under overlay. So, the P&P will be concurred alter finalization of pavement design.
2. The drawings for profile of service roads &
drains, junction, road signs and markings shall be submitted as separate drawing and shall not be included in the P&P of main carriageway.
3. The width of paved carriageway is !Om
whereas the width of Minor/Major bridges/ROB is 16m and VUP is 13m.So tapers in paved portions shall be provided.
4. The approaches of ROB and other alliance
new CD structures will be based on approvals by Railways as well finalization of structure design and drawings.
5. The tapers at Major junctions shall be as
per IRC:SP:73-2015
6. The details of RoW and earthworks shall be
shown in the plan.
7. The bus bay locations based on joint site
visit shall be proposed.
8. There is mismatch in Type of structures with
reference to the CA proposals at km 166.468, km 169.605 and km 170.404. Any deviation as per site shall be bring to the notice of authority for approval. 9. It was noticed that there is filling of about 290mm on the existing retained bridges which needs to be justified.
10. The Existing road levels and the original
ground levels (centre) are missing between km 94 and km 96. Please indicate the same in profile.
Typical Cross Sections:
11. TCS schedules shall be submitted and any
deviation needs to be justified.
12. As per cl:2.5 {b) of CA the earthen shoulder
shall be with lSOmm thick compacted layer of granular material. Please modify the TCS accordingly
13. In general drain Slopes shall be 2: 1 and
incase the slopes steeper than 2: !suitable soil retention in slopes shall be proposed.
14. The design TCS showing service road along
with schedules near ROB location needs to be developed.
Horizontal & Vertical alignment:
15. As per cl.1.1 of the CA the project highway
shall follow the existing alignment whereas the new main highway has been proposed on RHS of existing road between km 94.00 to km 94.800. Please clarify with justification. 16. The tapers in main carriageway (at ROB & Bridges/YUP/PUP) as well as tapers at slip roads shall be as per IRC:SP:73-2017 between km 94 to km 95.140.
17. As per Clause 2.9.6(ii) of IRC:SP:73-2015,on
two lane roads normally intermediate sight distance (ISD) should be available. Sight distance f-or ISD are designed for a speed of80Kmph at km 94.176 & km 95.390, where as in curve table design speeds are given as 100Kmph. Please clarify the proposals with justification.
18. At km 170.800 & km 171,300 the sight
distance has been designed for ISD to a speed of 80kmph due to retained bridges. So, the speed limit boards in this section shall be for 80kmph and in curve table also design speed shall be mentioned as 80kmph.
19. At HIP Chainage km 95.231 the Super
elevation Provided is 5%, but as per Clause 2.9.3 super elevation shall be limited to 7 percent, if radius of curve is less than the desirable minimum. So super elevation needs to be revised.
20. For Cross road at km 165.745 the tapers
are not as per Fig. 3.6 of IRC:SP:73-2015. So please change accordingly
21. At km 94.!SO(ROB Location) the Entry and
Exit Arrangement should be as per Fig:2.1 A ofIRC:SP:73-2015. 22. As per cl.2.3 of CA the broken back curves between km 98.150 to km 98.500 and between km 171 to km 171.500 shall be replaced by single curve. Please revise the horizontal alignment.
23. As per CA there are no deviation in design
speeds where at the km 173.486 the curve has been designed for a speed of 6Skmph.Please redesign for the design speeds as per IRC:SP:73-2015.