PRESENTED BY:
Hasril Nuzahar
Director of Electricity Program Supervision
on :
Coffee Morning Directorate General of Electricity with Stakeholders in Electricity Sector
Development of power plant for peak load by using gas and PLTA (pump storage or
ordinary type of damp), so fuel oil power plant development is minimized
.
To support other power plants that use new renewable energy, in addition to fulfill power
need, in reducing CO2 emission level by giving interesting investment scheme and more
ocmpetitive selling price of power
Mix Primary Energy Policy for Power Generation
Primary energy source should be used optimally in line with National Energy Policy (KEN)
to guarantee sustainable power supply, and its utilization prioritized from new renewable
energy source
As for deduction of oil fuel dependency, Government guarantees coal supply for power
generation through DMO policy and supports domestic gas use for power plants.
The utilization of new energy source such as nuclear energy is last option after optimizing
the use of renewbale nergy source and other new energy source potency. .
2012 2021
Gas Gas
22.60% Geotherma 18.8%
Coal Geothermal
l
51.08% 11.0%
4.75%
coal
Water Water
62.8%
6.44% 6.5%
others others
Oil fuel 0.12% 0.1%
Oil fuel
15.02% 0.8%
Rural Electricity Program Policy and Electrification
Ratio
Handling of social mission meant to hep less fortunate society group, and electrify the
whole area of Indonesia conits of underprevilaged area, remote area, and rural electricity
development .
National electrification ratio targets 80% by the end of 2014, it is expected to become
around 99% by the end of 2020.
100
99.92 100.00
99.20 99.26 99.33 99.40 99.47 99.54 99.61 99.69 99.76 99.84
95
95.98
92.76
90
89.56
% 85 86.37
83.18
80
80.00
75 77.65
75.30
70
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Flow Chart Projection of Power Demand dan
Supply
start
Historical Data
(Input)
Regression Analysis
(Model)
stop
250 1,000
200 800
Additional power need (GW)
Existing capacity (GW)
On going capacity (plan) (GW) 150 600
Peak Load (GW)
Electricity energy need
100 400
GW
50 200
0 0
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Kebutuhan tambahan daya (GW) **) 5 8 11 14 18 22 27 31 36 41 46 52 58 65 72 80 88 97 108 119
Kapasitas exsisting (GW) *) 25 24 23 23 22 22 21 21 20 20 19 19 18 18 17 17 16 16 16 15
Kapasitas tahun berjalan (rencana) (GW) 30 32 34 37 41 44 48 52 56 60 65 70 75 81 88 95 103 112 122 133
Beban Puncak (GW) 23 24 26 29 31 34 37 40 43 46 50 54 58 63 68 73 79 86 94 102
Kebutuhan Energi Listrik (TWh) 130 141 153 166 181 197 214 233 253 274 295 319 345 374 405 440 478 521 568 621
*) Installed capacity year 2011 experience derating)
**) Acumulation
250 1,000
200 800
150 600
100 400
GW
50 200
0 0
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Kebutuhan tambahan daya (GW) **) 4 6 7 9 11 13 16 19 23 26 30 35 41 47 55 63 74 86 101 118
Kapasitas exsisting (GW) *) 8 7 7 7 7 7 7 6 6 6 6 6 6 5 5 5 5 5 5 5
Kapasitas tahun berjalan (rencana) (GW) 12 13 14 16 18 20 23 25 29 32 36 40 46 52 59 68 78 90 104 121
Beban Puncak (GW) 8 9 10 11 13 14 16 18 20 23 26 29 33 37 42 48 56 64 74 87
Kebutuhan Energi Listrik (TWh) 41 45 50 56 63 71 80 91 103 115 130 147 167 190 218 250 289 335 389 454
250 1,000
200 800
150 600
GW 100 400
50 200
0 0
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Kebutuhan tambahan daya (GW) **) 9 13 18 23 29 36 43 50 59 67 77 87 99 112 126 143 162 183 208 237
Kapasitas exsisting (GW) *) 32 32 31 30 29 28 28 27 26 26 25 24 24 23 23 22 22 21 20 20
Kapasitas tahun berjalan (rencana) (GW) 41 45 49 53 58 64 70 77 85 92 101 110 121 133 147 163 181 202 226 254
Beban Puncak (GW) 31 34 37 40 44 48 53 58 64 69 76 83 91 100 110 122 135 150 168 189
Kebutuhan Energi Listrik (TWh) 171 186 203 223 244 268 294 324 356 389 425 466 512 564 623 690 767 855 957 1,075
*) Kapasitas terpasang tahun 2011 yang mengalami penurunan kemampuan (derating)
**) Akumulasi
Average
Additional power need per year (20 thn)
11.710 MW
Additional power need per year (10 thn) Average 6.447 MW
Compaarison of Projection Result
1,200
RUKN 2008-2027
1,000
Draft RUKN 2010-2029
Draft RUKN 2012-2031
Realisasi Konsumsi
800
Electricity Energy Need (TWh)
600
400
200
0
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
RUKN 2008-2027 140 153 166 182 198 217 237 260 285 312 342 376 413 454 499 549 605 667 736 813
Draft RUKN 2010-2029 145 157 169 183 198 215 233 253 274 298 325 353 385 419 458 500 546 597 653 716
Draft RUKN 2012-2031 171 186 203 223 244 268 294 324 356 389 425 466 512 564 623 690 767 855 957 1,075
Realisasi Konsumsi 129 134 147 158 171