT 4
1 BMD PA fan-B control oil pressure is hunting from 11ksc to 14 ksc. 26.12.17 103116588
2 BMD PAPH-B abnormal sound and vibrations from fluid coupling. 26.12.17 opp 103116160
4 C&I Generator cold gas temperature control valve operation sluggish. 26.12.17 103117647
5 BMD PAPH- A flue gas side NMEJs got punctured 22.12.17 Near GB; divertion kopp
6 BMD Mill-E high coal in reject and current hunting. 19.12.17 uo ATTENDED, KEPT UNDER 103112034
OFFSITES
1 EMD Stg-1 Ash water sump MU(blowdown) valve is not operating . 26.12.17 att 103120282
2 AHM Stg-2 AW R/c pump-2 DE side vibrations high - maintaining 14.6mm26.12.17 103118302
3 AHM Stg-2 ASS-A flushing valve passing heavily. 26.12.17 27 103116755
4 OFS CSSP-1 discharge line having leakage. 26.12.17 27 103117980
6 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18 103114810
9 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17 28.12.17 ip
11 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up 20.12.1 30
CHEMISTRY
CHP
EMD Incorporation of siren, during every start of conveyor to be done 20.12.17
CIVIL dept not attending the CHP meeting
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
7 TMD TDBFP-3B RH spray vent line V/Vgland LKG 23.12.17 attended online injection will be do 103117168
9 TMD TDBFP-4A RH SPRAY LINE FIRST VENT V/V G/L 21.12.17 att 103114804
5 AHM Clinker grinder-D discharge gate not closing 26.12.17 att 103119437
6 C&I Soot blower control valve SD-24 position feedback hunting. 26.12.17 att 103118388
3 C&I Oil guns-CD1 and CD3 not proving. 26.12.17 att 103119665
1 EMD Stg-2 ASP-C2 breaker is not getting racked in/ out. 26.12.17 att 103119090
5 BMD Mill 2C rej LINE HOLE OVER TRUSSEL 16.12.17 Attended work in progress; 103105313
1 C&I Flue gas O2 RHS Tx-2 value is not responding. 26.12.17 Attended 103118830
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 Attended and put in servi
6 AHD ALV-3D UDG passing & BH-3D bag filters choke 20.12.17 21 attended
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43095
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
PRIORITY POINTS
UNIT -1
1 C&I Flue gas O2 RHS Tx-2 value is not responding. 26.12.17 Attended 103118830
2 C&I FD fans A & B blade pitch is varying continously by 3% . 26.12.17 under obserChecked 103117019
6 EMD ESP field 2D21 not developing voltage 26.12.17 short declared 103120219
8 OFS Potable water leak at unloading area and FOPH entrance. 18.12.17 up 21.12.17cables beneath area 103110757
UNIT -2
1 AHM ESP pass-D fields 1D12 & 4D22 short. 26.12.17 103120360
3 EMD Generator Seal oil H2/Air side interconnection valve having gland 26.12.17 103120218
5 BMD Mill 2C rej LINE HOLE OVER TRUSSEL 16.12.17 Attended work in progress; 103105313
6 TMD GSC min R/C line body leakage-CD41 valve 14.12.17 26.12.17 online injection will be do 103105313
7 TMD MDBFP BP nde side cooling water lkg 13.12.17 27.12.17 PERMIT REQUIRED; 2 hrs; 103101658
8 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 29.12.17 spare NA ; 103098730
9 TMD TDBFP-B ACV by pass vv CRH-13 gland leakage 07.12.17 26.12.17 online injection will be do
UNIT-3
1 BMD PAPH-A main motor current spikes coming and gearbox having ab 26.12.17 103119076
3 TMD Control fluid recirulation pump-A not developing pressure. 26.12.17 103118015
4 EMD CW pump-4 , CW pump-3 Lub water pumps-A & B EPB covers dam26.12.17 103114446
5 EMD Station Transformer-1 oil seepage from radiator bank. 26.12.17 under permiVery minor ; 103117919
6 TMD TDBFP B seal stm suply ctrl V/V gland LKG 23.12.17 26 103117171
7 TMD TDBFP-3B RH spray vent line V/Vgland LKG 23.12.17 attended online injection will be do 103117168
9 EMD SGECW-B EPB pressed alarm appeared in MMI 22.12.17 27.12.17 103116156
6 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 24.12.17 work in progress; 21 com 103095979
8 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 24.12.17 in progress;
9 TMD ACW-C NRV passing. 16.11.17 19.12.17 Matl not avl : PO to be plac 103052907
UNIT 4
1 BMD PA fan-B control oil pressure is hunting from 11ksc to 14 ksc. 26.12.17 103116588
2 BMD PAPH-B abnormal sound and vibrations from fluid coupling. 26.12.17 103116160
3 C&I Oil guns-CD1 and CD3 not proving. 26.12.17 att 103119665
5 AHM Clinker grinder-D discharge gate not closing 26.12.17 att 103119437
6 C&I Soot blower control valve SD-24 position feedback hunting. 26.12.17 att 103118388
7 C&I Generator cold gas temperature control valve operation sluggish. 26.12.17 103117647
8 BMD PAPH- A flue gas side NMEJs got punctured 22.12.17 gb a
9 TMD TDBFP-4A RH SPRAY LINE FIRST VENT V/V G/L 21.12.17 att 103114804
3 BMD Mill-E high coal in reject and current hunting. 19.12.17 ATTENDED, KEPT UNDER 103112034
OFFSITES
1 EMD Stg-2 ASP-C2 breaker is not getting racked in/ out. 26.12.17 att 103119090
2 EMD Stg-1 Ash water sump MU(blowdown) valve is not operating . 26.12.17 103120282
3 AHM Stg-2 AW R/c pump-2 DE side vibrations high - maintaining 14.6mm26.12.17 103118302
4 AHM Stg-2 ASS-A flushing valve passing heavily. 26.12.17 103116755
5 OFS CSSP-1 discharge line having leakage. 26.12.17 103117980
6 AHD ST-2 AHS TAC-3B drier tripping on LP press low. 22.12.17 ok TMD SIDE ATTENDED, C 103116142
7 CIVIL Repair of concrete pedestals inside St 1 Ash slurry pump house 21.12.17
8 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18 103114810
7 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17 ip
8 EMD HIGH MAST TOWER LIGHT@RAW PH NOT WORKING 15.12.17 22.12.17 temp supply given;
9 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up 20.12.1
10 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
11 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 Attended and put in servi
6 AHD ALV-3D UDG passing & BH-3D bag filters choke 20.12.17 21 attended
4 OFS St2 fire hyd pumps common r/c line gasket leakage 21.12.17 attended 103114813
3 BMD Mill-E coal pipe PF leakage from 1st bend 19.12.17 ok Mill-A bunker emptying in 103111245
4 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 23.12.17 attended ###
201712OFS sea wtr lub wtr filter i/l line lkg ok 103116221
6 BMD Mill-4F L.O p/p both A &B seal leakage 21.12.17 attended 103111605
4 EMD/BMD ESP Pass-4D I/L gate not operating 22.12.17 ok attended 103116106
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 59/64 79 /80 78/80; D Pass isolated 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
PRIORITY POINTS
2 CHP TP-7 & 8 Cladding & Structure Repair WHP 43089 43092
6 BMD Unit 1 ESP I/L duct APPROACH FABRICATION WORKS HWP 43087 43452
8 OFS PAINTING OF FIRE WATER LINES AT ESP AREA U 3 WHP 43088 43092
10 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43087 43093
13 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43087 43093
UNIT -1
3 OFS Potable water leak at unloading area and FOPH entrance. 18.12.17 21.12.17 103110757
UNIT -2
1 BMD Mill 2C rej LINE HOLE OVER TRUSSEL 16.12.17 22.12.17 work in progress; 103105313
2 TMD GSC min R/C line body leakage-CD41 valve 14.12.17 23.12.17 online injection will be do 103105313
3 TMD MDBFP BP nde side cooling water lkg 13.12.17 22.12.17 PERMIT REQUIRED; 2 hrs; 103101658
4 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 22.12.17 103098730
5 TMD TDBFP-B ACV by pass vv CRH-13 gland leakage 07.12.17 23.12.17 online injection will be do
UNIT-3
3 BMD Mill-E coal pipe PF leakage from 1st bend 19.12.17 24.12.17 Mill-A bunker emptying in 103111245
4 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 23.12.17 attended ###
5 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 24.12.17 work in progress; 21 com 103095979
UNIT 4
1 BMD All APHs flue gas side NMEJs got punctured 22.12.17
3 TMD TDBFP-4A RH SPRAY LINE FIRST VENT V/V G/L 21.12.17 103114804
5 BMD Mill-E high coal in reject and current hunting. 19.12.17 ATTENDED, KEPT UNDER 103112034
OFFSITES
1 AHD ST-2 AHS TAC-3B drier tripping on LP press low. 22.12.17 TMD SIDE ATTENDED, C 103116142
2 CIVIL Repair of concrete pedestals inside St 1 Ash slurry pump house 21.12.17
3 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 05.01.18 103114810
4 OFS St2 fire hyd pumps common r/c line gasket leakage 21.12.17 attended 103114813
9 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17 ip
10 EMD HIGH MAST TOWER LIGHT@RAW PH NOT WORKING 15.12.17 22.12.17 temp supply given;
11 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up 20.12.1
12 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
13 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
6 BMD Mill-4F L.O p/p both A &B seal leakage 21.12.17 attended 103111605
4 EMD/BMD ESP Pass-4D I/L gate not operating 22.12.17 ok attended 103116106
2 C&I Condensate cation conductivity maintaining more ,Drum chlorides 19.12.17 cond condctvity ok 2nd tx
3 TMD MOT VEF-1 oil leakage from gland. 18.12.17 21.12.17 ATTENDED, KEPT UNDER 103109449
1 EMD DC SOP taking auto start after trail run 22.12.17 uo Attended 103116247
1 C&I FG O2 RHS Tx-1 showing more at low load 21.12.17 ok attended 103112016
2 C&I Dearator level conrol valve CD 25 position not going above 75% 22.12.17 ok attended 103116262
11 OFS Stg-1 EDP pump-2 gland leakage. 09.12.17 att 4 hrs pumps stop required 103098170
8 Civil Stg-2 FOPH MCC room windows are damaged and false ceiling op
18.12.17 att false Celing attended 103109980
3 C&I/ AHD 1) Stage-1 ASS-31 scoop not increasing from remote 20.12.17 att
1 C&I/BMD Feeder-D tripping on Feeder not in remote protection 20.12.17 21 D - attended ; E - Under pe
5 EMD TG ECW-3C suction v/v open feed back not coming 16.12.17 ok emd to check 103103210
1 TMD TGECW pump-C pump NDE abnormal sound. 19.12.17 under permiattended 103110767
1 EMD Stage-1 FOPH MCC section-1 415 V LT breaker not closing 20.12.17 att 103113085
4 EMD Stg-1 ASP-21 motor having abnormal sound. 18.12.17 Attended under permit 103107328
4 C&I/ BMD Mill-E drop wise oil leakage from bottom bearing. 18.12.17 under permit
from RTD ; cni to check 103110080
9 EMD Poor Lighting; 1) Boiler corner-3 from AB to EF elevation 2) Contro 12.12.17 20.12.17 attended 103103210
5 C&I Upper OFA dampers not operating Cor2&4 16.12.17 attended ready ; i/p 103104529
2 C&I LPH-2 and LPH-3 getting isolated frequently. 18.12.17 ok CL302 level switch malfun 103110178
1 C&I CW Pump-4 hydraulic Power pack oil pump not taking start in auto 19.12.17 att Manually starting at press
2 C&I Generator LLD main lead bottom level high > Max alarm coming inte
18.12.17 att for alarm only 103110745
9 EMD Poor Lighting; 1) Stage2 Sea water SWGR room; U#4 ESP buildin12.12.17 16.12.17 4 att 103103190
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43091
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 59/64 79 /80 78/80; D Pass isolated 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
PRIORITY POINTS
2 CHP TP-7 & 8 Cladding & Structure Repair WHP 43089 43092
6 BMD Unit 1 ESP I/L duct APPROACH FABRICATION WORKS HWP 43087 43452
8 OFS PAINTING OF FIRE WATER LINES AT ESP AREA U 3 WHP 43088 43092
10 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43087 43093
13 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43087 43093
UNIT -1
1 C&I Dearator level control valve CD 22 malfunctioning 22.12.17 ok Position hunting from 40 t 103116259
2 C&I Dearator level conrol valve CD 25 position not going above 75% 22.12.17 ok 103116262
4 TMD MOT VEF-1 oil leakage from gland. 18.12.17 21.12.17 ATTENDED, KEPT UNDER 103109449
5 OFS Potable water leak at unloading area and FOPH entrance. 18.12.17 21.12.17 103110757
UNIT -2
1 C&I Condensate cation conductivity maintaining more ,Drum chlorides 19.12.17 cond condctvity ok 2nd tx
2 BMD Mill 2C rej LINE HOLE OVER TRUSSEL 16.12.17 22.12.17 work in progress; 103105313
3 TMD GSC min R/C line body leakage-CD41 valve 14.12.17 23.12.17 online injection will be do 103105313
4 TMD MDBFP BP nde side cooling water lkg 13.12.17 22.12.17 PERMIT REQUIRED; 2 hrs; 103101658
5 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 22.12.17 103098730
6 TMD TDBFP-B ACV by pass vv CRH-13 gland leakage 07.12.17 23.12.17 online injection will be do
UNIT-3
1 EMD DC SOP taking auto start after trail run 22.12.17 uo 103116247
2 BMD Mill-E coal pipe PF leakage from 1st bend 19.12.17 24.12.17 Mill-A bunker emptying in 103111245
3 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 23.12.17 ###
4 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 24.12.17 work in progress; 21 com 103095979
5 TMD COND DO HIGH WHILE CEP-C IN STANDBY 05.12.17 under observation; 103094415
UNIT 4
2 BMD All APHs flue gas side NMEJs got punctured 22.12.17
1 TMD TDBFP-4A RH SPRAY LINE FIRST VENT V/V G/L 21.12.17 103114804
2 BMD Mill-4F L.O p/p both A &B seal leakage 21.12.17 103111605
4 BMD Mill-E high coal in reject and current hunting. 19.12.17 UO 103112034
OFFSITES
1 AHD ST-2 AHS TAC-3B drier tripping on LP press low. 22.12.17 TAC-4A already under per 103116142
1 CIVIL Repair of concrete pedestals inside St 1 Ash slurry pump house 21.12.17
2 EMD St2 cwph Supply air fans 9-12 not taking start 21.12.17 103114810
3 OFS St2 fire hyd pumps common r/c line gasket leakage 21.12.17 103114813
4 AHD ALV-3D UDG passing & BH-3D bag filters choke 20.12.17 21 Passing attended;
5 EMD Cables are hanging in CT Area 19.12.17 ip
7 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17 ip
8 EMD HIGH MAST TOWER LIGHT@RAW PH NOT WORKING 15.12.17 22.12.17 temp supply given;
9 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up 20.12.1
10 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
13 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
11 OFS Stg-1 EDP pump-2 gland leakage. 09.12.17 att 4 hrs pumps stop required 103098170
8 Civil Stg-2 FOPH MCC room windows are damaged and false ceiling op
18.12.17 att false Celing attended 103109980
3 C&I/ AHD 1) Stage-1 ASS-31 scoop not increasing from remote 20.12.17 att
1 C&I/BMD Feeder-D tripping on Feeder not in remote protection 20.12.17 21 D - attended ; E - Under pe
5 EMD TG ECW-3C suction v/v open feed back not coming 16.12.17 ok emd to check 103103210
1 TMD TGECW pump-C pump NDE abnormal sound. 19.12.17 under permiattended 103110767
1 EMD Stage-1 FOPH MCC section-1 415 V LT breaker not closing 20.12.17 att 103113085
4 EMD Stg-1 ASP-21 motor having abnormal sound. 18.12.17 Attended under permit 103107328
4 C&I/ BMD Mill-E drop wise oil leakage from bottom bearing. 18.12.17 under permit
from RTD ; cni to check 103110080
9 EMD Poor Lighting; 1) Boiler corner-3 from AB to EF elevation 2) Contro 12.12.17 20.12.17 attended 103103210
5 C&I Upper OFA dampers not operating Cor2&4 16.12.17 attended ready ; i/p 103104529
2 C&I LPH-2 and LPH-3 getting isolated frequently. 18.12.17 ok CL302 level switch malfun 103110178
1 C&I CW Pump-4 hydraulic Power pack oil pump not taking start in auto 19.12.17 att Manually starting at press
2 C&I Generator LLD main lead bottom level high > Max alarm coming inte
18.12.17 att for alarm only 103110745
9 EMD Poor Lighting; 1) Stage2 Sea water SWGR room; U#4 ESP buildin12.12.17 16.12.17 4 att 103103190
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43090
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 59/64 79 /80 60/60 ; D Pass isolated 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 Matl recvd; Under permit
PRIORITY POINTS
4 CHP con-3b rec chute mother plate changing. HWP 43090 43091
5 CHP SR-3 SLEW GB OIL SEAL LKG NOTICED HWP 43090 43092
8 CHP TP-7 & 8 Cladding & Structure Repair WHP 43089 43092
12 CHP Cr-3,4 chute punctures & CH1 Windows rep HWP 43087 43088
15 BMD Unit 1 ESP I/L duct APPROACH FABRICATION WORKS HWP 43087 43452
17 OFS PAINTING OF FIRE WATER LINES AT ESP AREA U 3 WHP 43088 43092
19 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43087 43093
22 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43087 43093
UNIT -1
1 C&I LLD LEVEL AT MAIN LEADS ALARAM PERSISTING 21.12.17 ATTENDED 103113787
2 TMD MOT VEF-1 oil leakage from gland. 18.12.17 21 ATTENDED, KEPT UNDER 103109449
3 OFS Potable water leak at unloading area and FOPH entrance. 18.12.17 21 103110757
UNIT -2
1 C&I Condensate cation conductivity maintaining more ,Drum chlorides 19.12.17 cond condctvity ok 2nd tx
2 BMD Mill 2C rej LINE HOLE OVER TRUSSEL 16.12.17 22.12.17 ip 103105313
3 TMD GSC min R/C line body leakage-CD41 valve 14.12.17 23.12.17 online injection will be do 103105313
4 TMD MDBFP BP nde side cooling water lkg 13.12.17 22.12.17 PERMIT REQUIRED; 2 hrs; 103101658
5 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 22.12.17 103098730
6 TMD TDBFP-B ACV by pass vv CRH-13 gland leakage 07.12.17 23.12.17 online injection will be do
UNIT-3
3 BMD Mill-E coal pipe PF leakage from 1st bend 19.12.17 24 Mill-A bunker emptying in 103111245
4 C&I Mill-C air flow transmitters deviation high 19.12.17 ATTENDED 103111954
5 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 23.12.17 ###
6 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 24.12.17 work in progress; 21 com 103095979
7 TMD COND DO HIGH WHILE CEP-C IN STANDBY 05.12.17 under observation; 103094415
UNIT 4
1 TMD TDBFP-4A RH SPRAY LINE FIRST VENT V/V G/L 21.12.17 103114804
2 BMD Mill-4F L.O p/p both A &B seal leakage 21.12.17 103111605
2 BMD Mill-E high coal in reject and current hunting. 19.12.17 under permi76 to 126A 103112034
3 BMD ESP pass-D isolated for attending short fields. 19.12.17 21 103112037
5 TMD VAM-2 tripping on anti-freeze protection 12.12.17 20.12.17 attended;to check by op 103097939
OFFSITES
4 AHD ALV-3D UDG passing & BH-3D bag filters choke 20.12.17 21
7 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17 ip
8 EMD HIGH MAST TOWER LIGHT@RAW PH NOT WORKING 15.12.17 22.12.17 temp supply given;
9 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up 20.12.1
10 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
13 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHEMISTRY
CHP
1 CHP Sturctural distress observed in crusher house 1 21.12.17 Temp works in progress a
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
11 OFS Stg-1 EDP pump-2 gland leakage. 09.12.17 att 4 hrs pumps stop required 103098170
8 Civil Stg-2 FOPH MCC room windows are damaged and false ceiling op
18.12.17 att false Celing attended 103109980
3 C&I/ AHD 1) Stage-1 ASS-31 scoop not increasing from remote 20.12.17 att
1 C&I/BMD Feeder-D tripping on Feeder not in remote protection 20.12.17 21 D - attended ; E - Under pe
5 EMD TG ECW-3C suction v/v open feed back not coming 16.12.17 ok emd to check 103103210
1 TMD TGECW pump-C pump NDE abnormal sound. 19.12.17 under permiattended 103110767
1 EMD Stage-1 FOPH MCC section-1 415 V LT breaker not closing 20.12.17 att 103113085
4 EMD Stg-1 ASP-21 motor having abnormal sound. 18.12.17 Attended under permit 103107328
4 C&I/ BMD Mill-E drop wise oil leakage from bottom bearing. 18.12.17 under permit
from RTD ; cni to check 103110080
9 EMD Poor Lighting; 1) Boiler corner-3 from AB to EF elevation 2) Contro 12.12.17 20.12.17 attended 103103210
5 C&I Upper OFA dampers not operating Cor2&4 16.12.17 attended ready ; i/p 103104529
2 C&I LPH-2 and LPH-3 getting isolated frequently. 18.12.17 ok CL302 level switch malfun 103110178
1 C&I CW Pump-4 hydraulic Power pack oil pump not taking start in auto 19.12.17 att Manually starting at press
2 C&I Generator LLD main lead bottom level high > Max alarm coming inte
18.12.17 att for alarm only 103110745
9 EMD Poor Lighting; 1) Stage2 Sea water SWGR room; U#4 ESP buildin12.12.17 16.12.17 4 att 103103190
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 60/64 79 /80 60/60 ; D Pass isolated 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
2 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43087 43093
3 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43087 43093
UNIT -1
1 EMD Stage-1 FOPH MCC section-1 415 V LT breaker not closing 20.12.17 att 103113085
4 OFS Potable water leak at unloading area and FOPH entrance. 18.12.17 20 103110757
UNIT -2
3 BMD Mill 2C rej LINE HOLE OVER TRUSSEL 16.12.17 18.12.17 19 ip 103105313
4 TMD GSC min R/C line body leakage 14.12.17 23.12.17 online injection will be do 103105313
5 TMD MDBFP BP nde side cooling water lkg 13.12.17 19.12.17 PERMIT REQUIRED; 2 hrs; 103101658
6 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 22.12.17 22 103098730
7 TMD TDBFP-B CRH-13 gland leakage 07.12.17 23.12.17 online injection will be do
UNIT-3
2 TMD oil leakage from boiler side MOT filter 19.12.17 seepage; on opportnity aft 103111602
3 BMD Mill-E coal pipe PF leakage from 1st bend 19.12.17 21 Mill-A bunker emptying in 103111245
4 C&I Mill-C air flow transmitters deviation high 19.12.17 35/70 TPH; permit req 103111954
5 EMD TG ECW-3C suction v/v open feed back not coming 16.12.17 ok emd to check 103103210
10 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 20.12.17 ###
12 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 22.12.17 work in progress; up 103095979
13 TMD COND DO HIGH WHILE CEP-C IN STANDBY 05.12.17 under observation; 103094415
14 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
11 C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 permit required 103095979
15 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 22.12.17 in progress;
16 TMD ACW-C NRV passing. 16.11.17 19.12.17 Matl not avl : PO to be pla 103052907
UNIT 4
1 C&I/BMD Feeder-D tripping on Feeder not in remote protection 20.12.17 D - attended ; E - Under pe
1 TMD TGECW pump-C pump NDE abnormal sound. 19.12.17 under permiattended 103110767
2 BMD Mill-E high coal in reject and current hunting. 19.12.17 under permi76 to 126A 103112034
3 BMD ESP pass-D isolated for attending short fields. 19.12.17 under permi outlet gate-2 not closing 103112037
5 C&I VAM-2 tripping on anti-freeze protection 12.12.17 20.12.17 permit required; 103097939
OFFSITES
2 AHD ALV-3D UDG passing & BH-3D bag filters choke 20.12.17
3 C&I/ AHD 1) Stage-1 ASS-31 scoop not increasing from remote 20.12.17
6 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17 Notfcation not AVL
8 Civil Stg-2 FOPH MCC room windows are damaged and false ceiling op
18.12.17 21 false Celing attended 103109980
10 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up 20.12.1 CAN BE ERECTION PEND
11 OFS Stg-1 EDP pump-2 gland leakage. 09.12.17 20.12.17 4 hrs pumps stop required 103098170
10 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
11 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
4 EMD Stg-1 ASP-21 motor having abnormal sound. 18.12.17 Attended under permit 103107328
4 C&I/ BMD Mill-E drop wise oil leakage from bottom bearing. 18.12.17 under permit
from RTD ; cni to check 103110080
9 EMD Poor Lighting; 1) Boiler corner-3 from AB to EF elevation 2) Contro 12.12.17 20.12.17 attended 103103210
5 C&I Upper OFA dampers not operating Cor2&4 16.12.17 attended ready ; i/p 103104529
2 C&I LPH-2 and LPH-3 getting isolated frequently. 18.12.17 ok CL302 level switch malfun 103110178
1 C&I CW Pump-4 hydraulic Power pack oil pump not taking start in auto 19.12.17 att Manually starting at press
2 C&I Generator LLD main lead bottom level high > Max alarm coming inte
18.12.17 att for alarm only 103110745
9 EMD Poor Lighting; 1) Stage2 Sea water SWGR room; U#4 ESP buildin12.12.17 16.12.17 4 att 103103190
7 C&I Mill D Th padtemp 1 & 4 became bad. 14.12.17 18.12.17 Attended 103104529
8 BMD SCAPH drain lines from the common header leakages 12.12.17 20.12.17 Attended 103102358
4 BMD U#3 Feeder 3E I/L gate hard to operate 16.12.17 ok 103102358
1 C&I ACW common discharge pressure Tx-1 hunting 18.12.17 attended Alarm is continuously com 103098274
2 BMD Soot blower isolation valve SB-6 having gland leakage. 18.12.17 attended 103109970
5 C&I LPHeater-2 lvl trx 1& 2 dev high. 16.12.17 under obser20mm deviation; ok
4 C&I drum water cloride lab / mmi value misma 16.12.17 18.12.17 ip; ok 103101658
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43088
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 60/64 79 /80 60/60 ; D Pass isolated 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
PRIORITY POINTS
2 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43087 43093
3 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43087 43093
UNIT -1
4 OFS Potable water leak at unloading area and FOPH entrance. 18.12.17 20 103110757
UNIT -2
3 BMD Mill 2C rej LINE HOLE OVER TRUSSEL 16.12.17 18.12.17 19 ip 103105313
4 TMD GSC min R/C line body leakage 14.12.17 23.12.17 online injection will be do 103105313
5 TMD MDBFP BP nde side cooling water lkg 13.12.17 19.12.17 PERMIT REQUIRED; 2 hrs; 103101658
6 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 22.12.17 22 103098730
7 TMD TDBFP-B CRH-13 gland leakage 07.12.17 23.12.17 online injection will be do
UNIT-3
2 TMD oil leakage from boiler side MOT filter 19.12.17 seepage on opp 103111602
3 BMD Mill-E coal pipe PF leakage from 1st bend 19.12.17 21 Mill-A bunker emptying in 103111245
4 C&I Mill-C air flow transmitters deviation high 19.12.17 35/70 TPH; permit req 103111954
5 C&I Upper OFA dampers not operating Cor2&4 16.12.17 attended ready ; i/p 103104529
6 EMD TG ECW-3C suction v/v open feed back not coming 16.12.17 18.12.17 emd to check 103103210
9 EMD Poor Lighting; 1) Boiler corner-3 from AB to EF elevation 2) Contro 12.12.17 20.12.17 attended 103103210
10 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 20.12.17 ###
12 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 22.12.17 work in progress; up 103095979
13 TMD COND DO HIGH WHILE CEP-C IN STANDBY 05.12.17 i/s; under observation; CEP 103094415
14 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
11 C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 permit required 103095979
15 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 22.12.17 in progress;
16 TMD ACW-C NRV passing. 16.11.17 19.12.17 Matl not avl : PO to be pla 103052907
UNIT 4
1 TMD TGECW pump-C pump NDE abnormal sound. 19.12.17 under permi 103110767
2 BMD Mill-E high coal in reject and current hunting. 19.12.17 under permi76 to 126A 103112034
3 BMD ESP pass-D isolated for attending short fields. 19.12.17 under permi outlet gate-2 not closing 103112037
4 C&I/ BMD Mill-E drop wise oil leakage from bottom bearing. 18.12.17 under permit
from RTD ; cni to check 103110080
5 C&I VAM-2 tripping on anti-freeze protection 12.12.17 20.12.17 permit required; 103097939
OFFSITES
3 CIVIL Concrete chipping a required for supports of Ash Dispossal Line 19.12.17
4 EMD Stg-1 ASP-21 motor having abnormal sound. 18.12.17 Attended under permit 103107328
6 Civil Stg-2 FOPH MCC room windows are damaged and false ceiling op
18.12.17 21 false Celing attended 103109980
8 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 up20.12.17 CAN BE ERECTION PEND
9 OFS Stg-1 EDP pump-2 gland leakage. 09.12.17 20.12.17 4 hrs pumps stop required 103098170
10 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 permit req for 6 hrs . pro 103034882
11 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
9 EMD Poor Lighting; 1) Stage2 Sea water SWGR room; U#4 ESP buildin12.12.17 16.12.17 4 att 103103190
7 C&I Mill D Th padtemp 1 & 4 became bad. 14.12.17 18.12.17 Attended 103104529
8 BMD SCAPH drain lines from the common header leakages 12.12.17 20.12.17 Attended 103102358
4 BMD U#3 Feeder 3E I/L gate hard to operate 16.12.17 ok 103102358
1 C&I ACW common discharge pressure Tx-1 hunting 18.12.17 attended Alarm is continuously com 103098274
2 BMD Soot blower isolation valve SB-6 having gland leakage. 18.12.17 attended 103109970
5 C&I LPHeater-2 lvl trx 1& 2 dev high. 16.12.17 under obser20mm deviation; ok
4 C&I drum water cloride lab / mmi value misma 16.12.17 18.12.17 ip; ok 103101658
2 EMD ESP Field-4D22 DC volatge-0KV- Manual rapping done twice in las18.12.17 short ESP filed-1D12 already sh 103109939
6 Civil Stg-1 CW pump house toilet entrance door damaged 18.12.17 attended 103110820
7 OFS CW seal water pumps-2&4 having gland leak. 18.12.17 attended 103108997
2 AHM Stg-1 ASS-1 discharge valve having gland leakage. 18.12.17 attended 103110207
5 AHM Stg-2 FAHP-C NRV passing and gland leakage 18.12.17 attended 103109960
6 AHD St 2 Ash water pump house make up CW blowdown heavy lkg 16.12.17 attended
3 OFS CW seal water pumps - 5 & 6 oil draining from oil catcher. 18.12.17 attended 103110749
1 EMD Main tutrbine seal steam drain valve AS-152 overload acting while18.12.17 attended open & mod off; Repeatin 103109946
4 EMD SAPH-A sootblower motor running feed back not coming. 18.12.17 ok 103109943
5 BMD Flue gas ammonia dosing filling station manifold 2nd valve is passi18.12.17 ok Always two cylinders are 103107648
6 EMD Condenser pit dewatering pump-B not taking start. 18.12.17 ok Repeating. 103110569
2 EMD Diesel fire water booster pump not starting with battery-2 18.12.17 ok 103109904
7 EMD Stg-2 Ash water recirculation module doors not closing. 09.12.17 ATTENDED 103099786
2 OFS st-2 raw water pump-1&2 heavy gland leakage 13.12.17 ATTENDED
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 80 /80 76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (a 4.1 4.2 5.6 3.8 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 308 270 280 267 03.12.17 -3590
HYDROGEN DEW POINT 17.11.17 -17 -19 -18 -17 02.12.17 -3650
INSTRUMENT AIR DEW POINT 17.11.17 -39 NO Provision for sample 17.12.17-4020
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
2 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43087 43093
3 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43087 43093
4 CHP CONV 23B CHUTE INSP DOOR ANGLES TO B PRO HWP 43087 43088
5 CHP Cr-3,4 chute punctures & CH1 Windows rep HWP 43087 43088
6 BMD ESP I/L duct APPROACH FABRICATION WORKS HWP 43087 43452
UNIT -1
1 C&I Generator LLD main lead bottom level high > Max alarm coming inte
18.12.17 103110745
2 EMD Diesel fire water booster pump not starting with battery-2 18.12.17 103109904
4 OFS CW seal water pumps - 5 & 6 oil draining from oil catcher. 18.12.17 103110749
6 OFS Potable water leak at unloading area and FOPH entrance. 18.12.17 103110757
7 Civil Stg-1 CW pump house toilet entrance door damaged 18.12.17 103110820
UNIT -2
1 EMD Main tutrbine seal steam drain valve AS-152 overload acting while18.12.17 open & mod off; Repeatin 103109946
2 C&I LPH-2 and LPH-3 getting isolated frequently. 18.12.17 CL302 level switch malfun 103110178
3 EMD ESP Field-4D22 DC volatge-0KV- Manual rapping done twice in las18.12.17 ESP filed-1D12 already sh 103109939
4 EMD SAPH-A sootblower motor running feed back not coming. 18.12.17 103109943
5 BMD Flue gas ammonia dosing filling station manifold 2nd valve is passi18.12.17 Always two cylinders are 103107648
6 EMD Condenser pit dewatering pump-B not taking start. 18.12.17 Repeating. 103110569
8 C&I drum water cloride lab / mmi value misma 16.12.17 18 103101658
6 TMD GSC min R/C line body leakage 14.12.17 20.12.17 online injection will be do 103105313
7 TMD MDBFP BP nde side cooling water lkg 13.12.17 19.12.17 PERMIT REQUIRED 103101658
9 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 18.12.17 22 103098730
10 TMD TDBFP-B CRH-13 gland leakage 07.12.17 18.12.17 online injection will be d
11 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18 long
UNIT-3
1 C&I ACW common discharge pressure Tx-1 hunting 18.12.17 Alarm is continuously com 103098274
2 BMD Soot blower isolation valve SB-6 having gland leakage. 18.12.17 103109970
3 C&I Upper OFA dampers not operating Cor2&4 16.12.17 18 ready ; 103104529
4 BMD U#3 Feeder 3E I/L gate hard to operate 16.12.17 103102358
5 C&I TG ECW-3C suction v/v open feed back not 16.12.17 18 103103210
9 EMD Poor Lighting; 1) Boiler corner-3 from AB to EF elevation 2) Contro 12.12.17 18.12.17 103103210
9 C&I Drum hydrastep (LHS) fault persisting 11.12.17 long locally no leakage ###
10 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 20.12.17 ###
11 C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 08.12.17 permit required 103095979
12 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 19+3.12.17 work in progress; up 103095979
13 TMD COND DO HIGH WHILE CEP-C IN STANDBY 05.12.17 08.12.17 i/s; uo; 103094415
14 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
15 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.12.17 in progress;
16 TMD ACW-C NRV passing. 16.11.17 19.12.17 Matl not avl : PO to be pla 103052907
UNIT 4
1 BMD Mill-E drop wise oil leakage from bottom bearing. 18.12.17 103110080
2 AHM Stg-1 ASS-1 discharge valve having gland leakage. 18.12.17 103110207
3 AHM Stg-1 ASS-3 scoop not increasing and line leakage outside pump 18.12.17 103108596
4 Civil Stg-2 FOPH MCC room windows are damaged and false ceiling op
18.12.17 103109980
5 AHM Stg-2 FAHP-C NRV passing and gland leakage 18.12.17 103109960
6 AHD St 2 Ash water pump house make up CW blowdown heavy lkg 16.12.17 18.12.17
8 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 CAN BE ERECTION PEND
9 EMD Poor Lighting; 1) Stage2 Sea water SWGR room 12.12.17 16.12.17 103103190
10 OFS Stg-1 EDP pump-2 gland leakage. 09.12.17 4 hrs pumps stop required 103098170
12 EMD Poor Lighting : U#3&4 ESP building 18.11.17 16.12.17 u 3 COMPL BUT 4 pend
13 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
14 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL; 4t
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
10 C&I lph-2 alt drip cv dr37 , demand/ position mismatch 16.12.17 ok ATTEMPTED BUT STILL M 103098730
7 EMD Stg-2 Ash water recirculation module doors not closing. 09.12.17 ATTENDED 103099786
2 OFS st-2 raw water pump-1&2 heavy gland leakage 13.12.17 ATTENDED
10 C & I Vac p/p A ejec v/v open/close frequently 07.12.17 att 103093361
7 TMD Safety handrails around PHE pit area missing. 09.12.17 att 103099676
3 BMD Feeder-3E tripping on no coal on belt . 13.12.17 att
11 AHM Clinker grinder jet valve area platform grills loose. 09.12.17 att up 103098598
1 BMD SH spray isolation v/v SD06 gland lkg 13.12.17 attended 103103939
7 BMD Mill-H abnormal sound at all coal flows 11.12.17 Ok No ab sound persists ; ###
8 C&I Mill-J having high coal reject, suspecting more coal feeding 11.12.17 attended For the same coal flow: ###
12 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 19.12.17 Attended 103090183
9 OFS Live Reservoir inlet valve became free 09.12.17 attendeed Valve is closing on its own 103094885
1 BMD Mill-D abnormal sound and current hunting 11.12.17 attended current hunting increases ###
2 TMD IAC-2 water is mixing in lub oil system 11.12.17 attended second time
8 OFS Fire water booster pump NRV passing 07.12.17 attended 103095879
11 C&I CWP 2 top brg vibration x not responding 06.12.17 attended Will be done after CW PUM 103095269
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43085
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 80 /80 76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
PRIORITY POINTS
3 OFS U2 fire hydr line lhs lkg near blr lift WHP 43082 43083
7 BMD ESP I/L duct APPROACH FABRICATION WORKS HWP 43081 43085
8 BMD ESP I/L duct APPROACH FABRICATION WORKS WHP 43081 43085
13 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43080 43086
14 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43080 43086
15 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43080 43086
UNIT -1
UNIT -2
1 TMD GSC min R/C line body leakage 14.12.17 18.12.17 online injection will be do 103105313
2 OFS U2 fire hydr line lhs lkg near blr lift 13.12.17 compl 103104354
3 TMD MDBFP BP nde side cooling water lkg 13.12.17 PERMIT REQUIRED 103101658
5 EMD PHE pit de watering pump is running with temporaray calbe arra 11.12.17 23.12.17 Pump to be avl permanentl ###
6 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 18.12.17 103098730
7 TMD TDBFP-B CRH-13 gland leakage 07.12.17 18.12.17 online injection will be do
8 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18
9 OPRN/ EMDBUNKER-2C & 2H O/L GATE PASSING 02.12.17 OPERATION TO ARRANGE 103072750
UNIT-3
6 EMD Poor Lighting; 1) Boiler corner-3 from AB to EF elevation 2) Contro 12.12.17 18.12.17 103103210
7 C&I Drum hydrastep (LHS) fault persisting 11.12.17 locally no leakage ###
8 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 20.12.17 ###
9 OFS U-3Cable gallery mulsifire suction hdr lkg 07.12.17 13.12.17 attended 103095269
10 C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 08.12.17 permit required 103095979
11 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 12.12.17 work in progress 103095979
12 TMD COND DO HIGH WHILE CEP-C IN STANDBY 05.12.17 08.12.17 i/s 103094415
13 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
14 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.12.17 in progress;
15 TMD ACW-C NRV passing. 16.11.17 13.01.17 Matl not avl : PO to be pla 103052907
16 EMD/ C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiattended, 103052914
17 EMD/ C&I Debris filter-B Gear motor not taking start 02.12.17 attended 103090090
UNIT 4
2 BMD Mill 4E abnormal sound and high rejects 14.12.17 15.12.17 COMPL. 103104089
5 EMD Phosphate dozing P/p-A not taking start 13.12.17 15.12.17 attended
7 AHM BAOF Pump-A abnormal sound from fluid coupling. 09.12.17 attended 103098599
OFFSITES
2 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 CAN BE ERECTION PEND
4 EMD Poor Lighting; 1) Stage2 Sea water SWGR room 12.12.17 16.12.17 103103190
6 OFS HFO tank-2 sprinkler detectetion line leakage above tank 09.12.17 ATTENDED 103099188
9 EMD Stg-1 Ash water make up from CW blowdown valve not operating. 09.12.17 ATTENDED 103099341
11 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
12 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
7 EMD Stg-2 Ash water recirculation module doors not closing. 09.12.17 ATTENDED 103099786
2 C&I/ TMD Swyd AC compressor 1 tripped on LP PRESS low 13.12.17 ATTENDED
2 OFS st-2 raw water pump-1&2 heavy gland leakage 13.12.17 ATTENDED
10 C & I Vac p/p A ejec v/v open/close frequently 07.12.17 att 103093361
7 TMD Safety handrails around PHE pit area missing. 09.12.17 att 103099676
3 BMD Feeder-3E tripping on no coal on belt . 13.12.17 att
11 AHM Clinker grinder jet valve area platform grills loose. 09.12.17 att up 103098598
1 BMD SH spray isolation v/v SD06 gland lkg 13.12.17 attended 103103939
7 BMD Mill-H abnormal sound at all coal flows 11.12.17 Ok No ab sound persists ; ###
8 C&I Mill-J having high coal reject, suspecting more coal feeding 11.12.17 attended For the same coal flow: ###
12 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 19.12.17 Attended 103090183
9 OFS Live Reservoir inlet valve became free 09.12.17 attendeed Valve is closing on its own 103094885
1 BMD Mill-D abnormal sound and current hunting 11.12.17 attended current hunting increases ###
2 TMD IAC-2 water is mixing in lub oil system 11.12.17 attended second time
8 OFS Fire water booster pump NRV passing 07.12.17 attended 103095879
11 C&I CWP 2 top brg vibration x not responding 06.12.17 attended Will be done after CW PUM 103095269
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43084
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 80 /80 76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (a 4.5 4.9 5.3 3.7 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 300 270 280 275 03.12.17 -3590
HYDROGEN DEW POINT 17.11.17 -17 -19 -18 -17 02.12.17 -3650
INSTRUMENT AIR DEW POINT 17.11.17 -39 NO Provision for sample
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
3 OFS U2 fire hydr line lhs lkg near blr lift WHP 43082 43083
7 BMD ESP I/L duct APPROACH FABRICATION WORKS HWP 43081 43085
8 BMD ESP I/L duct APPROACH FABRICATION WORKS WHP 43081 43085
13 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43080 43086
14 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43080 43086
15 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43080 43086
UNIT -1
UNIT -2
1 TMD GSC min R/C line body leakage 14.12.17 18.12.17 online injection will be do 103105313
2 OFS U2 fire hydr line lhs lkg near blr lift 13.12.17 work in progress 103104354
3 TMD MDBFP BP nde side cooling water lkg 13.12.17 PERMIT REQUIRED 103101658
5 EMD PHE pit de watering pump is running with temporaray calbe arra 11.12.17 23.12.17 Pump to be avl permanentl ###
6 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 18.12.17 103098730
7 TMD TDBFP-B CRH-13 gland leakage 07.12.17 18.12.17 online injection will be do
8 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18
9 OPRN/ EMDBUNKER-2C & 2H O/L GATE PASSING 02.12.17 OPERATION TO ARRANGE 103072750
UNIT-3
6 EMD Poor Lighting; 1) Boiler corner-3 from AB to EF elevation 2) Contro 12.12.17 18.12.17 103103210
7 C&I Drum hydrastep (LHS) fault persisting 11.12.17 locally no leakage ###
8 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 20.12.17 ###
9 OFS U-3Cable gallery mulsifir suction hdr lkg 07.12.17 13.12.17 103095269
10 C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 08.12.17 permit required 103095979
11 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 12.12.17 work in progress 103095979
12 TMD COND DO HIGH WHILE CEP-C IN STANDBY 05.12.17 08.12.17 i/s 103094415
13 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
14 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.12.17 in progress;
15 TMD ACW-C NRV passing. 16.11.17 13.01.17 Matl not avl : PO to be pla 103052907
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
16 EMD/ C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
17 EMD/ C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
2 BMD Mill 4E abnormal sound and high rejects 14.12.17 15.12.17 work in progress 103104089
3 C&I TDBFP-A seal steam controller tripping to manual frequently. 14.12.17 attended 103105754
4 TMD condenser vac P/p-4B abn sound from pump DE side 13.12.17 15.12.17 no abnormal sound found 103103946
7 AHM BAOF Pump-A abnormal sound from fluid coupling. 09.12.17 work in progress 103098599
OFFSITES
2 EMD RAWPH ST2 BATTERY ROOM EXHAUST FAN NOT WORKING 15.12.17 CAN BE ERECTION PEND
4 EMD Poor Lighting; 1) Stage2 Sea water SWGR room 12.12.17 16.12.17 103103190
6 OFS HFO tank-2 sprinkler detectetion line leakage above tank 09.12.17 103099188
9 EMD Stg-1 Ash water make up from CW blowdown valve not operating. 09.12.17 103099341
11 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
12 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
7 EMD Stg-2 Ash water recirculation module doors not closing. 09.12.17 ATTENDED 103099786
2 OFS st-2 raw water pump-1&2 heavy gland leakage 13.12.17 ATTENDED
10 C & I Vac p/p A ejec v/v open/close frequently 07.12.17 att 103093361
7 TMD Safety handrails around PHE pit area missing. 09.12.17 att 103099676
3 BMD Feeder-3E tripping on no coal on belt . 13.12.17 att
11 AHM Clinker grinder jet valve area platform grills loose. 09.12.17 att up 103098598
1 BMD SH spray isolation v/v SD06 gland lkg 13.12.17 attended 103103939
7 BMD Mill-H abnormal sound at all coal flows 11.12.17 Ok No ab sound persists ; ###
8 C&I Mill-J having high coal reject, suspecting more coal feeding 11.12.17 attended For the same coal flow: ###
12 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 19.12.17 Attended 103090183
9 OFS Live Reservoir inlet valve became free 09.12.17 attendeed Valve is closing on its own 103094885
1 BMD Mill-D abnormal sound and current hunting 11.12.17 attended current hunting increases ###
2 TMD IAC-2 water is mixing in lub oil system 11.12.17 attended second time
8 OFS Fire water booster pump NRV passing 07.12.17 attended 103095879
11 C&I CWP 2 top brg vibration x not responding 06.12.17 attended Will be done after CW PUM 103095269
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43083
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 80 /80 76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (a 4.5 4.9 5.3 3.7 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 300 270 280 275 03.12.17 -3590
HYDROGEN DEW POINT 17.11.17 -17 -19 -18 -17 02.12.17 -3650
INSTRUMENT AIR DEW POINT 17.11.17 -39 NO Provision for sample
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
3 OFS U2 fire hydr line lhs lkg near blr lift WHP 43082 43083
7 BMD ESP I/L duct APPROACH FABRICATION WORKS HWP 43081 43085
8 BMD ESP I/L duct APPROACH FABRICATION WORKS WHP 43081 43085
13 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43080 43086
14 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43080 43086
15 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43080 43086
UNIT -1
1 EMD Gen Field Quadrature axis measurement coil current hunting. 14.12.17 for easurement oly; not us 103105769
UNIT -2
1 TMD GSC min R/C line body leakage 14.12.17 18.12.17 online injection will be do 103105313
2 OFS U2 fire hydr line lhs lkg near blr lift 13.12.17 work in progress 103104354
4 TMD MDBFP BP nde side cooling water lkg 13.12.17 PERMIT REQUIRED 103101658
6 EMD PHE pit de watering pump is running with temporaray calbe arra 11.12.17 23.12.17 Pump to be avl permanentl ###
8 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 18.12.17 103098730
9 TMD TDBFP-B CRH-13 gland leakage 07.12.17 18.12.17 online injection will be do
11 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18
8 TMD HP turbine shaft-1X & 1Y vibrations increasing with load reduction 04.12.17 NO Mech problem in m/c o 103093075
9 OPRN/ EMDBUNKER-2C & 2H O/L GATE PASSING 02.12.17 OPERATION TO ARRANGE 103072750
UNIT-3
7 EMD Poor Lighting; 1) Boiler corner-3 from AB to EF elevation 2) Contro 12.12.17 18.12.17 103103210
8 BMD ID Fan-B Fan NDE bearing oil leakage 11.12.17 attended R/C vv adj; oprn to see pr ###
9 C&I Drum hydrastep (LHS) fault persisting 11.12.17 locally no leakage ###
10 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 20.12.17 ###
13 OFS U-3Cable gallery mulsifir suction hdr lkg 07.12.17 13.12.17 103095269
14 C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 08.12.17 permit required 103095979
15 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 12.12.17 work in progress 103095979
16 TMD COND DO HIGH WHILE CEP-C IN STANDBY 05.12.17 08.12.17 i/s 103094415
17 TMD U#3 Ammonia p/p-A low discharge flow 05.12.17 attended TMD replaced pump but sti 103094309
18 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
19 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.12.17 in progress;
20 TMD ACW-C NRV passing. 16.11.17 13.01.17 Matl not avl : PO to be pla 103052907
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
21 EMD/ C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
22 EMD/ C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
1 BMD Mill 4E abnormal sound and high rejects 14.12.17 15.12.17 103104089 103104089
2 C&I TDBFP-A seal steam controller tripping to manual frequently. 14.12.17 103105754 103105754
3 TMD condenser vac P/p-4B abn sound from pump DE side 13.12.17 15.12.17 no abnormal sound found 103103946
9 BMD FD-fan-A&B common discharge duct insulation damaged. 09.12.17 18.12.17 103099700
10 BMD SAPH-A& B secondary air duct insulation hanging. 09.12.17 18.12.17 103099091
11 AHM BAOF Pump-A abnormal sound from fluid coupling. 09.12.17 103098599
13 BMD Mill-4F LOP-A seal oil leakage 07.12.17 08.12.17 no leakage found 103095854
OFFSITES
1 OFS Stage 2 raw water pump 1 leakage from discharge valve 14.12.17 Header drain required 103105865
6 OFS HFO tank-2 sprinkler detectetion line leakage above tank 09.12.17 103099188
7 EMD Stg-2 Ash water recirculation module doors not closing. 09.12.17 103099786
7 AHM ASP- 21 leakage at discharge flange 09.12.17 ASS-3 is not available, c 103099669
8 ASP-22 suction bolt got detached and having leakage. 09.12.17 Temporarily tied with rope 103099670
10 EMD Stg-1 Ash water make up from CW blowdown valve not operating. 09.12.17 103099341
11 AHD ESP Vacuum pump-3D2 not available 04.12.17 10.12.17 Under permit
14 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
15 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. BOD:14.12.17 ; PR : 300
COMPLETED JOBS
10 C & I Vac p/p A ejec v/v open/close frequently 07.12.17 att 103093361
7 TMD Safety handrails around PHE pit area missing. 09.12.17 att 103099676
3 BMD Feeder-3E tripping on no coal on belt . 13.12.17 att
11 AHM Clinker grinder jet valve area platform grills loose. 09.12.17 att up 103098598
1 BMD SH spray isolation v/v SD06 gland lkg 13.12.17 attended 103103939
7 BMD Mill-H abnormal sound at all coal flows 11.12.17 Ok No ab sound persists ; ###
8 C&I Mill-J having high coal reject, suspecting more coal feeding 11.12.17 attended For the same coal flow: ###
12 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 19.12.17 Attended 103090183
9 OFS Live Reservoir inlet valve became free 09.12.17 attendeed Valve is closing on its own 103094885
1 BMD Mill-D abnormal sound and current hunting 11.12.17 attended current hunting increases ###
2 TMD IAC-2 water is mixing in lub oil system 11.12.17 attended second time
8 OFS Fire water booster pump NRV passing 07.12.17 attended 103095879
11 C&I CWP 2 top brg vibration x not responding 06.12.17 attended Will be done after CW PUM 103095269
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43082
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 80 /80 76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (a 4.5 4.9 5.3 3.7 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 300 256 280 275 03.12.17 -3590
HYDROGEN DEW POINT 17.11.17 -17 -19 -18 -17 02.12.17 -3650
INSTRUMENT AIR DEW POINT 17.11.17 -39 NO Provision for sample
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
PRIORITY POINTS
5 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
6 AHD Mil reject hoppers in st 2 two ejector silos to be provided 08.12.17
7 AHD Interconnection of AWRC lines of st 1 & st2 to be done 06.12.17
8 OFS Make up Water connection of sweet water for st 2 CW forebay 08.12.17
1 BMD ESP I/L duct APPROACH FABRICATION WORKS WHP 43081 43085
2 BMD ESP I/L duct APPROACH FABRICATION WORKS HWP 43081 43085
3 CHP VGF-1 bypass to 2A mother plate worn out HWP 43081 43082
12 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43080 43086
13 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43080 43086
15 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43080 43086
UNIT -1
3 TMD BFP-B heavy steam leakage after ACV. 09.12.17 Passing; opportunity SD
UNIT -2
1 OFS U2 fire hydr line lhs lkg near blr lift 13.12.17 ip 103104354
4 TMD MDBFP BP nde side cooling water lkg 13.12.17 permit required oprn 103101658
6 EMD PHE pit de watering pump is running with temporaray calbe arra 11.12.17 23.12.17 Pump to be avl permanentl ###
8 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 18.12.17 103098730
9 TMD TDBFP-B CRH-13 gland leakage 07.12.17 .12.17 online injection will be do
10 C & I Vac p/p A ejec v/v open/close frequently 07.12.17 att 103093361
11 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18
UNIT-3
8 BMD ID Fan-B Fan NDE bearing oil leakage 11.12.17 R/C vv adj; oprn to see pr ###
9 C&I Drum hydrastep (LHS) fault persisting 11.12.17 locally no leakage ###
10 BMD Mill-E &C mixed PA duct insulation cladding sheets hanging 11.12.17 20.12.17 ###
11 AHM Clinker grinder jet valve area platform grills loose. 09.12.17 att up 103098598
13 OFS U-3Cable gallery mulsifir suction hdr lkg 07.12.17 13.12.17 103095269
14 C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 08.12.17 permit required 103095979
15 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 12.12.17 work in progress 103095979
16 TMD COND DO HIGH WHILE CEP-C IN STANDBY 05.12.17 08.12.17 i/s 103094415
17 TMD U#3 Ammonia p/p-A low discharge flow 05.12.17 08.12.17 TMD replaced pump but sti 103094309
18 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
19 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 09.12.17 in progress;
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
21 C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
22 C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD SH spray isolation v/v SD06 gland lkg 13.12.17 attended 103103939
3 TMD condenser vac P/p-4B abn sound from pump DE side 13.12.17 no abnormal sound found 103103946
7 BMD Mill-H abnormal sound at all coal flows 11.12.17 permit required ###
8 C&I Mill-J having high coal reject, suspecting more coal feeding 11.12.17 attended For the same coal flow: ###
9 BMD FD-fan-A&B common discharge duct insulation damaged. 09.12.17 18.12.17 103099700
10 BMD SAPH-A& B secondary air duct insulation hanging. 09.12.17 18.12.17 103099091
11 AHM BAOF Pump-A abnormal sound from fluid coupling. 09.12.17 103098599
12 TMD TDBFP-A ACV Steam line hole developed. 09.12.17 SV gasket leak SD 103099062
13 BMD Mill-4F LOP-A seal oil leakage 07.12.17 08.12.17 no leakage found 103095854
14 TMD Cond Vac P/P-4B suction mamual valve gland seal wtr lkg 07.12.17 seal water SD 103092826
OFFSITES
4 EMD Poor Lighting; 1) Stage2 Sea water SWGR room 12.12.17 103103190
6 OFS HFO tank-2 sprinkler detectetion line leakage above tank 09.12.17 103099188
7 EMD Stg-2 Ash water recirculation module doors not closing. 09.12.17 103099786
7 AHM ASP- 21 leakage at discharge flange 09.12.17 ASS-3 is not available, c 103099669
8 ASP-22 suction bolt got detached and having leakage. 09.12.17 Temporarily tied with rope 103099670
10 EMD Stg-1 Ash water make up from CW blowdown valve not operating. 09.12.17 103099341
11 AHD ESP Vacuum pump-3D2 not available 04.12.17 10.12.17 Under permit
14 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
15 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
1 TMD ARCW/ECW NRV replacement with duel plate check valves. 19.09.17 BOD:14.12.17 ; PR : 300
4 EMD 33kv Sweet water Lines replacement 19.09.17 NIT to be released (As 07
5 EMD 33kV stage-1 MST swgr breakers replacement 19.09.17 Extd BOD:29.12.17 ; PR
6 AHD AWRC pu coated pipe line replacement 19.09.17 BOD:14.12.17 ;PR 3000252
COMPLETED JOBS
1 BMD Mill-D abnormal sound and current hunting 11.12.17 attended current hunting increases ###
2 TMD IAC-2 water is mixing in lub oil system 11.12.17 attended second time
8 OFS Fire water booster pump NRV passing 07.12.17 attended 103095879
11 C&I CWP 2 top brg vibration x not responding 06.12.17 attended Will be done after CW PUM 103095269
13 OFS ARV lkg observed in CW p/p-2 before BFV 05.12.17 attended Will be done after CW PUM 103094681
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43081
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 80 /80 ; 76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
5 OFS PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43080 43086
7 OFS PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43080 43086
9 OFS PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43080 43086
UNIT -1
1 TMD BFP-B heavy steam leakage after ACV. 09.12.17 Passing; 103099415
2 CMP air compresser house doors not locking and window glass broken,07.12.17 CIVIL to Inspect and give t
UNIT -2
1 EMD PHE pit de watering pump is running with temporaray calbe arra 11.12.17 ###
2 TMD Safety handrails around PHE pit area missing. 09.12.17 103099676
3 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 103098730
5C & I Vac p/p A ejec v/v open/close frequently 07.12.17 08.12.17 103093361
6 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18
UNIT-3
6 OFS U-3Cable gallery mulsifir suction hdr lkg 07.12.17 13.12.17 103095269
7C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 08.12.17 permit required 103095979
8 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 12.12.17 work in progress 103095979
10 TMD U#3 Ammonia p/p-A low discharge flow 05.12.17 08.12.17 TMD replaced pump but sti 103094309
11 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
12 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 09.12.17 in progress;
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
14 C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
15 C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
2 C&I Mill-J having high coal reject, suspecting more coal feeding 11.12.17 For the same coal flow: ###
3 BMD FD-fan-A&B common discharge duct insulation damaged. 09.12.17 103099700
5 AHM BAOF Pump-A abnormal sound from fluid coupling. 09.12.17 103098599
6 TMD TDBFP-A ACV Steam line hole developed. 09.12.17 SV gasket leak SD 103099062
8 TMD Cond Vac P/P-4B suction mamual valve gland seal wtr lkg 07.12.17 seal water 103092826
OFFSITES
2 OFS HFO tank-2 sprinkler detectetion line leakage above tank 09.12.17 103099188
3 EMD Stg-2 Ash water recirculation module doors not closing. 09.12.17 103099786
6 AHM ASP- 21 leakage at discharge flange 09.12.17 ASS-3 is not available, c 103099669
7 ASP-22 suction bolt got detached and having leakage. 09.12.17 Temporarily tied with rope 103099670
8 OFS Live Reservoir inlet valve became free 09.12.17 Valve is closing on its own 103094885
9 EMD Stg-1 Ash water make up from CW blowdown valve not operating. 09.12.17 103099341
10 AHD ESP Vacuum pump-3D2 not available 04.12.17 10.12.17 Under permit
11 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 19.12.17 Attended 103090183
13 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
14 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
4 EMD 33kv Sweet water Lines replacement 19.09.17 PR under F&A vetting ; (
5 EMD 33kV stage-1 MST swgr breakers replacement 19.09.17 PR with C&M for floatng T
6 AHD AWRC pu coated pipe line replacement 19.09.17 PR releases pending wit
COMPLETED JOBS
1 BMD Mill-D abnormal sound and current hunting 11.12.17 attended current hunting increases ###
2 TMD IAC-2 water is mixing in lub oil system 11.12.17 attended second time
8 OFS Fire water booster pump NRV passing 07.12.17 attended 103095879
11 C&I CWP 2 top brg vibration x not responding 06.12.17 attended Will be done after CW PUM 103095269
13 OFS ARV lkg observed in CW p/p-2 before BFV 05.12.17 attended Will be done after CW PUM 103094681
10 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 attended permit required, operatio 103084821
3 BMD Mill-E reject dome valve seal damaged. 09.12.17 attended 103099404
4 OFS CW seal water pump-8 body getting hot. 09.12.17 attended 103099710
2 TMD ESP AHU-3 blower having abnormal sound. 09.12.17 attended 103098532
4 C&I CW-2 top bearing vibration : X not responding 08.12.17 attended 103095269
2 TMD TDBFP-B Main pump horizontal strainer having leakage. 09.12.17 attended 103099476
8 EMD FD-A LOP-A MOTOR ABNORMAL SOUND 06.12.17 attended motor decouple trial taken 103095879
3 BMD FD Fan-B LOP-A Pump side abnormal sound. 09.12.17 attended 103099655
4 TMD HPH-5A normal drip CV DR-15 having gland leakage. 09.12.17 attended 103099692
7 BMD Mill-E MDV and corner-1 coal pipe having PF leakage. 09.12.17 attended Repeating. 103099082
9 TMD TDBFP-A centrifuge area platform grills damaged. 09.12.17 attended 103098555
1 AHM Clinker grinder-B chamber back door having heavy leakage. 09.12.17 attended 103099672
14 TMD TDBFP-B horizontal strainer drain having leakage. 01.12.17 ok uo online inj will be done 103090090
15 BMD Mill-A gear box oil leakage in stand still condition. 01.12.17 ok uo > 36 deg ; declared ok b 103088971
5 BMD ST#2 MRHS conveying air line leakages. 07.12.17 att, to be checked 103094681
08.12.2BMD Drum sampling line 1st root valve from left having gland leakage. 09.12.17 att 103098710
TMD BFP-B main pump NDE seal water return line leak 08.12.17 ok uo 103098333
TMD BFP-B horizontal strainer drain valve leak 08.12.17 ok uo 103090090
7 C&I HPH-6B emergency drip valves ( DR-11) passing 18.11.17 08.12.17 attended 103072750
10 EMD PA system defects at various locations. 07.11.17 Attended spares not Available, 103055603
5 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 Attended will take up after After VA 103060714
1 AHM/C&I Stage-2 SILO-1 &2 LOS Rotary feeder intake valves & Vent valves 04.12.17 OK
7 EMD Unit-2 lighting defects 29.11.17 Attended i/p, Operation needs fee 103086555
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43078
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 80 /80 ; 76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
9 Unit 01 unit 1 esp inlet plat form required WHP 43075 43078
11 Coal Handlitp-22 to 23: channel fixing for roof sheet HWP 43074 43081
13 Coal HandliCH-1 Handrails & Cladding sheet works WHP 43073 43076
18 Offsite Stag PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43073 43079
19 Unit 03 PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43073 43079
20 Unit 04 PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43073 43079
UNIT -1
1 TMD BFP-B heavy steam leakage after ACV. 09.12.17 Passing; 103099415
5 CMP air compresser house doors not locking and window glass broken,07.12.17 CIVIL to Inspect and give t
UNIT -2
1 TMD Safety handrails around PHE pit area missing. 09.12.17 103099676
2 TMD ESP AHU-3 blower having abnormal sound. 09.12.17 attended 103098532
3 BMD SH LHS spray block valve (S-117) having body leakage. 09.12.17 103098730
5C & I Vac p/p A ejec v/v open/close frequently 07.12.17 08.12.17 103093361
6 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18
8 TMD HP turbine shaft-1X & 1Y vibrations increasing with load reduction 04.12.17 NO Mech problem in m/c o 103093075
9 OPRN/ EMDBUNKER-2C & 2H O/L GATE PASSING 02.12.17 OPERATION TO ARRANGE 103072750
10 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 attended permit required, operatio 103084821
UNIT-3
6 OFS U-3Cable gallery mulsifir suction hdr lkg 07.12.17 13.12.17 103095269
7C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 08.12.17 permit required 103095979
8 EMD FD-A LOP-A MOTOR ABNORMAL SOUND 06.12.17 attended motor decouple trial taken 103095879
9 C&I CWP 2 top brg vibration x not responding 06.12.17 Will be done after CW PUM 103095269
10 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 12.12.17 work in progress 103095979
11 OFS ARV lkg observed in CW p/p-2 before BFV 05.12.17 Will be done after CW PUM 103094681
13 TMD U#3 Ammonia p/p-A low discharge flow 05.12.17 08.12.17 TMD replaced pump but sti 103094309
15 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
16 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 09.12.17 in progress;
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
18 C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
19 C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
1 AHM Clinker grinder-B chamber back door having heavy leakage. 09.12.17 attended 103099672
3 BMD FD Fan-B LOP-A Pump side abnormal sound. 09.12.17 attended 103099655
4 TMD HPH-5A normal drip CV DR-15 having gland leakage. 09.12.17 attended 103099692
6 AHM BAOF Pump-A abnormal sound from fluid coupling. 09.12.17 103098599
7 BMD Mill-E MDV and corner-1 coal pipe having PF leakage. 09.12.17 attended Repeating. 103099082
9 TMD TDBFP-A centrifuge area platform grills damaged. 09.12.17 attended 103098555
10 TMD TDBFP-A ACV Steam line hole developed. 09.12.17 SV gasket leak SD 103099062
13 TMD Cond Vac P/P-4B suction mamual valve gland seal wtr lkg 07.12.17 seal water 103092826
OFFSITES
1 OFS HFO tank-2 sprinkler detectetion line leakage above tank 09.12.17 103099188
2 EMD Stg-2 Ash water recirculation module doors not closing. 09.12.17 103099786
5 AHM ASP- 21 leakage at discharge flange 09.12.17 ASS-3 is not available, c 103099669
6 ASP-22 suction bolt got detached and having leakage. 09.12.17 Temporarily tied with rope 103099670
7 OFS Live Reservoir inlet valve became free 09.12.17 Valve is closing on its own 103094885
8 EMD Stg-1 Ash water make up from CW blowdown valve not operating. 09.12.17 103099341
9 AHD ESP Vacuum pump-3D2 not available 04.12.17 10.12.17 Under permit
10 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 19.12.17 1 i/s; 103090183
12 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
13 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
4 EMD 33kv Sweet water Lines replacement 19.09.17 PR under F&A vetting ; (
5 EMD 33kV stage-1 MST swgr breakers replacement 19.09.17 PR with C&M for floatng T
6 AHD AWRC pu coated pipe line replacement 19.09.17 PR releases pending wit
COMPLETED JOBS
14 TMD TDBFP-B horizontal strainer drain having leakage. 01.12.17 ok uo online inj will be done 103090090
15 BMD Mill-A gear box oil leakage in stand still condition. 01.12.17 ok uo > 36 deg ; declared ok b 103088971
5 BMD ST#2 MRHS conveying air line leakages. 07.12.17 att, to be checked 103094681
08.12.2BMD Drum sampling line 1st root valve from left having gland leakage. 09.12.17 att 103098710
TMD BFP-B main pump NDE seal water return line leak 08.12.17 ok uo 103098333
TMD BFP-B horizontal strainer drain valve leak 08.12.17 ok uo 103090090
7 C&I HPH-6B emergency drip valves ( DR-11) passing 18.11.17 08.12.17 attended 103072750
10 EMD PA system defects at various locations. 07.11.17 Attended spares not Available, 103055603
5 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 Attended will take up after After VA 103060714
1 AHM/C&I Stage-2 SILO-1 &2 LOS Rotary feeder intake valves & Vent valves 04.12.17 OK
7 EMD Unit-2 lighting defects 29.11.17 Attended i/p, Operation needs fee 103086555
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43077
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 80 /80 ; 76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
5 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
6 AHD Mil reject hoppers in st 2 two ejector silos to be provided 08.12.17
3 Unit 01 unit 1 esp inlet plat form required WHP 43075 43078
5 Coal Handlitp-22 to 23: channel fixing for roof sheet HWP 43074 43081
7 Coal HandliCH-1 Handrails & Cladding sheet works WHP 43073 43076
12 Offsite Stag PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43073 43079
13 Unit 03 PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43073 43079
14 Unit 04 PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43073 43079
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
4 CMP air compresser house doors not locking and window glass broken,07.12.17 CIVIL to Inspect and give t
UNIT -2
2C & I Vac p/p A ejec v/v open/close frequently 07.12.17 08.12.17 103093361
3 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18
5 TMD HP turbine shaft-1X & 1Y vibrations increasing with load reduction 04.12.17 NO Mech problem in m/c o 103093075
8 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 08.12.17 permit required, operatio 103084821
9 C&I HPH-6B emergency drip valves ( DR-11) passing 18.11.17 08.12.17 attended 103072750
10 EMD PA system defects at various locations. 07.11.17 Attended spares not Available, 103055603
UNIT-3
3C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 08.12.17 permit required 103095979
4 BMD ST#2 MRHS conveying air line leakages. 07.12.17 att, to be checked 103094681
5 EMD FD-A LOP-A MOTOR ABNORMAL SOUND 06.12.17 up motor decouple trial taken 103095879
7 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 12.12.17 work in progress 103095979
10 TMD U#3 Ammonia p/p-A low discharge flow 05.12.17 08.12.17 TMD replaced pump but sti 103094309
11 TMD TDBFP-B horizontal strainer drain having leakage. 01.12.17 ok uo online inj will be done 103090090
12 BMD Mill-A gear box oil leakage in stand still condition. 01.12.17 ok uo > 36 deg ; declared ok b 103088971
14 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
15 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 09.12.17 in progress;
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
17 C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
18 C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
2 TMD Cond Vac P/P-4B suction mamual valve gland seal wtr lkg 07.12.17 seal water 103092826
4 AHD ESP Vacuum pump-3D2 not available 04.12.17 10.12.17 Under permit
5 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 19.12.17 1 i/s; 103090183
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
4 EMD 33kv Sweet water Lines replacement 19.09.17 PR under F&A vetting ; (
5 EMD 33kV stage-1 MST swgr breakers replacement 19.09.17 PR with C&M for floatng T
6 AHD AWRC pu coated pipe line replacement 19.09.17 PR releases pending wit
COMPLETED JOBS
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17 Attendd
5 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 Attended will take up after After VA 103060714
1 AHM/C&I Stage-2 SILO-1 &2 LOS Rotary feeder intake valves & Vent valves 04.12.17 OK
7 EMD Unit-2 lighting defects 29.11.17 Attended i/p, Operation needs fee 103086555
2 TMD ARCW-A pump NDE vibration high 21.11.17 Attended Pump bearings replaced. V conv27b to 18b mother plate damaged
5 C&I Mill-E motor NDE brg/shaft temp. bad 02.12.17 Attended 103089922
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 80 /80 ; 76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17 Attendd
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
5 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
6 AHD Mil reject hoppers in st 2 two ejector silos to be provided 08.12.17
7 AHD Interconnection of AWRC lines of st 1 & st2 to be done 06.12.17
8 OFS Make up Water connection of sweet water for st 2 CW forebay 08.12.17
1 Coal HandliVGF2: TOP STOP SCREEN rep & VGF1 scrn ck HWP 43076 43077 Attended
3 Coal HandliCONV 8B BELT SHORT & DEFLECTOR REPAIR HWP 43076 43077 Attended
7 Unit 01 unit 1 esp inlet plat form required WHP 43075 43078
9 Coal HandliConv-4A M.Plate Repl & Deflector Insp. HWP 43074 43075 Attended
11 Coal Handlitp-22 to 23: channel fixing for roof sheet HWP 43074 43081
13 Coal HandliRBF-2 TAIL PULLEY BRNG TEMPERATURE HI HWP 43073 43074 Attended
15 Coal HandliCH-1 Handrails & Cladding sheet works WHP 43073 43076
20 Offsite Stag PAINTING WORKS AT MAIN PLANT & OS AREA WHP 43073 43079
21 Unit 03 PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 43073 43079
22 Unit 04 PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 43073 43079
UNIT -1
UNIT -2
2C & I Vac p/p A ejec v/v open/close frequently 07.12.17 08.12.17 103093361
3 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18
5 TMD HP turbine shaft-1X & 1Y vibrations increasing with load reduction 04.12.17 NO Mech problem in m/c o 103093075
8 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 08.12.17 permit required, operatio 103084821
9 C&I HPH-6B emergency drip valves ( DR-11) passing 18.11.17 08.12.17 103072750
10 EMD PA system defects at various locations. 07.11.17 Attended spares not Available, 103055603
UNIT-3
3C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.17 08.12.17 permit required 103095979
4 BMD ST#2 MRHS conveying air line leakages. 07.12.17 att, to be checked 103094681
5 EMD FD-A LOP-A MOTOR ABNORMAL SOUND 06.12.17 08 checkedmotor decouple trial taken 103095879
7 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 12.12.17 work in progress 103095979
10 TMD U#3 Ammonia p/p-A low discharge flow 05.12.17 08.12.17 TMD replaced pump but sti 103094309
11 TMD TDBFP-B horizontal strainer drain having leakage. 01.12.17 07.12.17 online inj will be done 103090090
12 BMD Mill-A gear box oil leakage in stand still condition. 01.12.17 > 36 deg ; declared ok b 103088971
14 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
15 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 09.12.17 in progress;
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
17 C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
18 C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
2 TMD Cond Vac P/P-4B suction mamual valve gland seal wtr lkg 07.12.17 seal water 103092826
2 BMD LDO PUMP-B HIGH VIBRATION -7.5 MM/S 06.12.17 08.12.17 BMD WILL ATTEND ON 08
4 AHD ESP Vacuum pump-3D2 not available 04.12.17 10.12.17 Under permit
5 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 19.12.17 1 i/s; 103090183
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
4 EMD 33kv Sweet water Lines replacement 19.09.17 PR under F&A vetting ; (
5 EMD 33kV stage-1 MST swgr breakers replacement 19.09.17 PR with C&M for floatng T
6 AHD AWRC pu coated pipe line replacement 19.09.17 PR releases pending wit
COMPLETED JOBS
5 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 Attended will take up after After VA 103060714
1 AHM/C&I Stage-2 SILO-1 &2 LOS Rotary feeder intake valves & Vent valves 04.12.17 OK
7 EMD Unit-2 lighting defects 29.11.17 Attended i/p, Operation needs fee 103086555
2 TMD ARCW-A pump NDE vibration high 21.11.17 Attended Pump bearings replaced. V conv27b to 18b mother plate damaged
5 C&I Mill-E motor NDE brg/shaft temp. bad 02.12.17 Attended 103089922
6 C&I Mill -E C2 coal pipe tempature became bad. 01.12.17 Attended 103089922
7 C&I MILL-4A SEAL AIR VV CLOSED WHILE RUNNING 29.11.17 Attended 103086621
5 OFS Sweet water line leakage near logoon-1,Stage-1 sweet water pump-
04.12.17 Atended 103090644
3 EMD GT-1 & ST-1 tie breaker lockout relay operated alarm appeared twic04.12.17 Attdn 103093433
1 OFS HFO tank 2 sprinkler line leak near tank 05.12.17 Attenmde 103094685
7 OFS Stg-1 Sweet water pump-4 suction vent line damaged. 01.12.17 Attended 103090178
10 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 Attended c&i trip on before loading 103081659
11 EMD Stg-2 ASP A2 pump having abnormal sound. 24.11.17 Attended 103082230
6 AHM Stg-1 Ash slurry series,3 under PTW. 23.11.17 28.11.17 Attended
8 Civil Stg-2 FOPH toilet flush tank fallen down. 01.12.17 05.12.17 Attended 103089785
3 C&I CRB08 pr05 fault coming intermittently 02.12.17 attended under observation 103086555
1 BMD Mill-E heavy PF leakage from MDVs & coal pipe coupling. 04.12.17 up Attendd 103092721
1 C&I TDBFP B GB I/P TB TEMP AP00910 HUNTING ( 0-48) 05.12.17 uo checked 103093543
9 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 02.12.17 ATTENDED 103082986
2 C&I All LHS Flue gas temperature points of SH/RH zone became bad 04.12.17 attended 103093284
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43076
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 60 /80 ; A PASS ISOLATED
76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17 Attendd
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
5 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
5 CHP Conv-4A M.Plate Repl & Deflector Insp. HWP 05.12.17 06.12.17
6 CHP tp-22 to 23: channel fixing for roof sht HWP 05.12.17 12.12.17
10 CHP CH-1 Handrails & Cladding sheet works WHP 04.12.17 43076
13 Unit 01 unit 1 esp inlet plat form required WHP 06.12.17 43078
19 Unit 03 PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 04.12.17 43079
20 Unit 04 PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 04.12.17 43079
UNIT -1
1 C&I EHC posn fb Tx1,2 dev 4% intermittently(DURING PART LOAD) 05.12.17 attended 103091460
3 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 Attended 103082311
4 TMD ARCW-A pump NDE vibration high 21.11.17 07.12.17 Pump bearings replaced. V
5 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 attended
UNIT -2
1 C&I/ TMD TDBFP-B ACV POSITION SHOWING 7% AT NO DEMAND 06.12.17 Local also 7%; TMD, AC 103095154
2 BMD FEEDERS INLET GATE NOT OPERATING WITH CHAIN 06.12.17 31.01.18
5 TMD HP turbine shaft-1X & 1Y vibrations increasing with load reduction 04.12.17 NO Mech problem in m/c o 103093075
6 OPRN/ EMDBUNKER-2C & 2H O/L GATE PASSING 02.12.17 OPERATION TO ARRANGE 103072750
8 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 01.12.17 permit required, operatio 103084821
10 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
1 EMD FD-A LOP-A MOTOR ABNORMAL SOUND 06.12.17 motor decouple trial taken 103095879
2 C&I CWP 2 top brg vibration x not responding 06.12.17 pump s/d reqd 103095269
3 C&I CWP-3 MOTOR TOP BRG VIBRATION SPIKES 06.12.17 compl 103095877
4 CIVIL CW PUMP-5 BFV FOUNDATION STRUCTURE DAMAGED 06.12.17 12.12.17 work started 103095979
5 BMD RH Spray line SD-15 drain v/v gland lkg 06.12.17 attended 103095656
8 C&I CW PUMP-3 TOP BRG VIB BECAME BAD 05.12.17 compl 103076081
9 C&I Hotwell Sp.Conductivity (LHS) hunting (3-25) 05.12.17 attended, u/b 103093955
10 TMD U#3 Ammonia p/p-A low discharge flow 05.12.17 TMD replaced pump but sti 103094309
11 TMD TDBFP-B horizontal strainer drain having leakage. 01.12.17 07.12.17 online inj will be done 103090090
12 BMD Mill-A gear box oil leakage in stand still condition. 01.12.17 > 36 deg ; declared ok b 103088971
14 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
15 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 09.12.17 in progress;
16 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s long pending job, Design o 103061601
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
18 C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
19 C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
2 BMD PAPH-4A Gear box shaft oil leakage 06.12.17 very minor, declared 103095379
5 C&I HP Turbine rear bearing temperature ponit-7(1) hunting 04.12.17 Protection is from 2 points 103092826
6 BMD SAPH-B flue gas duct developed a hole near FG outlet damper. 04.12.17 compl 103079210
7 CHE Water Lkg from Sampling rack @ U#4 CPU 29.11.17 103087380
8 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 07.12.17 vacuum pp gasket repl. W
9 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 After VAM 2 103060714
OFFSITES
4 Stage-2 SILO-1 &2 LOS Rotary feeder intake valves & Vent valves 04.12.17
1 OFS LIVE RESERVOIR INLET VALVE BECAME FREE 06.12.17 attended 103094885
1 AHD ESP Vacuum pump-3D2 not available 04.12.17 10.12.17 Under permit
2 OFS Stg-1 EDP pump-2 having gland leakage. 01.12.17 07.12.17 attended 103090175
9 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 08.12.17 1 i/s; 103090183
7 EMD Poor Lighting : St 2 Ash Slurry Pump house, St 1TAC Area , U#3&4 18.11.17 28.11.17
8 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
9 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
4 EMD 33kv Sweet water Lines replacement 19.09.17 PR under F&A vetting ; (
5 EMD 33kV stage-1 MST swgr breakers replacement 19.09.17 PR with C&M for floatng T
6 AHD AWRC pu coated pipe line replacement 19.09.17 PR releases pending wit
COMPLETED JOBS
5 C&I Mill-E motor NDE brg/shaft temp. bad 02.12.17 Attended 103089922
6 C&I Mill -E C2 coal pipe tempature became bad. 01.12.17 Attended 103089922
7 C&I MILL-4A SEAL AIR VV CLOSED WHILE RUNNING 29.11.17 Attended 103086621
5 OFS Sweet water line leakage near logoon-1,Stage-1 sweet water pump-
04.12.17 Atended 103090644
3 EMD GT-1 & ST-1 tie breaker lockout relay operated alarm appeared twic04.12.17 Attdn 103093433
1 OFS HFO tank 2 sprinkler line leak near tank 05.12.17 Attenmde 103094685
7 OFS Stg-1 Sweet water pump-4 suction vent line damaged. 01.12.17 Attended 103090178
10 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 Attended c&i trip on before loading 103081659
11 EMD Stg-2 ASP A2 pump having abnormal sound. 24.11.17 Attended 103082230
6 AHM Stg-1 Ash slurry series,3 under PTW. 23.11.17 28.11.17 Attended
8 Civil Stg-2 FOPH toilet flush tank fallen down. 01.12.17 05.12.17 Attended 103089785
3 C&I CRB08 pr05 fault coming intermittently 02.12.17 attended under observation 103086555
1 BMD Mill-E heavy PF leakage from MDVs & coal pipe coupling. 04.12.17 up Attendd 103092721
1 C&I TDBFP B GB I/P TB TEMP AP00910 HUNTING ( 0-48) 05.12.17 uo checked 103093543
9 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 02.12.17 ATTENDED 103082986
2 C&I All LHS Flue gas temperature points of SH/RH zone became bad 04.12.17 attended 103093284
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43075
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 60 /80 ; A PASS ISOLATED
76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17 Attendd
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
5 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
5 CHP Conv-4A M.Plate Repl & Deflector Insp. HWP 05.12.17 06.12.17
6 CHP tp-22 to 23: channel fixing for roof sht HWP 05.12.17 12.12.17
10 CHP CH-1 Handrails & Cladding sheet works WHP 04.12.17 43076
13 Unit 01 unit 1 esp inlet plat form required WHP 06.12.17 43078
19 Unit 03 PAINTNG WORKS U#3 BOILER TURBINE AREA WHP 04.12.17 43079
20 Unit 04 PAINTNG WORKS U#4 BOILER TURBINE AREA WHP 04.12.17 43079
UNIT -1
1 C&I EHC posn fb Tx1,2 dev 4% intermittently(DURING PART LOAD) 05.12.17 103091460
3 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
5 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 permit req; vacuum pp gas
UNIT -2
1 C&I/ TMD TDBFP-B ACV POSITION SHOWING 7% AT NO DEMAND 06.12.17 Local also 7%; TMD 103095154
5 TMD HP turbine shaft-1X & 1Y vibrations increasing with load reduction 04.12.17 NO Mech problem in m/c o 103093075
6 OPRN/ EMDBUNKER-2C & 2H O/L GATE PASSING 02.12.17 OPERATION TO ARRANGE 103072750
8 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 01.12.17 permit required 103084821
9 C&I HPH-6B emergency drip valves ( DR-11) passing 18.11.17 Checked but; downstream 103072750
10 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
5 BMD RH Spray line SD-15 drain v/v gland lkg 06.12.17 103095656
8 C&I CW PUMP-3 TOP BRG VIB BECAME BAD 05.12.17 hunting 103076081
10 TMD U#3 Ammonia p/p-A low discharge flow 05.12.17 C&I prob 103094309
11 TMD TDBFP-B horizontal strainer drain having leakage. 01.12.17 07.12.17 online inj will be done 103090090
12 BMD Mill-A gear box oil leakage in stand still condition. 01.12.17 > 36 deg ; 103088971
14 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
15 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 09.12.17 in progress;
16 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s oem to check due to frequ 103061601
17 TMD ACW-C NRV passing. 16.11.17 oem to check due to frequ 103052907
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
18 EMD/C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
19 C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
5 C&I HP Turbine rear bearing temperature ponit-7(1) hunting 04.12.17 Protection is from 2 points 103092826
6 BMD SAPH-B flue gas duct developed a hole near FG outlet damper. 04.12.17 103079210
7 CHE Water Lkg from Sampling rack @ U#4 CPU 29.11.17 103087380
8 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 07.12.17 vacuum pp gasket repl. W
9 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 After VAM 2 103060714
OFFSITES
4 Stage-2 SILO-1 &2 LOS Rotary feeder intake valves & Vent valves 04.12.17
1 AHD ESP Vacuum pump-3D2 not available 04.12.17 10.12.17 Under permit
2 OFS Stg-1 EDP pump-2 having gland leakage. 01.12.17 07.12.17 103090175
9 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 08.12.17 1 i/s; 103090183
7 EMD Poor Lighting : St 2 Ash Slurry Pump house, St 1TAC Area , U#3&4 18.11.17 28.11.17
8 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
9 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
4 EMD 33kv Sweet water Lines replacement 19.09.17 PR under F&A vetting ; (
5 EMD 33kV stage-1 MST swgr breakers replacement 19.09.17 PR with C&M for floatng T
6 AHD AWRC pu coated pipe line replacement 19.09.17 PR releases pending wit
COMPLETED JOBS
5 C&I Mill-E motor NDE brg/shaft temp. bad 02.12.17 Attended 103089922
6 C&I Mill -E C2 coal pipe tempature became bad. 01.12.17 Attended 103089922
7 C&I MILL-4A SEAL AIR VV CLOSED WHILE RUNNING 29.11.17 Attended 103086621
5 OFS Sweet water line leakage near logoon-1,Stage-1 sweet water pump-
04.12.17 Atended 103090644
3 EMD GT-1 & ST-1 tie breaker lockout relay operated alarm appeared twic04.12.17 Attdn 103093433
1 OFS HFO tank 2 sprinkler line leak near tank 05.12.17 Attenmde 103094685
7 OFS Stg-1 Sweet water pump-4 suction vent line damaged. 01.12.17 Attended 103090178
10 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 Attended c&i trip on before loading 103081659
11 EMD Stg-2 ASP A2 pump having abnormal sound. 24.11.17 Attended 103082230
6 AHM Stg-1 Ash slurry series,3 under PTW. 23.11.17 28.11.17 Attended
8 Civil Stg-2 FOPH toilet flush tank fallen down. 01.12.17 05.12.17 Attended 103089785
3 C&I CRB08 pr05 fault coming intermittently 02.12.17 attended under observation 103086555
1 BMD Mill-E heavy PF leakage from MDVs & coal pipe coupling. 04.12.17 up Attendd 103092721
1 C&I TDBFP B GB I/P TB TEMP AP00910 HUNTING ( 0-48) 05.12.17 uo checked 103093543
9 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 02.12.17 ATTENDED 103082986
2 C&I All LHS Flue gas temperature points of SH/RH zone became bad 04.12.17 attended 103093284
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43074
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 78/80 ; 1A76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS 4th hopper choke ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17 Attendd
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
1 BMD St 1 LDO line replacement works 01.11.17 Corroded part replaced; P
2 CHEM DM Plant, CPU Resin replacement to reduce chlorides in DM Wate01.11.17
3 TMD Unit 4 Condensor Air ingress; Helium test to be done 01.11.17
4 AHD Re use of Overflow of BAOF tank into bottom hoppers 01.11.17
5 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
UNIT -1
3 C&I EHC posn fb Tx1,2 dev 4% intermittently(DURING PART LOAD) 05.12.17 103091460
3 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
5 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 vacuum pp gasket repl. W
UNIT -2
2 TMD HP turbine shaft-1X & 1Y vibrations increasing with load reduction 04.12.17 Normal :1X/1Y: 160 /55 , 103093075
3 C&I CRB08 pr05 fault coming intermittently 02.12.17 attended under observation 103086555
4 EMD BUNKER-2C & 2H O/L GATE PASSING 02.12.17 OPERATION TO ARRANGE 103072750
6 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 01.12.17 permit required 103084821
7 C&I /TMD HPH-6B emergency drip valves ( DR-11) passing 18.11.17 02.12.17 Checked but; downstream 103072750
8 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
1 BMD Mill-E heavy PF leakage from MDVs & coal pipe coupling. 04.12.17 up Attendd 103092721
2 TMD TDBFP-B horizontal strainer drain having leakage. 01.12.17 online inj will be done 103090090
3 BMD Mill-A gear box oil leakage in stand still condition. 01.12.17 > 36 deg 103088971
4 Civil Stg-2 FOPH toilet flush tank fallen down. 01.12.17 5 103089785
5 C&I BCW cooling water emergency drain v/v not working 29.11.17 09.12.17 SPARES REQD; permit iso 103087302
7 C&I ASLD 1,6,9,22 not responding to test. 27.11.17 long 9,22 COMPLETED 103084148
8 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
9 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 09.12.17 in progress;
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
10 EMD/C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
11 C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply not 103090090
UNIT 4
3 C&I HP Turbine rear bearing temperature ponit-7(1) hunting 04.12.17 Protection is from 2 points 103092826
4 BMD SAPH-B flue gas duct developed a hole near FG outlet damper. 04.12.17 103079210
5 C&I Mill-E motor NDE brg/shaft temp. bad 02.12.17 Attended 103089922
6 C&I Mill -E C2 coal pipe tempature became bad. 01.12.17 Attended 103089922
7 C&I MILL-4A SEAL AIR VV CLOSED WHILE RUNNING 29.11.17 Attended 103086621
8 CHE Water Lkg from Sampling rack @ U#4 CPU 29.11.17 103087380
8 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
1 OFS HFO tank 2 sprinkler line leak near tank 05.12.17 103094685
2 OFS sea water working line leakage at SWPH end 05.12.17 103091565
1 EMD GT-1 & ST-1 tie breaker lockout relay operated alarm appeared twic04.12.17 103093433
2 Stage-2 SILO-1 &2 LOS Rotary feeder intake valves & Vent valves 04.12.17
1 OFS Stg-1 Sweet water pump-4 suction vent line damaged. 01.12.17 103090178
3 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 08.12.17 1 i/s; 103090183
4 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 c&i trip on before loading 103081659
5 EMD Stg-2 ASP A2 pump having abnormal sound. 24.11.17 MNDE sound 103082230
6 AHM Stg-1 Ash slurry series,3 under PTW. 23.11.17 28.11.17 ASS-3 line leak,
7 EMD Poor Lighting : St 2 Ash Slurry Pump house, St 1TAC Area , U#3&4 18.11.17 28.11.17
8 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
9 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
4 EMD 33kv Sweet water Lines replacement 19.09.17 PR under F&A vetting ; (
5 EMD 33kV stage-1 MST swgr breakers replacement 19.09.17 PR with C&M for floatng T
6 AHD AWRC pu coated pipe line replacement 19.09.17 PR releases pending wit
COMPLETED JOBS
9 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 02.12.17 ATTENDED 103082986
2 C&I All LHS Flue gas temperature points of SH/RH zone became bad 04.12.17 attended 103093284
2 BMD MILL-2D MDV PF LEAKAGE 02.12.17 att ATTENDED BUT LKG STIL 103084821
03.12.2EMD ID Fan-B speed and demand mismatch 04.12.17 att Demand: 346 RPM, CH1 S 103092604
1 AHM Stg-2 AWRC pump-2 having gland leakage. 01.12.17 att 103090132
9 OFS Sea water lub water pump-3 NRV passing. 23.11.17 25.11.17 artt 103080284
5 EMD Sea water line-3 incomer breaker is not closing. 01.12.17 att 103089815
6 CIVIL for VIP visit the vegetation growth along the road from canteen upto28.11.17 29.11.17 att
1 EMD /TMD ARCW PP-B motor terminal got burnt & ARCW PP-A running with pu Attended ARCW PP-B under permit
1 C&I U4 ECO O2 LHS & RHS DEVIATION HIGH 29.11.17 ok LHS: 3.7/3.65, RHS: 2.4/3 103086602
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 78/80 ; 1A77/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
5 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
7 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 vacuum pp gasket repl. W
UNIT -2
2 BMD MILL-2D MDV PF LEAKAGE 02.12.17 att ATTENDED BUT LKG STIL 103084821
3 EMD BUNKER-2C & 2H O/L GATE PASSING 02.12.17 OPERATION TO ARRANGE 103072750
5 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 01.12.17 permit required 103084821
6 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 02.12.17 Checked but; downstream 103072750
7 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
1 C&I Debris filter-B Gear motor not taking start 02.12.17 local ok; 24 V supply 103090090
2 TMD TDBFP-B horizontal strainer drain having leakage. 01.12.17 online inj 103090090
3 BMD Mill-A gear box oil leakage in stand still condition. 01.12.17 103088971
4 Civil Stg-2 FOPH toilet flush tank fallen down. 01.12.17 103089785
5 C&I BCW cooling water emergency drain v/v not working 29.11.17 09.12.17 SPARES REQD 103087302
7 C&I ASLD 1,6,9,22 not responding to test. 27.11.17 9,22 COMPL, 103084148
8 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
UNIT 4
4 CHE Water Lkg from Sampling rack @ U#4 CPU 29.11.17 103087380
5 BMD Hot air leakage between Mill-G & H NMEJ 25.11.17 02.12.17 shut down job 103079642
6 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
1 OFS Stg-1 Sweet water pump-4 suction vent line damaged. 01.12.17 103090178
3 EMD Stg-2 Ash water R/C pump house AC not working. 01.12.17 103090183
4 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 c&i trip on before loading 103081659
5 EMD Stg-2 ASP A2 pump having abnormal sound. 24.11.17 MNDE sound 103082230
0.6 AHM /EMD Stg-1 Ash slurry series-41,3 under PTW. 23.11.17 28.11.17 ASS-3 line leak, ASP-41 m
7 EMD Poor Lighting : St 2 Ash Slurry Pump house, St 1TAC Area , U#3&4 18.11.17 28.11.17
8 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
9 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
4 EMD 33kv Sweet water Lines replacement 19.09.17 PR under F&A vetting ; (
5 EMD 33kV stage-1 MST swgr breakers replacement 19.09.17 PR with C&M for floatng T
6 AHD AWRC pu coated pipe line replacement 19.09.17 PR releases pending wit
COMPLETED JOBS
1 C&I U4 ECO O2 LHS & RHS DEVIATION HIGH 29.11.17 ok LHS: 3.7/3.65, RHS: 2.4/3 103086602
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 78/80 ; 1A76/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
MAIN PLANT FH PR AT HIGHEST POINT (a 5.9 5.8 7.3 4.9 23.11.17 -3500
TURBINE SEAL STEAM TEMP-Deg C (I/L) 284 282 272 258
HYDROGEN DEW POINT 17.11.17 -17 -17 -17 -16
INSTRUMENT AIR DEW POINT 17.11.17 -39 NO Provision for sample
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17
PRIORITY POINTS
UNIT -1
2 OFS CW seal water pump-6 having heavy gland leakage. 01.12.17 up ATTENDED
5 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
7 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 vacuum pp gasket repl. W
8 BMD HFO line tracing steam insulation to be provided 17.11.17 02.12.17/10ATTENDED 103071182
9 EMD SWP-9 MOTOR NDE SIDE ABNORMAL SOUND 27.11.17 up ATTENDED 103084778
UNIT -2
2 BMD Mill-C LOP-B Pump DE side having oil leakage. 01.12.17 ATTENDED 103089891
3 C&I TDBFP-B gland steam Tx's having deviation. 01.12.17 ATTENDED 103089794
7 C&I HPBP FAST OPEN NOT WORK WHEN TUR TRIP 29.11.17 TO BE REMOVED 103087209
8 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 01.12.17 permit required 103084821
9 C&I CEP C REC VALVE CD 14 dem /pos mismatch 27.11.17 02.12.17 ATTENDED 103084612
11 BMD/ C&I Sootblowing control valves SD-25 passing. 23.11.17 02.12.17 ATTENDED 103080547
12 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 02.12.17 Checked but; downstream 103072750
13 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
2 BMD Mill-A gear box oil leakage in stand still condition. 103088971
5 C&I BCW cooling water emergency drain v/v not working 29.11.17 09.12.17 SPARES REQD 103087302
7 C&I ASLD 1,6,9,22 not responding to test. 27.11.17 ok 9,22 COMPL, 103084148
8 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
9 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 02.12.17 103082986
UNIT 4
04.11.2 AHM ESP Pass-D fields:- 1D1, 3D2 & 4D2 are short. 103057246
3 BMD Mill-4J Thrust Pad temp maintaining high 29.11.17 up ATTENDED 103087483
4 CHE Water Lkg from Sampling rack @ U#4 CPU 29.11.17 103087380
6 BMD Hot air leakage between Mill-G & H NMEJ 25.11.17 02.12.17 shut down job 103079642
7 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
1 CIVIL for VIP visit the vegetation growth along the road from canteen upto28.11.17 29.11.17
2 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 c&i trip on before loading 103081659
3 EMD Stg-2 ASP A2 pump having abnormal sound. 24.11.17 MNDE sound 103082230
4 OFS Sea water lub water pump-3 NRV passing. 23.11.17 25.11.17 103080284
5 AHM /EMD Stg-1 Ash slurry series-41,3 under PTW. 23.11.17 28.11.17 ASS-3 line leak, ASP-41 m
6 EMD Poor Lighting : St 2 Ash Slurry Pump house, St 1TAC Area , U#3&4 18.11.17 28.11.17
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
1 C&I U4 ECO O2 LHS & RHS DEVIATION HIGH 29.11.17 ok LHS: 3.7/3.65, RHS: 2.4/3 103086602
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 78/80 ; 1A77/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ DegC OFF LINE ST-II IN / OUT 10.6/6.5 9DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12.5 13. DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17
PRIORITY POINTS
UNIT -1
5 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
7 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 vacuum pp gasket repl. W
8 BMD HFO line tracing steam insulation to be provided 17.11.17 02.12.17 103071182
9 EMD SWP-9 MOTOR NDE SIDE ABNORMAL SOUND 27.11.17 02.12.17 103084778
UNIT -2
3 C&I hphs getting bypassed spuriously 29.11.17 Checked; Under Observat 103086595
4 C&I HPBP FAST OPEN NOT WORK WHEN TUR TRIP 29.11.17 103087209
7 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 01.12.17 permit required 103084821
8 C&I CEP C REC VALVE CD 14 dem /pos mismatch 27.11.17 02.12.17 103084612
10 BMD/ C&I Sootblowing control valves SD-25 passing. 23.11.17 02.12.17 joint check done; permit 103080547
11 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 02.12.17 Checked but; downstream 103072750
12 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
1 C&I BCW cooling water emergency drain v/v not working 29.11.17 103087302
7 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
8 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 02.12.17 103082986
UNIT 4
3 BMD Mill-4J Thrust Pad temp maintaining high 29.11.17 75 deg when mill was in s 103087483
4 CHE Water Lkg from Sampling rack @ U#4 CPU 29.11.17 103087380
5 C&I CW-5 BFV power pack pr maintaining high.(220 KSC) 27.11.17 103084901
6 BMD Hot air leakage between Mill-G & H NMEJ 25.11.17 02.12.17 103079642
7 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
1 CIVIL for VIP visit the vegetation growth along the road from canteen upto28.11.17 29.11.17
2 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 c&i trip on before loading 103081659
3 EMD Stg-2 ASP A2 pump having abnormal sound. 24.11.17 MNDE sound 103082230
4 OFS Sea water lub water pump-3 NRV passing. 23.11.17 25.11.17 103080284
5 AHM /EMD Stg-1 Ash slurry series-41,3 under PTW. 23.11.17 28.11.17 ASS-3 line leak, ASP-41 m
6 EMD Poor Lighting : St 2 Ash Slurry Pump house, St 1TAC Area , U#3&4 18.11.17 28.11.17
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
11 C&I CW-5 BFV power pack pr maintaining high.(220 KSC) 27.11.17 attended 103084901
12 EMD 220 V DC CHARGER1 O/P VOLTAGE 264V IN MMI 29.11.17 attended 103087044
14 EMD HPH 5B EXV: 21 FEED BACK NOT COMING 29.11.17 att attended 103087040
2 TMD TDBFP-B ACV warm up valve having gland leakage. ok attended 103090092
3 TMD TDBFP-B main pump NDE seal water cooler union joint leakage. ok attended 103087856
4 C&I LPBP control fluid pump-2 dicharge hose having leakage. ok attended 103090094
1 C&I HPH-5A alternate drip demand/position having mismatch. 01.12.17 attended 103089504
6 C&I MILL-G HAD demand position mismatch 27.11.17 att attended 103083134
3 TMD LPBP line drain near SDFT gland leakage. 01.12.17 attended
1 C&I U4 ECO O2 LHS & RHS DEVIATION HIGH 29.11.17 ok LHS: 3.7/3.65, RHS: 2.4/3 103086602
9 EMD Stage-2 FOPH both the ACs not working 13.11.17 28.11.17 1st completed; 2nd 24.11
11 C&I LPH-2 getting isolated due to level switch malfunctioning & level t 25.11.17 ip Attended 103083361
12 TMD HPH-5A NDCV DR15 manual valve having gland leakage. 24.11.17 under permiAttended 103081892
5 BMD ID Fan-A LOP-A&B motor coupling guard missing. 24.11.17 29.11.17 Attended 103081442
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43069
Last Updated 0.3958333333
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 Short 60/64 78/80 ; 1A77/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ 6.5 DegC OFF LINE ST-II IN / OUT 11.4/7.3 9 DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12. 14.5/ DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17
PRIORITY POINTS
UNIT -1
5 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
7 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 vacuum pp gasket repl. W
8 BMD HFO line tracing steam insulation to be provided 17.11.17 02.12.17 103071182
9 EMD SWP-9 MOTOR NDE SIDE ABNORMAL SOUND 27.11.17 02.12.17 103084778
UNIT -2
4 C&I HPBP FAST OPEN NOT WORK WHEN TUR TRIP 29.11.17 103087209
7 BMD RH SPRAY VALVE SD-14 NO FLOW 27.11.17 01.12.17 permit required 103084821
8 C&I CEP C REC VALVE CD 14 dem /pos mismatch 27.11.17 02.12.17 103084612
10 BMD/ C&I Sootblowing control valves SD-25 passing. 23.11.17 02.12.17 joint check done; permit 103080547
11 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 02.12.17 Checked but; downstream 103072750
12 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
1 C&I BCW cooling water emergency drain v/v not working 29.11.17 103087302
7 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
8 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 02.12.17 103082986
UNIT 4
1 C&I U4 ECO O2 LHS & RHS DEVIATION HIGH 29.11.17 LHS: 3.7/3.65, RHS: 2.4/3 103086602
4 BMD Mill-4J Thrust Pad temp maintaining high 29.11.17 75 deg when mill was in s 103087483
6 CHE Water Lkg from Sampling rack @ U#4 CPU 29.11.17 103087380
7 C&I CW-5 BFV power pack pr maintaining high.(220 KSC) 27.11.17 103084901
8 BMD Hot air leakage between Mill-G & H NMEJ 25.11.17 02.12.17 103079642
9 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
1 CIVIL MS /GRP LINE NEAR OAC HAVING BUSHES 27.11.17 contract award pending
2 CIVIL for VIP visit the vegetation growth along the road from canteen upto28.11.17 29.11.17
3 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 c&i trip on before loading 103081659
4 Civil Sweet water yard area grass cutting required. 24.11.17 contract award pending 103082278
5 EMD Stg-2 ASP A2 pump having abnormal sound. 24.11.17 MNDE sound 103082230
6 OFS Sea water lub water pump-3 NRV passing. 23.11.17 25.11.17 103080284
7 AHM /EMD Stg-1 Ash slurry series-41,3 under PTW. 23.11.17 28.11.17 ASS-3 line leak, ASP-41 m
8 EMD Poor Lighting : St 2 Ash Slurry Pump house, St 1TAC Area , U#3&4 18.11.17 28.11.17
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
10 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
9 EMD Stage-2 FOPH both the ACs not working 13.11.17 28.11.17 1st completed; 2nd 24.11
11 C&I LPH-2 getting isolated due to level switch malfunctioning & level t 25.11.17 ip Attended 103083361
12 TMD HPH-5A NDCV DR15 manual valve having gland leakage. 24.11.17 under permiAttended 103081892
5 BMD ID Fan-A LOP-A&B motor coupling guard missing. 24.11.17 29.11.17 Attended 103081442
6 BMD PA Fan-A LOP-A motor coupling guard missing. 24.11.17 29.11.17 Attended 103022370
2 EMD/ OPRNESP FIELD-1B21CERM TRIPPED NOT RESETTING 27.11.17 29.11.17 short 103084533
1 C&I HPCV-1/2 FEEDBACK ERRATIC, SHOWING 0% & 99 % respect. 27.11.17 Attended HPCV2 POS FEEDBACK 103084907
1 BMD MILL:H HEAVY VIBRATIONS OBSERVED & COAL LEAKAGE 27.11.17 ip attended 103084997
10 EMD ID Fan-A exciter winding temperatures maintaining more 17.11.17 ok 93.2/82.3/93.4 Deg C; CNI 103071566
7 EMD Stg-2 Sweet water pump house ACs not working. 23.11.17 25.11.17 attended 103080998
3 CIVIL U#4 TG 8.5m Toilet water line Leakage 27.11.17 Attended 103084795
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 -0KV 60/64 78/80 ; 1A77/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ 6.5 DegC OFF LINE ST-II IN / OUT 11.4/7.3 9 DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12. 14.5/ DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17
4 EMD Unit # 4 H2 drier B chiller tube leakage 26.10.17 no spares; 4000193464; l
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I HPCV-1/2 FEEDBACK ERRATIC, SHOWING 0% & 99 % respect. 27.11.17 Attended HPCV2 POS FEEDBACK 103084907
2 EMD/ OPRNESP FIELD-1B21CERM TRIPPED NOT RESETTING 27.11.17 29.11.17 short 103084533
5 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
8 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 vacuum pp gasket repl. W
6 BMD HFO line tracing steam insulation to be provided 17.11.17 02.12.17 103071182
5 EMD SWP-9 MOTOR NDE SIDE ABNORMAL SOUND 27.11.17 02.12.17 103084778
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I CEP C REC VALVE CD 14 dem /pos mismatch 27.11.17 02.12.17 103084612
6 C&I LPH-2 getting isolated due to level switch malfunctioning & level t 25.11.17 ip 103083361
8 TMD HPH-5A NDCV DR15 manual valve having gland leakage. 24.11.17 under permi 103081892
9 BMD/ C&I Sootblowing control valves SD-24 and SD-25 passing. 23.11.17 28.11.17 24 done; joint check to be 103080547
10 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 02.12.17 Checked but; downstream 103072750
11 TMD Steam leakage near CRH NRV limit switch. 16.11.17 01.12.17 103071038
12 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 02.12.17 permit required; alarm al 103083399
3 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 02.12.17 103082986
7 EMD Stage-2 FOPH both the ACs not working 13.11.17 28.11.17 1st completed; 2nd 24.11
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I CW-5 BFV power pack pr maintaining high.(220 KSC) 27.11.17 103084901
3 BMD Hot air leakage between Mill-G & H NMEJ 25.11.17 02.12.17 103079642
5 BMD ID Fan-A LOP-A&B motor coupling guard missing. 24.11.17 29.11.17 103081442
6 BMD PA Fan-A LOP-A motor coupling guard missing. 24.11.17 29.11.17 103022370
9 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
1 CIVIL MS /GRP LINE NEAR OAC HAVING BUSHES 27.11.17 contract award pending
2 CIVIL for VIP visit the vegetation growth along the road from canteen upto28.11.17 29.11.17
4 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 c&i trip on before loading 103081659
5 Civil Sweet water yard area grass cutting required. 24.11.17 contract award pending 103082278
6 EMD Stg-2 ASP A2 pump having abnormal sound. 24.11.17 MNDE sound 103082230
8 OFS Sea water lub water pump-3 NRV passing. 23.11.17 25.11.17 103080284
9 AHM /EMD Stg-1 Ash slurry series-41,3 under PTW. 23.11.17 28.11.17 ASS-3 line leak, ASP-41 m
10 EMD Poor Lighting : St 2 Ash Slurry Pump house, St 1TAC Area , U#3&4 18.11.17 28.11.17
11 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
12 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
1 BMD MILL:H HEAVY VIBRATIONS OBSERVED & COAL LEAKAGE 27.11.17 ip attended 103084997
10 EMD ID Fan-A exciter winding temperatures maintaining more 17.11.17 ok 93.2/82.3/93.4 Deg C; CNI 103071566
7 EMD Stg-2 Sweet water pump house ACs not working. 23.11.17 25.11.17 attended 103080998
3 CIVIL U#4 TG 8.5m Toilet water line Leakage 27.11.17 Attended 103084795
1 EMD FOPH OIL SEPERATOR PIT PUMPS NOT TAKING START 27.11.17 Attended Local avl ;
4 EMD Turbine zero metres and 8.5 metres lighting poor at some locations23.11.17 attended CFT, SOT area etc. 103079700
5 EMD ID A current hunting and vibration going high 21.11.17 ok motor nde, fan de-X
6 TMD MDBFP hydraulic Bearing no:11 temperature maintaining more 17.11.17 ok uo; 82 deg; cni tx check; 103052907
11 BMD HFO unloading pump-1 having high vibration. 16.11.17 attended 103071330
7 BMD SAPH-A soot blowing puppet valve passing. 24.11.17 temp attendPressure-25ksc after pupp 103081833
1 EMD U4 Debris-A O/L V/V motor cable faulty 27.11.17 attended 103085246
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43067
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B21 -0KV 60/64 78/80 ; 1A77/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ 6.5 DegC OFF LINE ST-II IN / OUT 11.4/7.3 9 DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12. 14.5/ DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I HPCV-1/2 FEEDBACK ERRATIC, SHOWING 0% & 99 % respect. 27.11.17 HPCV2 POS FEEDBACK 103084907
2 EMD/ OPRNESP FIELD-1B21CERM TRIPPED NOT RESETTING 27.11.17 29.11.17 after ash evac , will be ch 103084533
5 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
6 BMD HFO line tracing steam insulation to be provided 17.11.17 02.12.17 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
6 C&I LPH-2 getting isolated due to level switch malfunctioning & level t 25.11.17 ip 103083361
8 TMD HPH-5A NDCV DR15 manual valve having gland leakage. 24.11.17 under permi 103081892
9 BMD/ C&I Sootblowing control valves SD-24 and SD-25 passing. 23.11.17 28.11.17 24 done; joint check to be 103080547
10 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 Checked but; downstream 103072750
11 TMD Steam leakage near CRH NRV limit switch. 16.11.17 01.12.17 103071038
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 permit required; alarm al 103083399
3 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 103082986
4 EMD Turbine zero metres and 8.5 metres lighting poor at some locations23.11.17 attended CFT, SOT area etc. 103079700
5 EMD ID A current hunting and vibration going high 21.11.17 ok motor nde, fan de-X
6 TMD MDBFP hydraulic Bearing no:11 temperature maintaining more 17.11.17 ok uo; 82 deg; cni tx check; 103052907
7 EMD Stage-2 FOPH both the ACs not working 13.11.17 28.11.17 1st completed; 2nd 24.11
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD MILL:H HEAVY VIBRATIONS OBSERVED & COAL LEAKAGE 27.11.17 ip attended 103084997
2 C&I CW-5 BFV power pack pr maintaining high.(220 KSC) 27.11.17 103084901
3 BMD Hot air leakage between Mill-G & H NMEJ 25.11.17 02.12.17 103079642
4 BMD Abnormal sound coming from Mill-A roller chamber. 24.11.17 ok oprn: trial to be taken 103082206
5 BMD ID Fan-A LOP-A&B motor coupling guard missing. 24.11.17 29.11.17 103081442
6 BMD PA Fan-A LOP-A motor coupling guard missing. 24.11.17 29.11.17 103022370
7 BMD SAPH-B flue gas outlet hole developed near support bearing area.23.11.17 sd 103079644
8 BMD PAPH air outlet common duct having leakage. 23.11.17 sd 103079644
9 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
10 EMD ID Fan-A exciter winding temperatures maintaining more 17.11.17 ok 93.2/82.3/93.4 Deg C; CNI 103071566
1 EMD FOPH OIL SEPERATOR PIT PUMPS NOT TAKING START 27.11.17 Attended Local avl ;
CIVIL for VIP visit the vegetation growth along the road from canteen upto28.11.17 29.11.17
3 CIVIL U#4 TG 8.5m Toilet water line Leakage 27.11.17 Attended 103084795
4 AHM Stg-1 TAC-2 tripping on element-2 temperature high. 24.11.17 c&i trip on before loading 103081659
5 Civil Sweet water yard area grass cutting required. 24.11.17 contract award pending 103082278
6 AHM Stg-2 ASP A2 pump having abnormal sound. 24.11.17 MNDE sound 103082230
7 EMD Stg-2 Sweet water pump house ACs not working. 23.11.17 25.11.17 1 attended 103080998
8 OFS Sea water lub water pump-3 NRV passing. 23.11.17 25.11.17 103080284
9 AHM /EMD Stg-1 Ash slurry series-41,3 under PTW. 23.11.17 28.11.17 ASS-3 line leak, ASP-41 m
10 EMD Poor Lighting : St 2 Ash Slurry Pump house, St 1TAC Area , U#3&4 18.11.17 28.11.17
11 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
12 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
11 BMD HFO unloading pump-1 having high vibration. 16.11.17 attended 103071330
7 BMD SAPH-A soot blowing puppet valve passing. 24.11.17 temp attendPressure-25ksc after pupp 103081833
1 EMD U4 Debris-A O/L V/V motor cable faulty 27.11.17 attended 103085246
3 C&I HPH-6B alternate drip control valve positioner damaged and valve25.11.17
g ok its kept closed manually f 103083401
4 EMD UST-A Winding temperature local display not working. 24.11.17 ok 103081684
6 BMD Mill-D roller abnormal sound below 50 T/H. 24.11.17 Attended Under observation 103081474
9 TMD MS line impulse line leakage at TG 8.5M 18.11.17 ok MS pr bef HP byp; 103074903
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43066
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
ESP FIELDS IN SERVICE 63/64, 1B2 -0KV 60/64 78/80 ; 1A77/80 ; 23.04.17 - 3270
ECO HOPPER STATUS ALL CLEAR ALL CLEAR ALL CLEAR ALL CLEAR 15.07.17 -3430
UCB - 3 & 4
Chiller water Temp
1 ST-I UCB Chiller8.5/ 6.5 DegC OFF LINE ST-II IN / OUT 11.4/7.3 9 DegC OFF LINE
ESP
Chiller water Temp
2 ST-I ESP Chiller16/12. 14.5/ DegC OFF LINE ST-II IN / OUT Not Applica DegC OFF LINE
MAJOR EQUIPMENT OUTAGE STATUS SUMMARY
SL DEPT DEFECT DESCRIPTION AREA ISSUE RAISETARG. DT REMARKS
EQUIPMENT Not available > 15 days
1 TMD Dewatering Pumps which are under repair to be made available 27.06.17
2 BMD St 2 HFO PP C DE side oil leakage 25.02.16 seal replaced by OEM; but s
3 CMP St # 1 Series 1 disposal lines not available due to dyke end restrict16.10.17 02.11.17
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I HPCV-1/2 FEEDBACK ERRATIC, SHOWING 0% & 99 % respect. 27.11.17 HPCV2 POS FEEDBACK 103084907
5 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
8 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 vacuum pp gasket repl. W
9 BMD HFO line tracing steam insulation to be provided 17.11.17 28.11.17 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
6 C&I LPH-2 getting isolated due to level switch malfunctioning & level t 25.11.17 ip 103083361
7 BMD SAPH-A soot blowing puppet valve passing. 24.11.17 Pressure-25ksc after pupp 103081833
8 TMD HPH-5A NDCV DR15 manual valve having gland leakage. 24.11.17 under permi 103081892
9 BMD/ C&I Sootblowing control valves SD-24 and SD-25 passing. 23.11.17 24 done; 103080547
10 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 Checked but; downstream 103072750
11 TMD Steam leakage near CRH NRV limit switch. 16.11.17 NRV FB problem attende 103071038
12 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 pert required; alarm also 103083399
3 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 103082986
4 EMD Turbine zero metres and 8.5 metres lighting poor at some locations23.11.17 CFT, SOT area etc. 103079700
5 EMD ID A current hunting and vibration going high 21.11.17 motor nde, fan de-X
6 TMD MDBFP hydraulic Bearing no:11 temperature maintaining more 17.11.17 uo; 82 deg; cni tx check; 103052907
7 EMD Stage-2 FOPH both the ACs not working 13.11.17 28.11.17 1st completed; 2nd 24.11
8 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 30.11.17 in progress;
9 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s oem to check due to frequ 103061601
10 TMD ACW-C NRV passing. 16.11.17 oem to check due to frequ 103052907
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
11 EMD/C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
27.11.1 EMD U4 Debris-A O/L V/V motor cable faulty 27.11.17 103085246
26.11.1 BMD MILL:H HEAVY VIBRATIONS OBSERVED & COAL LEAKAGE 27.11.17 103084997
26.11.1 C&I CW-5 BFV power pack pr maintaining high.(220 KSC) 27.11.17 103084901
1 BMD Hot air leakage between Mill-G & H NMEJ 25.11.17 103079642
2 BMD Abnormal sound coming from Mill-A roller chamber. 24.11.17 Abnormal sound :-Mill-H 103082206
5 BMD SAPH-B flue gas outlet hole developed near support bearing area.23.11.17 103079644
6 BMD PAPH air outlet common duct having leakage. 23.11.17 103079644
7 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
8 EMD ID Fan-A exciter winding temperatures maintaining more 17.11.17 93.2/82.3/93.4 Deg C; CNI 103071566
10 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 After VAM 2 103060714
OFFSITES
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD FOPH OIL SEPERATOR PIT PUMPS NOT TAKING START 27.11.17
5 Civil Sweet water yard area grass cutting required. 24.11.17 contract award pending 103082278
7 EMD Stg-2 Sweet water pump house ACs not working. 23.11.17 25.11.17 1 attended 103080998
8 OFS Sea water lub water pump-3 NRV passing. 23.11.17 25.11.17 103080284
9 AHM /EMD Stg-1 Ash slurry series-41,3 under PTW. 23.11.17 25.11.17 ASS-3 line leak, ASP-41 m
10 EMD Poor Lighting : St 2 Ash Slurry Pup house, St 1TAC Area , U#3&4 E18.11.17 22.11.17
11 BMD HFO unloading pump-1 having high vibration. 16.11.17 25.11.17 103071330
12 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
13 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
3 C&I HPH-6B alternate drip control valve positioner damaged and valve25.11.17
g ok its kept closed manually f 103083401
4 EMD UST-A Winding temperature local display not working. 24.11.17 ok 103081684
6 BMD Mill-D roller abnormal sound below 50 T/H. 24.11.17 Attended Under observation 103081474
9 TMD MS line impulse line leakage at TG 8.5M 18.11.17 ok MS pr bef HP byp; 103074903
5 BMD Feeder-E inlet gate wheel lock not damaged. 24.11.17 ok 103081446
2 C&I/ BMD Mill-B CAD operation is sluggish. 24.11.17 ok Air flow coming only afte 103081688
11 C&I Mill-E Mixed PA flow Tx-1&2 deviation high. 23.11.17 ok permit requiired; Tx-1/2- 103080871
14 OFS Sea water lub filter 2 leakage from bottom 15.11.17 25.11.17 Attended 103065390
9 OFS Sea water lub water pump-1 not developing pressure. 23.11.17 25.11.17 Attended 103080283
4 BMD PA fan B fan vib going high 20.11.17 24.11.17 MTP vib taken , found high 103076776
6 TMD TDBFP-B Turbine RJB vibrations maintaing high after brg replacem18.11.17 higher speed to run
10 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 ok online injection will be do
PLANT DATA
PRIORITY POINTS
5 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
5 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 05.12.17 vacuum pp gasket repl. W
7 BMD HFO line tracing steam insulation to be provided 17.11.17 28.11.17 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I LPH-2 getting isolated due to level switch malfunctioning & level t 25.11.17 ip 103083361
2 BMD SAPH-A soot blowing puppet valve passing. 24.11.17 Pressure-25ksc after pupp 103081833
3 TMD HPH-5A NDCV DR15 manual valve having gland leakage. 24.11.17 under permi 103081892
4 BMD/ C&I Sootblowing control valves SD-24 and SD-25 passing. 23.11.17 24 done; 103080547
5 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 Checked but; downstream 103072750
6 TMD Steam leakage near CRH NRV limit switch. 16.11.17 NRV FB problem attende 103071038
7 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I SH Spray block valve (SD-3) got closed on its own due to diaphra 25.11.17 pert required; alarm also 103083399
2 TMD Ammonia Pump-B stroke not changing even from local also, suspe25.11.17 103082986
3 C&I HPH-6B alternate drip control valve positioner damaged and valve25.11.17
g ok its kept closed manually f 103083401
4 EMD UST-A Winding temperature local display not working. 24.11.17 ok 103081684
6 BMD Mill-D roller abnormal sound below 50 T/H. 24.11.17 Attended Under observation 103081474
7 EMD Turbine zero metres and 8.5 metres lighting poor at some locations23.11.17 CFT, SOT area etc. 103079700
8 EMD ID A current hunting and vibration going high 21.11.17 motor nde, fan de-X
9 TMD MS line impulse line leakage at TG 8.5M 18.11.17 ok MS pr bef HP byp; 103074903
10 TMD MDBFP hydraulic Bearing no:11 temperature maintaining more 17.11.17 uo; 82 deg; cni tx check; 103052907
11 EMD Stage-2 FOPH both the ACs not working 13.11.17 24.11.17 1st completed; 2nd 24.11
12 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 25.11.17 in progress; 1 wk
13 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s oem to check due to frequ 103061601
14 TMD ACW-C NRV passing. 16.11.17 oem to check due to frequ 103052907
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
15 EMD/C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD Hot air leakage between Mill-G & H NMEJ 25.11.17 103079642
2 C&I/ BMD Mill-B CAD operation is sluggish. 24.11.17 ok Air flow coming only afte 103081688
3 BMD Abnormal sound coming from Mill-A roller chamber. 24.11.17 Abnormal sound :-Mill-H 103082206
5 BMD Feeder-E inlet gate wheel lock not damaged. 24.11.17 ok 103081446
9 BMD SAPH-B flue gas outlet hole developed near support bearing area.23.11.17 103079644
10 BMD PAPH air outlet common duct having leakage. 23.11.17 103079644
11 C&I Mill-E Mixed PA flow Tx-1&2 deviation high. 23.11.17 ok permit requiired; Tx-1/2- 103080871
12 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
13 EMD ID Fan-A exciter winding temperatures maintaining more 17.11.17 93.2/82.3/93.4 Deg C; CNI 103071566
15 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 After VAM 2 103060714
OFFSITES
2 Civil Sweet water yard area grass cutting required. 24.11.17 contract award pending 103082278
4 EMD Stg-2 Sweet water pump house ACs not working. 23.11.17 25.11.17 1 attended 103080998
5 OFS Sea water lub water pump-3 NRV passing. 23.11.17 25.11.17 103080284
7 AHM /EMD Stg-1 Ash slurry series-41,3 under PTW. 23.11.17 25.11.17 ASS-3 line leak, ASP-41 m
9 EMD Poor Lighting : St 2 Ash Slurry Pup house, St 1TAC Area , U#3&4 E18.11.17 22.11.17
10 BMD HFO unloading pump-1 having high vibration. 16.11.17 25.11.17 103071330
12 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
13 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2, 3 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
4 BMD PA fan B fan vib going high 20.11.17 24.11.17 MTP vib taken , found high 103076776
6 TMD TDBFP-B Turbine RJB vibrations maintaing high after brg replacem18.11.17 higher speed to run
10 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 ok online injection will be do
4 EMD Mill-E bunker outlet gate not closing fully. 24.11.17 ok 103082202
2 AHM BAOF pump-A abnormal sound from fluid coupling. 24.11.17 ok 103081629
6 EMD ID fan-A motor NDE bearing oil leakage 20.11.17 ok under observation 103074510
1 C&I/ BMD Mill-E HAD passing by 60tph. ok Joint check to be done 103081827
3 EMD Ammonia dosing pump-1 not taking start. 24.11.17 24.11.17 att 103081381
4 BMD FD fan-A LOP-A after discharge line coupling leakage 20.11.17 temp attended 103074507
5 BMD /EMD Soot blowing control station MOVs (SB-63&64) passing by 13kg/c 18.11.17 ok SB 63 attended 103074896/ 103068490
6 BMD/C&I RH Spray Controlvalves SD-13, 14 & 16 passing 18.11.17 ok 19/12/8 tonns passing ; 1 103074884
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43063
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 EMD No lighting near clinker grinder-B1 and BAOF tank area. 24.11.17 103082311
6 BMD PA fan B fan vib going high 20.11.17 24.11.17 MTP vib taken , found high 103076776
7 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17 vacuum pp gasket repl. W
8 TMD TDBFP-B Turbine RJB vibrations maintaing high after brg replacem18.11.17 higher speed to run
9 BMD HFO line tracing steam insulation to be provided 17.11.17 28.11.17 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I/ BMD Mill-E HAD passing by 60tph. ok Joint check to be done 103081827
2 BMD SAPH-A soot blowing puppet valve passing. Pressure-25ksc after pupp 103081833
3 TMD HPH-5A NDCV DR15 manual valve having gland leakage. under permi 103081892
4 BMD/ C&I Sootblowing control valves SD-24 and SD-25 passing. 23.11.17 24 done; 103080547
5 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 Checked but; downstream 103072750
6 TMD Steam leakage near CRH NRV limit switch. 16.11.17 NRV FB problem attende 103071038
7 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD UST-A Winding temperature local display not working. 24.11.17 up 103081684
4 EMD Turbine zero metres and 8.5 metres lighting poor at some locations23.11.17 CFT, SOT area etc. 103079700
5 EMD ID A current hunting and vibration going high 21.11.17 motor nde, fan de-X
6 EMD ID fan-A motor NDE bearing oil leakage 20.11.17 ok under observation 103074510
7 TMD MS line impulse line leakage at TG 8.5M 18.11.17 MS pr bef HP byp; 103074903
8 TMD MDBFP hydraulic Bearing no:11 temperature maintaining more 17.11.17 uo; 82 deg; cni tx check; 103052907
9 EMD Stage-2 FOPH both the ACs not working 13.11.17 24.11.17 1st completed; 2nd 24.11
10 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 ok online injection will be do
11 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 25.11.17 in progress; 1 wk
12 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s oem to check due to frequ 103061601
13 TMD ACW-C NRV passing. 16.11.17 oem to check due to frequ 103052907
Spares required for power supply; remote operation is pending; 24 V DC is not getting extended.
14 EMD/C&I SCS pass-B flushing pump not taking start from control room 01.11.17 under permiLocal ON/OFF made available. 103052914
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I/ BMD Mill-B CAD operation is sluggish. 24.11.17 Air flow coming only afte 103081688
2 AHM BAOF pump-A abnormal sound from fluid coupling. 24.11.17 ok 103081629
3 BMD Abnormal sound coming from Mill-A roller chamber. 24.11.17 Abnormal sound :-Mill-H 103082206
4 EMD Mill-E bunker outlet gate not closing fully. 24.11.17 ok 103082202
5 BMD Feeder-E inlet gate wheel lock not damaged. 24.11.17 103081446
9 BMD SAPH-B flue gas outlet hole developed near support bearing area.23.11.17 103079644
10 BMD PAPH air outlet common duct having leakage. 23.11.17 103079644
11 C&I Mill-E Mixed PA flow Tx-1&2 deviation high. 23.11.17 permit requiired; Tx-1/2- 103080871
12 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17 vacuum pp gasket repl. W
13 EMD ID Fan-A exciter winding temperatures maintaining more 17.11.17 93.2/82.3/93.4 Deg C; CNI 103071566
15 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 After VAM 2 103060714
OFFSITES
2 Civil Sweet water yard area grass cutting required. 24.11.17 103082278
4 EMD Stg-2 Sweet water pump house ACs not working. 23.11.17 25.11.17 1 attended 103080998
5 OFS Sea water lub water pump-3 NRV passing. 23.11.17 25.11.17 103080284
6 OFS Sea water lub water pump-1 not developing pressure. 23.11.17 25.11.17 103080283
7 AHM /EMD Stg-1 Ash slurry series-41,3 under PTW. 23.11.17 25.11.17 ASS-3 line leak, ASP-41 m
9 EMD Poor Lighting : St 2 Ash Slurry Pup house, St 1TAC Area , U#3&4 E18.11.17 22.11.17
10 BMD HFO unloading pump-1 having high vibration. 16.11.17 25.11.17 103071330
11 OFS Sea water lub filter 2 leakage from bottom 15.11.17 25.11.17 103065390
12 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
13 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
3 EMD Ammonia dosing pump-1 not taking start. 24.11.17 24.11.17 att 103081381
4 BMD FD fan-A LOP-A after discharge line coupling leakage 20.11.17 temp attended 103074507
5 BMD /EMD Soot blowing control station MOVs (SB-63&64) passing by 13kg/c 18.11.17 ok SB 63 attended 103074896/ 103068490
3 C&I FG Cor-3 flame intensity showing zero 18.11.17 ok locally flame is good 103074782
6 BMD/C&I RH Spray Controlvalves SD-13, 14 & 16 passing 18.11.17 ok 19/12/8 tonns passing ; 1 103074884
7 C&I Turbine first stage pressure deviation more, P 17.11.17 ok 169/169/165 103071038
Attended but still deviation is high.
8 C&I LPH-2 level TX deviation high-P 17.11.17 ok Tx -60/-144 103055603
4 BMD Mill-h high vibrations and CAD operation sluggish. 21.11.17 under permiok
19.11.2 EMD/ C&I Leak steam bypass valve opening when kept in remote 20.11.17 ok 103076724
1 C&I RH spray control valves SD-17 and SD-20 not operating. ok 103080903
9 TMD TG ECW pump-C pump DE side vibration maintaining 8.0mm/sec 18.11.17 ok 103074506
12 C&I Seal air fan-B bearing temperature RTDs in removed condition 17.11.17 att 103067629
13 EMD STG#2 CWPH Switchgear dewatering pump not available 15.11.17 ok priming to be done ; fw ph 103067629
6 TMD VAM-2 is not effective 02.11.17 21.11.17 Permit not yet cancelled. 103054680
18 C&I Mill G BIG-3 open FB not coming 06.11.17 attended bmd scafflding to be done 103058180
1 AHM Bottom ash over flow pump-B Fluid coupling decoupled. 23.11.17 Attended 103080584
21.112 C&I fdr-d tripping on fdr not in remote ok suspected clutch problem.
21.11.2 C&I clinker grider-A and D discharge gate solenoid not operating ok 103077142
9 TMD MOT oil level to be topped up. 16.11.17 ok Level:- -46mm., COPU ce 103071566
10 C&I BAOF pump-A discharge valve closing on its own. 16.11.17 Attended 103071115
11 EMD CG-A EPB assembly hanging with cable 15.11.17 temp attended 103069253
9 EMD Stg-2 ASP- A1 scoop not operating 16.11.17 Scoop Motor Problem. EMD 103067624
6 EMD Stage-2 ASS-A1 scoop motor not operating 18.11.17 As per AHD, no jamming
1 MM-OS Seawater WL-1 v/v body hole devolped 20.11.17 21.11.17 Valve flange lkg, standby l 103054693
12 BMD Mill-4H abnormal sound below 50 TPH 11.11.17 ok Under observation 103065051
13 TMD VAM-2 is not effective 02.11.17 ok Permit not yet cancelled. 103054680
OSM Sea water working line-1 body leakage ok planned; reg at CT end
2 EMD Stg-2 AWRC outside DWP electrical connections to be restored ok pp ok; 103076697
11 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 ok Work In Progress. 103065278
12 EMD EXHAUST FANS ARE NOT WORKING AT ST2 CW PP HOUSE 11.11.17 ok 13/18 ok 103063925
3 C&I Main turbine AOP-1 did not stop in auto after turbine rolling. 16.11.17 ok ; card changed; lo pr 103071182
2 EMD ESP field 1A21 DC volt low 20.11.17 ok rapping done no improvem 103076777
19.11.2 C&I Feeder 1F feedrate calibration reqrd 20.11.17 ok belt replaced; 103076780
PLANT DATA
PRIORITY POINTS
5 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 BMD PA fan B fan vib going high 20.11.17 under permiMTP vib taken , found high 103076776
3 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17
4 BMD HFO line tracing steam insulation to be provided 17.11.17 28.11.17 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I Furnace pressure transmitters deviation 20.11.17 22.11.17 (-11/+9/-18); planned 103074780
2 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 downstream temp.196 & 20 103072750
3 BMD /EMD Soot blowing control station MOVs (SB-63&64) passing by 13kg/c 18.11.17 SB 63 attended 103074896/ 103068490
4 TMD Steam leakage near CRH NRV limit switch. 16.11.17 NRV FB problem attende 103071038
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 BMD Mill-h high vibrations and CAD operation sluggish. 21.11.17 under permi
3 EMD ID A current hunting and vibration going high 21.11.17 motor nde, fan de-X
4 EMD ID fan-A motor NDE bearing oil leakage 20.11.17 under observation 103074510
5 TMD TG ECW pump-C pump DE side vibration maintaining 8.0mm/sec 18.11.17 under permi 103074506
6 TMD MS line impulse line leakage at TG 8.5M 18.11.17 MS pr bef HP byp; 103074903
7 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 21.11.17 online injection will be do
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17
2 C&I ID Fan-A exciter winding temperatures maintaining more 17.11.17 93.2/82.3/93.4 Deg C; CNI 103071566
3 TMD Cond. Vacuumpump-1 suction valve platform railing not available 17.11.17 25.11.17 103071115
4 C&I BAOF pump-A discharge valve closing on its own. 16.11.17 103071115
2 EMD Poor Lighting : St 2 Ash Slurry Pup house, St 1TAC Area , U#3&4 E18.11.17 22.11.17
3 BMD HFO unloading pump-1 having high vibration. 16.11.17 25.11.17 103071330
4 EMD Stg-2 ASP- A1 scoop not operating 16.11.17 Scoop Motor Problem. EMD 103067624
5 OFS Sea water lub filter 2 leakage from bottom 15.11.17 103065390
6 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
7 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
PLANT DATA
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 BMD PA fan B fan vib going high 20.11.17 under permiMTP vib taken , found high 103076776
3 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17
4 BMD HFO line tracing steam insulation to be provided 17.11.17 28.11.17 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I Furnace pressure transmitters deviation 20.11.17 22.11.17 (-11/+9/-18); planned 103074780
2 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 downstream temp.196 & 20 103072750
3 BMD /EMD Soot blowing control station MOVs (SB-63&64) passing by 13kg/c 18.11.17 SB 63 attended 103074896/ 103068490
4 TMD Steam leakage near CRH NRV limit switch. 16.11.17 NRV FB problem attende 103071038
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 BMD Mill-h high vibrations and CAD operation sluggish. 21.11.17 under permi
3 EMD ID A current hunting and vibration going high 21.11.17 motor nde, fan de-X
4 EMD ID fan-A motor NDE bearing oil leakage 20.11.17 under observation 103074510
5 TMD TG ECW pump-C pump DE side vibration maintaining 8.0mm/sec 18.11.17 under permi 103074506
6 TMD MS line impulse line leakage at TG 8.5M 18.11.17 MS pr bef HP byp; 103074903
7 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 21.11.17 online injection will be do
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17
2 C&I ID Fan-A exciter winding temperatures maintaining more 17.11.17 93.2/82.3/93.4 Deg C; CNI 103071566
3 TMD Cond. Vacuumpump-1 suction valve platform railing not available 17.11.17 25.11.17 103071115
4 C&I BAOF pump-A discharge valve closing on its own. 16.11.17 103071115
2 EMD Poor Lighting : St 2 Ash Slurry Pup house, St 1TAC Area , U#3&4 E18.11.17 22.11.17
3 BMD HFO unloading pump-1 having high vibration. 16.11.17 25.11.17 103071330
4 EMD Stg-2 ASP- A1 scoop not operating 16.11.17 Scoop Motor Problem. EMD 103067624
5 OFS Sea water lub filter 2 leakage from bottom 15.11.17 103065390
6 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
7 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
PLANT DATA
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD PA fan B fan vib going high 20.11.17 under permiMTP vib taken , found high 103076776
2 EMD ESP field 1A21 DC volt low 20.11.17 rapping done no improvem 103076777
3 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17
4 TMD TDBFP-B Turbine RJB vibrations maintaing high after brg replacem18.11.17
5 BMD HFO line tracing steam insulation to be provided 17.11.17 28.11.17 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD GENERATOR EXCITATION BALANCE VOLTAGE GOT BAD 20.11.17 indication only ; 103076799
3 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 downstream temp.196 & 20 103072750
4 BMD /EMD Soot blowing control station MOVs (SB-63&64) passing by 13kg/c 18.11.17 SB 63 attended 103074896/ 103068490
Attended but still deviation is high.
5 C&I LPH-2 level TX deviation high-P 17.11.17 under obserTx -60/-144 103055603
6 TMD Steam leakage near CRH NRV limit switch. 16.11.17 NRV FB problem attende 103071038
7 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD ID fan-A motor NDE bearing oil leakage 20.11.17 under observation 103074510
2 TMD TG ECW pump-C pump DE side vibration maintaining 8.0mm/sec 18.11.17 103074506
3 TMD MS line impulse line leakage at TG 8.5M 18.11.17 MS pr bef HP byp; 103074903
4 EMD STG#2 CWPH Switchgear dewatering pump not available 15.11.17 priming to be done ; fw ph 103067629
5 EMD Stage-2 FOPH both the ACs not working 13.11.17 20.11.17 1st completed; 2nd 20.11
5 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 21.11.17 online injection will be do
6 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 25.11.17 in progress; 1 wk
7 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s oem to check 103061601
UNIT 4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17
2 C&I ID Fan-A exciter winding temperatures maintaining more 17.11.17 93.2/82.3/93.4 Deg C; CNI 103071566
3 TMD Cond. Vacuumpump-1 suction valve platform railing not available 17.11.17 25.11.17 103071115
4 TMD MOT oil level to be topped up. 16.11.17 18.11.17 Level:- -46mm., COPU ce 103071566
5 C&I BAOF pump-A discharge valve closing on its own. 16.11.17 103071115
7 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 Will be taken up after pro 103060714
OFFSITES
1 MM-OS Seawater WL-1 v/v body hole devolped 20.11.17 21.11.17 Valve flange lkg, standby l 103054693
2 EMD Stg-2 AWRC outside DWP electrical connections to be restored pp ok; 103076697
3 AHD Stage-1 ASS-41 high vibration & ANS from fluid coupling. 18.11.17
4 EMD Stage-2 ASS-A1 scoop motor not operating 18.11.17 As per AHD, no jamming
5 EMD Poor Lighting : St 2 Ash Slurry Pup house, St 1TAC Area , U#3&4 E18.11.17 22.11.17
6 BMD HFO unloading pump-1 having high vibration. 16.11.17 25.11.17 103071330
7 AHM Stg-2 ASP- A1 scoop not operating 16.11.17 Scoop Motor Problem. EMD 103067624
8 OFS Sea water lub filter 2 leakage from bottom 15.11.17 103065390
9 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 18.11.17 Work In Progress. 103065278
11 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
12 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
5 BMD soot blowing motorised and control valves passing. 14.11.17 attended 103068490
PLANT DATA
PRIORITY POINTS
5 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD PA fan B fan vib going high 20.11.17 MTP vib taken , found high 103076776
2 EMD ESP field 1A21 DC volt low 20.11.17 rapping done no improveme 103076777
3 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17
4 TMD TDBFP-B Turbine RJB vibrations maintaing high after brg replacem18.11.17
5 BMD HFO line tracing steam insulation to be provided-p 17.11.17 28.11.17 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD GENERATOR EXCITATION BALANCE VOLTAGE GOT BAD 20.11.17 indication only ; 103076799
2 C&I FG Cor-3 flame intensity showing zero 18.11.17 ok locally flame is good 103074782
2 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 downstream temp.196 & 20 103072750
3 BMD /EMD Soot blowing control station MOVs (SB-63&64) passing by 13kg/c 18.11.17 SB 63 attended 103074896/ 103068490
4 BMD/C&I RH Spray Controlvalves SD-13, 14 & 16 passing 18.11.17 ok 19/12/8 tonns passing ; 1 103074884
1 C&I Turbine first stage pressure deviation more, P 17.11.17 ok 169/169/165 103071038
Attended but still deviation is high.
5 C&I LPH-2 level TX deviation high-P 17.11.17 uo Tx -60/-144 103055603
6 TMD Steam leakage near CRH NRV limit switch. 16.11.17 NRV FB problem attende 103071038
7 EMD PA system defects at various locations. 07.11.17 19.12.17 spares not Available 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
19.11.2 EMD/ C&I Leak steam bypass valve opening when kept in remote 20.11.17 ok 103076724
17.11.2 EMD ID fan-A motor NDE bearing oil leakage 20.11.17 uo 103074510
17.11.2 BMD-RF FD fan-A LOP-A after discharge line coupling leakage 20.11.17 temp attended 103074507
1 TMD TG ECW pump-C pump DE side vibration maintaining 8.0mm/sec 18.11.17 103074506
2 TMD MS line impulse line leakage at TG 8.5M 18.11.17 MS pr bef HP byp; 103074903
1 TMD MDBFP hydraulic Bearing no:11 temperature maintaining more 17.11.17 uo; 82 deg; cni tx check; 103052907
2 C&I Seal air fan-B bearing temperature RTDs in removed condition 17.11.17 att 103067629
4 EMD STG#2 CWPH and FWPH Switchgear dewatering pump not availab15.11.17 priming to be done ; fw ph 103067629
5 EMD Stage-2 FOPH both the ACs not working 13.11.17 1st completed; 2nd 20.11
5 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 21.11.17 online injection will be do
6 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 25.11.17 in progress; 1 wk
7 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s oem to check 103061601
10 C&I Mill G BIG-3 open FB not coming 06.11.17 attended bmd scafflding to be done 103058180
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17
2 C&I ID Fan-A exciter winding temperatures maintaining more 17.11.17 93.2/82.3/93.4 Deg C; CNI 103071566
3 TMD Cond. Vacuumpump-1 suction valve platform railing not available- 17.11.17 25.11.17 103071115
4 TMD MOT oil level to be topped up. 16.11.17 18 Level:- -46mm., COPU ce 103071566
5 C&I BAOF pump-A discharge valve closing on its own. 16.11.17 103071115
6 TMD VAM-2 is not effective 02.11.17 21.11.17 Permit not yet cancelled. 103054680
7 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 Will be taken up after pro 103060714
OFFSITES
02.11.2 MM-OS Seawater WL-1 v/v body hole devolped Valve flange lkg, standby l 103054693
20.11.2 EMD Stg-2 AWRC outside DWP electrical connections to be restored pp ok; 103076697
1 AHD Stage-1 ASS-41 high vibration & ANS from fluid coupling. 18.11.17
2 EMD Stage-2 ASS-A1 scoop motor not operating 18.11.17 As per AHD, no jamming
3 EMD Poor Lighting : St 2 Ash Slurry Pup house, St 1TAC Area , U#3&4 E18.11.17 22.11.17
4 BMD HFO unloading pump-1 having high vibration. 16.11.17 25.11.17 103071330
5 AHM Stg-2 ASP- A1 scoop not operating 16.11.17 Scoop Motor Problem. EMD 103067624
6 OFS Sea water lub filter 2 leakage from bottom 15.11.17 103065390
7 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 18.11.17 Work In Progress. 103065278
9 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
10 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
5 BMD soot blowing motorised and control valves passing. 14.11.17 attended 103068490
8 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 attended planned on 16.11.17 103054698
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43058
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
17.11.2 TMD Condensate DO maintaining more (49PPB) & air ingress in the cond
18.11.17
17.11.2 TMD TDBFP-B Turbine RJB vibrations maintaing high after brg replacem18.11.17
2 BMD HFO line tracing steam insulation to be provided-p 17.11.17 28.11.17 103071182
3 C&I Main turbine AOP-1 did not stop in auto after turbine rolling. 16.11.17 ok ; card changed; lo pr 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
17.11.2 C&I /TMD HPH-6A & HPH-6B emergency drip valves (DR-5, DR-11) passing 18.11.17 downstream temp.196 & 20 103072750
17.11.2 BMD /EMD Soot blowing control station MOVs (SB-63&64) passing by 13kg/c 18.11.17 SB 63 attended 103074896/ 103068490
17.11.2 BMD/C&I RH Spray Controlvalves SD-13, 14 & 16 passing 18.11.17 i/p 19/12/8 tonns passing ; 1 103074884
1 C&I Turbine first stage pressure deviation more, P 17.11.17 ok 169/169/165 103071038
Attended but still deviation is high.
2 C&I LPH-2 level TX deviation high-P 17.11.17 uo Tx -60/-144 103055603
3 TMD Steam leakage near CRH NRV limit switch. 16.11.17 attended NRV FB problem 103071038
4 EMD PA system defects at various locations. 07.11.17 19.11.17 work in progress; spares n 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
17.11.2 TMD TG ECW pump-C pump DE side vibration maintaining 8.0mm/sec 18.11.17 103074506
17.11.2 TMD MS line impulse line leakage at TG 8.5M 18.11.17 MS pr bef HP byp; 103074903
1 TMD MDBFP hydraulic Bearing no:11 temperature maintaining more 17.11.17 uo; 82 deg; cni tx check; 103052907
2 C&I Seal air fan-B bearing temperature RTDs in removed condition 17.11.17 att 103067629
4 EMD STG#2 CWPH and FWPH Switchgear dewatering pump not availab15.11.17 priming to be done 103067629
6 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 21.11.17 online injection will be do
7 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 25.11.17 in progress; 1 wk
8 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
17.12.2TMD Air ingress in the condenser is more (120 kg/hr) at full load & it is 18.11.17
1 C&I ID Fan-A exciter winding temperatures maintaining more 17.11.17 93.2/82.3/93.4 Deg C; CNI 103071566
2 TMD Cond. Vacuumpump-1 suction valve platform railing not available- 17.11.17 25 103071115
4 TMD MOT oil level to be topped up. 16.11.17 18 Level:- -46mm., COPU ce 103071566
5 C&I BAOF pump-A discharge valve closing on its own. 16.11.17 ahd : pu 103071115
6 EMD CG-A EPB assembly hanging with cable 15.11.17 temp attended 103069253
7 BMD Mill-4H abnormal sound below 50 TPH 11.11.17 ok Under observation 103065051
8 TMD VAM-2 is not effective 02.11.17 21 Permit not yet cancelled. 103054680
9 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 Will be taken up after pro 103060714
OFFSITES
1 AHD Stage-1 ASS-41 high vibration & ANS from fluid coupling. 18.11.17
2 EMD Stage-2 ASS-A1 scoop motor not operating 18.11.17 As per AHD, no jamming
1 EMD Poor Lighting : St 2 Ash Slurry Pup house, St 1TAC Area , U#3&4 E18.11.17 22
3 AHM Stg-2 ASP- A1 scoop not operating 16.11.17 Scoop Motor Problem. EMD 103067624
4 OFS Sea water lub filter 2 leakage from bottom 15.11.17 103065390
5 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 18.11.17 Work In Progress. 103065278
6 EMD EXHAUST FANS ARE NOT WORKING AT ST2 CW PP HOUSE 11.11.17 ok 13/18 ok 103063925
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
5 BMD soot blowing motorised and control valves passing. 14.11.17 attended 103068490
8 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 attended planned on 16.11.17 103054698
2 C&I AUX PRDS Control valve AS26 not going to auto 15.11.17 attended 103069831
2 OFS Sea water lub water filter inlet valves not operating 15.11.17 attended 103069233
9 EMD ID fan-3B VFD-2 current dipping below 90A 03.11.17 ok during load variation; pres 103055623
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43057
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
3 C&I Main turbine AOP-1 did not stop in auto after turbine rolling. 16.11.17 PENDING. 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I Turbine first stage pressure deviation more, P 17.11.17 169/169/165 103071038
Attended but still deviation is high.
2 C&I LPH-2 level TX deviation high-P 17.11.17 Tx -60/-144 103055603
3 TMD Steam leakage near CRH NRV limit switch. 16.11.17 Unable to attend NRV FB 103071038
4 EMD PA system defects at various locations. 07.11.17 19.11.17 work in progress 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD MDBFP hydraulic Bearing no:11 temperature maintaining more 17.11.17 103052907
2 C&I Seal air fan-B bearing temperature RTDs in removed condition 17.11.17 103067629
4 EMD STG#2 CWPH and FWPH Switchgear dewatering pump not availab15.11.17 103067629
5 EMD Stage-2 FOPH both the ACs not working 13.11.17 1st completed; 2nd 20.11
7 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 14.11.17 online injection will be do
8 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.11.17 in progress
9 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
11 C&I Mill G BIG-3 open FB not coming 06.11.17 19.11.17 bmd scafflding to be done 103058180
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I ID Fan-A exciter winding temperatures maintaining more 17.11.17 93.2/82.3/93.4 Deg C 103071566
2 TMD Cond. Vacuumpump-1 suction valve platform railing not available- 17.11.17 103071115
4 TMD MOT oil level to be topped up. 16.11.17 Level:- -46mm., COPU ce 103071566
5 C&I BAOF pump-A discharge valve closing on its own. 16.11.17 103071115
6 EMD CG-A EPB assembly hanging with cable 15.11.17 temp attended 103069253
7 BMD Mill-4H abnormal sound below 50 TPH 11.11.17 Under observation 103065051
8 TMD VAM-2 is not effective 02.11.17 Permit not yet cancelled. 103054680
9 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 Will be taken up after pro 103060714
OFFSITES
2 AHM Stg-2 ASP- A1 scoop not operating 16.11.17 Scoop Motor Problem. EMD 103067624
3 OFS Sea water lub filter 2 leakage from bottom 15.11.17 103065390
4 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 16.11.17 Work In Progress. 103065278
5 EMD EXHAUST FANS ARE NOT WORKING AT ST2 CW PP HOUSE 11.11.17 5/12 ok 103063925
6 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
7 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
5 BMD soot blowing motorised and control valves passing. 14.11.17 attended 103068490
8 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 attended planned on 16.11.17 103054698
2 C&I AUX PRDS Control valve AS26 not going to auto 15.11.17 attended 103069831
2 OFS Sea water lub water filter inlet valves not operating 15.11.17 attended 103069233
9 EMD ID fan-3B VFD-2 current dipping below 90A 03.11.17 ok during load variation; pres 103055623
1 C&I AUX PRDS Control valve AS26 not opening beyond 66% 15.11.17 ok 103070551
5 TMD TG bearing-5 JOP line pin hole oil leakage. 14.11.17 ok 103069265
7 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 att Alarm coming in alarm disp 103061215
3 C&I CONDENSOR PIT DW LOW LVL SWITCH NW 11.11.17 attended, to be checked 103065764
2 C&I Feeder-D tripping on " feeder not in remote" / "no coal on belt". 13.11.17 uo 103065051
1 EMD Kalapaka-1 main breaker 1752 trip circuit fault coming 13.11.17 ok 103065308
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43056
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I HP Turbine bearing vibration-1X spikes coming intermittently. 16.11.17 ok C&I TIGHTENED THE PR 103071799
2 AHM Eco hopper- 4 mixing chamber heavy leakage. 16.11.17 ATTENDED 103071849
3 C&I Main turbine AOP-1 did not stop in auto after turbine rolling. 16.11.17 PENDING. 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD PAPH-A & SAPH-B Oil carry over probe is very hard to operate. 16.11.17 attended 103071806
3 TMD Steam leakage near CRH NRV limit switch. 16.11.17 Unable to attend NRV FB 103071038
4 C&I CRH NRV open feedback not coming 15.11.17 ATTENDED 103070197
6 EMD PA system defects at various locations. 07.11.17 19.11.17 work in progress 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD TDBFP-B main pump suction impulse line having leakage. 16.11.17 attended 103068514
2 EMD Wall blowers 45 & 66 covers are interchanged 16.11.17 attended 103067638
3 C&I ID fan-A fan NDE side bearing vibration-X spikes are coming. 16.11.17 attended 103071952
5 EMD STG#2 CWPH and FWPH Switchgear dewatering pump not availab15.11.17 103067629
6 EMD Stage-2 FOPH both the ACs not working 13.11.17 1st completed; 2nd 20.11
8 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 14.11.17 online injection will be do
9 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.11.17 in progress
10 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
12 C&I Mill G BIG-3 open FB not coming 06.11.17 19.11.17 bmd scafflding to be done 103058180
13 EMD SCS pass-B flushing pump not taking start from control room 01.11.17 16.11.17 remote thru, pending; Loc 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD MOT oil level to be topped up. 16.11.17 Level:- -46mm., COPU ce 103071566
2 C&I BAOF pump-A discharge valve closing on its own. 16.11.17 103071115
3 EMD CG-A EPB assembly hanging with cable 15.11.17 temp attended 103069253
4 BMD Mill-4H abnormal sound below 50 TPH 11.11.17 under observation 103065051
7 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 after vam 2 103060714
OFFSITES
2 BMD Stg-2 FOPH tracing steam leakages at multiple locations inside p 16.11.17 ATTENDED 103064264
3 AHM Stg-2 ASP- A1 scoop not operating, ASP-C1 FC foundation bolts ca16.11.17 ASP-C SERIES ATTENDE 103067624
4 OFS Sea water lub filter 2 leakage from bottom 15.11.17 ip 103065390
5 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 16 Work In Progress. 103065278
6 EMD EXHAUST FANS ARE NOT WORKING AT ST2 CW PP HOUSE 11.11.17 5/12 ok 103063925
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
5 BMD soot blowing motorised and control valves passing. 14.11.17 attended 103068490
8 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 attended planned on 16.11.17 103054698
2 C&I AUX PRDS Control valve AS26 not going to auto 15.11.17 attended 103069831
2 OFS Sea water lub water filter inlet valves not operating 15.11.17 attended 103069233
9 EMD ID fan-3B VFD-2 current dipping below 90A 03.11.17 ok during load variation; pres 103055623
1 C&I AUX PRDS Control valve AS26 not opening beyond 66% 15.11.17 ok 103070551
5 TMD TG bearing-5 JOP line pin hole oil leakage. 14.11.17 ok 103069265
7 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 att Alarm coming in alarm disp 103061215
3 C&I CONDENSOR PIT DW LOW LVL SWITCH NW 11.11.17 attended, to be checked 103065764
2 C&I Feeder-D tripping on " feeder not in remote" / "no coal on belt". 13.11.17 uo 103065051
1 EMD Kalapaka-1 main breaker 1752 trip circuit fault coming 13.11.17 ok 103065308
PLANT DATA
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
3 C&I Main turbine AOP-1 did not stop in auto after turbine rolling. 16.11.17 103071182
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD PAPH-A & SAPH-B Oil carry over probe is very hard to operate. 16.11.17 up 103071806
3 TMD Steam leakage near CRH NRV limit switch. 16.11.17 Unable to attend NRV FB 103071038
7 EMD PA system defects at various locations. 07.11.17 19.11.17 work in progress 103055603
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD TDBFP-B main pump suction impulse line having leakage. 16.11.17 up 103068514
3 C&I ID fan-A fan NDE side bearing vibration-X spikes are coming. 16.11.17 103071952
1 EMD STG#2 CWPH and FWPH Switchgear dewatering pump not availab15.11.17 103067629
2 EMD Stage-2 FOPH both the ACs not working 13.11.17 1st completed; 2nd 20.11
4 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 14.11.17 online injection will be do
5 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.11.17 in progress
6 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
8 C&I Mill G BIG-3 open FB not coming 06.11.17 19.11.17 bmd scafflding to be done 103058180
10 EMD SCS pass-B flushing pump not taking start from control room 01.11.17 16.11.17 remote thru pending; Loca 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD MOT oil level to be topped up. 16.11.17 Level:- -46mm. 103071566
2 C&I BAOF pump-A discharge valve closing on its own. 16.11.17 103071115
3 EMD CG-A EPB assembly hanging with cable 15.11.17 temp attended 103069253
4 BMD Mill-4H abnormal sound below 50 TPH 11.11.17 under observation 103065051
7 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 after vam 2 103060714
OFFSITES
2 BMD Stg-2 FOPH tracing steam leakages at multiple locations inside p 16.11.17 103064264
3 AHM Stg-2 ASP- A1 scoop not operating, ASP-C1 FC foundation bolts ca16.11.17 ASS-B is Emergency stand 103067624
1 OFS Sea water lub filter 2 leakage from bottom 15.11.17 ip 103065390
3 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 16 Work In Progress. 103065278
4 EMD EXHAUST FANS ARE NOT WORKING AT ST2 CW PP HOUSE 11.11.17 5/12 ok 103063925
5 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
6 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
5 BMD soot blowing motorised and control valves passing. 14.11.17 attended 103068490
8 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 attended planned on 16.11.17 103054698
2 C&I AUX PRDS Control valve AS26 not going to auto 15.11.17 attended 103069831
2 OFS Sea water lub water filter inlet valves not operating 15.11.17 attended 103069233
9 EMD ID fan-3B VFD-2 current dipping below 90A 03.11.17 ok during load variation; pres 103055623
1 C&I AUX PRDS Control valve AS26 not opening beyond 66% 15.11.17 ok 103070551
5 TMD TG bearing-5 JOP line pin hole oil leakage. 14.11.17 ok 103069265
7 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 att Alarm coming in alarm disp 103061215
3 C&I CONDENSOR PIT DW LOW LVL SWITCH NW 11.11.17 attended, to be checked 103065764
2 C&I Feeder-D tripping on " feeder not in remote" / "no coal on belt". 13.11.17 uo 103065051
1 EMD Kalapaka-1 main breaker 1752 trip circuit fault coming 13.11.17 ok 103065308
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43054
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
3 BMD soot blowing motorised and control valves passing. 14.11.17 103068490
5 EMD PA system defects at various locations. 07.11.17 19.11.17 work in progress 103055603
6 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 planned 16.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I AUX PRDS Control valve AS26 not opening beyond 66% 15.11.17 ok 103070551
2 EMD STG#2 CWPH and FWPH Switchgear dewatering pump not availab15.11.17 103067629
2 EMD Stage-2 FOPH both the ACs not working 13.11.17 1st completed; 2nd 20.11
4 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 14 online injection will be do
5 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.11.17 in progress
6 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
9 C&I Mill G BIG-3 open FB not coming 06.11.17 9.11.17 bmd scafflding to be done 103058180
10 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 Under Obser
during load variation; pres 103055623
11 EMD SCS pass-B flushing pump not taking start from control room 01.11.17 remote thru pending; Loca 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I AUX PRDS Control valve AS26 not going to auto 15.11.17 103069831
4 BMD Mill-4H abnormal sound below 50 TPH 11.11.17 under observation 103065051
5 TMD TG bearing-5 JOP line pin hole oil leakage. 14.11.17 ok 103069265
3 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 after vam 2 103060714
4 EMD ESP - 4 AHU-11 not taking start. 01.11.17 11.11.17 bus sd req; 103052863
OFFSITES
1 OFS Sea water lub filter 2 leakage from bottom 15.11.17 ip 103065390
2 OFS Sea water lub water filter inlet valves not operating 15.11.17 ip 103069233
2 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 14 Work In Progress. 103065278
4 EMD EXHAUST FANS ARE NOT WORKING AT ST2 CW PP HOUSE 11.11.17 103063925
6 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
7 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
7 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 att Alarm coming in alarm disp 103061215
3 C&I CONDENSOR PIT DW LOW LVL SWITCH NW 11.11.17 attended, to be checked 103065764
2 C&I Feeder-D tripping on " feeder not in remote" / "no coal on belt". 13.11.17 uo 103065051
1 EMD Kalapaka-1 main breaker 1752 trip circuit fault coming 13.11.17 ok 103065308
4 C&I DM water consumption integrator wrong 11.11.17 att SHIFT-7 TONNES 103065794
7-8%(820-740 MMWC),
5 C&I/BMD PAF-2A BLADE PITCH HUNTING OBSERVED 11.11.17 ok 85-90 A, 103065240
1 TMD st-2 IAC-2 lub oil level increasing. 11.11.17 att 103065308
5 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 att under permit 103055836 103054716
1 C&I Mill 1F motor DE vib point :1 showing high 06.11.17 atte PT:1/2 :5/1 mm. MTP: 1.5 103057796
5 TMD Cond vacuum pump-1 NRV abnormal sound coming intermittently 09.11.17 attended
2 C&I CD-1 oil gun command was not going 11.11.17 attended 103064267
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43053
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
PRIORITY POINTS
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I Mill 1F motor DE vib point :1 showing high 06.11.17 atte PT:1/2 :5/1 mm. MTP: 1.5 103057796
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
14/11/2 BMD soot blowing motorised and control valves passing. 103068490
4 C&I DM water consumption integrator wrong 11.11.17 att SHIFT-7 TONNES 103065794
5 EMD PA system defects at various locations. 07.11.17 19.11.17 work in progress 103055603
6 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 14.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 EMD Stage-2 FOPH both the ACs not working 13.11.17 1st 14.11.17; 2nd 20.11.1
4 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 14 online injection will be do
5 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.11.17 in progress
6 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
9 C&I Mill G BIG-3 open FB not coming 06.11.17 9.11.17 bmd scafflding to be done 103058180
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
14/11/2 TMD TG bearing-5 JOP line pin hole oil leakage. 103069265
3 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 after vam 2 103060714
4 EMD ESP - 4 AHU-11 not taking start. 01.11.17 11.11.17 bus sd req; 103052863
OFFSITES
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD st-2 IAC-2 lub oil level increasing. 11.11.17 att 103065308
2 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 14 Work In Progress. 103065278
4 EMD EXHAUST FANS ARE NOT WORKING AT ST2 CW PP HOUSE 11.11.17 103063925
5 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 att under permit 103055836 103054716
6 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
7 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
5 TMD Cond vacuum pump-1 NRV abnormal sound coming intermittently 09.11.17 attended
2 C&I CD-1 oil gun command was not going 11.11.17 attended 103064267
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43052
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
PRIORITY POINTS
1 BMD PA Fan 1 A Vibrations on higher side 01.11.17 Dialy vibn is monitored;
2 BMD St 1 LDO line replacement works 01.11.17 Corroded part replaced; P
3 CHEM DM Plant, CPU Resin replacement to reduce chlorides in DM Wate01.11.17
4 TMD Unit 4 Condensor Air ingress; Helium test to be done 01.11.17
5 AHD Re use of Overflow of BAOF tank into bottom hoppers 01.11.17
6 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
4 C&I Mill 1F motor DE vib point :1 showing high 06.11.17 permit requiPT:1/2 :5/1 mm. MTP: 1.5 103057796
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
7 EMD PA system defects at various locations. 07.11.17 13.11.17 work in progress 103055603
8 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 14.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
4 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 online injection will be do
5 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.11.17 in progress
6 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
7 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 14.11.17 Alarm coming in alarm disp 103061215
9 C&I Mill G BIG-3 open FB not coming 06.11.17 9.11.17 bmd scafflding to be done 103058180
10 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 Under Obser
during load variation; pres 103055623
11 EMD SCS pass-B flushing pump not taking start from control room 01.11.17 remote thru pending; Loca 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
12.11.2 AHM CG-B poor discharge 103067935
12.11.2 C&I Feeder-D tripping on " feeder not in remote" Feeder
/ inspected. No abnormality found. 103067646
2 C&I Feeder-D tripping on " feeder not in remote" / "no coal on belt". 13.11.17 103065051
3 C&I CONDENSOR PIT DW LOW LVL SWITCH NW 11.11.17 attended, to be checked 103065764
4 BMD Mill-4H abnormal sound below 50 TPH 11.11.17 under observation 103065051
6 TMD UCR AC AHU-2 3 way valve spindle damage. 10.11.17 Long Isolation problem; V/v to 103054204
8 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 after vam 2 103060714
9 EMD ESP-2 AHU-11 not taking start. 01.11.17 11.11.17 bus sd req; 103052863
OFFSITES
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD Kalapaka-1 main breaker 1752 trip circuit fault coming 13.11.17 103065308
3 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 Work In Progress. 103065278
6 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 11.10.17 under permit 103055836 103054716
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
5 TMD Cond vacuum pump-1 NRV abnormal sound coming intermittently 09.11.17 attended
2 C&I CD-1 oil gun command was not going 11.11.17 attended 103064267
4 C&I PAC-2 lub oil temperature showing "0" 10.11.17 13.11.17 attended 103064610
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43052
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
PRIORITY POINTS
1 BMD PA Fan 1 A Vibrations on higher side 01.11.17 Dialy vibn is monitored;
2 BMD St 1 LDO line replacement works 01.11.17 Corroded part replaced; P
3 CHEM DM Plant, CPU Resin replacement to reduce chlorides in DM Wate01.11.17
4 TMD Unit 4 Condensor Air ingress; Helium test to be done 01.11.17
5 AHD Re use of Overflow of BAOF tank into bottom hoppers 01.11.17
6 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
4 C&I Mill 1F motor DE vib point :1 showing high 06.11.17 permit requiPT:1/2 :5/1 mm. MTP: 1.5 103057796
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
7 EMD PA system defects at various locations. 07.11.17 13.11.17 work in progress 103055603
8 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 14.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
4 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 online injection will be do
5 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.11.17 in progress
6 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
7 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 14.11.17 Alarm coming in alarm disp 103061215
9 C&I Mill G BIG-3 open FB not coming 06.11.17 9.11.17 bmd scafflding to be done 103058180
10 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 Under Obser
during load variation; pres 103055623
11 EMD SCS pass-B flushing pump not taking start from control room 01.11.17 remote thru pending; Loca 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I Feeder-D tripping on " feeder not in remote" / "no coal on belt". 13.11.17 103065051
3 C&I CONDENSOR PIT DW LOW LVL SWITCH NW 11.11.17 attended, to be checked 103065764
4 BMD Mill-4H abnormal sound below 50 TPH 11.11.17 under observation 103065051
6 TMD UCR AC AHU-2 3 way valve spindle damage. 10.11.17 Long Isolation problem; V/v to 103054204
8 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 after vam 2 103060714
9 EMD ESP-2 AHU-11 not taking start. 01.11.17 11.11.17 bus sd req; 103052863
OFFSITES
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD Kalapaka-1 main breaker 1752 trip circuit fault coming 13.11.17 103065308
3 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 Work In Progress. 103065278
6 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 11.10.17 under permit 103055836 103054716
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
5 TMD Cond vacuum pump-1 NRV abnormal sound coming intermittently 09.11.17 attended
2 C&I CD-1 oil gun command was not going 11.11.17 attended 103064267
4 C&I PAC-2 lub oil temperature showing "0" 10.11.17 13.11.17 attended 103064610
1 EMD ESP acp-1 SEC-1 INCOMER BKR HARD TO RACK 11.11.17 compl 103064837
2 EMD ESP PASS-A EARHTING ROD INTERLOCKS N/W 11.11.17 ok compl 103064196
3 BMD PAPH-A GUIDE BRG LOP-B FLOW HUNTING 11.11.17 compl 103064199
11 EMD CW control room one package ac not working 04.11.17 14.11.17 Attended 103057202
3 BMD HFO tracing steam leakage near St-2 AHP 10.11.17 atyt Under permit 103064264
2 BMD oil is leaking from Oil drums near ID Fan:2 A , to be removed. 09.11.17 10.11.17 ok
13.05.2C&I Flue gas O2 RHS Tx1/Tx2 mismatch at part load 23.05.17 ok ; 2 % mismatch 102861332
15 TMD GSC drain line strainer suspected choke 10.01.17 102728254; bigger size v/v attended
9 C&I PA fan A fan temp point showing wrong ;DE temp pts dev & NDEtemp 102747921 attended
4 C&I PA fan-B LOP SLC not getting ON Unit 1 31.05.17 sd auto c/o will not be succes Attended
5 OPRN /EMDESP filed 3B12 high spark rate and zero current. 08.11.17 ok rapping to be done;
3 TMD TDBFP:2 A being stopped for attending leakage from booster pum 09.11.17 attended under permit
2 OFS Fire hydrant booster line leakage near Mill-3F 10.11.17 ok 10.11.17 103064261
2 AHD ECO hopper-3&4 ash accumulated & leakage from top side. 09.11.17 ok 103063181
1 TMD MDBFP lub oil filter equilising line suspected choke 10.11.17 ok 103064452
2 C&I Eco hoppers-1,2,3 temperature points RTD damaged. 07.11.17 attended insulation removed; ip 103058913
3 Civil 8.5 Operator room Washbasin tap is passing 07.11.17 09.11.17 Attended 103060731
13 AHM CG-3C MOTOR DE SIDE AXIAL VIB HIGH 03.11.17 Attended 10.6 mm/s 103055185
6 TMD 17m oil canal door is damaged and hinges rusted 07.11.17 09.11.17 barricading to be done; we 103058244
1 TMD LPH-3 normal drip manual valve got closed with line hammering a 09.11.17 ok 103063173
9 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 attended ip 103052056
8 TMD SEAL OILCLRS WTR SIDE COM DRN LKG 06.11.17 attended 103059160
PLANT DATA
PRIORITY POINTS
1 BMD PA Fan 1 A Vibrations on higher side 01.11.17 Dialy vibn is monitored;
2 BMD St 1 LDO line replacement works 01.11.17 Corroded part replaced; P
3 CHEM DM Plant, CPU Resin replacement to reduce chlorides in DM Wate01.11.17
4 TMD Unit 4 Condensor Air ingress; Helium test to be done 01.11.17
5 AHD Re use of Overflow of BAOF tank into bottom hoppers 01.11.17
6 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD ESP acp-1 SEC-1 INCOMER BKR HARD TO RACK 11.11.17 compl 103064837
2 EMD ESP PASS-A EARHTING ROD INTERLOCKS N/W 11.11.17 ok compl 103064196
3 BMD PAPH-A GUIDE BRG LOP-B FLOW HUNTING 11.11.17 compl 103064199
4 C&I Mill 1F motor DE vib point :1 showing high 06.11.17 permit requiPT:1/2 :5/1 mm. MTP: 1.5 103057796
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
5 EMD PA system defects at various locations. 07.11.17 13.11.17 work in progress 103055603
6 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 14.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I CD-1 oil gun command was not going 11.11.17 attended 103064267
4 C&I PAC-2 lub oil temperature showing "0" 10.11.17 13.11.17 attended 103064610
5 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 online injection will be do
6 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.11.17 in progress
7 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
8 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 14.11.17 Alarm coming in alarm disp 103061215
11 C&I Mill G BIG-3 open FB not coming 06.11.17 9.11.17 bmd scafflding to be done 103058180
12 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 Under Obser
during load variation; pres 103055623
13 EMD SCS pass-B flushing pump not taking start from control room 01.11.17 remote thru pending; Loca 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I CONDENSOR PIT DW LOW LVL SWITCH NW 11.11.17 attended, to be checked 103065764
2 BMD Mill-4H abnormal sound below 50 TPH 11.11.17 under observation 103065051
4 TMD UCR AC AHU-2 3 way valve spindle damage. 10.11.17 Long Isolation problem; V/v to 103054204
5 TMD Cond vacuum pump-1 NRV abnormal sound coming intermittently 09.11.17 attended
7 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 after vam 2 103060714
8 EMD ESP-2 AHU-11 not taking start. 01.11.17 11.11.17 bus sd req; 103052863
OFFSITES
2 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 15MM/S(PUMP-DE), MM Wo 103065278
5 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 11.10.17 under permit 103055836 103054716
6 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
7 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
11 EMD CW control room one package ac not working 04.11.17 14.11.17 Attended 103057202
3 BMD HFO tracing steam leakage near St-2 AHP 10.11.17 atyt Under permit 103064264
2 BMD oil is leaking from Oil drums near ID Fan:2 A , to be removed. 09.11.17 10.11.17 ok
13.05.2C&I Flue gas O2 RHS Tx1/Tx2 mismatch at part load 23.05.17 ok ; 2 % mismatch 102861332
15 TMD GSC drain line strainer suspected choke 10.01.17 102728254; bigger size v/v attended
9 C&I PA fan A fan temp point showing wrong ;DE temp pts dev & NDEtemp 102747921 attended
4 C&I PA fan-B LOP SLC not getting ON Unit 1 31.05.17 sd auto c/o will not be succes Attended
5 OPRN /EMDESP filed 3B12 high spark rate and zero current. 08.11.17 ok rapping to be done;
3 TMD TDBFP:2 A being stopped for attending leakage from booster pum 09.11.17 attended under permit
2 OFS Fire hydrant booster line leakage near Mill-3F 10.11.17 ok 10.11.17 103064261
2 AHD ECO hopper-3&4 ash accumulated & leakage from top side. 09.11.17 ok 103063181
1 TMD MDBFP lub oil filter equilising line suspected choke 10.11.17 ok 103064452
2 C&I Eco hoppers-1,2,3 temperature points RTD damaged. 07.11.17 attended insulation removed; ip 103058913
3 Civil 8.5 Operator room Washbasin tap is passing 07.11.17 09.11.17 Attended 103060731
13 AHM CG-3C MOTOR DE SIDE AXIAL VIB HIGH 03.11.17 Attended 10.6 mm/s 103055185
6 TMD 17m oil canal door is damaged and hinges rusted 07.11.17 09.11.17 barricading to be done; we 103058244
1 TMD LPH-3 normal drip manual valve got closed with line hammering a 09.11.17 ok 103063173
9 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 attended ip 103052056
8 TMD SEAL OILCLRS WTR SIDE COM DRN LKG 06.11.17 attended 103059160
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43050
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
PRIORITY POINTS
1 BMD PA Fan 1 A Vibrations on higher side 01.11.17 Dialy vibn is monitored;
2 BMD St 1 LDO line replacement works 01.11.17 Corroded part replaced; P
3 CHEM DM Plant, CPU Resin replacement to reduce chlorides in DM Wate01.11.17
4 TMD Unit 4 Condensor Air ingress; Helium test to be done 01.11.17
5 AHD Re use of Overflow of BAOF tank into bottom hoppers 01.11.17
6 BMD/ TMD Utilisation of Hot water of CBD & VAM drains 01.11.17
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 EMD ESP acp-1 SEC-1 INCOMER BKR HARD TO RACK 11.11.17 103064837
4 C&I Mill 1F motor DE vib point :1 showing high 06.11.17 permit requiPT:1/2 :5/1 mm. MTP: 1.5 103057796
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I/BMD PAF-2A BLADE PITCH HUNTING OBSERVED 11.11.17 ok 7-8%(820-740 MMWC) 103065240
4 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 14.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I CD-1 oil gun command was not going 11.11.17 103064267
2 C&I PAC-2 lub oil temperature showing "0" 10.11.17 13 permit req; 103064610
4 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 online injection will be do
5 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 18.11.17 ip
6 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
7 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 14.11.17 Alarm coming in alarm disp 103061215
8 BMD Bunker-H outlet gate passing. 08.11.17 Mill i/ s EMD checked. Trorque act 103060575
10 C&I Mill G BIG-3 open FB not coming 06.11.17 9.11.17 bmd scafflding to be done 103058180
12 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 Under Obser
during load variation; 103055623
12 EMD SCS pass-B flushing pump not taking start from control room 01.11.17 remote thru pending; Loca 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD UCR AC AHU-2 3 way valve spindle damage. 10.11.17 Long Isolation problem; V/v to 103054204
2 TMD Cond vacuum pump-1 NRV abnormal sound coming intermittently 09.11.17 sound persisting
3 TMD VAM-2 is not effective 02.11.17 in progress Li Br chiller water DT-1.8 103054680
4 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 after vam 2 103060714
5 EMD ESP-2 AHU-11 not taking start. 01.11.17 11.11.17 bus sd req; 103052863
OFFSITES
2 AHM St-2 AWRC p/p -3 high vibratins pump DE 11.11.17 15MM/S(PUMP-DE) 103065278
2 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 11.10.17 under permit 103055836 103054716
3 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 11.11.17 permit req; 6 hrs for repl 103034882
4 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
11 EMD CW control room one package ac not working 04.11.17 14.11.17 Attended 103057202
3 BMD HFO tracing steam leakage near St-2 AHP 10.11.17 atyt Under permit 103064264
2 BMD oil is leaking from Oil drums near ID Fan:2 A , to be removed. 09.11.17 10.11.17 ok
13.05.2C&I Flue gas O2 RHS Tx1/Tx2 mismatch at part load 23.05.17 ok ; 2 % mismatch 102861332
15 TMD GSC drain line strainer suspected choke 10.01.17 102728254; bigger size v/v attended
9 C&I PA fan A fan temp point showing wrong ;DE temp pts dev & NDEtemp 102747921 attended
4 C&I PA fan-B LOP SLC not getting ON Unit 1 31.05.17 sd auto c/o will not be succes Attended
5 OPRN /EMDESP filed 3B12 high spark rate and zero current. 08.11.17 ok rapping to be done;
3 TMD TDBFP:2 A being stopped for attending leakage from booster pum 09.11.17 attended under permit
2 OFS Fire hydrant booster line leakage near Mill-3F 10.11.17 ok 10.11.17 103064261
2 AHD ECO hopper-3&4 ash accumulated & leakage from top side. 09.11.17 ok 103063181
1 TMD MDBFP lub oil filter equilising line suspected choke 10.11.17 ok 103064452
2 C&I Eco hoppers-1,2,3 temperature points RTD damaged. 07.11.17 attended insulation removed; ip 103058913
3 Civil 8.5 Operator room Washbasin tap is passing 07.11.17 09.11.17 Attended 103060731
13 AHM CG-3C MOTOR DE SIDE AXIAL VIB HIGH 03.11.17 Attended 10.6 mm/s 103055185
6 TMD 17m oil canal door is damaged and hinges rusted 07.11.17 09.11.17 barricading to be done; we 103058244
1 TMD LPH-3 normal drip manual valve got closed with line hammering a 09.11.17 ok 103063173
9 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 attended ip 103052056
8 TMD SEAL OILCLRS WTR SIDE COM DRN LKG 06.11.17 attended 103059160
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43049
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I Eco hoppers-1,2,3 temperature points RTD damaged. 07.11.17 attended insulation removed; ip 103058913
3 C&I Mill 1F motor DE vib point :1 showing high 06.11.17 permit requiPT:1/2 :5/1 mm. MTP: 1.5 103057796
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD MDBFP lub oil filter equilising line suspected choke 10.11.17 ok 103064452
2 AHD ECO hopper-3&4 ash accumulated & leakage from top side. 09.11.17 ok 103063181
3 TMD TDBFP:2 A being stopped for attending leakage from booster pum 09.11.17 attended under permit
4 BMD oil is leaking from Oil drums near ID Fan:2 A , to be removed. 09.11.17 10
5 OPRN /EMDESP filed 3B12 high spark rate and zero current. 08.11.17 ok rapping to be done;
8 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 14.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 OFS Fire hydrant booster line leakage near Mill-3F 10.11.17 ok 10.11.17 103064261
4 BMD HFO tracing steam leakage near St-2 AHP 10.11.17 up 103064264
3 TMD Feed water line drain valve after FDV-9 (HPH-5B I/L valve) passing09.11.17 online
4 AHD Bottom ash "W" portion view glass area platform got erroded. 09.11.17 10
5 TMD TG ECW pump- B NRV passing. 08.11.17 Pump i/s Reverse Rotation is there 103061601
6 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 14.11.17 Alarm coming in alarm disp 103061215
9 C&I Mill G BIG-3 open FB not coming 06.11.17 9.11.17 bmd scafflding to be done 103058180
11 EMD CW control room one package ac not working 04.11.17 10.11.17 motor rewinding 103057202
12 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 Under Obser
during load variation; 103055623
14 EMD SCS pass-B flushing pump not taking start from control room 01.11.17 remote thru pending; Loca 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 TMD Cond vacuum pump-1 NRV abnormal sound coming intermittently 09.11.17 under permit
3 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 after vam 2 103060714
5 TMD VAM-2 is not effective 02.11.17 in progress OEM will check; chiller w 103054680
1 CIVIL Sweet water pump house area grass cutting to be done 10.11.17 103035842
2 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 11.10.17 under permit 103055836 103054716
3 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 30.10.17 permit req; 6 hrs for repl 103034882
4 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 30.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
3 Civil 8.5 Operator room Washbasin tap is passing 07.11.17 09.11.17 Attended 103060731
13 AHM CG-3C MOTOR DE SIDE AXIAL VIB HIGH 03.11.17 Attended 10.6 mm/s 103055185
6 TMD 17m oil canal door is damaged and hinges rusted 07.11.17 09.11.17 barricading to be done; we 103058244
1 TMD LPH-3 normal drip manual valve got closed with line hammering a 09.11.17 ok 103063173
9 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 attended ip 103052056
8 TMD SEAL OILCLRS WTR SIDE COM DRN LKG 06.11.17 attended 103059160
9 C&I Mill-4H BIG Corner-2 Open Feedback not coming 06.11.17 attended 103059232
10 TMD CRH Line insulation damaged at 0m 06.11.17 attended cladding pending 103059206
11 C&I U4 ECO HOPPERS TEMP PTS TO BE MADE THRU 06.11.17 attended 103058925
13 C&I ECO HOPPER TEMP SHOWING WRONG 06.11.17 correct ; 56 deg 103058939
1 EMD/ TMD ESP-3 Air Washer Blower tripping on overload. 08.11.17 Attended 103061130
5 TMD No proper approach for MOT filter top cover and vent valve 07.11.17 attended stool will be provided 103060552
15 TMD LPH-3 vent line manual valve gland leak 06.11.17 attended 103058467
16 EMD CW p/p-3 lub wtr coupling lkg 04.11.17 attended disch flange leak 103057311
17 OFS CW p/p-4 lub p/p-A disch handle missing 04.11.17 attended 103057313
7 TMD BFP-B booster pump NDE side seal water impulse line having leak07.11.17 attended 103060609
8 EMD Primary SCAPH- A MOV ASS-27 supply is not extending. 07.11.17 attended 103060239
9 C&I Primary SCAPH- B control valves ASS-19/22 are not operating. 07.11.17 attended 103060241
10 BMD Primary SCAPH-B MOV ASS 22 manual valves handle missing. 07.11.17 attended 103060244
11 TMD ARCW SCS pass B, flush pump gland leakage 06.11.17 attended 103058470
2 C&I Online Drum Silica analyser showing erratic value. 08.11.17 attended 103061324
5 EMD poor lighting at st-2 fire water pumps area 06.11.17 attended 103059170
3 EMD Stg-1/2 LDO interconnection valve area lighting not available 07.11.17 attended Lighing to be provided. 103054139
8 AHD /EMD Stage-1 ash water sump make up MOV not operating 01.11.17 Attended ip
2 C&I FG O2@ECO O/L LHS TXR/LAB VALUE MISMATCH 06.11.17 ok LHS: 5.7/6.5,RHS:3..3/3.7 103058840
6 EMD ESP fied 7B21 rectifrmr earthin lvr free 06.11.17 ok 103058911
4 OFS Fire water booster pump-1 DE side heavy gland leakage. 07.11.17 ok 103052442
10 OFS U#2 C row potable water line leakage. 31.10.17 ok No leakage found 103036592
1 BMD PAPH-A Sootblower puppet valve jammed and not opening. 08.11.17 ok
2 EMD DC earthfault appearing when ASP-31 is taken into service. 08.11.17 ok checked
07.11.2 EMD Wall blower-17 not retracting and homeposition appearing. 08.11.17 ok
PLANT DATA
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I Eco hoppers-1,2,3 temperature points RTD damaged. 07.11.17 insulation 103058913
5 EMD Stg-1/2 LDO interconnection valve area lighting not available 07.11.17 Lighing to be provided. 103054139
7 C&I Mill 1F motor DE vib point :1 showing high 06.11.17 PT:1/2 :5/1 MM. MTP: 1.5 103057796
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 EMD ESP filed 3B12 high spark rate and zero current. 08.11.17
3 EMD poor lighting at st-2 fire water pumps area 06.11.17 103059170
7 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 10.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I Online Drum Silica analyser showing erratic value. 08.11.17 103061324
3 C&I DG-4 &6 local/remote change over alarm not coming in facie. 08.11.17 Alarm coming in alarm dis 103061215
4 BMD Bunker-H outlet gate passing. 08.11.17 EMD checked. Trorque act 103060575
3 TMD BFP-B booster pump NDE side seal water impulse line having leak07.11.17 103060609
4 EMD Primary SCAPH- A MOV ASS-27 supply is not extending. 07.11.17 103060239
5 C&I Primary SCAPH- B control valves ASS-19/22 are not operating. 07.11.17 103060241
6 BMD Primary SCAPH-B MOV ASS 22 manual valves handle missing. 07.11.17 103060244
7 TMD ARCW SCS pass B, flush pump gland leakage 06.11.17 103058470
8 C&I Mill G BIG-3 open FB not coming 06.11.17 bmd scafflding to be done 103058180
11 TMD LPH-3 vent line manual valve gland leak 06.11.17 103058467
12 EMD CW p/p-3 lub wtr coupling lkg 04.11.17 ip disch flange leak 103057311
14 EMD CW control room one package ac not working 04.11.17 08.11.17 motor rewinding 103057202
15 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 during load variation 103055623
16 AHM CG-3C MOTOR DE SIDE AXIAL VIB HIGH 03.11.17 10.6 mm/s 103055185
17 EMD SCS pass-B flushing pump not taking start 01.11.17 6.11.17 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 EMD ESP-3 Air Washer Blower tripping on overload. 08.11.17 TMD 103061130
6 TMD AHU-2 chilled water line 3 way valve spindle damaged 08.11.17 isolation prob ; manual ll b 103054204
8 TMD UCR AC Chilled Water Pump-2 NRV passing. 08.11.17 vam 103060714
1 TMD No proper approach for MOT filter top cover and vent valve 07.11.17 stool will be provided 103060552
2 TMD 17m oil canal door is damaged and hinges rusted 07.11.17 103058244
3 EMD All stg- 2 DG sets local/remote FB is not coming in MMI 07.11.17 ip 103060732
5 TMD SEAL OILCLRS WTR SIDE COM DRN LKG 06.11.17 103059160
6 C&I Mill-4H BIG Corner-2 Open Feedback not coming 06.11.17 103059232
11 TMD VAM-2 is not effective 02.11.17 07.11.17 OEM will check; chiller w 103054680
2 OFS Seawater standby line ARV leak near sea water jetty 07.11.17 103060227
4 All secs Area wise toilets , its numbering & responsiblities to be identified 07.11.17
6 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 103055836 103054716
7 Civil MST A&B 33KV SWGR area grass cutting to be done. 01.11.17 contract awarding pendin 103049829
8 AHD /EMD Stage-1 ash water sump make up MOV not operating 01.11.17 6 ip
9 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 08.11.17 cable fault ';from other t 103052056
10 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 30.10.17 permit req; 6 hrs for repl 103034882
11 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 20.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
4 OFS Fire water booster pump-1 DE side heavy gland leakage. 07.11.17 ok 103052442
10 OFS U#2 C row potable water line leakage. 31.10.17 ok No leakage found 103036592
1 BMD PAPH-A Sootblower puppet valve jammed and not opening. 08.11.17 ok
2 EMD DC earthfault appearing when ASP-31 is taken into service. 08.11.17 ok checked
07.11.2 EMD Wall blower-17 not retracting and homeposition appearing. 08.11.17 ok
5 TMD ESP-2 COMPRESSOR-1&2 TRIPPING ON LP PRESS LOW 03.11.17 ok Joint Check 103055596
7 C&I UCR AC Chilled Water Pump-2 discharge valve not closing in auto08.11.17 ok 103060713
3 C&I/BMD Mill-G PV3 power cylinder passing & gate bend. 08.11.17 ok 103061199
1 EMD PAPH-A Soot blower running feedback is not coming in MMI. 08.11.17 ok 103061889
10 C&I Feeder-4D tripped on Fdr not in Remote 06.11.17 ok bmd scafflding to be done 103058996
4 TMD Debris filter-A leakage from spool piece increased 07.11.17 temp att 103060680
4 BMD 20m boiler drains to IBD line having pin hole leakage. 07.11.17 ok 103060692
1 C&I LP Bypass valves are not opening with demand even >50%. 07.11.17 ok 103059802
C&I flue gas temp points bad 06.11.17 ok BEFORE SAPH:A,B : 1 PO 103059194
PLANT DATA
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I Eco hoppers-1,2,3 temperature points RTD damaged. 07.11.17 ins 103058913
4 OFS Fire water booster pump-1 DE side heay gland leakage. 07.11.17 103052442
5 EMD Stg-1/2 LDO interconnection valve area lighting not available 07.11.17 Lighing to be provided. 103054139
6 EMD ESP fied 7B21 rectifrmr earthin lvr free 06.11.17 ok 103058911
3 C&I Mill 1F motor DE vib point :1 showing high 06.11.17 PT:1/2 :5/1 MM. MTP: 1.5 103057796
6 OFS U#2 C row potable water line leakage. 31.10.17 No leakage found 103036592
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I LP Bypass valves are not opening with demand even >50%. 07.11.17 ok 103059802
4 BMD 20m boiler drains to IBD line having pin hole leakage. 07.11.17 ok 103060692
2 C&I FG O2@ECO O/L LHS TXR/LAB VALUE MISMATCH 06.11.17 ok LHS: 5.7/6.5,RHS:3..3/3.7 103058840
3 EMD poor lighting at st-2 fire water pumps area 06.11.17 103059170
6 TMD ESP-2 COMPRESSOR-1&2 TRIPPING ON LP PRESS LOW 03.11.17 Joint Check 103055596
7 TMD TDBFP-B DC EOP pump DE (H) vibrations high 02.11.17 06.11.17 up 103053949
8 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 10.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
07.11.2 TMD BFP-B booster pump NDE side seal water impulse line having leak07.11.17 103060609
06.11.2 EMD Primary SCAPH- A MOV ASS-27 supply is not extending. 07.11.17 103060239
06.11.2 C&I Primary SCAPH- B control valves ASS-19/22 are not operating. 07.11.17 103060241
06.11.2 BMD Primary SCAPH-B MOV ASS 22 manual valves handle missing. 07.11.17 103060244
1 TMD ARCW SCS pass B, flush pump gland leakage 06.11.17 103058470
2 C&I Mill G BIG-3 open FB not coming 06.11.17 bmd scafflding to be done 103058180
5 TMD LPH-3 vent line manual valve gland leak 06.11.17 103058467
6 EMD CW p/p-3 lub wtr coupling lkg 04.11.17 ip disch flange leak 103057311
8 EMD CW control room one package ac not working 04.11.17 08.11.17 motor rewinding 103057202
9 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 during load variation 103055623
10 AHM CG-3C MOTOR DE SIDE AXIAL VIB HIGH 03.11.17 10.6 mm/s 103055185
11 EMD SCS pass-B flushing pump not taking start 01.11.17 6.11.17 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
07.11.2 TMD No proper approach for MOT filter top cover and vent valve 07.11.17 stool will be provided 103060552
04.11.2 TMD 17m oil canal door is damaged and hinges rusted 07.11.17 103058244
07.11.2 EMD All stg- 2 DG sets local/remote FB is not coming in MMI 07.11.17 103060732
07.11.2 TMD Debris filter-A leakage from spool piece increased 07.11.17 103060680
1 TMD SEAL OILCLRS WTR SIDE COM DRN LKG 06.11.17 103059160
2 C&I Mill-4H BIG Corner-2 Open Feedback not coming 06.11.17 103059232
6 C&I Feeder-4D tripped on Fdr not in Remote 06.11.17 bmd scafflding to be done 103058996
7 TMD VAM-2 is not effective 02.11.17 07.11.17 OEM will check; chiller w 103054680
02.11.2 OFS Sea water pump-3 ratchet mechanism damaged. 07.11.17 103054966
06.11.2 OFS Seawater standby line ARV leak near sea water jetty 07.11.17 103060227
02.11.2 Civil Grass cutting required Stg-1 FOPH area 07.11.17 103055556
All secs Area wise toilets , its numbering & responsiblities to be identified 07.11.17
3 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 103055836 103054716
4 CMP MST A&B 33KV SWGR area grass cutting to be done. 01.11.17 contract awarding pendin 103049829
5 AHD /EMD Stage-1 ash water sump make up MOV not operating 01.11.17 6 ip
6 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 08.11.17 cable fault ';from other t 103052056
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 30.10.17 permit req; 6 hrs for repl 103034882
8 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 20.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
COMPLETED JOBS
C&I flue gas temp points bad 06.11.17 ok BEFORE SAPH:A,B : 1 PO 103059194
6 EMD Poor lighting: unit #3 & 4 buffer hopper area 30.10.17 Attended
4 TMD UCR AC COMP-4 COMP-4 COOLING NOT EFFECTIVE 30.10.17 ok trippng on Over Load; 103050942
2 OFS/ C&I Sea water pump # 3 tripped on lube water flow low 04.11.17 ok
PLANT DATA
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
EMD ESP fied 7B21 rectifrmr earthin lvr free 06.11.17 103058911
C&I flue gas temp points bad 06.11.17 ok BEFORE SAPH:A,B : 1 PO 103059194
C&I Mill 1F motor DE vib point :1 showing high 06.11.17 PT:1/2 :5/1 MM. MTP: 1.5 103057796
2 OFS U#2 C row potable water line leakage. 31.10.17 No leakage found 103036592
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
C&I FG O2@ECO O/L LHS TXR/LAB VALUE MISMATCH 06.11.17 LHS: 5.7/6.5,RHS:3..3/3.7 103058840
EMD poor lighting at st-2 fire water pumps area 06.11.17 103059170
C&I ECO HOPPERS TEMPERA POINTS TO BE PROVIDED 06.11.17 103058908
1 TMD ESP-2 COMPRESSOR-1&2 TRIPPING ON LP PRESS LOW 03.11.17 Joint Check 103055596
2 TMD TDBFP-B DC EOP pump DE (H) vibrations high 02.11.17 06.11.17 103053949
3 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 10.11.17 103054698
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
TMD ARCW SCS pass B, flush pump gland leakage 06.11.17 103058470
C&I Mill G BIG-3 open FB not coming 06.11.17 bmd scafflding to be done 103058180
EMD IF FAN:B CH:1&2 CURRENT MISMATCH IS HIGH 06.11.17 ch 1 ok 324/276 A; opp 103058675
TMD LPH-3 vent line manual valve gland leak 06.11.17 103058467
1 EMD CW p/p-3 lub wtr coupling lkg 04.11.17 ip disch flange leak 103057311
3 EMD CW control room one package ac not working 04.11.17 08.11.17 motor rewinding 103057202
5 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 during load variation 103055623
6 AHM CG-3C MOTOR DE SIDE AXIAL VIB HIGH 03.11.17 10.6 mm/s 103055185
8 EMD SCS pass-B flushing pump not taking start 01.11.17 6.11.17 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
TMD SEAL OILCLRS WTR SIDE COM DRN LKG 06.11.17 103059160
C&I Mill-4H BIG Corner-2 Open Feedback not coming 06.11.17 103059232
C&I Feeder-4D tripped on Fdr not in Remote 06.11.17 bmd scafflding to be done 103058996
2 TMD VAM-2 is not effective 02.11.17 07.11.17 OEM will check; chiller w 103054680
1 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 103055836 103054716
2 CMP MST A&B 33KV SWGR area grass cutting to be done. 01.11.17 contract awarding pendin 103049829
3 AHD /EMD Stage-1 ash water sump make up MOV not operating 01.11.17 6 ip
4 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 08.11.17 cable fault ';from other t 103052056
5 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 30.10.17 permit req; 6 hrs for repl 103034882
7 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 20.10.17 AWRC PP 1 &PP 2 AVL;
CHEMISTRY
CHP
PRIORITY POINTS
COMPLETED JOBS
6 EMD Poor lighting: unit #3 & 4 buffer hopper area 30.10.17 Attended
4 TMD UCR AC COMP-4 COMP-4 COOLING NOT EFFECTIVE 30.10.17 ok trippng on Over Load; 103050942
2 OFS/ C&I Sea water pump # 3 tripped on lube water flow low 04.11.17 ok
6 CMP switchyard Drink Water over head tank overflowing. 31.10.17 3 Overflowing continuously 103052090
10 Poor lighting: unit #3 buffer hopper area ;St 1 AW pp house; Ash sl 30.10.17 p
4 C&I Fire hydnt pr. Gauge at Raw water PH showing erratic value. 31.10.17 ok guage rep 103052058
4 OFS DMCW, and IA lines from FOPH to boiler got corroded. 27.10.17 No CORRODMCW, and IA lines check 103047106
2 C&I TDBFP-A LO temperature control valve nominclature at local oppos02.11.17 att 103051889
04.11.2 C&I CC pump cavity cooling emergency supply and drain valves did n checked; vv made free; ope 103056543
3 BMD ESP pass-A I/L gate-2 not opening 02.11.17 ok Mechanical jam 103054577
O&M DAILY PLANNING MEETING
MTP/STP/001 DATE: 43043
Last Updated 0.3958333333
SAFETY
SL DEPT DEFECT DESCRIPTION REMARKS
Our Vision: To be the World's Leading Power Company, Energizing India's Growth.
Our Mission: Provide Reliable Power and Related Solutions in an Economical, Efficient and Environment friendly manner, driven by Innovation and Agility.
PLANT DATA
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
3 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 10 103054698
4 TMD UCR AC COMP-4 COMP-4 COOLING NOT EFFECTIVE 30.10.17 31 trippng on Over Load; 103050942
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
5 EMD ID fan-B VFD-2 current dipping below 90A 03.11.17 during load variation 103055623
6 AHM CG-3C MOTOR DE SIDE AXIAL VIB HIGH 03.11.17 10.6 mm/s 103055185
4 EMD SCS pass-B flushing pump not taking start 01.11.17 6 103052914
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD VAM-2 is not effective 02.11.17 07.11.17 OEM will check; chiller w 103054680
1 C&I/ AHD Stage 1 AHP IAC 1 tripping on discharge pr V.high 04.11.17 103055836 103054716
2 OFS/ C&I Sea water pump # 3 tripped on lube water flow low 04.11.17
1 OFS Sea water working line-1 valve body developed a hole 03.11.17 flange leak ; long ; vv re 103054693
2 CMP MST A&B 33KV SWGR area grass cutting to be done. 01.11.17 awrding pending 103049829
3 AHD /EMD Stage-1 ash water sump make up MOV not operating 01.11.17 ip
4 C&I Fire hydnt pr. Gauge at Raw water PH showing erratic value. 31.10.17 guage rep 103052058
5 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 05.11.17 cable fault 103052056
6 CMP switchyard Drink Water over head tank overflowing. 31.10.17 3 Overflowing continuously 103052090
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 30.10.17 permit req; 6 hrs for repl 103034882
Poor Lighti
10 Poor lighting: unit #3 buffer hopper area ;St 1 AW pp house; Ash sl 30.10.17 p
13 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 20.10.17 AWRC PP 1 : vibn ; 11mm/s
CHEMISTRY
CHP
PRIORITY POINTS
1 BMD PA Fan 1 A Vibrations on higher side 01.11.17
2 BMD St 1 LDO line replacement works 01.11.17
3 CHEM DM Plant, CPU Resin replacement to reduce chlorides in DM Wate01.11.17
4 TMD Unit 4 Condensor Air ingress; Helium test to be done 01.11.17
5 AHD Re use of Overflow of BAOF tank into bottom hoppers 01.11.17
6 BMD/ TMD Utilisation of Hot water of CWBD/VAM drains 01.11.17
COMPLETED JOBS
4 OFS DMCW, and IA lines from FOPH to boiler got corroded. 27.10.17 No CORRODMCW, and IA lines check 103047106
2 C&I TDBFP-A LO temperature control valve nominclature at local oppos02.11.17 att 103051889
04.11.2 C&I CC pump cavity cooling emergency supply and drain valves did n checked; vv made free; ope 103056543
3 BMD ESP pass-A I/L gate-2 not opening 02.11.17 ok Mechanical jam 103054577
5 BMD Tracing steam leakages near GH-2 & HFO station,impulse line leak02.11.17 ok 103053641
8 OPRN/ OFSST#2 EDP p/p-2 hole devloped after discharge v/v 11.10.17 Attended permit req 103030336
8 C&I MOT Filter choke alarm not coming. 30.10.17 Attended No provision for isolation 103049156
6 BMD LDO unloading header got corroded ,to be replaced 02.11.17 ok 103054147
7 C&I BFP-B lub oil temperature cooler :1, Control valve not operating 01.11.17 attended ip 103051890
1 CnI IAC-1 getting unloaded intermittently ok in hdr below 6 ksc, repea 103055586
2 TMD ARCW A abnormal sound As per TMD can run; vib r 103055024
PLANT DATA
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
4 OFS DMCW, and IA lines from FOPH to boiler got corroded. 27.10.17 Attended DMCW, and IA lines check 103047106
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
3 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 02.11.17 103054698
4 UCR AC COMP-4 COMP-4 COOLING NOT EFFECTIVE 30.10.17 31 trippng on Over Load; 103050942
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 AHM CG-3C MOTOR DE SIDE AXIAL VIB HIGH 03.11.17 10.6 mm/s 103055185
3 BMD ESP pass-A I/L gate-2 not opening 02.11.17 Mechanical jam 103054577
5 BMD Tracing steam leakages near GH-2 & HFO station,impulse line leak02.11.17 103053641
7 EMD SCS pass-B flushing pump not taking start 01.11.17 103052914
8 OFS CW pump-5 gland leakage has increased. 23.10.17 pp running; on opportunit 103043120
10 BMD / C&I Feeder 3H High vibration and feed rate hunting 11.10.17 Under observation; GB rep 103028814
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD VAM-2 is not effective 02.11.17 07.11.17 OEM will check; chiller w 103054680
5 C&I LHS SH Spray block valve SD-4 diaphragm ruptutred 25.10.17 permit required; will be g 103044309
OFFSITES
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 OFS Sea water working line-1 valve body developed a hole 03.11.17 flange leak ; long ; vv rep 103054693
2 CMP MST A&B 33KV SWGR area grass cutting to be done. 01.11.17 103049829
3 AHD /EMD Stage-1 ash water sump make up MOV not operating 01.11.17 ip
4 C&I Fire hydnt pr. Gauge at Raw water PH showing erratic value. 31.10.17 103052058
5 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 05.11.17 cable fault 103052056
6 CMP switchyard Drink Water over head tank overflowing. 31.10.17 3 Overflowing continuously 103052090
7 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 30.10.17 permit req; 6 hrs for repl 103034882
8 OPRN/ OFSST#2 EDP p/p-2 hole devloped after discharge v/v 11.10.17 Attended permit req 103030336
10 Poor lighting: unit #3 buffer hopper area ;St 1 AW pp house; Ash sl 30.10.17
21 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 20.10.17 AWRC PP 1 : vibn ; 11mm/s
CHEMISTRY
CHP
PRIORITY POINTS
1 BMD PA Fan 1 A Vibrations on higher side 01.11.17
2 BMD St 1 LDO line replacement works 01.11.17
3 CHEM DM Plant, CPU Resin replacement to reduce chlorides 01.11.17
4 TMD Unit 4 Condensor Air ingress; Helium test to be done 01.11.17
5 AHD Re use of Overflow of BAOF tank into bottom hoppers 01.11.17
6 BMD/ TMD Utilisation of Hot water of CWBD/VAM drains 01.11.17
COMPLETED JOBS
8 C&I MOT Filter choke alarm not coming. 30.10.17 Attended No provision for isolation 103049156
6 BMD LDO unloading header got corroded ,to be replaced 02.11.17 ok 103054147
7 C&I BFP-B lub oil temperature cooler :1, Control valve not operating 01.11.17 attended ip 103051890
1 CnI IAC-1 getting unloaded intermittently ok in hdr below 6 ksc, repea 103055586
2 TMD ARCW A abnormal sound As per TMD can run; vib r 103055024
2 OFS Sea water pump-3 lub water line developed leakage 103054697 ok 103054697
5 EMD st-2 sweet water lub water p/p no-1 not taking start (MCC distrub 01.11.17 ok under permit 103051947
11 TMD IAC-1 tripped on element-1 o/l temp(220deg) 21.10.17 Ok cooler cleaning will be d 103040741 1035-S2COM-AIR-IA1
9 BMD HFO pressuring p/p C seal lkg 28.10.17 17.11.17 under permit 103048048
14 EMD ST-1 &2 EDP AC'S NOT WORKING 30.10.17 Attended 103050925
13 OFS Stg-1 EDP pump-1 pin hole leakage developed after discharge val23.10.17 Attended 103041480
11 Civil Jungle cutting to be done at FOPH area on the way to LDO intercon27.10.17 attended 103048001
1 EMD Sea water pump-2 PTW pending from 01/11/2017 For painting work
10 EMD ST#2 Sweet water lube water control supply fail. 31.10.17 no problem 103051947
4 EMD SC A-2 COMPR TRIP ON "LOSS OF CONNECTION AT BOARD" 28.10.17 Attended 103048727
4 OFS CW-3 lube water pump-B gland lkg 28.10.17 Attended 103048987
5 C&I TDBFP-B suction flow Transmitters deviation high. 31.10.17 Attended Tx-1/2/3 flow 425/524/600 103052049
6 EMD CEP-C disch v/v CDV-6 not closing. 31.10.17 Attended permit req 103051406
7 C&I MILL 3F Hot Air Gate NOT OPENING 30.10.17 Attended scaff req 103050244
8 OFS Hydrant line pine hole lkg near Station Transformer/UAT-3A 30.10.17 Attended 103050311
6 EMD OLTC Pass-A , recirculation pump heavy abnormal sound, ball vess
07.09.17 ok motor clearance pending; 102992637
1 BMD Seal air fan-B discharge expansion bellow leakage. 31.10.17 Attended 103050943
3 TMD U#2 ESP AC compressor2 ice formation 75% 30.10.17 Attended 103049146
02.11.2 BMD MILL-C&E reject line above trestle developed a hole 103054701 attended
5 TMD SCS Pass 3A Flushing line valve body punctured. 31.10.17 Attended flange leak 103035074
PLANT DATA
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
02.11.2 BMD LDO unloading header got corroded ,to be replaced 103054147
1 C&I BFP-B lub oil temperature cooler :1, Control valve not operating 01.11.17 ip 103051890
3 OFS DMCW, and IA lines from FOPH to boiler got corroded. 27.10.17 LDO attend 103047106
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
02.11.2 BMD MILL-C&E reject line above trestle developed a hole 103054701 attended
02.11.2 EMD 220V DC CHARGER-1 current bad & voltage showing less at MMI 103054698
1 BMD Seal air fan-B discharge expansion bellow leakage. 31.10.17 Attended 103050943
3 TMD U#2 ESP AC compressor2 ice formation 75% 30.10.17 Attended 103049146
4 TMD UCR AC COMP-4 COMP-4 COOLING NOT EFFECTIVE 30.10.17 31 trippng on Over Load 103050942
6 EMD OLTC Pass-A , recirculation pump heavy abnormal sound, ball vess
07.09.17 ok motor clearance pending; 102992637
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
02.11.2 BMD ESP pass-A I/L gate-2 not opening 103054577 Mechanical jam
01.11.2 BMD Tracing steam leakages near GH-2 & HFO station,impulse line leak 103053641
3 EMD SCS pass-B flushing pump not taking start 01.11.17 103052914
4 OFS CW-3 lube water pump-B gland lkg 28.10.17 Attended 103048987
5 C&I TDBFP-B suction flow Transmitters deviation high. 31.10.17 Attended Tx-1/2/3 flow 425/524/600 103052049
6 EMD CEP-C disch v/v CDV-6 not closing. 31.10.17 Attended permit req 103051406
7 C&I MILL 3F Hot Air Gate NOT OPENING 30.10.17 Attended scaff req 103050244
8 OFS Hydrant line pine hole lkg near Station Transformer/UAT-3A 30.10.17 Attended 103050311
11 BMD HFO pressuring p/p C seal lkg 28.10.17 17.11.17 under permit 103048048
12 OFS CW pump-5 gland leakage has increased. 23.10.17 pp running; on opportunit 103043120
13 TMD IAC-1 tripped on element-1 o/l temp(220deg) 21.10.17 01.11.17 cooler cleaning will be d 103040741 1035-S2COM-AIR-IA1
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
02.11.2 TMD VAM-2 is not effective 103054680 chiller water DT-1.8 degr
3 TMD TDBFP 4B ain pump DE brg vibn on higher side 31.11.17 4040 rpm ;
4 EMD SC A-2 COMPR TRIP ON "LOSS OF CONNECTION AT BOARD" 28.10.17 Attended 103048727
6 TMD / C&I Stg-II AC AHU-2: 3-Way V/V not working 21.10.17 31.10.17 under permit by C&I 103040834 1035-S2COM-ACV-MAN-AHU-002
7 C&I LHS SH Spray block valve SD-4 diaphragm ruptutred 25.10.17 permit required; will be g 103044309
OFFSITES
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
02.11.2 EMD Sea water pump-2 PTW pending from 01/11/2017 For painting work
02.11.2 OFS Sea water working line-1 valve body developed a hole 103054693
02.11.2 OFS Sea water pump-3 lub water line developed leakage 103054697
1 CMP MST A&B 33KV SWGR area grass cutting to be done. 01.11.17 103049829
2 AHD /EMD Stage-1 ash water sump make up MOV not operating 01.11.17 ip
3 EMD st-2 sweet water lub water p/p no-1 not taking start (MCC distrub 01.11.17 up 2 103051947
4 C&I Fire hydnt pr. Gauge at Raw water PH showing erratic value. 31.10.17 103052058
5 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 05.11.17 05.11.17 cable fault 103052056
6 CMP switchyard DW over head tank overflowing. 31.10.17 3 Overflowing continuously 103052090
7 EMD ST#2 Sweet water lube water control supply fail. 31.10.17 no problem 103051947
9 Poor lighting: unit #3 buffer hopper area ;St 1 AW pp house; Ash sl 30.10.17
11 Civil Jungle cutting to be done at FOPH area on the way to LDO intercon27.10.17 attended 103048001
12 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 30.10.17 permit req; 6 hrs for repl 103034882
13 OFS Stg-1 EDP pump-1 pin hole leakage developed after discharge val23.10.17 Attended 103041480
14 OPRN/ OFSST#2 EDP p/p-2 hole devloped after discharge v/v 11.10.17 2 permit req 103030336
16 Sea water pump house fresh air fans one number not available, 217.10.17 30.10.17 Total 4 103037170
17 Sea water pump house Roof exhaust fans three numbers not worki17.10.17 30.10.17 Total 3
18 Sea water pump house chlorination room fresh air 2 numbers not17.10.17 30.10.17 Total 2
19 EMD Sea water pump house LT SWGR Room roof exhaust fans 2 numb
17.10.17 30.10.17 Toatl 2
21 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 20.10.17 AWRC PP 1 : vibn ; 11mm/s
CHEMISTRY
CHP
PRIORITY POINTS
BMD PA Fan 1 A Vibrations on higher side
BMD St 1 LDO line replacement works
CHEM DM Plant CPU Resin replacement to reduce chlorides
TMD Unit 4 Condensor Air ingress; Helium test to be done
AHD Re use of Overflow of BAOF tank into bottom hoppers
BMD/TMD Utilisation of Hot water of CWBD/VAM drains
COMPLETED JOBS
5 TMD SCS Pass 3A Flushing line valve body punctured. 31.10.17 Attended flange leak 103035074
6 TMD SCS Pass 3B Flushing pump gland lkg. 31.10.17 Attended 103037914
3 TMD HPCF R/C pump- B not developing pressure. 31.10.17 Attended PRV setting will be done 103051674
2 TMD HPH-5A normal drip line developed pin hole leakage near DRV-15 att 103052107
3 CMP St # 2 Series C disposal lines not available due to dyke end restrict16.10.17 Attended
3 TMD Debris Filter-A Debris Discharge line leakage before manual valve30.10.17 plugged 103050154
4 TMD Stg-2 Screw Chiller A1 Comp tripped on oil low Pres 30.10.17 att A2 N AVL 103050903
PLANT DATA
UNIT -1
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 BMD / OFS LDO, DMCW, and IA lines from FOPH to boiler got corroded. 27.10.17 temp corroded part to be r 103047106
UNIT -2
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 BMD Seal air fan-B discharge expansion bellow leakage. 31.10.17 103050943
4 TMD / EMDUCR AC COMP-4 COMP-4 COOLING NOT EFFECTIVE 30.10.17 31 trippng on OL 103050942
6 TMD / EMDOLTC Pass-A , recirculation pump heavy abnormal sound, ball vess
07.09.17 PP OH will be done ;moto 102992637
UNIT-3
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
2 C&I TDBFP-B suction flow Transmitters deviation high. 31.10.17 Tx-1/2/3 flow 425/524/600 103052049
3 TMD HPCF R/C pump- B not developing pressure. 31.10.17 Attended PRV setting will be done 103051674
4 EMD CEP-C disch v/v CDV-6 not closing. 31.10.17 permit req 103051406
5 TMD SCS Pass 3A Flushing line valve body punctured. 31.10.17 Attended flange leak 103035074
6 TMD SCS Pass 3B Flushing pump gland lkg. 31.10.17 Attended 103037914
7 C&I MILL 3F Hot Air Gate NOT OPENING 30.10.17 scaff req 103050244
8 OFS Hydrant line pine hole lkg near Station Transformer/UAT-3A 30.10.17 31 103050311
11 BMD HFO pressuring p/p C seal lkg 28.10.17 under permit 103048048
12 OFS CW pump-5 gland leakage has increased. 23.10.17 pp running; on opportunit 103043120
13 TMD IAC-1 tripped on element-1 o/l temp(220deg) 21.10.17 01.11.17 cooler cleaning will be d 103040741 1035-S2COM-AIR-IA1
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 TMD TDBFP 4B ain pump DE brg vibn on higher side 31.11.17 4040 rpm ;
2 EMD SC A-2 COMPR TRIP ON "LOSS OF CONNECTION AT BOARD" 28.10.17 card problem; 103048727
4 TMD / C&I Stg-II AC AHU-2: 3-Way V/V not working 21.10.17 31.10.17 under permit by C&I 103040834 1035-S2COM-ACV-MAN-AHU-002
5 C&I LHS SH Spray block valve SD-4 diaphragm ruptutred 25.10.17 permit required; will be g 103044309
OFFSITES
SL DEPT DEFECT DESCRIPTION DEFECT DT TARG. DT REMARKS
1 C&I Fire hydnt pr. Gauge at Raw water PH showing erratic value. 31.10.17 103052058
2 EMD Sea wtr swgr ACDB Sec-B supply not extending. 31.10.17 05.11.17 cable fault 103052056
3 CMP switchyard DW over head tank overflowing. 31.10.17 Overflowing continuously 103052090
4 EMD ST#2 Sweet water lube water control supply fail. 31.10.17 103051947
11 Civil Jungle cutting to be done at FOPH area on the way to LDO intercon27.10.17 30 103048001
12 AHM Stg-1 Ashwater sump CW blowdown line flange leakage after MOV.23.10.17 30.10.17 permit req; 6 hrs for repl 103034882
13 OFS Stg-1 EDP pump-1 pin hole leakage developed after discharge val23.10.17 30.10.17 103041480
14 OPRN/ OFSST#2 EDP p/p-2 hole devloped after discharge v/v 11.10.17 20.10.17 permit req 103030336
16 Sea water pump house fresh air fans one number not available, 217.10.17 30.10.17 Total 4 103037170
17 Sea water pump house Roof exhaust fans three numbers not worki17.10.17 30.10.17 Total 3
18 Sea water pump house chlorination room fresh air 2 numbers not17.10.17 30.10.17 Total 2
19 EMD Sea water pump house LT SWGR Room roof exhaust fans 2 numb
17.10.17 30.10.17 Toatl 2
21 AHM/ EMD Stage-2 AWRC Pumps got submerged 21.08.17 20.10.17 AWRC PP 1 : vibn ; 11mm/s
CHEMISTRY
CHP
COMPLETED JOBS
3 TMD Debris Filter-A Debris Discharge line leakage before manual valve30.10.17 plugged 103050154
4 TMD Stg-2 Screw Chiller A1 Comp tripped on oil low Pres 30.10.17 att A2 N AVL 103050903
9 TMD BFP-B RH SPRAY VALVE GLAND LEAK 20.10.17 attended bonnet leak ; online 103039863
3 C&I VACUUM P/P-1 & 2 EJECTOR V/V NOT OPENING 30.10.17 att 1 ok ; 103046629
3 CIVIL In Boiler MCC room at 24 mts, roof drain pipe is leaking water is gett
29.08.17 attended
1 OFS ESP-1 CNTRL ROOM AREA SW LINE LKG 30.10.17 Attended 103046265
2 OFS U#1 Seal oil system mulsifier detection line lkg. 31.10.17 att 103051888
1 OFS ST-1 RAW WTR P/P-3 abnrml p/p sound. 28.10.17 2.2 m/ s; OK 103048796
5 AHD Stage 2 AHP ESP hoppers header vacuum coming less 26.10.17 28 4 hdrs; k
3 EMD sea wtr Elctrolizer-2 rectifier y-ph n/w 28.10.17 Attedn 103048229
3 EMD SG charger-1A rectifier voltage zero in MMI 28.10.17 local AVL 103048421
4 TMD Condesate line after GSC impulse line joint leakage 27.10.17 30.10.17 att 103047811
LONG DURA
SL DEPT DEFECT DESCRIPTION
8 Civil Stg-2 8.5m UPS room emergency exit door is not availab
Civil/
8 Stg-2 compressor room trench filled with water
TMD
1 5 BMD Mill-4 H abn sound and hi vib at all loads, PF leakage fro
2 OPRN/ EMD
BUNKER-2C & 2H O/L GATE PASSING
4 EMD Seal steam drain valve AS 152 overload acting while clos
14 OFS Seawater standby line ARV leak near sea water jetty
27 EMD Sea water pump house fresh air fans one number not a
33 EMD 33 Sea water line-3 at sea water SWGR earth switch not
34 BMD Platform to be provided to open and close feeder inlet ga
50OPRN/ CIVIL
St # 2 ESP IAC, TAC compressor house toilets not work
63 AHM Stg-2 All ASPs Fluid coupling water cooler lines got ruste
68 BMD FD F-B oil leakage from lub oil recirculation line flange
88 OFS Stg-1 Fire water tank level local indicators are not workin
93 TMD Control fluid level has been increasing on it's own (31.12
94 C&I Service water and potable water tank level switches not w
100 OFS sea water p/p 3: lube water pump Not available
101 EMD & C&IBoiler LHS side cables dressing is required (the cables re
109 OFS CSSP-1 abnormal sound from Pump-DE, PP-2 gland coo
110 C&I "Sea water pump-3 trip" alarm not coming in C&I panel (V
111 C&I TDBFP-A&B lub oil filter DP high alarms to be provided &
112 OS CW DEWATERING PUMP-1 NOT AVAILABLE.
115 TMD Unit-3 ESP AHU Room door seal got damaged, rain wate
118 TMD H2 FILLING ROOM & ACW MCC ROOM DOORS HANG
119 TMD UCR AC Compressor Room Boiler side Iron door dislodg
126 TMD Stage-2 AC Plant AHU Room Doors Not Closing Fully
131CIVIL / CCD
U#4 FEEDER FLOOR VIBRATION OBSERVED WHEN
ering pit both de watering pumps not availble ( moto unit 4 02.02.17
oom door seal got damaged, rain water entering in UNIT 4 10.06.16
103160900
31.01.18 long
OPERATION TO ARRANGE
103072750
FOR PERMIT.
103084148
103059215
long 103058817
Mill i/ s opp
102819520 103054204
SD required 103028814
commnication problem,S/D
103041519
req
commnication problem,S/D
103040834
req
At less load No Passing; will
Attended be checked at higherloads, 103037170
500 MW
spare NA
30.11.17 Total 3
30.11.17 Total 2
30.11.17 Toatl 2
long attended
16 spares NA ; 3 m 102942147
dewpoint after trial : 11 ;
OEM service engr will be
long
called; condensor cleaning ;
procure of condensor;
31.12.17
102929728
long pr 102841092
long 102929728
PR Raised 102907553
SD 14 pending ,15 attended;
102863455
SD13 & SD 16 attended
Long pending
Long pending
1035-S1U02-BLR-RCF-00A
102859398
1 month 102797237
1 month
1 month 102856838
Pump Balancing Done on
29.04.17 and brought down
long
the vibrations. Pump spares
NA
pump shut down requiredsd
long attended
07.05.17 Taken up with erec;
module prob system
yet to be handed over by
erection.CCR UPS room
zones isolatedfrom gas
extinguishing system;
Hanging
howeversheets removed;
fire detection is
long scaffolding In these
available for progress ; PR
zones.
for new sheets
102792907, PR TO BE
RAISED.
spares NA
OEM to check;spares
04.03.17
required
inspection to be done; on
Attended opportunity; drawing high
current 3.5 Amps ;back
civil scrap pending; CCD has
to remove
procurement to be done
long
attended
12.10.16
hooter required; On
opprtunity will be done
WDA, TO BE CARRIED
OUT.
O&M- Civil
O&M- Civil
O&M- Civil
to be seen after PO of
faridabad
down related
1035-S2U04-BLR-PRP-DRM
1035-S2U04-BLR-PRP-RHR
1035-S2COM-ACV-MAN-AHU-002
102942147
SL DEPT DEFECT DESC
DEFECT DESCRIPTION
VS brightness is inadequate.
points
WORK TARGET DATE
e provided PR Raised
ng development works PR Raised
air works 95% completed
COMPLETED JOBS
or Unit 2 OH Completed
Road at speed breaker to be done Completed
03.02.18
03.02.18
27.01.18
Trench may be connectedc to
outside drain with a valve;
10.01.18 10.02.18 tint film
Checked; Minor problem ; Reinforcement
05.01.18 28.02.18 cover edge cutting observed; however job
will be taken up
ok 02.01.18 05.02.18
Civil to made approach ; Then job
will be taken up by EMD
28.12.17 10.02.18
26.12.17 28.02.18
06.11.17 01.03.18
15.09.17
29.07.17
proj scope : clarification will be
taken ;
PR 200066602 raised for fixing of
12.06.17
sheets; LOI issued; PO to be placed
23.05.17 30.06.17
PR raised for fixing of sheets;
Sheets will be provided AHM
13.05.17
Steel Doors, donot in CIVIL scope
mm
17.08.2016
PR 200065648 PO placed;
;covered in 5S works
UNIT 1 27.07.2016
Water proofing treatment is
required. PR inintiated. PR closed
13.07.17 attended
11.01.18 25.01.18 Completed
swyd 16.12.17 Completed
27.11.17 Completed
20.10.17 Completed
20.10.17 Completed
20.10.17 Completed
St 2 20.10.17 Completed
20.10.17 Completed
01.11.17 Completed
07.11.17 Completed
St 1 07.12.17 Completed
St 1 07.10.16 25.05.2017Completed
28.09.16 30.05.2017Completed
19.07.17 Completed
TMD to remove sheet; PR
30.05.17 Completed
200066602 raised for fixing of
sheets; Sheets will be provided
AHM
15.05.17 Completed102865783; Not in civil Scope
13.05.17 Attended
grass cutting done ; approach avl
now; ; 28 lights not glowing
15.05.17 Attended Oprn House Keeping
Raw wtr PH compl. FOPH i/p;
08.04.17 Completed
Septic tan construction
completed; Precst slbs laying roof
in progresss
REMARKS
103170683
103170709
tank not working ; will
103160901
ced with new one
ck to be done 103160900
may be connectedc to
103160900
rain with a valve;
103139539
Minor problem ; Reinforcement
cutting observed; however job
n up
made approach ; Then job
103129339
ken up by EMD
103128660
103059306
15.09.2017
e : clarification will be
ES thru approved NS
ed ; PR closed
ed; PO to be placed
ed; PO to be placed
65648 PO placed;
in 5S works
oofing treatment is
PR inintiated. PR closed
ed i/p
d NS required;
102928498
ed 103141281
ed 103082278
ed 103082278
ed 103035842
ed
ed
ed
ed
ed
ed
ed 103035842
ed 103049829
ed 103055556
ed
ed
ed
ed
ed ###
ed
ed
ed 103129774
ed
ed
ed 102873421
emove sheet; PR
02 raised for fixing of
70011263
Sheets will be provided
OFFSITES
BOILER
TURBINE
Stg 1 IAC 1
IAC 2
IAC 3
PAC 1
PAC 2
Stg 2 IAC 1
IAC 2
IAC 3
PAC 1
PAC 2
REMARKS
During OH
During OH
During OH
During OH
During OH
During OH
During OH
During OH
6 BMD/ C&I sh div panel element temp maint high( panel8 elem-4/panel 1 elem 5)
7 EMD ID Fan A ch2 current mismatch Between MMI & Local
8 EMD Unit-1 main bus side isolator-989 close FB is not coming in MMI.
102783030
102800281
08.09.17 102992100
102741514
102741195
103085856
103069583
102753866
1 C&I Generator exciter end winding vibration pickup -1 showing bad & T07.09.17 Not Taken up; Long Shutdown 102886393
2 TMD LPH-3 normal drip line hammering. 28.08.17 Not Taken up; Long Shutdown 102979367
3 TMD Oil seepage from Main Turbine Speeder Gear Bottom 21.08.17 Not Taken up; Long Shutdown
4 TMD Oil kg from vaccum protection device top 26.08.17 Not Taken up; Long Shutdown 102978920
5 TMD HPTF 1X shaft vibration maintaining high 03.12.2017 Not Taken up; Long Shutdown 103093075
6 TMD BP 101 & MS 105 MOVs HEAVY PASSING 26.09.2017 Not Taken up; Long Shutdown 103015597
7 TMD Turbine lub oil lkg dropwise from 3-way 12.09.2017 Not Taken up; Long Shutdown 102999253
8 TMD TDBFP-A ESV OIL LEAKAGE 18.08.2017 Not Taken up; Long Shutdown 102969555
9 C&I Turb seal stm supply bypass MOV inoperative EMD Checked; C&I to Check; continous coman
EMD Checked; C&I to Check; continous comand persisting
10 TMD MAIN TUR SPEEDER GEAR BOTTOM OIL LKG 20.08.2017 102971759
11 TMD Lube oil temp increased to 65 deg to avoid stopping of barring 12.01.18
Hydro test not done in shut down on 25.01.18 due to boiler stop
valves passing
UNIT -3
14.08.17 102959533 C&I/ TMD MDBFP-C main pump-NDE cooler outlet temp. maintainingC&I TO CHECK TX ; 118 degC
22.09.17 TMD Speeder gear drain pot level high alarm coming. SHUTDOWN JOB
07.10.17 103026180 TMD BFP-B Main pump seal water leakage. opportunity
14.10.17 103033688 TMD TG HPCV-1 not opening fully as per demand
27.10.17 103047105 BMD PAPH -B main drive shaft oil lkg(minor)
27.10.17 103047108 EMD PAPH -A current spikes coming intermittent transducer problem opp 7 to 12 A. Locally current checked found OK
30.10.17 103049839 TMD D/A Ext NRV Pilot Dropwise lkg @ 0mtr
EMD IF FAN:B CH:1&2 CURRENT MISMATCH IS HIGH 103058675
BMD FD fan-A LOP-A after discharge line coupling leakage 103074507
20171128 C&I BCW cooling water emergency drain v/v not working 103087302
2 2 TMD oil leakage from boiler side MOT filter 103111602 19.12.1seepage; on opportnity after filter change over
1 9 C&I SH Spray block valve (SD-3) got closed on its own due to 103083399 25.11.1permit required; alarm also not appeared
4 10 C & I LHS SH SPRAY ISO V/V-SD-5 NOT OPERATING 07.12.1permit require 103095979
2 4 TMD HRH strainer-2 slight steam leakage 30.12.1minor uo sd 103125523
2 4 C&I FD FAN-B FAN NDE-X VIB POINT BEACAME BAD sensor bad; SD 29.12.1sensor bad; S 103122061
3 9 C&I/OFS CW-3 discharge BFV not opening fully-92% 09.01.18 opp SD 103137510
12 BMD PAPH-A main motor current spikes coming and gearbox having abnormal sound. 26.12.17 under observa 103119076
1 1 BMD ESP-pass-B inlet gate-2 not operating. 01.02.18 opended 103166725
01.02.1 EMD
3 TMD BFP 3B Jacket cooling water line flange leakage 3.02.18 sd
2 8 Checked ; 103167231
05.02.18
25.01.1 Transducer is
6 C&I TG ECW 3C Current Showing Bad MMI. cni to
3 8 check;
is OK; SD 103158466
27.01.1 wire card with
5 BMD ESP Pass-B Pass inlet gate not operating 05.02.18 PASD
fan
8
Positioner
06.02.1 will be
2 C&I Burner tilt cor-2 opening fully at 80% demand. opp hot air duct 103174168
8 adusted
leak - SD
05.02.1 accordingly
-Mill D leak
3 BMD Mill-C& D mixed PA duct leakage increased 103099694
8 attended ###
UNIT # 4 SHUT DOWN JOBS 14.01.17
UNIT -4
SL DEPT DEFECT DESCRIPTION DEFECT DT REMARKS
1 AHM Clinker grinder-D feed gate passing. 04.08.17 planned 23.10.17 102953451
2 BMD ALL PA & FD FANS RETURN OIL VIEW GLASS NOT CLEAR 12.10.17 cleaned but not clear ; wll be r 103030328
3 C&I Generator stator slot no: 8 bar temperature high-138 deg 05.04.17 Checked but OH jb
5 TMD IPCV-2 is JAM 20.03.17 OH JOB 88% ;max-138 mm; Pilot v/v cleaning req
6 TMD U-4 APRDS header drains multiple leakages 11.09.17 Seal steam charged; ; isolation102995702
7 EMD ID Fan-B CH-1 & CH-2 speed deviation more 25.10.17 15 rpm 103045181
9 TMD IP-Governing Rack Test valve (SWYD) oil lkg 30.10.17 103050152
11 BMD PA Fan-4B Lub Oil lkg from return line 06.11.17 103057256
14 TMD Cond. Vacuumpump-1 suction valve platform railing not available 17.11.17 25.11.17 103071115
15 BMD SAPH-B flue gas outlet hole developed near support bearing area. 23.11.17 sd 103079644
16 BMD PAPH air outlet common duct having leakage. 23.11.17 sd 103079644
17 BMD Hot air leakage between Mill-G & H NMEJ 25.11.17 02.12.17 103079642 103079642
14 TMD Cond Vac P/P-4B suction mamual valve gland seal wtr lkg 07.12.17 seal water SD 103092826
12 TMD TDBFP-A ACV Steam line hole developed. 09.12.17 SV gasket leak SD 103099062
4C & I DROP 5,11,62,51,53 alarm persisting 15.12.17 opp sd C&I checks are in progress
2 BMD PAPH-B abnormal sound and vibrations from fluid coupling. 26.12.17 opp 103116160
5 BMD PAPH- A flue gas side NMEJs got punctured 22.12.17 Near GB; divertion kopp
7 BMD PAPH-4A Main Motor man handle shaft oil lkg 29.12.17 sd 103123058
3 EMD ID Fan-B VFD Ch-1&2 RPM mismatch (280/330). 02.01.18 03.01.18 30rpm; speed adjustment will b103128717
BMD/ OPRNAll APH water water washing to be done in opp shut down 23.01.18
3 BMD PA fan-B fan side vibrations spikes going upto 20mm/s. 27.01.18 uo Present fan vibrations:- X-15 102744562
drant at raw water pump house will be providing a tap from raw wa
CATION PR TO PROPOSE
15.03.17
12.12.16
02.12.16 PR under pr
26.11.16
24.10.16
01.10.16
27.06.16
st 2 15.04.16
APPROX
OTHER ISSUES
TENANCE-OFFSITE-CORROSION PREVENTION CELL
TS AND WORK STATUS Dtd. 05.02.2018
REMARKS
This PO is valid
upto 10.02.2018.
PR No.
200074216 is in pipline.
Details at S.No. 5
1) Agency temporarily
stopped work at site due to
Financial crunch. GST Issue
is pending. Due to this
Agency could not raise their
bills.
(2) PO
is valid upto 20.02.2018.
Note sheet initiated for
provisional time extension
for 3 months.
PR initiated on Dt.
12.01.2018 and is in
process of approvals.
Works in this PR are for
U#1 & U#2 covering
painting of structures in
Boiler & Turbine area like
ongoing contracts for U#3
and U#4.
SAP MM ROLES
AUTHORIZATION
REQUIRED TO EMP. No.
032561
EQUIPMENTS WITH HIGH VIBRATION
3 CCD Unit # 3 & 4 Cable gallery drain point to be provided; & doors to be checked
26.08.16
26.08.16
26.08.16
26.08.16
26.08.16
AC SYSTEM STATUS HEALTHINESS
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
UCB - 3 & 4
UCB Chiller
Chiller water
1 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT
ESP
ESP Chiller
Chiller water
2 ST-I water temp DegC ST-II DegC
Temp
IN / OUT
IN / OUT