CALCULO DE POBLACION DE DISEÑO

PROYECTO : MEJORAMIENTO Y CONSTRUCCION DEL SISTEMA


DE AGUA POTABLE Y DESAGUE DE LA LOCALIDAD
DE ZEPITA, DISTRITO DE ZEPITA
SUBSITEMA : CONEXIÓN AGUA POTABLE
LUGAR : CHALLAHAHUIRA
DISTRITO : ZEPITA
FECHA : AGOSTO DEL 2010

Distrito Población Total Urbano Rural %


Juli 23741.00 8157.00 15584.00 18.80
Desaguadero 20009.00 14365.00 5644.00 15.80
Huacullani 14906.00 2879.00 12027.00 11.80
Kelluyo 17869.00 3181.00 14688.00 14.20
Pisacoma 12151.00 3027.00 9124.00 9.60
Pomata 17787.00 1777.00 16010.00 14.10
Zepita 19796.00 2381.00 17415.00 15.70
Total Prov. Ch 126259.00 35767.00 90492.00 100.00
Fuente: INEI

Nº DE FAMILIAS 396.83 familias

1 de 8
2 de 8
DETERMINACIÓN DE CAUDALES DE CONEXIÓN
PROYECTO :
MEJORAMIENTO Y CONSTRUCCION DEL SISTEMA DE AGUA POTABLE
Y DESAGUE DE LA LOCALIDAD DE ZEPITA, DISTRITO DE ZEPITA
SUBSITEMA : CONEXIÓN AGUA POTABLE
LUGAR : CHOCOPAMPA
DISTRITO : ZEPITA
FECHA : AGOSTO DEL 2010
Nº DE FAMILIAS 100
A.- POBLACION ACTUAL 600 DATO DE RECOPILACION
B.- TASA DE CRECIMIENTO (%) 15
C.- PERIODO DE DISEÑO (AÑOS) 20
D.- POBLACION FUTURA Pf = Po * ( 1+ r*t/100 ) 780

E.- DOTACION (LT/HAB/DIA) 50.00 REGION SIERRA SEGÚN MINISTERIO DE SALUD

F.- CONSUMO PROMEDIO ANUAL (LT/SEG Qp = Pf * Dot./86,400 0.45

G.- CONSUMO MAXIMO DIARIO (LT/SEG) 0.59 ¡ OK, Cumple !

H.- CAUDAL DE LA FUENTE (LT/SEG) 5.00 01 FUENTE

I.- VOLUMEN DEL RESERVORIO (M3) V = 0.25 x Pf xd/1000 9.75


A Utilizar (m³ ) : 50.00
J.- C (para tubos) 140.00

PROYECTO : MEJORAMIENTO Y CONSTRUCCION DEL SISTEMA DE AGUA POTABLE


Y DESAGUE DE LA LOCALIDAD DE ZEPITA, DISTRITO DE ZEPITA
SUBSITEMA : CONEXIÓN AGUA POTABLE
LUGAR : JACHAPAMPA
DISTRITO : ZEPITA
FECHA : AGOSTO DEL 2010
Nº DE FAMILIAS 100
A.- POBLACION ACTUAL 600 DATO DE RECOPILACION
B.- TASA DE CRECIMIENTO (%) 15
C.- PERIODO DE DISEÑO (AÑOS) 20
D.- POBLACION FUTURA Pf = Po * ( 1+ r*t/100 ) 780

E.- DOTACION (LT/HAB/DIA) 50.00 REGION SIERRA SEGÚN MINISTERIO DE SALUD

F.- CONSUMO PROMEDIO ANUAL (LT/SEG Qp = Pf * Dot./86,400 0.45

G.- CONSUMO MAXIMO DIARIO (LT/SEG) 0.59 ¡ OK, Cumple !

H.- CAUDAL DE LA FUENTE (LT/SEG) 5.00 01 FUENTE

I.- VOLUMEN DEL RESERVORIO (M3) V = 0.25 x Pf xd/1000 9.75


A Utilizar (m³ ) : 50.00
J.- C (para tubos) 140.00

PROYECTO : MEJORAMIENTO Y CONSTRUCCION DEL SISTEMA DE AGUA POTABLE


Y DESAGUE DE LA LOCALIDAD DE ZEPITA, DISTRITO DE ZEPITA
SUBSITEMA : CONEXIÓN AGUA POTABLE
LUGAR : CHALLAHAHUIRA
DISTRITO : ZEPITA
FECHA : AGOSTO DEL 2010
Nº DE FAMILIAS 100
A.- POBLACION ACTUAL 600 DATO DE RECOPILACION
B.- TASA DE CRECIMIENTO (%) 15
C.- PERIODO DE DISEÑO (AÑOS) 20
D.- POBLACION FUTURA Pf = Po * ( 1+ r*t/100 ) 780

E.- DOTACION (LT/HAB/DIA) 50.00 REGION SIERRA SEGÚN MINISTERIO DE SALUD

F.- CONSUMO PROMEDIO ANUAL (LT/SEG Qp = Pf * Dot./86,400 0.45

G.- CONSUMO MAXIMO DIARIO (LT/SEG) 0.59 ¡ OK, Cumple !

H.- CAUDAL DE LA FUENTE (LT/SEG) 5.00 01 FUENTE

I.- VOLUMEN DEL RESERVORIO (M3) V = 0.25 x Pf xd/1000 9.75


A Utilizar (m³ ) : 50.00
J.- C (para tubos) 140.00

PROYECTO : MEJORAMIENTO Y CONSTRUCCION DEL SISTEMA DE AGUA POTABLE


Y DESAGUE DE LA LOCALIDAD DE ZEPITA, DISTRITO DE ZEPITA
SUBSITEMA : CONEXIÓN AGUA POTABLE
LUGAR : MOLINOS UMACATA
DISTRITO : ZEPITA
FECHA : AGOSTO DEL 2010
Nº DE FAMILIAS 150
A.- POBLACION ACTUAL 900 DATO DE RECOPILACION
B.- TASA DE CRECIMIENTO (%) 15
C.- PERIODO DE DISEÑO (AÑOS) 20
D.- POBLACION FUTURA Pf = Po * ( 1+ r*t/100 ) 1170

E.- DOTACION (LT/HAB/DIA) 50.00 REGION SIERRA SEGÚN MINISTERIO DE SALUD

F.- CONSUMO PROMEDIO ANUAL (LT/SEG Qp = Pf * Dot./86,400 0.68

G.- CONSUMO MAXIMO DIARIO (LT/SEG) 0.88 ¡ OK, Cumple !

H.- CAUDAL DE LA FUENTE (LT/SEG) 5.00

I.- VOLUMEN DEL RESERVORIO (M3) V = 0.25 x Pf xd/1000 14.62


A Utilizar (m³ ) : 50.00
J.- C (para tubos) 140.00

3 de 8
DISEÑO DE CAPTACION DE LADERA

1.- NOMBRE DEL PROYECTO : MEJORAMIENTO Y CONSTRUCCION DEL SISTEMA DE AGUA POTABLE Y DESAGUE DE LA
LOCALIDAD DE ZEPITA, DISTRITO DE ZEPITA
2.- SUB SISTEMA : AGUA POTABLE
3.- LUGAR : ZEPITA
4.- DISTRITO : ZEPITA
5.- FECHA : AGOSTO DEL 2010
Entre las secciones 0 y 1 por Bernoulli
PO V2 P V2
+ h O + O = 1 + h1 + 1
γ 2g γ 2g
Haciendo : V 0 , P0 , h 1 y P1 = 0
V12
hO = .......... .......... .......... .......( 1)
2g
Donde :
h O = Altura entre el afloramien to y el
orificio de entrada ( 0 .4 a 0 .5m )
V1 = Velocidad teórica de pase (m / s )
g = Gravedad ( 9 .81m / s 2 )

Por Continuidad entre las secciones 1 y 2

Q1 = Q 2 Entonces reemplazan do la ecuacion ( 2 ) en (1) :


C d A 1 V1 = A 2 V 2 V 22
h O = 1 .56 .......... .......... .......... .......... .....( 3)
Haciendo A 1 = A 2 2g
V2 Donde :
V1 = .......... .......... .......... .......... ...( 2 )
Cd h O = Altura entre el afloramien to y el
Donde : orificio de entrada ( 0 .4 a 0 .5m )
V 2 = Velocidad de pase por el orificio ( ≤ 0 .6m / s ) necesario para producir
C d = Coeficient ededesc arg a( 0 . 8 ) V 2 ≤ 0 . 6m / s
De la figura abajo ilustrada:
H f = H − h o .......... .......... .......... .......... .......( 4 )

Donde:
Hf = Pérdida de carga en (m)
H f = 0 . 3L .......... .......... .......... .......... .......( 5 )
L= Distancia entre el afloramiento y la caja de captacion (m)

Hf H

ho

0 1 2
Asumiendo:
V2 = 0.57 m/s en la ecuacion (3) yH= 0.4 m
ho = 0.03 m

En la ecuacion (4) y (5)


Hf = 0.37 m
L= 1.2 m

4 de 8
1.- NOMBRE DEL PROYECTO : MEJORAMIENTO Y CONSTRUCCION DEL SISTEMA DE AGUA POTABLE Y DESAGUE DE LA
LOCALIDAD DE ZEPITA, DISTRITO DE ZEPITA
2.- SUB SISTEMA : AGUA POTABLE
3.- LUGAR : ZEPITA
4.- DISTRITO : ZEPITA
5.- FECHA : AGOSTO DEL 2010

Diametro del orificio:

Qmáx πD 2
= .......... .......... .......... ........( 6 )
Cd * V 4
En la ecuacion (6)
Q= 5.0 l/s
D= 4.65 pulg

Diametro asumido: 1 pulg. 2 FILAS 3 de 1 "

Numero de orificios:
Dc 2
No = + 1 .......... .......... .......... .......... ....( 7 )
Da 2
b
En la ecuacion (7)
No = 5.7 Und UTILIZE 2 FILAS

Ancho de pantalla:
b = 2( 6 * Da ) + No * Da + 3 * D(No − 1)......... .( 8 )
En la ecuacion (8)
b= 0.8 m L= 0.46 m

Dimensionamiento de la canastilla:
Dc = 3 pulg Linea de conducción
Dca = 6 pulg Canastilla

Lca = 0.23 m
Lca = 0.46 m

Longitud canastilla = 0.5 m en cuanto a ranuras adquirir de acuerdo a la disponibilidad en el mercado.

Rebose y Limpia:
Por fórmula de Hazen y Williams (C=140) S= 1.0% pendiente de fondo de cámara
0 .38
0 .71 * Q
D= .......... .......... .......... .......... ..( 9 )
hf 0.21
Donde :
hf = Pendiente del piso de cámara (1 % a 1 .5 %)
Q = Caudal máximo de la fuente (l / s )
D = Diámetro de la tubería (pu lg)

D= 3.4 pulg

Asumimos Cono de rebose: 4 X 6 pulg.

Altura de cámara: Ht=Hf+ho+Dca/2+H+E

Ht = 1 m

5 de 8
DISEÑO HIDRAULICO LINEA DE CONDUCCION
PROYECTO :
MEJORAMIENTO Y CONSTRUCCION DEL SISTEMA DE AGUA
POTABLE Y DESAGUE DE LA LOCALIDAD DE ZEPITA, DISTRITO
DE ZEPITA
SUBSITEMA : AGUA POTABLE
LUGAR : ZEPITA
DISTRITO : ZEPITA
FECHA : AGOSTO DEL 2010
Nº DE FAMILIAS 397
A.- POBLACION ACTUAL 2381 SEGÚN CENSO 2007
B.- TASA DE CRECIMIENTO (%) 15
C.- PERIODO DE DISEÑO (AÑOS) 20
D.- POBLACION FUTURA Pf = Po * ( 1+ r*t/100 ) 3095

E.- DOTACION (LT/HAB/DIA) 50.00 REGION SIERRA SEGÚN MINISTERIO DE SALUD

F.- CONSUMO PROMEDIO ANUAL (LT/SEGQp = Pf * Dot./86,400 1.79 TOTAL CAUDAL DEMANDA 4.97 l/s
ZEPITA 2.3286 l/s
G.- CONSUMO MAXIMO DIARIO (LT/SEG) 2.33 ¡ OK, Cumple ! MOLINOS UMACATA 0.8798 l/s
CHOCOPAMPA 0.5866 l/s
H.- CAUDAL DE LA FUENTE (LT/SEG) 5.00 01 FUENTE JACHAPAMPA 0.5866 l/s
CHALLAHAHUIRA 0.5866 l/s
I.- VOLUMEN DEL RESERVORIO (M3) V = 0.25 x Pf xd/1000 38.69
A Utilizar (m³ 50.00
J.- C (para tubos) 140.00

LINEA DE CONDUCCION
Downstrea
Upstream Discharge Upstream Downstrea Pressure
m Hazen- Headloss From To
From To Calculated Length Diameter (Absolute Velocity Structure m Structure Pipe
Label Calculated Williams Gradient Material Elevation Elevation
Node Node Pressure (m) (mm) Value) (m/s) Hydraulic Hydraulic Headloss
Pressure (m C (m/km) (m) (m)
(m H2O) (l/s) Grade (m) Grade (m) (m)
H2O)
P-1 C-1 J-1 0.00 17.29 101.80 75.00 4.97 1.12 140.00 4,075.96 4,074.08 1.88 18.46 PVC 4,075.96 4,056.79
P-2 J-1 J-2 17.29 24.67 100.58 75.00 4.97 1.12 140.00 4,074.08 4,072.22 1.86 18.46 PVC 4,056.79 4,047.55
P-3 J-2 J-3 24.67 26.88 99.97 75.00 4.97 1.12 140.00 4,072.22 4,070.38 1.85 18.46 PVC 4,047.55 4,043.50
P-4 J-3 J-4 26.88 26.64 99.97 75.00 4.97 1.12 140.00 4,070.38 4,068.53 1.85 18.47 PVC 4,043.50 4,041.89
P-5 J-4 J-5 26.64 26.38 99.97 75.00 4.97 1.12 140.00 4,068.53 4,066.69 1.85 18.46 PVC 4,041.89 4,040.31
P-6 J-5 J-6 26.38 29.34 99.97 75.00 4.97 1.12 140.00 4,066.69 4,064.84 1.85 18.47 PVC 4,040.31 4,035.50
P-7 J-6 J-7 29.34 28.76 99.97 75.00 4.97 1.12 140.00 4,064.84 4,062.99 1.85 18.46 PVC 4,035.50 4,034.23
P-8 J-7 J-8 28.76 23.25 99.97 75.00 4.97 1.12 140.00 4,062.99 4,061.15 1.85 18.46 PVC 4,034.23 4,037.90
P-9 J-8 J-9 23.25 27.61 100.28 75.00 4.97 1.12 140.00 4,061.15 4,059.30 1.85 18.47 PVC 4,037.90 4,031.69
P-10 J-9 J-10 27.61 25.03 99.97 75.00 4.97 1.12 140.00 4,059.30 4,057.45 1.85 18.46 PVC 4,031.69 4,032.42
P-11 J-10 J-11 25.03 23.65 99.97 75.00 4.97 1.12 140.00 4,057.45 4,055.60 1.85 18.46 PVC 4,032.42 4,031.96
P-12 J-11 J-12 23.65 23.12 99.97 75.00 4.97 1.12 140.00 4,055.60 4,053.76 1.85 18.47 PVC 4,031.96 4,030.64
P-13 J-12 J-13 23.12 21.57 99.97 75.00 4.97 1.12 140.00 4,053.76 4,051.91 1.85 18.46 PVC 4,030.64 4,030.34
P-14 J-13 J-14 21.57 20.52 99.97 75.00 4.97 1.12 140.00 4,051.91 4,050.07 1.85 18.47 PVC 4,030.34 4,029.55
P-15 J-14 J-15 20.52 18.52 99.97 75.00 4.97 1.12 140.00 4,050.07 4,048.22 1.85 18.46 PVC 4,029.55 4,029.70
P-16 J-15 J-16 18.52 17.52 99.97 75.00 4.97 1.12 140.00 4,048.22 4,046.38 1.85 18.46 PVC 4,029.70 4,028.86
P-17 J-16 J-17 17.52 19.59 99.97 75.00 4.97 1.12 140.00 4,046.38 4,044.53 1.85 18.47 PVC 4,028.86 4,024.94
P-18 J-17 J-18 19.59 17.77 100.28 75.00 4.97 1.12 140.00 4,044.53 4,042.68 1.85 18.46 PVC 4,024.94 4,024.91
P-19 J-18 J-19 17.77 17.88 99.97 75.00 4.97 1.12 140.00 4,042.68 4,040.83 1.85 18.46 PVC 4,024.91 4,022.95
P-20 J-19 J-20 17.88 16.44 100.28 75.00 4.97 1.12 140.00 4,040.83 4,038.98 1.85 18.47 PVC 4,022.95 4,022.54
P-21 J-20 J-21 16.44 16.81 99.97 75.00 4.97 1.12 140.00 4,038.98 4,037.13 1.85 18.46 PVC 4,022.54 4,020.32
P-22 J-21 J-22 16.81 17.02 91.14 75.00 4.97 1.12 140.00 4,037.13 4,035.45 1.68 18.46 PVC 4,020.32 4,018.43
P-23 J-22 J-23 17.02 33.83 110.64 75.00 4.09 0.93 140.00 4,035.45 4,034.03 1.42 12.87 PVC 4,018.43 4,000.20
P-24 J-23 J-24 33.83 52.12 101.80 75.00 4.09 0.93 140.00 4,034.03 4,032.72 1.31 12.87 PVC 4,000.20 3,980.60
P-120J-24 CRP6 52.12 62.85 58.52 75.00 4.09 0.93 140.00 4,032.72 4,031.96 0.75 12.87 PVC 3,980.60 3,969.12
P-121CRP6 - J-25 0.00 7.27 42.67 75.00 4.09 0.93 140.00 3,969.12 3,968.57 0.55 12.87 PVC 3,969.12 3,961.30
P-26 J-25 J-26 7.27 21.17 101.19 75.00 4.09 0.93 140.00 3,968.57 3,967.27 1.30 12.87 PVC 3,961.30 3,946.10
P-27 J-26 J-27 21.17 33.44 100.89 75.00 4.09 0.93 140.00 3,967.27 3,965.97 1.30 12.87 PVC 3,946.10 3,932.53
P-28 J-27 CRP 6 33.44 42.24 100.58 75.00 4.09 0.93 140.00 3,965.97 3,964.67 1.29 12.87 PVC 3,932.53 3,922.43
P-29 CRP 6 - J-29 0.00 7.97 100.58 75.00 4.09 0.93 140.00 3,922.43 3,921.14 1.29 12.87 PVC 3,922.43 3,913.17
P-30 J-29 J-30 7.97 10.79 99.97 75.00 4.09 0.93 140.00 3,921.14 3,919.85 1.29 12.87 PVC 3,913.17 3,909.06
P-31 J-30 J-31 10.79 14.26 100.28 75.00 4.09 0.93 140.00 3,919.85 3,918.56 1.29 12.87 PVC 3,909.06 3,904.30
P-32 J-31 J-32 14.26 23.86 100.58 75.00 4.09 0.93 140.00 3,918.56 3,917.26 1.29 12.87 PVC 3,904.30 3,893.40
P-33 J-32 J-33 23.86 38.51 101.19 75.00 4.09 0.93 140.00 3,917.26 3,915.96 1.30 12.87 PVC 3,893.40 3,877.45
P-34 J-33 J-34 38.51 44.37 99.97 75.00 4.09 0.93 140.00 3,915.96 3,914.67 1.29 12.87 PVC 3,877.45 3,870.30
P-35 J-34 J-35 44.37 46.38 100.28 75.00 4.09 0.93 140.00 3,914.67 3,913.38 1.29 12.87 PVC 3,870.30 3,867.00
P-36 J-35 J-36 46.38 50.89 100.28 75.00 4.09 0.93 140.00 3,913.38 3,912.09 1.29 12.87 PVC 3,867.00 3,861.20
P-37 J-36 J-37 50.89 54.19 99.97 75.00 4.09 0.93 140.00 3,912.09 3,910.81 1.29 12.87 PVC 3,861.20 3,856.62
P-38 J-37 J-38 54.19 54.12 99.97 75.00 4.09 0.93 140.00 3,910.81 3,909.52 1.29 12.87 PVC 3,856.62 3,855.40
P-39 J-38 J-39 54.12 53.15 99.97 75.00 4.09 0.93 140.00 3,909.52 3,908.23 1.29 12.87 PVC 3,855.40 3,855.08
P-40 J-39 J-40 53.15 52.65 99.97 75.00 4.09 0.93 140.00 3,908.23 3,906.95 1.29 12.87 PVC 3,855.08 3,854.30
P-41 J-40 J-41 52.65 52.06 99.97 75.00 3.50 0.79 140.00 3,906.95 3,905.98 0.97 9.66 PVC 3,854.30 3,853.92

6 de 8
LINEA DE CONDUCCION
Downstrea
Upstream Discharge Upstream Downstrea Pressure
m Hazen- Headloss From To
From To Calculated Length Diameter (Absolute Velocity Structure m Structure Pipe
Label Calculated Williams Gradient Material Elevation Elevation
Node Node Pressure (m) (mm) Value) (m/s) Hydraulic Hydraulic Headloss
Pressure (m C (m/km) (m) (m)
(m H2O) (l/s) Grade (m) Grade (m) (m)
H2O)
P-42 J-41 J-42 52.06 51.31 99.97 75.00 3.50 0.79 140.00 3,905.98 3,905.02 0.97 9.66 PVC 3,853.92 3,853.70
P-43 J-42 J-43 51.31 51.25 99.97 75.00 3.50 0.79 140.00 3,905.02 3,904.05 0.97 9.66 PVC 3,853.70 3,852.80
P-44 J-43 J-44 51.25 47.98 99.97 75.00 3.50 0.79 140.00 3,904.05 3,903.08 0.97 9.66 PVC 3,852.80 3,855.10
P-45 J-44 J-45 47.98 47.06 99.97 75.00 3.50 0.79 140.00 3,903.08 3,902.12 0.97 9.66 PVC 3,855.10 3,855.06
P-46 J-45 J-46 47.06 46.75 99.97 75.00 3.50 0.79 140.00 3,902.12 3,901.15 0.97 9.66 PVC 3,855.06 3,854.40
P-47 J-46 J-47 46.75 49.32 99.97 75.00 3.50 0.79 140.00 3,901.15 3,900.19 0.97 9.66 PVC 3,854.40 3,850.87
P-48 J-47 J-48 49.32 49.22 99.97 75.00 3.50 0.79 140.00 3,900.19 3,899.22 0.97 9.66 PVC 3,850.87 3,850.00
P-49 J-48 J-49 49.22 53.65 99.97 75.00 3.50 0.79 140.00 3,899.22 3,898.25 0.97 9.66 PVC 3,850.00 3,844.60
P-50 J-49 J-50 53.65 58.89 100.28 75.00 3.50 0.79 140.00 3,898.25 3,897.29 0.97 9.66 PVC 3,844.60 3,838.40
P-51 J-50 J-51 58.89 59.15 99.97 75.00 3.50 0.79 140.00 3,897.29 3,896.32 0.97 9.66 PVC 3,838.40 3,837.17
P-52 J-51 J-52 59.15 59.80 99.97 75.00 3.50 0.79 140.00 3,896.32 3,895.35 0.97 9.66 PVC 3,837.17 3,835.55
P-53 J-52 J-53 59.80 60.09 99.97 75.00 3.50 0.79 140.00 3,895.35 3,894.39 0.97 9.66 PVC 3,835.55 3,834.30
P-54 J-53 J-54 60.09 60.17 99.97 75.00 3.50 0.79 140.00 3,894.39 3,893.42 0.97 9.66 PVC 3,834.30 3,833.25
P-55 J-54 J-55 60.17 60.66 99.97 75.00 3.50 0.79 140.00 3,893.42 3,892.46 0.97 9.66 PVC 3,833.25 3,831.80
P-56 J-55 J-56 60.66 58.83 99.97 75.00 3.50 0.79 140.00 3,892.46 3,891.49 0.97 9.66 PVC 3,831.80 3,832.66
P-57 J-56 J-57 58.83 62.28 93.88 75.00 3.50 0.79 140.00 3,891.49 3,890.58 0.91 9.66 PVC 3,832.66 3,828.30
P-58 J-57 J-58 62.28 62.15 14.02 75.00 3.50 0.79 130.00 3,890.58 3,890.43 0.16 11.08 HDPE 3,828.30 3,828.28
P-59 J-58 J-59 62.15 62.58 92.05 75.00 3.50 0.79 140.00 3,890.43 3,889.54 0.89 9.66 PVC 3,828.28 3,826.96
P-60 J-59 J-60 62.58 63.12 99.97 75.00 3.50 0.79 140.00 3,889.54 3,888.57 0.97 9.66 PVC 3,826.96 3,825.45
P-61 J-60 J-61 63.12 63.31 99.97 75.00 3.50 0.79 140.00 3,888.57 3,887.61 0.97 9.66 PVC 3,825.45 3,824.30
P-62 J-61 J-62 63.31 63.10 99.97 75.00 3.50 0.79 140.00 3,887.61 3,886.64 0.97 9.66 PVC 3,824.30 3,823.54
P-63 J-62 J-63 63.10 62.71 99.97 75.00 3.50 0.79 140.00 3,886.64 3,885.68 0.97 9.66 PVC 3,823.54 3,822.97
P-64 J-63 J-64 62.71 62.52 99.97 75.00 3.50 0.79 140.00 3,885.68 3,884.71 0.97 9.66 PVC 3,822.97 3,822.19
P-65 J-64 J-65 62.52 61.74 99.97 75.00 3.50 0.79 140.00 3,884.71 3,883.74 0.97 9.66 PVC 3,822.19 3,822.00
P-66 J-65 J-66 61.74 61.99 99.97 75.00 3.50 0.79 140.00 3,883.74 3,882.78 0.97 9.66 PVC 3,822.00 3,820.79
P-67 J-66 J-67 61.99 61.81 99.97 75.00 3.50 0.79 140.00 3,882.78 3,881.81 0.97 9.66 PVC 3,820.79 3,820.00
P-68 J-67 J-68 61.81 61.66 99.97 75.00 3.50 0.79 140.00 3,881.81 3,880.85 0.97 9.66 PVC 3,820.00 3,819.19
P-69 J-68 J-69 61.66 61.44 20.12 75.00 3.50 0.79 130.00 3,880.85 3,880.62 0.22 11.08 HDPE 3,819.19 3,819.18
P-70 J-69 J-70 61.44 61.25 79.86 75.00 3.50 0.79 140.00 3,880.62 3,879.85 0.77 9.66 PVC 3,819.18 3,818.60
P-71 J-70 J-71 61.25 61.16 99.97 75.00 2.92 0.66 140.00 3,879.85 3,879.16 0.69 6.88 PVC 3,818.60 3,818.00
P-72 J-71 J-72 61.16 60.92 99.97 75.00 2.92 0.66 140.00 3,879.16 3,878.48 0.69 6.88 PVC 3,818.00 3,817.56
P-73 J-72 J-73 60.92 60.83 99.97 75.00 2.92 0.66 140.00 3,878.48 3,877.79 0.69 6.88 PVC 3,817.56 3,816.96
P-74 J-73 J-74 60.83 60.40 99.67 75.00 2.92 0.66 140.00 3,877.79 3,877.10 0.69 6.88 PVC 3,816.96 3,816.70
P-75 J-74 J-75 60.40 61.01 100.28 75.00 2.92 0.66 140.00 3,877.10 3,876.41 0.69 6.88 PVC 3,816.70 3,815.40
P-76 J-75 J-76 61.01 60.44 99.97 75.00 2.92 0.66 140.00 3,876.41 3,875.73 0.69 6.88 PVC 3,815.40 3,815.29
P-77 J-76 J-77 60.44 60.44 99.97 75.00 2.92 0.66 140.00 3,875.73 3,875.04 0.69 6.88 PVC 3,815.29 3,814.60
P-78 J-77 J-78 60.44 59.75 99.97 75.00 2.92 0.66 140.00 3,875.04 3,874.35 0.69 6.88 PVC 3,814.60 3,814.60
P-79 J-78 J-79 59.75 59.68 99.97 75.00 2.92 0.66 140.00 3,874.35 3,873.66 0.69 6.88 PVC 3,814.60 3,813.98
P-80 J-79 J-80 59.68 59.17 99.97 75.00 2.92 0.66 140.00 3,873.66 3,872.97 0.69 6.88 PVC 3,813.98 3,813.80
P-81 J-80 J-81 59.17 58.69 99.97 75.00 2.92 0.66 140.00 3,872.97 3,872.29 0.69 6.88 PVC 3,813.80 3,813.60
P-82 J-81 J-82 58.69 58.00 99.97 75.00 2.92 0.66 140.00 3,872.29 3,871.60 0.69 6.88 PVC 3,813.60 3,813.60
P-83 J-82 J-83 58.00 57.70 56.08 75.00 2.92 0.66 140.00 3,871.60 3,871.21 0.39 6.88 PVC 3,813.60 3,813.51
P-84 J-83 J-84 57.70 57.58 19.20 75.00 2.92 0.66 130.00 3,871.21 3,871.06 0.15 7.89 HDPE 3,813.51 3,813.48
P-85 J-84 J-85 57.58 57.19 24.69 75.00 2.92 0.66 140.00 3,871.06 3,870.89 0.17 6.88 PVC 3,813.48 3,813.70
P-86 J-85 J-86 57.19 56.57 99.67 75.00 2.92 0.66 140.00 3,870.89 3,870.21 0.69 6.88 PVC 3,813.70 3,813.64
P-87 J-86 J-87 56.57 56.12 99.97 75.00 2.92 0.66 140.00 3,870.21 3,869.52 0.69 6.88 PVC 3,813.64 3,813.40
P-88 J-87 J-88 56.12 55.23 100.28 75.00 2.92 0.66 140.00 3,869.52 3,868.83 0.69 6.88 PVC 3,813.40 3,813.60
P-89 J-88 J-89 55.23 54.26 99.97 75.00 2.92 0.66 140.00 3,868.83 3,868.14 0.69 6.88 PVC 3,813.60 3,813.88
P-90 J-89 J-90 54.26 53.33 100.28 75.00 2.92 0.66 140.00 3,868.14 3,867.45 0.69 6.88 PVC 3,813.88 3,814.12
P-91 J-90 J-91 53.33 53.32 99.67 75.00 2.33 0.53 140.00 3,867.45 3,867.00 0.45 4.54 PVC 3,814.12 3,813.68
P-92 J-91 J-92 53.32 52.85 99.97 75.00 2.33 0.53 140.00 3,867.00 3,866.55 0.45 4.54 PVC 3,813.68 3,813.69
P-93 J-92 J-93 52.85 52.49 100.28 75.00 2.33 0.53 140.00 3,866.55 3,866.09 0.46 4.54 PVC 3,813.69 3,813.60
P-94 J-93 J-94 52.49 52.05 99.67 75.00 2.33 0.53 140.00 3,866.09 3,865.64 0.45 4.54 PVC 3,813.60 3,813.59
P-95 J-94 J-95 52.05 51.45 99.67 75.00 2.33 0.53 140.00 3,865.64 3,865.19 0.45 4.54 PVC 3,813.59 3,813.74
P-96 J-95 J-96 51.45 51.31 60.05 75.00 2.33 0.53 140.00 3,865.19 3,864.91 0.27 4.54 PVC 3,813.74 3,813.60
P-97 J-96 J-97 51.31 51.21 22.56 75.00 2.33 0.53 130.00 3,864.91 3,864.80 0.12 5.21 HDPE 3,813.60 3,813.59
P-98 J-97 J-98 51.21 50.79 17.68 75.00 2.33 0.53 140.00 3,864.80 3,864.72 0.08 4.53 PVC 3,813.59 3,813.93
P-99 J-98 J-99 50.79 50.86 100.28 75.00 2.33 0.53 140.00 3,864.72 3,864.26 0.46 4.54 PVC 3,813.93 3,813.40
P-100J-99 J-100 50.86 50.34 99.97 75.00 2.33 0.53 140.00 3,864.26 3,863.81 0.45 4.54 PVC 3,813.40 3,813.47

7 de 8
LINEA DE CONDUCCION
Downstrea
Upstream Discharge Upstream Downstrea Pressure
m Hazen- Headloss From To
From To Calculated Length Diameter (Absolute Velocity Structure m Structure Pipe
Label Calculated Williams Gradient Material Elevation Elevation
Node Node Pressure (m) (mm) Value) (m/s) Hydraulic Hydraulic Headloss
Pressure (m C (m/km) (m) (m)
(m H2O) (l/s) Grade (m) Grade (m) (m)
H2O)
P-101J-100 J-101 50.34 50.05 99.67 75.00 2.33 0.53 140.00 3,863.81 3,863.35 0.45 4.54 PVC 3,813.47 3,813.30
P-102J-101 J-102 50.05 49.28 100.28 75.00 2.33 0.53 140.00 3,863.35 3,862.90 0.45 4.54 PVC 3,813.30 3,813.62
P-103J-102 J-103 49.28 49.09 99.97 75.00 2.33 0.53 140.00 3,862.90 3,862.45 0.45 4.54 PVC 3,813.62 3,813.36
P-122J-103 J-120 49.09 49.01 28.96 75.00 2.33 0.53 140.00 3,862.45 3,862.31 0.13 4.54 PVC 3,813.36 3,813.30
P-123J-120 J-121 49.01 48.91 23.16 75.00 2.33 0.53 130.00 3,862.31 3,862.19 0.12 5.20 HDPE 3,813.30 3,813.28
P-124J-121 J-104 48.91 48.61 47.85 75.00 2.33 0.53 140.00 3,862.19 3,861.98 0.22 4.53 PVC 3,813.28 3,813.37
P-105J-104 J-105 48.61 47.92 99.97 75.00 2.33 0.53 140.00 3,861.98 3,861.52 0.45 4.54 PVC 3,813.37 3,813.60
P-125J-105 J-122 47.92 47.75 66.14 75.00 2.33 0.53 140.00 3,861.52 3,861.22 0.30 4.54 PVC 3,813.60 3,813.47
P-126J-122 J-106 47.75 47.51 34.14 75.00 2.33 0.53 130.00 3,861.22 3,861.05 0.18 5.21 HDPE 3,813.47 3,813.53
P-107J-106 J-107 47.51 46.99 99.97 75.00 2.33 0.53 140.00 3,861.05 3,860.59 0.45 4.54 PVC 3,813.53 3,813.60
P-108J-107 J-108 46.99 46.14 99.97 75.00 2.33 0.53 140.00 3,860.59 3,860.14 0.45 4.54 PVC 3,813.60 3,814.00
P-109J-108 J-109 46.14 45.61 99.97 75.00 2.33 0.53 140.00 3,860.14 3,859.68 0.45 4.54 PVC 3,814.00 3,814.07
P-110J-109 J-110 45.61 44.98 99.97 75.00 2.33 0.53 140.00 3,859.68 3,859.23 0.45 4.54 PVC 3,814.07 3,814.25
P-111J-110 J-111 44.98 43.53 99.67 75.00 2.33 0.53 140.00 3,859.23 3,858.78 0.45 4.54 PVC 3,814.25 3,815.25
P-112J-111 J-112 43.53 42.16 100.28 75.00 2.33 0.53 140.00 3,858.78 3,858.32 0.46 4.54 PVC 3,815.25 3,816.16
P-113J-112 J-113 42.16 41.77 99.97 75.00 2.33 0.53 140.00 3,858.32 3,857.87 0.45 4.54 PVC 3,816.16 3,816.10
P-114J-113 J-114 41.77 41.62 99.97 75.00 2.33 0.53 140.00 3,857.87 3,857.42 0.45 4.54 PVC 3,816.10 3,815.80
P-115J-114 J-115 41.62 39.56 99.97 75.00 2.33 0.53 140.00 3,857.42 3,856.96 0.45 4.54 PVC 3,815.80 3,817.40
P-116J-115 J-116 39.56 27.95 100.89 75.00 2.33 0.53 140.00 3,856.96 3,856.50 0.46 4.54 PVC 3,817.40 3,828.55
P-117J-116 J-117 27.95 10.05 101.50 75.00 2.33 0.53 140.00 3,856.50 3,856.04 0.46 4.54 PVC 3,828.55 3,845.99
P-118J-117 J-118 10.05 7.21 50.90 75.00 2.33 0.53 140.00 3,856.04 3,855.81 0.23 4.54 PVC 3,845.99 3,848.60
P-119J-118 J-119 7.21 8.81 21.03 75.00 2.33 0.53 140.00 3,855.81 3,855.72 0.10 4.54 PVC 3,848.60 3,846.91

RESUMEN : LINEA DE CONDUCCION RESUMEN : ESTRUCTURAS LINEA DE CONDUCCION


TUB. PVC SAP C-10,D=75mm 11053 Mts. CAPTACION 1.00 Und.
CRP 6 2.00 Und.
TUB. PEAD C-10,D=75mm 133 Mts. VALV CONTROL 14.00 Und.
VALV DE PURGA 5.00 Und.
VALVULA DE AIRE 4.00 Und.
CRUCE RIO 4.00 Und.
CRUCE CARRETERA 2.00 Und.
TOTAL 32.00 Und.
LONG.TOTAL DE TUBERIA-PVC 11053.3 Mts