You are on page 1of 28

Con Autoriz.

Aprobadas

CUADRO
PROYECTO REPLANTEO
ITEM LADO
INCIO FIN INICIO FIN
1 43+660.00 43+715.00 43+656.54 43+715.26 IZQ
45+153.15 45+168.48 25-Jan
45+321.34 45+340.86
2 45+895.00 45+950.00 IZQ
3 46+695.00 46+720.00 46+695.00 46+719.17 DER
4 46+995.00 47+015.00 46+994.64 47+015.00 DER
5 48+230.00 48+265.00 48+230.00 48+264.38 DER
6 48+825.00 48+840.00 48+825.00 48+841.63 IZQ
7 49+865.00 49+910.00 49+863.78 49+911.03 IZQ
8 49+995.00 50+015.00 49+995.00 50+015.00 IZQ
9 52+085.00 52+110.00 52+080.97 52+109.91 IZQ
10 53+332.50 53+347.50 53+332.34 53+352.09 IZQ
11 53+825.00 53+840.00 53+825.00 53+839.64 IZQ
12 53+950.00 53+980.00 53+948.05 53+980.65 IZQ
13 54+960.00 55+027.50 IZQ
14 55+450.00 55+490.00 55+450.00 55+490.19 IZQ
15 55+905.00 55+930.00 55+902.48 55+932.68 IZQ
16 58+575.00 58+585.00 58+575.00 58+585.19 IZQ
17 59+480.00 59+530.00 59+460.00 59+533.38 IZQ
18 62+385.00 62+415.00 62+385.00 62+415.00 IZQ
19 64+025.00 64+075.00 IZQ
20 64+550.00 64+592.50 64+550.32 64+592.56 IZQ
21 64+668.00 64+834.00 IZQ
22 65+100.00 65+130.00 65+100.00 65+129.99 DER
23 66+460.00 66+490.00 IZQ
24 66+805.00 66+845.00 66+805.00 66+844.53 IZQ
25 67+305.00 67+360.00 67+305.00 67+359.47 IZQ
26 70+466.00 70+536.00 DER
27 70+843.00 70+967.00 DER
28 73+425.00 73+460.00 DER
29 73+665.00 73+680.00 DER
30 76+617.50 76+627.50 IZQ
31 76+677.50 76+690.00 IZQ
32 76+805.00 76+900.00 IZQ
33 77+085.00 77+110.00 IZQ
34 79+471.00 79+507.00 IZQ
35 79+815.00 79+825.00 IZQ
36 80+025.00 80+065.00 IZQ
37 82+325.00 82+355.00 IZQ
38 82+382.50 82+405.00 IZQ
39 82+450.00 82+490.00 IZQ
40 82+585.00 82+680.00 IZQ
41 82+795.00 82+895.00 IZQ
42 82+935.00 82+950.00 IZQ
43 83+185.00 83+210.00 IZQ
44 83+275.00 83+321.00 IZQ
45 83+400.00 83+415.00 IZQ
46 83+885.00 83+915.00 IZQ
47 84+305.00 84+335.00 IZQ
48 84+745.00 84+760.00 DER
49 86+100.00 86+125.00 IZQ
50 87+860.00 87+930.00 87+853.88 87+936.64 IZQ
51 88+710.00 88+735.00 88+710.00 88+734.23 IZQ
52 89+515.00 89+595.00 89+515.00 89+594.61 DER
53 89+695.00 89+725.00 89+674.07 89+726.41 DER
54 89+945.00 89+980.00 89+945.00 89+978.95 DER
55 90+920.00 90+940.00 90+920.00 90+939.97 IZQ
56 91+100.00 91+150.00 91+094.35 91+150.53 IZQ
57 91+290.00 91+310.00 91+290.00 91+305.56 IZQ
58 91+345.00 91+385.00 91+339.75 91+376.24 IZQ
59 91+530.00 91+550.00 91+530.00 91+549.98 IZQ

LEYENDA :
DER : Derecha
IZQ : Izquierda
MCC : Muro de Concreto Ciclópeo
MCCBS : Muro de Concreto Ciclópeo con Barrera de Seguridad
MCA : Muro de Concreto Armado
MCABS : Muro de Concreto Armado con Barrera de Seguridad
MCAB : Muro de Concreto Armado con Baranda
MSR : Muro de Suelo Reforzado
SRBS : Suelo Reforzado con Baranda de Seguridad
MCASR : Muro de Concreto Armado Suelo Reforzado
CUADRO DE AVANCE DE MUROS - 2017
LONG. LONG. RPL LONG. RPL % DE AVAN
TIPO
PROYECTO 100% EJECUTADO EXCAVACION SOLADO
MCA 55 14.00 12.5 89.29%
15.33
19.52
MSR 55 14.00 14 100.00%
MCCBS 25 24.17 24.17 100.00%
MCCBS 20 20.36 0.00%
MCCBS 35 34.38 35 100.00%
MCCBS 15 16.63 16.63 100.00%
MCCBS 45 47.25
MCCBS 20 20.00
MCCBS 25 28.94
MCC 15 19.75
MCCBS 15 14.64
MCABS 30 32.60
MCAB 67.5 0.00
MCC 40 40.19
MCC 25 30.20
MCCBS 10 10.19
MCCBS 50 73.38
MCCBS 30 30.00
MSR 50 0.00
MCCBS 42.5 42.24
MCASR 166 0.00
MCCBS 30 29.99
MCCBS 30 0.00
MCC 40 39.53
MCCBS 55 54.47
MSR 70 0.00
MSR 124 0.00
MCCBS 35 0.00
MCCBS 15 0.00
MCCBS 10 0.00
MCCBS 12.5 0.00
MCABS 95 0.00
MCCBS 25 0.00
MSR 36 0.00
MCCBS 10 0.00
MCC 40 0.00
MCCBS 30 0.00
MCCBS 22.5 0.00
MCCBS 40 0.00
MCCBS 95 0.00
MCCBS 100 0.00
MCCBS 15 0.00
MCCBS 25 0.00
MSR 46 0.00
MCCBS 15 0.00
MSR 30 0.00
MCCBS 30 0.00
MCCBS 15 0.00
MCCBS 25 0.00
MCCBS 70 0.00
MCCBS 25 0.00
MCCBS 80 0.00
MCCBS 30 52.34
MCCBS 35 33.95
MCCBS 20 19.97
MCCBS 50 56.18
MCCBS 20 15.56
MCCBS 40 36.49
MCCBS 20 19.98
2342

on Barrera de Seguridad
n Barrera de Seguridad
n Baranda

de Seguridad
uelo Reforzado
% DE AVANCE
ENCOFRADO ACERO CONCRETO RELLENO
C

DATOS DE PROYECTO DATOS DE REPLANTEO


N° ESTRUCTURA
KM (Inicio) KM (Fin) Longitud KM ( Inicio) KM (Fin) Longitud

1 MCA 43+660.00 43+715.00 55.00 43+656.64 43+715.26 58.62


2 MCA 45+173.50 45+178.50 5.00 45+153.15 45+162.52 9.37
3 MCCBS 46+695.00 46+720.00 25.00 46+695.00 46+719.17 24.17
4 MCCBS 46+995.00 47+015.00 20.00 46+994.64 47+015.00 20.36
5 MCCBS 48+230.00 48+265.00 35.00 48+230.00 48+264.38 34.38
6 MCCBS 48+825.00 48+840.00 15.00 48+825.00 48+841.83 16.83
7 MCA 49+597.50 49+602.50 5.00 49+595.57 49+601.47 5.90
8 MCCBS 49+865.00 49+910.00 45.00 49+863.78 49+911.03 47.25
9 MCCBS 49+995.00 50+015.00 20.00 49+995.00 50+015.00 20.00
10 MCA 51+297.50 51+302.50 5.00 51+289.29 51+301.10 11.81
11 MCCBS 52+085.00 52+110.00 25.00 52+080.97 52+109.91 28.94
12 MCC 53+332.50 53+347.50 15.00 53+332.34 53+352.09 19.75
13 MCCBS 53+825.00 53+840.00 15.00 53+825.00 53+839.64 14.64
14 MCABS 53+950.00 53+980.00 30.00 53+948.05 53+980.65 32.60
15 MCA 54+540.00 54+550.00 10.00 54+537.57 54+550.99 13.42
16 MCA 54+777.50 54+782.50 5.00 54+776.74 54+782.19 5.45
17 MCA 54+960.00 55+027.50 67.50 54+960.00 55+029.18 69.18
18 MCC 55+450.00 55+490.00 40.00 55+450.00 55+490.19 40.19
19 MCC 55+905.00 55+930.00 25.00 55+902.48 55+932.68 30.20
20 MCA 56+827.00 56+831.00 4.00 56+824.25 56+829.73 5.48
21 MCA 58+284.00 58+288.00 4.00 58+281.85 58+286.00 4.15
22 MCCBS 58+575.00 58+585.00 10.00 58+575.00 58+585.15 10.15
23 MCCBS 59+070.00 59+070.00 0.00 59+070.00 59+070.00 0.00
24 MCCBS 59+480.00 59+530.00 50.00 59+480.00 59+533.38 53.38
25 MCA 60+267.50 60+272.50 5.00 60+267.50 60+272.50 5.00
26 MCA 61+601.50 61+606.50 5.00 61+595.08 61+600.28 5.20
27 MCCBS 62+385.00 62+415.00 30.00 62+385.00 62+415.00 30.00
28 MCA 62+968.00 62+972.00 4.00 62+971.86 62+975.56 3.70
29 MCCBS 64+550.00 64+592.50 42.50 64+550.32 64+592.56 42.24
30 MCABS 64+587.50 64+592.50 5.00 64+587.52 64+592.48 4.96
31 MCA 64+770.00 64+820.00 50.00 64+768.00 64+816.35 48.35
32 MCCBS 65+100.00 65+130.00 30.00 65+100.00 65+129.99 29.99
33 MCCBS 66+460.00 66+490.00 30.00 66+460.00 66+488.89 28.89
34 MCC 66+805.00 66+845.00 40.00 66+805.00 66+844.55 39.55
35 MCCBS 67+305.00 67+360.00 55.00 67+305.00 67+359.47 54.47
36 MCA 67+608.00 67+612.00 4.00 67+604.98 67+609.06 4.08
37 MCCBS 73+425.00 73+460.00 35.00 73+425.00 73+484.39 59.39
38 MCCBS 73+665.00 73+680.00 15.00 73+665.00 73+680.00 15.00
39 MCA 75+627.50 75+632.50 5.00 75+627.56 75+632.44 4.88
40 MCCBS 76+617.50 76+627.50 10.00 76+611.71 76+627.04 15.33
41 MCCBS 76+677.50 76+690.00 12.50 76+660.00 76+690.00 30.00
42 MCCBS 76+805.00 76+900.00 95.00 76+805.00 76+900.00 95.00
43 MCCBS 77+085.00 77+110.00 25.00 77+085.00 77+111.70 26.70
44 MCCBS 79+815.00 79+825.00 10.00 79+815.00 79+825.00 10.00
45 MCC 80+025.00 80+065.00 40.00 80+024.33 80+065.36 41.03
46 MCCBS 82+325.00 82+355.00 30.00 82+325.00 82+355.00 30.00
47 MCCBS 82+382.50 82+405.00 22.50 82+380.00 82+412.50 32.50
48 MCCBS 82+450.00 82+490.00 40.00 82+450.00 82+490.00 40.00
49 MCCBS 82+585.00 82+680.00 95.00 82+585.00 82+680.00 95.00
50 MCCBS 82+795.00 82+895.00 100.00 82+795.00 82+895.03 100.03
51 MCCBS 82+935.00 82+950.00 15.00 82+927.50 82+952.50 25.00
52 MCCBS 83+185.00 83+210.00 25.00 83+180.17 83+211.30 31.13
53 MCCBS 83+400.00 83+415.00 15.00 83+400.00 83+415.00 15.00
54 MCCBS 84+305.00 84+335.00 30.00 84+305.00 84+341.06 36.06
55 MCCBS 84+745.00 84+760.00 15.00 84+745.00 84+760.00 15.00
56 MCA 84+882.50 84+887.50 5.00 84+883.14 84+888.86 5.72
57 MCA 85+897.50 85+902.50 5.00 85+897.50 85+902.50 5.00
58 MCCBS 86+100.00 86+125.00 25.00 86+100.00 86+125.00 25.00
59 MCA 87+197.50 87+202.50 5.00 87+197.50 87+202.50 5.00
60 MCCBS 87+860.00 87+930.00 70.00 87+853.88 87+936.64 82.76
61 MCA 88+237.50 88+242.50 5.00 88+230.25 88+251.35 21.10
62 MCA 88+377.50 88+382.50 5.00 88+378.32 88+383.68 5.36

63 MCCBS 88+710.00 88+735.00 25.00 88+710.00 88+734.23 24.23

64 MCCBS 89+515.00 89+595.00 80.00 89+515.00 89+594.61 79.61


65 MCCBS 89+695.00 89+725.00 30.00 89+674.07 89+726.41 52.34
66 MCCBS 89+945.00 89+980.00 35.00 89+945.00 89+978.95 33.95
67 MCA 90+135.50 90+140.50 5.00 90+136.00 90+141.00 5.00
68 MCCBS 90+920.00 90+940.00 20.00 90+920.00 90+939.97 19.97
69 MCCBS 91+100.00 91+150.00 50.00 91+094.35 91+150.53 56.18
70 MCCBS 91+290.00 91+310.00 20.00 91+290.00 91+305.56 15.56
71 MCCBS 91+345.00 91+385.00 40.00 91+339.75 91+376.24 36.49
72 MCCBS 91+530.00 91+550.00 20.00 91+530.00 91+549.98 19.98
73 MCA 91+697.50 91+702.50 5.00 91+692.50 91+697.50 5.00
74 MCA 93+246.50 93+251.50 5.00 93+246.55 93+251.45 4.90
CONTROL GENERAL DE MUROS

GEOMETRIA
ZAPATA ELEVACION

Excavación Solado Encofrado Acero Concreto Encofrado Acero Concreto

100% 0% 0% 0% 0% 0% 0% 0%
100% 100% 0% 50% 0% 0% 0% 0%
100% 100% 50% 0% 0%
100% 100% 0% 0% 0%
100% 100% 0% 0% 0%
100% 100% 100% 0% 0%
100% 0% 0% 0% 0% 0% 0% 0%
100% 0% 0% 0% 0%
100% 0% 0% 0% 0%

50%

100% 0% 0% 0% 0%
100% 100% 100% 0% 0%

100% 100% 50% 0% 0%

100% 0% 0% 0% 0%
Control de Avance

Relleno N° % Avance Longitud Avance

0% 1 58.62 15.00% 5.25


0% 1 9.37 30.00% 3.90
0% 1 24.17 30.00% 7.25
0% 1 20.36 30.00% 6.11
0% 1 34.38 30.00% 10.31
0% 1 16.83 45.00% 7.57
0% 1 5.90 15.00% 0.89
0% 1 47.25 15.00% 7.09
0% 1 20.00 15.00% 3.00
1 11.81 0.00% 0.00
1 28.94 0.00% 0.00
1 19.75 0.00% 0.00
1 14.64 0.00% 0.00
1 32.60 0.00% 0.00
1 13.42 0.00% 0.00
1 5.45 0.00% 0.00
1 69.18 0.00% 0.00
1 40.19 0.00% 0.00
1 30.20 0.00% 0.00
1 5.48 0.00% 0.00
1 4.15 0.00% 0.00
1 10.15 0.00% 0.00
1 0.00 0.00% 0.00
1 53.38 0.00% 0.00
1 5.00 0.00% 0.00
1 5.20 0.00% 0.00
1 30.00 0.00% 0.00
1 3.70 0.00% 0.00
1 42.24 0.00% 0.00
1 4.96 0.00% 0.00
1 48.35 0.00% 0.00
1 29.99 0.00% 0.00
1 28.89 0.00% 0.00
1 39.55 0.00% 0.00
1 54.47 0.00% 0.00
1 4.08 0.00% 0.00
0% 1 59.39 15.00% 8.91
0% 1 15.00 45.00% 6.75
1 4.88 0.00% 0.00
1 15.33 0.00% 0.00
0% 1 30.00 42.50% 12.75
1 95.00 0.00% 0.00
0% 1 26.70 15.00% 4.00
1 10.00 0.00% 0.00
1 41.03 0.00% 0.00
1 30.00 0.00% 0.00
1 32.50 0.00% 0.00
1 40.00 0.00% 0.00
1 95.00 0.00% 0.00
1 100.03 0.00% 0.00
1 25.00 0.00% 0.00
1 31.13 0.00% 0.00
1 15.00 0.00% 0.00
1 36.06 0.00% 0.00
1 15.00 0.00% 0.00
1 5.72 0.00% 0.00
1 5.00 0.00% 0.00
1 25.00 0.00% 0.00
1 5.00 0.00% 0.00
1 82.76 0.00% 0.00
1 21.10 0.00% 0.00
1 5.36 0.00% 0.00

1 24.23 0.00% 0.00

1 79.61 0.00% 0.00


1 52.34 0.00% 0.00
1 33.95 0.00% 0.00
1 5.00 0.00% 0.00
1 19.97 0.00% 0.00
1 56.18 0.00% 0.00
1 15.56 0.00% 0.00
1 36.49 0.00% 0.00
1 19.98 0.00% 0.00
1 5.00 0.00% 0.00
1 4.90 0.00% 0.00
CONTROL GENERAL DE MUROS

GEOMETRIA
DATOS DE PROYECTO DATOS DE REPLANTEO Control de Avance
ZAPATA ELEVACION
N° ESTRUCTURA
KM (Inicio) KM (Fin) Longitud KM ( Inicio) KM (Fin) Longitud Excavación Solado Encofrado Acero Concreto Encofrado Acero Concreto Relleno N° % Avance Longitud Avance

1 MCA 43+660.00 43+715.00 55.00 43+656.64 43+715.26 58.62 100% 0% 0% 0% 0% 0% 0% 0% 0% 1 58.62 15.00% 5.25
2 MCA 45+173.50 45+178.50 5.00 45+153.15 45+162.52 9.37 100% 100% 0% 50% 0% 0% 0% 0% 0% 1 9.37 30.00% 3.90
3 MCCBS 46+695.00 46+720.00 25.00 46+695.00 46+719.17 24.17 100% 100% 50% 0% 0% 0% 1 24.17 30.00% 7.25
4 MCCBS 46+995.00 47+015.00 20.00 46+994.64 47+015.00 20.36 100% 100% 0% 0% 0% 0% 1 20.36 30.00% 6.11
5 MCCBS 48+230.00 48+265.00 35.00 48+230.00 48+264.38 34.38 100% 100% 0% 0% 0% 0% 1 34.38 30.00% 10.31
6 MCCBS 48+825.00 48+840.00 15.00 48+825.00 48+841.83 16.83 100% 100% 50% 0% 0% 0% 1 16.83 45.00% 7.57
7 MCA 49+597.50 49+602.50 5.00 49+595.57 49+601.47 5.90 100% 0% 0% 0% 0% 0% 0% 0% 0% 1 5.90 15.00% 0.89
8 MCCBS 49+865.00 49+910.00 45.00 49+863.78 49+911.03 47.25 100% 0% 0% 0% 0% 0% 1 47.25 15.00% 7.09
9 MCCBS 49+995.00 50+015.00 20.00 49+995.00 50+015.00 20.00 100% 0% 0% 0% 0% 0% 1 20.00 15.00% 3.00
10 MCA 51+297.50 51+302.50 5.00 51+289.29 51+301.10 11.81 1 11.81 0.00% 0.00
11 MCCBS 52+085.00 52+110.00 25.00 52+080.97 52+109.91 28.94 1 28.94 0.00% 0.00

12 MCC 53+332.50 53+347.50 15.00 53+332.34 53+352.09 19.75 1 19.75 0.00% 0.00
13 MCCBS 53+825.00 53+840.00 15.00 53+825.00 53+839.64 14.64 1 14.64 0.00% 0.00
14 MCABS 53+950.00 53+980.00 30.00 53+948.05 53+980.65 32.60 1 32.60 0.00% 0.00
15 MCA 54+540.00 54+550.00 10.00 54+537.57 54+550.99 13.42 1 13.42 0.00% 0.00
16 MCA 54+777.50 54+782.50 5.00 54+776.74 54+782.19 5.45 1 5.45 0.00% 0.00
17 MCA 54+960.00 55+027.50 67.50 54+960.00 55+029.18 69.18 1 69.18 0.00% 0.00
18 MCC 55+450.00 55+490.00 40.00 55+450.00 55+490.19 40.19 1 40.19 0.00% 0.00
19 MCC 55+905.00 55+930.00 25.00 55+902.48 55+932.68 30.20 1 30.20 0.00% 0.00
20 MCA 56+827.00 56+831.00 4.00 56+824.25 56+829.73 5.48 1 5.48 0.00% 0.00
21 MCA 58+284.00 58+288.00 4.00 58+281.85 58+286.00 4.15 1 4.15 0.00% 0.00
22 MCCBS 58+575.00 58+585.00 10.00 58+575.00 58+585.15 10.15 1 10.15 0.00% 0.00
23 MCCBS 59+070.00 59+070.00 0.00 59+070.00 59+070.00 0.00 1 0.00 0.00% 0.00
24 MCCBS 59+480.00 59+530.00 50.00 59+480.00 59+533.38 53.38 1 53.38 0.00% 0.00
25 MCA 60+267.50 60+272.50 5.00 60+267.50 60+272.50 5.00 1 5.00 0.00% 0.00
26 MCA 61+601.50 61+606.50 5.00 61+595.08 61+600.28 5.20 1 5.20 0.00% 0.00
27 MCCBS 62+385.00 62+415.00 30.00 62+385.00 62+415.00 30.00 1 30.00 0.00% 0.00
28 MCA 62+968.00 62+972.00 4.00 62+971.86 62+975.56 3.70 1 3.70 0.00% 0.00
29 MCCBS 64+550.00 64+592.50 42.50 64+550.32 64+592.56 42.24 1 42.24 0.00% 0.00
30 MCABS 64+587.50 64+592.50 5.00 64+587.52 64+592.48 4.96 1 4.96 0.00% 0.00
31 MCA 64+770.00 64+820.00 50.00 64+768.00 64+816.35 48.35 1 48.35 0.00% 0.00
32 MCCBS 65+100.00 65+130.00 30.00 65+100.00 65+129.99 29.99 1 29.99 0.00% 0.00
33 MCCBS 66+460.00 66+490.00 30.00 66+460.00 66+488.89 28.89 1 28.89 0.00% 0.00
34 MCC 66+805.00 66+845.00 40.00 66+805.00 66+844.55 39.55 1 39.55 0.00% 0.00
35 MCCBS 67+305.00 67+360.00 55.00 67+305.00 67+359.47 54.47 1 54.47 0.00% 0.00
36 MCA 67+608.00 67+612.00 4.00 67+604.98 67+609.06 4.08 1 4.08 0.00% 0.00
37 MCCBS 73+425.00 73+460.00 35.00 73+425.00 73+484.39 59.39 100% 0% 0% 0% 0% 0% 1 59.39 15.00% 8.91
38 MCCBS 73+665.00 73+680.00 15.00 73+665.00 73+680.00 15.00 100% 100% 100% 0% 0% 0% 1 15.00 45.00% 6.75
39 MCA 75+627.50 75+632.50 5.00 75+627.56 75+632.44 4.88 1 4.88 0.00% 0.00
40 MCCBS 76+617.50 76+627.50 10.00 76+611.71 76+627.04 15.33 1 15.33 0.00% 0.00
41 MCCBS 76+677.50 76+690.00 12.50 76+660.00 76+690.00 30.00 100% 100% 50% 0% 0% 0% 1 30.00 42.50% 12.75
42 MCCBS 76+805.00 76+900.00 95.00 76+805.00 76+900.00 95.00 1 95.00 0.00% 0.00
43 MCCBS 77+085.00 77+110.00 25.00 77+085.00 77+111.70 26.70 100% 0% 0% 0% 0% 0% 1 26.70 15.00% 4.00
44 MCCBS 79+815.00 79+825.00 10.00 79+815.00 79+825.00 10.00 1 10.00 0.00% 0.00
45 MCC 80+025.00 80+065.00 40.00 80+024.33 80+065.36 41.03 1 41.03 0.00% 0.00
46 MCCBS 82+325.00 82+355.00 30.00 82+325.00 82+355.00 30.00 1 30.00 0.00% 0.00
47 MCCBS 82+382.50 82+405.00 22.50 82+380.00 82+412.50 32.50 1 32.50 0.00% 0.00
48 MCCBS 82+450.00 82+490.00 40.00 82+450.00 82+490.00 40.00 1 40.00 0.00% 0.00
49 MCCBS 82+585.00 82+680.00 95.00 82+585.00 82+680.00 95.00 1 95.00 0.00% 0.00
50 MCCBS 82+795.00 82+895.00 100.00 82+795.00 82+895.03 100.03 1 100.03 0.00% 0.00
51 MCCBS 82+935.00 82+950.00 15.00 82+927.50 82+952.50 25.00 1 25.00 0.00% 0.00
52 MCCBS 83+185.00 83+210.00 25.00 83+180.17 83+211.30 31.13 1 31.13 0.00% 0.00
53 MCCBS 83+400.00 83+415.00 15.00 83+400.00 83+415.00 15.00 1 15.00 0.00% 0.00

54 MCCBS 84+305.00 84+335.00 30.00 84+305.00 84+341.06 36.06 1 36.06 0.00% 0.00
55 MCCBS 84+745.00 84+760.00 15.00 84+745.00 84+760.00 15.00 1 15.00 0.00% 0.00
56 MCA 84+882.50 84+887.50 5.00 84+883.14 84+888.86 5.72 1 5.72 0.00% 0.00
57 MCA 85+897.50 85+902.50 5.00 85+897.50 85+902.50 5.00 1 5.00 0.00% 0.00

58 MCCBS 86+100.00 86+125.00 25.00 86+100.00 86+125.00 25.00 1 25.00 0.00% 0.00
59 MCA 87+197.50 87+202.50 5.00 87+197.50 87+202.50 5.00 1 5.00 0.00% 0.00

60 MCCBS 87+860.00 87+930.00 70.00 87+853.88 87+936.64 82.76 1 82.76 0.00% 0.00
61 MCA 88+237.50 88+242.50 5.00 88+230.25 88+251.35 21.10 1 21.10 0.00% 0.00
62 MCA 88+377.50 88+382.50 5.00 88+378.32 88+383.68 5.36 1 5.36 0.00% 0.00

63 MCCBS 88+710.00 88+735.00 25.00 88+710.00 88+734.23 24.23 1 24.23 0.00% 0.00

64 MCCBS 89+515.00 89+595.00 80.00 89+515.00 89+594.61 79.61 1 79.61 0.00% 0.00
65 MCCBS 89+695.00 89+725.00 30.00 89+674.07 89+726.41 52.34 1 52.34 0.00% 0.00
66 MCCBS 89+945.00 89+980.00 35.00 89+945.00 89+978.95 33.95 1 33.95 0.00% 0.00
67 MCA 90+135.50 90+140.50 5.00 90+136.00 90+141.00 5.00 1 5.00 0.00% 0.00
68 MCCBS 90+920.00 90+940.00 20.00 90+920.00 90+939.97 19.97 1 19.97 0.00% 0.00
69 MCCBS 91+100.00 91+150.00 50.00 91+094.35 91+150.53 56.18 1 56.18 0.00% 0.00
70 MCCBS 91+290.00 91+310.00 20.00 91+290.00 91+305.56 15.56 1 15.56 0.00% 0.00
71 MCCBS 91+345.00 91+385.00 40.00 91+339.75 91+376.24 36.49 1 36.49 0.00% 0.00
72 MCCBS 91+530.00 91+550.00 20.00 91+530.00 91+549.98 19.98 1 19.98 0.00% 0.00
73 MCA 91+697.50 91+702.50 5.00 91+692.50 91+697.50 5.00 1 5.00 0.00% 0.00
74 MCA 93+246.50 93+251.50 5.00 93+246.55 93+251.45 4.90 1 4.90 0.00% 0.00
CONTROL DE MUROS C.A. Y C.C - MAYO

DATOS DE REPLANTEO GEOMETRIA

N° ESTRUCTURA Zapata Elevación

KM ( Inicio) KM (Fin) Longitud Excavación Solado Encofrado Acero Concreto Encofrado Acero Concreto

1 MCA 43+656.64 43+715.26 35.00 100% 100% 100% 100% 20% 10% 30%
2 MCA 45+153.15 45+162.52 13.00 100% 100% 100% 50% 100% 100% 100% 100%
3 MCCBS 46+695.00 46+719.17 24.17 100% 100% 50% 100% 100%
4 MCCBS 46+994.64 47+015.00 20.36 100% 100% 100% 100% 100%
5 MCCBS 48+230.00 48+264.38 34.38 100% 100% 100% 100% 100%
6 MCCBS 48+825.00 48+841.83 16.83 100% 100% 50% 100% 100%
7 MCA 49+595.57 49+601.47 5.90 100% 100% 100% 100% 100% 100% 100%
8 MCCBS 49+863.78 49+911.03 47.25 100% 100% 100% 100% 100%
9 MCCBS 49+995.00 50+015.00 20.00 100% 100% 100% 100% 100%
10 MCA 51+289.29 51+301.10 11.81 100% 100% 100% 100% 100% 100% 100% 100%
11 MCCBS 52+080.97 52+109.91 28.94 100% 100% 100% 80% 80%
12 MCC 53+332.34 53+352.09 15.00 100% 100% 100% 50%
13 MCCBS 53+825.00 53+839.64 14.64 0%
14 MCABS 53+948.05 53+980.65 32.60 0%
15 MCA 54+537.57 54+550.99 13.42 100%
16 MCA 54+776.74 54+782.19 5.45 100%
17 MCA 54+960.00 55+029.18 69.18 100% 100% 50% 50% 20%
18 MCC 55+450.00 55+490.19 40.19 100% 100% 100%
19 MCC 55+902.48 55+932.68 30.20 100% 100% 100%
20 MCA 56+824.25 56+829.73 5.48 100%
21 MCA 58+281.85 58+286.00 4.15 100%
22 MCCBS 58+575.00 58+585.15 10.15 100%
CONTROL DE MUROS C.A. Y C.C - MAYO

DATOS DE REPLANTEO GEOMETRIA

N° ESTRUCTURA Zapata Elevación

KM ( Inicio) KM (Fin) Longitud Excavación Solado Encofrado Acero Concreto Encofrado Acero Concreto

23 MCCBS 59+070.00 59+070.00 20.00 0%


24 MCCBS 59+480.00 59+533.38 53.38 0%
25 MCA 60+267.50 60+272.50 5.00 0%
26 MCA 61+595.08 61+600.28 5.20 0%
27 MCCBS 62+385.00 62+415.00 30.00 100% 100%
28 MCA 62+971.86 62+975.56 3.70 100%
29 MCCBS 64+550.32 64+592.56 42.24 0%
30 MCABS 64+587.52 64+592.48 4.96 100%
31 MCA 64+768.00 64+816.35 48.35 0%
32 MCCBS 65+100.00 65+129.99 29.99 0%
33 MCCBS 66+460.00 66+488.89 28.89 0%
34 MCC 66+805.00 66+844.55 39.55 0%
35 MCCBS 67+305.00 67+359.47 54.47 0%
36 MCA 67+604.98 67+609.06 4.08 0%
37 MCCBS 73+425.00 73+484.39 59.39 100% 50%
38 MCCBS 73+665.00 73+680.00 15.00 100% 100% 100% 100% 50%
39 MCA 75+627.56 75+632.44 4.88 0%
40 MCCBS 76+611.71 76+627.04 15.33 0%
41 MCCBS 76+660.00 76+690.00 30.00 100% 100% 30% 30%
42 MCCBS 76+805.00 76+900.00 95.00 0%
43 MCCBS 77+085.00 77+111.70 26.70 100%
44 MCCBS 79+815.00 79+825.00 10.00 0%
45 MCC 80+024.33 80+065.36 41.03 0%
46 MCCBS 82+325.00 82+355.00 30.00 0%
CONTROL DE MUROS C.A. Y C.C - MAYO

DATOS DE REPLANTEO GEOMETRIA

N° ESTRUCTURA Zapata Elevación

KM ( Inicio) KM (Fin) Longitud Excavación Solado Encofrado Acero Concreto Encofrado Acero Concreto

47 MCCBS 82+380.00 82+412.50 32.50 0%


48 MCCBS 82+450.00 82+490.00 40.00 0%
49 MCCBS 82+585.00 82+680.00 95.00 0%
50 MCCBS 82+795.00 82+895.03 100.03 0%
51 MCCBS 82+927.50 82+952.50 25.00 0%
52 MCCBS 83+180.17 83+211.30 31.13 0%
53 MCCBS 83+400.00 83+415.00 15.00 0%
54 MCCBS 84+305.00 84+341.06 36.06 0%
55 MCCBS 84+745.00 84+760.00 15.00 0%
56 MCA 84+883.14 84+888.86 5.72 0%
57 MCA 85+897.50 85+902.50 5.00 0%
58 MCCBS 86+100.00 86+125.00 25.00 0%
59 MCA 87+197.50 87+202.50 5.00 0%
60 MCCBS 87+853.88 87+936.64 82.76 0%
61 MCA 88+230.25 88+251.35 21.10 0%
62 MCA 88+378.32 88+383.68 5.36 0%
63 MCCBS 88+710.00 88+734.23 24.23 0%
64 MCCBS 89+515.00 89+594.61 79.61 100%
65 MCCBS 89+674.07 89+726.41 52.34 30%
66 MCCBS 89+945.00 89+978.95 33.95 100%
67 MCA 90+136.00 90+141.00 5.00 0%
68 MCCBS 90+920.00 90+939.97 19.97 100% 100% 99%
69 MCCBS 91+094.35 91+150.53 56.18 0%
70 MCCBS 91+290.00 91+305.56 15.56 100% 100% 99%
CONTROL DE MUROS C.A. Y C.C - MAYO

DATOS DE REPLANTEO GEOMETRIA

N° ESTRUCTURA Zapata Elevación

KM ( Inicio) KM (Fin) Longitud Excavación Solado Encofrado Acero Concreto Encofrado Acero Concreto

71 MCCBS 91+339.75 91+376.24 36.49 100% 100% 99%


72 MCCBS 91+530.00 91+549.98 19.98 0%
73 MCA 91+692.50 91+697.50 5.00 0%
74 MCA 93+246.55 93+251.45 4.90 100% 100% 100% 100% 100% 30%
0%

100% = EJECUTADAS DURANTE EL MES


99% = PRESENTADAS POR EL CONTRATISTA COMO EJECUTADAS, EN OBRA NO SE ENCUENTRAN TALES ACTIVIDADES
50% = RESTANTE por EJECUTAR DE ACTIVIDAD RESPECTO DEL MES ANTERIOR
100% = EJECUTADAS MES ANTERIOR
ROL DE MUROS C.A. Y C.C - MAYO

GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto


Relleno
corrugada 4" pvc-sap, d=2" de drenaje

100% 100% 100% 100%


100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100%
ROL DE MUROS C.A. Y C.C - MAYO

GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto


Relleno
corrugada 4" pvc-sap, d=2" de drenaje
ROL DE MUROS C.A. Y C.C - MAYO

GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto


Relleno
corrugada 4" pvc-sap, d=2" de drenaje
ROL DE MUROS C.A. Y C.C - MAYO

GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto


Relleno
corrugada 4" pvc-sap, d=2" de drenaje
CONTROL DE MUROS C.A. Y C.C - JUNIO

DATOS DE REPLANTEO GEOMETRIA

N° ESTRUCTURA Zapata Elevación

KM ( Inicio) KM (Fin) Longitud Excavación Solado Encofrado Acero Concreto Encofrado Acero Concreto

1 MCA 43+656.64 43+715.26 35.00 100% 100% 100% 100% 100% 100% 100% 100%
2 MCA 45+153.15 45+162.52 13.00 100% 100% 100% 100% 100% 100% 100% 100%
3 MCCBS 46+695.00 46+719.17 24.17 100% 100% 100% 100% 100%
4 MCCBS 46+994.64 47+015.00 20.36 100% 100% 100% 100% 100%
5 MCCBS 48+230.00 48+264.38 34.38 100% 100% 100% 100% 100%
6 MCCBS 48+825.00 48+841.83 16.83 100% 100% 100% 100% 100%
7 MCA 49+595.57 49+601.47 5.90 100% 100% 100% 100% 100% 100% 100%
8 MCCBS 49+863.78 49+911.03 47.25 100% 100% 100% 100% 100%
9 MCCBS 49+995.00 50+015.00 20.00 100% 100% 100% 100% 100%
10 MCA 51+289.29 51+301.10 11.81 100% 100% 100% 100% 100% 100% 100% 100%
11 MCCBS 52+080.97 52+109.91 28.94 100% 100% 100% 100% 100%
12 MCC 53+332.34 53+352.09 15.00 100% 100% 100% 100% 100%
14 MCABS 53+948.05 53+980.65 32.60 100%
15 MCA 54+537.57 54+550.99 13.42 100% 100% 100% 100% 100%
16 MCA 54+776.74 54+782.19 5.45 100% 100% 100% 100% 100% 100% 100% 100%
17 MCA 54+960.00 55+029.18 69.18 100% 100% 100% 100% 10% 90%
18 MCC 55+450.00 55+490.19 40.19 100% 100% 100% 100% 50%
19 MCC 55+902.48 55+932.68 30.20 100% 100% 100% 100% 100%
20 MCA 56+824.25 56+829.73 5.48 100% 100% 100% 100% 100% 100% 100%
21 MCA 58+281.85 58+286.00 4.15 100%
22 MCCBS 58+575.00 58+585.15 10.15 100% 100%
23 MCCBS 59+070.00 59+070.00 20.00 100%
CONTROL DE MUROS C.A. Y C.C - JUNIO

DATOS DE REPLANTEO GEOMETRIA

N° ESTRUCTURA Zapata Elevación

KM ( Inicio) KM (Fin) Longitud Excavación Solado Encofrado Acero Concreto Encofrado Acero Concreto

24 MCCBS 59+480.00 59+533.38 53.38 100% 100%


27 MCCBS 62+385.00 62+415.00 30.00 100% 100% 100% 100%
28 MCA 62+971.86 62+975.56 3.70 100% 100% 100% 50%
29 MCCBS 64+550.32 64+592.56 42.24 100% 100% 100% 100%
30 MCABS 64+587.52 64+592.48 4.96 100%
31 MCA 64+768.00 64+816.35 48.35 100% 50% 30% 30%
32 MCCBS 65+100.00 65+129.99 29.99 100% 100%
33 MCCBS 66+460.00 66+488.89 28.89 100% 100%
34 MCC 66+805.00 66+844.55 39.55 100% 100%
37 MCCBS 73+425.00 73+484.39 59.39 100% 100% 100% 100% 100%
38 MCCBS 73+665.00 73+680.00 15.00 100% 100% 100% 100% 100%
41 MCCBS 76+660.00 76+690.00 30.00 100% 100% 100% 100% 100%
42 MCCBS 76+805.00 76+900.00 95.00 100% 100% 100%
43 MCCBS 77+085.00 77+111.70 26.70 100% 100% 100% 100%
60 MCCBS 87+853.88 87+936.64 82.76 100%
64 MCCBS 89+515.00 89+594.61 79.61 100% 100% 100% 50%
65 MCCBS 89+674.07 89+726.41 52.34 100% 100%
66 MCCBS 89+945.00 89+978.95 33.95 100% 100% 100% 100% 100%
68 MCCBS 90+920.00 90+939.97 19.97 100% 100% 100% 100% 100%
70 MCCBS 91+290.00 91+305.56 15.56 100% 100% 100%
71 MCCBS 91+339.75 91+376.24 36.49 100% 100% 100% 100% 100%
74 MCA 93+246.55 93+251.45 4.90 100% 100% 100% 100% 100% 100% 100% 100%
CONTROL DE MUROS C.A. Y C.C - JUNIO

DATOS DE REPLANTEO GEOMETRIA

N° ESTRUCTURA Zapata Elevación

KM ( Inicio) KM (Fin) Longitud Excavación Solado Encofrado Acero Concreto Encofrado Acero Concreto

= EJECUTADAS DURANTE EL MES


= CUENTAN CON DICHAS PARTIDAS
= EJECUTADAS MES ANTERIOR
OL DE MUROS C.A. Y C.C - JUNIO

GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto


Relleno
corrugada 4" pvc-sap, d=2" de drenaje

100% 100% 100% 100%


100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100%
OL DE MUROS C.A. Y C.C - JUNIO

GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto


Relleno
corrugada 4" pvc-sap, d=2" de drenaje