PROJECT: SHARAFCO STORAGE TERMINAL AT HAMRIYA FREE ZONE

SR. NO. DESCRIPTION QTY UNIT

PIPELINE
1 Datasheet for Valves 1 Lot
2 Datasheet for Isolation Flange 1 No
3 Datasheet for Barred Tee 1 No
4 Datasheet for Pipeline 1 No
5 Datasheet for Bends 1 No
5 Tie-in schedule 1 No
5 Pipe support drawing 1 No
6 Updation of Pipeline Route plan 1 No
7 Pipeline MTO 1 Lot
8 Pipeline Alignment sheet (Profile drawing) 3 Nos
9 Typical Tench/ Crossing details 1 No
10 Station Approach drawing 1 No
6 Isometrics 3 Nos
11 Stress Analysis 1 Lot

SUB TOTAL ESTIMATED


APPROVED MAN-HOURS FOR QUOTING
APPROVED MAN-HOURS FOR ENGINEERING
ACTUAL MAN-HOURS FOR ENGINEERING
VARIATION
Deviations from scope of work / specifications, with reasons thereof:
1
2
3

Exclusions
SITE SURVEY,,SURVEY REPORT SUBMISSION,INSPECTION OF EXISTING PIPE THICKNESS,FABRICATION,
1
COMMISSIONING ARE NOT CONSIDERED THE ABOVE ESTIMATE

0 Issued for proposal RG RAM


REV. Description Pr.by Ch.by

PETROCIL ENGINEERS AND CONSULTANT


PIPING
PROJECT:
Notes
1 Above man-hour estimation is based on reference documents & scope of work furnished along with E-mail
2 Following Input Documents & Drawings are required:
i) P&ID
ii) Piping Material specification
iii) Line List
iv) Native files of Route plan
v) Soil Data
vi) Topogrhaphic Survey drawing
Vii) Specification of coating

0
REV.

PETROCIL ENGINEERS AND CONSULTANT


MRIYA FREE ZONE JOB NO. 146201 CLIENT:

SOFTWARE USAGE
LEMH SEMH EMH DMH
NAME HRS

3 6 16
2 2 8
2 4 8
2 4 8
2 4 8
2 4 8
2 4 8 16
2 4 8 24
2 4 16
8 16 24 96
2 4 8 24
2 4 8 24
2 4 8 16
Caesar 100

100 33 64 136 200

HICKNESS,FABRICATION, CONSTRUCTION, ERECTION, INSPECTION, CERTIFICATION, TESTING, PRE-COMMISSIONING&

PS
App.by

AND CONSULTANTS PVT. LTD.

CLIENT:
rnished along with E-mail by client.

AND CONSULTANTS PVT. LTD.


PAGE 1 OF 1

SHARAFCO

REMARKS/ NOTES

533

TING, PRE-COMMISSIONING&

2.12.2015
Date

PAGE
SHARAFCO

You might also like