You are on page 1of 15
0%8B Sie. Ber ~ aking ie (CRBE-- Bild King Joint Venture’ -CCOMN EDD [AZCOM) = coxtmctorssusmssion Bes ‘NEC Option ‘00107 (CONTRACT: [Tseung Kwan O-Lam Tin Tunnel- Road P2 and Assoclated| CONTRACT Nor NE/2015/02 Works [DETTER ER: | vyTk0.P2/NE201S02/22.03.03.00/000021 7. ISSUE DATE: 20 October Z046 7 US COMM: (CAPTION: ee aaa [PREVIOUS COM [pisciruine: [Na [REVISION Nox Sedtion A te The rjc Manager Drawings copes: M6 Wola Demin RE) 1D Progamme tetera Pei or pi 1 Mead Sitement 1 Ones: caleton ales ae ka Descpon Pe" operas soe ‘ype CSgboard (Se f3) 1 amps soos “e GSeboat (hee? of3) 1 anpoross skyo06 Type Sipnourd (mee 5065} Feared enclosed ou subisin fr Type GSbrd aston a rewing with ICEcetfaton or your ppv Section! Response [comm copy Accepted 1 Revs and Resateiear Noted tin Accept Noted 1 Recast Acknowitges Conrasorropyneede Yes/No mass man Qur Ref: HK047-CER-003-005 Check Certificates for Temporary Works (Clause F4 of the additional conditions of contract) Contract No. NE/2015/02 ‘Tseung Kwan O — Lam Tin Tunnel ~ Road P2 and Associated Works Description of Temporary Works: G Sianboard which consists of steel sections and concrete pad foot full description including drawing references, if any) SK/004 _| Type G Signboard (sheet 1 of 3) SK/005__ | Type G Signboard (sheet 2 of 3) SK/006__| Type G Signboard (sheet 3 of 3) We" certify that the Temporary Works described above have been properly and safelyesigned and the design has been checked and found satisfactory by the checking engineer. Date: Signed 2 = for and on behalf of (OC ANI VEMNG VV (name of the Contractor) (the Contractor) | certify that the Temporary Works described above have been properly and safely designed and that | have checked the design and found it satisfactory. “Chengrui Hu MSc, CEng, MICE, MAKE, RPE On behalf of: Hewson Consulting Limited. Unit 1101, 11" Floor, 9 Chong Yip Street, Kwun Tong, Kowloon, Hong Kong (name and qualifications of checking engineer) * Delete as appropriate. * Person signing shall be duly authorised by the Contractor. BELEABRRIESA CHINA ROAD AND BRIDGE CORPORATION - & k NCTE "DAL SrRvewRAL STEEL Senne Be bade SATS, 2) FoR non - Sraucrwrad DETALIS, MSERRENCE Sth BR MADE Te CEDD'S STANDARD DRWengs Cons k Ce02/ah B)WerkauG Mgoond BEAR PlEssvRe £5 SOKPL ville #8 Mven LEER TAN ALLeroMBLE Gatoond BEARING capacaty OF TIPrEAe GREER THs (oe PL Fol FLL Hite FoR ATP. tom WERE FOONDATHON EN Tonned - Road Pa oa Fooe = ESS, ace sl 4 aaa al | BBee | t i ! i wo a eo eS + et teal (Se 1050 [ose tese lese. lose ELEVATION [SK/004 - Type G Signboard (sheet 1 of 3) AA scaled PRMELBRARRECD CHINA ROAD AND BRIDGE CORPORATION Lani Tent TonWEL — Road PA D (DT LH 69 Hg Chr loom fe MAK. Hb eeape da, EStOmm the BeSx Se SHR ym OB Bam $rel ——o Pate Fron E10), TP find Betton, SteTren _f-A CSecteent B-B Senza) (2% G44 Ue ype MG abide 3a. @ S60 vim ee J. Se5Ki6S% S4 [Ryka UB ——|} — Amur Evy. TOP Aud BeTTor{ see Sree PATE —_ 4 [SKI005 - Type G Signboard (sheet 2 of 3) AA scaled PR BMELBARRELA CHINA ROAD AND BRIDGE CORPORATION [Project: TSUN Ran 0 — Ane Tal Townes — Road Pd Subject: 305% 65% 54 kim 0B Bee lOmin STECFENER pa brn Edd. Batt SADES, 6 BoS x Sx SH Kefon UB i ag UbtS0 x A000 Forms JenBedeeut=dee A373 Hest —AecTzen D-p ‘Sheet No. THk Feetenid (conekeTe. ffRiE 2eb/re) | — Winn PLE Hidsst ERE. DETAELS [SK/006 - Type G Signboard (sheet 3 of 3) MA scaled FTeeung Kwan O Lam Tin Tunnel Rosd P2 and Assocated Werks INezorsioz ffseung Kwan O - Lam Tin Tunnel -Rosd P2 and Assodated Works Inereorsvae TT = oo eaee MBuildKing} | TIE Teoung Kwan O- Lam Ts Tunnel Road PD and Resoasted Works es Ineraorsioa rei Aesocisles Works] crge - Build King Joint Venture Fiseung Kwan O- Lam Ta Tunnel Road P2 and Assocated Works INevaotsio2 oe Koadke King Joint Venture SuGe eeee MBuildKing; [Feeung Kwan O Cam Tin Tornel- Road PZ and Ascodaiod Wor cane thee Midi eae tare & ie [CRBC Build King Joint Ventur ung Kwan © Lam Tin Tunnal- Road P2 and Assodated Waris Ta Ne Fee sheet r ze | ef Sguy 2 oe 55 on ] 3 gris, = 28 ze Ee |e 38 ~| 2382 ge be L 2 gs Baba 2 58 3 58 Feet Ee eS 8 Hes : i = 2 = a oo IT. | s = pee Ely i. [lez AER]; £ 83 3 5 fe 33 £3 | “Nd S42: Paes 3 ai ' He eF Ee < =z fe = (/Qy | | 2g z| rhe WO 8) Co ‘4 no bul (. 53./< ~~ g 23 a . WOW | / = - 3 z Eg r 2 ° | (es eeoor me gna Sedov a8 — 11 F ‘NOTES 9. 4,5 & 7 AMENDED riginal Signed] 09.2007] = _[ 86 PARTWENTAL L000 [ong Spd es © | SESRY ISLS RE" [oan sels oq Tr, REVISION TaNATURE[DATE Giop _ CIVIL ENGINEERING AND ene AR CEDD DEVELOPMENT DEPARTMENT E R OJ ECT $ | 0 D SCALE DIAGRAMMATIC | DRAWING NO. SHEET 1 OF 2) DATE OCT 191 C10021G Sale Ghee We Engineer Hong Kong's Development SINT =H SEG Sa F SEF | g \ a] |i 2 « ie . Fr g R 2 3 \ 3 al | g =| | 2 a | a e/elelelela 8 | Te awenoeD final igea oa 215 ‘A__| NAME OF DEPARTMENT AMENDED [orginal Signed|o2 205 [steWATURE|DATE MAJOR PROJECT SIGNBOARD (SHEET 2 OF 2) REF REVISION pb CIVIL ENGINEERING AND SCALE DIAGRAMMATIC DEVELOPMENT DEPARTMENT DATE JAN 1991 C1002/2B Sale Shee DRAWING NO. We Engineer Hong Kong's Development

You might also like