Professional Documents
Culture Documents
d) LONE WORKING.
7. AUTHORISATION
This permit authorizes the above to proceed with the work in the area and on the equipment as specified.
I accept responsibility for work on the apparatus, in the area specified in this Permit. I have read and agree to
comply with the specified precautions Starwood Minimum Standards Document for contractors. No attempt
will be made by myself, or anyone under my control, to work on any other apparatus, or in another area,
without prior authorisation.
TO BE SIGNED BY SUB-CONTRACTOR:
9. CESSATION OF WORK (to be signed by Sub-contractor)
This is to certify that the work specified in this Permit has been suspended/completed, and that all men under my
control have been withdrawn. The area/apparatus specified in this Permit has been left clear and in a safe
condition.
I hereby declare this Permit to Work cancelled and that all precautionary measures specified have been
withdrawn.
SIGNED: DATE: TIME AM/PM
TO BE RETAINED BY SUB-CONTRACTOR UNTIL COMPLETION OF THE WORK OR THE END OF THE DAY
WHICHEVER IS EARLIER.