1a) Calculate the Area & Xbar for the Stem & Soil (if Battered):
Section Area (SF) Xi (ft) Xi*A Xbar (ft)
Stem Rect. = 1 10.625 2.125 22.58
Stem triangle = 2 0.00 2.75 0.00 2.125
Page 1 Wingwall
h for EV & LSv calc = 8.500 ft sLS = 0.073 ksf
c) Determine the Required As: Use the wall thickness at the base.
j= 0.9 (assumed) f= 0.9
cover = 2.75 in.
Page 2 Wingwall
ds = 11.9375 in. As-req'd = Mr/(ffyjd) = 0.25 in2
jd = 10.744 in. Use # 5 Bars @ 12 As-prov'd = 0.31 in2
Page 3 Wingwall
EV = 4.11 -1.6666667 1.35 5.55 -9.24
LS = 1.2 -1.6666667 1.75 2.11 -3.52 Mu- = -15.89 k-ft
Page 4 Wingwall
εs = 0.002121 εs -max = 0.006 Use εs = 0.0021
sx = 32.196 in.
sxe = sx(1.38/(ag + 0.63)) (Eqn. 5.8.3.4.2-5) sxe = 27.258
b= 2.000
7) Check Sliding:
Use the min. LF for DC, DW & EV and don't include the vertical component of LS, CT or FW.
a) Case w/No Buoyancy, LL or BR:
RR = fRn = ftRt + fepRep (Eqn. 10.6.4.3-1) Per Geotech Report
Rt = Vtanδ ft = 0.8
From Section 2 Above: tanδ = 0.7
Pu = 8.01 kips
Hu = 4.34 kips
Rt = 5.60 kips
RR = 4.48 kips RR is > Hu D/C = 0.97
Sliding Check OK
Page 5 Wingwall
Johnson, Mirmiran & Thompson PROJECT #: 13-1027-001
9201 Arboretum Parkway, Suite 310 PROJECT: Lakeside Ave
Richmond, Virginia 23236 CALCULATED BY: SRC
(804) 323-9900 DATE: 5/15/2017
SHEET No. of
Cantilever Wall/Abutment Footing
Structure: Abutment A - Max Total Height Location: Max height of Abutment & Backwall.
Super Type: Steel Check: Construction Case
Page 6 Abut-A_Constr_Tall
Vertical Loads: Arm & Moments about the Toe
Buoyancy Mom. Arm @ Fact. Pu (k)
Force To Wall/Heel (klf): Vol (cf/ft) (klf) Toe (ft): Factors: Mu (k-ft)
Super DC = 0 0.5 0.03 -2.458 0.90 0.00 0.00
DCbkwll = 1.99 -6.875 0.90 1.79 -12.28
DCstem = 10.24 38.6 2.41 -4.333 0.90 9.21 -39.92
DCftg = 4.13 22.8 1.42 -4.583 0.90 3.71 -17.02
Const. Tol. = 0.00 0.00 -2.458 0.90 0.00 0.00
Rail = 0.00 45.8 0.13 -2.458 0.90 0.00 0.00
DWtopp = 0 77.0 0.22 -2.458 0.65 0.00 0.00
DWwear = 0 0.00 -2.458 0.65 0.00 0.00
LL = 0 0.00 -2.458 1.75 0.00 0.00
EV = 3.05 14.0 0.03 -8.4167 1.00 3.05 -25.63
LS = 0.87 33.4 2.09 -8.4167 0.00 0.00 0.00
WS = 0.00 0.00 0.000 0.00 0.00 0.00
Totals = 17.76 -94.85 Mres
Page 7 Abut-A_Constr_Tall
WS = 0.00
WL = 0.00
BR = 0.000 10.8 1.75 0.00 0.00
TU = 0.000 10.8 1.0 0.00 0.00
SH & CR = 0.000 10.8 1.0 0.00 0.00
Page 8 Abut-A_Constr_Tall
Wall Strip Properties - 1-Ft Wide: y (in) I (in4) S (in3)
At Base: t= 6.67 ft 40 512000 12800 Strip Width, b = 12 in.
At h/2: t= 1.58 ft 9.498 6854.6689 721.696032
Page 9 Abut-A_Constr_Tall
θ = 29 + 3500εs (Eqn. 5.8.3.4.2-3) b= 1.031
Page 10 Abut-A_Constr_Tall
c) Calculate Vc: (5.8.3.3)
Vc = .0316b√f'cbvdv (Eqn. 5.8.3.3-3) (5.5.4.2) f= 0.9
Vc = 51.88 kips 0.5fVc = 23.35 kips
D/C = 0.30
So; Vs Is Not Required
Page 11 Abut-A_Constr_Tall
a) Determine dv: (5.8.2.9)
dv = dist. between the resultant T & C forces but not less than max[0.9de, 0.71h].
i) Calculate compression block depth, a, at Bearing:
Analysis dv = 32.20 in.
de = (Asfyds)/(Asfy) (Eqn. 5.8.2.9-2) 0.9de = 29.25 in.
de = 32.5 in. 0.72h = 25.92 in.
dv = 32.20 in.
b) Calculate Β and θ: (5.8.3.4.2)
• If heel load is within 3dv of back of stem, b can be taken as 2.0 (5.8.3.4.1)
3dv = 96.588 in.
bheel = 18 in. Beta = 2.0
5) Check Sliding:
Use the min. LF for DC, DW & EV and don't include the vertical component of LS, CT or FW.
a) Case w/No Buoyancy, LL or BR:
RR = fRn = ftRt + fepRep (Eqn. 10.6.4.3-1) Per Geotech Report
Rt = Vtanδ ft = 0.8
From Section 2 Above: tanδ = 0.7
Pu = 17.76 kips
Hu = 9.74 kips
Rt = 12.43 kips
RR = 9.94 kips RR is > Hu D/C = 0.98
Sliding Check OK
Page 12 Abut-A_Constr_Tall