PIPELINE
1 Datasheet for Valves 1 Lot
2 Datasheet for Isolation Flange 1 No
3 Datasheet for Barred Tee 1 No
4 Datasheet for Pipeline 1 No
5 Datasheet for Bends 1 No
5 Tie-in schedule 1 No
5 Pipe support drawing 1 No
6 Updation of Pipeline Route plan 1 No
7 Pipeline MTO 1 Lot
8 Pipeline Alignment sheet (Profile drawing) 3 Nos
9 Typical Tench/ Crossing details 1 No
10 Station Approach drawing 1 No
6 Isometrics 3 Nos
11 Stress Analysis 1 Lot
Exclusions
SITE SURVEY,,SURVEY REPORT SUBMISSION,INSPECTION OF EXISTING PIPE THICKNESS,FABRICATION,
1
COMMISSIONING ARE NOT CONSIDERED THE ABOVE ESTIMATE
0
REV.
SOFTWARE USAGE
LEMH SEMH EMH DMH
NAME HRS
3 6 16
2 2 8
2 4 8
2 4 8
2 4 8
2 4 8
2 4 8 16
2 4 8 24
2 4 16
8 16 24 96
2 4 8 24
2 4 8 24
2 4 8 16
Caesar 100