Project Eagle

QUALITY MANAGEMENT Date: 22/11/2017


INSPECTION REPORT Revision: 00
FORM PEQC 001-17 IR Pages: 1 of 1

Project No.: Date: Report No.:


Package/Contract: PF Bag Filter 06/03/2018 00PE2018

Location: Sappi Ngodwana

Vendor: Howden

Applicable Codes &


AWS D1.1
Standards:
Equipment Description: Steel Structure

Equipment No.: Bag Filter Chute Internals - Attachment welds


Visual
☒ Dimensional Inspection ☐ Fit-up Inspection ☐
Inspection
Inspection Activity: Material ID ☐ Surveillance Inspection ☐ Performance Test ☐

Other ☐ Specify other

Findings/Recommendations: Welding on attachment welds are visually unacceptable


Defects are as follows:

1) Slag not cleaned

2) Welds not completely welded all around

3) Arc strikes on main wall

4) Guide plates not level and/or straight

Recommend chip, clean and fettle welding. Complete fillet all around and di-penetrant test 10 % of all attachments.

Straighten misaligned sections.

Vendor Rep: Client Rep: R. Pretorius

Signature: Signature:
Date: Date: 06/03/2018
Note: This report does not relieve vendor of contractual obligation to supply equipment compliant to relevant codes, standards or
regulations.

1 Project Eagle Phase II


Sappi Ngowana
Quality Control Department
N4 Highway, Ngodwana, 1209
Project Eagle

Figure 1 Welding on steelwork inside PF Bag Filter

2 Project Eagle Phase II


Sappi Ngowana
Quality Control Department
N4 Highway, Ngodwana, 1209