Bill Of Quantities
Mental Health Center / Halhoul
Bill of Quantities
1 / 22
Mental Health Center / Halhoul
Bill of Quantities
Supply and cast 26cm thick ribbed slab. Unit price shall
include cost of supplying and laying lightweight blocks density
25kg/m³, (Etolite size 50X20X12, the cement block is 6cm
2.03 M.S 130
thick) and the required steel reinforcement. Price shall include
drop beams, projected beams, and all other beams and
projections as per drawing (S06 ),and specifications.
Supply and cast 15cm thick solid slab. Unit price shall include
2.04 cost of supplying and laying the required steel reinforcement, M.S 18
beams as per drawing (S09) ,and specifications.
2 / 22
Mental Health Center / Halhoul
Bill of Quantities
3.03 Supply & install one side windows sills 3cm high, 33 cm wide. M.R 20
3 / 22
Mental Health Center / Halhoul
Bill of Quantities
4 / 22
Mental Health Center / Halhoul
Bill of Quantities
5 / 22
Mental Health Center / Halhoul
Bill of Quantities
6 / 22
Mental Health Center / Halhoul
Bill of Quantities
7 / 22
Mental Health Center / Halhoul
Bill of Quantities
Panting the door and frames with oil paint, as instructed and
approved by the Engineer. Unit rate shall include cost for
preparing surface, sanding, primer, two coats of putty, one
undercoat and two coats of matt enamel paints mixed colors.
8 / 22
Mental Health Center / Halhoul
Bill of Quantities
The contractor shall, when pricing the rates of this bill, take
into consideration including and allow for the costs or
expenses of all requirements stipulated in the preambles,
drawings and technical specification of the contract. Rates for
all suspended ceilings works includes suspension system with
anchors to the structure, L& Z, main& main profiles, omega
profiles. clips, gaskets and all necessary fittings in
accordance to the manufacture technical data and related
standards covering this type of works, The rate includes also
cutting and preparation for installing lighting fixtures, ceiling
recess, maintenance openings, grills, ceiling utilities... etc.
9 / 22
Mental Health Center / Halhoul
Bill of Quantities
Total section 10, Steel and miscellaneous metallic works carried to summary
10 / 22
Mental Health Center / Halhoul
Bill of Quantities
11 / 22
Mental Health Center / Halhoul
Bill of Quantities
12.02 Supply and apply three coats of poly-cide paint for ceilings M.S 40
Supply and apply two coats of oil paints on walls. Price shall
12.03 M.S 70
include surface preparation, priming, two coats of putty.
12 / 22
Mental Health Center / Halhoul
Bill of Quantities
13 / 22
Mental Health Center / Halhoul
Bill of Quantities
14 / 22
Mental Health Center / Halhoul
Bill of Quantities
14.4.5 16A, Single Phase ceiling mounted socket outlet for split units No. 3
32A three phase isolator with waterproof enclosure on
14.4.6 No. 1
painted steel angle base
14.05 Under Floor Boxes
under floor service Box contains 2 No. twin power sockets
14.5.1 No. 2
,2no. telephone sockets,4no. data sockets
15 / 22
Mental Health Center / Halhoul
Bill of Quantities
16 / 22
Mental Health Center / Halhoul
Bill of Quantities
17 / 22
Mental Health Center / Halhoul
Bill of Quantities
18 / 22
Mental Health Center / Halhoul
Bill of Quantities
Ø1/2" Eye 3
Ø1/2" Eye 7
19 / 22
Mental Health Center / Halhoul
Bill of Quantities
a- Ø1/2" M.L 40
b- Ø3/4" M.L 5
15.3.2 Hot Water and Storage Tank Replacement
Dismantle and relocate the existing water heating and storage
system, from existing roof to proposed new roof, including all JOB 1
required accessories .
15.04 Air Conditioning VRV System
Supply and installation testing and commissioning of the
following spilt unit, ceiling mounted cassette and wall
mounted type indoor unit, complete with electrical
.
connections, insulated PVC drained pipe, indoor/ outdoor
hanging supports and insulated copper pipes with necessary
accessories. as per drawings and related codes.
15.05 Ventilation
15.5.1 Exhaust Fans
Supply, install, connect, testing and commissioning of, wall/
glass mounted exhaust fans with gravity shutter driven by IP
65 electric motors. Price shall include all required electrical
connections as per specifications, drawings and related
codes.
a-150cfm tube fan window mounted No. 1
b-120cfm tube fan window mounted No. 1
c-100cfm tube fan window mounted No. 1
Total section 15, Mechanical works carried to summary
20 / 22
Mental Health Center / Halhoul
Bill of Quantities
Supply and cast concrete B200 for external slab 10 cm. thick
at the place where indicated by the drawings . Price Includes
16.02 surface leveling, finishing, polyethylene sheets 500 micron, M.S 35
steel reinforcement (1Ø 10@20 cm both way) and spreading
and compacting 20cm base course layer under the slab.
21 / 22
Mental Health Center / Halhoul
Bill of Quantities
SUMMARY
13 Other Works
TITLE: -
22 / 22