Project : M/s.VIDUL BIO MASS PVT LTD Volume basis calcualtion Heat load calcualtion Delta T :36.25-33.2 3 S=0.24kj/kg°c @

Total room
Total Air
Equipment people Exposed Exposed wall Q= HC x860 Air volume to be
final air
Capacity for
Sl.no Description Room size (m) Air changes / hour requirement Light (KW) Total heat load (KW) changes /
size (m3)
(m3 /hr)
(KW) (KW) roof (KW) (KW) --------------- conisered
hr
Exhaust fans

40w/sq. m  X SX (T0-Tr)
L B H LxBxH 1 watt/sq.ft 250w/person 50w/sq.m (two sides m3/hr m3/hr
only)
TOTAL Air
TOTAL Air requirement
0.00 requirement heat 0.00
@volume basis
load basis

B EXHAUST Ventilation Selected 240000 240000

1 TG building layout 0.0m lvl 22 10 5 1100 15 16500 2.37 5.00 0.5 0 8.4 16.27 17663.50 18000.00 15 18000.00

2 TG building layout 0.0m lvl -MCC ROOM 22 7 5 770 25 19250 1.66 20.00 0.5 0 7.2 29.36 31877.33 32000.00 25 32000.00

TG building layout Operating floor +5.0m


3 22 10 8.5 1870 15 28050 2.37 1.00 0.5 11 14.28 29.15 31649.36 31650.00 15 31650.00
floor level

4 Equipment room in WTP building 14 5 6 420 15 6300 0.75 2.00 0.5 3.5 5.76 12.51 13587.44 14000.00 15 14000.00

5 WTP MCC panel room 3 4 4 48 25 1200 0.13 1.00 0.5 0.6 0.48 2.71 2941.70 3000.00 25 3000.00

6 TG MCC room panel @4.4m lvl 5 9.5 5 237.5 25 5938 0.51 0.80 0.5 2.375 1 5.19 5631.29 5938.00 25 6000.00

Battery & battery charger room @ 4.4m


7 2.3 5.7 5 65.55 15 983 0.14 0.60 0.25 0.6555 1.6 3.25 3525.29 3525.00 15 3600.00
floor lvl

Raw water cum fire water pump house


8 6.1 11.5 4 280.6 15 4209 0.75 0.00 0.5 3.5075 3.792 8.55 9288.65 9288.65 15 10000.00
room

9 Toilet at 10.0m lvl (Right side of lift) 3.3 2.3 5 37.95 10 380 0.08 0.00 0.25 0.3795 0.66 1.37 1488.88 1481.00 10 1489.00