Professional Documents
Culture Documents
QC 1.8
1M
QO 9
x 1
x y 5
5x x y
y 4x 1
dy dx
4
dt dt 1
(ii) Let CE s m .
s 2 42 y 2
ds dy 1M
2s 0 2y
dt dt
ds dx
2s 2 y (4 )
dt dt
dx s ds
dt 4 y dt
ds
1
dt
When y 5,
s 2 4 2 52 1
s 9
2
s 3 or 3 (rejected)
dx 3 3
(1)
dt 4(5) 20
The rate of change of the length of
3 1
the shadow is m/s when y 5.
20
(b) Let be the angle of elevation of the lamp post from the man.
9 1.8
tan
y
7.2
tan
y
d 7.2 dy
sec2 2
dt y dt
d 7.2 cos 2 dy 1M+1A
dt y2 dt
When y 5,
dy dx 3 3
4 4( )
dt dt 20 5
DP2 (9 1.8) 2 52
DP (9 1.8) 2 52
5 1
cos
(9 1.8) 2 52
5
7.2( )
d (9 1.8) 2 5 2 3
2
( )
dt 5 5
7.2 52 3
5 2
(9 1.8) 5
2 2 5
108
1 921 1
0.056 2 (corr. to 3 sig. fig.)
The required rate of change of the angle
of elevation of the top of the lamp post
from the man is 0.056 2 r a d ./s .
(c) (i) Let C ' , D ' and Q ' be new positions of C, D and Q respectively after the
movement of the man.
Q'D' C ' ~ Q'PO