I. Hypothesis
Structure
Clear Span Length L = 14000 mm
TotalWidth W W = 10760 mm
Roadway Wr Wr = 10000 mm
Wearing Surface dw dw = 75 mm
Width of Barrier B B = 380 mm
Materials
Density of Wearing Surface ρw = 2250 kg/m3
Concrete Density ρc = 2400 kg/m3
Concrete Strength f'c = 30 Mpa
Reinforcement Strength fy = 400 Mpa
Elastic Modulus of Concrete Ec = 27691.47 Mpa
Elastic Modulus of Steel Es = 200000 Mpa
L
SOIL SOIL
ELEVATION VIEW
B Wr B
Future Wearing Surface
h
SECTION VIEW
B
Wr/2
Wr
W
Wr/2
B
TOP VIEW
Page 1
Institut de Technologie du Cambodge Projet du pont
h_min=(1.2[S(mm)+3000mm])/30
= 680 mm
U = 0.75 (LL+IM)
Coefficient
Strength I Limite State Service Limite State Fatigue
γDC 1.25 1.00 -
γDW 1.50 1.00 -
γLL 1.75 1.00 0.75
IM 0.33 0.75
Page 2
Institut de Technologie du Cambodge Projet du pont
L1 = min(L,18m) = 14000 mm
W1 = min(W,9m) = 9000 mm
〖 �^� 〗 _𝑖𝑛𝑡=2.10+0.12√(𝐿1∗𝑊1)≤𝑊/𝑁_𝐿
W1 =min(W,18m) = 10760 mm
NL = 2.78
We take: NL = 2
EMint = 3572.826 mm
Page 3
Institut de Technologie du Cambodge Projet du pont
According to clause [4.6.2.1.4b], the effective width of a strip without edge beam is the sum
of distance between the edge of the deck and theinside face of the barrier, plus 300mm, plus
one-quarter of the strip width specified in Article 4.6.2.1.3 and also 4.6.2.3 or 4.6.2.10 but
Slab-type bridges shall be designed for all of vehiclar live loads sprcified in AASHTO
1. Maximum Shear Force - Axle Loads on Slab Bridge Observed Point at support
145kN 145kN
35kN
L1 Lk=4.3to 9m 4.3m 4.3m
110kN 110kN
1.2m
Page 4
Institut de Technologie du Cambodge Projet du pont
Lm1
Lm2
Lm3
�=(𝑃−((𝑃∗𝐿_𝑚))/𝐿_𝑡 )/𝑃
Vtrappuis = η1*P1 + η2*P2 + η3*P3
Vtrappuis= 258.96 kN
Vteappuis = 210.5714 kN
q= 9.3 kN/m
V appuis =1/2*q*L =
l
65.1 kN
The static effect design truck or tendem shall be increased by percentage of IM ( Dynamic
Load Allowance), but not be applied to the design pedestrain load or to the design lane load.
Page 5
Institut de Technologie du Cambodge Projet du pont
The factor to be applied to the static load shall be taken as: (1+IM)
1.2. Maximum Bending Moment at Mid-Span - Axle Load We observe at L/4 & L/2
1.2.1. Design Load of Truck
Influence Line at L/2 L/2 = 7 m
145kN 145kN
35kN
L1 Lk =4.3to 9m 4.3m 4.3m
Lm1
Lm2=L/2
Lm3
M( @ L/2 )= 750.5 kN
145kN 145kN
35kN
4.3m Lk=4.3 ~ 9m
Lm2=L/4
Lm3
Page 6
Institut de Technologie du Cambodge Projet du pont
1.2m
L/2
L
1.2m
L/4
L
The Static Effect for Moment is taken (1+IM), but not be applied for lane load deign [3.6.2.1]
Page 7
Institut de Technologie du Cambodge Projet du pont
Shear and Bending Moment are given in VIII is per multiple strip Eint where Eint 3573 mm
�_(𝐿𝐿+𝐼�)=�_(��+��)/�_𝑖𝑛𝑡
VLL+IM = 114.62 kN
�_(𝐿𝐿+𝐼�)=�_(��+��)/�_𝑖𝑛𝑡
MLL+IM = 343.15 kN.m At L/2
2. Exterior Strip
One lane width was considered is 3600mm, but Eedge = Eext = 1800 mm
�_(𝐷𝑊,𝑖𝑛𝑡)=1/8∗𝑤_(𝐷𝑊,𝑖
𝑛𝑡) 𝐿^2= 41.34 kN.m per m
Page 8
Institut de Technologie du Cambodge Projet du pont
DC :
𝑤_(𝐷𝐶,𝑒𝑥𝑡)=𝑤_(𝐷𝐶,𝑖𝑛𝑡) 18.903 kN/m per m
+𝑤_𝑏𝑎𝑟𝑟𝑖𝑒𝑟/�_𝑒𝑥𝑡𝑒𝑟𝑖𝑜𝑟 =
�_(𝐷𝐶,𝑒𝑥𝑡)=1/2∗𝑤_𝐷𝑐𝐶𝑖𝑛𝑡
∗𝐿= 132.32 kN per m
�_(𝐷𝐶,𝑒𝑥𝑡)=1/8∗𝑤_𝐷𝑐𝐶𝑖𝑛
𝑡∗𝐿^2= 463.13 kN.m per m
DW :
𝑤_(𝐷𝑊,𝑒𝑥𝑡)=𝑤_(𝐷𝑤,𝑖𝑛𝑡)+
((�_𝑒𝑥𝑡−𝐷_𝑏𝑎𝑟𝑟𝑖𝑒𝑟))/�_𝑒𝑥𝑡𝑒𝑟𝑖𝑜𝑟 = 1.33 kN/m
Cover for Unprotected Main Reinforceing Steel(mm), Ref. [Table 5.12.3-1] such as below:
Trail Reinforcement:
�_𝑠=�/(𝑓_𝑠 𝑗𝑑)
Assume: j= 0.875
Page 9
Institut de Technologie du Cambodge Projet du pont
As formula above:
𝑓_𝑠≤𝑓_𝑠𝑎=𝑍/(𝑑_𝑐∗�)^(1/3) ≤0.6𝑓_�
with b= 1.00 m
As = 5891.04 mm2/m
Page 10
Institut de Technologie du Cambodge Projet du pont
B= 1 m
x
d
d-x
Strain Stress
𝑥^2+2𝑛�𝑠/𝑏 𝑥−2𝑛�𝑠𝑑/𝑏=0
𝑥^2+2𝐵𝑥−𝑐=0
B = 42.54773
c = 53950.52
𝑥=−𝐵+√(𝐵^2+𝐶)= 193.5896 mm
Steel Stress:
𝑓𝑠/𝑛=�(𝑑−𝑥)/𝐼_𝑐𝑟 =
32.37 Mpa
dc = is concrete cover measured from the extreme tension fiber to the center of nearest
Page 11
Institut de Technologie du Cambodge Projet du pont
===> dc = 46 mm
fsa > fs OK
As = 6792.992 mm2
B = 49.06
C = 62210.6
x = 205.14 mm
b= 1000 mm
fs = 235.3875 Mpa
A = 10222.22 mm2
fs < fsa OK
Page 12
Institut de Technologie du Cambodge Projet du pont
3. Deformations [5.7.3.6].
�_𝐷𝐿=1/8∗𝑤_(𝐷𝐿,𝑡𝑜𝑡𝑎𝑙)∗𝐿^2=
4836.1 kN.m
By using Ie [A5.7.3.6.2]
∆_𝐷𝐿=5/384∗𝑤_(𝐷𝐿,𝑡𝑜𝑡𝑎𝑙)∗𝐿^4/(�_𝑐 𝐼_𝑒 )
�_𝑐𝑟=𝑓_𝑟∗𝐼_𝑔/�_𝑏
Ig = 2.82E+11 mm4
Ma = 3401.0 kNm
fs = 240 Mpa
𝐼_(𝑐𝑟,𝑡𝑜𝑡𝑎𝑙)=(2∗�_𝑒𝑥𝑡𝑒𝑟𝑖𝑜𝑟∗𝐼_(𝑐𝑟,𝑒𝑥𝑡𝑒𝑟𝑖𝑜𝑟)+�_(𝑖𝑛𝑡,𝑡𝑜𝑡𝑎𝑙)∗�_(��,𝑖𝑛𝑡𝑒𝑟𝑖𝑜𝑟)
Icr,total =) 1.1E+11 mm4
Page 13
Institut de Technologie du Cambodge Projet du pont
By Using Ig [5.7.3.6.2]
∆_(𝐷𝐿,𝐼𝑒)=∆_(𝐷𝐿,𝐼𝑔)∗𝐼𝑒/𝐼𝑔=
12.65 mm
Camber = 50.58688 mm
〖∆ ^𝑎𝑙𝑙𝑜𝑤 〗 _(𝐿𝐿+𝐼�)=𝑠𝑝𝑎𝑛/800=
17.5 mm
Use design truck alone or design lane load plus 25% truck load [A.6.1.3.2]. When design truck
alone, it should be placed so that the distance between its resultant and the nearest wheel is bisected
m= 0.85
The value of Ie changes with the magnetude of the applied moment Ma. The moment associated
with the live load deflection includes the dead load moment plus the truck moment.
�_(𝐷𝐿+𝐿𝐿+𝐼�)=�_𝐷𝐿+ 〖 �〖 ∗
(1+𝐼�)∗� 〗 _𝑇𝑟𝑢𝑐�
Page 14
Institut de Technologie du Cambodge Projet du pont
(Mcr / Ma )3 = 0.084024
Ie = 1.3E+11 mm4
For P3 = 35 kN = 79.135 kN
𝑥_𝐺=(𝑃_1∗𝑥_1+�_2∗�_2+�_3∗�_3)/(𝑃_1+𝑃_2+𝑃_3 )
145kN 145kN
35kN
Lk =4.3to 9m 4.3m
L
CL
Lk = 4.3 ~ 9m 4.3m
P3 R P2
P1
a a
xG
Page 15
Mmax= ? kNm
a a
Institut de Technologie du Cambodge xG
Projet du pont
Mmax= ? kNm
P3=118.7kN
x
b
P3 = 79.135 kN
x1 = 0 m Then xG = 5.76 m
x2 = 4.3 m a = 0.728 m
x3 = 8.6 m b= 1.972 m
x= 7.73 m
∆_1=𝑃3∗𝑏∗𝑥/6�𝐼𝐿 (𝐿^2−𝑏^2−𝑥^2 )
Δ_P3 = 0.547 mm
b
P2 = 327.845 kN b= 6.27 m
x= 7.73 m
Δ_P2 = 5.28 mm
P1 = 327.85 kN b = 3.43 m
x= 6.27 m
Δ_P1 = 3.50 mm
Page 16
Institut de Technologie du Cambodge Projet du pont
Δlane = 3.03 mm
We consider tendom load as a cencentrated load located at mid span for having a critical deflection
P=110kN
L/2 L/2
∆_𝑇𝑒𝑛𝑑𝑜𝑚=1/48∗𝑞_𝑡𝑒𝑛𝑑𝑜𝑚∗𝐿^3/(�_𝑐 𝐼_𝑒 )
qtendom = 497.42 kN
Δtendom = 8.2 mm OK
f'c = 30 Mpa
β= 0.84
Strength I.
Minterior = η*Σγi.Qi = 1.05*[1.25*MDC + 1.5*MDW + (1+IM )*MLL+IM ]
Page 17
Institut de Technologie du Cambodge Projet du pont
c = 110.574 mm
a = β*c = 92.40854 mm
ratio of c and ds is = OK
Φ= 0.9
Page 18
Institut de Technologie du Cambodge Projet du pont
b= 1000 mm
c = 127.504 mm
a = β*c = 106.5567 mm
ratio of c and ds is = OK
Φ= 0.9
The amount of bottom transverse reinforcement may be takent as a percenage of the main
a) Interior Strip
ρ= 0.148
Page 19
Institut de Technologie du Cambodge Projet du pont
ρ= 0.148
The shrinkage or temperature reinforcement shall not be spaced farther than 450mm or 3 time of
compenent thickness.
Ash > 0.11*Ag / fy = 187 mm2 / m DB10 @313.3 In the both directions
U = 0.75*(LL+IM) IM = 15%
Fatigue load shall be one design truck with 9000mm axial spacing no multiple present factor
applied (m =1).
4.3 m 9m
P1 P2 P2
fallowable = 145-0.33*fmin +55(r/h) where fmin =0, because deck is treated as a simple beam, thus, there
ff = 161.5 Mpa
Page 20
Institut de Technologie du Cambodge Projet du pont
η= 1.00
γ= 0.75
CL
x
P1 R P2 P3
A C B
L/2+x/2 L/2-x/2
x1 x2 x4
L = 14000 mm
P1= 35 kN
P2 = 145 kN
x= 0.836 m x4 = 6.5819 m
x2 = 4.3 m
x1 = 3.12 m
where n= 7.22
𝑓_𝑚𝑎𝑥/𝑛=(�_𝑚𝑎𝑥 (𝑑−𝑥))/𝐼_𝑐𝑟
x= 193.59 mm b = 1000 mm
Φ= 25 mm
Page 21
Institut de Technologie du Cambodge Projet du pont
XVII. Conclusion
Après avoir fait ce projet du pont, il nous permet d'avoir le concept, le dimesionnement et le calcul
sur le pont dalle de béton armé (solide slab bridge) par le norme AASHTO. En plus,il nous donne
aussi un model pour calculer d'autres types du pont.
Dans ce projet, on n'a calculé que les sections d'armatures de la portée L/2 et L/4. Pour qu'on peut
économiser l'argent sur l'utilisation d'armatures, on doit calculer plusieurs points sur cet portée.
Et on a vérifier seulement le milieu de la portée L/2, le point le plus critique qu'on doit considérer
comme le flèche et le moment. On n'a pas vérifier l'effort tranchant parce qu'il n'est pas le point
critique pour le pont dalle grâce au largeur de la dalle importance. En conclusion, on a adopté sur
la vérification et le calcul de ce pont dalle en béton armé.
Page 22
Institut de Technologie du Cambodge Projet du pont
380m 380m
XVIII. Sketch of Br
Institut de Technologie du Cambodge
Eext=180 m Eint=640 m Eext=180 m Projet du pont
380m 380m
CONTENTS
VIII. Applicability ofLive Load for Decks and Deck Systems: .....................................Page04
Page 24
Institut de Technologie du Cambodge Projet du pont
Page 25
Institut de Technologie du Cambodge Projet du pont
ure3.6.1.2.1-1
Page 26
Institut de Technologie du Cambodge Projet du pont
uch as below:
Page 27
Institut de Technologie du Cambodge Projet du pont
er of nearest
Page 28
Institut de Technologie du Cambodge Projet du pont
Exterior Strip
Page 29
Institut de Technologie du Cambodge Projet du pont
Page 30
Institut de Technologie du Cambodge Projet du pont
n design truck
heel is bisected
ment associated
Page 31
Institut de Technologie du Cambodge Projet du pont
cal deflection
Page 32
Institut de Technologie du Cambodge Projet du pont
mm or 3 time of
present factor
m, thus, there
Page 33
Institut de Technologie du Cambodge Projet du pont
ent et le calcul
nous donne