Zapata 1 Zap
Corte Simple Punzonado
lc 0.20 m Ap 1.40
Vu 11,313.48 kgf Bo 4.00
φVc 56,565.24 kgf Vu 88,784.30
Chequeo 1.00 vc1 357,548.19
vc2 894,400.49
vc3 268,161.15
φVc 201,120.86
Chequeo 1.00
Viga Conectora
bv 0.40 m
Iz1 0.03
Iz2 0.02
Iz a utilizar 0.03
hv 1.30 m
Area de la barra pa
Columna 2
0.50 m D= 5.50 m
0.40 m
Pedestal 2
0.60 m
0.50 m
Max
85,074.87
134,098.63
1,2cp+cv+s 1,2cp+cv-s 0,9cp+s 0,9cp-s Max d1=
89,787.87 40,570.13 67,025.87 17,808.13 d2=
141,897.03 75,562.57 103,352.83 37,018.37 α
101,821.30 46,007.36 76,008.72 20,194.79 βc
129,863.60 70,125.34 94,369.98 34,631.71 h1
31,426.33 14,199.80 23,459.48 6,232.96 31,426.33 h2
29,447.53 15,901.44 21,399.09 7,853.00 29,447.53
Zapata 2
Corte simple
m² lc 0.40 m
m vu 24,735.92 kgf
kgf φVc 52,794.23 kgf
kgf Chequeo 1.00
kgf
kgf
kgf
Acero Zapata 2
0.80 m
19,788.74 Kgf m
14.54 m²
18.90 m²
18.90 m²
4.00
1.27 cm
1.27 cm²
15.00 Acero el la
13.00 direccion de X
18.90 m²
15.00 Acero el la
13.00 direccion de Z
ta 2
VERIFICA
ta 2
NOTA: Si el diametro de las barra es mayor a N-6, debe cambiar ϒ
CUMPLE
Zapata 2
tro de barras en la columna 1.91 Cm
Ldc 37.95
CONTROLA
LzDisp 38.06
VERIFICA
0.50 m
0.40 m
10.60
1.20
0.60 m
0.50 m