1. The document discusses various topics related to tank inspections and repairs as per API 653 standards.
2. It provides multiple choice questions regarding swing line inspections, roof tank inspections, weld preparation measurement gauges, likely causes of tank bottom lining failure, effective inspection methods before deciding repair methods, visual inspection examiner qualifications, requirements for repairing tanks operating at low temperatures, suitable temperature ranges for epoxy lining, and inspector qualifications.
3. It also summarizes that the exam focused heavily on hydrotesting, lining, repairing lining, and lining failure; and emphasized annexes B, G, and C. Calculations for corrosion allowances and closed book format were also examined.
1. The document discusses various topics related to tank inspections and repairs as per API 653 standards.
2. It provides multiple choice questions regarding swing line inspections, roof tank inspections, weld preparation measurement gauges, likely causes of tank bottom lining failure, effective inspection methods before deciding repair methods, visual inspection examiner qualifications, requirements for repairing tanks operating at low temperatures, suitable temperature ranges for epoxy lining, and inspector qualifications.
3. It also summarizes that the exam focused heavily on hydrotesting, lining, repairing lining, and lining failure; and emphasized annexes B, G, and C. Calculations for corrosion allowances and closed book format were also examined.
1. The document discusses various topics related to tank inspections and repairs as per API 653 standards.
2. It provides multiple choice questions regarding swing line inspections, roof tank inspections, weld preparation measurement gauges, likely causes of tank bottom lining failure, effective inspection methods before deciding repair methods, visual inspection examiner qualifications, requirements for repairing tanks operating at low temperatures, suitable temperature ranges for epoxy lining, and inspector qualifications.
3. It also summarizes that the exam focused heavily on hydrotesting, lining, repairing lining, and lining failure; and emphasized annexes B, G, and C. Calculations for corrosion allowances and closed book format were also examined.
A- check the condition of the line B- check the cleanness of the line C- check the free movement of the line D- check the tightness of the line
2. Before roof tank inspection, the deck plate shall be
A- water wash B-UT testing C- sand blasting D- Air testing 3. What is the suitable gauge used for measurement of weld preparation Angel? bridge cam gauge 4. What’s the most likely effect on the failure of the linning of tank bottom? A- wrong coating specification B- in proper curing of the coating C- failure to use solvent cleaning before painting D- low DFT 5. What’s the most effective method of inspection before decide the method of repairing of linning A- visual inspection B-Holiday test C- service assessment D- correct procedure 6. As per API 653, examiner for Visual inspection qualification shall be as per A- SNT-C - level I B- SNT-C - level II C- API 650 B- AWS
7. Repairing tank which was working at 15 F / - 10 C , the organization of repairing
A- shall provide the WPS B- must conduct impact test C- no further action D- shall provide qualified welders 8. Epoxy linear linning used at which temperature? A- 160F - 220 F B- 180 F C- 120F - 160F B- 160F - 180F 9.
متحانAPI 653 فى الميه او اكتر من االمتحانات القديمه65 كان
بس نخلى بلنا انه ركز اوى على الهيروتست فى خمس اسئله ممكن يتم او ال اهم سؤال كان لو فاتحنا دور شيت فىshell و اى اكتر طريقه نقدر نستخدمه inspector Qualificationsواهم سؤالين كانوا liningنعمل هيدرو وال كمان ركز اوى على repairing liningقبل ما نحدد lining failureواى اكتر شئ سبب فى Hاسئله كتير على حسابات التخانه و بيحكى قصص طويله اوى وفى االخر الخل فى سطر annex B , G , Cركز على وجاب سؤال او اتنين على كل واحد بصيغه مختلفه caustic mitigationوجاب خمس اسئله منهم على API 571ركز على Closed Book بس وبيحكى فيلم طويل Hو ال H-1وهل هى Hالحسابات اللى فيها لعب ركز على حسابات bottom6 inاصعبهم فى وجه نظرى ان كان مدى عيب ممتد فوق ال H liquid = 39 H tank = 40 ? H for calculation