You are on page 1of 22

SK E&C

in Brief
Contents

1 SK
Company
Engineering
Profile
& Construction (Company Profile)

2 Business
Business Area
Areas

33 Global
GlobalProject
ProjectExperience_20
Experience Countries

44 Project
CurrentExperience_Current
Global BOT ProjectsBOT Projects

5 Water Projects

1
1. Company Profile

As of 2011

1 Established : 1962

2 Assets : US $ 3.6 Billion

3 Sales : US $ 5.5 Billion

4 Order : US $ 7.3 Billion

5 Net Income : US $ 73.6 Mil.

6 Employees : 4,520

7 CEO : CHOI, Gwang-Chul

2
2. Business Areas

Infrastructure Architecture & Building Plant

 High Speed Railroad  Refinery


 Residential Building
 Oil & Gas Processing
 Subway  Hotel
 Petrochemical
 Road and Bridge
 Office Building  Fertilizers
 Underground Storage
 Hospital  NG Chain Products
 Tunnel
 Fine Chemical
 Sports Facilities
 Harbor
 Power Plant
 Water Supply & Sewage  Recreation Complex
 Industrial Plant
Treatment  Shopping Center  Environmental Control
 Dam & Hydropower
 Airport Terminal  Telecommunications
Plant

3
3. Global Project Experience

Kuwait
• Propane Tank Mexico
• Acid Gas Removal Thailand • SWT
• Merox Unit
Romania • Sriracha Tank Farm • CCR Reformer
• Reconstruc’n of MAA
• FCC Feed HDT • Marine TK Terminal • MTBE / TAME
• Rebuilding of GC15 &
• Sulfuric Acid Alkylation • No.1 Aromatics • SRP
BS 131
• H2S Removal • Cadereyta Refinery
• Facility Modernization
• Madero Refinery
• Aromatics Complex • Sulfuric Acid
• Air Separation Unit
• KOC GC-24 • ROC Tank Terminal
India • Cyclohexane
 • No. 2 Aromatics
• SMTP 
USA
  • PET
China
 Colombia
  • ABS
    • RFCC Revamp

Brazil/Bolivia

 • Gas Compression Station
Oman
Ghana 
• DHDS
• 3 Storage Depots (PPSD) Philippines 
• LPG Cylinder • Power Plant
UAE
• TOR-CDU Expansion
• Sulfur Handling II
• TOR-RFCC Indonesia
• Pipeline (Buipe-Bolga) Brazil
• Polyester
YEMEN • MSG • RFCC Revamping Phase I & II
• LNG Liquefaction Plant • LBO

4
4. Current Global BOT Projects
Laos
 Xepian-Xenamnoy
Hydroelectric Power PJT

 Business Type : BOT

Turkey  TIC : 830 million USD

 Eurasia Tunnel PJT  PJT period : 32 years


 Business Type : BOT  Scope of Works :
 TIC : 1.0 billion USD 2 Dams, 1 Intake structure,
 PJT period : 30.5 years Power Tunnel 15.3 Km

 Scope of Works :
Shield TBM 3.3 Km 

BOT : Build - Operate – Transfer

5
5. Water Projects

5-1. Sewage Treatment

Major Projects (Completed) Assume : USD 1 = KRW 1,129


Project Name Contract Project Description

Yong-Yeon Sewage Treatment Facilities Construction 47.6 Mil. USD Treatment Capacity : 250,000 ton/day

Sancheong-Eup Sewage Treatment Facilities


11.0 Mil. USD Treatment Capacity : 2,800 ton/day
Construction
Paju-Unjung Sewage Treatment Plant Construction
46.3 Mil. USD Treatment Capacity : 60,000 ton/day
Project
Seohocheon Public Sewage Treatment Plant Treatment Capacity : 47,000 ton/day
Construction 80.4 Mil. USD
Underground Sewage Treatment Plant
Yongam Wastewater Treatment Plant Construction Treatment Capacity : 85,000 ton/day
83.1 Mil. USD
Project Pipeline : 45 km
Ansan New City 2nd Phase Construction Project Drainage Pipeline : 48.3 km
134.7 Mil. USD
(Section 1) Sewage Pipeline : 33.3 km
Drainage Pipeline : 15.9 km
Daegu-Yulha Land Development Phase 2 Project 41.2 Mil. USD
Sewage Pipeline : 8.4 km

Total 444.3 Mil. USD


6
5. Water Projects

5-1. Sewage Treatment

Major Projects (Ongoing)


Assume : USD 1 = KRW 1,129

Project Name Contract Project Description

Installation & Refurbishment of Sewage


60.3 Mil. USD Sewage Pipeline : 118 km, O&M Stage
Transmission System Phase 2, Gimhae-si (BTL)
Installation & Refurbishment of Sewage
88.5 Mil. USD Sewage Pipeline : 129 km, O&M Stage
Transmission System Phase 1, Ulsan-si (BTL)
Installation & Refurbishment of Sewage
102.5 Mil. USD Sewage Pipeline : 97 km, Under Construction
Transmission System Phase 1, Pohang-si (BTL)
Installation & Refurbishment of Sewage
99.6 Mil. USD Sewage Pipeline : 149 km, Under Construction
Transmission System, Gwangju-si (BTL)
Installation & Refurbishment of Sewage
74.5 Mil. USD Sewage Pipeline : 111 km, Under Construction
Transmission System, Daejun-si (BTL)
Installation & Refurbishment of Sewage
83.0 Mil. USD Sewage Pipeline : 165 km, Under Construction
Transmission System Phase 2, Ulsan-si (BTL)
Installation & Refurbishment of Sewage
40.6 Mil. USD Sewage Pipeline : 76 km, Under Construction
Transmission System Phase 3, Gimhae-si (BTL)
Installation & Refurbishment of Sewage
58.4 Mil. USD Sewage Pipeline : 39 km, Under Construction
Transmission System Phase 2, Pohang-si (BTL)
7
5. Water Projects

5-1. Sewage Treatment

Major Projects (Ongoing)


Assume : USD 1 = KRW 1,129

Project Name Contract Project Description

Treatment Capability : 100,000 m3/day


Pump Station : 60,000 m3/day, 100,000 m3/day
Ulsan Nongso Wastewater Treatment Plant (BTO) 110.7 Mil. USD
Sewage Pipeline : 10.5 km
Financial Closing Stage
Treatment Capability : 13,500 m3/day
Wastewater Treatment Facility of Sukmun
29.2 Mil. USD Emergency Sea Outfall : 1.35 km
National Industrial Complex
TSE treatment Capability : 4,000 m3/day

Total 747.3 Mil. USD

8
5. Water Projects

5-1. Sewage Treatment

Seohocheon Public Sewage Treatment Plant Construction (80.4 Mil. USD)

9
5. Water Projects

5-1. Sewage Treatment

Installation & Refurbishment of Sewage Transmission System Phase 1, Pohang-si_BTL


(102.5 Mil. USD)

10
5. Water Projects

5-1. Sewage Treatment

Ulsan Nongso Wastewater Treatment Plant_BTO (110.7 Mil. USD)

11
5. Water Projects

5-2. Water Supply

Major Projects (Completed) Assume : USD 1 = KRW 1,129


Project Name Contract Project Description

Juam Dam Water Supply Facilities Construction Pumping Station : 360,000 ton/day
Phase 2 17.2 Mil. USD
Pipeline : 20 km

Upgrade Construction of Myung-jang Water 32.1 Mil. USD Plant Capacity (New) : 170,000 ton/day
Filtration Facilities

Water Supply System Rearrangement Section 3 Pumping Station : 152,000 ton/day


Project in Metropolitan Area 25.2 Mil. USD
Pipeline : 29.3 km

Water Conveyance Work Section 1, 1st Stage Han-


river Downstream Water Supply System Construction 55.2 Mil. USD Pipeline : 10.4 km
Project

Ulsan Industrial Water Supply Improvement Project 17.2 Mil. USD Pipeline : Total 13.8 km

Total 146.9 Mil. USD

12
5. Water Projects

5-2. Water Supply

Water Conveyance Work Section 1, 1st Stage Han-river Downstream Water Supply System
Construction Project (55.2 Mil. USD)

13
5. Water Projects

5-2. Water Supply

Upgrade Construction of Myung-jang Water Filtration Facilities (32.1 Mil. USD)

14
5. Water Projects

5-3. Water Resources

Major Projects (Ongoing) Assume : USD 1 = KRW 1,129


Project Name Contract Project Description

Paju-Unjeong Water Circulation System 102.7 Mil. USD Client : Korea Land Housing Corporation

Gyeongin Waterway Section 6 212.6 Mil. USD Client : K-Water

Nakdong-river Revitalization Section 20 219.9 Mil. USD Total Length of Maintenance = 47.5 km

Saemangeum Seawall Dongjin Section 3 86.0 Mil. USD Total Length of Waterproof Facility = 10 km

Youngsan-gang Estuary Dyke Structure


112.3 Mil. USD Total Length of Extension of Waterway = 6 km
Improvement Section 3

Plant Capacity : 100,000 ton/day


Gwangju Stream Improvement Project 56.6 Mil. USD Pumping Station : 100,000 ton/day
Pipeline : 18.4 km

Total 790.1 Mil. USD

15
5. Water Projects

5-3. Water Resources

Paju-Unjeong Water Circulation System (102.7 Mil. USD)

16
5. Water Projects

5-3. Water Resources

Nakdong-river Revitalization Section 20 (219.9 Mil. USD)

17
5. Water Projects

5-3. Water Resources

Saemangeum Seawall Dongjin Section 3 (86.0 Mil. USD)

18
5. Water Projects

5-3. Water Resources

Youngsan-gang Estuary Dyke Structure Improvement Section 3 (112.3 Mi. USD)

19
5. Water Projects

5-3. Water Resources

Gwangju Stream Improvement Project (56.6 Mil. USD)

20
Thank You

21

You might also like