1 - 000 Others
2 - 001 Marketing related works
174 100 Downdraft table - 5 No's
3 176 101 Hard chrome scrubber
4 187 102 FRP Blower
5 193 103 Centralized Laser fume dust extractor
6 194 104 TD730, drum dust collector
7 182 105 Ventilation Survey Report
8 003 106 TD840 - two stage dust collector
9 005 107 Dust collector without blower
10 007 108 FRP Blower & Ducting
11 008 109 ESD Workstation - Al profile - 3 No's
12 009 110 TD850 - Two stage dust collector - 9 No's
13 011 111 ALF4010 ss with cyclone - demo
14 012 112 FX200 - 1No's
15 013 113 SS Ducting -
16 015 114 Drum type TD750 for demo
17 016 115 HEPA Filter for SFX100
18 017 116 Wet scrubber, PP FRP APB- 60
19 019 117 ESD basic workstation (EWS 40B)- 1 No's
20 020 118 Customize hood / Linshing machine
21 022 119 SD510, Singe stage DC wih double Bag
22 023 120 Prefilter & external filter box redesign
23 024 121 RK-Overseas table rework
Customer Delivery Date Current Status
start production.
S.I Project Code Task ID
Aero Equipments
RRK Industries , Chennai Sandeep -
Aero Equipments
GSE Filter
Impec Filters
GSE Filter
supplier from paris
Aero Equipments
Ashai filters
GSE Filter
GSE Filter
Parshivi Technologies
RRK Industries , Chennai
Aero Equipments
Ashai filters
S&V Automation
Premier Precision engineering,Covai
Asahi Filters
Amazon
Varun Engineering
SRB Pumps, Bangalore
Lokesh Electricals, bangalore
Aero Equip
New Supplier
New Supplier
Aero Equip
Asahi Filters
Parrys
Remarks
Lokesh
Muthukumaresan
Balmer Lowrie - tender - 3000 CFM Wet scrubber customer drawing
creation.
PREMAVILAS- WET SC
4 LEG SUPPORT
5 PUMP
12 HANDLE PROBLEM
14 FILTER STANDARDISATION
15 WHEEL
AIR PURIFIER:
20 MOTOR FRAME SIZE IS ACCORDING TO SPEED IS NOT VERIFIED
CORRECTLY BY THE DESIGN TEAM
ALF4010 SS 304
28 Panel lock ( Quality Issue)
30 Hinges issue
33 Drawing issue
45 FLAME PROOF
46 VENTURY DESIGN
49 DESIGN STANDARDS
50 GD&T
73 Alf4010 Qc Check
TRY TO AVOID
TRY TO AVOID
TRY TO IMPROVE
Acquire knowlegde
Class started
Class started
Started class
PRODUCTION PROBLEM
drawing issue
Inspection problem
Drawing issue, fabrication problem
hinges choose problem
Door Loacking Space problem
DATE 2/4/2017
Here after give a techinical details With a work order Searching new make
and Than MOM Of reg W.O ,
We will check the drawing(One or more times) before Lack of Fabrication knowledge
give to fabrication
Plz give me the impeller details before we completed Keep stock of impeller & to provide exact drawings
the design. from Purchase dept/Stores
We plan to give stciker details Planned for New stickering machine
We will discuss with you before Dont use Design data without technical
Give to fabrication specifications.
We will discuss with you before Dont use Design data without technical
complete the design specifications.
DATE 2/11/2017
we planned to make partition plates inside the liquid Have to take care of design. Design review shud be
tank to reduce the wave formation made.
DATE 2/18/2017
We will study the problem Poor Design . Design review Must needed.
DATE 2/25/2017
We will give Nut and bolt details Lack of Inputs in production drawings. Have to take
in drawing care by Design team.
We planed to change hinges Dia Lack of Design Knowledge. Refer various design for
will be change Hinges and Locking arrangements .
We will discuss with you before Design error. Load & stress calculation basic
Give to fabrication knowledge needed.
DATE 3/4/2017
We planned to give detailed drawing Please make a MOM with customer hereafter.
We should collect the data sheet Design data team proceeeded without drawings.
in future Hereafter shud not happen.Negligance error.
We discussed with tamil Sir, Design and Functionality Error. Will check and
here after Planned to give drain there Update
We will be Change the Future drawing or upcoming Design error. Design review needed.
product. Drawing is updated
DATE 3/11/2017
Impeller Design Needed. Have to search Other
We Will be solve future Product Supplier. Or Design on our Own. Have to spend
with Development work.
Drawing Is ubdated
DATE 3/18/2017
DATE 3/25/2017
DATE 4/8/2017
DATE 4/15/2017
DATE 4/22/2017
In give detail drawing in future Will be give infuture, Part level Qc need
DATE 4/29/2017-5/06/2017
DATE 13/5/17
we will mention the type of fitting in the drawing in We will discussed with before gave
future to fabrication
DATE 5/20/2017
DATE 5/27/2017
Here after we get approval from responsible We plan to study today onward next
person, Lack of GD& T issue week end we present the ppt abut GD&T
DATE 6/10/2017
1.Here after get sample or drawing of Ph monitor
2.Get confirmed from our dept before give the We planned to avoid future in this problem
drawing We explained the product purpose to
3. Dosing pump is chocked because solid particles production team or service team
sucked
Pending task
Drawing
In Drawing
In drawing
Searching
Learning
Going
Impeller is changed
problem solve
In Drawing
In drawing
In Drawing
VFD provided
Design change
Panel Lock issue, Will be choose
Quality is good correct locking arrangement
In darwings
Learning
In Drawing
In drawings ,
Prepared revised drawing
Space constrained
Learning
on going Learning
on going
on going
on going
on going
on going
In drawing
In Drawing
Deatiled drawing
Drawing is updated,
Support will be provide
Gasket problem,
Assemble nut and bolt tighten
problem
Impeller is changed
problem solve
In drawings ,
Prepared revised drawing
drawing is ubdated
Drawing is ubdated
Drawing is ubdated
on going
Drawing is ubdated
Drawing updated
Drawing Changed
Corrected drawing
Updated drawing
Drawing Changed
on going
GD& T Training - Total 431 Pages