INTRODUCTION
The project road highway comprises the section of National Highway No.11A Extn. which starts at
Dausa at Km 0.000 (Km 164.300 on NH-11) and ends at Km 82.850 at Kauthun (Km 37.500 on NH-
12). The bridge at ch.10+648 having 2x12m (Exp to Exp) span configuration & 12.5 m wide
carriageway . The carriageway has 0.5m wide railing, 1.5m wide footpath, 0.5m wide crash barrier on
both sides .
This note pertain to design of Abutment A1 & A2 for MNB at Chainage 10.648
Reference Codes:
1. IRC 6: 2014
2. IRC 78: 2014
3. IRC 112: 2011
Design of Abutment for Minor Bridge at CH. 10.648
DESIGN DATA
SUPERSTRUCTURE DETAILS
Span (C/C of Expansion Joint) = 12 m
Distance b/w center of bearing to center of expansion = 0.2 m
Type of Superstructure = RCC Solid Slab
Overall Width of Deck 12.5
Carriageway Width 9.5
Thickness of Deck Slab = 0.9 m
Bearing Details
Type of Bearing = Tarpaper
MISCELLANEOUS DETAILS
Wearing Coat Thickness = 0.065 m
Width of Crash Barrier @ 1 t/m = 0.500 m
Width of RCC Railing @ 1 t/m = 0.500 m
Minimum Thickness of Pedestal & Bearing = 0.000 m
Design of Abutment for Minor Bridge at CH. 10.648
MATERIAL DETAILS
Structure Material
Grade of Concrete = M 35
Grade of Steel = Fe 500
3
Unit Weight of Concrete = 2.5 t/m
3
Unit Weight of Wearing Coat = 2.5 t/m
Backfill Material
Angle of Soil Friction (f) = 30 ᵒ
Angle of Wall friction (d) = 20 ᵒ
3
Unit Weight of Dry Soil, Υ dry = 2.0 t/m
3
Unit Weight of Submerged Soil, Υsub = 1.0 t/m
CAMBER DETAILS
Camber % = 2%
FRL provided at Center line / Median Edge = At Median Edge
Bi-Directional / Uni-Directional = Uni-Directional
Design of Abutment for Minor Bridge at CH. 10.648
NON-SEISMIC CONDITION
Where,
Degrees Radians
a = Angle of wall w.r.t. horizontal = 90.0 1.571
b = Slope of filling = 0.0 0.000
d = Angle of wall friction = 20.0 0.349
f = Angle of internal friction = 30.0 0.524
Therefore,
Ka = 0.297
Kah = 0.297 x cos(20) = 0.279
Kav = 0.297 x sin(20) = 0.102
sin2(a+f)
Ka ' =
sin2a sin(a-d)[ 1 + {sin(f+d)sin(f-b)/(sin(a-d)sin(a+b))}0.5]2
Where,
Degrees Radians
a = Angle of wall w.r.t. horizontal = 90.0 1.571
b = Slope of filling = 0.0 0.000
d = dsub = ddry = 20.0 0.349
Therefore,
Ka ' = 0.297
Kah' = 0.297 x cos(20) = 0.279
Kav' = 0.297 x sin(20) = 0.102
Design of Abutment for Minor Bridge at CH. 10.648
LL Surcharge
p = Kah x Υ x H FxLL
p = Kah x Υ x 1.2
Fx
Stem Bottom Level 309.700
5.406 0.67 (SBL)
LWL Condition (Dry) upto Founding level considering Earth pressure below scour level as zero
Backfill
Height of fill, H 7.006 m
3
Υdry 2.0 t/m
Kah 0.279
p max K ah x Υ x H 3.915 t/m2
Area Factor 0.5
Width, W 14.490 m
Horizontal Force, Fx 0.5 x p x H x W 198.705 t
Vertical Lever Arm, ey (Cl. 214.1 IRC: 6-2014) 0.42 x H 7.112 m
Transverse Moment about Toe, Mz exF -1413.10 t-m
LL Surcharge
HFL Condition
Backfill upto foundation
Hdry 2.345 m
Hsub 8.830 m
3
Υdry 2.0 t/m
3
Υsub 1.0 t/m
Kah 0.279
Kah' 0.279
2
p1 max K ah x Υ dry x H dry 1.310 t/m
2
p2 max K ah ' x Υ dry x H dry 1.310 t/m
2
p3 max K ah ' x Υ sub x H sub 2.467 t/m
Design of Abutment for Minor Bridge at CH. 10.648
Width, W 14.490 m
F1x 0.5 x p1 max x H dry x W 22.262 t
F2x 1.0 x p2 max x H sub x W 167.650 t
F3x 0.5 x p3 max x H sub x W 157.820 t
Fx F1x + F2x + F3x 347.731 t
e1y (Cl. 214.1 IRC: 6-2014) H sub + 0.42 x H dry 9.815 m
e2y 0.5 x H sub 4.415 m
e3y (Cl. 214.1 IRC: 6-2014) 0.42 x H sub 3.709 m
M1z e1y x F1x -218.4947 t-m
M2z e2y x F2x -740.1736 t-m
M3z e3y x F3x -585.2895 t-m
Mz M1z + M2z+ M3z -1543.958 t-m
(Note: Water pressure not considered from Earth Side as the same is counteracted with equal pressure
from River Side )
LL Surcharge
Hdry 2.345 m
Hsub 8.830 m
LL Surcharge Height 1.200 m
3
Υdry 2.0 t/m
Kah 0.279
Kah' 0.279
Design of Abutment for Minor Bridge at CH. 10.648
2
p1 max Kah x Υdry x 1.2 0.671 t/m
2
p2 max Kah' x Υdry x 1.2 0.671 t/m
Width, W 14.490 m
F1x LL p1 max x H dry x W 22.784 t
F2x LL p2 max x H sub x W 85.791 t
FxLL F1xLL + F2xLL 108.575 t
e1y H sub + 0.5 x H dry 10.003 m
e2y 0.5 x H sub4.415 m
M1z LL e1y x F1x -227.8935 t-m
M2z LL e2y x F2x -378.7669 t-m
MzLL M1zLL + M2zLL -606.6604 t-m
F1xLL
p1 Hdry
F1x
HFL 317.030
p2
HFL Condition
HFL Condition upto Founding level considering Earth pressure below scour level as zero
Hdry 2.345 m
Hsub 4.661 m
3
Υdry 2.0 t/m
3
Υsub 1.0 t/m
Kah 0.279
Kah' 0.279
2
p1 max K ah x Υ dry x H dry 1.310 t/m
2
p2 max K ah ' x Υ dry x H dry 1.310 t/m
2
p3 max K ah ' x Υ sub x H sub 1.302 t/m
Design of Abutment for Minor Bridge at CH. 10.648
Width, W 14.490 m
F1x 0.5 x p1 max x H dry x W 22.262 t
F2x 1.0 x p2 max x H sub x W 88.496 t
F3x 0.5 x p3 max x H sub x W 43.974 t
Fx F1x + F2x + F3x 154.731 t
e1y (Cl. 214.1 IRC: 6-2014) H sub + 0.42 x H dry 9.815 m
e2y 0.5 x H sub 6.500 m
e3y (Cl. 214.1 IRC: 6-2014) 0.42 x H sub 6.127 m
M1z e1y x F1x -218.4947 t-m
M2z e2y x F2x -575.1766 t-m
M3z e3y x F3x -269.413 t-m
Mz M1z + M2z+ M3z -1063.084 t-m
(Note: Water pressure not considered from Earth Side as the same is counteracted with equal pressure
from River Side )
LL Surcharge
Hdry 2.345 m
Hsub 4.661 m
LL Surcharge Height 1.200 m
3
Υdry 2.0 t/m
Kah 0.279
Kah' 0.279
2
p1 max Kah x Υdry x 1.2 0.671 t/m
2
p2 max Kah' x Υdry x 1.2 0.671 t/m
Width, W 14.490 m
F1x LL p1 max x H dry x W 22.784 t
F2x LL p2 max x H sub x W 45.286 t
FxLL F1xLL + F2xLL 68.069 t
e1y H sub + 0.5 x H dry 10.003 m
e2y 0.5 x H sub 6.4995 m
M1z LL e1y x F1x -227.8935 t-m
M2z LL e2y x F2x -294.3335 t-m
MzLL M1zLL + M2zLL -522.227 t-m
LL Surcharge
H 9.675 m
LL Surcharge Height 1.2 m
3
Υdry 2.0 t/m
Kah 0.279
p max Kah x Υ x 1.2 0.671 t/m2
Area Factor 1.0
Width, W 2.800 m
FzLL 1.0 x p x H x W 18.164 t
eyLL 0.50 x H 6.3375 m
Moment about base, MxLL exF -115.117 t-m
p = Kah x Υ x H FxLL
p = Kah x Υ x 1.2
Fx
Stem Bottom Level 309.700
5.406 0.67 (SBL)
HFL Condition
Backfill
Hdry 2.345 m
Hsub 7.330 m
3
Υdry 2.0 t/m
3
Υsub 1.0 t/m
Kah 0.279
Kah' 0.279
2
p1 max K ah x Υ dry x H dry 1.310 t/m
2
p2 max K ah ' x Υ dry x H dry 1.310 t/m
2
p3 max K ah ' x Υ sub x H sub 2.048 t/m
Width, W 2.800 m
F1z 0.5 x p1 max x H dry x W 4.302 t
F2z 1.0 x p2 max x H sub x W 26.893 t
F3z 0.5 x p3 max x H sub x W 21.015 t
Fz F1x + F2x + F3x 52.210 t
e1y (Cl. 214.1 IRC: 6-2014) H sub + 0.42 x H dry 9.815 m
e2y 0.5 x H sub 5.165 m
e3y (Cl. 214.1 IRC: 6-2014) 0.42 x H sub 4.579 m
M1x e1y x F1z -42.221 t-m
M2x e2y x F2z -138.901 t-m
M3x e3y x F3z -96.221 t-m
Mx M1x + M2x + M3x -277.343 t-m
(Note: Water pressure not considered from Earth Side as the same is counteracted with equal pressure
from River Side )
Design of Abutment for Minor Bridge at CH. 10.648
LL Surcharge
Hdry 2.345 m
Hsub (m) 7.330 m
LL Surcharge Height 1.2 m
3
Υdry 2.0 t/m
Kah 0.279
Kah' 0.279
2
p1 max Kah x Υdry x 1.2 0.671 t/m
2
p2 max Kah' x Υdry x 1.2 0.671 t/m
Width, W 2.800 m
F1z LL p1 max x H dry x W 4.403 t
F2z LL p2 max x H sub x W 13.762 t
FzLL F1zLL + F2zLL 18.164 t
e1y H sub + 0.5 x H dry 10.003 m
e2y 0.5 x H sub 5.165 m
M1x LL e1y x F1z -44.0374 t-m
M2x LL e2y x F2z -71.07953 t-m
MxLL M1xLL + M2xLL -115.1169 t-m
F1xLL
p1 Hdry
F1x
HFL 317.030
F2x p2
F2xLL
F3x p3 Hsub Stem Bottom Level 309.700
(SBL)
NON-SEISMIC CONDITION
Kp cos2(a+f)
=
cos a cos(d-a)[ 1 - {sin(f+d)sin(f+b)/(cos(d-a)sin(a-b))}0.5]2
2
Where,
Degrees Radians
a = Angle of wall w.r.t. Vertical = 0.0 0.000
b = Slope of filling = 0.0 0.000
d = Angle of wall friction = 8.0 0.140
f = Angle of internal friction = 12.0 0.209
c = 0.67 kg / cm2 = 6.7 T/M^2
Therefore,
Kp = 1.803
Kah = 1.803 x cos(8) = 1.785
Kav = 1.803 x sin(8) = 0.251
Triangle Rectangle
Passive Pressure = kp g z + 2 c (kp)^0.5 =
Dry = 11.877 + 17.993 = 29.870 T/m2
HFL = 4.360 + 17.993 = 22.353 T/m2
p = Kah x Υ x H FxLL
Fx
Scour Level Stem Bottom Level 309.700
(SBL)
4.17
Founding Level Founding Level 308.200
(FL)
Design of Abutment for Minor Bridge at CH. 10.648
Dry Condition
Active Earth pressure force upto founding level = 614.12 t including LL Surcharge
Active Earth pressure below Scour level = 347.35 t including LL Surcharge
Passive Earth pressure force = 722.83 t after FOS
Kp-Ka shall be considered and Active force below scour level shall not be considered
HFL Condition
Active Earth pressure force upto founding level = 456.31 t including LL Surcharge
Active Earth pressure below Scour level = 233.50 t including LL Surcharge
Passive Earth pressure force = 609.31 t after FOS
Kp-Ka shall be considered and Active force below scour level shall not be considered
Design of Abutment for Minor Bridge at CH. 10.648
SUMMARY & CALCULATION OF FORCES ABOUT TOE / BASE FOR CALCULATION OF STABILITY
DUE TO SELF WEIGHT OF ABUTMENT (DRY CONDITION)
SEISMIC C
NORMAL CONDITION
Longitudinal Seismic Transverse Seismic
Vertical Eccentricity
Vertical Eccentricity
Moment about Toe
about Toe/Base
about Toe/Base
Fx (ah = 0.100)
Fz (ah = 0.100)
Longitudinal
Longitudinal
Component
Area Factor
Weight (t)
about Toe
Density
Length
Height
Width
(Mz)
(Mz)
1a 1.0 7.800 0.600 14.49 2.5 169.53 3.900 661.2 0.000 0.30 0.0 0.000 0.30
1b 0.5 2.800 0.900 14.49 2.5 45.64 5.933 270.82 0.000 0.90 0.0 0.000 0.90
1c 1.0 1.200 0.900 14.49 2.5 39.12 4.400 172.14 0.000 1.05 0.0 0.000 1.05
1d 0.5 3.800 0.900 14.49 2.5 61.94 2.533 156.93 0.000 0.90 0.0 0.000 0.90
2a 1.0 1.005 3.298 14.49 2.5 120.09 4.497 540.1 12.009 3.15 -37.8 12.009 3.15
2a' 0.5 0.195 3.298 14.49 2.5 11.64 3.930 45.74 1.164 2.60 -3.0 1.164 2.60
2b 1.0 0.767 4.032 14.49 2.5 112.02 4.617 517.2 11.202 6.81 -76.3 11.202 6.81
2b' 0.5 0.238 4.032 14.49 2.5 17.40 4.154 72.25 1.740 6.14 -10.7 1.740 6.14
2c 1.0 0.720 0.795 14.49 2.5 20.74 4.640 96.21 2.074 9.23 -19 2.074 9.23
2c' 0.5 0.047 0.795 14.49 2.5 0.68 4.264 2.88 0.068 9.09 -0.6 0.068 9.09
3a 1.0 0.720 0.000 14.49 2.5 0.00 4.640 0.00 0.000 9.63 0.0 0.000 9.63
3b 0.5 0.000 0.000 14.49 2.5 0.00 4.280 0.00 0.000 9.63 0.0 0.000 9.63
3c 0.5 0.000 0.000 14.49 2.5 0.00 5.000 0.00 0.000 9.63 0.0 0.000 9.63
3d 1.0 0.720 0.300 14.49 2.5 7.82 4.640 36.31 0.782 9.78 -7.6 0.782 9.78
4a 1.0 0.300 1.250 14.49 2.5 13.58 4.850 65.88 1.358 10.55 -14.3 1.358 10.55
4bs 1.0 0.300 0.300 13.49 2.5 3.04 5.150 15.63 0.304 10.73 -3.3 0.304 10.73
4bt 0.5 0.3 0.300 13.49 2.5 1.52 5.100 7.74 0.152 10.48 -1.6 0.152 10.48
SUM 624.8 2660.9 30.9 -174 30.9
Vertical Eccentricity
Moment about Toe
about Toe/Base
about Toe/Base
Fx (ah = 0.100)
Fz (ah = 0.100)
Longitudinal
Longitudinal
Component
Area Factor
Weight (t)
about Toe
Density
Length
Height
Width
(Mz)
(Mz)
1a 1.0 7.800 0.600 14.49 1.5 101.72 3.900 396.71 0.000 0.30 0.0 0.000 0.30
1b 0.5 2.800 0.900 14.49 1.5 27.39 5.933 162.49 0.000 0.90 0.0 0.000 0.90
1c 1.0 1.200 0.900 14.49 1.5 23.47 4.400 103.28 0.000 1.05 0.0 0.000 1.05
1d 0.5 3.800 0.900 14.49 1.5 37.17 2.533 94.16 0.000 0.90 0.0 0.000 0.90
2a 1.0 1.005 3.298 14.49 1.5 72.05 4.497 324.05 7.205 3.15 -22.7 7.205 3.15
2a' 0.5 0.195 3.298 14.49 1.5 6.98 3.930 27.44 0.698 2.60 -1.8 0.698 2.60
Design of Abutment for Minor Bridge at CH. 10.648
2b 1.0 0.767 4.032 14.49 1.5 67.21 4.617 310.3 6.721 6.81 -45.8 6.721 6.81
2b' 0.5 0.238 4.032 14.49 1.5 10.44 4.154 43.35 1.044 6.14 -6.4 1.044 6.14
2c 1.0 0.720 0.795 14.49 2.5 20.74 4.640 96.21 2.074 9.23 -19 2.074 9.23
2c' 0.5 0.047 0.795 14.49 2.5 0.68 4.264 2.88 0.068 9.09 -0.6 0.068 9.09
3a 1.0 0.720 0.000 14.49 2.5 0.00 4.640 0.00 0.000 9.63 0.0 0.000 9.63
3b 0.5 0.000 0.000 14.49 2.5 0.00 4.280 0.00 0.000 9.63 0.0 0.000 9.63
3c 0.5 0.000 0.000 14.49 2.5 0.00 5.000 0.00 0.000 9.63 0.0 0.000 9.63
3d 1.0 0.720 0.300 14.49 2.5 7.82 4.640 36.31 0.782 9.78 -7.6 0.782 9.78
4a 1.0 0.300 1.250 14.49 2.5 13.58 4.850 65.88 1.358 10.55 -14.3 1.358 10.55
4bs 1.0 0.300 0.300 13.49 2.5 3.04 5.150 15.63 0.304 10.73 -3.3 0.304 10.73
4bt 0.5 0.300 0.300 13.49 2.5 1.52 5.100 7.74 0.152 10.48 -1.6 0.152 10.48
SUM 393.8 1686.4 20.4 -123 20.4
Fz (ah = 0.100)
Component
Area Factor
Weight (t)
Toe/Base
Toe/Base
Toe (Mz)
Toe (Mz)
Density
Length
Height
Width
E1 0.5 2.800 0.900 13.655 2.0 34.411 6.87 236.29 3.441 1.20 -4.1 3.441 1.20
E2 1.0 2.800 3.298 13.726 2.0 253.51 6.40 1622.5 25.35 3.15 -80 25.35 3.15
E3 1.0 2.800 4.032 13.850 2.0 312.7 6.40 2001.5 31.27 6.81 -213 31.27 6.81
E4 1.0 2.800 0.795 13.932 2.0 62.03 6.40 396.96 6.203 9.23 -57 6.203 9.23
E5 0.5 2.800 0.000 13.945 2.0 0.000 6.40 0 0 9.63 0.0 0 9.63
E6 1.0 2.800 1.435 13.968 2.0 112.24 6.40 718.37 11.22 10.34 -116 11.22 10.34
E7 1.0 3.8 2.7 14.5 2.0 293.92 1.90 558.45
E7' 0.5 3.8 0.9 14.5 2.0 49.56 1.27 62.771
SUM 1118.4 5596.8 0.0 0 77.5
Fz (ah = 0.100)
Component
Area Factor
Weight (t)
Toe/Base
Toe/Base
Toe (Mz)
Toe (Mz)
Density
Length
Height
Width
E1 0.5 2.800 0.900 13.655 1.0 17.206 6.87 118.15 1.721 1.20 -2.06 1.721 1.20
Design of Abutment for Minor Bridge at CH. 10.648
E2 1.0 2.800 3.298 13.726 1.0 126.75 6.40 811.23 12.68 3.15 -39.9 12.68 3.15
E3 1.0 2.800 4.032 13.850 1.0 156.36 6.40 1000.7 15.64 6.81 -107 15.64 6.81
E4 1.0 2.800 0.795 13.932 2.0 62.03 6.40 396.96 6.203 9.23 -57.2 6.203 9.23
E5 0.5 2.800 0.000 13.945 2.0 0.000 6.40 0 0 9.63 0 0 9.63
E6 1.0 2.800 1.435 13.968 2.0 112.24 6.40 718.37 11.22 10.34 -116 11.22 10.34
E7 1.0 3.800 2.669 14.490 1.0 146.96 1.90 279.22 <== Considering soil over Toe below
E7' 0.5 3.800 0.900 14.490 1.0 24.78 1.27 31.385 scour level
SUM 646.3 3356.0 0.0 0 47.5
NORMAL CONDITION
Longitudinal Seismic
Vertical Eccentricity
Moment about Toe
about Toe/Base
Fx (ah = 0.100)
Hor. Ecc. from
center to edge
Longitudinal
Longitudinal
Component
Area Factor
Weight (t)
about Toe
Density
Length
Height
Width
(Mz)
Mz
Left Side
R1 0.50 2.80 0.90 0.83 2.50 2.63 6.87 18.06 6.83 -18.0 0.26 1.05 -0.28
R2 1.00 2.80 3.30 0.76 2.50 17.63 6.40 112.84 6.86 -121.0 1.76 3.11 -5.48
R3 1.00 2.80 4.03 0.64 2.50 18.05 6.40 115.54 6.92 -125.0 1.81 6.74 -12.17
R4 0.50 2.80 2.35 0.54 2.50 4.40 6.40 28.14 6.98 -30.7 0.44 9.98 -4.39
R5 1.00 0.00 0.00 0.50 2.50 0.00 7.80 0.00 6.995 0.0 0.00 11.18 0.00
R6 0.50 0.00 0.00 0.50 2.50 0.00 7.80 0.00 6.995 0.0 0.00 11.18 0.00
Right Side
R1 0.00 0.00 0.00 0.00 2.50 0.00 6.87 0.00 6.83 0.0 0.00 1.05 0.00
R2 0.00 0.00 0.00 0.00 2.50 0.00 6.40 0.00 6.86 0.0 0.00 3.11 0.00
R3 0.00 0.00 0.00 0.00 2.50 0.00 6.40 0.00 6.92 0.0 0.00 6.74 0.00
R4 0.00 0.00 0.00 0.00 2.50 0.00 6.40 0.00 6.98 0.0 0.00 9.98 0.00
R5 0.00 0.00 0.00 0.00 2.50 0.00 7.80 0.00 7.00 0.0 0.00 11.18 0.00
R6 0.00 0.00 0.00 0.00 2.50 0.00 7.80 0.00 7.00 0.0 0.00 11.18 0.00
SUM 42.71 274.6 -294.6 4.27 -22.32
NORMAL CONDITION
Longitudinal Seismic
Vertical Eccentricity
Moment about Toe
about Toe/Base
Fx (ah = 0.100)
Hor. Ecc. from
center to edge
Longitudinal
Longitudinal
Component
Area Factor
Weight (t)
about Toe
Density
Length
Height
Width
(Mz)
Mz
Left Side
Design of Abutment for Minor Bridge at CH. 10.648
R1 0.50 2.80 0.90 0.83 1.50 1.58 6.87 10.83 6.83 10.8 0.16 1.05 -0.17
R2 1.00 2.80 3.30 0.76 1.50 10.58 6.40 67.70 6.86 72.6 1.06 3.11 -3.29
R3 1.00 2.80 4.03 0.64 1.50 10.83 6.40 69.33 6.92 75.0 1.08 6.74 -7.30
R4 0.50 2.80 2.35 0.54 2.50 4.40 6.40 28.14 6.98 30.7 0.44 9.98 -4.39
R5 1.00 0.00 0.00 0.50 2.50 0.00 7.80 0.00 7.00 0.0 0.00 11.18 0.00
R6 0.50 0.00 0.00 0.50 2.50 0.00 7.80 0.00 7.00 0.0 0.00 11.18 0.00
Right Side
R1 0.00 0.00 0.00 0.00 1.50 0.00 6.87 0.00 6.83 0.0 0.00 1.05 0.00
R2 0.00 0.00 0.00 0.00 1.50 0.00 6.40 0.00 6.86 0.0 0.00 3.11 0.00
R3 0.00 0.00 0.00 0.00 1.50 0.00 6.40 0.00 6.92 0.0 0.00 6.74 0.00
R4 0.00 0.00 0.00 0.00 2.50 0.00 6.40 0.00 6.98 0.0 0.00 9.98 0.00
R5 0.00 0.00 0.00 0.00 2.50 0.00 7.80 0.00 7.00 0.0 0.00 11.18 0.00
R6 0.00 0.00 0.00 0.00 2.50 0.00 7.80 0.00 7.00 0.0 0.00 11.18 0.00
SUM 27.39 176.0 189.05 2.74 -15.14
Vertical Eccentricity
Moment about Toe
about Toe/Base
Hor. Ecc. from
center to edge
Longitudinal
Longitudinal
Component
Area Factor
ah = 0.100
Weight (t)
about Toe
Density
Length
Height
Width
Mz
1 1.0 2.800 1.200 14.490 2.0 97.37 6.40 623.19 0 0.00 9.7 11.8 114.7
SUM 97.4 623 0 9.7 115
Design of Abutment for Minor Bridge at CH. 10.648
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
Overturni Restoring Overturni Restoring
LC1: Normal, Dry, No Span, EP (t) (t) (t)
g (t-m) (t-m) ng (t-m) (t-m)
400.16 1881.32 109.84 0 0 -4469.19 10354.01
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
LC2: Normal, Dry, With Span, Min Overturni Restoring Overturni Restoring
(t) (t) (t)
LL, EP g (t-m) (t-m) ng (t-m) (t-m)
548.08 2068.42 109.84 -0.88 0 -5938.52 11223.38
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
LC3: Normal, Dry, With Span, Overturni Restoring Overturni Restoring
(t) (t) (t)
Max LL, EP g (t-m) (t-m) ng (t-m) (t-m)
548.08 2149.02 109.84 -164.98 0 -5937.29 11596.11
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
Overturni Restoring Overturni Restoring
LC10: Normal, HFL, No Span, EP (t) (t) (t)
g (t-m) (t-m) ng (t-m) (t-m)
334.20 1183.69 78.31 0 0 -3225.93 6780.25
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
LC11: Normal, HFL, With Span, Overturni Restoring Overturni Restoring
(t) (t) (t)
Min LL, EP g (t-m) (t-m) ng (t-m) (t-m)
482.12 1370.79 78.31 -0.88 0 -4695.26 7649.62
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
LC12: Normal, HFL, With Span, Overturni Restoring Overturni Restoring
(t) (t) (t)
Max LL, EP g (t-m) (t-m) ng (t-m) (t-m)
482.12 1451.38 78.31 -164.98 0 -4694.02 8022.35
Design of Abutment for Minor Bridge at CH. 10.648
LC10 Normal, HFL, No Span, EP 334.20 1183.69 78.31 0.00 0.00 -3225.93 6780.25
LC11 Normal, HFL, With Span, Min LL, EP 482.12 1370.79 78.31 -0.88 0.00 -4695.26 7649.62
LC12 Normal, HFL, With Span, Max LL, EP 482.12 1451.38 78.31 -164.98 0.00 -4694.02 8022.35
Verification of Stability
f= 12 degree m= 0.500
Sliding Check (along longitudinal direction, x-direction) Overturning Check (about transverse direction, about z-axis)
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
Overturni Restoring Overturni Restoring
LC1: Normal, Dry, No Span, EP (t) (t) (t)
g (t-m) (t-m) ng (t-m) (t-m)
266.77 1636.86 73.23 0 0 -2979.46 10277.74
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
LC2: Normal, Dry, With Span, Min Overturni Restoring Overturni Restoring
(t) (t) (t)
LL, EP g (t-m) (t-m) ng (t-m) (t-m)
365.39 1833.81 73.23 -0.88 0 -3959.49 11192.86
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
LC3: Normal, Dry, With Span, Overturni Restoring Overturni Restoring
(t) (t) (t)
Max LL, EP g (t-m) (t-m) ng (t-m) (t-m)
365.39 1918.65 73.23 -164.98 0 -3958.19 11585.21
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
Overturni Restoring Overturni Restoring
LC10: Normal, HFL, No Span, EP (t) (t) (t)
g (t-m) (t-m) ng (t-m) (t-m)
222.80 1074.25 52.21 0 0 -2150.62 6826.49
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
LC11: Normal, HFL, With Span, Overturni Restoring Overturni Restoring
(t) (t) (t)
Min LL, EP g (t-m) (t-m) ng (t-m) (t-m)
321.41 1271.20 52.21 -0.88 0 -3130.65 7741.62
Summary
Mx = MLL Mx = MLL Mz = MTT Mz = MTT
Fx = HL Fy = V Fz=HT
LC12: Normal, HFL, With Span, Overturni Restoring Overturni Restoring
(t) (t) (t)
Max LL, EP g (t-m) (t-m) ng (t-m) (t-m)
321.41 1356.03 52.21 -164.98 0 -3129.35 8133.97
Design of Abutment for Minor Bridge at CH. 10.648
LC10 Normal, HFL, No Span, EP 222.80 1074.25 52.21 0.00 0.00 -2150.62 6826.49
LC11 Normal, HFL, With Span, Min LL, EP 321.41 1271.20 52.21 -0.88 0.00 -3130.65 7741.62
LC12 Normal, HFL, With Span, Max LL, EP 321.41 1356.03 52.21 -164.98 0.00 -3129.35 8133.97
Verification of Stability
f= 12 degree m= 0.500
Sliding Check (along longitudinal direction, x-direction) Overturning Check (about transverse direction, about z-axis)
INTERACTION DIAGRAM
Traffic direction
1200.00
706.00 Section dimensions of pier shaft
As1 Length, B = 14490 mm ( equivalent length of pier shaft)
Thickness,D = 1200 mm
Material properties
fck = 35 Mpa
fyk = 500 Mpa
14490 As3 As4 14316 Es = 200000 Mpa
Mc = Cc * ( 0.5D -x )
Ms = Csi * yi
Design of Abutment for Minor Bridge at CH. 10.648
Mu (ton- 30000
m) Pu (ton)
3400.00 -1201.26 25000
4635.98 1473.10
20000
5405.80 3670.08
5956.27 5867.05 15000
6287.40 8064.02
6143.39 10763.54 10000
Pu(t)
5342.24 14323.16
4495.14 17542.11 5000
3544.30 20533.96
2472.48 23332.53 0
-1000 0 1000 2000 3000 4000 5000 6000 7000
1274.61 25967.82
-5000
-93.97 28482.69
Mu(t-m)
Interaction diagram
Design of Abutment for Minor Bridge at CH. 10.648
30000
Pu(t)
43217.24 8786.01 15000
47215.61 10982.98
48565.37 13179.96 10000
47144.61 15393.97
43089.97 17605.93 5000
36410.56 19814.56
27099.51 22020.82 0
0 10000 20000 30000 40000 50000 60000
15159.06 24224.39
Mu(t-m)
581.88 26426.30
Interaction diagram