PLOT # 50 PHASE-1A
M3 INDUSTRIAL
Quantity CITY FAISALABAD
As per
Construc-
Item No. Description of Items Unit
tion
drawings
SECTION-5 FLOORINGS / WALL FINISHES
5.2 Ceramic Tile and Porcelain Tile Work
Provided and lay glazed ceramic tileson walls over plaster
and 600mm x 300mm best quality imported tiles or
approved equivalent, color will be selected from samples at
the time of construction, as per Specifications, and as per
AD-02 sample approved by the Engineer. M2 -
Provided and lay glazed ceramic tiles over floor and 800mm
x 800mm best quality imported tiles or approved equivalent,
color will be selected from samples at the time of
construction, as per Specifications, and as per sample
AD-03 approved by the Engineer. M2
TOTAL:Amount
ng Resources Recycling Co. Ltd,
OT # 50 PHASE-1A
TRIAL CITY FAISALABAD
Total Rate As per Claim
Accumulative Total Claim Claim for
Claim till Contract Amount
Quantity till IPC 09 till IPC 09 IPC 09
last IPC Agreement (Rs)
-
-
-
- - - 4,455,000
Claim Justification
7380.00 211,584.60
28.67
5.67 12100.00 68,607.00
1.89 12100.00 22,869.00
7.89 15800.00 124,662.00
- - - 427,723
Claim Justification
Because of good
quality ash wood
doors
Malik MIJ Chunxing Resources Recycling Co. Ltd,
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
Main Plant Builing
Excess Work Claims
for IPC 09
16-09-2017 to 31-10-2017
A B C=B-A D
Quantity
As per Accumulative Total
Item Total Claim
Description of Items Unit Construc-tion Quantity till Claim till
No. till IPC 09
drawings IPC 09 last IPC
SECTION-3 MASONRY
Toa walls 450mm Thick in loading way M3 - 39.45 39.45 39.45
3.1.1
AD-40
Additional work of labor for vibrating, cleaning, compaction and Lum Sump
etc.
TOTAL:Amount
d,
E=C-D F Z=F X E
Claim for
Rate As per Claim Claim Justification
IPC 09
Contract
Agreement
Amount
(Rs)
71.79
13,000
933,270.00
1008.00
538.00
542,304.00
1,000,000.00
4,797,664
Malik MIJ Chunxing Resources Recycling C
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
External Sewerage Syste
for IPC 08
30.6.2017 to 15.9.2017
Quantity
As per Accumulative
Item No. Description of Items Unit Construc- Quantity till IPC
tion 08
drawings
W1.4
PN16 conforming to DIN STANDARD of 8074 / 8075
and ps 3580 made by "Dadex" or approved equivalent
for water supply lines with specials and fittings
according to SDR-17 including cutting, jointing and
testing as per Manufacturer's Specifications, supported
on walls or run in chases or under floors including pipe - -
hangers, supports, making requisite number of holes
where
required and making good the holes and chases,
complete.
a) 200mm RM - 6.00
b) 75mm RM - 8.60
c) 125mm RM - 744.00
TOTAL:Amount
esources Recycling Co. Ltd,
50 PHASE-1A
AL CITY FAISALABAD
l Sewerage System
IPC 08
7 to 15.9.2017
Rate As per Claim
Total Claim Claim till Claim for
Contract
till IPC 08 IPC 07 IPC 08
Agreement Amount
(Rs)
- - - - -
- - 6.00 3,600.00 -
- - 8.60 2,800.00 -
- - 744.00 2,300.00 -
-
Claim Justification
Complete revised design provided by Chinese
Engineer and installed under their supervision and
approved by PM through CMD#10
Malik MIJ Chunxing Resources Recycling Co. L
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
Desulfurization Poo
for IPC 09
16-09-2017 to 31-10-2017
Quantity
As per
Accumulative
Construc-
Item No. Description of Items Unit Quantity till
tion
IPC 09
drawings
TOTAL:Amount
s Recycling Co. Ltd,
SE-1A
FAISALABAD
rization Pool
r IPC 09
to 31-10-2017
Claim
Total Rate As per
Total Claim Claim for
Claim till Contract Amount
till IPC 09 IPC 09 Claim Justification
last IPC Agreement (Rs)
- - - 16000.00 3,412,480.00
- - - 3,412,480
Malik MIJ Chunxing Resources Recycling Co. Ltd,
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
SUMMARY OF CLAIMS
for IPC 09
16-09-2017 to 31-10-2017
Excess work claim
Sr. till IPC 06
Description
No.
Amount (Rs)
3 Desulferization Pool
3,412,480
o Civil Works
4 Washing Area
o Civil Works 4,455,000
Total Claim Amount: 13,092,867