You are on page 1of 72

S.I W.

O No Project Code Description

1 - 000 Others
2 - 001 Marketing related works
174 100 Downdraft table - 5 No's
3 176 101 Hard chrome scrubber
4 187 102 FRP Blower
5 193 103 Centralized Laser fume dust extractor
6 194 104 TD730, drum dust collector
7 182 105 Ventilation Survey Report
8 003 106 TD840 - two stage dust collector
9 005 107 Dust collector without blower
10 007 108 FRP Blower & Ducting
11 008 109 ESD Workstation - Al profile - 3 No's
12 009 110 TD850 - Two stage dust collector - 9 No's
13 011 111 ALF4010 ss with cyclone - demo
14 012 112 FX200 - 1No's
15 013 113 SS Ducting -
16 015 114 Drum type TD750 for demo
17 016 115 HEPA Filter for SFX100
18 017 116 Wet scrubber, PP FRP APB- 60
19 019 117 ESD basic workstation (EWS 40B)- 1 No's
20 020 118 Customize hood / Linshing machine
21 022 119 SD510, Singe stage DC wih double Bag
22 023 120 Prefilter & external filter box redesign
23 024 121 RK-Overseas table rework
Customer Delivery Date Current Status

Hinduja Foundaries 7/6/2017 Production


Wheels India Ltd 8/6/2017 Production
C&E Limited 5/19/2017 Design
Cooper Standard 6/24/2017 Production
KYB India 6/18/2017 Production
Arvos Energy india ltd 4/17/2017 Completed
Mahle Engine components, Chennai 8/7/2017 Design
Wheels India Ltd 6/27/2017 Design
Johnson Lifts 6/29/2017 Design
GE India, Pune 6/26/2017 Production
Infac India 6/30/2017 Design
EID Parry 11/6/2017 Production
Meera Laser 6/22/2017 Production
Syymrise pvt ltd, Chennai 10/7/2017 Production
Yamaha India 6/25/2017 Production
Meera Laser 6/28/2017 Orderd
Ve Tech Infrastructure 7/20/2017 Design
All India Radio 6/21/2017 Production
Yamaha India 6/22/2017 Design
SR Engineering 12/7/2017 Design
Domino Printech 6/30/2017 Design
RK Overseas Design
Remarks
17/06 : Scrubber given for production, will be ready by (Ask Sanjith)
17/06 : Hood & Ducting drawing given to production team, Supplier to be identified and start production.
17/06 : Mist eliminator to be ordered to Varun Engg
17/06 : Pump to be orderd to SRB Pumps
17/06
17/06 :: Roller
Damper bracket, drawingwith
to be ordered completed,
premiertopolymer.
be checkd by Bala before giving to production
17/06 : Roller will be ready by Wednesday (21-06-2017)
17/06 : Control panel to be start manufacturing, VFD to get confirmation from customer and start production.
17/06
17/06 :: Frame
Waitingtofor
bemotor
redesigned andfrom
drawing givesupplier
to Bsr for
toProduction.
check on fitment.
17/06 : Production not yet started.
17/06 : Ducting drawing to be QC checked and given for production. Clamping pending.
17/06 : In assembly
17/06/17 : Report send by Muthukumaresan on 17/06/2017
17/06 : Design qc to be done and give to bsr for production
17/06 : Design qc to be done and give to bsr for production
17/06 : Blower to be orderd with sandeep, ducts matching blower outlet to be made.
17/06 : Given for production
17/06 : Drawing is completed, Waiting for advance payment
17/06 : In Production
17/06 : In stock, asked to assemble the system
17/06 : No design works, given to Baskar (Guhan Engineers)
17/06 : Design completed, QC Pending
17/06 : No design works, order placed in Amazon
17/06 : Not yet started
17/06 : Material in stock, need to assemble, QC and delivery
17/06 : insufficient dimensions, need additional details
17/06 :Not yet started
17/06 : Production to be started after customer approval drawing.
17/06 :
t production.

start production.
S.I Project Code Task ID

1 101/ Hard Chrome T001


2 101/ Hard Chrome T002
3 101/ Hard Chrome T003
4 101/ Hard Chrome T004
5 101/ Hard Chrome T005
6 100/Down draft table T006

7 102 / FRP Blower T007

8 102 / FRP Blower T008


9 102 / FRP Blower T009
10 103 / Centralised fume ex T010
11 103 / Centralised fume ex T011
12 104 /Drum type T012
13 106 / Two stage / Mahle T013
14 106 / Two stage / Mahle T014
16 107/ DC without blower / WIL T015
17 107/ DC without blower / WIL T016
18 108/FRP Blower/Johson lift T017
19 109/ESD workstation / GE T018
20 109/ESD workstation / GE T019
21 110/two stage / Infac T020
22 110/two stage / Infac T021
23 111/Alf4010 with cyclone/ EID Parry T022
24 112/ Fx 200/ Meera Laser T023
25 114/ Drum Type TD 750/Yamaha T024
26 116/ Wet Scrubber APB-60/VE tech T025
27 116/ Wet Scrubber APB-60/VE tech T026
28 116/ Wet Scrubber APB-60/VE tech T027
29 116/ Wet Scrubber APB-60/VE tech T028
30 116/ Wet Scrubber APB-60/VE tech T029
31 116/ Wet Scrubber APB-60/VE tech T030
32 116/ Wet Scrubber APB-60/VE tech T031
33 117/ ESD basic/All India Radio T032
34 118/ Customise hood/ Yamaha T033
35 118/ Customise hood/ Yamaha T034
36 119/SD 510 single stage /SR Engg T035
37 119/SD 510 single stage /SR Engg T036
38 119/SD 510 single stage /SR Engg T037
39 120/Prefilter and External box/Domino T038
40 120/Prefilter and External box/Domino T039
41 120/Prefilter and External box/Domino T040
42 121/RK Overseas rework T041
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
Task Description Time required

Frame to be designed and drawing creation 2 days


Blower outlet duct drawing to be created. 4 hrs
Hood & Duct drawing to be QC Checked and given to production 1 hr
Control Panel for Hard Chrome scrubber with VFD & IE3 motor to be started 2 days
700 Liters Tank design and drawing creation 4 hrs
Roller Bracket drawing to be get approved and given for production .5 hr
Follow up with supplier and get exact motor drawing. Match the blower drawing for motor 1 hr
dimensions.
Motor bed drawing / MS construction to be checked and given to BSR 1 hr
Impeller & Casing drawing to be checked and given to supplier for manufacturing 1 hr
Inlet and outlet Ducting drawing to be get approved and give for production 1 hr
Control Panel finishing and testing 1 hr
Final QC to be done 4 Hrs
Drawing QC to be done and give for production. 1 Hr
Create usermanual for Two stage modified 1 Hr
Drawing QC to be done and give for production. 1 Hr
Create usermanual for DC without blower 2 Hr
Blower outlet ducting drawing ( to be matched on blower outlet dimensions) 2 Hr
Final QC to be planned 4 hr
User manual & Assembly / Installation instruction manual to be created 4 Hr
Drawing QC to be done and give for production. 1 hr
Create usermanual for Two stage modified .5 hr
Final QC to be planned 4 hr
Final QC to be planned 4 hr
Final QC to be planned 4 hr
Wet scrubber Design And Drawing creation 2 days
Bom Creation 1 Hr
Gantt Chart Creation 4 Hrs
Cost Estimation 4 Hrs
Blower and ducting design drawing 1 days
Create usermanual for APB-60 4 Hrs
Final QC to be planned 4 Hrs
Final QC to be planned 4 Hrs
Hood design and Drawing ( Insuffient dimension) 2 Hrs
Final QC to be planned 4 Hrs
Design and drawing creation 2 days
User manual manual to be created 4 Hrs
Final QC to be planned 4 Hrs
Design and drawing creation 2 days
Ppt Presentation 4 Hrs
Final QC to be planned 4 Hrs
Rework drawing creation for tables - 4 no's 5 hrs
Actual
Actual
Delivery Date Completion Total Hours Assigned to Remarks
start date date
S.I Project Code

1 101/ Hard chrome


2 101/ Hard chrome
3 101/ Hard chrome
4 101/ Hard chrome
5 101/ Hard chrome
6 101/ Hard chrome
7 101/ Hard chrome
8 101/ Hard chrome
9 101/ Hard chrome
10 101/ Hard chrome
11 101/ Hard chrome
12 102 / FRP Blower
13 103/Centralised fume ex
14 103/Centralised fume ex
15 103/Centralised fume ex
16 103/Centralised fume ex
17 103/Centralised fume ex
18 103/Centralised fume ex
19 106 / Two stage / Mahle
20 106 / Two stage / Mahle
21 107 / DC without blr / WIL
22 107 / DC without blr / WIL
23 107 / DC without blr / WIL
24 108/FRP Blower/Johson lift
25 110/two stage / Infac
26 110/two stage / Infac
27 110/two stage / Infac
28 110/two stage / Infac
29 110/two stage / Infac
30 114/ Drum Type TD 750/Yamaha
31 115/ Hepa Filter For SFx 100/Meera
32 116/ Wet Scrubber APB-60/VE tech
33 116/ Wet Scrubber APB-60/VE tech
34 116/ Wet Scrubber APB-60/VE tech
35 116/ Wet Scrubber APB-60/VE tech
36 116/ Wet Scrubber APB-60/VE tech
37 116/ Wet Scrubber APB-60/VE tech
38 116/ Wet Scrubber APB-60/VE tech
39 119/SD 510 single stage /SR Engg
40 119/SD 510 single stage /SR Engg
41 119/SD 510 single stage /SR Engg
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
Description QTY Status

20 HP Blower with FRP Lining 1 Ordered


20 HP VFD, ABB Make 1
20HP IE3 Motor 1
5 HP Pump with foot valve. 2 Quatation received
5 HP Pump motor, flange mounted for pump 2
Mist eliminator - 150 width (2) & 50mm Width (1 No's) 3 Quatation received
PP Damper ( 8 inch- 2 no's, 10 inch - 3 No's) 5 Quatation received
SS Nut & Bolts
EPDM Gasket
PP Tank - 700 Liters 2
PVC Flexible hose ( 200mm dia - 2 mtr, 250mm dia - 3 mtr)
3 HP FLP Motor 1 Quatation received
5 HP Blower 2 Ordered
5HP, 2 pole motor 2
Cartridge Filter 6
HEPA Filter 3
1" Rotex make solenoid valve 6
Siemens make spring return electrical actuators 7
3 HP, flange, two pole motor 1
Filter bag, 10 packet with snap band 1
Cartridge Filter 1
1" Rotex make solenoid valve 1
DP Switch 2
5HP, 150mm WC FRP Blower 1
3 HP 2 Pole, flange , marathan 9
Filter bag, 10 pocket, double side snap band 9
Hinges (Make - Elesa Ganter) 36
Spring hinge ( Make - Dharsana) 36
Wheel ,2" ( 2 break and 2 without break) 1 set 18
Filter Bag 1 Ordered
Hepa filter 2
Packings
Mist eliminator 150 mm ht and 600 dia 1
Pump 1 Hp 1
Pump Motor 1
Blower Motor 1
PH Monitor 1
Dosing Pump 1
Blower motor 1
Filter bag 2
Plastic bag 2
Supplier Supplier contacts

RRK Industries , Chennai Sandeep -


Euro Process Automatik, Chennai
Power house, Chennai Karthik - 9962056216
SRB Pumps, Bangalore
Lokesh electricals, Bangalore
Varun Engineering
Premier Polymer
to be identified

Aero Equipments
RRK Industries , Chennai Sandeep -
Aero Equipments
GSE Filter
Impec Filters
GSE Filter
supplier from paris
Aero Equipments
Ashai filters
GSE Filter
GSE Filter
Parshivi Technologies
RRK Industries , Chennai
Aero Equipments
Ashai filters
S&V Automation
Premier Precision engineering,Covai

Asahi Filters
Amazon

Varun Engineering
SRB Pumps, Bangalore
Lokesh Electricals, bangalore
Aero Equip
New Supplier
New Supplier
Aero Equip
Asahi Filters
Parrys
Remarks

To be delivered to SRB Pumps


Week 12-06-2017 to 17-06-2017

Lokesh

6/12/2017 Infac drawing creation. Mahle concept creation

Infac india, Mahle & Roller bracket - Auto CAD


6/13/2017 Drawing creation

6/14/2017 Wheels india - Dust collector without blower

6/15/2017 Cooper standard ducting drawing creation.

Correctio on Mahle, Wheels india DC, Roller bracket


6/16/2017 redesign.

Infac cover slot design .


6/17/2017 RK Overseas correction works
Report creation.
Week 12-06-2017 to 17-06-2017

Muthukumaresan
Balmer Lowrie - tender - 3000 CFM Wet scrubber customer drawing
creation.

Yamaha hood design and draft drawing creation for discussion


Arvos Energy - ventilation survey report creation

Arvos Energy - ventilation survey report creation - continuation

QC - Down draft table at BSR shed


Fabrication drawing creation for 1000CFM wet scrubber for ve tech
infra
4 ft ESD Basic table usermanual creation
Ventilation survey report review and completion
250 CFM Chlorie scrubber with stiffener drawing creation

SD510 Dust collector - single stage double bag design started.


90 deg bend drawing creation for TTK.
Drawing creation for hood for two stage - Delhi hotel demo.
Sri Ranganathan (New Joinee)

Domino Printech filter redesign works

Domino Printech filter redesign works

Domino Printech filter redesign works

Domino Printech filter redesign works

Domino Printech filter redesign works

Domino Printech filter redesign works


WEEKLY ME
S.No PROBLEMS
DESIGN TEAM: B.LOKESH
M.MUTHU KUMARESAN

PREMAVILAS- WET SC

1 FLOAT VALVE PROBLEM

2 PACKING SUPPORT PLATE

3 VENTURI DESIGN NOT KNOWN

4 LEG SUPPORT

5 PUMP

SOLVENT FUME EXTRACTOR S

6 DEVIATION IN FABRICATION DRAWING

7 FLAME PROOF PURPOSE

8 MINIMISE THE NUT&BOLT USAGE

9 USE SS NUT& BOLTS FROM M6 & M8

10 IMPELLER RING NOT OVERLAP


11 STICKER & NAMEPLATE

12 HANDLE PROBLEM

13 LOCATING PIN DESIGN

14 FILTER STANDARDISATION

15 WHEEL

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN

16 CARTRIDGE FILTER (ALTEK BEISSEL 2STAGE 3HP)

17 IMPELLER (ALTEK BEISSEL 2 STAGE 3HP)

FLOAT VALVE POSITION (PREMAVILAS)


CAUSES:
18 OSCILLATION OF FLOATING BALL DUE THE WATER
WAVES FORMED DURING THE WORKING OF SYSTEM

19 BALLVALVE (R.K OVERSEAS WET DUSTCOLLECTOR)

AIR PURIFIER:
20 MOTOR FRAME SIZE IS ACCORDING TO SPEED IS NOT VERIFIED
CORRECTLY BY THE DESIGN TEAM

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN

MOTOR NOT WORKING (PREMAVILAS)


CAUSES:
21 MOTOR COVER DESIGN NOT GIVE PROPER COOLING TO
THE MOTOR
VENTURI THICKNESS NOT ENOUGH (PREMAVILAS)
CAUSES:
22 WORKING TEMPERATURE MENTIONED IS NOT MATCH
WITH ACTUAL

23 NUT/BOLT MATERIAL (PREMAVILAS)

PUMP NOT WORKING PROPERLY DUE TO


24 HIGH TEMPERATURE (PREMAVILAS)

GASKETS ARE MELTED DUE TO HIGH TEMPERATURE


25 (PREMAVILAS SCRUBBER)

FUME SCRUBBER NOT AS


26 PER GA DRAWING (RPS ENVIRO)
IN ACTUAL PRODUCT, INLET DIA IS NOT AS PER DESIGN

TAKASAGO BAG FILTER


FILTER MOUNTING PROBLEM
27 VENTURI MOUNTING
LEG SUPPORT
WIRING ROUTING
DESIGN TEAM: B.LOKESH
M.MUTHU KUMARESAN

ALF4010 SS 304
28 Panel lock ( Quality Issue)

DC 1500 cfm, Dust collector


29 Nut And bolt Length Issue

30 Hinges issue

31 Door mounting Issue (Wing Nut And Thread rod)

32 Leg Support Issue ( Cross support Not given)

33 Drawing issue

Wet type dust collector (WDC 2000)


34 Float valve oscilltation

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN
Grossingstation RB700i
35 Two way tap hole position change

36 overflow connection is wrong (Chlorine scrubber)

pump height is not match with waterlevel


37 (Chlorine scrubber)

scrubbing liquid stagnation in the partition plate after the mist


38 eliminator (Chlorine scrubber)

space between the blower and the outlet pipe


39 of the scrubber is not enough (Chlorine scrubber)

40 Blower design is not satisfactory (Chlorine scrubber)

41 Liquid spraying outside through the inlet

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN
42 NOISE PROBLEM (ALF400)

wet dust collector (rk overseas)


1. ordinary motor change to flp motor for safety purpose
2. bch control panel change to flp control panel for safety
43 purpose
3. use dp switch with atex certfied
4. make partition inside the tank.

Have to consider Static electriity charges in ducts


44 and euipments

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN
PROBLEMS TO STUDY

45 FLAME PROOF

46 VENTURY DESIGN

DESIGN FOR MANUFACTURING,DESIGN FOR ASSEMBLY,


47 DESIGN FOR SERVICE

48 ENCLOSURE STANDARDS IP RATING

49 DESIGN STANDARDS

50 GD&T

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN

51 RB700i GROSSING STATION DRAIN PROBLEM


DESIGN TEAM: B.LOKESH
M.MUTHU KUMARESAN

BLOWER CONTROL BOX PROVISION & WIRE HOLE


52 NOT GIVEN - (DUST COLLECTOR RBI)

CHANGE THE POSITION OF NUT WELD AT ANGLE IRON


53 FILTER LOCKING - DUST COLLECTOR (RBI)

DRAIN VALVE DAMAGED DURING TRANSPORTATION


54 - (CL2 SCRUBBER - CSIR)

SLOTTED HOLES LEADS TO LEAKAGE IN THE DRAIN


55 FLANGE- (CL2 SCRUBBER - CSIR)

56 LEVEL INDICATOR MISALIGNMENT- (CL2 SCRUBBER - CSIR)

57 SUCTION IS NOT ENOUGH - (VICKY BRUSH 2STAGE DC 3HP)

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN

58 Wet type dust collector (


1. Mist eliminator mounting problem due to water passed through blower unit

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN

RBI dust collector


1. Ladder issue
2. Hopper Issue
3. Ducting problem
59 4.Blower Heating Problem
5. Pulse cleaning manual
6. Vaccum Gauge
7. control panel lock and key type
8.

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN
ALF4010 SS 304
60 Panel lock
61 holes mismatch problem

62 fabrication Quality issue


63 filter loacking Arrangement issue
64 Hinges problem
65 door locking problem
DESIGN TEAM: B.LOKESH
M.MUTHU KUMARESAN

66 Alf4010 M.S , Blower ventialation Issue

67 Alf 3010, Blower ventilation

68 Balmer Lawrie , Installation ducting issue

69 Alf 600i, Basf, is not working at customer place


DESIGN TEAM: B.LOKESH
M.MUTHU KUMARESAN
drain valve is fixed by welding instead of flange mount.( GREEN
70 EARTH BIOGAS - WET SCRUBBER)
DESIGN TEAM: B.LOKESH
M.MUTHU KUMARESAN

71 Development drawing issue in DT1500

72 Compressor tank nipples issues

73 Alf4010 Qc Check

74 Filter Bag Issue

75 Alf door lock issue

76 Alf 4010 rework for ventilation purpose

77 Filter bag Issue

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN

78 RK Overseas table issue, We not clear about the product

DESIGN TEAM: B.LOKESH


M.MUTHU KUMARESAN
Wet scrubber mounting Issue
1. Ph monitor
79 2. Water inlet
3.Dosing pump

Rbi Dust collector Issues


1. Pressure relief
2. Cylinder Sound(need to silencer )
80 3. compressor tank mounting problem(slanding)
4. laying prblem (Cylinder wire and hose,Sensor wire)
5.System shaking ( When slide gate operate)
6. Fenzing Mounting Issue
WEEKLY MEETING
ACTIONS PLANNED

PREMAVILAS- WET SCRUBBER 1200 CMH

TRY TO COLLECT DETAILED DRAWING


FOR DIFFERENT SIZE OF FLOAT VALVES

TRY TO GIVE DETAILED DRAWING TO


FABRICATION

PLAN TO STUDY FROM BALA SIR

PLAN TO FIX WITH PRODUCT WITH


YOUR CONFIRMATION BEFORE FABRICATION
PLAN TO FIX WITH PRODUCT WITH
YOUR CONFIRMATION BEFORE FABRICATION
SOLVENT FUME EXTRACTOR SE300 - SS304 (MOC)

TRY TO AVOID

PLAN TO STUDY ABOUT FLP

TRY TO AVOID

WE TRY TO MENTION IN THE DRAWING

TRY TO GIVE RING SIZE WITH DRAWING


DISCUSS WITH BALA SIR & PRODUCTION

TRY TO GET DATA SHEET

TRY TO IMPROVE

TRY TO MAINTAIN STANDARD SIZE

TRY TO GET DATA SHEET

PLANNED TO CHANGE THE SUPPLIER

CHANGE THE IMPELLER

DISCUSS WITH BALA SIR TO CHANGE THE FLOAT VALVE


MODEL

WE PLANNED TO USE THE GATE VALVE

AVOID THIS TYPE OF PROBLEMS IN


FUTURE BY CROSS CHECKING THE DRAWINGS BEFORE
CONVEY TO THE PRODUCTION TEAM

WE WILL DISCUSS WITH ELECTRICAL FOR


THIS PROBLEM
RECONFIRM THE TEMPERATURE DETAILS FROM THE END
USER.

TRY TO USE SS NUT/BOLTS FOR WHERE


IT IS POSSIBLE

WE WILL MENTION THE PUMP TYPE ACCORDING TO


TEMPERATURE

WE WILL MENTION THE TYPE OF GASKET


ACCORDING TO THE APPLICATION

WE TRY TO AVOID IN FUTURE

WE TRY TO AVOID IN FUTURE


We try to avoid in future
We desided to change the supplier or Proper Assm

we try to avoid in future

We try to give hinges drawing

We try to give Locking drawing

We try to avoid in future

We try to study the GD&T

We change the drawing (revised)

we should mention the position of the


tap holes in future grossing station design
we already shown the correct drawing.
This problem is raised by fabrication side.
we try to get the pump details before
the fabrication work and mention the flange details for the
pump bed
we will put holes in partition plate where the
water stagnation occur.

we consider this problem and give proper


space in future designs

we will give detailed drawing of blower with


your confirmation

we planned to remove the nozzles near the


inlet.
We will find the reason for noise and rectify that as soon as
possible.

1. we planned to replace flp motor


2. we planned to replace flp control panel
3. we will search dp switch with atex certification
4. we planned to make the partition

Acquire knowlegde

NOT YET STARTED

We studied about performance and design


calculation only. We don’t Know deep knowledge about this.

Class started

We Studied Enclosure standards , but this


standards where it is applicable. In our Products

Class started

Started class

IN FUTURTE WE WILL GIVE DETAILED DRAWING FOR DRAIN


WITH YOUR CONFIRMATION
We already discussed with you before give to
fabrication. This job is new one (then Only Lokesh Give to
open condition)

NEGLIGIBLE ERROR - WE TRY TO AVOID IN FUTURE

REDUCE THE DRAIN PROVISION PIPE LENGTH


(IF POSSIBLE)

WE PREFER ROUND HOLES only.

PRODUCTION PROBLEM

REPLACE THE IMPELLER

Door stiffner problem,


Drawings is gived

1. ladder not supply to customer


fenz opening problem
2. Hopper will be fixed there leg support touch
3.Short Y bend due to cause pressure drop high,
dust lagging there
4.not to give cooling
5. manual cleaning will be planned to future
6. Vaccume gauge in future
7. control panel lock key in future

Panel lock is good but fabrication issue

drawing issue

Inspection problem
Drawing issue, fabrication problem
hinges choose problem
Door Loacking Space problem

Blower is heating , one cut off stage


blower is not working

Above same Problem

hood arrangement mounting issue, because


insufficient space
Improper qc check

it is not clearly mentioned in the drawing.

We will check the drawing one or more times,


before submitted to production

Drawing is not clear

Product is not check clearly

filter Open size small , didn't incert the bag

Lock length is not enough

We planned to give ventilation

We orderer wrongly, because communication issue

Table drawing legnth issue, we not get confirmation


1.We planned to keep stock in our office reg sample
(Ph monitor)
2.Water inlet provision is not satisfaction this size
is small
3.Dosing pump is not working proper

1. We searching new brand presuure relief


2.We missed silencer , to provide silncer .
3. we check before assemble and qc
4. We designed to plan laying diagram
5.We
MEETING
REMEDIES TAKEN REMARKS

DATE 2/4/2017

T SCRUBBER 1200 CMH

Here after give a techinical details With a work order Searching new make
and Than MOM Of reg W.O ,

We will explained deeply with production team Before


give a drawing to production team.After Production
team give to fabrication
We strictly mentioned here after don’t explained to
fabrication unit, production team only explained with
fabrication unit.
detailed drawing

Plz teach about venturi , After We will try to study in Searching


online

Here after give a techinical details Confirm to responsible person


Before give a work order and MOM Of reg WO
Here after give a techinical details Have to follow Product requirements document
Before give a work order and MOM Of reg WO -Maintain
OR SE300 - SS304 (MOC)

We will check the drawing(One or more times) before Lack of Fabrication knowledge
give to fabrication

We will be Study On going

We will discuss with you before Avoided nut & bolt


complete the design

We will discuss with you before Mentioned


Give to fabrication

Plz give me the impeller details before we completed Keep stock of impeller & to provide exact drawings
the design. from Purchase dept/Stores
We plan to give stciker details Planned for New stickering machine

We will discuss with you before Dont use Design data without technical
Give to fabrication specifications.

We study about locating pin , Product Design Knowledge Lacking.


where it is used

We will discuss with you before Standardize


Give to fabrication

We will discuss with you before Dont use Design data without technical
complete the design specifications.

DATE 2/11/2017

Filter problem . Have to design for other


New Supplier Ok filter,Application choosen problem

New Impeller To be implemented in all existing


Impeller Ok Dust collector.

we planned to make partition plates inside the liquid Have to take care of design. Design review shud be
tank to reduce the wave formation made.

GATE VALVE IS USED. In future designs


Gate Valve
we planned to use butterfly valves.

Will check up the Datasheet Properly. Negligance error - Should be avoided.

DATE 2/18/2017

Functionality and Environment Requiremnts error.


We Will give detailed Drawing Functionality and Environment Requiremnts not
studied properly
Redesign is completed, Sent to Functionality and Environment Requiremnts error.
production . Functionality and Environment Requiremnts not
VFD will be provided to customer, studied properly. Sheet Metal Design based on
There is no problem . Load and Thermal calculautions.

Functionality and Environment Requiremnts error.


Functionality and Environment Requiremnts not
We will give details in drawing studied properly. Sheet Metal Design based on
Load and Thermal calculautions. & Use material s
with Dta.

Functionality and Environment Requiremnts error.


Functionality and Environment Requiremnts not
We study to rectify the problem studied properly. Sheet Metal Design based on
Load and Thermal calculautions. & Use material s
with Dta.

Functionality and Environment Requiremnts error.


Functionality and Environment Requiremnts not
We choose insulation ropes studied properly. Sheet Metal Design based on
Load and Thermal calculautions. & Use material s
with Dta.

Design Team should not intrupt in production. No


We will give details in drawing confirmation should be given directly hereafter.

We will study the problem Poor Design . Design review Must needed.
DATE 2/25/2017

Dont use Design data with technical


specifications./ Lack of Assembly Knowledge in
supplier ok. Give instructions about Production team. Training should be given to
fixing the lock to production team. Production team by design team before
implementing New spares.

We will give Nut and bolt details Lack of Inputs in production drawings. Have to take
in drawing care by Design team.

We planed to change hinges Dia Lack of Design Knowledge. Refer various design for
will be change Hinges and Locking arrangements .

We planed to give machining drawing


We change the Thread rod size Have to follow up standards.

We will discuss with you before Design error. Load & stress calculation basic
Give to fabrication knowledge needed.

we planned to make partition plates


inside the liquid tank to reduce
the wave formation

DATE 3/4/2017

We planned to give detailed drawing Please make a MOM with customer hereafter.

We explained detaily before give a Problem With production team


drawing to production

We should collect the data sheet Design data team proceeeded without drawings.
in future Hereafter shud not happen.Negligance error.

We discussed with tamil Sir, Design and Functionality Error. Will check and
here after Planned to give drain there Update

There size concerned. We Discussed Design error. Design review needed.


with you before give production

We will be give all details in Detailed drawing needed.


Drawing sheet

We will be Change the Future drawing or upcoming Design error. Design review needed.
product. Drawing is updated

DATE 3/11/2017
Impeller Design Needed. Have to search Other
We Will be solve future Product Supplier. Or Design on our Own. Have to spend
with Development work.

Drawing Is ubdated

Planned to study not yet started

DATE 3/18/2017

In future planned conduct a class Class started


by Mr .thamilselvan regards flame proof

In future planned conduct a class Class started


by Mr .thamilselvan regards flame proof

In future planned conduct a class Class started


by Mr .thamilselvan regards flame proof

In future planned conduct a class Class started


by Mr .thamilselvan regards flame proof

In future planned conduct a class Class started


by Mr .thamilselvan regards flame proof

In future planned conduct a class Class started


by Mr .thamilselvan regards flame proof

DATE 3/25/2017

We discussed with you,


here after I will confirm with you.
DATE 4/1/2017

In Future avoid this problem.

In future design we will be avoided.


Drawing is ubdated soon.

We will be discussed with you


before give to production

This problem is not from design side.

This problem is not from design side.

Impeller design is modified.


Drawing is ubdated

DATE 4/8/2017

Purpose of stiffner will be mentioned additionally we fix it support there


in drawing

DATE 4/15/2017

1. Approved person insufficient product knowledge


2. In drawing issue , will be check before give it 1. In Future Will be explanied product details,
fabrication approval person.
3.Drawing will be mentioned clearly, 2.Will be check in drawing, to avoid in future
Purpose not mentioned in drawing, 3.to be shared fabrication team what we planned,
4.Discuss with Electrical team will be explained in future.
5. Discuss with sales team 4.
6. discuss with sales team

DATE 4/22/2017

In give detail drawing in future Will be give infuture, Part level Qc need

Drawing Is ubdated, but Drawing will be explained


Insuffient product knowledge in Will be explained about product in future
production team
Design will be changed Design is started
Hinges choose correct but supplier issue Will stock in store
Drawing issue Detailed drawing will be give

DATE 4/29/2017-5/06/2017

In future design we provide a ventilation Design is modification

We desided to modifed the door, give Design is edited to give fabrication


some ventilation
Modification work is going to rework on Site study is not good, in future Avoided
duct and hood

DATE 13/5/17

we will mention the type of fitting in the drawing in We will discussed with before gave
future to fabrication

DATE 5/20/2017

We discussed with production regards


We will rectify as soon this problem
We discussed with production regards
We gave to solution to production unit this problem

We strictly informed to production team


Dent and dust are identified at customer place before sent to job ,clean and neat pack of the job

We planned to rework the bag already gave to We will avoid in future


fabricator
We will order new one we planed new

The blower needs to cooling , the blower gets


over heat means , shut off the blower is not run we planed ubdate new drawing

We avoid in future. Here after mentioned


purchase details in mail. We discussed with We disussed with you in later
responsibility people

DATE 5/27/2017

Here after we get approval from responsible We plan to study today onward next
person, Lack of GD& T issue week end we present the ppt abut GD&T

DATE 6/10/2017
1.Here after get sample or drawing of Ph monitor
2.Get confirmed from our dept before give the We planned to avoid future in this problem
drawing We explained the product purpose to
3. Dosing pump is chocked because solid particles production team or service team
sucked

1. Here after we purchase branded material


2. silencer will be provide in future avoid in this
mistakes
3.we avoid in future We planned to avoid future in this problem
4. laying drawing wil be planned before give the We explained the product purpose to
drawing production team or service team
5. Cylinder stroke speed will be reduce then
automatically system not shake
6. avoid in future
Completed Task Pending

Pending task

Drawing

Explained and drawing

Collected pump drawing

Learn about modern


techniques in sheet metal Learning
fabrication.

Will send the Documents about Learning


Flame proof and Atex

In Drawing

In drawing

Impeller drawing collected


Machine problem
How to operate that machine
please teach about the machine

Searching

Learning

Going

Collected wheel drawing&


spec

Pleated Bag Filter is ok

Impeller is changed
problem solve

In Drawing

In drawing

Air purifier assemble and testing by


bala sir

In Drawing
VFD provided

In Drawing SS nut and bolt replaced

VFD provided, Pump working Application choosen problem


is normally

In Drawing Application choosen problem

In drawing Irregular Communication

Design change
Panel Lock issue, Will be choose
Quality is good correct locking arrangement

In drawing Give BOM

Choose correct hinges

Small Wheel used

In darwings

Learning

Design change and modification

In Drawing

In darwings Lack of fabrication knowledge

Collected pump drawing

In drawings ,
Prepared revised drawing

Space constrained

In Detail Drawing detail drawing will be submitted

Inlet pipe Changed


Searching sound absorber foam,
changed impeller Learning noise reduction technology

1.Inlet Partition is made. Will be planne to change


2. Float valve changed customer place

Learning

on going Learning

on going

on going

on going

on going

on going

In drawing
In Drawing

Deatiled drawing

Drawing is updated,
Support will be provide

Gasket problem,
Assemble nut and bolt tighten
problem

In give Detailed drawing Fabrication Problem

Impeller is changed
problem solve

In drawings , Drawing ubdated


Prepared revised drawing

In drawings ,
Prepared revised drawing

Drawing is edited searching

drawing is ubdated

Drawing is edited Production team


Drawing is edited
stock maintain
Drawing is edited

Drawing is ubdated

Drawing is ubdated

on going

Drawing is ubdated

Completed the work

Drawing updated

QC is checked and discuss with


thamil sir

Drawing Changed

Corrected drawing

Updated drawing

Drawing Changed

Discussed with bala and thamil on going


on going

on going
GD& T Training - Total 431 Pages

Date Pages covered Attendees Remarks

6/13/2017 1 to 60 Lokesh, Kumaresan & Thamil


6/14/2017 61 to 98 Lokesh, Kumaresan & Thamil
6/15/2017 99 to 156 Lokesh, Kumaresan & Thamil
6/16/2017 157 to 225 Lokesh, Kumaresan & Thamil
6/20/2017 Planned
6/21/2017
6/22/2017

You might also like