You are on page 1of 200

SWACHCHH

BHARAT
SWACHCHH
VIDHYALAYA
A Hollistic Approach For
Sanitation & Hygiene
Education In Our Schools

SARVA SHIKSHA ABHIYAN,


GUJARAT COUNCIL OF ELEMENTARY EDUCATION,
SECTOR – 17, GANDHINAGAR
BACKGROUND

Access to safe water and sanitary facilities in schools are paramount to achieve the “Whole School”
development concept of Sarva Shiksha Abhiyan (SSA). Cultivating healthy and hygienic behavior among
school children at young age (“Catch them young and teach them healthy hygienic behaviors”) is important
to help them become responsible and environment friendly citizens. In schools, lack of proper water and
sanitation facilities affects the quality of education by hampering regular attendance of school children,
especially adolescent girls attending schools.

Every day children spend approximately a third of their valuable time in school, which is often considered
their second home. Schools can enhance the quality of the education they are providing to students by
ensuring access to all of the basic amenities, in particular drinking water and sanitary facilities which are
clean, comfortable, adequate, usable, located at a safe place and easily accessible to children.

The provision of safe water supply and sanitary services on school campuses along with intensive hygiene
promotion in schools are essential to improve the health of children. In addition, SSA is aware that the simple
provision of facilities in schools does not mean that the schools are necessarily providing the accessibility,
quantity or quality of services that meet the needs of students. SSA therefore believes that it is critical to
provide appropriate and functional, child friendly facilities for both boys and girls in schools.

WASH
School Water Supply, Sanitation and Hygiene Promotion, widely known as WASH, is a comprehensive
programme to ensure child-friendly water supply, toilet and hand washing facilities in schools and promote
behavioral change by imparting hygiene education. The facilities can stimulate interactive learning and
development:

1. Environmental development: Children receive information from the environment by seeing,


smelling, hearing and touching and they use this information in their intellectual development.
Spaces they encounter, including hygiene and sanitation facilities, can provide a range of positive
and negative experiences related to colors, smells, shapes and sounds.

2. Social Development: The layout of spaces and the way they are used can encourage contact with
others or offer seclusion. This is relevant for hygiene and sanitation facilities because they require
both privacy and sharing with others.

3. Creative Development: Children’s creativity can be stimulated by giving them the opportunity to
make the spaces their own and letting them to better suit their needs.

1
4. Physiological development: The use of hygiene and sanitation facilities can help to develop
necessary skills in young children, such as fine-tuning of the physical movements viz opening taps
etc. WASH program under WSDP not only ensures the child’s right to have healthy and clean
environment but also leads to effective & healthy learning and increased enrolment of girls in
particular, and reduce diseases and worm infestation.

HOLISTIC WASH FACILITIES IN SCHOOLS – GUIDING PRINCIPLES

SSA envisions schools adapting the framework as given in the diagram below to ensure safe water and
sanitation services under the “whole school Development Plan” concept. The eight important activities within
this framework include:

a) Potable drinking water systems and toilet facilities should be easily accessible available and at a safe
location on the school campus and these systems should be protected to avoid indiscriminate use by
outsiders during off school hours or during school holidays.

b) Separate toilet facilities for boys and girls which should be safe and easily accessible with hand washing
facility, provision for sanitary napkin, change room & incinerator in girl’s toilet.

c) The proportion of toilet facilities (number of Urinals and toilets) should match the students’ enrollment in
school.

d) The water delivery system and toilet facilities should be child and gender friendly and should meet the
requirements of the children with special needs in school. The modification to fit in to the existing facility
can be carried out with little extra cost.

e) Access to sanitary napkins, privacy to change napkins and a safe disposal system for used sanitary
napkins should be a priority in the design of school water and sanitation facilities. Creation of awareness
among school children and teachers on school water supply, sanitation and health and hygiene education
on use of safe water and toilets, hand washing at critical times (after anal cleaning, before taking food
etc.), safe disposal of solid and liquid wastes, water and food handling and personal hygiene habits
through designated health personnel and adolescents at least once a quarter for menstrual hygiene
management education should be carried out.

f) Water supply needs to be sufficient not only for drinking purposes, but also for maintaining the toilet block
and mid-day meal service in the school. The water source should be located in the school campus. In
case of any water quality issues (such as excess iron, fluoride, arsenic, etc.) detected, an appropriate
treatment method/ system should be introduced.

2
GUIDING PRINCIPLES FOR HOLISTIC WASH FACILITIES IN SCHOOLS

Adequate potable
drinking water facility
Separate toilet
within school
facilities for girls &
campus with
boys
appropriate filter
system, if required

Size of Toilet block –


Hygiene education Matching with
student strength –
Including menstrual provision of
hygiene adequate no. of
urinals and WCs

Proper maintenance Toilet Facility – Child


system to keep the friendly & meets the
toilet neat & clean need of Children
With Special Needs.

Access & disposal of


sanitary napkin
Sufficient water
facilities i.e.
supply to toilet block
provision of
incinerators

3
NORMS AND STANDARDS
FOR TOILET BLOCKS (SANITARY BLOCKS) IN SCHOOL

To begin any school toilet design exercise, it is first important to establish the need and then follow the norms
for provision of facilities. The norms for school toilets, urinals and other wash facilities have been defined in
the National Building Code (NBC) and also in the SSHE manual published by the Ministry of Drinking Water
Supply and Sanitation. However, it may be noted that the norms must be simple, pragmatic and based on:
 Field experience of the ground situation(s)
 Observed pattern of usage of sanitary facilities
 Methods that connect directly with planning of school classrooms and other infrastructure provisions
(planned for multiples of 40 children)

For example, in most day-schools the frequency of use of urinals is much higher than toilets as compared to
residential schools. Most norm-based calculations are envisaged for ‘peak’ load situations of usage. If such
peak times can be offset by creative planning of the time table, the provision of infrastructure may be
optimized without compromising on quality. For example, if in larger schools, the lunch break is staggered
for primary and middle schools, the number of urinals and toilets to be provided may be reduced without
causing any inconvenience and ensuring better utilization of available resources. In general, one Urinal for
every 20 children and one toilet for every 80 children have been suggested.

TABLE - 1

Sr. No. Provision Head* Numbers to be provided Remarks

GIRLS’ TOILET
Girls toilet squatting 1 unit for every 80 girls + lady Day School, without residential
1
pan* teacher facility
In case only 1 girl’s toilet is needed in
a school, This single toilet must be
Girls toilet for At least 1 unit in a girl’s toilet
2 designed for CWSN. In case more
CWSN block
toilets are needed, the others need
not cater to CWSN

Wash Tap in Girls’ Located conveniently for use by the


3 1 tap in each toilet
Toilet child as well as adult

At least 2 hooks at different child


Cloths-hanging
4 Hooks in each toilet accessible heights – suitable for 5
hook*
year child to an adult

4
Sr. No. Provision Head* Numbers to be provided Remarks

GIRLS’ TOILET
Recessed in the wall to keep sanitary
5 Niche in Wall* 1 niche in each toilet
napkins
Size 450x450 mm at a height and
Ventilation 1 opening for location that allows sunlight to
6
arrangement Ventilation in each toilet penetrate for few house in a day for
self-drying
Door to be 2100 mm high with child
7 Door* 1 door in each WC
accessible latching arrangement
GIRLS’ URINAL

With partitions. Two minutes


1 urinal for every 20
8 Girl’s urinal* waiting/queuing time for using the
girls
facility at peak hours

Any flushing system that washes the


soiled surfaces with minimal water is
Self-cleaning 1 flushing system in
9 accessible. Use of recycled water is
system each urinal
desirable. Use of standard urinal or
toilet flush is not compulsory

Height and location that allows


Ventilation 1 opening for
10 sunlight to reach the floor for few
arrangement* Ventilation in each urinal area
hours in a day for self-drying
Screen door to be 1500 mm high with
11 Screen door 1 door for each urinal child accessible latching
arrangement
BOYS’ TOILET
Boy’s toilet 1 unit for every 80 boys +
12 Day school, without residential facility
squatting pan* male teacher
In case only 1 boy’s toilet is needed
in a school, this single toilet must be
Boy’s toilet for At least 1 unit in a
13 designed for CWSN. In case more
CWSN boy’s toilet block
toilets are needed, the others need
not cater to CWSN
Wash tap in boy’s Located conveniently for child as well
14 1 tap in each WC
WC* as adult use

5
Sr. No. Provision Head* Numbers to be provided Remarks

BOYS’ TOILET
Clothes-hanging Hooks at different child accessible
15 2 hooks in each WC
hook* heights – from 5 year child to adult
Size 450x450 mm at a height and
Ventilation 1 opening for location that allows sunlight to
16
arrangement* ventilation in each toilet penetrate for few hours in a day for
self-drying
Door to be 2100 mm high with child
17 Door* 1 door in each WC
accessible latching arrangement
BOYS’ URINAL
1 urinal for every 20
18 Boy’s urinal* With partitions
boys + gent teacher
Any flushing system that washes the
soiled surface and works with
Self-cleaning 1 flushing system in minimal water is acceptable. Use of
19
system each urinal recycled water is desirable. Use of
standard urinals or toilet flush is not
compulsory
Height and location that allows
1 opening for
Ventilation sunlight to penetrate to the wet
20 Ventilation in each urinal
arrangement* wall/urinal pan and floor for a
area.
few hours a day for self-drying
HAND WASH
Minimum of 2. One Can be provided as
Hand wash
21 wash tap for every 20 common/separate for girl’s and
(toilet/urinal)*
children boy’s toilet blocks
To be provided near MDM
Hand wash – Minimum of three - One kitchen. Preferably should be
22 MDM wash tap for every 20 segregated and separate from
kitchen* children thereafter toilet hand wash for hygiene
purposes.
Soap tray 1 with every two wash Soap type can be according to
23
with soap* taps feasibility
24 Mirror 1 in each hand wash unit

6
Sr. No. Provision Head* Numbers to be provided Remarks

HAND WASH

Minimum 500 Liters for a


Wash water The tank capacity does not
school of up to 100
25 storage include a buffer storage
Children. Subsequent
tank* reserve in case of emergency
calculation @ 5 liters/child.

GIRLS’ TOILET

Girl’s toilet 1 unit for every 20


Residential school with
26 squatting Girls + Lady
boarding facility
pan* teacher/supervisor

BOYS’ TOILET
Boy’s toilet 1 unit for every 20
Residential school with
27 squatting boys + Gent
boarding facility
pan* teacher/supervisor
 All marked with ‘ * ’ are essential and mandatory.

GUIDELINES FOR TOILETS & SANITATION SET UP


This part covers necessary preparatory measures to be taken care of prior to planning & construction of
sanitary facilities in schools and presents a range of design options with corresponding cost estimates based
on the established norms (Table – 1).

For ease of understanding, the content is illustrated through four stage wise sections as mentioned below:

Section 1: Preparatory Planning

Section 2: Understanding designs, their attributes and features

Section 3: A set of 9 designs with their salient features, technical drawings and estimates.

Section 4: Operation & Maintenance

Section 5: District-wise list of schools with requisite sanitary requirements. (As per strength of Boys & Girls.)

7
SECTION – 1
PREPARATORY PLANNING FOR SANITATION
FACILITY IN SCHOOL
This section details out the preparatory steps for school sanitation activities which will be very helpful in the
planning process and thereafter implementing the programme. Following are the suggested guiding steps:

Identify Site for Facilities


 Survey the site for construction of sanitation block.
 Identify the zones where the amenities can be located.
 Prioritize options.

Selecting the Design


 Identify the range of design options and technology options that seems most feasible on site.
 Check the design most suitable for the site
 However, necessary modifications in to the suggested design options may be opted if required in
accordance to the norms

Location and Placement


Before finalizing the location(s), analyze the site for the following:
 Is the site for toilet the best from the point of view of usage and safety of all users? E.g. is it readily
accessible to all children, remains under visual command of school management, etc.

 Does the site offer enough space for good ventilation and natural light? E.g. Is the longer sides of the
toilet block facing south, west or east? Are the openings located on the windward side?

 Does the site offer enough space for future need / expansion? E.g. is there enough space / clearance for
the amenities to expand side-ways / front / back in future without adversely affecting the efficiency of
present buildings and facilities?

 Will the drainage of waste and soil water be proper and safe? E.g. is there sufficient space for
accommodating the type of sewage disposal system that it most suitable on site? Is this point adequately
away from the ground water source used by the school or the community?

 Will the location of amenities affect the performance of existing buildings negatively? If so, can this be
minimized? E.g. will the construction affect natural light and ventilation of present classrooms?
Based on this finalize the location and orientation of toilet building.

8
Site specific adaption
 Make site specific adaption in the design according to need.
 Check how drainage from amenities can be most efficiently recycled or safely discharged.
 Identify the most frequent used path to approach the facilities being created. Check if it is safe as well as
conductive for all children including Children with Special Needs.
 Analyze, which environmentally good practices can be used with the design on this site.

SAFETY

RISK OF
GROUND WATER PRIVACY
CONTAMINATION

TOILET BLOCK
SITE SELECTION

ENVIRONMENTAL
ACCESSIBILITY
DEGRADATION

SUGGESTED
DESIGN
APPLICABLE /
MODIFICATIONS
REQUIRED

9
SECTION – 2
UNDERSTANDING THE DESIGN
Suggested designs
It must be clearly understood that these are suggested designs, keeping in mind the ground realities. But,
availability of materials and skills as well as geo-climatic condition varies across the state. Hence, requisite
site specific modifications are perfectly acceptable as long as the adapted design addresses the norms given
in this document.

Design for Children as well as Teachers


All the designs suggested are designed keeping in mind that they will be used by children as well as teachers
in the school. The hardware and plumbing provisions keep this dual use in mind for all girls and boys toilets
and urinals including Children with Special Needs (CWSN) toilets.

Design Types
Based on essential and desirable components, proposed norms, guiding principles for design of School
Sanitation & Hygiene Education (SSHE) facilities, several sample designs have been developed are being
illustrated here. The below listed 7 types of designs have been developed to cater for different requirements
of schools:

A. Girls Toilet Blocks:

Sr. Design Configuration


Design Code Capacity
No. CWSN Normal W.C. / Urinals
1 GTB-01 1 2 40 Girl
2 GTB-02 1 4 80 Girl
3 GTB-03 1 6 120 Girl
4 GTB-04 0 3 60 Girl

B. Boys Toilet Blocks:

Sr. Design Configuration


Design Code Capacity
No. CWSN Normal W.C. Urinals
5 BTB-01 1 1 5 100 Boy
6 BTB-02 1 2 8 160 Boy
7 BTB-03 0 1 3 60 Boy

10
C. Combined Toilet Blocks:

Sr. Design Configuration


Gender Design Code Capacity
No. CWSN Normal W.C. Urinals
CTB-01 1 0 4 80 Boy
8 BOYS
CTB-02 1 1 5 100 Boy
Sr. Design Configuration
Gender Design Code Capacity
No. CWSN Normal W.C./ Urinals
CTB-01 1 2 40 Girl
9 GIRLS
CTB-02 1 4 80 Girl

NOTE:
 All designs have been developed so that adult teachers (ladies and gents) can also use the facilities,
hence there is no need for separate toilets or urinals for them.
 The present set of designs is not developed for multi-stored structures.

Based on the preparatory details provided in section – 1 and considering the design selection factors as
mentioned above a particular design type may be selected.

For further help, detailed design documents have also been provided in following section – 3.

11
SECTION – 3
TOILET DESIGNS – DETAILS & SPECIFICATIONS
The following pages have all the 7 design options with it’s’ orientation, plan, elevation, section, plumbing
details, structural details & estimate.

GENERAL SPECIFICATIONS
 All toilets are designed as load bearing structures with pucca RCC roof.
 Foundation design is only indicative & may need review based on local site conditions.
 Cement Sand Mortar in 1:4 for masonry.
 This design is valid for earthquake zone III, IV and V.
 Incinerator to be provide only with Girl’s toilet and to have chute from inside.
 Location of waste drainage pipes, inspection chamber, septic tank & soak pits is indicative only.
Actual location to be decided based on site conditions.
 Minimum distance of soak pit from building foundation to be 125cm.
 BBCC 1:5:10 Cement: Coarse Sand : Brick Bats in foundation.
 1 No. of 10 mm dia HYSD bar for Zone – III & 1 no. of 12 mm dia HYSD bar for zone – IV & V shall
be used as corner bar as per detail provided in drawing.
 75mm thick plinth band in 1:1.5:3 Reinforced Cement Concrete.
 100 mm thick RCC slab in concrete mix 1:1.5:3 (Cement : Sand : Aggregates).
 10 mm thick single coat mala plaster in CM 1:3 on interior face.
 15 mm thick single coat mala plaster in CM 1:3 on exterior face.
 Water proofing at terrace in IPS 1:2:4 of 40 mm avg. thickness.
 Toilet Floor to be finished with matt finish flooring while the dado shall be furnished with glossy
ceramic tiles. The height of dado shall be followed as per drawing.
 Door and ventilator frame in metal angle sections shall be painted with two coat of primer before
installation.
 Door, shutter in metal painted with two coats of primer and painted with enamel paint in light color.
 Internal faces above dado and ceiling to be finished with 3 coats of white wash with lime.
 External faces to be painted with 100% acrylic paint of matt finish.
 All water supply pipes in UPVC SCH 40 with suitable elbow/tee/nipple/union/ scour valves.
 All tapes of best quality – preferably brass chromium plated bib tap.
 All waste water carrying pipes shall be PVC pipes.
 All drainage and sewage pipes from urinals / squatting pan area in PVC / SW as per local availability.
 Soak pit with 230 mm thick honeycomb brickwork in 1:4 cement and sand mortar of dimensions as
per drawing.
 PVC water tank of capacity 500 Litre at roof level.

12
TOILET DESIGNS

Sr. No. Design Code Details of Drawings with Estimate

1 GTB – 01 Dwg. No.: GTB – 01:1 TO GTB – 01:14

2 GTB – 02 Dwg. No.: GTB – 02:1 TO GTB – 02:14

3 GTB – 03 Dwg. No.: GTB – 03:1 TO GTB – 03:14

4 GTB – 04 Dwg. No.: GTB – 04:1 TO GTB – 04:13

5 BTB – 01 Dwg. No.: BTB – 01:1 TO GTB – 01:13

6 BTB – 02 Dwg. No.: BTB – 02:1 TO GTB – 02:13

7 BTB – 03 Dwg. No.: GTB – 03:1 TO GTB – 03:12

8 CTB – 01 Dwg. No.: CTB – 01:1 TO GTB – 01:14

9 CTB – 02 Dwg. No.: CTB – 02:1 TO GTB – 02:15

 Detail of Doors & Ventilation


Details common to all
10  Detail of Soak Pit
above design types
 Detail of Septic Tank

ESTIMATE
The estimate given with each design is based on Gujarat State Roads & Building Department Schedule of
Rates (SoR) 2013-14.

13
14
GIRLS' TOILET | GTB - 01
BEST ORIENTATION

NO
RT
H
CWSN TOILET W.C. / URINAL
SATISFACTORY ORIENTATION
1 2
ORIENTATION PRIORITY ON SITE
NORTH

ACCEPTABLE ORIENTATION
DETAILS OF DRAWINGS
NORTH
DRAWING NO. PARTICULARS
GTB-01:1/14 GROUND FLOOR PLAN

GTB-01:2/14 FIRST FLOOR PLAN

GTB-01:3/14 FLOORING PATTERN

GTB-01:4/14 ELEVATIONS

GTB-01:5/14 ELEVATIONS

GTB-01:6/14 SECTIONS

GTB-01:7/14 SECTIONS

GTB-01:8/14 WATER SUPPLY LAYOUT

GTB-01:9/14 DRAINAGE LAYOUT

GTB-01:10/14 RAILING AND HANDWASH

GTB-01:11/14 INCINERATOR DETAIL

GTB-01:12/14 STRUCTURAL DETAILS -


GENERAL NOTE, WALL SECTIONS, PLINTH BENDS

GTB-01:13/14 STRUCTURAL DETAILS - FOUNDATION LEVEL

GTB-01:14/14 STRUCTURAL DETAILS - SLAB LEVEL


S1 C S2
DOOR-WINDOW SCHEDULE
TYPE SIZE LIN. SILL NOS. REMARKS
0.115 3.46 0.115
_
D 1.20 X 2.40 2.40M 1 M.S.SHUTTER
2.13 1.33 _
D1 1.00 X 2.40 2.40M 1 BOTH SIDE OPNEBLE
M.S.SHUTTER
0.73 0.90 0.73 1.33 _
D2 0.70 X 2.40 2.40M 2 M.S.SHUTTER
V1 0.90 X 0.60 2.40M 1.80 1 CEMENT JALI
Plinth protection V2 0.47 X 1.20 2.40M 1.20 1 LOUVERS
V3 0.60 X 0.60 2.40M 1.80 3 CEMENT JALI

0.115
0.115
NT
incinerator

1.32
1.32
Peep hole to
incinerator

CWSN

2.33
1.90 X 2.10

0.38
S3

1.01

0.60
W.C.

4.44
1.10 X 0.90
B

4.78
4.78

0.57
0.90 1.00 0.23 0.70 0.40

Plinth protection
D

Plinth protection
Kotah stone

0.30
0.60
0.60

1.43
1.20
1.43

platform as Lvl :+0.40


0.07 S4

0.30
per detail - D1
0.40 0.23 1.20 0.23 0.70 0.40
0.57

W.C.
1.10 X 0.90
0.60

1.02
1.02

0.57
0.38

0.115
0.115

0.23 mt. thk. and 0.90 Lvl :+0.38


RAMP UP

1.32
1.32

mt. high brick wall I.P.S. FINISH ON RAMP Lvl : 00


I.P.S. FINISH
M.S.railing as per detail - D2

0.23 1.20 4.00 0.65

A
0.23 0.47 0.23 1.20 1.56
GIRLS' TOILET CWSN W.C. URINALS
0.70 1.43 1.33 DESIGN CODE :GTB-01 01 02 -
0.115 3.46 0.115

GROUND FLOOR PLAN


DRAWING NO
GTB-01 : 1/14

15
16
S1 S2
C

60 C M LONG 50 mm G.I.
PIPE FOR WATER SPOUT

1.37
PVC overhead
water tank
capacity 500 lit.

1.90 1.33 S3

3.98
TERRACE
Lvl :+2.92
B 0.23 X 0.35 mt.
40mm I.P.S. FINISH FLOOR
BRICK CURBING D
ABOVE R.C.C. SLAB

3.18
S4

0.70 2.53

0.23 X 0.35 mt.

0.57
BRICK CURBING

GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-01 01 02 -

TERRACE PLAN
A DRAWING NO
GTB-01 : 2/14
FINISH I.P.S.
F L O O R

6 5 4 3 2 1

3
Lvl :+0.35 4
0.30 mt. X 0.30 mt. matte
Glazed ceramic tile5
4 3 2 1
6
2
7
Lvl :+0.38 3

FINISH I.P.S.
F L O O R
R 10 9 8 7 6 5 4 3 2 1

2
Lvl :+0.40
0.30 mt. X 0.30 mt. matte 3
Glazed ceramic tile

FINISH I.P.S.
F L O O R
4

Lvl :+0.38 3

4 3 2 1

Lvl :+0.38
Lvl : 00
I.P.S. floor
RAMP UP
300 X 300
I.P.S. FINISH ON RAMP
ANTI SKID
M.S.railing as per detail - D2 T I L E S
GIRLS' TOILET CWSN W.C. URINALS
DESIGN CODE :GTB-01 01 02 -

FLOORING PATTERN
DRAWING NO
GTB-01 : 3/14

17
18
CURBING TOP
+3.27

SLAB BOTTOM
+2.80
M.S. grill over
t h e d o o r

SILL 15 mm thk.
+1.60 Ma la p laste r 0.78 mt. high
M.S. pipe railing

0.23 mt. thk. and 0.90


mt. h igh b rick wall

PLINTH PROTECTION
+0.30

ELEVATION - A

CURBING TOP
+3.27

15 mm thk. 0.23 mt. thk. and 0.90


M ala p laste r mt. hig h br ick w all

Plinth protection
f inished with I.P.S.

PLINTH PROTECTION GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-01 01 02 -
+0.30

ELEVATIONS
ELEVATION - B
DRAWING NO
GTB-01 : 4/14
CURBING TOP
+3.27

SLAB BOTTOM
+2.80
Cement jali
SILL
+2.20

Vent pipe

0.78mt. high M.S. 15 mm thk.


pipe railing M ala p laste r

Incinerator

Plinth protection PLINTH PROTECTION


+0.30

ELEVATION - C
CURBING TOP
+3.27

Cement jali
Vent pipe

0.78mt. high M.S.


pipe railing 15 mm thk.
M ala p laste r

Incinerator

Plinth protection PLINTH PROTECTION


+0.30 GIRLS' TOILET
RAMP CWSN W.C. URINALS
DESIGN CODE :GTB-01 01 02 -

ELEVATION - D
ELEVATIONS
DRAWING NO
GTB-01 : 5/14

19
20
Cement vata CURBING TOP
TERRACE
+3.27
Lvl :+2.92
SLAB TOP
+2.92
M.S. grill over
t h e d o o r
10 mm thk. SILL
0.23 mt. thk. and 0.90
M ala plaste r +2.20
m t. h igh b rick wall Cubby hole
for soap 7 6 5 4 3 2 START 1.50 mt. high 0.30 mt. X
HERE
0.78mt. high M.S. START
0.30 mt. Glazed tile dado

2.40
4 3 2 2
HERE
pipe railing Mirror
2
3
grab bar

1.20
4
Plinth protection

0.78
0.70
finishe d with I.P.S.

0.60
0.60
0.70
5

0.40
CWSN TOILET PLINTH LVL.
+0.40

SECTION 1-1

TERRACE CURBING TOP


Lvl :+2.92 +3.27

0.35
0.35
SLAB TOP

0.12
0.23 mt. X 0.35 mt.
brick curbing +2.92

0.60
SILL
+2.20

10 mm thk. 10 mm thk. 10 mm thk.


Ma la p laste r Ma la p laste r M ala pla ste r 2.40

START START

1.80
2 3 3 2
HERE HERE

2 2 0.78 mt. high M.S.


0.90 mt. high 0.30 mt. X

0.90
pipe railing
0.30 mt. Glazed tile dado 3 3
W.C. GIRLS' TOILET W.C.
PLINTH LVL.
GIRLS' TOILET CWSN W.C. URINALS
+0.40
DESIGN CODE :GTB-01 01 02 -

SECTIONS
DRAWING NO
SECTION 2-2
GTB-01 : 6/14
TERRACE Cement vata CURBING TOP
+3.27
Lvl :+2.92
SLAB TOP
+2.92

0.60
0.90 mt. X 0.60 mt. high
1.50 mt. high 0.30 mt. X
cement jali ventilation
0.30 mt. Glazed tile dado 10 mm thk. 10 mm thk.
M ala pla ste r Ma la p laste r
START 2 3 4 5 6 R
HERE

0.90 mt. high 0.30 mt. X


2
0.30 mt. Glazed tile dado
START

1.80
3 R 3 2
HERE
grab bar
4 2
Plinth protection
3 finished with I.P.S.
5 W.C.

0.48
CWSN TOILET PLINTH LVL.
+0.40

SECTION 3-3

TERRACE Cement vata CURBING TOP


Lvl :+2.92 +3.27
0.23 mt. X 0.35 mt. SLAB TOP
brick curbing +2.92
M.S. grill M.S. grill over the
over the door door

0.60
K o t a h s t o n e
platform for hand wash

1.80
Plinth protection
finished with I.P.S.
0.70

0.60
0.40

PLINTH LVL. GIRLS' TOILET CWSN W.C. URINALS


+0.40 DESIGN CODE :GTB-01 01 02 -

SECTIONS
DRAWING NO
SECTION 4-4
GTB-01 : 7/14

21
22
WATER SUPPLY FROM SUPPLY FROM MAINS
OVER HEAD TANK TO OVER HEAD TANK

Lvl :+0.40

Lvl :+0.40
Lvl : 00

GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-01 01 02 -

WATER SUPPLY LAYOUT


DRAWING NO
GTB-01 : 8/14
SEPTIK TANK
L : 2.0m | B : 1.2m | D : 1.8m
SOAK PIT
1.2m DIA.
1.8m DEPTH

SOAK PIT
1.2m DIA.
1.8m DEPTH

Lvl :+0.40

Lvl :+0.40 GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-01 01 02 -
Lvl : 00

DRAINAGE LAYOUT
DRAWING NO
GTB-01 : 9/14

23
24
Cubby hole
for soap

EQ EQ

0.30 0.60 0.30

0.40
35mm single polish kotah stone
s up p o r t w i th 10 mm sl o p e

0.30 0.30 0.30 0.30

300mm X 300mm glossy

0.30
ceramic glazed tiles 0.40

0.42
The tap at The tap at
0.15 height 0.70 mt. height 0.80 mt.

0.30
Cubby hole PLAN

0.12
for soap

35MM d oub le pol ish ko tah sto ne ver tic al sup por t kotah stone

0.20

0.80
35mm single polish kotah stone

0.70
su p p o rt w i t h 1 0m m s lo p e

0.60
0.40
N.T. N.T.

DETAIL - D1 (HAND WASH)


ELEVATION SECTION

4.00 1.43
0.30 0.82 0.82 0.82 0.82 0.82 1.02 0.34

40mm DIA. M.S.HOLLOW PIPE


0.78
0.60

0.78
0.60
GIRLS' TOILET CWSN W.C. URINALS
DETAIL - D2 (HAND RAIL) DESIGN CODE :GTB-01 01 02 -

DETAILS OF RAILING & HAND WASH


DRAWING NO
GTB-01 : 10/14
INLET PIPE FOR
THROWING WASTE

VENT PIPE

0.45
M.S.JALI TO COLLECT WASTE BRICK WALL

0.12
0.12 0.60 0.12
M.S.SHUTTER (CLOSED)

VENT PIPE VENT PIPE

R.C.C OR STONE COVER R.C.C OR STONE COVER


0.55
TOP HUNG M.S.SHUTTER
FOR DISPOSAL OF
WASTE NEPKINS
M.S.SHUTTER (CLOSED) M.S.SHUTTER (CLOSED)
M.S.JALI TO COLLECT WASTE BRICK WALL

0.85
M.S.SHUTTER (WITH GRILL)

0.70
M.S.SHUTTER (WITH GRILL)
SOLID FUEL FOR
1.25 PLINTH PROTECTION
BURNING THE WASTE
C.W.S.N (INSIDE)

GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-01 01 02 -

MASONARY INCINERATOR OUT SIDE OF GIRLS TOILET DETAIL OF INCINERATOR


DRAWING NO
GTB-01 : 11/14

25
26
NOTES 10
d(
>
GENERAL:- 75
mm
)
1. ALL R.C.C. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
REFERENCE TO THE ARCHITECT DRAWINGS .
d
2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS SPECIFIED
OTHERWISE.

Ld
3. ALL DIMENSIONS ARE TO BE CHECKED AND CORELATED WITH THE

Ld
BEAM WEB REINFORCEMENT
ARCHITECTURAL DRAWINGS AND ANY AMBIGUITY IF FOUND, THEREIN
d = DIA OF STIRRUPS
SHALL BE BROUGHT TO THE NOTICE TO THE OFFICE BEFORE
EXECUTION OF THE WORK.
8# @200C/C
4. LIVE LOADS ARE ADOPTED AS PER I.S. 875 - 1987 PART-2(L.L.) L-JUNCTION T-JUNCTION 30 60 60 30
5. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS
75

SHALL BE FOLLOWED.
2-8# FOR EQ. ZONE-III
6. THE STRUCTURE IS DESIGNED FOR DEAD LOAD, LIVE LOAD, ARRANGEMENT OF BARS IN PLAN FOR 230 2-10# FOR EQ. ZONE-IV &V
SEISMIC LOAD AND WIND LOAD. SEISMIC LOADS AS PER I.S.:1893 R.C.C. PLINTH BAND
STRENGTHENING AT WALL JUNCTIONS.
-2002 AND DEAD,LIVE AND WIND LOADS AS PER I.S.:875 - 1987. FOR 230TH LOAD BEARING WALL
7. THE STRUCTURAL CONSULTANT IS NOT RESPONSIBLE FOR CROSS SECTION OF R.C.C. BAND
QUALITY CONTROL AND SUPERVISION OF THE WORKS.
8. MORTAR MIX OF (CEMENT: SAND)1:4 SHALL BE USED. 230
9. ALL BRICK SHALL CONFORM TO IS 1077 :1970 AND SHALL HAVE PLINTH LVL. PLINTH LVL.
MINIMUM CRUSHING STRENGTH OF 35KG/SQ.CM. 8#@200 C/C
75

10. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.

75 75
75

11.
STATED. B.K. MASONARY 2-8# B.K. MASONARY 2-8#
GR.LVL. GR.LVL.
12. REINFORCEMENT TO BE USED SHALL BE H.Y.S.D. BARS IN C.M. (1:4) 0.00 IN C.M. (1:6) 0.00
CONFORMING TO I.S. 1786:2008.
13. LAP LENGTH SHALL BE PROVIDED AS UNDER.

GRADE OF CONCRETE MILD STEEL Fe. 415 (H.Y.S.D.)


M:20 47D 57D 350 350

175
175

M:25 41D 49D


B.B.C.C. B.B.C.C.

150
150

MINI. 600mm.
MINI. 450mm.

14. CLEAR COVER TO MAIN REINFORCEMENTS SHALL BE 30mm (1 : 5 : 10) (1 : 5 : 10)

UP TO GOOD SOIL
UP TO GOOD SOIL

FOR BEAMS AND 20 mm FOR SLABS.


450
600
15. CONTINUOUS PLINTH BANDS SHALL BE PROVIDED ADOPTING
WALL - W2
WALL JUNCTION DETAILS AS SHOWN IN DRAWING. WALL - W1
FOR 230 TH. OTTA WALL
16. THE TOILET IS DESIGNED FOR GROUND FLOOR ONLY
FOR 230 TH. LOAD BEARING WALL & PARTITION WALL
SPECIAL NOTE FOR STRUCTURE UP TO 10 KMS. FROM
SEA COAST GIRLS' TOILET CWSN W.C. URINALS
DESIGN CODE :GTB - 01 01 02 -
1. ALL CONCRETE MIX FOR SLABS AND BEAMS SHALL BE M25.
2. CLEAR COVER TO THE MAIN RAINFORECEMNT SHALL BE
30mmFOR SLABS AND 40mm FOR BEAMS.
DRAWING NO
GTB - 01 : 12/14
230
W1 PLINTH LVL.
8#@200 C/C
1-10# FOR EQ. ZONE-III

75 75
1-12# FOR EQ. ZONE-IV&V
B.K. MASONARY 2-8# GR.LVL.

W1

W1
W1 IN C.M. (1:4) 0.00

115x115(M:20) CONCRETE

350

175
150
P.C.C. (1:2:4)

MINI. 600mm.
W1

UP TO GOOD SOIL
PB1
600
WALL - W1

W1

W1
W1
FOUNDATION DETAILS AT WALL JUNCTIONS
W1 PB1

W1
W1 W2

W1
W2
W2

W2 W2
FOUNDATION PLAN

GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE : GTB - 01 01 02 -

STRUCTURAL DETAILS 02 FOUNDATION LEVEL


FOUNDATION DESIGN SHALL BE REVISED AS PER SOIL TYPE, SPECIALLY FOR BLACK COTTON & FIELD UP SOIL DRAWING NO
GTB - 01 : 13/14

27
28
SCHEDULE OF REINFORCEMENT FOR SLABS
A 8# @ 200 C/C ALTERNATE BENT UP BARS
SB1 B 8# @ 250 C/C DISTRIBUTION STEEL
C 8# @ 150 C/C ALTERNATE BENT UP BARS

ALL SLABS ARE 100 THICK.

500
300
A

SB2
SB2
400
300 A 400 2-8# 2-10#

8#@150C/C 8#@150C/C

100
100

2-10# 3-10#
230 230
SB1
SB1 SB2
SB2
STRUCTURAL LAY-OUT AT SLAB LVL.

NOTE:
GIRLS' TOILET CWSN W.C. URINALS
1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED OTHERWISE. DESIGN CODE : GTB - 01 01 02 -
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL
STRUCTURAL DETAILS PLEASE REFER DRAWING NO.- STRUCTURAL DETAILS 02 SLAB LEVEL
DRAWING NO
GTB-01:12/14 GTB - 01 : 14/14
ESTIMATE – GTB – 01 – 1 CWSN + 2 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
1 Excavation for foundation up to 1.5m depth 12.24 Cmt. 83.00 1,015.92
including sorting out. Stacking of useful materials
and disposing of the excavated stuff up to
50mt.lead. (Item no.-1 (0)(A) page.-22) Loose or
soft soil.
2 Providing & Laying Brick bat cement Concrete 3.02 Cmt. 2,126.00 6,420.52
1:5:10 (1Cement : 5Coarse sand :10 graded brick
bats) in foundation and plinth and curing complete
excluding cost of formwork (Item no-(9)5.3.8
Pg.27)
3 Brick work using common burnt clay building 8.16 Cmt. 3,651.00 29,792.16
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand) R.A
4 Filling with the available excavated earth 9.8 Cmt. 53.40 523.32
(excluding rock) in trenches, plinth, sides of
foundation etc.in layers not exceeding 20cm in
depth consolidating each deposited layer by
ramming and watering. (item no-(6)4.12 pg.23
5 Providing & Laying brick bat cement Concrete 2.05 Cmt. 2,396.00 4,911.80
1:4:8 (1 Cement: 4 Coarse sand: 8 graded brick
bat) in foundation and plinth and curing complete
excluding cost of formwork. (Item no.-
8(5.3.3)page.-27)
6 Providing & Laying ordinary cement Concrete 0.68 Cmt. 4,689.00 3,188.52
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC coping .R.A..
7 Providing & Laying ordinary cement Concrete 0.85 Cmt. 4,001.00 3,400.85
1:2:4 (1 Cement :2 Coarse sand:4 graded stone
aggregates) and finishing smooth with curing etc.
complete excluding the cost of formwork for
concrete work in plinth protection & corner bar
bed. item no10(5.3.13)pg-27
8 Brick work using common burnt clay building 11.78 Cmt. 3,769.00 44,398.82
conventional bricks having crushing strength not
less than 35kg/sq. cm. In super structure in
cement mortar 1:4 (1cement:4fine sand) R.A
9 Half brick masonry in common brunt clay building 1.92 Smt. 500.70 961.34
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand)in super
structure including curing etc. complete.(Item no-
(8)6.3 I(B) Pg.42)+(Item no-(10)6.32(B) Pg.43)
10 Providing & Laying ordinary cement Concrete 1.96 Cmt. 6,455.00 12,651.80
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
ESTIMATE – GTB – 01 – 1 CWSN + 2 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC slabs having thickness
more than 10 cm and up to 13cm thickness. R.A.
11 Providing & Laying reinforcement for RCC work 220.42 Kg. 54.00 11,902.68
including bending, binding and placing in position
etc. complete up to floor two level Thermo
Mechanical Treated Bars as per I.S.
Standard.(T.M.T ) (item no-14A (5.4.11(A)pg.28
12 Providing 10mm thick inside cement plaster in 50.62 Smt. 100.00 5,062.00
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no1 (17.58)
(I) Pg.89
13 Providing 15mm thick outside cement plaster in 66.66 Smt. 137.10 9,139.09
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no3 (17.60)
(I) Pg.89
14 Providing & Fixing 30mm thick polished Kotah 1.2 Rmt 603.00 723.60
stone 40cm wide & 20cm depth for HAND WASH
FACILITY as per approved drawing & details by
engineer in charge including making hole with
waste water pipe, coupling ,rubbing etc. comp.
R.A
15 40mm thick cement concrete flooring 1:2:4 19.96 Smt. 236.00 4,710.56
(1cement:2 coarse sand: 4 graded stone
aggregates 20mm normal size) laid in one layer
finished with a floating coat of neat cement, curing
etc. Complete. (Item no-15(14.71)(A) Pg.78)
16 Providing cement vata (10cmx10cm size) quarter 18.82 Rmt 22.60 425.33
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. (Item no-
15(0.0)Pg.91
17 Providing & fixing washbasin with hole for pillar 1 Each 2,033.00 2,033.00
tap with C.I or M.S brackets painted with including
cutting holes and making good .(A)vitreous china
(II)Flat back washbasin 550mmx400mm in white
colour including pillar tap, waste pipe, stop cock,
union required all fitting, fixture etc. comp. RA
18 Construction of ICN chamber as per approved 1 Each 2,250.00 2,250.00
drawing & design complete detail. R.A.
19 Providing & Fixing 25mm thick double polished 0 Smt. 773.00 -
vertical Kotah stone for (partition) urinal as par
drawing including round edge moulding etc.
comp. R,A
20 Providing & fixing 40 mm dia. MS hollow pipe 9.2 Rmt 976.00 8,979.20
(B-TYPE) 78 cm height railing for ramp as per
approved drawing & details by engineer in charge
ESTIMATE – GTB – 01 – 1 CWSN + 2 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
including applying primer coat & two coats of oil
paints comp. R,A
21 Providing & Fixing in position M.S. Angle 359.7 Kg. 75.00 26,977.50
40mmx40mmx6mm Angle frame for door and
35mmx35mmx5mm angle frame for shutters, 18
gauge iron sheet of shutters with 4 nos. of hold
fasts for door as per the approved drawing &
design including applying a priming coat of red
lead paint and all necessary fittings fixtures,
locking arrangements etc. Complete. (Item no-
25(10.100)Pg.56)
22 Painting two coats (Excluding Priming coat) on 20 Smt. 61.60 1,232.00
new steel and other metal, surfaces with enamel
paint, brushing , interior to give an even shade
including cleaning the surface of all dirt, dust and
other foreign matter etc. Complete(Item
no2(19.7).Pg.98)
23 White washing with lime on undecorated wall 50.62 Smt. 8.10 410.02
surfaces, 3 coats to give an even shade including
thoroughly brooming the surface to remove all
dirt, dust, mortar drops and other foreign matter,
(Item no-1(18.11) +(Item no-3(18,13) Pg.93)
24 Providing & Applying three coats of 100% acrylic 66.66 Smt. 74.00 4,932.84
base matt finishing exterior paint of approved
manufacture of required shade on external
surface to give an even shade after thoroughly
brushing the surface free from mortar dropping &
other foreign matter before application of paint
etc. complete as directed for all floors and all
lifts.(Item no-35 (0.0) Pg.220)
25 Providing and laying Ceramic tiles 6mm thick in 19.14 Smt. 746.00 14,278.44
skirting, risers of steps & dado on 10 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;21(0.00)pg;79
26 Providing and laying Ceramic tiles 6mm thick in 10.53 Smt. 691.00 7,276.23
flooring, treads of steps & landing on 12 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;20(0.00)pg;79
27 Providing up to floor two level precast cement 1.62 Smt. 528.00 855.36
concrete jali or grill mix(1 Cement :2 Coarse
sand:4 graded stone aggregates) reinforced with
1.6mm dia. mild steel wire including cleaning,
fixing and finishing in cement mortar 1:3 and
curing complete.(D)75 mm thick item
no;19(5.6.2)(D)pg;28
28 Construction of a soak pit of 1.2m dia. and depth 2 Each 1,418.00 2,836.00
1.8m (capacity 2.00 cmt volume) including
excavation and filling brick bats with dry brick
ESTIMATE – GTB – 01 – 1 CWSN + 2 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
masonry as per the approved drawing & design
etc. complete item no;18(0)(A) pg. no;137
29 Providing & fixing 32 mm dia. pipe of 16G ASIS 3 Each 725.00 2,175.00
Grade-304 for Grab bar in CWSN W/C 75 cm long
as per given detail. R.A.
30 Providing & fixing 15mm dia screw down brass 5 NO. 226.00 1,130.00
chromium plated bib tap of approved quality etc.
complete. item no;28(23.92) pg;127
31 Providing & laying 150mm diameter salt glazed 22.79 Metre 236.00 5,378.44
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete.
item no;1(24.1)(A) pg;133
32 Providing & laying 100mm diameter salt glazed 7 Metre 165.00 1,155.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete
item no;1(24.1)(B) pg;133
33 Construction of brick masonry chamber of size 1 Each 3,909.00 3,909.00
455mm * 610mm internal dimensions and depth
up to 450mm for ground inspection chamber with
brick having crushing strength not less than
35Kg/sqcm. in cement mortar 1:5 40mm thick C.I
cover with frame (light duty) complete item
no;16(24.44 I)pg;137
34 Providing & fixing urinal of approved 0 Each 1,440.00 -
quality(550X300mm size) including connecting
trap and with integral longitudinal flush pipe and
15 mm dia brass screw down stop tap complete
item no;34(23.124)(A)+item
no;30(23.96)(A);PG;127
35 Providing & fixing wash down water closet 1 Each 2,910.00 2,910.00
(European Type W.C. pan ) with integral P or S
trap including jointing the trap with soil pipe in CM
1 :1 (1 Cement : 1 fine sand ) including 12.5 litres
low level flushing PVC
cistern,seatcover.iteam10(23.112)pg;125+iteam
16(23.120)pg;126+iteam17(23.121)(ii)pg;126+ite
am 31pg,80.
36 Providing & fixing vitreous china long pattern 2 Each 1,586.00 3,172.00
white colour water closet squatting pan(Indian
type W.C. Pan) size 580mm including earthwork,
bed concrete, foot rests, G.I inlet connection for
flush pipe,trap,25mm flush cock etc. Complete
item9(23.111)pg;124+iteam11(23.113)pg;125+it
eam12(23.114)pg;125+itean;16(23.120)pg;126+i
team 32(0.0)pg;127
37 Providing & fixing PVC water tanks of 500 LITRES 500 LIT 5.00 2,500.00
as required on terrace level including making
ESTIMATE – GTB – 01 – 1 CWSN + 2 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
platform for bottom support and making
necessary inlet, outlet and overflow connection
etc. complete.
38 Providing & fixing gun metal check or non-return 2 No. 576.00 1,152.00
full way wheel valve(A)25mm dia item
no;30(23.99)(C)PG;127
39 Construction of septic tank of size 2.00 Mt length 1 No. 29,200.00 29,200.00
x 1.2 Mt width internal dimensions and depth up
to 1.8mt with brick having crushing strength not
less than 35Kg/sqcm. in cement mortar 1:6
including 0.60 X 0.60 cement cover as per
approved drawing etc. comp. R.A
40 Providing and fixing 25mm dia U.P.V.C.Pipe 30.84 RMT 102.00 3,145.68
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;8 pg;129
41 Providing and fixing 15mm dia U.P.V.C.Pipe 13.1 RMT 85.00 1,113.50
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;7 pg;129
42 Providing and fixing 50mm dia G.I. Rain water 4 No. 285.00 1,140.00
spout 60CM long complete. R.A
43 providing & fixing stone wear gully trap with C.I 3 Each 1,483.00 4,449.00
grating brick masonry chamber and water tight C.I
cover with frame of 300mm X 300mm size with
standard weight (i) square mouth traps 150m x
100 mm size p or R type etc. complete. item
no;6(24.19 B) pg;134
44 providing & fixing PVC SWR nahni trap IS 14735 2 Each 355.00 710.00
for drain-100mm diameter with jali of following
nominal diameter of self-cleansing design with CI
spread down including cost of cutting comp. item
no;14 pg;131
45 Providing & fixing stainless steel soap tray near 2 Each 50.00 100.00
wash basin & hand wash facility etc. comp. RA
46 Painting of logo on front side wall. (R.A) 1 No. 700.00 700.00
TOTAL COST RS. 2,75,328.52
ADDING 3% FOR CONTINGENCY 2,83,588.38
SAY RS. 2,83,600.00
34
GIRLS' TOILET | GTB - 02 BEST ORIENTATION

NO
RT
H

CWSN TOILET W.C. / URINAL SATISFACTORY ORIENTATION


ORIENTATION PRIORITY ON SITE
NORTH

1 4

ACCEPTABLE ORIENTATION

DETAILS OF DRAWINGS NORTH

DRAWING NO. PARTICULARS


GTB-02:1/14 GROUND FLOOR PLAN

GTB-02:2/14 TERRACE PLAN

GTB-02:3/14 FLOORING PATTERN

GTB-02:4/14 ELEVATIONS

GTB-02:5/14 ELEVATIONS

GTB-02:6/14 SECTIONS

GTB-02:7/14 SECTIONS

GTB-02:8/14 WATER SUPPLY LAYOUT

GTB-02:9/14 DRAINAGE LAYOUT

GTB-02:10/14 RAILING AND HANDWASH

GTB-02:11/14 INCINERATOR DETAIL

GTB-02:12/14 STRUCTURAL DETAILS -


GENERAL NOTE, WALL SECTIONS, PLINTH BENDS

GTB-02:13/14 STRUCTURAL DETAILS - FOUNDATION LEVEL

GTB-02:14/14 STRUCTURAL DETAILS - SLAB LEVEL


S1 C S2
0.115 4.27 0.115 DOOR-WINDOW SCHEDULE
2.13 2.15
TYPE SIZE LIN. SILL NOS. REMARKS
0.73 0.90 0.73 0.15 0.60 0.42 0.60 0.38 2.40M _
1
D 1.20 X 2.40 M.S.SHUTTER
_
D1 1.00 X 2.40 2.40M 1 BOTH SIDE OPENBLE
M.S.SHUTTER
Plinth protection _
D2 0.70 X 2.40 2.40M 4 M.S.SHUTTER

0.45
V1 0.90 X 0.60 2.40M 1.80 1 CEMENT JALI

0.115
0.115
V2 0.47 X 1.20 2.40M 1.20 1 LOUVERS
V3 0.60 X 0.60 2.40M 1.80 5 CEMENT JALI
NT Incinerator
Peep hole to

1.11
incinerator Plinth protection

0.45
CWSN
1.90 X 2.10

2.33
Lvl :+0.35

1.21
B

1.10
S3

1.89
W.C. W.C.

4.74
0.90 x 1.10 0.90 x 1.10

0.90 1.00 0.43 0.70 0.32 0.70

5.28
5.28

D
0.40

Plinth protection
Kotah stone Lvl :+0.40
0.60

1.73
1.50
1.50
1.73

platform as

Plinth protection
per detail - D1
S4
0.47 0.23 1.20 0.23 0.70 0.32 0.70

W.C. W.C.
0.90 x 1.10 0.90 x 1.10
1.89

1.10

1.22
1.22

0.77

0.115
0.115

Lvl :+0.38
I.P.S. floor
0.23 mt. thk. and 0.90
RAMP UP

1.31
1.32

mt. high brick wall I.P.S. FINISH ON RAMP

M.S.railing as per detail - D2

0.23 1.20 4.00 0.65

GIRLS' TOILET CWSN W.C. URINALS


0.23 0.47 0.23 1.20 0.38 0.60 0.42 0.60 0.38 0.45 DESIGN CODE :GTB-02 01 04 -
0.70 1.43 2.15
0.115 4.27 0.115
GROUND FLOOR PLAN
A DRAWING NO
GTB-02 : 1/14

35
36
S1 S2
C

1.12
60 CM LONG 50 mm G.I.
PVC overhead PIPE FOR WATER SPOUT
water tank
capacity 500 lit.

1.90 2.15

B
S3

4.28
0.23 X 0.35 mt.
BRICK CURBING
D
TERRACE

3.93
Lvl :+2.92
40mm I.P.S. FINISH FLOOR
ABOVE R.C.C. SLAB S4

0.70 3.35

0.23 X 0.35 mt.

0.77
BRICK CURBING

GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-02 01 04 -

TERRACE PLAN
DRAWING NO
A GTB-02 : 2/14
FINISH I.P.S.
F L O O R

6 5 4 3 2 1

2
FINISH I.P.S.
3 F L O O R
Lvl :+0.35 4
0.30 mt. X 0.30 mt. matte 1 2 3 1 2 3
Glazed ceramic tile5
2 2
6
3 3
7
Lvl :+0.38 Lvl :+0.38
R R

FINISH I.P.S.
F L O O R
R 13 12 11 10 9 8 7 6 5 4 3 2 1

2
Lvl :+0.40
0.30 mt. X 0.30 mt. matte 3
Glazed ceramic tile
4

FINISH I.P.S.
F L O O R
5

4 4
Lvl :+0.38 Lvl :+0.38
3 3

2 2

3 2 1 3 2 1

Lvl :+0.38
Lvl : 00
FINISH I.P.S. RAMP UP 1:10
F L O O R 300 X 300
BROOM FINISH
ANTI SKID GIRLS' TOILET CWSN W.C. URINALS
I.P.S. FLOOR
T I L E S DESIGN CODE :GTB-02 01 04 -

FLOORING PATTERN
DRAWING NO
GTB-02 : 3/14

37
38
CURBING TOP
+3.27

SLAB BOTTOM
+2.80
Cement jali

SILL 15 mm thk.
+1.60 Mala plaster 0.78 mt. high
M.S. pipe railing

PLINTH PROTECTION
+0.30

ELEVATION - A

CURBING TOP
+3.27

0.23 mt. thk. and 0.90


15 mm thk. mt. high brick wall
Mala plaster

PLINTH PROTECTION Plinth protection GIRLS' TOILET CWSN W.C. URINALS


+0.30 DESIGN CODE :GTB-02 01 04 -

ELEVATION - B ELEVATIONS
DRAWING NO
GTB-02 : 4/14
CURBING TOP
+3.27

SLAB BOTTOM
+2.80
Cement jali
SILL
+2.20

Vent pipe

15 mm thk. 15 mm thk.
0.78mt. high M.S.
Mala plas ter Mala plaster
pipe railing

Incinerator
Plinth protection PLINTH PROTECTION
+0.30

ELEVATION - C
CURBING TOP
+3.27

Cement jali

Vent pipe

0.78mt. high M.S.


pipe railing 15 mm thk.
Mala plas ter
Incinerator

Plinth protection PLINTH PROTECTION


RAMP +0.30
GIRLS' TOILET CWSN W.C. URINALS
ELEVATION - D DESIGN CODE :GTB-02 01 04 -

ELEVATIONS
DRAWING NO
GTB-02 : 5/14

39
40
TERRACE Cement vata CURBING TOP
Lvl :+2.92 +3.27
0.23 mt. X 0.35 mt.
brick curbing SLAB TOP
+2.92

10 mm thk.
0.23 mt. thk. and 0.90 Mala plaster
1.50 mt. high 0.30 mt. X
mt. high brick wall 1.20 mt. high 0.30 mt. X
0.30 mt. Glazed tile dado
0.30 mt. glossy finished 7 6 5 4 3 2 START
HERE
ceramic tile on wall
0.78mt. high M.S. START

2.40
5 4 3 2 2
HERE
pipe railing Mirror
Cubby hole grab bar
2
for soap 3

4 Plinth protection

1.20
3

0.80

0.78
finished with I.P.S.

0.70

0.60
0.60
0.70
R 5

0.40
CWSN TOILET PLINTH LVL.
+0.40

SECTION 1-1 0.23 mt. X 0.35 mt.


brick curbing
TERRACE Cement vata CURBING TOP
Lvl :+2.92 +3.27

0.35
0.35
SLAB TOP

0.12
+2.92
M.S. grill

0.60
0.60
over the door
SILL
+2.20
10 mm thk. 10 mm thk.
M ala plaster Mala plaster
0.90 mt. high 0.30 mt. X
0.30 mt. Glazed tile dado
START START

1.80
1.80

2 3 R R 3 2
HERE HERE
10 mm thk.
2 Mala plas ter 2 0.78 mt. high M.S.

0.90
pipe railing
3 W.C. W.C. 3
GIRLS' TOILET PLINTH LVL. GIRLS' TOILET CWSN W.C. URINALS
+0.40 DESIGN CODE :GTB-02 01 04 -

SECTIONS
DRAWING NO
SECTION 2-2
GTB-02 : 6/14
TERRACE Cement vata CURBING TOP
0.23 mt. X 0.35 mt. Lvl :+2.92 +3.27
brick curbing SLAB TOP
+2.92

0.90 mt. X 0.60 mt. high


cement jali ventilation
1.50 mt. high 0.30 mt. X
10 mm thk.
0.30 mt. Glazed tile dado 10 mm thk.
Mala plaster 10 mm thk.
START 2 3 4 5 6 R Mala plaster Mala plaster
HERE
0.90 mt. high 0.30 mt. X

2.40
2
0.30 mt. Glazed tile dado

0.60
1.80
START 2 3 START 2 3
grab bar 3 HERE HERE

2 2 Plinth protection
4

0.90
Bib cock Bib cock finished with I.P.S.

0.70
3 3

0.45
5

0.47
W.C. W.C. PLINTH LVL.
CWSN TOILET
+0.40

SECTION 3-3
0.23 mt. X 0.35 mt.
brick curbing
Cement vata CURBING TOP
TERRACE
+3.27
Lvl :+2.92
SLAB TOP

0.12 0.35
+2.92

0.40

0.60
K o t a h s t o n e
platform for hand wash

2.00

1.80
Plinth protection
0.80

finished with I.P.S.


0.70

0.60
0.40

PLINTH LVL. GIRLS' TOILET CWSN W.C. URINALS


+0.40 DESIGN CODE :GTB-02 01 04 -

SECTIONS
DRAWING NO
SECTION 4-4
GTB-02 : 7/14

41
42
WATER SUPPLY FROM SUPPLY FROM MAINS
OVER HEAD TANK TO OVER HEAD TANK

NT

CWSN
1.90 X 2.10

Lvl :+0.40

GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-02 01 04 -

WATER SUPPLY
DRAWING NO
GTB-02 : 8/14
SEPTIK TANK
L : 3.0m | B : 1.2m | D : 1.8m
SOAK PIT
1.2m DIA.
1.8m DEPTH

SOAK PIT
1.2m DIA.
1.8m DEPTH NT

CWSN
1.90 X 2.10

Lvl :+0.40

GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE : GTB-02 01 04 -

DRAINAGE LAYOUT
DRAWING NO
GTB-02 : 9/14

43
44
Cubby hole
for soap

EQ EQ

0.30 0.90 0.30

0.40
35mm single polish kotah stone support with 10mm slope

0.30 0.30 0.30 0.30 0.30

0.30
300mm X 300mm glossy ceramic glazed tiles
0.40

The tap at The tap at


0.15 height 0.70 mt. height 0.80 mt.

0.30
Cubby hole PLAN

0.12
for soap

35MM double polish kotah stone vertical support kotah stone

0.20

0.80
0.70
35mm single polish kotah stone support with
1 0 m m s l o p e

0.60
0.40
N.T. N.T.

DETAIL - D1 (HAND WASH)


ELEVATION SECTION

4.00 1.43
0.30 0.82 0.82 0.82 0.82 0.82 1.02 0.34

40mm DIA. M.S.HOLLOW PIPE


0.78
0.60

0.78
0.60
DETAIL - D2 (HAND RAIL) BOYS' TOILET CWSN W.C. URINALS
DESIGN CODE :GTB-02 01 04 -

DETAILS OF RAILING & HAND WASH


DRAWING NO
BTB-01 : 10/14
INLET PIPE FOR
THROWING WASTE

VENT PIPE

0.45
M.S.JALI TO COLLECT WASTE BRICK WALL

0.12
0.12 0.60 0.12
M.S.SHUTTER (CLOSED)

VENT PIPE VENT PIPE

R.C.C OR STONE COVER R.C.C OR STONE COVER


0.55
TOP HUNG M.S.SHUTTER
FOR DISPOSAL OF
WASTE NEPKINS
M.S.SHUTTER (CLOSED) M.S.SHUTTER (CLOSED)
M.S.JALI TO COLLECT WASTE BRICK WALL

0.85
M.S.SHUTTER (WITH GRILL)

0.70
M.S.SHUTTER (WITH GRILL)

1.25
SOLID FUEL FOR PLINTH PROTECTION
BURNING THE WASTE
C.W.S.N (INSIDE)

GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-02 01 04 -

MASONARY INCINERATOR OUT SIDE OF GIRLS TOILET DETAIL OF INCINERATOR


DRAWING NO
GTB-02 : 11/14

45
46
NOTES 10
d(
>
GENERAL:- 75
mm
)
1. ALL R.C.C. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
REFERENCE TO THE ARCHITECT DRAWINGS .
d
2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS SPECIFIED
OTHERWISE.

Ld
3. ALL DIMENSIONS ARE TO BE CHECKED AND CORELATED WITH THE

Ld
BEAM WEB REINFORCEMENT
ARCHITECTURAL DRAWINGS AND ANY AMBIGUITY IF FOUND, THEREIN
d = DIA OF STIRRUPS
SHALL BE BROUGHT TO THE NOTICE TO THE OFFICE BEFORE
EXECUTION OF THE WORK.
8# @200C/C
4. LIVE LOADS ARE ADOPTED AS PER I.S. 875 - 1987 PART-2(L.L.) L-JUNCTION T-JUNCTION 30 60 60 30
5. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS
75

SHALL BE FOLLOWED.
2-8# FOR EQ. ZONE-III
6. THE STRUCTURE IS DESIGNED FOR DEAD LOAD, LIVE LOAD, ARRANGEMENT OF BARS IN PLAN FOR 230 2-10# FOR EQ. ZONE-IV &V
SEISMIC LOAD AND WIND LOAD. SEISMIC LOADS AS PER I.S.:1893 R.C.C. PLINTH BAND
STRENGTHENING AT WALL JUNCTIONS.
-2002 AND DEAD,LIVE AND WIND LOADS AS PER I.S.:875 - 1987. FOR 230TH LOAD BEARING WALL
7. THE STRUCTURAL CONSULTANT IS NOT RESPONSIBLE FOR CROSS SECTION OF R.C.C. BAND
QUALITY CONTROL AND SUPERVISION OF THE WORKS.
8. MORTAR MIX OF (CEMENT: SAND)1:4 SHALL BE USED. 230
9. ALL BRICK SHALL CONFORM TO IS 1077 :1970 AND SHALL HAVE PLINTH LVL. PLINTH LVL.
MINIMUM CRUSHING STRENGTH OF 35KG/SQ.CM. 8#@200 C/C
75

10. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.

75 75
75

11.
STATED. B.K. MASONARY B.K. MASONARY 2-8#
GR.LVL. GR.LVL.
12. REINFORCEMENT TO BE USED SHALL BE H.Y.S.D. BARS IN C.M. (1:4) IN C.M. (1:6)
0.00 0.00
CONFORMING TO I.S. 1786:2008.
13. LAP LENGTH SHALL BE PROVIDED AS UNDER.

GRADE OF CONCRETE MILD STEEL Fe. 415 (H.Y.S.D.)


M:20 47D 57D 350 350

175
175

M:25 41D 49D


B.B.C.C. B.B.C.C.

150
150

MINI. 600mm.
MINI. 450mm.

14. CLEAR COVER TO MAIN REINFORCEMENTS SHALL BE 30mm (1 : 5 : 10) (1 : 5 : 10)

UP TO GOOD SOIL
UP TO GOOD SOIL

FOR BEAMS AND 20 mm FOR SLABS.


600 450
15. CONTINUOUS PLINTH BANDS SHALL BE PROVIDED ADOPTING
WALL JUNCTION DETAILS AS SHOWN IN DRAWING. WALL - W1 WALL - W2
16. THE TOILET IS DESIGNED FOR GROUND FLOOR ONLY FOR 230 TH. OTTA WALL
FOR 230 TH. LOAD BEARING WALL
& PARTITION WALL
SPECIAL NOTE FOR STRUCTURE UP TO 10 KMS. FROM
SEA COAST
GIRLS' TOILET CWSN W.C. URINALS
1. ALL CONCRETE MIX FOR SLABS AND BEAMS SHALL BE M25. DESIGN CODE :GTB-02 01 04 -
2. CLEAR COVER TO THE MAIN RAINFORECEMNT SHALL BE
30mmFOR SLABS AND 40mm FOR BEAMS.

DRAWING NO
GTB-02 : 12/14
230
PLINTH LVL.
8#@200 C/C 1-10# FOR EQ. ZONE-III
W1 1-12# FOR EQ. ZONE-IV & V

75 75
BARS FROM FOUNDATIONS TO PASS
B.K. MASONARY THROUGHPLINGTH BAND, MASONARY AND
GR.LVL. 2-8# TO BE TAKEN IN TO AND ANCHORED IN TO SLAB
IN C.M. (1:4) 0.00
W1

W1

W1
115x115(M:20) CONCRETE

350 P.C.C. (1:2:4)

PB1
175
( 350 x 500 x 175 )

150
B.B.C.C. ( 1:5:10 )

MINI. 600mm.
UP TO GOOD SOIL
600
W1
W2 WALL - W1

W1
FOUNDATION DETAILS AT WALL JUNCTIONS

W1
150

W1
2-8#
W2
W1
8#@150 C/C ALL
230

2-10#

PB1

W1
PB1
NOTE:
W2 1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED
OTHERWISE.
W1
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL

W1
STRUCTURAL DETAILS PLEASE REFER THIS PROJECT R.C.C.
DRAWING NO.- GTB-02 12/14

W2
W2

W2 W2

FOUNDATION PLAN GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-02 01 04 -

STRUCTURAL DETAILS - FOUNDATION LEVEL


FOUNDATION DESIGN SHALL BE REVISED AS PER SOIL TYPE, SPECIALLY FOR BLACK COTTON & FIELD UP SOIL DRAWING NO
GTB-02 : 13/14

47
48
SB1 SCHEDULE OF REINFORCEMENT FOR SLABS
A 8# @ 200 C/C ALTERNATE BENT UP BARS
B 8# @ 250 C/C DISTRIBUTION STEEL
C 8# @ 150 C/C ALTERNATE BENT UP BARS
ALL SLABS ARE 100 THICK.
SB1
C

500
300
A

B B

600
SB1

SB3
300 A 400

SB1
NOTE:
1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED
OTHERWISE.
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL
SB1 STRUCTURAL DETAILS PLEASE REFER THIS PROJECT R.C.C.
STRUCTURAL LAY-OUT AT SLAB LVL. DRAWING NO.- GTB-02 12/14
3. NOTE FOR BLACK COTTON SOIL
2-8# 2-10# 2-10#

8#@150C/C 8#@150C/C 8#@150C/C GIRLS' TOILET

100
100
100

CWSN W.C. URINALS


DESIGN CODE : GTB-02 01 04 -
2-10# 3-10# 2-12#+1-10#
STRUCTURAL DETAILS - SLAB LEVEL
230 230 230
DRAWING NO
SB1 SB2 SB3 GTB-02 : 14/14
ESTIMATE – GTB – 02 – 1 CWSN + 4 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
1 Excavation for foundation up to 1.5m depth 14.32 Cmt. 83.00 1,188.56
including sorting out. Stacking of useful materials
and disposing of the excavated stuff up to
50mt.lead. (Item no.-1 (0)(A) page.-22) Loose or
soft soil.
2 Providing & Laying Brick bat cement Concrete 4.52 Cmt. 2,126.00 9,609.52
1:5:10 (1Cement : 5Coarse sand :10 graded brick
bats) in foundation and plinth and curing complete
excluding cost of formwork (Item no-(9)5.3.8
Pg.27)
3 Brick work using common burnt clay building 9.66 Cmt. 3,651.00 35,268.66
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand) R.A
4 Filling with the available excavated earth 11.45 Cmt. 53.40 611.43
(excluding rock) in trenches, plinth, sides of
foundation etc.in layers not exceeding 20cm in
depth consolidating each deposited layer by
ramming and watering. (item no-(6)4.12 pg.23
5 Providing & Laying brick bat cement Concrete 2.43 Cmt. 2,396.00 5,822.28
1:4:8 (1 Cement: 4 Coarse sand: 8 graded brick
bat) in foundation and plinth and curing complete
excluding cost of formwork. (Item no.-
8(5.3.3)page.-27)
6 Providing & Laying ordinary cement Concrete 0.78 Cmt. 4,689.00 3,657.42
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC coping .R.A..
7 Providing & Laying ordinary cement Concrete 0.55 Cmt. 4,001.00 2,200.55
1:2:4 (1 Cement :2 Coarse sand:4 graded stone
aggregates) and finishing smooth with curing etc.
complete excluding the cost of formwork for
concrete work in plinth protection & corner bar
bed. item no10(5.3.13)pg-27
8 Brick work using common burnt clay building 13.00 Cmt. 3,769.00 48,997.00
conventional bricks having crushing strength not
less than 35kg/sq. cm. In super structure in
cement mortar 1:4 (1cement:4fine sand) R.A
9 Half brick masonry in common brunt clay building 7.78 Smt. 500.70 3,895.45
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand)in super
structure including curing etc. complete.(Item no-
(8)6.3 I(B) Pg.42)+(Item no-(10)6.32(B) Pg.43)
10 Providing & Laying ordinary cement Concrete 2.52 Cmt. 6,455.00 16,266.60
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
ESTIMATE – GTB – 02 – 1 CWSN + 4 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC slabs having thickness
more than 10 cm and up to 13cm thickness. R.A.
11 Providing & Laying reinforcement for RCC work 248.00 Kg. 54.00 13,392.00
including bending, binding and placing in position
etc. complete up to floor two level Thermo
Mechanical Treated Bars as per I.S.
Standard.(T.M.T ) (item no-14A (5.4.11(A)pg.28
12 Providing 10mm thick inside cement plaster in 90.27 Smt. 100.00 9,027.00
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no1 (17.58)
(I) Pg.89
13 Providing 15mm thick outside cement plaster in 54.85 Smt. 137.10 7,519.94
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no3 (17.60)
(I) Pg.89
14 Providing & Fixing 30mm thick polished Kotah 1.50 Rmt 603.00 904.50
stone 40cm wide & 20cm depth for HAND WASH
FACILITY as per approved drawing & details by
engineer in charge including making hole with
waste water pipe, coupling ,rubbing etc. comp.
R.A
15 40mm thick cement concrete flooring 1:2:4 23.97 Smt. 236.00 5,656.92
(1cement:2 coarse sand: 4 graded stone
aggregates 20mm normal size) laid in one layer
finished with a floating coat of neat cement, curing
etc. Complete. (Item no-15(14.71)(A) Pg.78)
16 Providing cement vata (10cmx10cm size) quarter 19.00 Rmt 22.60 429.40
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. (Item no-
15(0.0)Pg.91
17 Providing & fixing washbasin with hole for pillar 1.00 Each 2,033.00 2,033.00
tap with C.I or M.S brackets painted with including
cutting holes and making good .(A)vitreous china
(II)Flat back washbasin 550mmx400mm in white
colour including pillar tap, waste pipe, stop cock,
union required all fitting, fixture etc. comp. RA
18 Construction of ICN chamber as per approved 1.00 Each 2,250.00 2,250.00
drawing & design complete detail. R.A.
19 Providing & Fixing 25mm thick double polished 0.00 Smt. 773.00 -
vertical Kotah stone for (partition) urinal as par
drawing including round edge moulding etc.
comp. R,A
20 Providing & fixing 40 mm dia. MS hollow pipe 10.25 Rmt 976.00 10,004.00
(B-TYPE) 78 cm height railing for ramp as per
approved drawing & details by engineer in charge
ESTIMATE – GTB – 02 – 1 CWSN + 4 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
including applying primer coat & two coats of oil
paints comp. R,A
21 Providing & Fixing in position M.S. Angle 491.28 Kg. 75.00 36,846.00
40mmx40mmx6mm Angle frame for door and
35mmx35mmx5mm angle frame for shutters, 18
gauge iron sheet of shutters with 4 nos. of hold
fasts for door as per the approved drawing &
design including applying a priming coat of red
lead paint and all necessary fittings fixtures,
locking arrangements etc. Complete. (Item no-
25(10.100)Pg.56)
22 Painting two coats (Excluding Priming coat) on 27.56 Smt. 61.60 1,697.70
new steel and other metal, surfaces with enamel
paint, brushing , interior to give an even shade
including cleaning the surface of all dirt, dust and
other foreign matter etc. Complete(Item
no2(19.7).Pg.98)
23 White washing with lime on undecorated wall 90.27 Smt. 8.10 731.19
surfaces, 3 coats to give an even shade including
thoroughly brooming the surface to remove all
dirt, dust, mortar drops and other foreign matter,
(Item no-1(18.11) +(Item no-3(18,13) Pg.93)
24 Providing & Applying three coats of 100% acrylic 54.85 Smt. 74.00 4,058.90
base matt finishing exterior paint of approved
manufacture of required shade on external
surface to give an even shade after thoroughly
brushing the surface free from mortar dropping &
other foreign matter before application of paint
etc. complete as directed for all floors and all
lifts.(Item no-35 (0.0) Pg.220)
25 Providing and laying Ceramic tiles 6mm thick in 26.73 Smt. 746.00 19,940.58
skirting, risers of steps & dado on 10 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;21(0.00)pg;79
26 Providing and laying Ceramic tiles 6mm thick in 14.84 Smt. 691.00 10,254.44
flooring, treads of steps & landing on 12 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;20(0.00)pg;79
27 Providing up to floor two level precast cement 2.00 Smt. 528.00 1,056.00
concrete jali or grill mix(1 Cement :2 Coarse
sand:4 graded stone aggregates) reinforced with
1.6mm dia. mild steel wire including cleaning,
fixing and finishing in cement mortar 1:3 and
curing complete.(D)75 mm thick item
no;19(5.6.2)(D)pg;28
28 Construction of a soak pit of 1.2m dia. and depth 2.00 Each 1,418.00 2,836.00
1.8m (capacity 2.00 cmt volume) including
excavation and filling brick bats with dry brick
ESTIMATE – GTB – 02 – 1 CWSN + 4 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
masonry as per the approved drawing & design
etc. complete item no;18(0)(A) pg. no;137
29 Providing & fixing 32 mm dia. pipe of 16G ASIS 2.00 Each 725.00 1,450.00
Grade-304 for Grab bar in CWSN W/C 75 cm long
as per given detail. R.A.
30 Providing & fixing 15mm dia screw down brass 7.00 NO. 226.00 1,582.00
chromium plated bib tap of approved quality etc.
complete. item no;28(23.92) pg;127
31 Providing & laying 150mm diameter salt glazed 12.14 Metre 236.00 2,865.04
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete.
item no;1(24.1)(A) pg;133
32 Providing & laying 100mm diameter salt glazed 11.74 Metre 165.00 1,937.10
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete
item no;1(24.1)(B) pg;133
33 Construction of brick masonry chamber of size 1.00 Each 3,909.00 3,909.00
455mm * 610mm internal dimensions and depth
up to 450mm for ground inspection chamber with
brick having crushing strength not less than
35Kg/sqcm. in cement mortar 1:5 40mm thick C.I
cover with frame (light duty) complete item
no;16(24.44 I)pg;137
34 Providing & fixing urinal of approved 0.00 Each 1,440.00 -
quality(550X300mm size) including connecting
trap and with integral longitudinal flush pipe and
15 mm dia brass screw down stop tap complete
item no;34(23.124)(A)+item
no;30(23.96)(A);PG;127
35 Providing & fixing wash down water closet 1.00 Each 2,910.00 2,910.00
(European Type W.C. pan ) with integral P or S
trap including jointing the trap with soil pipe in CM
1 :1 (1 Cement : 1 fine sand ) including 12.5 litres
low level flushing PVC
cistern,seatcover.iteam10(23.112)pg;125+iteam
16(23.120)pg;126+iteam17(23.121)(ii)pg;126+ite
am 31pg,80.
36 Providing & fixing vitreous china long pattern 4.00 Each 1,586.00 6,344.00
white colour water closet squatting pan(Indian
type W.C. Pan) size 580mm including earthwork,
bed concrete, foot rests, G.I inlet connection for
flush pipe,trap,25mm flush cock etc. Complete
item9(23.111)pg;124+iteam11(23.113)pg;125+it
eam12(23.114)pg;125+itean;16(23.120)pg;126+i
team 32(0.0)pg;127
37 Providing & fixing PVC water tanks of 500 LITRES 500.00 LIT 5.00 2,500.00
as required on terrace level including making
ESTIMATE – GTB – 02 – 1 CWSN + 4 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
platform for bottom support and making
necessary inlet, outlet and overflow connection
etc. complete.
38 Providing & fixing gun metal check or non-return 2.00 No. 576.00 1,152.00
full way wheel valve(A)25mm dia item
no;30(23.99)(C)PG;127
39 Construction of septic tank of size 2.00 Mt length 1.00 No. 29,200.00 29,200.00
x 1.2 Mt width internal dimensions and depth up
to 1.8mt with brick having crushing strength not
less than 35Kg/sqcm. in cement mortar 1:6
including 0.60 X 0.60 cement cover as per
approved drawing etc. comp. R.A
40 Providing and fixing 25mm dia U.P.V.C.Pipe 44.15 RMT 102.00 4,503.30
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;8 pg;129
41 Providing and fixing 15mm dia U.P.V.C.Pipe 5.50 RMT 85.00 467.50
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;7 pg;129
42 Providing and fixing 50mm dia G.I. Rain water 1.00 No. 285.00 285.00
spout 60CM long complete. R.A
43 providing & fixing stone wear gully trap with C.I 4.00 Each 1,483.00 5,932.00
grating brick masonry chamber and water tight C.I
cover with frame of 300mm X 300mm size with
standard weight (i) square mouth traps 150m x
100 mm size p or R type etc. complete. item
no;6(24.19 B) pg;134
44 providing & fixing PVC SWR nahni trap IS 14735 2.00 Each 355.00 710.00
for drain-100mm diameter with jali of following
nominal diameter of self-cleansing design with CI
spread down including cost of cutting comp. item
no;14 pg;131
45 Providing & fixing stainless steel soap tray near 2.00 Each 50.00 100.00
wash basin & hand wash facility etc. comp. RA
46 Painting of logo on front side wall. (R.A) 1.00 No. 700.00 700.00
TOTAL COST RS. 3,22,701.98
ADDING 3% CONTINGENCY 3,32,383.04
SAY RS. 3,32,400.00
54
GIRLS' TOILET | GTB - 03 BEST ORIENTATION

NO
RT
H

CWSN TOILET W.C. / URINAL SATISFACTORY ORIENTATION


ORIENTATION PRIORITY ON SITE
NORTH

1 6

ACCEPTABLE ORIENTATION

DETAILS OF DRAWINGS NT
NORTH

DRAWING NO. PARTICULARS


GTB-03:1/14 GROUND FLOOR PLAN

GTB-03:2/14 TERRACE PLAN

GTB-03:3/14 FLOORING PATTERN

GTB-03:4/14 ELEVATIONS

GTB-03:5/14 ELEVATIONS

GTB-03:6/14 SECTIONS

GTB-03:7/14 SECTIONS

GTB-03:8/14 WATER SUPPLY LAYOUT

GTB-03:9/14 DRAINAGE LAYOUT

GTB-03:10/14 RAILING AND HANDWASH

GTB-03:11/14 INCINERATOR DETAIL

GTB-03:12/14 STRUCTURAL DETAILS -


GENERAL NOTE, WALL SECTIONS, PLINTH BENDS

GTB-03:13/14 STRUCTURAL DETAILS - FOUNDATION LEVEL

GTB-03:14/14 STRUCTURAL DETAILS - SLAB LEVEL


DOOR-WINDOW SCHEDULE
C
S1 S2 TYPE SIZE LIN. SILL NOS. REMARKS
0.115 5.29 0.115 _
D 1.20 X 2.40 2.40M 1 M.S.SHUTTER
2.13 3.16 _
D1 1.00 X 2.40 2.40M 1 BOTH SIDE OPENABLE
0.68 0.90 0.78 0.15 0.60 0.42 0.60 0.42 0.60 0.38 M.S.SHUTTER
_
D2 0.70 X 2.40 2.40M 6 M.S.SHUTTER
V 1.20 X 0.90 2.40M 1.50 1 M.S.JALI
vertical grab rail
V1 0.90 X 0.60 2.40M 1.80 1 CEMENT JALI
V2 0.47 X 1.20 2.40M 1.20 1 M.S.JALI
Plinth protection V3 0.60 X 0.60 2.40M 1.80 6 CEMENT JALI

0.45

0.115
NT

1.00
1.00

1.00
Plinth protection
CWSN
1.90 X 2.10

2.33
1.33

1.60
S3
W.C. W.C. W.C.

4.51
0.45 0.90 x 1.10 0.90 x 1.10 0.90 x 1.10

Plinth protection
0.90 1.00 0.43 0.70 0.32 0.70 0.32 0.70
0.45

5.16
B D
0.40
Kotah stone Lvl :+0.40

4.39

1.50
1.20
1.50
platform as

Plinth protection
per detail - D1
0.47 0.23 1.20 0.23 0.70 0.32 0.70 0.32 0.70 0.20 S4

W.C. W.C. W.C.


0.90 x 1.10 0.90 x 1.10 0.90 x 1.10

0.45
1.60

1.33
1.33

0.115
Lvl :+0.38
I.P.S. floor
0.23 mt. thk. and 0.90 RAMP UP
1.32

mt. high brick wall I.P.S. FINISH ON RAMP

M.S.railing as per detail - D2

0.23 0.47 0.23 1.20 0.38 0.60 0.42 0.60 0.42 0.60 0.38

0.70 1.43 3.16 GIRL'S TOILET CWSN W.C. URINALS


DESIGN CODE :GTB - 03 01 06 -
0.115 5.29 0.115

A GROUND FLOOR PLAN


DRAWING NO
GTB-03 : 1/14

55
56
S1 S2

100mm G.I. PIPE FOR

1.12
PVC overhead WATER SPOUNT
water tank
capacity 500 lit.

S3
2.13 3.16

4.17
0.45
0.23 X 0.35 mt.
TERRACE BRICK CURBING

Lvl :+2.92
WEATHER
40mm I.P.S. FINISH FLOOR
S H E D

3.93
3.93
1.50

ABOVE R.C.C. SLAB

S4

0.70 4.36

0.23 X 0.35 mt.


BRICK CURBING

GIRL'S TOILET CWSN W.C. URINALS


DESIGN CODE :GTB - 03 01 06 -

TERRACE PLAN
DRAWING NO
GTB 03 : 2/14
FINISH I.P.S.
F L O O R

R 6 5 4 3 2 1

2
FINISH I.P.S.
3 F L O O R

Lvl :+0.35 4
0.30 mt. X 0.30 mt. matte 1 2 3 1 2 3 1 2 3
Glazed ceramic tile5
2 2 2
6
3 3 3
7 Lvl :+0.38 Lvl :+0.38 Lvl :+0.38
R R R

FINISH I.P.S.
F L O O R
R 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

2
Lvl :+0.40
0.30 mt. X 0.30 mt. matte 3
Glazed ceramic tile
4
FINISH I.P.S.
F L O O R

Lvl :+0.38 R Lvl :+0.38 R Lvl :+0.38 R

3 3 3

2 2 2

3 2 1 3 2 1 3 2 1

Lvl :+0.38
Lvl : 00
I.P.S. floor
RAMP UP
300 X 300
I.P.S. FINISH ON RAMP ANTI SKID
M.S.railing as per detail - D2 GIRL'S TOILET CWSN W.C. URINALS
T I L E S
DESIGN CODE :GTB - 03 01 06 -

FLOORING PATTERN
DRAWING NO
GTB 03 : 3/14

57
58
CURBING TOP
WEATHER +3.27
SHED SLAB TOP
+2.92

Cement jali
SILL
+2.20

15 mm thk. 0 . 7 8 m t . hi g h
Mala plaster M.S. pipe railing

P l i n t h
Protection
PLINTH PROTECTION.
+0.30

ELEVATION - A

CURBING TOP
+3.27

15 mm thk.
Mala plaster 0.23 mt. thk. and 0.90
mt. high brick wall

P l i n t h GIRL'S TOILET CWSN W.C. URINALS


Protection DESIGN CODE :GTB - 03 01 06 -

ELEVATIONS
DRAWING NO
ELEVATION - B GTB - 03 : 4/14
CURBING TOP
+3.27
WEATHER
S H E D SLAB BOTTOM
+2.80
Cement jali

SILL
+2.20

Vent pipe

0 . 7 8 m t. h i g h
M.S. pipe railing

I n c i n e r a t o r
15 mm thk.
Mala pl aster

PLINTH PROTECTION.
+0.30

ELEVATION - C
W E A T H E R
S H E D CURBING TOP
+3.27

SLAB BOTTOM
+2.80

Vent pipe
SILL
+1.90

10 mm x 10 mm M.S.
bar 0.10mt. c/c
0 . 7 8 m t . hi g h
M.S. pipe railing Incinerator
15 mm thk. Mala
p l a s t e r P l i n t h
Protection
GIRL'S TOILET CWSN W.C. URINALS
DESIGN CODE : GTB -01 01 06 -
RAMP
ELEVATIONS
ELEVATION - D DRAWING NO
GTB -03 : 5/14

59
60
0.23 mt. X 0.35 mt.
brick curbing
TERRACE Cement vata CURBING TOP
+3.27
Lvl :+2.92
SLAB TOP
+2.92

10 mm thk.
1.20 mt. high 0.30 mt. X 10 mm thk.
Ma la plaster
0.30 mt. glossy finished Mala plaster
1.50 mt. high 0.30 mt. X
ceramic tile on wall
0.30 mt. Glazed tile dado
7 6 5 4 3 2 START
HERE

0.78mt. high M.S. START

2.40
R 4 3 2 2
HERE
pipe railing Mirror
Water tap
2 grab bar
3
Water tap

1.20
4 Plinth protection
3

0.80

0.78
0.70
finished with I.P.S.

0.60
0.60
R 5

0.40
CWSN TOILET PLINTH LVL.
+0.40

SECTION 1-1

0.23 mt. X 0.35 mt.


brick curbing
TERRACE Cement vata CURBING TOP
+3.27
Lvl :+2.92

0.35
0.35
SLAB TOP
0.12

+2.92
M.S. grill
0.60

over the door

0.90
SILL
10 mm thk. +2.20
Mala plaster 10 mm thk.
Mala plaster
0.90 mt. high 0.30 mt. X
0.30 mt. Glazed tile dado
1.80

START 2 3 R R 3 2 START
HERE HERE

1.50
10 mm thk.
2 Mala plaster 2 0.78 mt. high M.S.

0.90
pipe railing
3 W.C. W.C. 3
GIRLS' TOILET PLINTH LVL. GIRL'S TOILET CWSN W.C. URINALS
+0.40 DESIGN CODE :GTB - 01 01 06 -

SECTIONS
DRAWING NO
SECTION 2-2 GTB 03 : 6/14
0.23 mt. X 0.35 mt.
brick curbing
TERRACE Cement vata CURBING TOP
+3.27
Lvl :+2.92
SLAB TOP
+2.92

0.60 mt. X 0.60 mt. high


1.50 mt. high 0.30 mt. X c e m e n t j a l i v en t i l a t i o n
0.30 mt. Glazed tile dado
START 2 3 4 5 6 R 10 mm thk. 10 mm thk. 10 mm thk.
HERE
Mala plaster Mala pla st er Mala plaster

2.40
2 0.90 mt. high 0.30 mt. X
0.30 mt. Glazed tile dado

1.80
START 2 3 START 2 3 START 2 3
grab bar 3 HERE HERE HERE

2 2 2
4
Plinth protection

0.90
Plinth protection 3 3 3

0.45
5

0.48
finished with I.P.S. CWSN TOILET W.C. W.C. W.C. PLINTH LVL.
+0.40

SECTION 3-3

0.23 mt. X 0.35 mt.


W E A TH E R brick curbing
TERRACE Cement vata CURBING TOP
S H E D +3.27
Lvl :+2.92
SLAB TOP
+2.92
M.S. grill M.S. grill M.S. grill M.S. grill
10 mm x 10 mm M.S.

0.90
bar 0.10mt. c/c

Kotah stone
platform for hand
wash

1.50
0.80
0.70

Plinth protection
0.60
0.40

finished with I.P.S. PLINTH LVL. GIRL'S TOILET CWSN W.C. URINALS
+0.40 DESIGN CODE :GTB - 03 01 06 -

SECTIONS
DRAWING NO
SECTION 4-4
GTB -03 : 7/14

61
62
WATER SUPPLY FROM SUPPLY FROM MAINS
OVER HEAD TANK TO OVER HEAD TANK

Lvl :+0.40

GIRL'S TOILET CWSN W.C. URINALS


DESIGN CODE :GTB - 03 01 06 -

WATER SUPPLY
DRAWING NO
GTB - 03 : 8/14
SEPTIK TANK
L : 3.0m | B : 1.2m | D : 1.8m
SOAK PIT
1.2m DIA.
1.8m DEPTH

SOAK PIT
1.2m DIA.
1.8m DEPTH

Lvl :+0.40

GIRL'S TOILET CWSN W.C. URINALS


DESIGN CODE :GTB - 03 01 06 -

DRAINAGE LAYOUT
DRAWING NO
GTB - 03 : 9/14

63
64
Cubby hole
for soap

0.60

0.30 0.60 0.37

3 5M M single pol is h ko tah st one

0.40
support with 10mm slope

0.30 0.30 0.30 0.30 0.07

300mm X 300mm glossy

0.30
ceramic glazed tiles
0.40

0.42
0.15

0.30
Cubby hole

0.12
for soap kotah stone

0.20
35MM double polish kotah stone vertical support

0.84

0.80
0.70
35mm single polish kotah stone
support with 10mm slope

0.50

0.40
N.T. N.T.

DETAIL - D1 (HAND WASH)

4.00 1.43
0.30 0.82 0.82 0.82 0.82 0.82 1.02 0.34

40mm DIA. M.S.HOLLOW PIPE


0.78
0.60

0.78
0.60
GIRL'S TOILET CWSN W.C. URINALS
DETAIL - D2 (HAND RAIL) DESIGN CODE :GTB - 03 01 06 -

HAND WASH & DETAILS OF RAILING


DRAWING NO
GTB - 03 : 10/14
INLET PIPE FOR
THROWING WASTE

VENT PIPE

0.45
M.S.JALI TO COLLECT WASTE BRICK WALL

0.12
0.12 0.60 0.12
M.S.SHUTTER (CLOSED)

VENT PIPE VENT PIPE

R.C.C OR STONE COVER R.C.C OR STONE COVER


0.55
TOP HUNG M.S.SHUTTER
FOR DISPOSAL OF
WASTE NEPKINS
M.S.SHUTTER (CLOSED) M.S.SHUTTER (CLOSED)
M.S.JALI TO COLLECT WASTE BRICK WALL

0.85
M.S.SHUTTER (WITH GRILL)

0.70
M.S.SHUTTER (WITH GRILL)

1.25
SOLID FUEL FOR PLINTH PROTECTION
BURNING THE WASTE
C.W.S.N (INSIDE)

GIRL'S TOILET CWSN W.C. URINALS


DESIGN CODE :GTB - 03 01 06 -
MASONARY INCINERATOR OUT SIDE OF GIRLS TOILET
DETAIL OF INCINERATOR
DRAWING NO
GTB - 03 : 11/14

65
66
NOTES 10
d(
>
GENERAL:- 75
mm
)
1. ALL R.C.C. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
REFERENCE TO THE ARCHITECT DRAWINGS .
d
2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS SPECIFIED
OTHERWISE.

Ld
3. ALL DIMENSIONS ARE TO BE CHECKED AND CORELATED WITH THE

Ld
BEAM WEB REINFORCEMENT
ARCHITECTURAL DRAWINGS AND ANY AMBIGUITY IF FOUND, THEREIN
d = DIA OF STIRRUPS
SHALL BE BROUGHT TO THE NOTICE TO THE OFFICE BEFORE
EXECUTION OF THE WORK.
8# @200C/C
4. LIVE LOADS ARE ADOPTED AS PER I.S. 875 - 1987 PART-2(L.L.) L-JUNCTION T-JUNCTION 30 60 60 30
5. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS
75

SHALL BE FOLLOWED.
2-8# FOR EQ. ZONE-III
6. THE STRUCTURE IS DESIGNED FOR DEAD LOAD, LIVE LOAD, ARRANGEMENT OF BARS IN PLAN FOR 230 2-10# FOR EQ. ZONE-IV &V
SEISMIC LOAD AND WIND LOAD. SEISMIC LOADS AS PER I.S.:1893 R.C.C. PLINTH BAND
STRENGTHENING AT WALL JUNCTIONS.
-2002 AND DEAD,LIVE AND WIND LOADS AS PER I.S.:875 - 1987. FOR 230TH LOAD BEARING WALL
7. THE STRUCTURAL CONSULTANT IS NOT RESPONSIBLE FOR CROSS SECTION OF R.C.C. BAND
QUALITY CONTROL AND SUPERVISION OF THE WORKS.
8. MORTAR MIX OF (CEMENT: SAND)1:4 SHALL BE USED. 230
9. ALL BRICK SHALL CONFORM TO IS 1077 :1970 AND SHALL HAVE PLINTH LVL. PLINTH LVL.
MINIMUM CRUSHING STRENGTH OF 35KG/SQ.CM. 8#@200 C/C
75

10. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.

75 75
75

11.
STATED. B.K. MASONARY B.K. MASONARY 2-8#
GR.LVL. GR.LVL.
12. REINFORCEMENT TO BE USED SHALL BE H.Y.S.D. BARS IN C.M. (1:4) 0.00 IN C.M. (1:6) 0.00
CONFORMING TO I.S. 1786:2008.
13. LAP LENGTH SHALL BE PROVIDED AS UNDER.

GRADE OF CONCRETE MILD STEEL Fe. 415 (H.Y.S.D.)


M:20 47D 57D 350 350

175
175

M:25 41D 49D


B.B.C.C. B.B.C.C.

150
150

MINI. 600mm.
MINI. 450mm.

14. CLEAR COVER TO MAIN REINFORCEMENTS SHALL BE 30mm (1 : 5 : 10) (1 : 5 : 10)

UP TO GOOD SOIL
UP TO GOOD SOIL

FOR BEAMS AND 20 mm FOR SLABS.


600 450
15. CONTINUOUS PLINTH BANDS SHALL BE PROVIDED ADOPTING
WALL JUNCTION DETAILS AS SHOWN IN DRAWING. WALL - W1 WALL - W2
16. THE TOILET IS DESIGNED FOR GROUND FLOOR ONLY FOR 230 TH. OTTA WALL
FOR 230 TH. LOAD BEARING WALL
& PARTITION WALL
SPECIAL NOTE FOR STRUCTURE UP TO 10 KMS. FROM
SEA COAST
1. ALL CONCRETE MIX FOR SLABS AND BEAMS SHALL BE M25. GIRLS' TOILET CWSN W.C. URINALS
2. CLEAR COVER TO THE MAIN RAINFORECEMNT SHALL BE DESIGN CODE :GTB-03 01 06 -
30mmFOR SLABS AND 40mm FOR BEAMS.

DRAWING NO
GTB-03 : 12/14
230
PLINTH LVL.
8#@200 C/C 1-10# FOR EQ. ZONE-III
1-12# FOR EQ. ZONE-IV & V

75 75
BARS FROM FOUNDATIONS TO PASS
B.K. MASONARY THROUGHPLINGTH BAND, MASONARY AND
GR.LVL. 2-8# TO BE TAKEN IN TO AND ANCHORED IN TO SLAB
IN C.M. (1:4)
W1 0.00

115x115(M:20) CONCRETE
W1

W1
350 P.C.C. (1:2:4)

W1
175
( 350 x 500 x 175 )

150
B.B.C.C. ( 1:5:10 )

MINI. 600mm.
UP TO GOOD SOIL

PB1
PB1
600
WALL - W1

FOUNDATION DETAILS AT WALL JUNCTIONS


W1
W2

W1

W1
150

W1
W2 2-8#
W1
8#@150 C/C ALL
230

PB1
PB1
2-10#

W1
PB1
W2
W1

W1
W2
W2

W2 W2 GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-03 01 06 -
FOUNDATION PLAN
STRUCTURAL DETAILS - FOUNDATION LEVEL
FOUNDATION DESIGN SHALL BE REVISED AS PER SOIL TYPE, SPECIALLY FOR BLACK COTTON & FIELD UP SOIL DRAWING NO
GTB-03 : 13/14

67
68
SCHEDULE OF REINFORCEMENT FOR SLABS
A 8# @ 200 C/C ALTERNATE BENT UP BARS
B 8# @ 250 C/C DISTRIBUTION STEEL
SB1 C 8# @ 150 C/C ALTERNATE BENT UP BARS
ALL SLABS ARE 100 THICK.
POSITION OF P.V.C. WATER TANK
CAPACITY AS PER ARCH. DRAWING

SB1
C

300
B

400
300

300
SB2 SB2 SB2

400
D
B

A
B
600

SB3
B @ TOP

SB2
& BOTTOM

300
300 A 400 SB2 SB2 SB2

300
B

A
SB1

300
SB2 SB1

STRUCTURAL LAY-OUT AT SLAB LVL. NOTE:


1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED
OTHERWISE.
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL
STRUCTURAL DETAILS PLEASE REFER THIS PROJECT
2-8# 2-10# 2-10# R.C.C. DRAWING NO.- GTB-03-12/14
3. NOTE FOR BLACK COTTON SOIL
8#@150C/C 8#@150C/C 8#@150C/C

100
100
100

2-10# 3-10# 2-12#+1-10# GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-03 01 06 -
230 230 230

SB1 SB2 SB3 STRUCTURAL DETAILS - SLAB LEVEL


DRAWING NO
GTB-03 : 14/14
ESTIMATE – GTB – 03 – 1 CWSN + 6 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
1 Excavation for foundation up to 1.5m depth 16.05 Cmt. 83.00 1,332.15
including sorting out. Stacking of useful materials
and disposing of the excavated stuff up to
50mt.lead. (Item no.-1 (0)(A) page.-22) Loose or
soft soil.
2 Providing & Laying Brick bat cement Concrete 4.47 Cmt. 2,126.00 9,503.22
1:5:10 (1Cement : 5Coarse sand :10 graded brick
bats) in foundation and plinth and curing complete
excluding cost of formwork (Item no-(9)5.3.8
Pg.27)
3 Brick work using common burnt clay building 11.19 Cmt. 3,651.00 40,854.69
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand) R.A
4 Filling with the available excavated earth 12.84 Cmt. 53.40 685.66
(excluding rock) in trenches, plinth, sides of
foundation etc.in layers not exceeding 20cm in
depth consolidating each deposited layer by
ramming and watering. (item no-(6)4.12 pg.23
5 Providing & Laying brick bat cement Concrete 3.07 Cmt. 2,396.00 7,355.72
1:4:8 (1 Cement: 4 Coarse sand: 8 graded brick
bat) in foundation and plinth and curing complete
excluding cost of formwork. (Item no.-
8(5.3.3)page.-27)
6 Providing & Laying ordinary cement Concrete 1.07 Cmt. 4,689.00 5,017.23
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC coping .R.A..
7 Providing & Laying ordinary cement Concrete 0.76 Cmt. 4,001.00 3,040.76
1:2:4 (1 Cement :2 Coarse sand:4 graded stone
aggregates) and finishing smooth with curing etc.
complete excluding the cost of formwork for
concrete work in plinth protection & corner bar
bed. item no10(5.3.13)pg-27
8 Brick work using common burnt clay building 11.09 Cmt. 3,769.00 41,798.21
conventional bricks having crushing strength not
less than 35kg/sq. cm. In super structure in
cement mortar 1:4 (1cement:4fine sand) R.A
9 Half brick masonry in common brunt clay building 11.83 Smt. 500.70 5,923.28
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand)in super
structure including curing etc. complete.(Item no-
(8)6.3 I(B) Pg.42)+(Item no-(10)6.32(B) Pg.43)
10 Providing & Laying ordinary cement Concrete 3.02 Cmt. 6,455.00 19,494.10
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
ESTIMATE – GTB – 03 – 1 CWSN + 6 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC slabs having thickness
more than 10 cm and up to 13cm thickness. R.A.
11 Providing & Laying reinforcement for RCC work 347.18 Kg. 54.00 18,747.72
including bending, binding and placing in position
etc. complete up to floor two level Thermo
Mechanical Treated Bars as per I.S.
Standard.(T.M.T ) (item no-14A (5.4.11(A)pg.28
12 Providing 10mm thick inside cement plaster in 113.53 Smt. 100.00 11,353.00
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no1 (17.58)
(I) Pg.89
13 Providing 15mm thick outside cement plaster in 78.43 Smt. 137.10 10,752.75
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no3 (17.60)
(I) Pg.89
14 Providing & Fixing 30mm thick polished Kotah 1.27 Rmt 603.00 765.81
stone 40cm wide & 20cm depth for HAND WASH
FACILITY as per approved drawing & details by
engineer in charge including making hole with
waste water pipe, coupling ,rubbing etc. comp.
R.A
15 40mm thick cement concrete flooring 1:2:4 29.24 Smt. 236.00 6,900.64
(1cement:2 coarse sand: 4 graded stone
aggregates 20mm normal size) laid in one layer
finished with a floating coat of neat cement, curing
etc. Complete. (Item no-15(14.71)(A) Pg.78)
16 Providing cement vata (10cmx10cm size) quarter 20.00 Rmt 22.60 452.00
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. (Item no-
15(0.0)Pg.91
17 Providing & fixing washbasin with hole for pillar 1.00 Each 2,033.00 2,033.00
tap with C.I or M.S brackets painted with including
cutting holes and making good .(A)vitreous china
(II)Flat back washbasin 550mmx400mm in white
colour including pillar tap, waste pipe, stop cock,
union required all fitting, fixture etc. comp. RA
18 Construction of ICN chamber as per approved 1.00 Each 2,250.00 2,250.00
drawing & design complete detail. R.A.
19 Providing & Fixing 25mm thick double polished - Smt. 773.00 -
vertical Kotah stone for (partition) urinal as par
drawing including round edge moulding etc.
comp. R,A
20 Providing & fixing 40 mm dia. MS hollow pipe 10.27 Rmt 976.00 10,023.52
(B-TYPE) 78 cm height railing for ramp as per
approved drawing & details by engineer in charge
ESTIMATE – GTB – 03 – 1 CWSN + 6 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
including applying primer coat & two coats of oil
paints comp. R,A
21 Providing & Fixing in position M.S. Angle 647.28 Kg. 75.00 48,546.00
40mmx40mmx6mm Angle frame for door and
35mmx35mmx5mm angle frame for shutters, 18
gauge iron sheet of shutters with 4 nos. of hold
fasts for door as per the approved drawing &
design including applying a priming coat of red
lead paint and all necessary fittings fixtures,
locking arrangements etc. Complete. (Item no-
25(10.100)Pg.56)
22 Painting two coats (Excluding Priming coat) on 36.20 Smt. 61.60 2,229.92
new steel and other metal, surfaces with enamel
paint, brushing , interior to give an even shade
including cleaning the surface of all dirt, dust and
other foreign matter etc. Complete(Item
no2(19.7).Pg.98)
23 White washing with lime on undecorated wall 113.53 Smt. 8.10 919.59
surfaces, 3 coats to give an even shade including
thoroughly brooming the surface to remove all
dirt, dust, mortar drops and other foreign matter,
(Item no-1(18.11) +(Item no-3(18,13) Pg.93)
24 Providing & Applying three coats of 100% acrylic 78.43 Smt. 74.00 5,803.82
base matt finishing exterior paint of approved
manufacture of required shade on external
surface to give an even shade after thoroughly
brushing the surface free from mortar dropping &
other foreign matter before application of paint
etc. complete as directed for all floors and all
lifts.(Item no-35 (0.0) Pg.220)
25 Providing and laying Ceramic tiles 6mm thick in 30.97 Smt. 746.00 23,103.62
skirting, risers of steps & dado on 10 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;21(0.00)pg;79
26 Providing and laying Ceramic tiles 6mm thick in 17.84 Smt. 691.00 12,327.44
flooring, treads of steps & landing on 12 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;20(0.00)pg;79
27 Providing up to floor two level precast cement 2.70 Smt. 528.00 1,425.60
concrete jali or grill mix(1 Cement :2 Coarse
sand:4 graded stone aggregates) reinforced with
1.6mm dia. mild steel wire including cleaning,
fixing and finishing in cement mortar 1:3 and
curing complete.(D)75 mm thick item
no;19(5.6.2)(D)pg;28
28 Construction of a soak pit of 1.2m dia. and depth 2.00 Each 1,418.00 2,836.00
1.8m (capacity 2.00 cmt volume) including
excavation and filling brick bats with dry brick
ESTIMATE – GTB – 03 – 1 CWSN + 6 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
masonry as per the approved drawing & design
etc. complete item no;18(0)(A) pg. no;137
29 Providing & fixing 32 mm dia. pipe of 16G ASIS 2.00 Each 725.00 1,450.00
Grade-304 for Grab bar in CWSN W/C 75 cm long
as per given detail. R.A.
30 Providing & fixing 15mm dia screw down brass 9.00 NO. 226.00 2,034.00
chromium plated bib tap of approved quality etc.
complete. item no;28(23.92) pg;127
31 Providing & laying 150mm diameter salt glazed 13.00 Metre 236.00 3,068.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete.
item no;1(24.1)(A) pg;133
32 Providing & laying 100mm diameter salt glazed 19.00 Metre 165.00 3,135.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete
item no;1(24.1)(B) pg;133
33 Construction of brick masonry chamber of size 1.00 Each 3,909.00 3,909.00
455mm * 610mm internal dimensions and depth
up to 450mm for ground inspection chamber with
brick having crushing strength not less than
35Kg/sqcm. in cement mortar 1:5 40mm thick C.I
cover with frame (light duty) complete item
no;16(24.44 I)pg;137
34 Providing & fixing urinal of approved - Each 1,440.00 -
quality(550X300mm size) including connecting
trap and with integral longitudinal flush pipe and
15 mm dia brass screw down stop tap complete
item no;34(23.124)(A)+item
no;30(23.96)(A);PG;127
35 Providing & fixing wash down water closet 1.00 Each 2,910.00 2,910.00
(European Type W.C. pan ) with integral P or S
trap including jointing the trap with soil pipe in CM
1 :1 (1 Cement : 1 fine sand ) including 12.5 litres
low level flushing PVC
cistern,seatcover.iteam10(23.112)pg;125+iteam
16(23.120)pg;126+iteam17(23.121)(ii)pg;126+ite
am 31pg,80.
36 Providing & fixing vitreous china long pattern 6.00 Each 1,586.00 9,516.00
white colour water closet squatting pan(Indian
type W.C. Pan) size 580mm including earthwork,
bed concrete, foot rests, G.I inlet connection for
flush pipe,trap,25mm flush cock etc. Complete
item9(23.111)pg;124+iteam11(23.113)pg;125+it
eam12(23.114)pg;125+itean;16(23.120)pg;126+i
team 32(0.0)pg;127
37 Providing & fixing PVC water tanks of 500 LITRES 500.00 LIT 5.00 2,500.00
as required on terrace level including making
ESTIMATE – GTB – 03 – 1 CWSN + 6 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
platform for bottom support and making
necessary inlet, outlet and overflow connection
etc. complete.
38 Providing & fixing gun metal check or non-return 2.00 No. 576.00 1,152.00
full way wheel valve(A)25mm dia item
no;30(23.99)(C)PG;127
39 Construction of septic tank of size 2.50 m length 1.00 No. 36,500.00 36,500.00
x 1.2 m width internal dimensions and depth up
to 1.8mt with brick having crushing strength not
less than 35Kg/sqcm. in cement mortar 1:6
including 0.60 X 0.60 cement cover as per
approved drawing etc. comp. R.A
40 Providing and fixing 25mm dia U.P.V.C.Pipe 40.00 RMT 102.00 4,080.00
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;8 pg;129
41 Providing and fixing 15mm dia U.P.V.C.Pipe 10.00 RMT 85.00 850.00
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;7 pg;129
42 Providing and fixing 50mm dia G.I. Rain water 2.00 No. 285.00 570.00
spout 60CM long complete. R.A
43 providing & fixing stone wear gully trap with C.I 4.00 Each 1,483.00 5,932.00
grating brick masonry chamber and water tight C.I
cover with frame of 300mm X 300mm size with
standard weight (i) square mouth traps 150m x
100 mm size p or R type etc. complete. item
no;6(24.19 B) pg;134
44 providing & fixing PVC SWR nahni trap IS 14735 2.00 Each 355.00 710.00
for drain-100mm diameter with jali of following
nominal diameter of self-cleansing design with CI
spread down including cost of cutting comp. item
no;14 pg;131
45 Providing & fixing stainless steel soap tray near 2.00 Each 50.00 100.00
wash basin & hand wash facility etc. comp. RA
46 Painting of logo on front side wall. (R.A) 1.00 No. 700.00 700.00
TOTAL COST RS. 3,74,591.45
ADDING 3% CONTINGENCY 3,85,829.19
SAY RS. 3,85,900.00
74
GIRLS' TOILET | GTB - 04

W.C. URINAL BEST ORIENTATION ORIENTATION PRIORITY ON SITE


1 2 H
RT
NO

SATISFACTORY ORIENTATION

NORTH
DETAILS OF DRAWINGS

DRAWING NO. PARTICULARS ACCEPTABLE ORIENTATION

GTB-04:1/13 GROUND FLOOR PLAN


NORTH

GTB-04:2/13 TERRACE PLAN

GTB-04:3/13 FLOORING PATTERN

GTB-04:4/13 ELEVATIONS

GTB-04:5/13 ELEVATIONS

GTB-04:6/13 SECTIONS

GTB-04:7/13 WATER SUPPLY LAYOUT

GTB-04:8/13 DRAINAGE LAYOUT

GTB-04:9/13 RAILING AND HANDWASH

GTB-04:10/13 INCINERATOR DETAIL

GTB-04:11/13 STRUCTURAL DETAILS -


GENERAL NOTE, WALL SECTIONS, PLINTH BENDS

GTB-04:12/13 STRUCTURAL DETAILS - FOUNDATION LEVEL

GTB-04:13/13 STRUCTURAL DETAILS - SLAB LEVEL


DOOR-WINDOW SCHEDULE
S1 TYPE SIZE LIN. SILL NOS. REMARKS
C
3.69 _
D 1.20 X 2.40 2.40M 1 M.S.SHUTTER
_
0.30 3.16 D2 0.70 X 2.40 2.40M 3 M.S.SHUTTER
V1 0.90 X 0.60 2.40M 1.80 2 CEMENT JALI
0.30 0.38 0.60 0.42 0.60 0.42 0.60 0.38 V3 0.60 X 0.60 2.40M 1.80 3 CEMENT JALI

Plinth protection

0.45
Incinerator
0.45

1.22
1.22
1.45
0.45
URINAL URINAL W.C. 0.60 Peep hole to
1.10 X 0.90 1.10 X 0.90 1.10 X 0.90 incinerator

0.38

2.88
2.88

0.40 0.10 0.70 0.32 0.70 0.32 0.70 0.23 0.30 0.30 D
B
Kotah stone
GIRLS' TOILET S2

0.90
1.43
1.20

platform as Lvl :+0.40

Plinth protection
per detail - D1

0.38
0.45
Plinth protection
1.55 0.90 1.25 0.60
3.69 GIRL'S TOILET CWSN W.C. URINALS
DESIGN CODE :GTB - 04 - 01 02

A GROUND FLOOR PLAN


DRAWING NO
GTB-04 : 1/13

75
76
S1
60 CM LONG 50 mm G.I.
PIPE FOR WATER SPOUT

PVC overhead 0.23 X 0.35 mt.


BRICK CURBING

1.22
water tank
capacity 500 lit.

0.60
0.33 2.90
TERRACE
S2

1.20
1.66

Lvl :+2.92
40mm I.P.S. FINISH FLOOR W E A T H E R
ABOVE R.C.C. SLAB S H E D

GIRL'S TOILET CWSN W.C. URINALS


DESIGN CODE :GTB - 04 - 01 02

TERRACE PLAN
DRAWING NO
GTB-04 : 2/13
FINISH I.P.S.
F L O O R

R R R

R R R

R R R

1 2 3 1 2 3 1 2 3

4
Lvl :+0.40
3 Floor finish with
0.30 mt. X 0.30 mt. matte polished kotah stone
2

FINISH I.P.S.
F L O O R
Glazed ceramic tile
0.23
R 10 9 8 7 6 5 4 3 2 1 R

FINISH I.P.S.
F L O O R
GIRL'S TOILET CWSN W.C. URINALS
DESIGN CODE :GTB - 04 - 01 02

TERRACE PLAN
DRAWING NO
GTB-04 : 3/13

77
78
CURBING TOP
+3.27

SLAB BOTTOM
+2.80

SILL W E A T HE R
+2.20 S H E D

15 mm thk.
Mala plaster

Plinth protection
finished with I.P.S.
PLINTH PROTECTION
+0.30

ELEVATION - A

CURBING TOP
+3.27

SLAB BOTTOM
+2.80
Cement jali
SILL
+2.20

15 mm thk. 15 mm thk.
Mala plaster Mala plaster

Plinth protection
finished with I.P.S.
GIRL'S TOILET CWSN W.C. URINALS
PLINTH PROTECTION
DESIGN CODE :GTB - 04 - 01 02
+0.30
ELEVATIONS
ELEVATION - B DRAWING NO
GTB-04 : 4/13
CURBING TOP
+3.27
W E A T H E R
S H E D
SLAB BOTTOM
+2.80
Cement jali

SILL
+2.20

Vent pipe

15 mm thk.
Mala plaster

Incinerator
Plinth protection
finished with I.P.S.
PLINTH PROTECTION
+0.30

ELEVATION - C
W E A T HE R
S H E D
CURBING TOP
+3.27

SLAB BOTTOM
+2.80

Vent pipe
15 mm thk.
Mala plaster

Incinerator

GIRL'S TOILET CWSN W.C. URINALS


PLINTH PROTECTION DESIGN CODE :GTB - 04 - 01 02
+0.30
ELEVATIONS
DRAWING NO
ELEVATION - D
GTB-04 : 5/13

79
80
CURBING TOP TERRACE
+3.27 Lvl :+2.92
0.23 mt. X 0.35 mt.

0.47
SLAB BOTTOM brick curbing
+2.80

0.60
SILL
+2.20 10 mm thk.
10 mm thk.
Mala plaster
Mala plaster
Cubby hole 0.90 mt. high 0.30 mt. X
for soap START 2 3 4 0.30 mt. Glazed tile dado
HERE

1.80
2 R 3 2 START
HERE
1.20 mt. high 0.30 mt. X
0.30 mt. glossy finished 2
Plinth protection

0.90
ceramic tile on wall

0.80
0.70

0.60
3 finished with I.P.S.

0.40
PLINTH LVL. W.C.
+0.40

SECTION 1-1

Cement vata
CURBING TOP TERRACE W E A T H E R
+3.27
Lvl :+2.92 S H E D
SLAB BOTTOM

0.12 0.35
+2.80
M.S. grill M.S. grill M.S. grill M.S. grill over

0.60
the door
SILL
+2.20 10 mm
thk. Mala
plaster

Kotah stone
platform for

1.80
hand wash

Plinth protection

0.60
finished with I.P.S. GIRL'S TOILET

0.40
CWSN W.C. URINALS
3 DESIGN CODE :GTB - 04 - 01 02
2
1
SECTIONS
DRAWING NO
SECTION 2-2
GTB-04 : 6/13
SUPPLY FROM MAINS WATER SUPPLY FROM
TO OVER HEAD TANK OVER HEAD TANK

GIRL'S TOILET CWSN W.C. URINALS


DESIGN CODE :GTB - 04 - 01 02

GROUND FLOOR PLAN


DRAWING NO
GTB-04 : 7/13

81
82
SEPTIK TANK
L : 2.5m | B : 1.2m | D : 1.8m
SOAK PIT
1.2m DIA.
1.8m DEPTH

GIRL'S TOILET CWSN W.C. URINALS


DESIGN CODE :GTB - 04 - 01 02

GROUND FLOOR PLAN


DRAWING NO
GTB-04 : 8/14
0.30 0.30 0.30 0.30

300mm X 300mm glossy

0.30
ceramic glazed tiles
0.40

0.42
0.15

0.30
Cubby hole

0.12
for soap

35MM double polish kotah stone vertical support kotah stone

0.20

0.80
0.80

0.70
35mm single polish kotah stone

0.70
support with 10mm slope

0.60

0.40
0.40
N.T. N.T.

ELEVATION SECTION

Cubby hole
for soap

EQ EQ

0.30 0.60 0.30

0.40
35mm single polish kotah stone
support with 10mm slope

The tap at The tap at GIRL'S TOILET


height 0.70 mt. height 0.80 mt.
CWSN W.C. URINALS
DESIGN CODE :GTB - 04 - 01 02
PLAN
HAND WASH DETAIL
DETAIL - D1 (HAND WASH) DRAWING NO
GTB-04 : 9/13

83
84
INLET PIPE FOR
THROWING WASTE

VENT PIPE

0.45
M.S.JALI TO COLLECT WASTE BRICK WALL

0.12
0.12 0.60 0.12
M.S.SHUTTER (CLOSED)

VENT PIPE VENT PIPE

R.C.C OR STONE COVER R.C.C OR STONE COVER


0.55
TOP HUNG M.S.SHUTTER
FOR DISPOSAL OF
WASTE NEPKINS
M.S.SHUTTER (CLOSED) M.S.SHUTTER (CLOSED)
M.S.JALI TO COLLECT WASTE BRICK WALL

0.85
M.S.SHUTTER (WITH GRILL)

0.70
M.S.SHUTTER (WITH GRILL)

1.25
SOLID FUEL FOR PLINTH PROTECTION
BURNING THE WASTE
C.W.S.N (INSIDE)

GIRL'S TOILET CWSN W.C. URINALS


DESIGN CODE : GTB - 04 - 01 02
MASONARY INCINERATOR OUT SIDE OF GIRLS TOILET
INCINERATOR DETAIL
DRAWING NO
GTB - 04 : 10/13
NOTES

10
d(
>
GENERAL:-

75
mm
)
1. ALL R.C.C. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
REFERENCE TO THE ARCHITECT DRAWINGS .
d
2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS SPECIFIED
OTHERWISE.

Ld
3. ALL DIMENSIONS ARE TO BE CHECKED AND CORELATED WITH THE

Ld
BEAM WEB REINFORCEMENT
ARCHITECTURAL DRAWINGS AND ANY AMBIGUITY IF FOUND, THEREIN
d = DIA OF STIRRUPS
SHALL BE BROUGHT TO THE NOTICE TO THE OFFICE BEFORE
EXECUTION OF THE WORK. 8# @200C/C
30 60 60 30
4. LIVE LOADS ARE ADOPTED AS PER I.S. 875 - 1987 PART-2(L.L.) L-JUNCTION T-JUNCTION
75

5. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS


SHALL BE FOLLOWED. ARRANGEMENT OF BARS IN PLAN FOR 2-8# FOR EQ. ZONE-III
230 2-10# FOR EQ. ZONE-IV &V
STRENGTHENING AT WALL JUNCTIONS.
6. THE STRUCTURE IS DESIGNED FOR DEAD LOAD, LIVE LOAD, R.C.C. PLINTH BAND
SEISMIC LOAD AND WIND LOAD. SEISMIC LOADS AS PER I.S.:1893 FOR 230TH LOAD BEARING WALL
-2002 AND DEAD,LIVE AND WIND LOADS AS PER I.S.:875 - 1987. CROSS SECTION OF R.C.C. BAND

7. THE STRUCTURAL CONSULTANT IS NOT RESPONSIBLE FOR


230
QUALITY CONTROL AND SUPERVISION OF THE WORKS.
8. MORTAR MIX OF (CEMENT: SAND)1:4 SHALL BE USED. PLINTH LVL. PLINTH LVL.
8#@200 C/C
9. ALL BRICK SHALL CONFORM TO IS 1077 :1970 AND SHALL HAVE
75

MINIMUM CRUSHING STRENGTH OF 35KG/SQ.CM.

75 75
75

10. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.


B.K. MASONARY GR.LVL. B.K. MASONARY 2-8# GR.LVL.
11. IN C.M. (1:4) IN C.M. (1:6)
0.00 0.00
STATED.
12. REINFORCEMENT TO BE USED SHALL BE H.Y.S.D. BARS
CONFORMING TO I.S. 1786:2008.
13. LAP LENGTH SHALL BE PROVIDED AS UNDER.
MILD STEEL Fe. 415 (H.Y.S.D.) 350 350

175
175

GRADE OF CONCRETE
M:20 47D 57D
B.B.C.C. B.B.C.C.

150
150

MINI. 600mm.
MINI. 450mm.

M:25 41D 49D (1 : 5 : 10) (1 : 5 : 10)

UP TO GOOD SOIL
UP TO GOOD SOIL

14. CLEAR COVER TO MAIN REINFORCEMENTS SHALL BE 30mm 600 450


FOR BEAMS AND 20 mm FOR SLABS.
WALL - W1
15. CONTINUOUS PLINTH BANDS SHALL BE PROVIDED ADOPTING WALL - W2
FOR 230 TH. LOAD BEARING WALL FOR 230 TH. OTTA WALL
WALL JUNCTION DETAILS AS SHOWN IN DRAWING.
& PARTITION WALL
16. THE TOILET IS DESIGNED FOR GROUND FLOOR ONLY
GIRLS' TOILET CWSN W.C. URINALS
SPECIAL NOTE FOR STRUCTURE UP TO 10 KMS. FROM DESIGN CODE :GTB-04 - 01 02
SEA COAST
1. ALL CONCRETE MIX FOR SLABS AND BEAMS SHALL BE M25.
2. CLEAR COVER TO THE MAIN RAINFORECEMNT SHALL BE DRAWING NO
30mmFOR SLABS AND 40mm FOR BEAMS.
GTB-04 : 11/13

85
86
W1

W1 230
W1 PLINTH LVL.

PB
PB
8#@200 C/C 1-10# FOR EQ. ZONE-III
W2 W2 1-12# FOR EQ. ZONE-IV & V

75 75
BARS FROM FOUNDATIONS TO PASS
B.K. MASONARY THROUGH PLINGTH BAND, MASONARY AND
GR.LVL. 2-8# TO BE TAKEN IN TO AND ANCHORED IN TO SLAB
IN C.M. (1:4)
0.00

W1 W1 W2 115x115(M:20) CONCRETE

W1
350 P.C.C. (1:2:4)

175
( 350 x 500 x 175 )

150
B.B.C.C. ( 1:5:10 )

MINI. 600mm.
UP TO GOOD SOIL
W2 600

FOUNDATION PLAN WALL - W1

FOUNDATION DETAILS AT WALL JUNCTIONS


(DETAILS OF VERTICAL STEEL REINFORCEMENT)
150
2-8#

8#@150 C/C ALL

230
2-10#
PB1

GIRLS' TOILET CWSN W.C. URINALS


DESIGN CODE :GTB-04 - 01 02

STRUCTURAL DETAILS - FOUNDATION LEVEL


FOUNDATION DESIGN SHALL BE REVISED AS PER SOIL TYPE, SPECIALLY FOR BLACK COTTON & FILLED UP SOIL DRAWING NO
GTB-04 : 12/13
SCHEDULE OF REINFORCEMENT FOR SLABS
A 8# @ 200 C/C ALTERNATE BENT UP BARS
B 8# @ 250 C/C DISTRIBUTION STEEL

SB1
ALL SLABS ARE 100 THICK.

400
POSITION OF P.V.C.WATER TANK
CAPACITY AS PER ARCH.DRAWING.

2-10# A 500 B @ TOP & BOT.


500

SB2
A
2-8# 2-10#

400
SB2
8#@150C/C 8#@150C/C

100
100

SB2
2-10# 3-10#
230 230
STRUCTURAL LAY-OUT AT SLAB LVL.
SB1 SB2

GIRLS' TOILET CWSN W.C. URINALS


NOTE: DESIGN CODE :GTB-04 - 01 02
1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED OTHERWISE.
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL STRUCTURAL DETAILS - SLAB LEVEL
STRUCTURAL DETAILS PLEASE REFER DRAWING NO.- DRAWING NO
BTB-01:11/13
GTB-04 : 13/13

87
ESTIMATE – GTB – 04 – 3 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
1 Excavation for foundation up to 1.5m depth 7.55 Cmt. 83.00 626.65
including sorting out. Stacking of useful materials
and disposing of the excavated stuff up to
50mt.lead. (Item no.-1 (0)(A) page.-22) Loose or
soft soil.
2 Providing & Laying Brick bat cement Concrete 2.52 Cmt. 2,126.00 5,357.52
1:5:10 (1Cement : 5Coarse sand :10 graded brick
bats) in foundation and plinth and curing complete
excluding cost of formwork (Item no-(9)5.3.8
Pg.27)
3 Brick work using common burnt clay building 4.76 Cmt. 3,651.00 17,378.76
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand) R.A
4 Filling with the available excavated earth 6.04 Cmt. 53.40 322.54
(excluding rock) in trenches, plinth, sides of
foundation etc.in layers not exceeding 20cm in
depth consolidating each deposited layer by
ramming and watering. (item no-(6)4.12 pg.23
5 Providing & Laying brick bat cement Concrete 0.93 Cmt. 2,396.00 2,228.28
1:4:8 (1 Cement: 4 Coarse sand: 8 graded brick
bat) in foundation and plinth and curing complete
excluding cost of formwork. (Item no.-
8(5.3.3)page.-27)
6 Providing & Laying ordinary cement Concrete 0.37 Cmt. 4,689.00 1,734.93
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC coping .R.A..
7 Providing & Laying ordinary cement Concrete 0.67 Cmt. 4,001.00 2,680.67
1:2:4 (1 Cement :2 Coarse sand:4 graded stone
aggregates) and finishing smooth with curing etc.
complete excluding the cost of formwork for
concrete work in plinth protection & corner bar
bed. item no10(5.3.13)pg-27

8 Brick work using common burnt clay building 6.33 Cmt. 3,769.00 23,857.77
conventional bricks having crushing strength not
less than 35kg/sq. cm. In super structure in
cement mortar 1:4 (1cement:4fine sand) R.A

9 Half brick masonry in common brunt clay building 8.37 Smt. 500.70 4,190.86
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand)in super
structure including curing etc. complete.(Item no-
(8)6.3 I(B) Pg.42)+(Item no-(10)6.32(B) Pg.43)

88
ESTIMATE – GTB – 04 – 3 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
10 Providing & Laying ordinary cement Concrete 1.22 Cmt. 6,455.00 7,875.10
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC slabs having thickness
more than 10 cm and up to 13cm thickness. R.A.
11 Providing & Laying reinforcement for RCC work 166.60 Kg. 54.00 8,996.40
including bending, binding and placing in position
etc. complete up to floor two level Thermo
Mechanical Treated Bars as per I.S.
Standard.(T.M.T ) (item no-14A (5.4.11(A)pg.28
12 Providing 10mm thick inside cement plaster in 54.10 Smt. 100.00 5,410.00
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no1 (17.58)
(I) Pg.89
13 Providing 15mm thick outside cement plaster in 42.83 Smt. 137.10 5,871.99
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no3 (17.60)
(I) Pg.89
14 Providing & Fixing 30mm thick polished Kotah 1.20 Rmt 603.00 723.60
stone 40cm wide & 20cm depth for HAND WASH
FACILITY as per approved drawing & details by
engineer in charge including making hole with
waste water pipe, coupling ,rubbing etc. comp.
R.A
15 40mm thick cement concrete flooring 1:2:4 7.09 Smt. 236.00 1,673.24
(1cement:2 coarse sand: 4 graded stone
aggregates 20mm normal size) laid in one layer
finished with a floating coat of neat cement, curing
etc. Complete. (Item no-15(14.71)(A) Pg.78)
16 Providing cement vata (10cmx10cm size) quarter 14.02 Rmt 22.60 316.85
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. (Item no-
15(0.0)Pg.91
17 Providing & fixing washbasin with hole for pillar - Each 2,033.00 -
tap with C.I or M.S brackets painted with including
cutting holes and making good .(A)vitreous china
(II)Flat back washbasin 550mmx400mm in white
colour including pillar tap, waste pipe, stop cock,
union required all fitting, fixture etc. comp. RA

18 Construction of ICN chamber as per approved 1.00 Each 2,250.00 2,250.00


drawing & design complete detail. R.A.

89
ESTIMATE – GTB – 04 – 3 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
19 Providing & Fixing 25mm thick double polished - Smt. 773.00 -
vertical Kotah stone for (partition) urinal as par
drawing including round edge moulding etc.
comp. R,A
20 Providing & fixing 40 mm dia. MS hollow pipe - Rmt 976.00 -
(B-TYPE) 78 cm height railing for ramp as per
approved drawing & details by engineer in charge
including applying primer coat & two coats of oil
paints comp. R,A
21 Providing & Fixing in position M.S. Angle 316.80 Kg. 75.00 23,760.00
40mmx40mmx6mm Angle frame for door and
35mmx35mmx5mm angle frame for shutters, 18
gauge iron sheet of shutters with 4 nos. of hold
fasts for door as per the approved drawing &
design including applying a priming coat of red
lead paint and all necessary fittings fixtures,
locking arrangements etc. Complete. (Item no-
25(10.100)Pg.56)
22 Painting two coats (Excluding Priming coat) on 17.82 Smt. 61.60 1,097.71
new steel and other metal, surfaces with enamel
paint, brushing , interior to give an even shade
including cleaning the surface of all dirt, dust and
other foreign matter etc. Complete(Item
no2(19.7).Pg.98)
23 White washing with lime on undecorated wall 54.10 Smt. 8.10 438.21
surfaces, 3 coats to give an even shade including
thoroughly brooming the surface to remove all
dirt, dust, mortar drops and other foreign matter,
(Item no-1(18.11) +(Item no-3(18,13) Pg.93)

24 Providing & Applying three coats of 100% acrylic 42.83 Smt. 74.00 3,169.42
base matt finishing exterior paint of approved
manufacture of required shade on external
surface to give an even shade after thoroughly
brushing the surface free from mortar dropping &
other foreign matter before application of paint
etc. complete as directed for all floors and all
lifts.(Item no-35 (0.0) Pg.220)

25 Providing and laying Ceramic tiles 6mm thick in 10.11 Smt. 746.00 7,542.06
skirting, risers of steps & dado on 10 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;21(0.00)pg;79

26 Providing and laying Ceramic tiles 6mm thick in 8.07 Smt. 691.00 5,576.37
flooring, treads of steps & landing on 12 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;20(0.00)pg;79

90
ESTIMATE – GTB – 04 – 3 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
27 Providing up to floor two level precast cement 2.16 Smt. 528.00 1,140.48
concrete jali or grill mix(1 Cement :2 Coarse
sand:4 graded stone aggregates) reinforced with
1.6mm dia. mild steel wire including cleaning,
fixing and finishing in cement mortar 1:3 and
curing complete.(D)75 mm thick item
no;19(5.6.2)(D)pg;28

28 Construction of a soak pit of 1.2m dia. and depth 1.00 Each 1,418.00 1,418.00
1.8m (capacity 2.00 cmt volume) including
excavation and filling brick bats with dry brick
masonry as per the approved drawing & design
etc. complete item no;18(0)(A) pg. no;137

29 Providing & fixing 32 mm dia. pipe of 16G ASIS - Each 725.00 -


Grade-304 for Grab bar in CWSN W/C 75 cm long
as per given detail. R.A.

30 Providing & fixing 15mm dia screw down brass 5.00 NO. 226.00 1,130.00
chromium plated bib tap of approved quality etc.
complete. item no;28(23.92) pg;127

31 Providing & laying 150mm diameter salt glazed 4.00 Metre 236.00 944.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete.
item no;1(24.1)(A) pg;133

32 Providing & laying 100mm diameter salt glazed 12.50 Metre 165.00 2,062.50
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete
item no;1(24.1)(B) pg;133

33 Construction of brick masonry chamber of size 1.00 Each 3,909.00 3,909.00


455mm * 610mm internal dimensions and depth
up to 450mm for ground inspection chamber with
brick having crushing strength not less than
35Kg/sqcm. in cement mortar 1:5 40mm thick C.I
cover with frame (light duty) complete item
no;16(24.44 I)pg;137

34 Providing & fixing urinal of approved - Each 1,440.00 -


quality(550X300mm size) including connecting
trap and with integral longitudinal flush pipe and
15 mm dia brass screw down stop tap complete
item no;34(23.124)(A)+item
no;30(23.96)(A);PG;127

91
ESTIMATE – GTB – 04 – 3 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
35 Providing & fixing wash down water closet - Each 2,910.00 -
(European Type W.C. pan ) with integral P or S
trap including jointing the trap with soil pipe in CM
1 :1 (1 Cement : 1 fine sand ) including 12.5 litres
low level flushing PVC
cistern,seatcover.iteam10(23.112)pg;125+iteam
16(23.120)pg;126+iteam17(23.121)(ii)pg;126+ite
am 31pg,80.
36 Providing & fixing vitreous china long pattern 3.00 Each 1,586.00 4,758.00
white colour water closet squatting pan(Indian
type W.C. Pan) size 580mm including earthwork,
bed concrete, foot rests, G.I inlet connection for
flush pipe,trap,25mm flush cock etc. Complete
item9(23.111)pg;124+iteam11(23.113)pg;125+it
eam12(23.114)pg;125+itean;16(23.120)pg;126+i
team 32(0.0)pg;127

37 Providing & fixing PVC water tanks of 500 LITRES 250.00 LIT 5.00 1,250.00
as required on terrace level including making
platform for bottom support and making
necessary inlet, outlet and overflow connection
etc. complete.
38 Providing & fixing gun metal check or non-return 2.00 No. 576.00 1,152.00
full way wheel valve(A)25mm dia item
no;30(23.99)(C)PG;127
39 Construction of septic tank of size 2.00 Mt length 1.00 No. 29,200.00 29,200.00
x 1.2 Mt width internal dimensions and depth up
to 1.8mt with brick having crushing strength not
less than 35Kg/sqcm. in cement mortar 1:6
including 0.60 X 0.60 cement cover as per
approved drawing etc. comp. R.A
40 Providing and fixing 25mm dia U.P.V.C.Pipe 33.00 RMT 102.00 3,366.00
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;8 pg;129
41 Providing and fixing 15mm dia U.P.V.C.Pipe 5.00 RMT 85.00 425.00
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;7 pg;129
42 Providing and fixing 50mm dia G.I. Rain water 1.00 No. 285.00 285.00
spout 60CM long complete. R.A
43 providing & fixing stone wear gully trap with C.I 3.00 Each 1,483.00 4,449.00
grating brick masonry chamber and water tight C.I
cover with frame of 300mm X 300mm size with
standard weight (i) square mouth traps 150m x
100 mm size p or R type etc. complete. item
no;6(24.19 B) pg;134

92
ESTIMATE – GTB – 04 – 3 NORMAL W.C. / URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
44 providing & fixing PVC SWR nahni trap IS 14735 1.00 Each 355.00 355.00
for drain-100mm diameter with jali of following
nominal diameter of self-cleansing design with CI
spread down including cost of cutting comp. item
no;14 pg;131
45 Providing & fixing stainless steel soap tray near 1.00 Each 50.00 50.00
wash basin & hand wash facility etc. comp. RA
46 Painting of logo on front side wall. (R.A) 1.00 No. 700.00 700.00
TOTAL COST RS. 1,89,672.91
ADDING 3% CONTINGENCY 1,95,363.10
SAY RS. 1,95,400.00

93
94
BOYS' TOILET | BTB - 01
BEST ORIENTATION
CWSN TOILET W.C. URINAL
H
RT
NO
1 1 5
SATISFACTORY ORIENTATION

NORTH
ORIENTATION PRIORITY ON SITE
ACCEPTABLE ORIENTATION
DETAILS OF DRAWINGS
NORTH
DRAWING NO. PARTICULARS
BTB-01:1/13 GROUND FLOOR PLAN

BTB-01:2/13 TERRACE PLAN

BTB-01:3/13 FLOORING PATTERN

BTB-01:4/13 ELEVATIONS

BTB-01:5/13 ELEVATIONS

BTB-01:6/13 SECTIONS

BTB-01:7/13 SECTIONS

BTB-01:8/13 WATER SUPPLY LAYOUT

BTB-01:9/13 DRAINAGE LAYOUT

BTB-01:10/13 RAILING AND HANDWASH

BTB-01:11/13 STRUCTURAL DETAILS -


GENERAL NOTES, WALL SECTIONS, PLINTH BENDS

BTB-01:12/13 STRUCTURAL DETAILS - FOUNDATION LEVEL

BTB-01:13/13 STRUCTURAL DETAILS - SLAB LEVEL


S1 C S2
DOOR-WINDOW SCHEDULE
0.115 4.93 0.115 TYPE SIZE LIN. SILL NOS. REMARKS
_
2.80 2.13 D 1.20 X 2.40 2.40M 1 M.S.SHUTTER
_
D1 1.00 X 2.40 2.40M 1 BOTH SIDE OPENABLE
M.S.SHUTTER
0.45 0.71 0.60 0.74 0.60 0.15 0.73 0.90 0.73 0.45 _
D2 0.70 X 2.40 2.40M 1 M.S.SHUTTER
V 1.20 X 0.90 2.40M 1.50 1 M.S.JALI
V1 0.90 X 0.60 2.40M 1.80 1 CEMENT JALI
Plinth protection V2 0.47 X 1.20 2.40M 1.20 1 LOUVERS
V3 0.60 X 0.60 2.40M 1.80 3 CEMENT JALI

0.45
0.115
Plinth protection

0.45
CWSN
1.90 X 2.10

0.115
2.10
2.33

0.60
S3
Lvl :+0.45 Lvl :+0.45

1.45
0.78 0.78
W.C.
Both side
0.90 x 1.10 4.59
4.36

polished

0.23
kotah stone D

2.65
1.56 0.32 0.70 0.23 1.00 0.50 0.40
B

3.25
1.82

Plinth protection
Plinth protection

0.30
BOYS' TOILET

1.20
1.20
0.60
1.43

Kotah stone
1.20 mt. X 0.90 mt. Lvl :+0.40 platform as per
S4
M . S . j a l i detail - D1
0.86 0.86 0.86 0.23 1.20 0.23
0.30

0.23
Lvl :+0.45 Lvl :+0.45 Lvl :+0.45

0.60

0.60
0.83
0.60

0.60

0.115
0.115

I.P.S. FINISH
RAMP UP Lvl :+0.38
1.31

1.32
1.32

Lvl : 00 I.P.S. FINISH ON RAMP 0.23 mt. thk. and 0.90


mt. high brick wall
M.S.railing as per detail - D2

0.65 4.00 1.20 0.23

1.22 0.60 1.22 1.20 0.23 0.47 0.23 0.45


BOYS' TOILET CWSN W.C. URINALS
DESIGN CODE :BTB-01 01 01 05
2.80 1.43 0.70
0.115 4.93 0.115
GROUND FLOOR PLAN
A DRAWING NO
BTB-01 : 1/13

95
96
S1 S2

1.12
60 CM LONG 50 mm G.I.
PIPE FOR WATER SPOUT PVC overhead
water tank
capacity 500 lit.
2.80 1.90
S3

0.45

TERRACE
0.23 X 0.35
WE A T H E R
Lvl :+2.92 BRICK CURBING

3.02
S H E D
40mm I.P.S. FINISH FLOOR

1.50
ABOVE R.C.C. SLAB
S4

4.70

BOYS' TOILET CWSN W.C. URINALS


DESIGN CODE :BTB-01 01 01 05

TERRACE PLAN
DRAWING NO
BTB-01 : 2/13
FINISH I.P.S.
F L O O R

1 2 3 4 5 6 R

2
FINISH I.P.S.
F L O O R 3
Lvl :+0.35

4 0.30 mt. X 0.30 mt. matte


Glazed ceramic tile
120mm X 120mm deep channel 1 2 3
5
Lvl :+0.45 Lvl :+0.45 2
1 2 R 1 2 R 6
3
6 7
Lvl :+0.38
4
5

FINISH I.P.S.
F L O O R
FINISH I.P.S.
F L O O R

Lvl :+0.40
3 0.30 mt. X 0.30 mt. matte
2 Glazed ceramic tile

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 R
R 1 R R 1 R R 1 R
Lvl :+0.45 Lvl :+0.45 Lvl :+0.45
R R R
120mm X 120mm deep channel

Lvl : 00
RAMP UP 1:10
Lvl :+0.38
300 X 300
BROOM FINISH
ANTI SKID FINISH I.P.S.
I.P.S. FLOOR BOYS' TOILET CWSN W.C. URINALS
T I L E S F L O O R DESIGN CODE :BTB-01 01 01 05

FLOORING PATTERN
DRAWING NO
BTB-01 : 3/13

97
98
WE A T H ER CURBING TOP
S H E D +3.27

SLAB BOTTOM
+2.80
Cement jali

SILL
15 mm thk.
+1.60
0.78 mt. high Mala plaster
M.S. pipe railing

PLINTH PROTECTION.
+0.30

ELEVATION - A

W E A T HE R
S H E D CURBING TOP
+3.27

SLAB BOTTOM
+2.80

SILL
+1.90

10 mm x 10 mm M.S.
bar 0.10mt. c/c
0.78 mt. high
M.S. pipe railing
15 mm thk.
Mala plaster
PLINTH LVL. BOYS' TOILET CWSN W.C. URINALS
DESIGN CODE :BTB-01 01 01 05
+0.40
RAMP
ELEVATIONS
ELEVATION - B DRAWING NO
BTB-01 : 4/13
CURBING TOP
WEATHER +3.27
SHED SLAB TOP
+2.92

Cement jali
SILL
+2.20

15 mm thk. 15 mm thk. 0.78 mt. high


Mala plas ter Mala plaster M.S. pipe railing

Plinth protection
finished with I.P.S.
PLINTH PROTECTION.
+0.30

ELEVATION - C

CURBING TOP
+3.27

0.23 mt. thk. and 0.90 15 mm thk.


mt. high brick wall Mala plaster

Plinth protection
finished with I.P.S.
PLINTH PROTECTION. BOYS' TOILET CWSN W.C. URINALS
+0.30 DESIGN CODE :BTB-01 01 01 05

ELEVATIONS
ELEVATION - D
DRAWING NO
BTB-01 : 5/13

99
100
0.23 mt. X 0.35 mt.
brick curbing
Cement vata CURBING TOP
TERRACE +3.27
Lvl :+2.92 SLAB TOP
+2.92
0.60 mt. X 0.60 mt. high
cement jali ventilation

0.60
0.90
SILL
+2.20

120mm X 120mm
Both side polished kota stone

2.40
deep channel as a vertical partition

1.80
1.50
10 mm thk.

1.15
0.78 mt. high M.S. Plinth protection
Mala plaster
pipe railing finished with I.P.S.

0.60

0.05

0.45
BOYS' TOILET PLINTH LVL.
+0.40
GROUND LVL.

SECTION 1-1
0.23 mt. X 0.35 mt.
brick curbing
Cement vata CURBING TOP
TERRACE +3.27
Lvl :+2.92 SLAB TOP

0.12 0.35
+2.92
1.50 mt. high 0.30 mt. X

0.40
0.30 mt. glossy finished M.S. grill

0.60
ceramic tile on wall over the door
0.23 mt. thk. and 0.90
Vertical Grab bar 10 mm thk. mt. high brick wall
Mal a plaster
START 2 3 4 5 6 7 0.78 mt. high
HERE

4 3 2 START
M.S. pipe railing
2
HERE
Mirror PARAPET TOP

0.60
Cubby hole

1.80
3 2 +1.30
for soap

4 15 mm thk.
3

0.90
0.80
0.78

0.70
Mala plaster

0.70
0.70
0.60
0.58

4
5

0.40
CWSN TOILET
BOYS' TOILET CWSN W.C. URINALS
DESIGN CODE :BTB-01 01 01 05
GROUND LVL.
SECTIONS
SECTION 2-2 DRAWING NO
BTB-01 : 6/13
0.60 mt. X 0.60 mt. high
cement jali ventilation
Cement vata CURBING TOP
TERRACE +3.27
Lvl :+2.92
SLAB TOP
+2.92

1.50 mt. high 0.30 mt. X 0.30


mt. glossy finished ceramic
10 mm thk. tile wall dado
1.20 mt. high 0.30 mt. X Mala plast er
10 mm thk. R 6 5 4 3 2 START
0.30 mt. glossy finished HERE
ceramic tile on wall START START
Mala plaster
2 R R 2
HERE HERE 2

0.60
0.60
2 2 START

1.80
2 3
HERE 3

1.50
3 3
Plinth protection

1.20
2
4
finished with I.P.S.

0.90
Bib cock
R R

0.70
0.70
3

0.45
5

0.47
W.C. CWSN TOILET PLINTH LVL.
+0.40
GROUND LVL.

SECTION 3-3

0.23 mt. X 0.35 mt.


brick curbing
Cement vata CURBING TOP
TERRACE +3.27
Lvl :+2.92 SLAB TOP
+2.92
M.S. grill

0.40
over the door

10 mm thk.
1.20 mt. high 0.30 mt. X
Mala plaster
0.30 mt. glossy finished
R 2 START R 2 START R 2 START ceramic tile on wall
HERE HERE HERE

2.00
2 2 2

Plinth protection
3 3 3

1.20
finished with I.P.S.

0.80
0.70
0.60

R R R

0.60

0.40
BOYS' TOILET PLINTH LVL. BOYS' TOILET CWSN W.C. URINALS
+0.40 DESIGN CODE :BTB-01 01 01 05

GROUND LVL.
SECTIONS
DRAWING NO
SECTION 4-4
BTB-01 : 7/13

101
102
SUPPLY FROM MAINS WATER SUPPLY FROM
TO OVER HEAD TANK OVER HEAD TANK

Lvl :+0.40

Lvl :+0.38
BOYS' TOILET CWSN W.C. URINALS
DESIGN CODE :BTB-01 01 01 05

Lvl : 00
WATER SUPPLY LAYOUT
DRAWING NO
BTB-01 : 8/13
SEPTIK TANK
L : 2.5m | B : 1.2m | D : 1.8m
SOAK PIT
1.2m DIA.
1.8m DEPTH

SOAK PIT
1.2m DIA.
1.8m DEPTH

Lvl :+0.40

BOYS' TOILET CWSN W.C. URINALS


Lvl :+0.38 DESIGN CODE :BTB-01 01 01 05

Lvl : 00
DRAINAGE LAYOUT
DRAWING NO
BTB-01 : 9/13

103
104
Cubby hole
for soap

EQ EQ

0.30 0.60 0.30

0.40
35mm single polish kotah stone
support with 10mm slope

0.30 0.30 0.30 0.30

300mm X 300mm glossy

0.30
ceramic glazed tiles
0.40

0.42
The tap at The tap at
0.15 height 0.70 mt. height 0.80 mt.

0.30
Cubby hole PLAN

0.12
for soap

3 5 M M d o u b l e p o l i s h k o t a h s t o n e v e r t i c a l s u p p o rt kotah stone

0.20

0.80
0.80
35mm single polish kotah stone

0.70
0.70
support with 10mm slope

0.60

0.40
0.40
N.T. N.T.

DETAIL - D1 (HAND WASH)


ELEVATION SECTION

4.00 1.43
0.30 0.82 0.82 0.82 0.82 0.82 1.02 0.34

40mm DIA. M.S.HOLLOW PIPE


0.78
0.60

0.78
0.60
DETAIL - D2 (HAND RAIL) BOYS' TOILET CWSN W.C. URINALS
DESIGN CODE :BTB-01 01 01 05

DETAILS OF RAILING & HAND WASH


DRAWING NO
BTB-01 : 10/13
NOTES

10
d(
>
GENERAL:-

75
mm
)
1. ALL R.C.C. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
REFERENCE TO THE ARCHITECT DRAWINGS .
d
2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS SPECIFIED
OTHERWISE.

Ld
3. ALL DIMENSIONS ARE TO BE CHECKED AND CORELATED WITH THE

Ld
BEAM WEB REINFORCEMENT
ARCHITECTURAL DRAWINGS AND ANY AMBIGUITY IF FOUND, THEREIN
d = DIA OF STIRRUPS
SHALL BE BROUGHT TO THE NOTICE TO THE OFFICE BEFORE
EXECUTION OF THE WORK. 8# @200C/C
30 60 60 30
4. LIVE LOADS ARE ADOPTED AS PER I.S. 875 - 1987 PART-2(L.L.) L-JUNCTION T-JUNCTION
75

5. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS


SHALL BE FOLLOWED. ARRANGEMENT OF BARS IN PLAN FOR 2-8# FOR EQ. ZONE-III
230 2-10# FOR EQ. ZONE-IV &V
STRENGTHENING AT WALL JUNCTIONS.
6. THE STRUCTURE IS DESIGNED FOR DEAD LOAD, LIVE LOAD, R.C.C. PLINTH BAND
SEISMIC LOAD AND WIND LOAD. SEISMIC LOADS AS PER I.S.:1893 FOR 230TH LOAD BEARING WALL
-2002 AND DEAD,LIVE AND WIND LOADS AS PER I.S.:875 - 1987. CROSS SECTION OF R.C.C. BAND

7. THE STRUCTURAL CONSULTANT IS NOT RESPONSIBLE FOR


230
QUALITY CONTROL AND SUPERVISION OF THE WORKS.
8. MORTAR MIX OF (CEMENT: SAND)1:4 SHALL BE USED. PLINTH LVL. PLINTH LVL.
8#@200 C/C
9. ALL BRICK SHALL CONFORM TO IS 1077 :1970 AND SHALL HAVE
75

MINIMUM CRUSHING STRENGTH OF 35KG/SQ.CM.

75 75
75

10. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.


B.K. MASONARY GR.LVL. B.K. MASONARY 2-8# GR.LVL.
11. IN C.M. (1:4) IN C.M. (1:6)
0.00 0.00
STATED.
12. REINFORCEMENT TO BE USED SHALL BE H.Y.S.D. BARS
CONFORMING TO I.S. 1786:2008.
13. LAP LENGTH SHALL BE PROVIDED AS UNDER.
MILD STEEL Fe. 415 (H.Y.S.D.) 350 350

175
175

GRADE OF CONCRETE
M:20 47D 57D
B.B.C.C. B.B.C.C.

150
150

MINI. 600mm.
MINI. 450mm.

M:25 41D 49D (1 : 5 : 10) (1 : 5 : 10)

UP TO GOOD SOIL
UP TO GOOD SOIL

14. CLEAR COVER TO MAIN REINFORCEMENTS SHALL BE 30mm 600 450


FOR BEAMS AND 20 mm FOR SLABS.
WALL - W1
15. CONTINUOUS PLINTH BANDS SHALL BE PROVIDED ADOPTING WALL - W2
FOR 230 TH. LOAD BEARING WALL FOR 230 TH. OTTA WALL
WALL JUNCTION DETAILS AS SHOWN IN DRAWING.
& PARTITION WALL
16. THE TOILET IS DESIGNED FOR GROUND FLOOR ONLY
BOYS' TOILET CWSN W.C. URINALS
SPECIAL NOTE FOR STRUCTURE UP TO 10 KMS. FROM DESIGN CODE :BTB-01 01 01 05
SEA COAST
1. ALL CONCRETE MIX FOR SLABS AND BEAMS SHALL BE M25.
2. CLEAR COVER TO THE MAIN RAINFORECEMNT SHALL BE DRAWING NO
30mmFOR SLABS AND 40mm FOR BEAMS.
BTB-01 : 11/13

105
106
W1

230
PLINTH LVL.
W1 1-10# FOR EQ. ZONE-III
8#@200 C/C

W1

W1
1-12# FOR EQ. ZONE-IV & V

75 75
BARS FROM FOUNDATIONS TO PASS
B.K. MASONARY THROUGHPLINGTH BAND, MASONARY AND
GR.LVL. 2-8# TO BE TAKEN IN TO AND ANCHORED IN TO SLAB
IN C.M. (1:4)
0.00

W1
W2
115x115(M:20) CONCRETE

W1 350 P.C.C. (1:2:4)

175
W2 ( 350 x 500 x 175 )

150
B.B.C.C. ( 1:5:10 )

MINI. 600mm.

W1
UP TO GOOD SOIL
600

W1
WALL - W1

W1 W1 FOUNDATION DETAILS AT WALL JUNCTIONS

W1

W1

W2

W2
W2 W2

FOUNDATION PLAN

BOYS' TOILET CWSN W.C. URINALS


DESIGN CODE :BTB-01 01 01 05

STRUCTURAL DETAILS - FOUNDATION LEVEL


FOUNDATION DESIGN SHALL BE REVISED AS PER SOIL TYPE, SPECIALLY FOR BLACK COTTON & FIELD UP SOIL DRAWING NO
BTB-01 : 12/13
SCHEDULE OF REINFORCEMENT FOR SLABS
SB1 A 8# @ 200 C/C ALTERNATE BENT UP BARS
B 8# @ 250 C/C DISTRIBUTION STEEL
C 8# @ 150 C/C ALTERNATE BENT UP BARS
POSITION OF P.V.C.WATER TANK
CAPACITY AS PER ARCH.DRAWING. ALL SLABS ARE 100 THICK.
SB2
C

450
2-8# 2-10#

8#@150C/C 8#@150C/C

A
100
100
450 450
2-10# 3-10#
230 230
A B
400 550

SB3

SB3
SB1 SB2
650 400 300
A
2-10#

450
B @ TOP 8#@150C/C
& BOTTOM 100

SB2 SB1 3-12#


230

SB3

STRUCTURAL LAY-OUT AT SLAB LVL.

BOYS' TOILET CWSN W.C. URINALS


NOTE: DESIGN CODE :BTB-01 01 01 05
1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED OTHERWISE.
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL STRUCTURAL DETAILS - SLAB LEVEL
STRUCTURAL DETAILS PLEASE REFER DRAWING NO.- DRAWING NO
BTB-01:11/13
BTB-01 : 13/13

107
ESTIMATE – BTB – 01 – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
1 Excavation for foundation up to 1.5m depth 13.48 Cmt. 83.00 1,118.84
including sorting out. Stacking of useful materials
and disposing of the excavated stuff up to
50mt.lead. (Item no.-1 (0)(A) page.-22) Loose or
soft soil.
2 Providing & Laying Brick bat cement Concrete 3.65 Cmt. 2,126.00 7,759.90
1:5:10 (1Cement : 5Coarse sand :10 graded brick
bats) in foundation and plinth and curing complete
excluding cost of formwork (Item no-(9)5.3.8
Pg.27)
3 Brick work using common burnt clay building 8.57 Cmt. 3,651.00 31,289.07
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand) R.A
4 Filling with the available excavated earth 10.78 Cmt. 53.40 575.65
(excluding rock) in trenches, plinth, sides of
foundation etc.in layers not exceeding 20cm in
depth consolidating each deposited layer by
ramming and watering. (item no-(6)4.12 pg.23
5 Providing & Laying brick bat cement Concrete 2.46 Cmt. 2,396.00 5,894.16
1:4:8 (1 Cement: 4 Coarse sand: 8 graded brick
bat) in foundation and plinth and curing complete
excluding cost of formwork. (Item no.-
8(5.3.3)page.-27)
6 Providing & Laying ordinary cement Concrete 0.60 Cmt. 4,689.00 2,813.40
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC coping .R.A..
7 Providing & Laying ordinary cement Concrete 1.25 Cmt. 4,001.00 5,001.25
1:2:4 (1 Cement :2 Coarse sand:4 graded stone
aggregates) and finishing smooth with curing etc.
complete excluding the cost of formwork for
concrete work in plinth protection & corner bar
bed. item no10(5.3.13)pg-27
8 Brick work using common burnt clay building 12.33 Cmt. 3,769.00 46,471.77
conventional bricks having crushing strength not
less than 35kg/sq. cm. In super structure in
cement mortar 1:4 (1cement:4fine sand) R.A
9 Half brick masonry in common brunt clay building 4.69 Smt. 500.70 2,348.28
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand)in super
structure including curing etc. complete.(Item no-
(8)6.3 I(B) Pg.42)+(Item no-(10)6.32(B) Pg.43)
10 Providing & Laying ordinary cement Concrete 2.51 Cmt. 6,455.00 16,202.05
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing

108
ESTIMATE – BTB – 01 – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC slabs having thickness
more than 10 cm and up to 13cm thickness. R.A.
11 Providing & Laying reinforcement for RCC work 185.52 Kg. 54.00 10,018.08
including bending, binding and placing in position
etc. complete up to floor two level Thermo
Mechanical Treated Bars as per I.S.
Standard.(T.M.T ) (item no-14A (5.4.11(A)pg.28
12 Providing 10mm thick inside cement plaster in 75.64 Smt. 100.00 7,564.00
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no1 (17.58)
(I) Pg.89
13 Providing 15mm thick outside cement plaster in 67.29 Smt. 137.10 9,225.46
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no3 (17.60)
(I) Pg.89
14 Providing & Fixing 30mm thick polished Kotah 1.20 Rmt 603.00 723.60
stone 40cm wide & 20cm depth for HAND WASH
FACILITY as per approved drawing & details by
engineer in charge including making hole with
waste water pipe, coupling ,rubbing etc. comp.
R.A
15 40mm thick cement concrete flooring 1:2:4 24.14 Smt. 236.00 5,697.04
(1cement:2 coarse sand: 4 graded stone
aggregates 20mm normal size) laid in one layer
finished with a floating coat of neat cement, curing
etc. Complete. (Item no-15(14.71)(A) Pg.78)
16 Providing cement vata (10cmx10cm size) quarter 19.32 Rmt 22.60 436.63
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. (Item no-
15(0.0)Pg.91
17 Providing & fixing washbasin with hole for pillar 1.00 Each 2,033.00 2,033.00
tap with C.I or M.S brackets painted with including
cutting holes and making good .(A)vitreous china
(II)Flat back washbasin 550mmx400mm in white
colour including pillar tap, waste pipe, stop cock,
union required all fitting, fixture etc. comp. RA
18 Construction of ICN chamber as per approved - Each 2,250.00 -
drawing & design complete detail. R.A.
19 Providing & Fixing 25mm thick double polished 2.16 Smt. 773.00 1,669.68
vertical Kotah stone for (partition) urinal as par
drawing including round edge moulding etc.
comp. R,A
20 Providing & fixing 40 mm dia. MS hollow pipe 10.26 Rmt 976.00 10,013.76
(B-TYPE) 78 cm height railing for ramp as per
approved drawing & details by engineer in charge

109
ESTIMATE – BTB – 01 – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
including applying primer coat & two coats of oil
paints comp. R,A
21 Providing & Fixing in position M.S. Angle 311.28 Kg. 75.00 23,346.00
40mmx40mmx6mm Angle frame for door and
35mmx35mmx5mm angle frame for shutters, 18
gauge iron sheet of shutters with 4 nos. of hold
fasts for door as per the approved drawing &
design including applying a priming coat of red
lead paint and all necessary fittings fixtures,
locking arrangements etc. Complete. (Item no-
25(10.100)Pg.56)
22 Painting two coats (Excluding Priming coat) on 17.30 Smt. 61.60 1,065.68
new steel and other metal, surfaces with enamel
paint, brushing , interior to give an even shade
including cleaning the surface of all dirt, dust and
other foreign matter etc. Complete(Item
no2(19.7).Pg.98)
23 White washing with lime on undecorated wall 75.64 Smt. 8.10 612.68
surfaces, 3 coats to give an even shade including
thoroughly brooming the surface to remove all
dirt, dust, mortar drops and other foreign matter,
(Item no-1(18.11) +(Item no-3(18,13) Pg.93)
24 Providing & Applying three coats of 100% acrylic 67.29 Smt. 74.00 4,979.46
base matt finishing exterior paint of approved
manufacture of required shade on external
surface to give an even shade after thoroughly
brushing the surface free from mortar dropping &
other foreign matter before application of paint
etc. complete as directed for all floors and all
lifts.(Item no-35 (0.0) Pg.220)
25 Providing and laying Ceramic tiles 6mm thick in 22.41 Smt. 746.00 16,717.86
skirting, risers of steps & dado on 10 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;21(0.00)pg;79
26 Providing and laying Ceramic tiles 6mm thick in 14.71 Smt. 691.00 10,164.61
flooring, treads of steps & landing on 12 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;20(0.00)pg;79
27 Providing up to floor two level precast cement 1.62 Smt. 528.00 855.36
concrete jali or grill mix(1 Cement :2 Coarse
sand:4 graded stone aggregates) reinforced with
1.6mm dia. mild steel wire including cleaning,
fixing and finishing in cement mortar 1:3 and
curing complete.(D)75 mm thick item
no;19(5.6.2)(D)pg;28
28 Construction of a soak pit of 1.2m dia. and depth 2.00 Each 1,418.00 2,836.00
1.8m (capacity 2.00 cmt volume) including
excavation and filling brick bats with dry brick

110
ESTIMATE – BTB – 01 – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
masonry as per the approved drawing & design
etc. complete item no;18(0)(A) pg. no;137
29 Providing & fixing 32 mm dia. pipe of 16G ASIS 2.00 Each 725.00 1,450.00
Grade-304 for Grab bar in CWSN W/C 75 cm long
as per given detail. R.A.
30 Providing & fixing 15mm dia screw down brass 4.00 NO. 226.00 904.00
chromium plated bib tap of approved quality etc.
complete. item no;28(23.92) pg;127
31 Providing & laying 150mm diameter salt glazed 5.50 Metre 236.00 1,298.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete.
item no;1(24.1)(A) pg;133
32 Providing & laying 100mm diameter salt glazed 15.00 Metre 165.00 2,475.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete
item no;1(24.1)(B) pg;133
33 Construction of brick masonry chamber of size 2.00 Each 3,909.00 7,818.00
455mm * 610mm internal dimensions and depth
up to 450mm for ground inspection chamber with
brick having crushing strength not less than
35Kg/sqcm. in cement mortar 1:5 40mm thick C.I
cover with frame (light duty) complete item
no;16(24.44 I)pg;137
34 Providing & fixing urinal of approved 5.00 Each 1,440.00 7,200.00
quality(550X300mm size) including connecting
trap and with integral longitudinal flush pipe and
15 mm dia brass screw down stop tap complete
item no;34(23.124)(A)+item
no;30(23.96)(A);PG;127
35 Providing & fixing wash down water closet 1.00 Each 2,910.00 2,910.00
(European Type W.C. pan ) with integral P or S
trap including jointing the trap with soil pipe in CM
1 :1 (1 Cement : 1 fine sand ) including 12.5 litres
low level flushing PVC
cistern,seatcover.iteam10(23.112)pg;125+iteam
16(23.120)pg;126+iteam17(23.121)(ii)pg;126+ite
am 31pg,80.
36 Providing & fixing vitreous china long pattern 1.00 Each 1,586.00 1,586.00
white colour water closet squatting pan(Indian
type W.C. Pan) size 580mm including earthwork,
bed concrete, foot rests, G.I inlet connection for
flush pipe,trap,25mm flush cock etc. Complete
item9(23.111)pg;124+iteam11(23.113)pg;125+it
eam12(23.114)pg;125+itean;16(23.120)pg;126+i
team 32(0.0)pg;127
37 Providing & fixing PVC water tanks of 500 LITRES 500.00 LIT 5.00 2,500.00
as required on terrace level including making

111
ESTIMATE – BTB – 01 – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
platform for bottom support and making
necessary inlet, outlet and overflow connection
etc. complete.
38 Providing & fixing gun metal check or non-return 2.00 No. 576.00 1,152.00
full way wheel valve(A)25mm dia item
no;30(23.99)(C)PG;127
39 Construction of septic tank of size 2.00 Mt length 1.00 No. 29,200.00 29,200.00
x 1.2 Mt width internal dimensions and depth up
to 1.8mt with brick having crushing strength not
less than 35Kg/sqcm. in cement mortar 1:6
including 0.60 X 0.60 cement cover as per
approved drawing etc. comp. R.A
40 Providing and fixing 25mm dia U.P.V.C.Pipe 33.70 RMT 102.00 3,437.40
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;8 pg;129
41 Providing and fixing 15mm dia U.P.V.C.Pipe 11.70 RMT 85.00 994.50
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;7 pg;129
42 Providing and fixing 50mm dia G.I. Rain water 1.00 No. 285.00 285.00
spout 60CM long complete. R.A
43 providing & fixing stone wear gully trap with C.I 4.00 Each 1,483.00 5,932.00
grating brick masonry chamber and water tight C.I
cover with frame of 300mm X 300mm size with
standard weight (i) square mouth traps 150m x
100 mm size p or R type etc. complete. item
no;6(24.19 B) pg;134
44 providing & fixing PVC SWR nahni trap IS 14735 4.00 Each 355.00 1,420.00
for drain-100mm diameter with jali of following
nominal diameter of self-cleansing design with CI
spread down including cost of cutting comp. item
no;14 pg;131
45 Providing & fixing stainless steel soap tray near 2.00 Each 50.00 100.00
wash basin & hand wash facility etc. comp. RA
46 Painting of logo on front side wall. (R.A) 1.00 No. 700.00 700.00
TOTAL COST RS. 2,98,795.17
ADDING 3% FOR CONTINGENCY 3,07,759.03
SAY RS. 3,07,800.00

112
BOYS' TOILET | BTB - 02
BEST ORIENTATION

H
RT
CWSN TOILET W.C. URINAL NO

SATISFACTORY ORIENTATION
1 2 8

NORTH
ORIENTATION PRIORITY ON SITE
ACCEPTABLE ORIENTATION

NORTH
DETAILS OF DRAWINGS

DRAWING NO. PARTICULARS


BTB-02:1/13 GROUND FLOOR PLAN

BTB-02:2/13 TERRACE PLAN

BTB-02:3/13 FLOORING PATTERN

BTB-02:4/13 ELEVATIONS

BTB-02:5/13 ELEVATIONS

BTB-02:6/13 SECTIONS

BTB-02:7/13 SECTIONS

BTB-02:8/13 WATER SUPPLY LAYOUT

BTB-02:9/13 DRAINAGE LAYOUT

BTB-02:10/13 RAILING AND HANDWASH

BTB-02:11/13 STRUCTURAL DETAILS -


GENERAL NOTE, WALL SECTIONS, PLINTH BENDS

BTB-02:12/13 STRUCTURAL DETAILS - FOUNDATION LEVEL

BTB-02:13/13 STRUCTURAL DETAILS - SLAB LEVEL

113
DOOR-WINDOW SCHEDULE

114
S1 C S2 TYPE SIZE LIN. SILL NOS. REMARKS
_
D 1.20 X 2.40 2.40M 1 M.S.SHUTTER
_
D1 1.00 X 2.40 2.40M 1 BOTH SIDE OPNEBLE
0.115 5.88 C/C 0.115
M.S.SHUTTER
3.75 2.12 _
D2 0.70 X 2.40 2.40M 2 M.S.SHUTTER
0.83 0.60 0.56 0.60 0.42 0.60 0.15 0.73 0.90 0.73 V 1.20 X 0.90 2.40M 1.50 1 M.S.JALI
V1 0.90 X 0.60 2.40M 1.80 1 CEMENT JALI
V2 0.47 X 1.20 2.40M 1.20 1 LOUVERS
V3 0.60 X 0.60 2.40M 1.80 3 CEMENT JALI

0.115
0.115
NT

1.12
Plinth protection

0.45
CWSN
1.90 X 2.10

2.33
0.45
S3

1.09
0.75
1.22
W.C. W.C.
0.90 x 1.10 0.90 x 1.10

0.75
5.19
0.60 0.78 0.43 0.70 0.32 0.70 0.23 1.00 0.90

4.96 C/C
4.96 C/C

B D

1.20

3.25
Both side polished
kotah stone Plinth protection

0.75
Kotah stone
platform as S4
2.03

1.80
1.80
Lvl :+0.40
per detail - D1

0.07

0.75

1.19
Plinth protection
NT 0.73 0.73 0.73 0.73 0.23 1.20 0.23 0.40

0.60

0.60
0.60

0.60

0.115
0.115

RAMP UP Lvl :+0.38


Lvl : 00

1.32
1.32

I.P.S. FINISH ON RAMP I.P.S. FINISH


M.S.railing as per detail - D2 0.23 mt. thk. and 0.90
mt. high brick wall
0.65 4.00 1.20 0.23

0.60 3.38 1.20 0.23 0.47 0.23

0.60 3.15 1.43 0.69 BOY'S TOILET CWSN W.C. URINALS


0.115 5.88 C/C 0.115 DESIGN CODE : BTB - 02 01 02 08

GROUND FLOOR PLAN


A DRAWING NO
BTB-02 : 1/13
S1 S2

100mm G.I. PIPE FOR

1.12
WATER SPOUNT PVC overhead
water tank
capacity 500 lit.

3.75 1.90
S3
0.45

TERRACE
Lvl :+2.92
4.73

0.23 X 0.35
40mm I.P.S. FINISH FLOOR

1.50
BRICK CURBING

3.01
ABOVE R.C.C. SLAB

WEATHER 3.62 S4
S H E D

0.60
5.05

BOY'S TOILET CWSN W.C. URINALS


DESIGN CODE : BTB - 02 01 02 08

TERRACE PLAN
DRAWING NO
BTB - 02 : 2/13

115
116
FINISH I.P.S.
F L O O R

1 2 3 4 5 6

2
FINISH I.P.S.
F L O O R 3 Lvl :+0.35
4 0.30 mt. X 0.30 mt. matte
Glazed ceramic tile
R 1 2 3 1 2 3
10 5
2 2 2
Lvl :+0.45 6
9
R 1 3 3
R 8 7
R R
2 7
Lvl :+0.45
R 1 6
R
FINISH I.P.S.
F L O O R

FINISH I.P.S.
F L O O R
2

120mm X 120mm deep channel


Lvl :+0.45 Lvl :+0.40
4
R 1 0.30 mt. X 0.30 mt. matte
R 3 Glazed ceramic tile

2 2
Lvl :+0.45
R 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 R
R 2 1 R 2 1 R 2 1 R 2 1
Lvl :+0.45 Lvl :+0.45 Lvl :+0.45 Lvl :+0.45
R R R R
120mm X 120mm deep channel

Lvl : 00
RAMP UP 1:10 I.P.S. FINISH
300 X 300 Lvl :+0.38
BROOM FINISH
ANTI SKID
I.P.S. FLOOR
T I L E S BOY'S TOILET CWSN W.C. URINALS
DESIGN CODE : BTB - 02 01 02 08

FLOORING PATTERN
DRAWING NO
BTB -02 : 3/13
W E A T H E R
CURBING TOP
S H E D
+3.27

SLAB BOTTOM
+2.80

15 mm thk.
Mala plaster
SILL
+1.60
0.78 mt. high
M.S. pipe railing

PLINTH PROTECTION
+0.30

ELEVATION - A

W E A T H E R
S H E D CURBING TOP
+3.27

SLAB TOP
+2.80

SILL
+1.90

10 mm x 10 mm M.S.
bar 0.10mt. c/c

BOY'S TOILET CWSN W.C. URINALS


DESIGN CODE : BTB - 02 01 02 08

RAMP ELEVATIONS
DRAWING NO
ELEVATION - B
BTB - 02 : 4/13

117
118
CURBING TOP
+3.27
SLAB TOP
+2.92

C e m e n t C e m e n t W E A T H E R
j a l i j a l i S H E D
SILL
+2.20

0 . 7 8 m t . h i gh
15 mm thk. 15 mm thk. M.S. pipe railing
Mala plaster Mala plaster

PLINTH PROTECTION.
+0.30

ELEVATION - C

CURBING TOP
+3.27

15 mm thk.
Mala plaste r
0.23 mt. thk. and 0.90
mt. high brick wall

Plinth protection
finished with I.P.S.
PLINTH PROTECTION.
+0.30 BOY'S TOILET CWSN W.C. URINALS
DESIGN CODE : BTB -02 01 02 08
ELEVATION - D
ELEVATIONS
DRAWING NO
BTB -02 : 5/13
0.23 mt. X 0.35 mt.
brick curbing
TERRACE Cement vata CURBING TOP
+3.27
Lvl :+2.92
SLAB TOP

0.12 0.35
+2.92
1.20 mt. high 0.30 mt. X M.S. grill
over the door

0.60
0.30 mt. glossy finished
10 mm thk.

0.90
ceramic tile on wall SILL
Mala plaster +2.20
Both side polished kota stone 10 mm thk.
as a vertical partition Mala plaster
0.90 mt. high 0.30 mt. X
START 2 R START 2 R
HERE HERE 0.30 mt. glossy finished
ceramic tile on wall

1.80
2 2
120mm X 120mm

1.50
3
deep channel

1.15
1.20
3 3
Plinth protection

0.90
2
finished with I.P.S.

0.60
R R
W.C. START
R 3 2 HERE PLINTH LVL.
+0.40

SECTION 1-1
0.23 mt. X 0.35 mt.
brick curbing
TERRACE Cement vata CURBING TOP
Lvl :+2.92 +3.27
SLAB TOP
+2.92
1.50 mt. high 0.30 mt. X
0.30 mt. glossy finished M.S. grill
ceramic tile on wall over the door

Vertical Grab bar


Cubby hole
START 2 3 4 5 6 7
HERE
for soap 0.78 mt. high
6 5 4 3 2 START M.S. pipe railing
2 HERE
Mirror PARAPET TOP

0.70
grab bar
2 +1.30
3
1.20

Plinth protection 4 3
0.80
0.78

finished with I.P.S.

0.70

0.70
0.70
0.60
0.60

0.40 4
5 CWSN TOILET I.P.S. FINISH PLINTH LVL.
+0.40 BOY'S TOILET CWSN W.C. URINALS
DESIGN CODE : BTB - 02 01 02 08

SECTIONS
SECTION 2-2 DRAWING NO
BTB -02 : 6/13

119
120
0.23 mt. X 0.35 mt.
brick curbing Cement vata CURBING TOP
TERRACE
+3.27
Lvl :+2.92
SLAB TOP

0.12 0.35
+2.92

0.60
SILL
1.20 mt. high 0.30 mt. X 10 mm thk. +2.20
0.30 mt. glossy finished 10 mm thk. Mala plaster
10 mm thk. R 6 5 4 3 2 START 1.50 mt. high 0.30 mt. X 0.30 mt.
ceramic tile on wall Mala plaste r HERE

0.90
Mala plaster glossy finished ceramic tile wall dado

2.40
2.40
START 2
HERE 2

0.60
2 START 2 3 START 2 3
HERE HERE 3 grab bar
120mm X 120mm

1.50
deep channel 3 2 2
4 Plinth protection

0.90
0.90
Bib cock Bib cock
finished with I.P.S.

0.70
R 3 3
W.C. W.C. 5
CWSN TOILET PLINTH LVL.
+0.40

SECTION 3-3

0.23 mt. X 0.35 mt.


brick curbing
TERRACE Cement vata CURBING TOP
Lvl :+2.92 +3.27
SLAB TOP
+2.92
M.S. grill 10 mm thk. WEATHER
over the door Mala plaster S H E D
1.20 mt. high 0.30 mt. X
Kotah stone 0.30 mt. glossy finished SILL
platform ceramic tile on wall +1.90
EQ EQ
START 2 R R 2 START START 2 R R 2 START
HERE HERE HERE HERE Both side polished kota stone
2 2 2 2
as a vertical partition

1.15
120mm X 120mm

1.20
3 3 3 3
deep channel

0.80
0.60

0.70
0.60
R R R R
0.45

0.40
PLINTH LVL. BOY'S TOILET CWSN W.C. URINALS
+0.40 DESIGN CODE : BTB - 02 01 02 08

SECTIONS
SECTION 4-4 DRAWING NO
BTB -02: 7/13
SUPPLY FROM MAINS WATER SUPPLY FROM
TO OVER HEAD TANK OVER HEAD TANK

Lvl :+0.35

Lvl :+0.38 Lvl :+0.38

Lvl :+0.40

Lvl :+0.38
BOY'S TOILET

Lvl : 00
CWSN W.C. URINALS
DESIGN CODE : BTB - 02 01 02 08

WATER SUPPLY
DRAWING NO
BTB - 02: 8/13

121
122
SEPTIK TANK
L : 3.0m | B : 1.2m | D : 1.8m
SOAK PIT
1.2m DIA.
1.8m DEPTH

Lvl :+0.35

Lvl :+0.38 Lvl :+0.38

SOAK PIT
1.2m DIA.
1.8m DEPTH

Lvl :+0.40

BOY'S TOILET CWSN W.C. URINALS


Lvl :+0.38
DESIGN CODE : BTB - 02 01 02 08

Lvl : 00
WATER SUPPLY
DRAWING NO
BTB - 02: 9/13
Cubby hole
for soap

0.60

0.30 0.60 0.60 0.30

0.40
35MM single polish kotah stone support with 10mm slope

0.30 0.30 0.31 0.30 0.30 0.30

0.30
300mm X 300mm glossy

0.42
ceramic glazed tiles
0.40
0.15

PLAN

0.30
Cubby hole

0.12
for soap

3 5 M M d o u b l e p o l i s h k o ta h s t o n e v e r t i c a l s u p p o r t

kotah stone

0.20

0.80

0.70
35MM single polish kotah stone

0.80
0.70
support with 10mm slope

0.60
0.40
N.T.
N.T.

DETAIL - D1 (HAND WASH)


ELEVATION SECTION

4.00 1.43
0.30 0.82 0.82 0.82 0.82 0.82 1.02 0.34

40mm DIA. M.S.HOLLOW PIPE


0.78
0.60

0.78
0.60
BOY'S TOILET CWSN W.C. URINALS
DETAIL - D2 (HAND RAIL) DESIGN CODE : BTB - 02 01 02 08

RAILING AND HANDWASH


DRAWING NO
BTB - 02: 10/13

123
124
NOTES 10
d(
>
GENERAL:- 75
mm
)
1. ALL R.C.C. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
REFERENCE TO THE ARCHITECT DRAWINGS .
d
2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS SPECIFIED
OTHERWISE.

Ld
3. ALL DIMENSIONS ARE TO BE CHECKED AND CORELATED WITH THE

Ld
BEAM WEB REINFORCEMENT
ARCHITECTURAL DRAWINGS AND ANY AMBIGUITY IF FOUND, THEREIN
d = DIA OF STIRRUPS
SHALL BE BROUGHT TO THE NOTICE TO THE OFFICE BEFORE
EXECUTION OF THE WORK.
8# @200C/C
4. LIVE LOADS ARE ADOPTED AS PER I.S. 875 - 1987 PART-2(L.L.) L-JUNCTION T-JUNCTION 30 60 60 30
5. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS
75

SHALL BE FOLLOWED.
2-8# FOR EQ. ZONE-III
6. THE STRUCTURE IS DESIGNED FOR DEAD LOAD, LIVE LOAD, ARRANGEMENT OF BARS IN PLAN FOR 230 2-10# FOR EQ. ZONE-IV &V
SEISMIC LOAD AND WIND LOAD. SEISMIC LOADS AS PER I.S.:1893 R.C.C. PLINTH BAND
STRENGTHENING AT WALL JUNCTIONS.
-2002 AND DEAD,LIVE AND WIND LOADS AS PER I.S.:875 - 1987. FOR 230TH LOAD BEARING WALL
7. THE STRUCTURAL CONSULTANT IS NOT RESPONSIBLE FOR CROSS SECTION OF R.C.C. BAND
QUALITY CONTROL AND SUPERVISION OF THE WORKS.
8. MORTAR MIX OF (CEMENT: SAND)1:4 SHALL BE USED. 230
9. ALL BRICK SHALL CONFORM TO IS 1077 :1970 AND SHALL HAVE PLINTH LVL. PLINTH LVL.
MINIMUM CRUSHING STRENGTH OF 35KG/SQ.CM. 8#@200 C/C
75

10. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.

75 75
75

11.
STATED. B.K. MASONARY B.K. MASONARY 2-8#
GR.LVL. GR.LVL.
12. REINFORCEMENT TO BE USED SHALL BE H.Y.S.D. BARS IN C.M. (1:4) IN C.M. (1:6)
0.00 0.00
CONFORMING TO I.S. 1786:2008.
13. LAP LENGTH SHALL BE PROVIDED AS UNDER.

GRADE OF CONCRETE MILD STEEL Fe. 415 (H.Y.S.D.)


M:20 47D 57D 350 350

175
175

M:25 41D 49D


B.B.C.C. B.B.C.C.

150
150

MINI. 600mm.
MINI. 450mm.

14. CLEAR COVER TO MAIN REINFORCEMENTS SHALL BE 30mm (1 : 5 : 10) (1 : 5 : 10)

UP TO GOOD SOIL
UP TO GOOD SOIL

FOR BEAMS AND 20 mm FOR SLABS.


600 450
15. CONTINUOUS PLINTH BANDS SHALL BE PROVIDED ADOPTING
WALL JUNCTION DETAILS AS SHOWN IN DRAWING. WALL - W1 WALL - W2
16. THE TOILET IS DESIGNED FOR GROUND FLOOR ONLY FOR 230 TH. OTTA WALL
FOR 230 TH. LOAD BEARING WALL
& PARTITION WALL
SPECIAL NOTE FOR STRUCTURE UP TO 10 KMS. FROM
SEA COAST BOYS' TOILET CWSN W.C. URINALS
DESIGN CODE :BTB-02 01 02 08
1. ALL CONCRETE MIX FOR SLABS AND BEAMS SHALL BE M25.
2. CLEAR COVER TO THE MAIN RAINFORECEMNT SHALL BE
30mmFOR SLABS AND 40mm FOR BEAMS.
DRAWING NO
BTB-02 : 11/13
230
W1
PLINTH LVL.
8#@200 C/C 1-10# FOR EQ. ZONE-III
1-12# FOR EQ. ZONE-IV & V

75 75
BARS FROM FOUNDATIONS TO PASS
W1 THROUGHPLINGTH BAND, MASONARY AND
B.K. MASONARY GR.LVL. 2-8# TO BE TAKEN IN TO AND ANCHORED IN TO SLAB

W1

W1
IN C.M. (1:4) 0.00

115x115(M:20) CONCRETE

PB1

W1
350 P.C.C. (1:2:4)

175
( 350 x 500 x 175 )

150
B.B.C.C. ( 1:5:10 )

MINI. 600mm.
W1

UP TO GOOD SOIL
W2 600
WALL - W1

W1
W1
FOUNDATION DETAILS AT WALL JUNCTIONS

W1

W1
W1 W1 150
2-8#
W1
8#@150 C/C ALL

W1
230

W2

W2
2-10#
PB1
W2 W2

FOUNDATION PLAN
BOYS' TOILET CWSN W.C. URINALS
DESIGN CODE :BTB-02 01 02 08

STRUCTURAL DETAILS - FOUNDATION LEVEL


FOUNDATION DESIGN SHALL BE REVISED AS PER SOIL TYPE, SPECIALLY FOR BLACK COTTON & FIELD UP SOIL DRAWING NO
BTB-02 : 12/13

125
126
SCHEDULE OF REINFORCEMENT FOR SLABS
A 8# @ 200 C/C ALTERNATE BENT UP BARS
B 8# @ 250 C/C DISTRIBUTION STEEL
SB1 C 8# @ 150 C/C ALTERNATE BENT UP BARS

POSITION OF P.V.C.WATER TANK ALL SLABS ARE 100 THICK.


CAPACITY AS PER ARCH.DRAWING.

B 2-8# 2-10#
450
8#@150C/C

100
150

350
8#@150C/C
450
B 2-10# 3-10#
400
230 230
300 A B

SB2
SB3
450 400 A SB1 SB2
500 2-10#
400 A 300

IB1
B @TOP 2-10#
& BOTTOM 8#@150C/C
300

8#@150C/C
150

3-12# 3-12#
230 230

SB1 SB1 SB3 IB1

STRUCTURAL LAY-OUT AT SLAB LVL.

NOTE: BOYS' TOILET CWSN W.C. URINALS


DESIGN CODE :BTB-02 01 02 08
1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED OTHERWISE.
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL STRUCTURAL DETAILS - SLAB LEVEL
STRUCTURAL DETAILS PLEASE REFER DRAWING NO.- DRAWING NO
BTB-02:11/13 BTB-02 : 13/13
ESTIMATE – BTB – 02 – 1 CWSN + 2 NORMAL W.C. + 8 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
1 Excavation for foundation up to 1.5m depth 14.39 Cmt. 83.00 1,194.37
including sorting out. Stacking of useful materials
and disposing of the excavated stuff up to
50mt.lead. (Item no.-1 (0)(A) page.-22) Loose or
soft soil.
2 Providing & Laying Brick bat cement Concrete 3.34 Cmt. 2,126.00 7,100.84
1:5:10 (1Cement : 5Coarse sand :10 graded brick
bats) in foundation and plinth and curing complete
excluding cost of formwork (Item no-(9)5.3.8
Pg.27)
3 Brick work using common burnt clay building 9.08 Cmt. 3,651.00 33,151.08
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand) R.A
4 Filling with the available excavated earth 11.51 Cmt. 53.40 614.63
(excluding rock) in trenches, plinth, sides of
foundation etc.in layers not exceeding 20cm in
depth consolidating each deposited layer by
ramming and watering. (item no-(6)4.12 pg.23
5 Providing & Laying brick bat cement Concrete 3.02 Cmt. 2,396.00 7,235.92
1:4:8 (1 Cement: 4 Coarse sand: 8 graded brick
bat) in foundation and plinth and curing complete
excluding cost of formwork. (Item no.-
8(5.3.3)page.-27)
6 Providing & Laying ordinary cement Concrete 0.63 Cmt. 4,689.00 2,954.07
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC coping .R.A..
7 Providing & Laying ordinary cement Concrete 1.33 Cmt. 4,001.00 5,321.33
1:2:4 (1 Cement :2 Coarse sand:4 graded stone
aggregates) and finishing smooth with curing etc.
complete excluding the cost of formwork for
concrete work in plinth protection & corner bar
bed. item no10(5.3.13)pg-27
8 Brick work using common burnt clay building 14.96 Cmt. 3,769.00 56,384.24
conventional bricks having crushing strength not
less than 35kg/sq. cm. In super structure in
cement mortar 1:4 (1cement:4fine sand) R.A
9 Half brick masonry in common brunt clay building 5.01 Smt. 500.70 2,508.51
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand)in super
structure including curing etc. complete.(Item no-
(8)6.3 I(B) Pg.42)+(Item no-(10)6.32(B) Pg.43)
10 Providing & Laying ordinary cement Concrete 3.45 Cmt. 6,455.00 22,269.75
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
ESTIMATE – BTB – 02 – 1 CWSN + 2 NORMAL W.C. + 8 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC slabs having thickness
more than 10 cm and up to 13cm thickness. R.A.
11 Providing & Laying reinforcement for RCC work 271.44 Kg. 54.00 14,657.76
including bending, binding and placing in position
etc. complete up to floor two level Thermo
Mechanical Treated Bars as per I.S.
Standard.(T.M.T ) (item no-14A (5.4.11(A)pg.28
12 Providing 10mm thick inside cement plaster in 94.02 Smt. 100.00 9,402.00
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no1 (17.58)
(I) Pg.89
13 Providing 15mm thick outside cement plaster in 74.82 Smt. 137.10 10,257.82
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no3 (17.60)
(I) Pg.89
14 Providing & Fixing 30mm thick polished Kotah 1.80 Rmt 603.00 1,085.40
stone 40cm wide & 20cm depth for HAND WASH
FACILITY as per approved drawing & details by
engineer in charge including making hole with
waste water pipe, coupling ,rubbing etc. comp.
R.A
15 40mm thick cement concrete flooring 1:2:4 30.15 Smt. 236.00 7,115.40
(1cement:2 coarse sand: 4 graded stone
aggregates 20mm normal size) laid in one layer
finished with a floating coat of neat cement, curing
etc. Complete. (Item no-15(14.71)(A) Pg.78)
16 Providing cement vata (10cmx10cm size) quarter 28.00 Rmt 22.60 632.80
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. (Item no-
15(0.0)Pg.91
17 Providing & fixing washbasin with hole for pillar 1.00 Each 2,033.00 2,033.00
tap with C.I or M.S brackets painted with including
cutting holes and making good .(A)vitreous china
(II)Flat back washbasin 550mmx400mm in white
colour including pillar tap, waste pipe, stop cock,
union required all fitting, fixture etc. comp. RA
18 Construction of ICN chamber as per approved - Each 2,250.00 -
drawing & design complete detail. R.A.
19 Providing & Fixing 25mm thick double polished 4.32 Smt. 773.00 3,339.36
vertical Kotah stone for (partition) urinal as par
drawing including round edge moulding etc.
comp. R,A
20 Providing & fixing 40 mm dia. MS hollow pipe 10.50 Rmt 976.00 10,248.00
(B-TYPE) 78 cm height railing for ramp as per
approved drawing & details by engineer in charge
ESTIMATE – BTB – 02 – 1 CWSN + 2 NORMAL W.C. + 8 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
including applying primer coat & two coats of oil
paints comp. R,A
21 Providing & Fixing in position M.S. Angle 345.60 Kg. 75.00 25,920.00
40mmx40mmx6mm Angle frame for door and
35mmx35mmx5mm angle frame for shutters, 18
gauge iron sheet of shutters with 4 nos. of hold
fasts for door as per the approved drawing &
design including applying a priming coat of red
lead paint and all necessary fittings fixtures,
locking arrangements etc. Complete. (Item no-
25(10.100)Pg.56)
22 Painting two coats (Excluding Priming coat) on 21.10 Smt. 61.60 1,299.76
new steel and other metal, surfaces with enamel
paint, brushing , interior to give an even shade
including cleaning the surface of all dirt, dust and
other foreign matter etc. Complete(Item
no2(19.7).Pg.98)
23 White washing with lime on undecorated wall 94.02 Smt. 8.10 761.56
surfaces, 3 coats to give an even shade including
thoroughly brooming the surface to remove all
dirt, dust, mortar drops and other foreign matter,
(Item no-1(18.11) +(Item no-3(18,13) Pg.93)
24 Providing & Applying three coats of 100% acrylic 74.82 Smt. 74.00 5,536.68
base matt finishing exterior paint of approved
manufacture of required shade on external
surface to give an even shade after thoroughly
brushing the surface free from mortar dropping &
other foreign matter before application of paint
etc. complete as directed for all floors and all
lifts.(Item no-35 (0.0) Pg.220)
25 Providing and laying Ceramic tiles 6mm thick in 27.50 Smt. 746.00 20,515.00
skirting, risers of steps & dado on 10 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;21(0.00)pg;79
26 Providing and laying Ceramic tiles 6mm thick in 21.13 Smt. 691.00 14,600.83
flooring, treads of steps & landing on 12 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;20(0.00)pg;79
27 Providing up to floor two level precast cement 1.62 Smt. 528.00 855.36
concrete jali or grill mix(1 Cement :2 Coarse
sand:4 graded stone aggregates) reinforced with
1.6mm dia. mild steel wire including cleaning,
fixing and finishing in cement mortar 1:3 and
curing complete.(D)75 mm thick item
no;19(5.6.2)(D)pg;28
28 Construction of a soak pit of 1.2m dia. and depth 2.00 Each 1,418.00 2,836.00
1.8m (capacity 2.00 cmt volume) including
excavation and filling brick bats with dry brick
ESTIMATE – BTB – 02 – 1 CWSN + 2 NORMAL W.C. + 8 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
masonry as per the approved drawing & design
etc. complete item no;18(0)(A) pg. no;137
29 Providing & fixing 32 mm dia. pipe of 16G ASIS 2.00 Each 725.00 1,450.00
Grade-304 for Grab bar in CWSN W/C 75 cm long
as per given detail. R.A.
30 Providing & fixing 15mm dia screw down brass 6.00 NO. 226.00 1,356.00
chromium plated bib tap of approved quality etc.
complete. item no;28(23.92) pg;127
31 Providing & laying 150mm diameter salt glazed 5.28 Metre 236.00 1,246.08
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete.
item no;1(24.1)(A) pg;133
32 Providing & laying 100mm diameter salt glazed 13.00 Metre 165.00 2,145.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete
item no;1(24.1)(B) pg;133
33 Construction of brick masonry chamber of size 2.00 Each 3,909.00 7,818.00
455mm * 610mm internal dimensions and depth
up to 450mm for ground inspection chamber with
brick having crushing strength not less than
35Kg/sqcm. in cement mortar 1:5 40mm thick C.I
cover with frame (light duty) complete item
no;16(24.44 I)pg;137
34 Providing & fixing urinal of approved 8.00 Each 1,440.00 11,520.00
quality(550X300mm size) including connecting
trap and with integral longitudinal flush pipe and
15 mm dia brass screw down stop tap complete
item no;34(23.124)(A)+item
no;30(23.96)(A);PG;127
35 Providing & fixing wash down water closet 1.00 Each 2,910.00 2,910.00
(European Type W.C. pan ) with integral P or S
trap including jointing the trap with soil pipe in CM
1 :1 (1 Cement : 1 fine sand ) including 12.5 litres
low level flushing PVC
cistern,seatcover.iteam10(23.112)pg;125+iteam
16(23.120)pg;126+iteam17(23.121)(ii)pg;126+ite
am 31pg,80.
36 Providing & fixing vitreous china long pattern 2.00 Each 1,586.00 3,172.00
white colour water closet squatting pan(Indian
type W.C. Pan) size 580mm including earthwork,
bed concrete, foot rests, G.I inlet connection for
flush pipe,trap,25mm flush cock etc. Complete
item9(23.111)pg;124+iteam11(23.113)pg;125+it
eam12(23.114)pg;125+itean;16(23.120)pg;126+i
team 32(0.0)pg;127
37 Providing & fixing PVC water tanks of 500 LITRES 500.00 LIT 5.00 2,500.00
as required on terrace level including making
ESTIMATE – BTB – 02 – 1 CWSN + 2 NORMAL W.C. + 8 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
platform for bottom support and making
necessary inlet, outlet and overflow connection
etc. complete.
38 Providing & fixing gun metal check or non-return 2.00 No. 576.00 1,152.00
full way wheel valve(A)25mm dia item
no;30(23.99)(C)PG;127
39 Construction of septic tank of size 2.50 m. length 1.00 No. 36,500.00 36,500.00
x 1.2 m width internal dimensions and depth up
to 1.8mt with brick having crushing strength not
less than 35Kg/sqcm. in cement mortar 1:6
including 0.60 X 0.60 cement cover as per
approved drawing etc. comp. R.A
40 Providing and fixing 25mm dia U.P.V.C.Pipe 37.70 RMT 102.00 3,845.40
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;8 pg;129
41 Providing and fixing 15mm dia U.P.V.C.Pipe 17.50 RMT 85.00 1,487.50
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;7 pg;129
42 Providing and fixing 50mm dia G.I. Rain water 2.00 No. 285.00 570.00
spout 60CM long complete. R.A
43 providing & fixing stone wear gully trap with C.I 4.00 Each 1,483.00 5,932.00
grating brick masonry chamber and water tight C.I
cover with frame of 300mm X 300mm size with
standard weight (i) square mouth traps 150m x
100 mm size p or R type etc. complete. item
no;6(24.19 B) pg;134
44 providing & fixing PVC SWR nahni trap IS 14735 4.00 Each 355.00 1,420.00
for drain-100mm diameter with jali of following
nominal diameter of self-cleansing design with CI
spread down including cost of cutting comp. item
no;14 pg;131
45 Providing & fixing stainless steel soap tray near 2.00 Each 50.00 100.00
wash basin & hand wash facility etc. comp. RA
46 Painting of logo on front side wall. (R.A) 1.00 No. 700.00 700.00
TOTAL COST RS. 3,55,655.45
ADDING 3% FOR CONTINGENCY 3,66,325.11
SAY RS. 3,66,400.00
132
BOYS' TOILET | BTB - 03

CWSN TOILET W.C. URINAL


BEST ORIENTATION
- 1 3
H ORIENTATION PRIORITY ON SITE
RT
NO

SATISFACTORY ORIENTATION

NORTH
DETAILS OF DRAWINGS
ACCEPTABLE ORIENTATION
DRAWING NO. PARTICULARS
BTB-03:1/12 GROUND FLOOR PLAN NORTH

BTB-03:2/12 TERRACE PLAN

BTB-03:3/12 FLOORING PATTERN

BTB-03:4/12 ELEVATIONS

BTB-03:5/12 ELEVATIONS

BTB-03:6/12 SECTIONS

BTB-03:7/12 WATER SUPPLY LAYOUT

BTB-03:8/12 DRAINAGE LAYOUT

BTB-03:9/12 RAILING AND HANDWASH

BTB-03:10/12 STRUCTURAL DETAILS -


GENERAL NOTE, WALL SECTIONS, PLINTH BENDS

BTB-03:11/12 STRUCTURAL DETAILS - FOUNDATION LEVEL

BTB-03:12/12 STRUCTURAL DETAILS - SLAB LEVEL


S2

0.115 4.23 0.115


1.22 2.41 0.60

1.22 0.56 0.60 0.33 0.60 0.56 0.60

Plinth protection

0.45

0.115
0.115

0.60
0.60

0.90
0.60
0.60

0.90
0.45
0.38

0.72 0.74 0.72 0.60

0.30

0.38
Both side polished

2.03
2.03

k o t a h s t o n e
0.90

1.20
1.43

S1

0.70
W.C. BOYS' TOILET

0.60

1.13
1.10 X 0.90 Lvl :+0.40
0.98 1.20 0.20 0.40

0.20

0.38
0.38

0.115
0.115

0.83

Plinth protection 2 Plinth protection

0.60
0.60

0.30 0.30

1
UP
Lvl : 00
2.31 0.12 1.20 0.12 0.72
0.115 4.23 0.115 BOY'S TOILET CWSN W.C. URINALS
DESIGN CODE :BTB - 03 - 01 03

GROUND FLOOR PLAN


DRAWING NO
BTB-03 : 1/12

133
134
S2

60 CM LONG 50 mm G.I. PIPE


FOR WATER SPOUT

0.60

0.90
PVC overhead
water tank
capacity 500 lit. 0.23 X 0.35 mt.
1.22 2.18 0.60 BRICK CURBING

1.20
TERRACE S1

0.90
Lvl :+2.92

W E A T H E R
S H E D

BOY'S TOILET CWSN W.C. URINALS


DESIGN CODE :BTB - 03 - 01 03

TERRACE PLAN
DRAWING NO
BTB-03 : 2/12
FINISH I.P.S.
F L O O R

120mm X 120mm deep channel

Lvl :+0.45 Lvl :+0.45 Lvl :+0.45


1 2 R 2 1 1 2
1 2 3 4 5 6 7 8 9 R
Lvl :+0.40
2
3 0.30 mt. X 0.30 mt. matte
Glazed ceramic tile
2 3
FINISH I.P.S.
F L O O R

FINISH I.P.S.
F L O O R
R R R 1

FINISH I.P.S.
F L O O R

BOY'S TOILET CWSN W.C. URINALS


DESIGN CODE :BTB - 03 - 01 03

FLOORING PATTERN
DRAWING NO
BTB-03 : 3/12

135
136
CURBING TOP
+3.27

SLAB BOTTOM
+2.80
M.S. grill over
the door

15 mm thk.
Mala plaster

Plinth protection
finished with I.P.S.
PLINTH PROTECTION
+0.30

ELEVATION - A

CURBING TOP
+3.27

SLAB BOTTOM
+2.80
Cement
SILL j a l i
+2.20

15 mm thk.
M ala plaster

Plinth protection
finished with I.P.S. BOY'S TOILET CWSN W.C. URINALS
PLINTH PROTECTION DESIGN CODE :BTB - 03 - 01 03
+0.30
ELEVATIONS
ELEVATION - B DRAWING NO
BTB-03 : 4/12
CURBING TOP
+3.27

SLAB BOTTOM
+2.80
Cement jali

15 mm thk. 15 mm thk.
Mala plaster Mala pl aster

Plinth protection
finished with I.P.S.
PLINTH PROTECTION
+0.30

ELEVATION - C

CURBING TOP
+3.27

SLAB BOTTOM
+2.80
Cement jali
SILL
+2.20

15 mm thk.
Mala plaster

Plinth protection
finished with I.P.S. BOY'S TOILET CWSN W.C. URINALS
PLINTH PROTECTION DESIGN CODE :BTB - 03 - 01 03
+0.30
ELEVATIONS
ELEVATION - D DRAWING NO
BTB-03 : 5/12

137
138
0.23 mt. X 0.35 mt.
brick curbing Cement vata
TERRACE CURBING TOP
+3.27
Lvl :+2.92
SLAB BOTTOM

0.12 0.35
+2.80
10 mm thk.

0.60
Ma la plaster
SILL
1.20 mt. high 0.30 mt. X 10 mm +2.20
10 mm thk. thk. Mala
0.90 mt. high 0.30 mt. X 0.30 mt. glossy finished
Mala plaster plaster
0.30 mt. Glazed tile dado ceramic tile on wall
START 2 R START R START R
HERE HERE HERE

START

1.80
2 3 R 2 2 2
HERE

1.15
2 3 3 3
Plinth protection

0.90
Plinth protection

0.60
0.60
finished with I.P.S. 3 R R R

0.45
W.C. finished with I.P.S.

0.40
SECTION 1-1
0.23 mt. X 0.35 mt.
brick curbing
TERRACE CURBING TOP
Lvl :+2.92 +3.27

SLAB BOTTOM

0.12 0.35
+2.80
M.S. grill over

0.60
the door

10 mm thk.
Ma la plaster
Cubby hole
120mm X 120mm 4 3 2 START
HERE
for soap
deep channel

1.80
2
1.20 mt. high 0.30 mt. X
0.30 mt. glossy finished
Plinth protection
ceramic tile on wall

0.80

0.70
finished with I.P.S.
0.60

0.45
0.40
3 PLINTH LVL. BOY'S TOILET CWSN W.C. URINALS
2 +0.40 DESIGN CODE :BTB - 03 - 01 03
1
SECTIONS
DRAWING NO
SECTION 2-2
BTB-03 : 6/12
SUPPLY FROM MAINS
TO OVER HEAD TANK

WATER SUPPLY FROM


OVER HEAD TANK

Lvl :+0.40

Lvl : 00

BOY'S TOILET CWSN W.C. URINALS


DESIGN CODE :BTB - 03 - 01 03

WATER SUPPLY LAYOUT


DRAWING NO
BTB-03 : 7/12

139
140
SEPTIK TANK
L : 2.5m | B : 1.2m | D : 1.8m
SOAK PIT
1.2m DIA.
1.8m DEPTH

Lvl :+0.40

BOY'S TOILET CWSN W.C. URINALS


DESIGN CODE :BTB - 03 - 01 03
Lvl : 00
DRAINAGE LAYOUT
DRAWING NO
BTB-03 : 8/12
0.30 0.30 0.30 0.30

300mm X 300mm glossy

0.30
ceramic glazed tiles
0.40

0.42
0.15

0.30
Cubby hole

0.12
for soap

35MM double polish kotah stone vertical support kotah stone

0.20

0.80
0.80

0.70
35mm single polish kotah stone

0.70
support with 10mm slope

0.60

0.40
0.40
N.T. N.T.

ELEVATION SECTION

Cubby hole
for soap

EQ EQ

0.30 0.60 0.30

0.40
35mm single polish kotah stone
support with 10mm slope

The tap at The tap at BOY'S TOILET


height 0.70 mt. height 0.80 mt.
CWSN W.C. URINALS
DESIGN CODE :BTB - 03 - 01 03
PLAN
HAND WASH DEATIL
DETAIL - D1 (HAND WASH) DRAWING NO
BTB-03 : 9/12

141
142
NOTES

10
d(
>
GENERAL:-

75
mm
)
1. ALL R.C.C. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
REFERENCE TO THE ARCHITECT DRAWINGS .
d
2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS SPECIFIED
OTHERWISE.

Ld
3. ALL DIMENSIONS ARE TO BE CHECKED AND CORELATED WITH THE

Ld
BEAM WEB REINFORCEMENT
ARCHITECTURAL DRAWINGS AND ANY AMBIGUITY IF FOUND, THEREIN
d = DIA OF STIRRUPS
SHALL BE BROUGHT TO THE NOTICE TO THE OFFICE BEFORE
EXECUTION OF THE WORK. 8# @200C/C
30 60 60 30
4. LIVE LOADS ARE ADOPTED AS PER I.S. 875 - 1987 PART-2(L.L.) L-JUNCTION T-JUNCTION
75

5. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS


SHALL BE FOLLOWED. ARRANGEMENT OF BARS IN PLAN FOR 2-8# FOR EQ. ZONE-III
230 2-10# FOR EQ. ZONE-IV &V
STRENGTHENING AT WALL JUNCTIONS.
6. THE STRUCTURE IS DESIGNED FOR DEAD LOAD, LIVE LOAD, R.C.C. PLINTH BAND
SEISMIC LOAD AND WIND LOAD. SEISMIC LOADS AS PER I.S.:1893 FOR 230TH LOAD BEARING WALL
-2002 AND DEAD,LIVE AND WIND LOADS AS PER I.S.:875 - 1987. CROSS SECTION OF R.C.C. BAND

7. THE STRUCTURAL CONSULTANT IS NOT RESPONSIBLE FOR


230
QUALITY CONTROL AND SUPERVISION OF THE WORKS.
8. MORTAR MIX OF (CEMENT: SAND)1:4 SHALL BE USED. PLINTH LVL. PLINTH LVL.
8#@200 C/C
9. ALL BRICK SHALL CONFORM TO IS 1077 :1970 AND SHALL HAVE
75

MINIMUM CRUSHING STRENGTH OF 35KG/SQ.CM.

75 75
75

10. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.


B.K. MASONARY GR.LVL. B.K. MASONARY 2-8# GR.LVL.
11. IN C.M. (1:4) IN C.M. (1:6)
0.00 0.00
STATED.
12. REINFORCEMENT TO BE USED SHALL BE H.Y.S.D. BARS
CONFORMING TO I.S. 1786:2008.
13. LAP LENGTH SHALL BE PROVIDED AS UNDER.
MILD STEEL Fe. 415 (H.Y.S.D.) 350 350

175
175

GRADE OF CONCRETE
M:20 47D 57D
B.B.C.C. B.B.C.C.

150
150

MINI. 600mm.
MINI. 450mm.

M:25 41D 49D (1 : 5 : 10) (1 : 5 : 10)

UP TO GOOD SOIL
UP TO GOOD SOIL

14. CLEAR COVER TO MAIN REINFORCEMENTS SHALL BE 30mm 600 450


FOR BEAMS AND 20 mm FOR SLABS.
WALL - W1
15. CONTINUOUS PLINTH BANDS SHALL BE PROVIDED ADOPTING WALL - W2
FOR 230 TH. LOAD BEARING WALL FOR 230 TH. OTTA WALL
WALL JUNCTION DETAILS AS SHOWN IN DRAWING.
& PARTITION WALL
16. THE TOILET IS DESIGNED FOR GROUND FLOOR ONLY
BOYS' TOILET CWSN W.C. URINALS
SPECIAL NOTE FOR STRUCTURE UP TO 10 KMS. FROM DESIGN CODE :BTB-03 - 01 03
SEA COAST
1. ALL CONCRETE MIX FOR SLABS AND BEAMS SHALL BE M25.
2. CLEAR COVER TO THE MAIN RAINFORECEMNT SHALL BE DRAWING NO
30mmFOR SLABS AND 40mm FOR BEAMS.
BTB-03 : 10/12
W1
W1 W1 W1 230
PLINTH LVL.
8#@200 C/C 1-10# FOR EQ. ZONE-III
1-12# FOR EQ. ZONE-IV & V

75 75
BARS FROM FOUNDATIONS TO PASS
B.K. MASONARY THROUGH PLINGTH BAND, MASONARY AND
W1 W1 GR.LVL. 2-8# TO BE TAKEN IN TO AND ANCHORED IN TO SLAB
W2 IN C.M. (1:4)
0.00
W1
115x115(M:20) CONCRETE

350 P.C.C. (1:2:4)

175
W1 W2 W2 ( 350 x 500 x 175 )

150
B.B.C.C. ( 1:5:10 )

MINI. 600mm.
UP TO GOOD SOIL
W2
600

FOUNDATION PLAN WALL - W1

FOUNDATION DETAILS AT WALL JUNCTIONS


(DETAILS OF VERTICAL STEEL REINFORCEMENT)

BOYS' TOILET CWSN W.C. URINALS


DESIGN CODE :BTB-03 - 01 03

STRUCTURAL DETAILS - FOUNDATION LEVEL


FOUNDATION DESIGN SHALL BE REVISED AS PER SOIL TYPE, SPECIALLY FOR BLACK COTTON & FILLED UP SOIL DRAWING NO
BTB-03 : 11/12

143
144
SCHEDULE OF REINFORCEMENT FOR SLABS
A 8# @ 200 C/C ALTERNATE BENT UP BARS
B 8# @ 250 C/C DISTRIBUTION STEEL
SB1
ALL SLABS ARE 100 THICK.

350
A

300

SB1
2-8# 2-10#

SB1
POSITION OF P.V.C.WATER TANK A B

450
400
CAPACITY AS PER ARCH.DRAWING.

300
8#@150C/C 8#@150C/C

100
100

SB2 2-10# 3-10#


230 230

B @ TOP SB1 SB2


& BOTTOM
STRUCTURAL LAY-OUT AT SLAB LVL.

BOYS' TOILET CWSN W.C. URINALS


NOTE: DESIGN CODE : BTB-03 - 01 03
1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED OTHERWISE.
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL STRUCTURAL DETAILS - SLAB LEVEL
STRUCTURAL DETAILS PLEASE REFER DRAWING NO.- DRAWING NO
BTB-01:11/13
BTB-03 : 12/12
ESTIMATE – BTB – 03 – 1 NORMAL W.C. + 3 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
1 Excavation for foundation up to 1.5m depth 7.02 Cmt. 83.00 582.66
including sorting out. Stacking of useful materials
and disposing of the excavated stuff up to
50mt.lead. (Item no.-1 (0)(A) page.-22) Loose or
soft soil.
2 Providing & Laying Brick bat cement Concrete 1.96 Cmt. 2,126.00 4,166.96
1:5:10 (1Cement : 5Coarse sand :10 graded brick
bats) in foundation and plinth and curing complete
excluding cost of formwork (Item no-(9)5.3.8
Pg.27)
3 Brick work using common burnt clay building 3.98 Cmt. 3,651.00 14,530.98
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand) R.A
4 Filling with the available excavated earth 5.62 Cmt. 53.40 300.11
(excluding rock) in trenches, plinth, sides of
foundation etc.in layers not exceeding 20cm in
depth consolidating each deposited layer by
ramming and watering. (item no-(6)4.12 pg.23
5 Providing & Laying brick bat cement Concrete 0.77 Cmt. 2,396.00 1,844.92
1:4:8 (1 Cement: 4 Coarse sand: 8 graded brick
bat) in foundation and plinth and curing complete
excluding cost of formwork. (Item no.-
8(5.3.3)page.-27)
6 Providing & Laying ordinary cement Concrete 0.22 Cmt. 4,689.00 1,031.58
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC coping .R.A..
7 Providing & Laying ordinary cement Concrete 0.95 Cmt. 4,001.00 3,800.95
1:2:4 (1 Cement :2 Coarse sand:4 graded stone
aggregates) and finishing smooth with curing etc.
complete excluding the cost of formwork for
concrete work in plinth protection & corner bar
bed. item no10(5.3.13)pg-27
8 Brick work using common burnt clay building 7.54 Cmt. 3,769.00 28,418.26
conventional bricks having crushing strength not
less than 35kg/sq. cm. In super structure in
cement mortar 1:4 (1cement:4fine sand) R.A
9 Half brick masonry in common brunt clay building 3.36 Smt. 500.70 1,682.35
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand)in super
structure including curing etc. complete.(Item no-
(8)6.3 I(B) Pg.42)+(Item no-(10)6.32(B) Pg.43)
10 Providing & Laying ordinary cement Concrete 1.35 Cmt. 6,455.00 8,714.25
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
ESTIMATE – BTB – 03 – 1 NORMAL W.C. + 3 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC slabs having thickness
more than 10 cm and up to 13cm thickness. R.A.
11 Providing & Laying reinforcement for RCC work 125.07 Kg. 54.00 6,753.78
including bending, binding and placing in position
etc. complete up to floor two level Thermo
Mechanical Treated Bars as per I.S.
Standard.(T.M.T ) (item no-14A (5.4.11(A)pg.28
12 Providing 10mm thick inside cement plaster in 45.05 Smt. 100.00 4,505.00
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no1 (17.58)
(I) Pg.89
13 Providing 15mm thick outside cement plaster in 45.15 Smt. 137.10 6,190.07
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no3 (17.60)
(I) Pg.89
14 Providing & Fixing 30mm thick polished Kotah 1.20 Rmt 464.00 556.80
stone 40cm wide & 20cm depth for HAND WASH
FACILITY as per approved drawing & details by
engineer in charge including making hole with
waste water pipe, coupling ,rubbing etc. comp.
R.A
15 40mm thick cement concrete flooring 1:2:4 5.74 Smt. 236.00 1,354.64
(1cement:2 coarse sand: 4 graded stone
aggregates 20mm normal size) laid in one layer
finished with a floating coat of neat cement, curing
etc. Complete. (Item no-15(14.71)(A) Pg.78)
16 Providing cement vata (10cmx10cm size) quarter 11.60 Rmt 22.60 262.16
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. (Item no-
15(0.0)Pg.91
17 Providing & fixing washbasin with hole for pillar - Each 2,033.00 -
tap with C.I or M.S brackets painted with including
cutting holes and making good .(A)vitreous china
(II)Flat back washbasin 550mmx400mm in white
colour including pillar tap, waste pipe, stop cock,
union required all fitting, fixture etc. comp. RA
18 Construction of ICN chamber as per approved - Each 2,250.00 -
drawing & design complete detail. R.A.

19 Providing & Fixing 25mm thick double polished 2.16 Smt. 773.00 1,669.68
vertical Kotah stone for (partition) urinal as par
drawing including round edge moulding etc.
comp. R,A
ESTIMATE – BTB – 03 – 1 NORMAL W.C. + 3 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
20 Providing & fixing 40 mm dia. MS hollow pipe - Rmt 976.00 -
(B-TYPE) 78 cm height railing for ramp as per
approved drawing & details by engineer in charge
including applying primer coat & two coats of oil
paints comp. R,A
21 Providing & Fixing in position M.S. Angle 182.40 Kg. 75.00 13,680.00
40mmx40mmx6mm Angle frame for door and
35mmx35mmx5mm angle frame for shutters, 18
gauge iron sheet of shutters with 4 nos. of hold
fasts for door as per the approved drawing &
design including applying a priming coat of red
lead paint and all necessary fittings fixtures,
locking arrangements etc. Complete. (Item no-
25(10.100)Pg.56)
22 Painting two coats (Excluding Priming coat) on 10.26 Smt. 61.60 632.02
new steel and other metal, surfaces with enamel
paint, brushing , interior to give an even shade
including cleaning the surface of all dirt, dust and
other foreign matter etc. Complete(Item
no2(19.7).Pg.98)
23 White washing with lime on undecorated wall 43.70 Smt. 8.10 353.97
surfaces, 3 coats to give an even shade including
thoroughly brooming the surface to remove all
dirt, dust, mortar drops and other foreign matter,
(Item no-1(18.11) +(Item no-3(18,13) Pg.93)
24 Providing & Applying three coats of 100% acrylic 45.15 Smt. 74.00 3,341.10
base matt finishing exterior paint of approved
manufacture of required shade on external
surface to give an even shade after thoroughly
brushing the surface free from mortar dropping &
other foreign matter before application of paint
etc. complete as directed for all floors and all
lifts.(Item no-35 (0.0) Pg.220)
25 Providing and laying Ceramic tiles 6mm thick in 6.82 Smt. 746.00 5,087.72
skirting, risers of steps & dado on 10 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;21(0.00)pg;79
26 Providing and laying Ceramic tiles 6mm thick in 5.99 Smt. 691.00 4,139.09
flooring, treads of steps & landing on 12 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;20(0.00)pg;79
27 Providing up to floor two level precast cement 1.62 Smt. 528.00 855.36
concrete jali or grill mix(1 Cement :2 Coarse
sand:4 graded stone aggregates) reinforced with
1.6mm dia. mild steel wire including cleaning,
fixing and finishing in cement mortar 1:3 and
curing complete.(D)75 mm thick item
no;19(5.6.2)(D)pg;28
ESTIMATE – BTB – 03 – 1 NORMAL W.C. + 3 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
28 Construction of a soak pit of 1.2m dia. and depth 1.00 Each 1,418.00 1,418.00
1.8m (capacity 2.00 cmt volume) including
excavation and filling brick bats with dry brick
masonry as per the approved drawing & design
etc. complete item no;18(0)(A) pg. no;137

29 Providing & fixing 32 mm dia. pipe of 16G ASIS - Each 725.00 -


Grade-304 for Grab bar in CWSN W/C 75 cm long
as per given detail. R.A.

30 Providing & fixing 15mm dia screw down brass 3.00 NO. 226.00 678.00
chromium plated bib tap of approved quality etc.
complete. item no;28(23.92) pg;127

31 Providing & laying 150mm diameter salt glazed 3.00 Metre 236.00 708.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete.
item no;1(24.1)(A) pg;133

32 Providing & laying 100mm diameter salt glazed 8.50 Metre 165.00 1,402.50
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete
item no;1(24.1)(B) pg;133

33 Construction of brick masonry chamber of size 1.00 Each 3,909.00 3,909.00


455mm * 610mm internal dimensions and depth
up to 450mm for ground inspection chamber with
brick having crushing strength not less than
35Kg/sqcm. in cement mortar 1:5 40mm thick C.I
cover with frame (light duty) complete item
no;16(24.44 I)pg;137

34 Providing & fixing urinal of approved 3.00 Each 1,440.00 4,320.00


quality(550X300mm size) including connecting
trap and with integral longitudinal flush pipe and
15 mm dia brass screw down stop tap complete
item no;34(23.124)(A)+item
no;30(23.96)(A);PG;127

35 Providing & fixing wash down water closet - Each 2,910.00 -


(European Type W.C. pan ) with integral P or S
trap including jointing the trap with soil pipe in CM
1 :1 (1 Cement : 1 fine sand ) including 12.5 litres
low level flushing PVC
cistern,seatcover.iteam10(23.112)pg;125+iteam
16(23.120)pg;126+iteam17(23.121)(ii)pg;126+ite
am 31pg,80.
ESTIMATE – BTB – 03 – 1 NORMAL W.C. + 3 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
36 Providing & fixing vitreous china long pattern 1.00 Each 1,586.00 1,586.00
white colour water closet squatting pan(Indian
type W.C. Pan) size 580mm including earthwork,
bed concrete, foot rests, G.I inlet connection for
flush pipe,trap,25mm flush cock etc. Complete
item9(23.111)pg;124+iteam11(23.113)pg;125+it
eam12(23.114)pg;125+itean;16(23.120)pg;126+i
team 32(0.0)pg;127
37 Providing & fixing PVC water tanks of 500 LITRES 500.00 LIT 5.00 2,500.00
as required on terrace level including making
platform for bottom support and making
necessary inlet, outlet and overflow connection
etc. complete.
38 Providing & fixing gun metal check or non-return 2.00 No. 576.00 1,152.00
full way wheel valve(A)25mm dia item
no;30(23.99)(C)PG;127
39 Construction of septic tank of size 2.00 Mt length 1.00 No. 29,200.00 29,200.00
x 1.2 Mt width internal dimensions and depth up
to 1.8mt with brick having crushing strength not
less than 35Kg/sqcm. in cement mortar 1:6
including 0.60 X 0.60 cement cover as per
approved drawing etc. comp. R.A
40 Providing and fixing 25mm dia U.P.V.C.Pipe 35.30 RMT 102.00 3,600.60
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;8 pg;129
41 Providing and fixing 15mm dia U.P.V.C.Pipe 3.30 RMT 85.00 280.50
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;7 pg;129

42 Providing and fixing 50mm dia G.I. Rain water 1.00 No. 285.00 285.00
spout 60CM long complete. R.A

43 providing & fixing stone wear gully trap with C.I 3.00 Each 1,483.00 4,449.00
grating brick masonry chamber and water tight C.I
cover with frame of 300mm X 300mm size with
standard weight (i) square mouth traps 150m x
100 mm size p or R type etc. complete. item
no;6(24.19 B) pg;134

44 providing & fixing PVC SWR nahni trap IS 14735 2.00 Each 355.00 710.00
for drain-100mm diameter with jali of following
nominal diameter of self-cleansing design with CI
spread down including cost of cutting comp. item
no;14 pg;131

45 Providing & fixing stainless steel soap tray near 1.00 Each 50.00 50.00
wash basin & hand wash facility etc. comp. RA
ESTIMATE – BTB – 03 – 1 NORMAL W.C. + 3 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.

46 Painting of logo on front side wall. (R.A) 1.00 No. 700.00 700.00

TOTAL COST RS. 1,71,403.01


ADDING 3% FOR CONTINGENCY 1,76,545.10
SAY RS. 1,76,600.00
COMBINED TOILET | CTB - 01 BEST ORIENTATION

CWSN TOILET W.C. URINAL NORTH

1 - 4 SATISFACTORY ORIENTATION
NORTH

CWSN TOILET W.C. / URINAL

GIRLS BOYS
1 2 ORIENTATION PRIORITY ON SITE ACCEPTABLE ORIENTATION

DETAILS OF DRAWINGS NORTH

DRAWING NO. PARTICULARS


CTB-01:1/14 GROUND FLOOR PLAN

CTB-01:2/14 TERRACE PLAN

CTB-01:3/14 FLOORING PATTERN

CTB-01:4/14 ELEVATIONS

CTB-01:5/14 ELEVATIONS

CTB-01:6/14 SECTIONS

CTB-01:7/14 SECTIONS

CTB-01:8/14 WATER SUPPLY LAYOUT

CTB-01:9/14 DRAINAGE LAYOUT

CTB-01:10/14 RAILING AND HANDWASH

CTB-01:11/14 INCINERATOR DETAIL

CTB-01:12/14 STRUCTURAL DETAILS -


GENERAL NOTE, WALL SECTIONS, PLINTH BENDS

CTB-01:13/14 STRUCTURAL DETAILS - FOUNDATION LEVEL

CTB-01:14/14 STRUCTURAL DETAILS - SLAB LEVEL

151
152
S1 S2 DOOR-WINDOW SCHEDULE
C
TYPE SIZE LIN. SILL NOS. REMARKS
_
D 1.20 X 2.40 2.40M 2 M.S.SHUTTER
_
D1 1.00 X 2.40 2.40M 2 BOTH SIDE OPNEABLE
0.115 7.12 0.115
M.S.SHUTTER
1.53 1.43 0.70 0.70 1.43 1.33 _
D2 0.70 X 2.40 2.40M 2 M.S.SHUTTER
1.53 0.73 0.90 1.23 0.90 0.73 1.33 V1 0.90 X 0.60 2.40M 1.80 3 CEMENT JALI
V2 0.60 X 0.60 2.40M 1.80 2 LOUVERS
V3 0.47 X 1.20 2.40M 1.20 3 CEMENT JALI

P l i n t h
protection

0.115

0.23
NT NT

1.09
1.32

1.57

1.57
CWSN CWSN
1.90 X 2.10 1.90 X 2.10
P l i n t h
protection
0.38

0.115
1.30
S3
1.05

0.60

0.76
W.C.

0.73

1.25
1.10 X 0.90
4.74

0.55

0.60 0.70 0.23 1.00 0.90 0.90 1.00 0.23 0.70 0.40

P l i n t h
protection
B Both side D

0.73
0.15
polished
kotah stone Kotah stone 0.75
0.60

platform as per detail - D1

3.17
0.90
S4
0.30

1.73
1.73

1.98
1.93

BOYS' TOILET 0.23 0.70 0.40


GIRLS' TOILET

0.73
0.55

Lvl :+0.40 Lvl :+0.40


protection
P l i n t h

0.07 0.07 W.C.


0.60 0.70 0.23 1.20 0.23 0.40 0.40 0.23 1.20 0.90 x 1.10
0.60

1.25
0.73
0.45
0.45

0.43
0.38

0.115
0.115

RAMP UP Lvl :+0.38 Lvl :+0.38 RAMP UP


Lvl : 00 I.P.S. floor I.P.S. floor Lvl : 00
I.P.S. FINISH ON RAMP I.P.S. FINISH ON RAMP

M.S.railing as per detail - D2 M.S.railing as per detail - D2

0.65 4.00 1.43 0.23 0.23 1.20 4.00 0.65

0.45 1.76 1.20 0.23 0.47 0.23 0.47 0.23 1.20 1.56 0.45

1.53 1.43 0.70 0.70 1.43 1.33 CWSN W.C. URINALS


0.115 7.12 0.115 01 02 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

A GROUND FLOOR PLAN


DRAWING NO
CTB-01 : 1/14
S1 S2

60 CM LON G 50 mm G.I.
PIPE FOR WA TER SPOUT
60 C M LONG 50 mm G.I.
PIPE F OR W ATER S POUT

1.37
PVC overhead

1.57
water tank
capacity 500 lit.

1.53 4.03 1.33 S3

6.89

4.51
TERRACE 0.23 X 0.35 mt.
Lvl :+2.92 BRICK CURBING D
B

3.14
40mm I.P.S. FINISH FLOOR

2.94
ABOVE R.C.C. SLAB S4

0.23 X 0.35 mt.


BRICK CURBING

CWSN W.C. URINALS


A 01 02 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

TERRACE PLAN
DRAWING NO
CTB-01 : 2/14

153
154
FINISH I.P.S.
F L O O R

1 2 3 4 5 6 6 5 4 3 2 1
NT NT
2 2

3 3
Lvl :+0.35 Lvl :+0.35
4 4
0.30 mt. X 0.30 mt. matte 0.30 mt. X 0.30 mt. matte
5 Glazed ceramic tile Glazed ceramic tile 5 4 3 2 1
R R
6 6 2
2 3

0.76
Lvl :+0.45
7 7 3
1 2
R 1 2 3 4 5 6 7 8 9 R 10 9 8 7 6 5 4 3 2 1
2 2 2
Lvl :+0.45
1 3
Lvl :+0.40 Lvl :+0.40 3
R
FINISH I.P.S.
F L O O R

FINISH I.P.S.
F L O O R
4 0.30 mt. X 0.30 mt. matte 0.30 mt. X 0.30 mt. matte
4

120mm X 120mm deep channel


2 Glazed ceramic tile Glazed ceramic tile
Lvl :+0.45
5
1
R 6 3

2 2
7
Lvl :+0.45
1 4 3 2 1

Lvl :+0.38 Lvl :+0.38


Lvl : 00 I.P.S. floor Lvl : 00
RAMP UP I.P.S. floor RAMP UP
300 X 300 I.P.S. FINISH ON RAMP I.P.S. FINISH ON RAMP 300 X 300
ANTI SKID ANTI SKID
T I L E S T I L E S

CWSN W.C. URINALS


01 02 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

FLOORING PATTERN
DRAWING NO
CTB-01 : 2/14
CURBING TOP
+3.27

SLAB BOTTOM
+2.80
M.S. grill over
t h e d o o r

15 mm thk.
15 mm thk.
Mal a pl ast er
0.78 mt. high Ma la p las te r 0.78 mt. high
M.S. pipe railing M.S. pipe railing

0.23 mt. thk. and


0.90 mt. high
brick wall

ELEVATION - A

CURBING TOP
+3.27

SLAB BOTTOM
+2.80

SLAB BOTTOM
+2.20

15 mm thk. 15 mm thk.
Ma la p last e r Mal a p last er
0.78 mt. high
M.S. pipe railing

CWSN W.C. URINALS


PLINTH LVL. 01 02 -
Plinth protection +0.40 COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

RAMP DESIGN CODE :CTB-01 01 - 04

ELEVATION - B
ELEVATIONS
DRAWING NO
CTB-01 : 4/14

155
156
Cement jali

CURBING TOP
+3.27

SLAB BOTTOM
+2.80

SILL
+2.20

Vent pipe

0 . 7 8 mt . h i g h 0.78 mt. high


M.S. pipe railing 15 mm thk. 15 mm thk. M.S. pipe railing
Mal a pl ast er Mal a p l ast er

Incinerator
Plinth protection
PLINTH PROTECTION
+0.30

ELEVATION - C

CURBING TOP CURBING TOP


+3.27 +3.27

SLAB BOTTOM
+2.80
Cement jali
Vent pipe
SILL
+2.20

0.78mt. high M.S. 15 mm thk.


pipe railing M ala p la ste r
PARAPET TOP
+1.30
Incinerator

Plinth protection
CWSN W.C. URINALS
PLINTH PROTECTION PLINTH PROTECTION 01 02 -
+0.30 RAMP +0.30 COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 02 - 01


ELEVATION - D
ELEVATIONS
DRAWING NO
CTB-01 : 5/14
0.23 mt. X 0.35 mt.
brick curbing
TERRACE Cement vata CURBING TOP
Lvl :+2.92
+3.27
SLAB TOP
+2.92
M . S . j a l i o ve r
10 mm thk.
t h e d o o r
M a la pl ast er
0.23 mt. thk. and 0.90 10 mm thk. 1.50 mt. high 0.30 mt. X
m t. h igh br i ck wall Cubby hole M a la pl ast er 0.30 mt. Glazed tile dado
for soap 7 6 5 4 3 2 START
HERE

START

2.40
0.78mt. high M .S. 4 3 2 2
HERE
pipe railing Mirror
2 grab bar
3

4 Plinth protection

0.78
finished wi th I.P.S.

0.70

0.60
0.60
5

0.40
CWSN TOILET PLINTH LVL.
+0.40

SECTION 1-1

0.23 mt. X 0.35 mt.


brick curbing
TERRACE CURBING TOP
Cement vata +3.27
Lvl :+2.92

0.35
0.35
SLAB TOP

0.12
+2.92

0.60
SILL
+2.20
10 mm thk.
0.90 mt. high 0.30 mt. X 0.30 mt.
M ala pl ast er 10 mm thk.
10 mm thk. glossy finished ceramic tile on wall
0.90 mt. high 0.30 mt. X M ala pl ast er
2.40
M ala p last e r
0.30 mt. Glazed tile dado
START START

1.80
2 3 3 2
HERE HERE

2 2 0.78 mt. high M.S.

0.90
pipe railing
3 3 CWSN W.C. URINALS
W.C. GIRLS' TOILET W.C. 01 02 -
PLINTH LVL.
COMBIEND TOILET CWSN W.C. URINALS
+0.40
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

SECTIONS
DRAWING NO
SECTION 2-2
CTB-01 : 6/14

157
158
0.23 mt. X 0.35 mt. 1.50 mt. high 0.30 mt. X
brick curbing TERRACE 0.30 mt. Glazed tile dado Cement vata
Lvl :+2.92

0.60
0.90 mt. X 0.60 mt. high
cement jali ventilation
10 mm thk. 10 mm thk.
1.20 mt. high 0.30 mt. X 10 mm thk. M a la pla ste r M ala pl ast er 10 mm thk.
0.30 mt. glossy finished M al a p las te r START START
R 6 5 4 3 2 2 3 4 5 6 R
ceramic tile on wall HERE HERE M al a pla ste r
0.90 mt. high 0.30 mt. X

2.40
2 2
0.30 mt. Glazed tile dado

0.60
START

1.80
R 3 2
3 3 HERE

1.50
1 2 0m m X 12 0 m m
2

1.20
4 4
deep channel

0.90
Plinth protection

0.70
3 finished with I.P.S.
5 5 W.C.

0.48
URINAL CWSN TOILET CWSN TOILET

SECTION 3-3

0.23 mt. X 0.35 mt.


brick curbing
TERRACE CURBING TOP
Cement vata Lvl :+2.92 +3.27
SLAB TOP
+2.92
M.S. grill M.S. grill M.S. grill

0.60
SILL
10 mm thk.
+2.20
M a la pl ast er

Both side polished kota stone


as a vertical partition

1.80
Kotah stone
platform
1.15

Plinth protection

0.70
0.60
fini shed with I.P .S .
0.05

CWSN W.C. URINALS

0.40
GIRL'S TOILET BOY'S TOILET PLINTH LVL. 01 02 -
+0.40 COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

SECTIONS
SECTION 4-4 DRAWING NO
CTB-01 : 7/14
SUPPLY FROM MAINS TO O.H.T. SUPPLY FROM O.H.T.

Lvl :+0.40 Lvl :+0.40

Lvl : 00
Lvl : 00

Lvl :+0.38 Lvl :+0.38

CWSN W.C. URINALS


01 02 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

WATER SUPPLY LAYOUT


DRAWING NO
CTB-01 : 8/14

159
160
SEPTIK TANK
L : 3.0m | B : 1.2m | D : 1.8m
SOAK PIT
1.2m DIA.
1.8m DEPTH

SOAK PIT
1.2m DIA.
1.8m DEPTH

Lvl :+0.40 Lvl :+0.40

Lvl : 00
Lvl : 00

Lvl :+0.38 Lvl :+0.38

CWSN W.C. URINALS


01 02 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

DRAINAGE LAYOUT
DRAWING NO
CTB-01 : 9/14
Cubby hole
for soap

EQ EQ

0.30 0.60 0.30

0.40
35mm single polish kotah stone
support with 1 0mm slope

0.30 0.30 0.30 0.30

3 0 0 mm X 3 0 0 mm g lo ssy

0.30
ceramic glazed tiles
0.40

0.42
The tap at The tap at
0.15 height 0.70 mt. height 0.80 mt.

0.30
Cubby hole PLAN

0.12
for soap

3 5M M d o u b l e p o l i s h k o t a h s t o n e v e r t i ca l s u p p o r t kotah stone

0.20

0.80
0.70
35mm single polish kotah stone
su pport wi th 1 0mm sl o pe

0.60
0.40
N.T. N.T.

DETAIL - D1 (HAND WASH)


ELEVATION SECTION

4.00 1.43
0.30 0.82 0.82 0.82 0.82 0.82 1.02 0.34

40mm DIA. M.S.HOLLOW PIPE


0.78
0.60

0.78
0.60
CWSN W.C. URINALS
01 02 -
DETAIL - D2 (HAND RAIL) COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

DETAILS OF HAND WASH & RAILING


DRAWING NO
CTB-01 : 10/14

161
162
INLET PIPE FOR
THROWING WASTE

VENT PIPE

0.45
M.S.JALI TO COLLECT WASTE BRICK WALL

0.12
0.12 0.60 0.12
M.S.SHUTTER (CLOSED)

VENT PIPE VENT PIPE

R.C.C OR STONE COVER R.C.C OR STONE COVER


0.55
TOP HUNG M.S.SHUTTER
FOR DISPOSAL OF
WASTE NEPKINS
M.S.SHUTTER (CLOSED) M.S.SHUTTER (CLOSED)
M.S.JALI TO COLLECT WASTE BRICK WALL

0.85
M.S.SHUTTER (WITH GRILL)

0.70
M.S.SHUTTER (WITH GRILL)
SOLID FUEL FOR 1.25 PLINTH PROTECTION
BURNING THE WASTE
C.W.S.N (INSIDE)

CWSN W.C. URINALS


01 02 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

MASONARY INCINERATOR OUT SIDE OF GIRLS TOILET DETAIL OF INCINERATOR


DRAWING NO
CTB-01 : 11/14
NOTES 10
d(
>
GENERAL:- 75
mm
)
1. ALL R.C.C. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
REFERENCE TO THE ARCHITECT DRAWINGS .
d
2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS SPECIFIED
OTHERWISE.

Ld
3. ALL DIMENSIONS ARE TO BE CHECKED AND CORELATED WITH THE

Ld
BEAM WEB REINFORCEMENT
ARCHITECTURAL DRAWINGS AND ANY AMBIGUITY IF FOUND, THEREIN
d = DIA OF STIRRUPS
SHALL BE BROUGHT TO THE NOTICE TO THE OFFICE BEFORE
EXECUTION OF THE WORK.
8# @200C/C
4. LIVE LOADS ARE ADOPTED AS PER I.S. 875 - 1987 PART-2(L.L.) L-JUNCTION T-JUNCTION 30 60 60 30
5. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS
75

SHALL BE FOLLOWED.
2-8# FOR EQ. ZONE-III
6. THE STRUCTURE IS DESIGNED FOR DEAD LOAD, LIVE LOAD, ARRANGEMENT OF BARS IN PLAN FOR 230 2-10# FOR EQ. ZONE-IV &V
SEISMIC LOAD AND WIND LOAD. SEISMIC LOADS AS PER I.S.:1893 R.C.C. PLINTH BAND
STRENGTHENING AT WALL JUNCTIONS.
-2002 AND DEAD,LIVE AND WIND LOADS AS PER I.S.:875 - 1987. FOR 230TH LOAD BEARING WALL
7. THE STRUCTURAL CONSULTANT IS NOT RESPONSIBLE FOR CROSS SECTION OF R.C.C. BAND
QUALITY CONTROL AND SUPERVISION OF THE WORKS.
8. MORTAR MIX OF (CEMENT: SAND)1:4 SHALL BE USED. 230
9. ALL BRICK SHALL CONFORM TO IS 1077 :1970 AND SHALL HAVE PLINTH LVL. PLINTH LVL.
MINIMUM CRUSHING STRENGTH OF 35KG/SQ.CM. 8#@200 C/C
75

10. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.

75 75
75

11.
STATED. B.K. MASONARY B.K. MASONARY 2-8#
GR.LVL. GR.LVL.
12. REINFORCEMENT TO BE USED SHALL BE H.Y.S.D. BARS IN C.M. (1:4) 0.00 IN C.M. (1:6) 0.00
CONFORMING TO I.S. 1786:2008.
13. LAP LENGTH SHALL BE PROVIDED AS UNDER.

GRADE OF CONCRETE MILD STEEL Fe. 415 (H.Y.S.D.)


M:20 47D 57D 350 350

175
175

M:25 41D 49D


B.B.C.C. B.B.C.C.

150
150

MINI. 600mm.
MINI. 450mm.

14. CLEAR COVER TO MAIN REINFORCEMENTS SHALL BE 30mm (1 : 5 : 10) (1 : 5 : 10)

UP TO GOOD SOIL
UP TO GOOD SOIL

FOR BEAMS AND 20 mm FOR SLABS.


600 450
15. CONTINUOUS PLINTH BANDS SHALL BE PROVIDED ADOPTING
WALL JUNCTION DETAILS AS SHOWN IN DRAWING. WALL - W1 WALL - W2
16. THE TOILET IS DESIGNED FOR GROUND FLOOR ONLY FOR 230 TH. OTTA WALL
FOR 230 TH. LOAD BEARING WALL
& PARTITION WALL
SPECIAL NOTE FOR STRUCTURE UP TO 10 KMS. FROM CWSN W.C. URINALS
SEA COAST 01 02 -
COMBINED TOILET CWSN W.C. URINALS
1. ALL CONCRETE MIX FOR SLABS AND BEAMS SHALL BE M25.
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04


2. CLEAR COVER TO THE MAIN RAINFORECEMNT SHALL BE
30mmFOR SLABS AND 40mm FOR BEAMS.

DRAWING NO
CTB-01 : 12/14

163
164
230
PLINTH LVL.
8#@200 C/C 1-10# FOR EQ. ZONE-III
W1 W1 1-12# FOR EQ. ZONE-IV & V

75 75
BARS FROM FOUNDATIONS TO PASS
B.K. MASONARY THROUGHPLINGTH BAND, MASONARY AND
GR.LVL. 2-8# TO BE TAKEN IN TO AND ANCHORED IN TO SLAB

W1
IN C.M. (1:4)
0.00

115x115(M:20) CONCRETE

W1
W1
W1 350 P.C.C. (1:2:4)

175
( 350 x 500 x 175 )
W1

150
B.B.C.C. ( 1:5:10 )

MINI. 600mm.
UP TO GOOD SOIL
600
W1 W1 PB1 WALL - W1

FOUNDATION DETAILS AT WALL JUNCTIONS

W1
W1
W1

W1
W1
W1 W1
W1
W1

W1

W1
W2 W2

W2
W2

W2 W2

FOUNDATION PLAN NOTE:


150 1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED
2-8# OTHERWISE.
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL
STRUCTURAL DETAILS PLEASE REFER DRAWING NO.-
8#@150 C/C ALL

230
CTB-02 : 12/14

2-10# CWSN W.C. URINALS


PB1 01 02 -
COMBINED TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04

DRAWING NO
CTB-01 : 13/14
SCHEDULE OF REINFORCEMENT FOR SLABS
A 8# @ 200 C/C ALTERNATE BENT UP BARS
B 8# @ 250 C/C DISTRIBUTION STEEL
C 8# @ 150 C/C ALTERNATE BENT UP BARS
SB1 SB1 ALL SLABS ARE 100 THICK.

POSITION OF P.V.C. WATER TANK


CAPACITY AS PER ARCH. DRAWING

500 400 C 400

400 C 400 500 B

SB1
B
B
B 450
500

400 A 400 500


350 300

SB3
SB1
A

SB2
500
450

SB3
500 400 A 400

300 350
A

SB1
SB1

STRUCTURAL LAY-OUT AT SLAB LVL. NOTE:


1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED
OTHERWISE.
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL
STRUCTURAL DETAILS PLEASE REFER THIS PROJECT
2-8# 2-10# 2-10# R.C.C. DRAWING NO.- CTB-01 : 12/14
3. NOTE FOR BLACK COTTON SOIL
8#@150C/C 8#@150C/C 8#@150C/C

140
100
100
2-10# 3-10# 2-12#+1-10# CWSN W.C. URINALS
01 02 -
230 230 230 COMBINED TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-01 01 - 04


SB1 SB2 SB3
STRUCTURAL DETAILS - SLAB LEVEL
DRAWING NO
CTB-01 : 14/14

165
ESTIMATE – CTB – 01 –
GIRLS TOILET - 1 CWSN + 2 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 0 NORMAL W.C. + 4 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
1 Excavation for foundation up to 1.5m depth 22.02 Cmt. 83.00 1,827.66
including sorting out. Stacking of useful materials
and disposing of the excavated stuff up to
50mt.lead. (Item no.-1 (0)(A) page.-22) Loose or
soft soil.
2 Providing & Laying Brick bat cement Concrete 5.80 Cmt. 2,126.00 12,330.80
1:5:10 (1Cement : 5Coarse sand :10 graded brick
bats) in foundation and plinth and curing complete
excluding cost of formwork (Item no-(9)5.3.8
Pg.27)

3 Brick work using common burnt clay building 13.27 Cmt. 3,651.00 48,448.77
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand) R.A

4 Filling with the available excavated earth 17.61 Cmt. 53.40 940.37
(excluding rock) in trenches, plinth, sides of
foundation etc.in layers not exceeding 20cm in
depth consolidating each deposited layer by
ramming and watering. (item no-(6)4.12 pg.23

5 Providing & Laying brick bat cement Concrete 4.35 Cmt. 2,396.00 10,422.60
1:4:8 (1 Cement: 4 Coarse sand: 8 graded brick
bat) in foundation and plinth and curing complete
excluding cost of formwork. (Item no.-
8(5.3.3)page.-27)

6 Providing & Laying ordinary cement Concrete 1.04 Cmt. 4,689.00 4,876.56
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC coping .R.A..

7 Providing & Laying ordinary cement Concrete 1.56 Cmt. 4,001.00 6,241.56
1:2:4 (1 Cement :2 Coarse sand:4 graded stone
aggregates) and finishing smooth with curing etc.
complete excluding the cost of formwork for
concrete work in plinth protection & corner bar
bed. item no10(5.3.13)pg-27

8 Brick work using common burnt clay building 18.87 Cmt. 3,769.00 71,121.03
conventional bricks having crushing strength not
less than 35kg/sq. cm. In super structure in
cement mortar 1:4 (1cement:4fine sand) R.A
ESTIMATE – CTB – 01 –
GIRLS TOILET - 1 CWSN + 2 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 0 NORMAL W.C. + 4 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
9 Half brick masonry in common brunt clay building 3.35 Smt. 500.70 1,677.35
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand)in super
structure including curing etc. complete.(Item no-
(8)6.3 I(B) Pg.42)+(Item no-(10)6.32(B) Pg.43)
10 Providing & Laying ordinary cement Concrete 3.78 Cmt. 6,455.00 24,399.90
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC slabs having thickness
more than 10 cm and up to 13cm thickness. R.A.
11 Providing & Laying reinforcement for RCC work 311.44 Kg. 54.00 16,817.76
including bending, binding and placing in position
etc. complete up to floor two level Thermo
Mechanical Treated Bars as per I.S.
Standard.(T.M.T ) (item no-14A (5.4.11(A)pg.28
12 Providing 10mm thick inside cement plaster in 120.50 Smt. 100.00 12,050.00
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no1 (17.58)
(I) Pg.89
13 Providing 15mm thick outside cement plaster in 81.58 Smt. 137.10 11,184.62
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no3 (17.60)
(I) Pg.89
14 Providing & Fixing 30mm thick polished Kotah 3.46 Rmt 603.00 2,086.38
stone 40cm wide & 20cm depth for HAND WASH
FACILITY as per approved drawing & details by
engineer in charge including making hole with
waste water pipe, coupling ,rubbing etc. comp.
R.A
15 40mm thick cement concrete flooring 1:2:4 42.64 Smt. 236.00 10,063.04
(1cement:2 coarse sand: 4 graded stone
aggregates 20mm normal size) laid in one layer
finished with a floating coat of neat cement, curing
etc. Complete. (Item no-15(14.71)(A) Pg.78)

16 Providing cement vata (10cmx10cm size) quarter 22.80 Rmt 22.60 515.28
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. (Item no-
15(0.0)Pg.91
ESTIMATE – CTB – 01 –
GIRLS TOILET - 1 CWSN + 2 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 0 NORMAL W.C. + 4 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
17 Providing & fixing washbasin with hole for pillar 2.00 Each 2,033.00 4,066.00
tap with C.I or M.S brackets painted with including
cutting holes and making good .(A)vitreous china
(II)Flat back washbasin 550mmx400mm in white
colour including pillar tap, waste pipe, stop cock,
union required all fitting, fixture etc. comp. RA
18 Construction of ICN chamber as per approved 1.00 Each 2,250.00 2,250.00
drawing & design complete detail. R.A.
19 Providing & Fixing 25mm thick double polished 2.16 Smt. 773.00 1,669.68
vertical Kotah stone for (partition) urinal as par
drawing including round edge moulding etc.
comp. R,A
20 Providing & fixing 40 mm dia. MS hollow pipe 20.52 Rmt 976.00 20,027.52
(B-TYPE) 78 cm height railing for ramp as per
approved drawing & details by engineer in charge
including applying primer coat & two coats of oil
paints comp. R,A
21 Providing & Fixing in position M.S. Angle 600.96 Kg. 75.00 45,072.00
40mmx40mmx6mm Angle frame for door and
35mmx35mmx5mm angle frame for shutters, 18
gauge iron sheet of shutters with 4 nos. of hold
fasts for door as per the approved drawing &
design including applying a priming coat of red
lead paint and all necessary fittings fixtures,
locking arrangements etc. Complete. (Item no-
25(10.100)Pg.56)
22 Painting two coats (Excluding Priming coat) on 33.53 Smt. 61.60 2,065.45
new steel and other metal, surfaces with enamel
paint, brushing , interior to give an even shade
including cleaning the surface of all dirt, dust and
other foreign matter etc. Complete(Item
no2(19.7).Pg.98)

23 White washing with lime on undecorated wall 120.50 Smt. 8.10 976.05
surfaces, 3 coats to give an even shade including
thoroughly brooming the surface to remove all
dirt, dust, mortar drops and other foreign matter,
(Item no-1(18.11) +(Item no-3(18,13) Pg.93)

24 Providing & Applying three coats of 100% acrylic 81.58 Smt. 74.00 6,036.92
base matt finishing exterior paint of approved
manufacture of required shade on external
surface to give an even shade after thoroughly
brushing the surface free from mortar dropping &
other foreign matter before application of paint
etc. complete as directed for all floors and all
lifts.(Item no-35 (0.0) Pg.220)
ESTIMATE – CTB – 01 –
GIRLS TOILET - 1 CWSN + 2 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 0 NORMAL W.C. + 4 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
25 Providing and laying Ceramic tiles 6mm thick in 34.63 Smt. 746.00 25,833.98
skirting, risers of steps & dado on 10 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;21(0.00)pg;79
26 Providing and laying Ceramic tiles 6mm thick in 24.30 Smt. 691.00 16,791.30
flooring, treads of steps & landing on 12 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;20(0.00)pg;79
27 Providing up to floor two level precast cement 1.62 Smt. 528.00 855.36
concrete jali or grill mix(1 Cement :2 Coarse
sand:4 graded stone aggregates) reinforced with
1.6mm dia. mild steel wire including cleaning,
fixing and finishing in cement mortar 1:3 and
curing complete.(D)75 mm thick item
no;19(5.6.2)(D)pg;28
28 Construction of a soak pit of 1.2m dia. and depth 2.00 Each 1,418.00 2,836.00
1.8m (capacity 2.00 cmt volume) including
excavation and filling brick bats with dry brick
masonry as per the approved drawing & design
etc. complete item no;18(0)(A) pg. no;137
29 Providing & fixing 32 mm dia. pipe of 16G ASIS 4.00 Each 725.00 2,900.00
Grade-304 for Grab bar in CWSN W/C 75 cm long
as per given detail. R.A.
30 Providing & fixing 15mm dia screw down brass 8.00 NO. 226.00 1,808.00
chromium plated bib tap of approved quality etc.
complete. item no;28(23.92) pg;127
31 Providing & laying 150mm diameter salt glazed 8.10 Metre 236.00 1,911.60
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete.
item no;1(24.1)(A) pg;133
32 Providing & laying 100mm diameter salt glazed 17.10 Metre 165.00 2,821.50
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete
item no;1(24.1)(B) pg;133
33 Construction of brick masonry chamber of size 2.00 Each 3,909.00 7,818.00
455mm * 610mm internal dimensions and depth
up to 450mm for ground inspection chamber with
brick having crushing strength not less than
35Kg/sqcm. in cement mortar 1:5 40mm thick C.I
cover with frame (light duty) complete item
no;16(24.44 I)pg;137
ESTIMATE – CTB – 01 –
GIRLS TOILET - 1 CWSN + 2 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 0 NORMAL W.C. + 4 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
34 Providing & fixing urinal of approved 4.00 Each 1,440.00 5,760.00
quality(550X300mm size) including connecting
trap and with integral longitudinal flush pipe and
15 mm dia brass screw down stop tap complete
item no;34(23.124)(A)+item
no;30(23.96)(A);PG;127
35 Providing & fixing wash down water closet 2.00 Each 2,910.00 5,820.00
(European Type W.C. pan ) with integral P or S
trap including jointing the trap with soil pipe in CM
1 :1 (1 Cement : 1 fine sand ) including 12.5 litres
low level flushing PVC
cistern,seatcover.iteam10(23.112)pg;125+iteam
16(23.120)pg;126+iteam17(23.121)(ii)pg;126+ite
am 31pg,80.
36 Providing & fixing vitreous china long pattern 2.00 Each 1,586.00 3,172.00
white colour water closet squatting pan(Indian
type W.C. Pan) size 580mm including earthwork,
bed concrete, foot rests, G.I inlet connection for
flush pipe,trap,25mm flush cock etc. Complete
item9(23.111)pg;124+iteam11(23.113)pg;125+it
eam12(23.114)pg;125+itean;16(23.120)pg;126+i
team 32(0.0)pg;127
37 Providing & fixing PVC water tanks of 500 LITRES 500.00 LIT 5.00 2,500.00
as required on terrace level including making
platform for bottom support and making
necessary inlet, outlet and overflow connection
etc. complete.
38 Providing & fixing gun metal check or non-return 2.00 No. 576.00 1,152.00
full way wheel valve(A)25mm dia item
no;30(23.99)(C)PG;127
39 Construction of septic tank of size 3.00 m length 1.00 No. 43,800.00 43,800.00
x 1.2 m width internal dimensions and depth up
to 1.8mt with brick having crushing strength not
less than 35Kg/sqcm. in cement mortar 1:6
including 0.60 X 0.60 cement cover as per
approved drawing etc. comp.R.A
40 Providing and fixing 25mm dia U.P.V.C.Pipe 38.50 RMT 102.00 3,927.00
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;8 pg;129

41 Providing and fixing 15mm dia U.P.V.C.Pipe 15.00 RMT 85.00 1,275.00
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;7 pg;129
ESTIMATE – CTB – 01 –
GIRLS TOILET - 1 CWSN + 2 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 0 NORMAL W.C. + 4 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
42 Providing and fixing 50mm dia G.I. Rain water 2.00 No. 285.00 570.00
spout 60CM long complete. R.A
43 providing & fixing stone wear gully trap with C.I 5.00 Each 1,483.00 7,415.00
grating brick masonry chamber and water tight C.I
cover with frame of 300mm X 300mm size with
standard weight (i) square mouth traps 150m x
100 mm size p or R type etc. complete. item
no;6(24.19 B) pg;134
44 providing & fixing PVC SWR nahni trap IS 14735 5.00 Each 355.00 1,775.00
for drain-100mm diameter with jali of following
nominal diameter of self-cleansing design with CI
spread down including cost of cutting comp. item
no;14 pg;131
45 Providing & fixing stainless steel soap tray near 4.00 Each 50.00 200.00
wash basin & hand wash facility etc. comp. RA
46 Painting of logo on front side wall. (R.A) 1.00 No. 700.00 700.00
TOTAL COST RS. 4,58,809.04
ADDING 3% CONTINGENCY 4,72,573.31
SAY RS. 4,72,600.00
172
COMBINED TOILET | CTB - 02
CWSN TOILET W.C. URINAL
1 1 4 BEST ORIENTATION

CWSN TOILET W.C. / URINAL NORTH

GIRLS BOYS
1 4 SATISFACTORY ORIENTATION
NORTH

DETAILS OF DRAWINGS ORIENTATION PRIORITY ON SITE


DRAWING NO. PARTICULARS ACCEPTABLE ORIENTATION

CTB-02:1/15 GROUND FLOOR PLAN


NORTH

CTB-02:2/15 TERRACE PLAN

CTB-02:3/15 FLOORING PATTERN

CTB-02:4/15 ELEVATIONS

CTB-02:5/15 ELEVATIONS

CTB-02:6/15 SECTIONS

CTB-02:7/15 SECTIONS

CTB-02:8/15 SECTIONS

CTB-02:9/15 WATER SUPPLY LAYOUT

CTB-02:10/15 DRAINAGE LAYOUT

CTB-02:11/15 RAILING AND HANDWASH

CTB-02:12/15 INCINERATOR DETAIL

STRUCTURAL DETAILS -
CTB-02:13/15 GENERAL NOTE, WALL SECTIONS, PLINTH BENDS

CTB-02:14/15 STRUCTURAL DETAILS - FOUNDATION LEVEL

CTB-02:15/15 STRUCTURAL DETAILS - SLAB LEVEL


S3 S1 S2 DOOR-WINDOW SCHEDULE
TYPE SIZE LIN. SILL NOS. REMARKS
C _
D 1.20 X 2.40 2.40M 2 M.S.SHUTTER
0.115 7.94 0.115 _
D1 1.00 X 2.40 2.40M 2 BOTH SIDE OPNEABLE
1.53 2.13 2.13 2.15 M.S.SHUTTER
_
0.15 D2 0.70 X 2.40 2.40M 5 M.S.SHUTTER
1.53 0.73 0.90 1.23 0.90 0.73 0.60 0.42 0.60 0.38
V1 0.90 X 0.60 2.40M 1.80 3 CEMENT JALI
V2 0.60 X 0.60 2.40M 1.80 2 LOUVERS
V3 0.47 X 1.20 2.40M 1.20 6 CEMENT JALI

Plinth protection
0.45

0.115
0.115

CWSN NT Incinerator

0.70
1.12

1.90 X 2.10 Peep hole to


1.11

incinerator Plinth protection


CWSN

0.150.23
1.90 X 2.10

2.10

0.60

1.13
W.C.

0.15
1.10 x 0.90
1.21

1.75

W.C. W.C.

0.50
0.90 x 1.10 0.90 x 1.10

0.73
0.23

1.24

4.98
4.98

0.30
0.90 1.00 0.43 0.70 0.32 0.70
0.60 0.70 0.23 1.00 0.90
0.40 0.40 Kotah stone
B platform as D

0.73
0.60
0.60

Kotah stone Lvl :+0.40


per detail - D1
0.30

platform as
Plinth protection

1.82
1.82
0.23 0.70 0.32 0.70 0.20

0.90
per detail - D1
S4

Plinth protection
0.47 0.23 1.20

2.65
2.65

0.07

0.73
W.C. W.C.
0.60 0.70 0.23 1.20 0.23 0.40
0.90 x 1.10 0.90 x 1.10
1.75

1.24
0.73
0.83
0.60

0.115
0.115

RAMP UP Lvl :+0.38 Lvl :+0.38 RAMP UP

1.32
1.32
1.32

Lvl : 00 I.P.S. FINISH ON RAMP Lvl : 00


I.P.S. FINISH I.P.S. FINISH I.P.S. FINISH ON RAMP
M.S.railing as per detail - D2 M.S.railing as per detail - D2

0.65 4.00 1.20 0.23 1.17 0.23 1.20 4.00 0.65

CWSN W.C. URINALS


01 04 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

1.76 1.20 0.23 0.47 0.23 0.47 0.23 1.20 0.38 0.60 0.42 0.60 0.38 0.45 DESIGN CODE :CTB-02 01 01 04
1.53 1.43 0.70 0.70 1.43 2.15
0.115 7.94 0.115 GROUND FLOOR PLAN
A DRAWING NO
CTB-02 : 1/15

173
174
S3 S1 S2

60 CM L ONG 50 mm G.I.

0.70
P IPE FOR W AT ER SPOUT

1.12
PVC overhead 60 CM L ONG 50 mm G. I.
water tank PIPE FO R WAT ER SPOUT
capacity 500 lit.
1.53 4.03 2.15

TERRACE 0.23 X 0.35 mt.


BRICK CURBING
Lvl :+2.92

4.05
40mm I.P.S. FINISH FLOOR
ABOVE R.C.C. SLAB

3.63
S4

0.23 X 0.35 mt.


BRICK CURBING

0.23 X 0.35 mt.


BRICK CURBING

RAMP UP Lvl :+0.40 Lvl :+0.40


RAMP UP
I.P.S. FINISH ON RAMP I.P.S. FINISH I.P.S. FINISH I.P.S. FINISH ON RAMP

M.S.railing as per detail - D2 M.S.railing as per detail - D2

CWSN W.C. URINALS


01 04 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-02 01 01 04

TERRACE PLAN
DRAWING NO
CTB-02 : 2/15
FINISH I.P.S.
F L O O R

1 2 3 4 5 6 6 5 4 3 2 1

2 2

3 3
1 2 3 R
4 Lvl :+0.35 Lvl :+0.35 4
2 0.30 mt. X 0.30 mt. matte 0.30 mt. X 0.30 mt. matte
1 2 3 1 2 3
5 Glazed ceramic tile Glazed ceramic tile 5
3 Lvl :+0.38
2 2
6 6
3 3
R R 7 7
Lvl :+0.38 Lvl :+0.38

0.50
2 2 R R
Lvl :+0.45

1 1 2 3 4 5 6 7 8 9
R 13 12 11 10 9 8 7 6 5 4 3 2 1
R R
2 Lvl :+0.40
2

FINISH I.P.S.
F L O O R
2 0.30 mt. X 0.30 mt. matte
Lvl :+0.45 3
Lvl :+0.40 Glazed ceramic tile 3
1
FINISH I.P.S.
F L O O R

0.30 mt. X 0.30 mt. matte


R 4 4
Glazed ceramic tile
2 5
Lvl :+0.45 R R

120mm X 120mm deep channel


1 6 Lvl :+0.38 Lvl :+0.38
R 3 3
7
2 2 2
Lvl :+0.45
R
1 3 2 1 3 2 1

Lvl : 00 Lvl : 00
RAMP UP Lvl :+0.40 Lvl :+0.40 RAMP UP 300 X 300
300 X 300
I.P.S. FINISH ON RAMP I.P.S. FINISH I.P.S. FINISH I.P.S. FINISH ON RAMP ANTI SKID
ANTI SKID
T I L E S T I L E S

CWSN W.C. URINALS


01 04 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-02 01 01 04

FLOORING PATTERN
DRAWING NO
CTB-02 : 3/15

175
176
CURBING TOP
+3.27

SLAB BOTTOM
+2.80
Cement jali

0.78 mt. high 0.78 mt. high


M.S. pipe railing M.S. pipe railing

ELEVATION - A

CURBING TOP
+3.27

SLAB BOTTOM
+2.80
C e m e n t j a l i
SILL
+2.20

0.78 mt. high


M.S. pipe railing

PLINTH LVL. CWSN W.C. URINALS


+0.40 01 04 -
RAMP COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-02 01 01 04


ELEVATION - B
ELEVATIONS
DRAWING NO
CTB-02 : 4/15
CURBING TOP
+3.27 ELEVATIONS

Cement jali

Vent pipe

0.78mt. high M.S.


pipe railing 15 mm thk.
Mala p l aste r
Incinerator

Plinth protection PLINTH PROTECTION


RAMP +0.30

ELEVATION - D

Cement jali

CURBING TOP
+3.27

Vent pipe

15 mm thk. 15 mm thk. 15 mm thk.


0.78mt. high M.S. Ma la p las te r Mal a p last er Ma la p la ste r
pipe railing

Incinerator

Plinth protection

ELEVATION - C CWSN W.C. URINALS


01 04 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-02 01 01 04

ELEVATIONS
DRAWING NO
CTB-02 : 5/15

177
178
0.23 mt. X 0.35 mt.
brick curbing
TERRACE Cement vata CURBING TOP
+3.27
Lvl :+2.92
SLAB TOP
+2.92
0.60 mt. X 0.60 mt. high
cement jali ventilation

1.80

0.80
0.70

0.60
PLINTH LVL.
+0.40

SECTION 4-4

0.90 mt. X 0.60 mt. high


cement jali ventilation
0.23 mt. X 0.35 mt. 1.50 mt. high 0.30 mt. X
brick curbing TERRACE 0.30 mt. Glazed tile dado CURBING TOP
Cement vata
Lvl :+2.92 +3.27
SLAB TOP
+2.92

R 6 5 4 3 2 START START 2 3 4 5 6 R
HERE HERE
0.90 mt. high 0.30 mt. X

2.40
2.40
2 2
0.30 mt. Glazed tile dado
START START START
1.80

2 3 R 2 3 2 3
HERE 3 3 HERE HERE

2 2 2 Plinth protection
4 4

0.90
0.90

Bib cock Bib cock fin ished with I.P.S.


3 3 3
0.45

5 5

0.48
0.48
W.C. CWSN TOILET CWSN TOILET W.C. W.C. PLINTH LVL. CWSN W.C. URINALS
+0.40 01 04 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-02 01 01 04

SECTION 5-5
ELEVATIONS
DRAWING NO
CTB-02 : 7/15
0.23 mt. X 0.35 mt.
brick curbing
TERRACE Cement vata CURBING TOP
Lvl :+2.92 +3.27
SLAB TOP
+2.92
10 mm thk.
M al a pl as te r 10 mm thk.
M al a p la st er

1.50 mt. high 0.30 mt. X


1.20 mt. high 0.30 mt. X
0.30 mt. Glazed tile dado
0.78mt. high M.S. 0.30 mt. glossy finished 7 6 5 4 3 2 START
HERE
pipe railing ceramic tile on wall
6 5 4 3 2 START
HERE 2
Mirror
2 grab bar
3

15 mm thk. 4 Plinth protection

1.20
0.80
0.90

0.78
M a la p la s ter finished with I.P.S.

0.70

0.60
0.60
0.70
5

0.40
CWSN TOILET PLINTH LVL.
+0.40

SECTION 1-1

0.23 mt. X 0.35 mt.


brick curbing
TERRACE Cement vata CURBING TOP
Lvl :+2.92 +3.27

0.35
0.35
SLAB TOP

0.12
+2.92
M.S. grill

0.60
0.60
over the door
SILL
10 mm thk. +2.20
Ma l a pl a st er 10 mm thk. 10 mm thk.
Ma la pl as te r M a la p la s ter
0.90 mt. high 0.30 mt. X
0.30 mt. Glazed tile dado

1.80
1.80
START 2 3 R R 3 2 START
HERE HERE

2 2 0.78 mt. high M.S.

0.90
pipe railing
3 W.C. W.C. 3
GIRLS' TOILET PLINTH LVL.
+0.40 CWSN W.C. URINALS
01 04 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-02 01 01 04

SECTION 2-2 ELEVATIONS


DRAWING NO
CTB-02 : 6/15

179
180
0.23 mt. X 0.35 mt.
brick curbing
TERRACE Cement vata CURBING TOP
Lvl :+2.92 +3.27
SLAB TOP
+2.92

10 mm thk.
Mala plast er 10 mm thk.
Mala plaste r
R 1 START R 1 START R 1 START R 1 START
HERE HERE HERE HERE

1 1 1 1 START 2 3
HERE

1.20
0.78 mt. high M.S. 2 2 2 2 2
Plinth protection
0.90

0.60
pipe railing

0.45
R R R R 3
W.C. PLINTH LVL.
+0.40

SECTION 3-3
CWSN W.C. URINALS
01 04 -
COMBIEND TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-02 01 01 04

SECTION
DRAWING NO
CTB-02 : 8/15
Lvl :+0.40 Lvl :+0.40

Lvl :+0.40 Lvl :+0.40

Lvl : 00
Lvl : 00

CWSN W.C. URINALS


01 04 -
COMBINED TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB - 02 01 01 04

WATER SUPPLY
DRAWING NO
CTB - 02 : 9/15

181
182
SEPTIK TANK
L : 3.0m | B : 1.2m | D : 1.8m
SOAK PIT
1.2m DIA.
1.8m DEPTH

SOAK PIT
1.2m DIA.
1.8m DEPTH

Lvl :+0.40 Lvl :+0.40

Lvl :+0.40 Lvl :+0.40 CWSN W.C. URINALS


01 04 -

Lvl : 00
Lvl : 00

COMBINED TOILET CWSN W.C. URINALS


BOYS GIRLS

DESIGN CODE :CTB - 02 01 01 04

DRAINAGE LAYOUT
DRAWING NO
CTB - 02 : 10/15
Cubby hole
for soap

0.30 0.60 0.60 0.30

0.40
35MM single polish kotah stone support with 10mm slope

0.30 0.30 0.30 0.30 0.30 0.30

300mm X 300mm glossy

0.30
ceramic glazed tiles

0.42
0.15
0.40

PLAN
Cubby hole

0.12
for soap

3 5 M M d ou b le p o li s h k ot a h s to n e v e r ti c a l s u p p o rt

kotah stone

0.20

0.80

0.70
35MM single polish kotah stone

0.80
0.70
su pp ort wi th 10 m m s lop e

0.60
0.40
N.T.
N.T.

DETAIL - D1 (HAND WASH)


ELEVATION SECTION

4.00 1.43
0.30 0.82 0.82 0.82 0.82 0.82 1.02 0.34

40mm DIA. M.S.HOLLOW PIPE


0.78
0.60

0.78
0.60
CWSN W.C. URINALS
01 04 -
DETAIL - D2 (HAND RAIL) COMBINED TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB - 02 01 01 04

HAND WASH & DETAILS OF RAILING


DRAWING NO
CTB - 02 : 11/15

183
184
INLET PIPE FOR
THROWING WASTE

VENT PIPE

0.45
M.S.JALI TO COLLECT WASTE BRICK WALL

0.12
0.12 0.60 0.12
M.S.SHUTTER (CLOSED)

VENT PIPE VENT PIPE

R.C.C OR STONE COVER R.C.C OR STONE COVER


0.55
TOP HUNG M.S.SHUTTER
FOR DISPOSAL OF
WASTE NEPKINS
M.S.SHUTTER (CLOSED) M.S.SHUTTER (CLOSED)
M.S.JALI TO COLLECT WASTE BRICK WALL

0.85
M.S.SHUTTER (WITH GRILL)

0.70
M.S.SHUTTER (WITH GRILL)

1.25
SOLID FUEL FOR PLINTH PROTECTION
BURNING THE WASTE
C.W.S.N (INSIDE)

CWSN W.C. URINALS


01 04 -
COMBINED TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB - 02 01 01 04


MASONARY INCINERATOR OUT SIDE OF GIRLS TOILET
DETAIL OF INCINERATOR
DRAWING NO
CTB - 02 : 12/15
NOTES

10
d(
>
GENERAL:-

75
mm
)
1. ALL R.C.C. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
REFERENCE TO THE ARCHITECT DRAWINGS .
d
2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS SPECIFIED
OTHERWISE.

Ld
3. ALL DIMENSIONS ARE TO BE CHECKED AND CORELATED WITH THE

Ld
BEAM WEB REINFORCEMENT
ARCHITECTURAL DRAWINGS AND ANY AMBIGUITY IF FOUND, THEREIN
d = DIA OF STIRRUPS
SHALL BE BROUGHT TO THE NOTICE TO THE OFFICE BEFORE
EXECUTION OF THE WORK.
8# @200C/C
4. LIVE LOADS ARE ADOPTED AS PER I.S. 875 - 1987 PART-2(L.L.) L-JUNCTION T-JUNCTION 30 60 60 30
5. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS
75

SHALL BE FOLLOWED.
2-8# FOR EQ. ZONE-III
6. THE STRUCTURE IS DESIGNED FOR DEAD LOAD, LIVE LOAD, ARRANGEMENT OF BARS IN PLAN FOR 230 2-10# FOR EQ. ZONE-IV &V
SEISMIC LOAD AND WIND LOAD. SEISMIC LOADS AS PER I.S.:1893 R.C.C. PLINTH BAND
STRENGTHENING AT WALL JUNCTIONS.
-2002 AND DEAD,LIVE AND WIND LOADS AS PER I.S.:875 - 1987. FOR 230TH LOAD BEARING WALL
7. THE STRUCTURAL CONSULTANT IS NOT RESPONSIBLE FOR CROSS SECTION OF R.C.C. BAND
QUALITY CONTROL AND SUPERVISION OF THE WORKS.
230
8. MORTAR MIX OF (CEMENT: SAND)1:4 SHALL BE USED.
PLINTH LVL. PLINTH LVL.
9. ALL BRICK SHALL CONFORM TO IS 1077 :1970 AND SHALL HAVE 8#@200 C/C
MINIMUM CRUSHING STRENGTH OF 35KG/SQ.CM.
75

10. ALL CONCRETE SHALL BE MACHINE MIXED AND MACHINE VIBRATED.

75 75
75

11. B.K. MASONARY B.K. MASONARY


GR.LVL. 2-8# GR.LVL.
STATED. IN C.M. (1:4) IN C.M. (1:6)
0.00 0.00
12. REINFORCEMENT TO BE USED SHALL BE H.Y.S.D. BARS
CONFORMING TO I.S. 1786:2008.
13. LAP LENGTH SHALL BE PROVIDED AS UNDER.

GRADE OF CONCRETE MILD STEEL Fe. 415 (H.Y.S.D.)


350 350

175
175

M:20 47D 57D


M:25 41D 49D B.B.C.C. B.B.C.C.

150
150

MINI. 600mm.
MINI. 450mm.

(1 : 5 : 10) (1 : 5 : 10)

UP TO GOOD SOIL
UP TO GOOD SOIL

14. CLEAR COVER TO MAIN REINFORCEMENTS SHALL BE 30mm


FOR BEAMS AND 20 mm FOR SLABS.
600 450
15. CONTINUOUS PLINTH BANDS SHALL BE PROVIDED ADOPTING
WALL - W1 WALL - W2
WALL JUNCTION DETAILS AS SHOWN IN DRAWING.
FOR 230 TH. OTTA WALL
16. THE TOILET IS DESIGNED FOR GROUND FLOOR ONLY FOR 230 TH. LOAD BEARING WALL
& PARTITION WALL
CWSN W.C. URINALS
SPECIAL NOTE FOR STRUCTURE UP TO 10 KMS. FROM 01 04 -
SEA COAST COMBINED TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-02 01 01 04


1. ALL CONCRETE MIX FOR SLABS AND BEAMS SHALL BE M25.
2. CLEAR COVER TO THE MAIN RAINFORECEMNT SHALL BE
30mmFOR SLABS AND 40mm FOR BEAMS.
DRAWING NO
CTB-02 : 13/15

185
186
230
PLINTH LVL.
8#@200 C/C 1-10# FOR EQ. ZONE-III
1-12# FOR EQ. ZONE-IV & V

75 75
W1 W1 BARS FROM FOUNDATIONS TO PASS
W1 B.K. MASONARY THROUGHPLINGTH BAND, MASONARY AND
GR.LVL. 2-8# TO BE TAKEN IN TO AND ANCHORED IN TO SLAB
IN C.M. (1:4)
0.00
W1
115x115(M:20) CONCRETE

W1

W1
W1

W1
350 P.C.C. (1:2:4)

175
( 350 x 500 x 175 )

PB1
150
B.B.C.C. ( 1:5:10 )

MINI. 600mm.
W1

UP TO GOOD SOIL
600

W1 W1 W2 WALL - W1

FOUNDATION DETAILS AT WALL JUNCTIONS

W1

W1
W2

W1 W1

W1
PB1
W1 W1

W1
W1

W2
W2
W2

W2
W2 W2

FOUNDATION PLAN

150
2-8# NOTE:
1. ALL DIMENSIONS ARE IN mm. UNLESS SPECIFIED
OTHERWISE.
8#@150 C/C ALL

230
2. FOR GENERAL NOTES, SPECIAL NOTES AND TYPICAL CWSN W.C. URINALS
STRUCTURAL DETAILS PLEASE REFER THIS PROJECT 01 04 -
R.C.C. DRAWING NO.- 01
COMBINED TOILET CWSN W.C. URINALS
BOYS GIRLS

2-10# DESIGN CODE :CTB-02 01 01 04


PB1
STRUCTURAL DETAILS - FOUNDATION LEVEL
DRAWING NO
FOUNDATION DESIGN SHALL BE REVISED AS PER SOIL TYPE, SPECIALLY FOR BLACK COTTON & FIELD UP SOIL
CTB-02 : 14/15
SB1 SB1 SCHEDULE OF REINFORCEMENT FOR SLABS
A 8# @ 200 C/C ALTERNATE BENT UP BARS
POSITION OF P.V.C. WATER TANK B 8# @ 250 C/C DISTRIBUTION STEEL
CAPACITY AS PER ARCH. DRAWING C 8# @ 150 C/C ALTERNATE BENT UP BARS
SB1
500 400 C 400 ALL SLABS ARE 100 THICK.

SB1
400 400 C 400 500 B

B B

B
500

SB3
SB2
400 400 A 400 500
500 500
A

SB2
SB3
500 400 A 400

300 500
350
A

SB1

STRUCTURAL LAY-OUT AT SLAB LVL.

2-8# 2-10# 2-10#

8#@150C/C 8#@150C/C 8#@150C/C

140
100
100 CWSN W.C. URINALS
01 04 -
2-10# 3-10# 2-12#+1-10# COMBINED TOILET CWSN W.C. URINALS
BOYS GIRLS

DESIGN CODE :CTB-02 01 01 04


230 230 230
STRUCTURAL DETAILS - SLAB LEVEL
SB1 SB2 SB3
DRAWING NO
CTB-02 : 15/15

187
ESTIMATE – CTB – 02 –
GIRLS TOILET - 1 CWSN + 4 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
1 Excavation for foundation up to 1.5m depth 23.23 Cmt. 83.00 1,928.09
including sorting out. Stacking of useful materials
and disposing of the excavated stuff up to
50mt.lead. (Item no.-1 (0)(A) page.-22) Loose or
soft soil.
2 Providing & Laying Brick bat cement Concrete 5.64 Cmt. 2,126.00 11,990.64
1:5:10 (1Cement : 5Coarse sand :10 graded brick
bats) in foundation and plinth and curing complete
excluding cost of formwork (Item no-(9)5.3.8
Pg.27)
3 Brick work using common burnt clay building 15.36 Cmt. 3,651.00 56,079.36
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand) R.A
4 Filling with the available excavated earth 18.58 Cmt. 53.40 992.17
(excluding rock) in trenches, plinth, sides of
foundation etc.in layers not exceeding 20cm in
depth consolidating each deposited layer by
ramming and watering. (item no-(6)4.12 pg.23
5 Providing & Laying brick bat cement Concrete 5.16 Cmt. 2,396.00 12,363.36
1:4:8 (1 Cement: 4 Coarse sand: 8 graded brick
bat) in foundation and plinth and curing complete
excluding cost of formwork. (Item no.-
8(5.3.3)page.-27)
6 Providing & Laying ordinary cement Concrete 1.29 Cmt. 4,689.00 6,048.81
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC coping .R.A..
7 Providing & Laying ordinary cement Concrete 1.51 Cmt. 4,001.00 6,041.51
1:2:4 (1 Cement :2 Coarse sand:4 graded stone
aggregates) and finishing smooth with curing etc.
complete excluding the cost of formwork for
concrete work in plinth protection & corner bar
bed. item no10(5.3.13)pg-27
8 Brick work using common burnt clay building 21.20 Cmt. 3,769.00 79,902.80
conventional bricks having crushing strength not
less than 35kg/sq. cm. In super structure in
cement mortar 1:4 (1cement:4fine sand) R.A
9 Half brick masonry in common brunt clay building 9.41 Smt. 500.70 4,711.59
conventional bricks having crushing strength not
less than 35kg/sq. cm. In foundation and plinth in
cement mortar 1:4 (1cement:4fine sand)in super
structure including curing etc. complete.(Item no-
(8)6.3 I(B) Pg.42)+(Item no-(10)6.32(B) Pg.43)
ESTIMATE – CTB – 02 –
GIRLS TOILET - 1 CWSN + 4 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
10 Providing & Laying ordinary cement Concrete 4.61 Cmt. 6,455.00 29,757.55
1:1.5:3 (1 Cement :1.5 Coarse sand:3 graded
stone aggregates) and finishing smooth with
curing etc. complete including smooth with curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for reinforced
concrete work in RCC slabs having thickness
more than 10 cm and up to 13cm thickness. R.A.
11 Providing & Laying reinforcement for RCC work 427.00 Kg. 54.00 23,058.00
including bending, binding and placing in position
etc. complete up to floor two level Thermo
Mechanical Treated Bars as per I.S.
Standard.(T.M.T ) (item no-14A (5.4.11(A)pg.28
12 Providing 10mm thick inside cement plaster in 128.23 Smt. 100.00 12,823.00
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no1 (17.58)
(I) Pg.89
13 Providing 15mm thick outside cement plaster in 117.58 Smt. 137.10 16,120.22
single coat on rough or fair side of single of half
brick wall for plastering finished even and smooth
in cement mortar 1:3(1 cement 3 sand ) and
watering, curing etc. complete. (item no3 (17.60)
(I) Pg.89
14 Providing & Fixing 30mm thick polished Kotah 3.64 Rmt 603.00 2,194.92
stone 40cm wide & 20cm depth for HAND WASH
FACILITY as per approved drawing & details by
engineer in charge including making hole with
waste water pipe, coupling ,rubbing etc. comp.
R.A
15 40mm thick cement concrete flooring 1:2:4 50.90 Smt. 236.00 12,012.40
(1cement:2 coarse sand: 4 graded stone
aggregates 20mm normal size) laid in one layer
finished with a floating coat of neat cement, curing
etc. Complete. (Item no-15(14.71)(A) Pg.78)

16 Providing cement vata (10cmx10cm size) quarter 25.83 Rmt 22.60 583.76
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. (Item no-
15(0.0)Pg.91
17 Providing & fixing washbasin with hole for pillar 2.00 Each 2,033.00 4,066.00
tap with C.I or M.S brackets painted with including
cutting holes and making good .(A)vitreous china
(II)Flat back washbasin 550mmx400mm in white
colour including pillar tap, waste pipe, stop cock,
union required all fitting, fixture etc. comp. RA
ESTIMATE – CTB – 02 –
GIRLS TOILET - 1 CWSN + 4 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
18 Construction of ICN chamber as per approved 1.00 Each 2,250.00 2,250.00
drawing & design complete detail. R.A.
19 Providing & Fixing 25mm thick double polished 2.16 Smt. 773.00 1,669.68
vertical Kotah stone for (partition) urinal as par
drawing including round edge moulding etc.
comp. R,A
20 Providing & fixing 40 mm dia. MS hollow pipe 23.86 Rmt 976.00 23,287.36
(B-TYPE) 78 cm height railing for ramp as per
approved drawing & details by engineer in charge
including applying primer coat & two coats of oil
paints comp. R,A
21 Providing & Fixing in position M.S. Angle 780.96 Kg. 75.00 58,572.00
40mmx40mmx6mm Angle frame for door and
35mmx35mmx5mm angle frame for shutters, 18
gauge iron sheet of shutters with 4 nos. of hold
fasts for door as per the approved drawing &
design including applying a priming coat of red
lead paint and all necessary fittings fixtures,
locking arrangements etc. Complete. (Item no-
25(10.100)Pg.56)
22 Painting two coats (Excluding Priming coat) on 43.79 Smt. 61.60 2,697.46
new steel and other metal, surfaces with enamel
paint, brushing , interior to give an even shade
including cleaning the surface of all dirt, dust and
other foreign matter etc. Complete(Item
no2(19.7).Pg.98)
23 White washing with lime on undecorated wall 128.23 Smt. 8.10 1,038.66
surfaces, 3 coats to give an even shade including
thoroughly brooming the surface to remove all
dirt, dust, mortar drops and other foreign matter,
(Item no-1(18.11) +(Item no-3(18,13) Pg.93)
24 Providing & Applying three coats of 100% acrylic 117.58 Smt. 74.00 8,700.92
base matt finishing exterior paint of approved
manufacture of required shade on external
surface to give an even shade after thoroughly
brushing the surface free from mortar dropping &
other foreign matter before application of paint
etc. complete as directed for all floors and all
lifts.(Item no-35 (0.0) Pg.220)
25 Providing and laying Ceramic tiles 6mm thick in 43.54 Smt. 746.00 32,480.84
skirting, risers of steps & dado on 10 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;21(0.00)pg;79
26 Providing and laying Ceramic tiles 6mm thick in 28.07 Smt. 691.00 19,396.37
flooring, treads of steps & landing on 12 mm thick
cement plaster 1:3 (1 cement : 3 course sand )
and join with white cement slurry etc. complete
item no;20(0.00)pg;79
ESTIMATE – CTB – 02 –
GIRLS TOILET - 1 CWSN + 4 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
27 Providing up to floor two level precast cement 3.78 Smt. 528.00 1,995.84
concrete jali or grill mix(1 Cement :2 Coarse
sand:4 graded stone aggregates) reinforced with
1.6mm dia. mild steel wire including cleaning,
fixing and finishing in cement mortar 1:3 and
curing complete.(D)75 mm thick item
no;19(5.6.2)(D)pg;28
28 Construction of a soak pit of 1.2m dia. and depth 2.00 Each 1,418.00 2,836.00
1.8m (capacity 2.00 cmt volume) including
excavation and filling brick bats with dry brick
masonry as per the approved drawing & design
etc. complete item no;18(0)(A) pg. no;137
29 Providing & fixing 32 mm dia. pipe of 16G ASIS 4.00 Each 725.00 2,900.00
Grade-304 for Grab bar in CWSN W/C 75 cm long
as per given detail. R.A.
30 Providing & fixing 15mm dia screw down brass 11.00 NO. 226.00 2,486.00
chromium plated bib tap of approved quality etc.
complete. item no;28(23.92) pg;127

31 Providing & laying 150mm diameter salt glazed 26.00 Metre 236.00 6,136.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete.
item no;1(24.1)(A) pg;133

32 Providing & laying 100mm diameter salt glazed 22.00 Metre 165.00 3,630.00
stoneware pipe / P.V.C.(6Kg/Sq.Cm) in the
required grade and slopes and joining wuth stiff
mixture of cement mortar in proportion 1:1,
including testing of pipes and joints etc. complete
item no;1(24.1)(B) pg;133

33 Construction of brick masonry chamber of size 3.00 Each 3,909.00 11,727.00


455mm * 610mm internal dimensions and depth
up to 450mm for ground inspection chamber with
brick having crushing strength not less than
35Kg/sqcm. in cement mortar 1:5 40mm thick C.I
cover with frame (light duty) complete item
no;16(24.44 I)pg;137

34 Providing & fixing urinal of approved 4.00 Each 1,440.00 5,760.00


quality(550X300mm size) including connecting
trap and with integral longitudinal flush pipe and
15 mm dia brass screw down stop tap complete
item no;34(23.124)(A)+item
no;30(23.96)(A);PG;127
ESTIMATE – CTB – 02 –
GIRLS TOILET - 1 CWSN + 4 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
35 Providing & fixing wash down water closet 2.00 Each 2,910.00 5,820.00
(European Type W.C. pan ) with integral P or S
trap including jointing the trap with soil pipe in CM
1 :1 (1 Cement : 1 fine sand ) including 12.5 litres
low level flushing PVC
cistern,seatcover.iteam10(23.112)pg;125+iteam
16(23.120)pg;126+iteam17(23.121)(ii)pg;126+ite
am 31pg,80.
36 Providing & fixing vitreous china long pattern 5.00 Each 1,586.00 7,930.00
white colour water closet squatting pan(Indian
type W.C. Pan) size 580mm including earthwork,
bed concrete, foot rests, G.I inlet connection for
flush pipe,trap,25mm flush cock etc. Complete
item9(23.111)pg;124+iteam11(23.113)pg;125+it
eam12(23.114)pg;125+itean;16(23.120)pg;126+i
team 32(0.0)pg;127
37 Providing & fixing PVC water tanks of 500 LITRES 500.00 LIT 5.00 2,500.00
as required on terrace level including making
platform for bottom support and making
necessary inlet, outlet and overflow connection
etc. complete.
38 Providing & fixing gun metal check or non-return 2.00 No. 576.00 1,152.00
full way wheel valve(A)25mm dia item
no;30(23.99)(C)PG;127
39 Construction of septic tank of size 3.00 m length 1.00 No. 43,800.00 43,800.00
x 1.2 m width internal dimensions and depth up
to 1.8mt with brick having crushing strength not
less than 35Kg/sqcm. in cement mortar 1:6
including 0.60 X 0.60 cement cover as per
approved drawing etc comp.R.A
40 Providing and fixing 25mm dia U.P.V.C.Pipe 47.30 RMT 102.00 4,824.60
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;8 pg;129
41 Providing and fixing 15mm dia U.P.V.C.Pipe 9.40 RMT 85.00 799.00
(SCH-40) to wall, ceiling & floor including all
necessary fittings & specials clamps, and testing
including making good wall and floor etc.
complete item no;7 pg;129
42 Providing and fixing 50mm dia G.I. Rain water 2.00 No. 285.00 570.00
spout 60CM long complete. R.A
43 providing & fixing stone wear gully trap with C.I 6.00 Each 1,483.00 8,898.00
grating brick masonry chamber and water tight C.I
cover with frame of 300mm X 300mm size with
standard weight (i) square mouth traps 150m x
100 mm size p or R type etc. complete. item
no;6(24.19 B) pg;134
ESTIMATE – CTB – 02 –
GIRLS TOILET - 1 CWSN + 4 NORMAL W.C. / URINALS
BOYS TOILET – 1 CWSN + 1 NORMAL W.C. + 5 URINALS
Sr.
Item of Work Quantity Unit Rate Amount
No.
44 providing & fixing PVC SWR nahni trap IS 14735 5.00 Each 355.00 1,775.00
for drain-100mm diameter with jali of following
nominal diameter of self-cleansing design with CI
spread down including cost of cutting comp. item
no;14 pg;131
45 Providing & fixing stainless steel soap tray near 2.00 Each 50.00 100.00
wash basin & hand wash facility etc. comp. RA
46 Painting of logo on front side wall. (R.A) 1.00 No. 700.00 700.00
TOTAL COST RS. 5,47,106.91
ADDING 3% FOR CONTINGENCY 5,63,520.12
SAY RS. 5,63,600.00
194
D - 1.20 x 2.40 D1=1.00 X 2.40 D1=0.70 X 2.40
M.S. ANGLE
40x40x6mm FOR
DOOR FRAME
10mm. SQUARE BAR 10 mm SQ. BAR

HOLD FAST
25X25X5
10mm. SQUARE BAR 10mm. SQUARE BAR
AT 15CM C/C AT 15CM C/C

0.40
40x40x6 0.40
FRAME
0.15
ANGLE
35X35X5

TOWER BOLT TOWER BOLT


0.15 15 CM. 0.15 15 CM.
HOLD FAST
25X25X5 HOLD FAST
25X25X5

ANGLE ANGLE
M.S. ANGLE 35X35X5 35X35X5
40x40x6mm FOR
Handel DOOR FRAME Handel Handel
M.S. FLAT
25x5

0.15
0.15
2.00
2.00

18 GUAGE TH.
IRON SHEET

ANGLE
35X35X5 ALDROP ALDROP

0.15
0.15
25cm. LONG) 25cm. LONG)

1.00
1.00
1.00

40x40x6 0.15
SHUTTER ANGLE

0.60
0.60
0.60

HOLD FAST
0.15
HOLD FAST
25X25X5 25X25X5

1.00 0.10 0.70


0.10

1.20

OUT SIDE ELEVATION OUT SIDE ELEVATION


OUT SIDE ELEVATION
35X35X5 35mm. Th. 35mm. Th.
DOOR FRAME SHUTTER DOOR DETAIL FOR SHUTTER DOOR DETAIL FOR
D1=1.00 X 2.00 D1=0.70 X 2.00
INSIDE INSIDE
35X35X5 INSIDE
ANGLE

OUTSIDE 0.70 OUTSIDE


T-SECTION 1.00
40x40x6 OUTSIDE
PIVOT SHUTTER ANGLE PLAN 40x40x6 PLAN
0.15 1.20 PLAN ANGLE
ANGLE DOOR DETAIL
ANGLE 18 GAUGE 35mm. Th.
25x25x5 IRON SHEET DOOR DETAIL
1.5 mm TH.
M.S. SHEET

GENERAL DETAILS
DOOR DETAIL FOR
35X35X5 D - 1.20 x 2.40
FRAME
25x25x5
ANGEL
DOOR DETAILS
PEG STAY
CEMENT JALI
35 x 35 x 6 mm
'L' Angle

M.S. FLAT
35 x 35 x 6 mm 25x5mm 3mm.th. Glass
'L' Angle 0.10 Lowers

eq
M.S. ANGLE
'Y' shape 25x25x5mm

0.10
hold fast

0.90
M.S. FLATE
20x5mm
0.15
10 x10 mm
M.S.square bar
10 x10 mm
M.S. square bar

eq
DETAIL : A
VENTILATER

inside
outside
Cement jali
V1-0.60 X 0.60 1.20
ANGLE 35x35x6mm
WINDOW FRAME
ELEVATION

VERTICAL SECTION 35 x 35 x 6 mm
10 x10 mm
inside M.S. square bar 'L' Angle
DETAIL : A
WELD MESH VENTILATOR
PLAN V1-0.90 X 0.60 HOLD FAST

outside 1.20 0.47


PLAN 25x5 M.S. FLAT M.S.ANGLE
25x25x5mm
V - 1.20 X 0.90
(M.S. GRILL)

0.15 0.47
WELD MESH VENTILATOR
CEMENT JALI PLAN V2-0.47 X 1.20

VENTILATER
Cement jali
V1-0.60 X 0.60

3mm GLASS
100mm

LOWERS
GALVANISED
FLY. MESH
75mm
VENTILATOR 'U' BARS
WELD MESH
PLAN V1-0.60 X 0.60

TYPICAL SECTIONS
OF LOUVERS VENTILATOR

GENERAL DETAILS

VENTILATION DETAILS

195
196
BRICK WALL WITH CEMENT PLASTER 150mm PIPE (OUTLET)

B
150mm PIPE (INLET)

PLAN
600mm x 600mm OPENING IN R.C.C.
SLAB FOR INSPECTION AND CLEANING R.C.C. SLAB AS PER
VENTILATION PIPE CLOSED WITH CEMENT COVER STRUCTURAL DESIGN

0.30
150mm PIPE (INLET) 150mm PIPE (OUTLET)

0.30
D/3 APPROX

D
OF 1:10 AT BOTTOM
SLOPE RATIO
GENERAL DETAILS

TYPICAL SKETCH OF SEPTIC TANK

S E C T I O N
1.66
PRECAST R.C.C. COVER OR MIN.
1.20
40mm THICK KOTAH STONE COVER
GROUND LEVEL

150mm PIPE
150mm PIPE (INLET FROM
(INLET FROM SEPTIC TANK)
SEPTIC TANK)

HONEY COMB
BRICK MASONRY

1.8
PLAN

SECTION

GENERAL DETAILS

TYPICAL SKETCH OF SOAK PIT

197
SECTION – 4
OPERATION & MAINTENANCE
Urinals, toilets and washrooms should be cleaned regularly and well-ventilated. Regular cleaning means
Cleaning more than once a day during peak periods of use. The poor maintenance of sanitary blocks often
prevents the long term use of these facilities in schools. Suggested protocol for environmental cleaning of
toilets is given below.

Item Frequency Method


General At least daily Surface area manually cleaned and dried between uses and/or at
e nvironmental end of day (depending on surface) using general purpose detergent
surfaces and water. Use disposable cloths/paper towels. Dry thoroughly.
Disinfectant/hypochlorite to be used if known infection risk and then
rinsed.
Hand wash basins, At least daily and As above re-detergent and water. Cream cleanser can be used
sinks, urinals and it is for sinks and basins. Ensure both sides of toilet seats and handles
toilets. Frequent advisable for are cleaned. Clean and dry basin taps. Clean toilet flush handles
hand contact sites, toilets to be and door knobs. Attention should be made to the underside of hand
such as toilet cleaned twice or dryers.
flush handles, three times daily
Taps and door As & when All surfaces of urinals are to be washed down using a detergent and
knobs. required water. Attention should be paid to the underside and surround of
urinals. Disabled persons’ grab rails should be cleaned with
detergent and water. All surfaces to be cleaned with detergent and
dry polished. Disinfectant/hypochlorite to be used if known infection
risk and then rinsed. Hand soap, preferably liquid soap, should be
available for all hand washbasins. Hygienic hand drying facilities
should be in close proximity to hand basins.
Drinking water Daily Water facilities should be cleaned daily. If children drink directly from
facilities a spout, the detergent needs to be safe. Peroxide sprays and/or
proprietary wipes (of a kind intended for water cooler use) should be
used daily to keep cooler taps/spouts in hygienic condition Drinking
water facilities (including taps, fountains and coolers) must not be
located in toilets areas. Drinking water facilities should be cleaned
daily, including outdoor facilities.
Floors Daily ash with water and detergent Disinfectant is required only after
contamination with blood spillages

198
Item Frequency Method
Bins Daily Empty bins at least twice daily. Clean outside bins daily, clean inside
with water and detergent, if contaminated. Lines to be renewed daily.
Sanitary product disposal bins are emptied and cleaned sufficiently,
often by a registered company to prevent them becoming over full
odorous.
Walls/ceilings/ Periodically Routine cleaning not required. Clean periodically with water and
windows/lights/ general purpose detergent. Clean with bleach if contaminated with
mirrors/ air- blood. Mirrors to be polished. Stainless steel should be kept bright.
vents/fittings/ pipe
work

199

You might also like