# Activity I.D Activity name Duration Start
Package M7-1 - Construction
Rail Bending shop
199 MS03800
Underground Mechanical/Electrical Rough-Ins (RBS)
Drainage piping
Trench drain 10d Apr.16.18
Mechanical rough-in above grade
Raw water line
Non-portable water line
Backfill for U/G Mechanical Electrical
201 MS03910 DMS must monitor the backfilling 10d Feb.12.18
210 MS04162 Hangers & Clips for Mechanical & Electrical 5d Jun.10.18
217 MS04400 Roofing - RBS 15d Jun.12.18
For ventilation line
220 MS04500
Roof Flood Test
DMS must monitor during flood test 3d Aug.02.18
222 MS04700
Green Roof
Piping works 20d Aug.20.18
Enbridge Gas Meter Replacement
242 MS05640 Application to be Submitted to Enbridge by DMS 1d Aug.28.17
244 MS05660 Gas Tree Reconfiguration at East Wall of OPS Building 3d Jul.18.18
Includes site inspection for bolt torqueng
245 MS05661 Install Pipe Supports for Gas Piping from OPS to RBS & Office 5d Jul.23.18
Includes painting works
246 MS05662 Install Gas Piping from OPS to RBS & Office 25d Jul.30.18
Apr.27.18 15d
12d
5d
Feb.26.18 10d
Jun.14.18 3d
Jul.03.18 15d
Aug.08.18 3d
Sep.17.18 20d
Feb.23.18 1d
Jul.20.18 8d
Jul.27.18 6d
Sep.04.18 37d
Sep.11.18 6d
May.22.18 1d
2d
2d
Jun.11.18 5d
1d
May.11.18 15d
May.16.18 2d
Aug.02.18 10d
3d
Aug.03.18 30d
4d
Aug.14.18 7d
Aug.28.18 8d
5d
5d
Oct.30.18 12d
Aug.24.18 12d
Sep.17.18 12d
Oct.16.18 6d
Oct.30.18 6d
3d
Nov.02.18 8d
Aug.03.18 10d
5d
Aug.14.18 10d
3d
Aug.28.18 12d
2d
Oct.30.18 5d
Apr.09.18 5d
5d
May.22.18 10d
Jun.14.18 12d
Jun.14.18 12d
Jun.26.18 7d
Jun.26.18 7d
5d
Jul.25.18 6d
Nov.13.18 12d
Nov.13.18 12d
10d