You are on page 1of 24

Operating personnel (excluding drill crew)

Shift rotation pattern


Days onsite 1 days 14
Days offsite 1 days 14
Days onsite 2 days 14
Days offsite 2 days 14

Cost per man $/yr 169,059

Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Topsides 1 number of men 51 51 51 51 51 51 51 51 51

Topsides 1 cost $ 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000

Total operating personnel cost $ 448,344,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000

Platform inspection & maintenance


Multiphase meters hrs/meter 100
Labour rate $/hr 228
DSV day rate $/day 247,209
Rotating equip changeout interval years 5
Rotating equip (% of equip & matls) % 8.00

Topsides Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 9.00 1.00 1.00 1.00

Topsides 1
Dry weight te 13,332
Manhours for specialist maint. hrs 53,327 53,327 53,327 53,327 53,327 53,327 53,327 53,327 53,327
Labour cost $ 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344
Spares cost $ 3,297,820 3,297,820 3,297,820 3,297,820 3,297,820 29,680,380 3,297,820 3,297,820 3,297,820
Total $ 507,492,000 15,460,000 15,460,000 15,460,000 15,460,000 15,460,000 41,843,000 15,460,000 15,460,000 15,460,000

Jackets Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Spares % of material cost % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Jacket 1
DSV days days 17 17 17 17 17 17 17 17 17
DSV cost $ 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552
Spares cost $ 152,520 152,520 152,520 152,520 152,520 152,520 152,520 152,520 152,520
Total $ 113,230,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000

Total platform I&M cost $ 620,722,000 19,815,000 19,815,000 19,815,000 19,815,000 19,815,000 46,198,000 19,815,000 19,815,000 19,815,000

Pipelines inspection & maintenance


Survey vessel
Speed km/day 6.00
Day rate $/day 162,679

Intelligent pigging
Interval years 4
1st operation in year 4
Day rate $/day 36,683
Analysis $/km 1,675

Pipelines Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Oil pipeline (offshore 1)
Length km 30.00
Repair interval years 10
Year of first repair 10
Repair unit rate $/km 247,209
Survey cost $ 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794
Pigging cost $ 0 0 0 490,431 0 0 0 490,431 0
Repair cost $ 0 0 0 0 0 0 0 0 0
Total $ 60,074,000 1,627,000 1,627,000 1,627,000 2,117,000 1,627,000 1,627,000 1,627,000 2,117,000 1,627,000
Gas pipeline (offshore 2)
Length km 30.00
Repair interval years 10
Year of first repair 10
Repair unit rate $/km 247,209
Survey cost $ 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794
Pigging cost $ 0 0 0 490,431 0 0 0 490,431 0
Repair cost $ 0 0 0 0 0 0 0 0 0
Total $ 60,074,000 1,627,000 1,627,000 1,627,000 2,117,000 1,627,000 1,627,000 1,627,000 2,117,000 1,627,000

Total pipeline I&M cost $ 120,148,000 3,254,000 3,254,000 3,254,000 4,234,000 3,254,000 3,254,000 3,254,000 4,234,000 3,254,000

Inspection and maintenance


Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Platforms $ 620,722,000 19,815,000 19,815,000 19,815,000 19,815,000 19,815,000 46,198,000 19,815,000 19,815,000 19,815,000
Pipelines $ 120,148,000 3,254,000 3,254,000 3,254,000 4,234,000 3,254,000 3,254,000 3,254,000 4,234,000 3,254,000

Total inspection & maintenance cost $ 740,870,000 23,069,000 23,069,000 23,069,000 24,049,000 23,069,000 49,452,000 23,069,000 24,049,000 23,069,000

Logistics and consumables


Helicopter
Speed km/hr 200.00
Standing charge $/week 100,480
Seats 18
Distance to heliport km 120.00
Trip time hr 4.20
Cost $/hr 1,754
Usage weeks/yr 52
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Trips platforms 78 78 78 78 78 78 78 78 78
Trips offloading 0 0 0 0 0 0 0 0 0
Total helicopter cost $ 150,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000

Supply boat
Speed knot 8.00
Distance to supply base km 120.00
Trip time hr 24.20
Day rate $/day 14,354
Diesel fuel consumption te/day 25.00
Diesel rate $/te 701.75
Usage weeks/yr 52
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Trips per week 2 2 2 2 2 2 2 2 2
Total supply boat cost $ 86,970,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000

Rescue and recovery boat


Required Yes
Day rate $/day 15,152
Usage days/yr 365
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Days 365 365 365 365 365 365 365 365 365
Total rescue and recovery boat cost $ 143,780,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000

Fuel gas
Rate $/Mscf 1.44
Onstream days days 350
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Power requirements
Electrical load MW 12.58 10.18 11.71 14.32 16.47 16.40 15.81 14.45 12.94
Compressor lo MW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Water injection MW 8.09 6.55 7.53 9.21 10.59 10.59 10.59 10.59 10.59
Oil export load MW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Quantity Mscf/yr 1,568,372 1,269,294 1,458,881 1,785,135 2,052,977 2,047,640 2,002,950 1,899,704 1,785,002
Heating requirements
Heating mediu MW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Quantity Mscf/yr 0 0 0 0 0 0 0 0 0
Total
Quantity Mscf/yr 1,568,372 1,269,294 1,458,881 1,785,135 2,052,977 2,047,640 2,002,950 1,899,704 1,785,002
Total fuel gas cost $ 56,147,000 2,251,000 1,822,000 2,094,000 2,562,000 2,947,000 2,939,000 2,875,000 2,727,000 2,562,000

Diesel
Rate $/te 701.75
Onstream days days 350
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Topsides consumption te 44.42 35.95 41.32 50.56 58.14 57.89 55.81 51.01 45.67
Floaters consumption te 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Diesel profile te 44.42 35.95 41.32 50.56 58.14 57.89 55.81 51.01 45.67
Total diesel cost $ 622,000 31,000 25,000 29,000 35,000 41,000 41,000 39,000 36,000 32,000

Chemicals
Production dosage rate kg/bbl 0.0253
Water injection dosage rate kg/bbl 0.0254
Production wells dosage rate te/well 0.0000

Production unit cost $/te 1,563


Injection unit cost $/te 1,563
Well unit cost $/te 1,563
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Oil production flow Mbbl/day 87.55 60.06 77.48 107.47 132.09 131.29 124.54 108.94 91.62
Water injection flow Mbbl/day 107.00 73.40 94.70 131.35 161.44 161.44 161.44 161.44 161.44
Production well count 10 10 10 12 14 14 14 14 14
Oil production chemicals used te 776.36 532.58 687.11 953.04 1,171.36 1,164.21 1,104.36 966.09 812.49
Water injection chemicals used te 952.68 653.54 843.17 1,169.49 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39
Well treatment chemicals used te 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total chemicals cost $ 74,582,000 2,702,000 1,854,000 2,392,000 3,318,000 4,077,000 4,066,000 3,973,000 3,757,000 3,517,000

Total logistics & consumables cost $ 512,901,000 19,659,000 18,376,000 19,190,000 20,590,000 21,740,000 21,721,000 21,562,000 21,195,000 20,786,000

Well costs
Oil production onstream wells
Full platform rig Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Number of new wells 14 3 3 2 3 3 0 0 0 0
Number of onstream wells 3 6 8 11 14 14 14 14 14

Oil production non-routine maintenance


Materials cost per operation $ 258,373

Platform rig
Rig day rate $/day 103,668
Interval years 4
Rig duration per operation days/op 7
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Platform wells count 0 0 0 3 3 2 3 6 3
Platform wells cost $ 71,832,000 0 0 0 2,952,000 2,952,000 1,968,000 2,952,000 5,904,000 2,952,000

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 4
Rig duration per operation days/op 8
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0 0

Oil production routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 97,289
Manhours mhr/well/yr 250
Labour rate $/hr 228
Number of onstream wells 3 6 8 11 14 14 14 14 14
All well cost $ 51,840,000 463,000 926,000 1,234,000 1,697,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000

Gas production onstream wells


Full platform rig Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Number of new wells 0 0 0 0 0 0 0 0 0 0
Number of onstream wells 0 0 0 0 0 0 0 0 0

Gas production non-routine maintenance


Materials cost per operation $ 309,410

Platform rig
Rig day rate $/day 103,668
Interval years 4
Rig duration per operation days/op 8
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Platform wells count 0 0 0 0 0 0 0 0 0
Platform wells cost $ 0 0 0 0 0 0 0 0 0 0

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 4
Rig duration per operation days/op 9
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0 0

Gas production routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 105,263
Manhours mhr/well/yr 300
Labour rate $/hr 228
Number of onstream wells 0 0 0 0 0 0 0 0 0
All well cost $ 0 0 0 0 0 0 0 0 0 0

Water injection onstream wells


Full platform rig Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Number of new wells 5 1 1 1 1 1 0 0 0 0
Number of onstream wells 1 2 3 4 5 5 5 5 5

Water injection non-routine maintenance


Materials cost per operation $ 213,716

Platform rig
Rig day rate $/day 103,668
Interval years 8
Rig duration per operation days/op 6
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Platform wells count 0 0 0 0 0 0 0 1 1
Platform wells cost $ 9,196,000 0 0 0 0 0 0 0 836,000 836,000

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 8
Rig duration per operation days/op 7
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0 0

Water injection routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 79,745
Manhours mhr/well/yr 200
Labour rate $/hr 228
Number of onstream wells 1 2 3 4 5 5 5 5 5
All well cost $ 15,047,000 125,000 251,000 376,000 501,000 627,000 627,000 627,000 627,000 627,000

Gas injection onstream wells


Full platform rig Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Number of new wells 0 0 0 0 0 0 0 0 0 0
Number of onstream wells 0 0 0 0 0 0 0 0 0

Gas injection non-routine maintenance


Materials cost per operation $ 213,716

Platform rig
Rig day rate $/day 103,668
Interval years 8
Rig duration per operation days/op 6
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Platform wells count 0 0 0 0 0 0 0 0 0
Platform wells cost $ 0 0 0 0 0 0 0 0 0 0

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 8
Rig duration per operation days/op 7
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0 0

Gas injection routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 89,314
Manhours mhr/well/yr 250
Labour rate $/hr 228
Number of onstream wells 0 0 0 0 0 0 0 0 0
All well cost $ 0 0 0 0 0 0 0 0 0 0

Non-routine maintenance total $ 81,028,000 0 0 0 2,952,000 2,952,000 1,968,000 2,952,000 6,740,000 3,788,000
Routine maintenance total $ 66,887,000 588,000 1,177,000 1,610,000 2,198,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000

Total well cost $ 147,915,000 588,000 1,177,000 1,610,000 5,150,000 5,739,000 4,755,000 5,739,000 9,527,000 6,575,000

Insurance
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Drilling
Offshore drilling 1 $ 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000
Total CAPEX $ 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 40,976,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000

Topsides
Topsides 1 $ 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000
Total CAPEX $ 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 96,356,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000

Jackets
Jacket 1 $ 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000
Total CAPEX $ 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 21,554,000 829,000 829,000 829,000 829,000 829,000 829,000 829,000 829,000 829,000

Platform sub total $ 158,886,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000

Pipelines
Oil pipeline (offshore 1) $ 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000
Gas pipeline (offshore 2) $ 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000
Total CAPEX $ 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 17,394,000 669,000 669,000 669,000 669,000 669,000 669,000 669,000 669,000 669,000

Grand total insurance cost $ 176,280,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000

Field / project costs


Onshore admin (% of personnel costs) % 10.00
Operations support (% of direct costs) % 25.00
Supply base cost $ 1,291,866

Share factors
Logistics % 100.00
Supply base / warehousing % 100.00
Onshore control / comms. & support % 100.00

Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Onshore admin $ 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400
Supply base / warehousing $ 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866
Operations support $ 16,835,000 16,661,500 16,973,250 18,453,250 18,643,000 24,988,000 18,598,500 19,698,750 18,613,500
Special items $ 0 0 0 0 0 0 0 0 0

Total field / project cost $ 585,003,000 19,851,000 19,678,000 19,990,000 21,470,000 21,659,000 28,004,000 21,615,000 22,715,000 21,630,000

Tariffs paid
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Liquid production profile MMbbl/yr 30.64 21.02 27.12 37.62 46.23 45.95 43.59 38.13 32.07
Gas production profile Bscf/yr 15.47 10.62 13.70 19.00 23.35 23.20 22.01 19.26 16.19

Tariff rate
-- Oil / condensate -- $/bbl
Transportation Yes $ 0.9000 27,577,620 18,918,270 24,407,460 33,853,680 41,608,665 41,354,775 39,228,840 34,317,360 28,860,930
Processing No $ 1.5949 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 443,148,000 27,578,000 18,918,000 24,407,000 33,854,000 41,609,000 41,355,000 39,229,000 34,317,000 28,861,000

-- Gas -- $/Mscf
Transportation Yes $ 0.7500 11,605,582 7,961,439 10,271,473 14,246,757 17,510,313 17,403,468 16,508,804 14,441,889 12,145,641
Processing No $ 0.4785 0 0 0 0 0 0 0 0 0
Total gas $ 186,491,000 11,606,000 7,961,000 10,271,000 14,247,000 17,510,000 17,403,000 16,509,000 14,442,000 12,146,000

Total tariffs paid $ 629,639,000 39,184,000 26,879,000 34,678,000 48,101,000 59,119,000 58,758,000 55,738,000 48,759,000 41,007,000

Tariffs received
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Liquids received profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gas received profile Bscf/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tariff rate
-- Oil / condensate -- $/bbl
Transportation No $ 0.0000 0 0 0 0 0 0 0 0 0
Processing No $ 1.5949 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0 0 0 0

-- Gas -- $/Mscf
Transportation No $ 0.0000 0 0 0 0 0 0 0 0 0
Processing No $ 0.4785 0 0 0 0 0 0 0 0 0
Total gas $ 0 0 0 0 0 0 0 0 0 0

Total tariffs received $ 0 0 0 0 0 0 0 0 0 0


Tariffs
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

Tariffs paid $ 629,639,000 39,184,000 26,879,000 34,678,000 48,101,000 59,119,000 58,758,000 55,738,000 48,759,000 41,007,000
Tariffs received $ 0 0 0 0 0 0 0 0 0 0

Tariffs total $ 629,639,000 39,184,000 26,879,000 34,678,000 48,101,000 59,119,000 58,758,000 55,738,000 48,759,000 41,007,000

CO2 Emissions
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

Process fluids Mscf/yr 0 0 0 0 0 0 0 0 0


Fuel gas Mscf/yr 1,725,209 1,396,224 1,604,769 1,963,648 2,258,275 2,252,404 2,203,245 2,089,675 1,963,503
Diesel fuel Mscf/yr 2,722 2,203 2,532 3,098 3,563 3,548 3,420 3,126 2,799
Flare load Mscf/yr 2,026 1,390 1,793 2,488 3,057 3,039 2,883 2,522 2,121
Other CO2 emissions source 1 Mscf/yr 0 0 0 0 0 0 0 0 0
Other CO2 emissions source 2 Mscf/yr 0 0 0 0 0 0 0 0 0

Total volume CO2 released Mscf/yr 1,729,957 1,399,817 1,609,094 1,969,234 2,264,895 2,258,991 2,209,548 2,095,322 1,968,422
Total mass CO2 released te/yr 91,005 73,638 84,647 103,592 119,145 118,835 116,234 110,225 103,549

Include CO2 tax in OPEX No


CO2 tax $/te 15.95
Total CO2 tax $ 0 0 0 0 0 0 0 0 0 0

Leases
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
Lease cost 1 $ 0 0 0 0 0 0 0 0 0 0
Lease cost 2 $ 0 0 0 0 0 0 0 0 0 0
Lease cost 3 $ 0 0 0 0 0 0 0 0 0 0
Lease cost 4 $ 0 0 0 0 0 0 0 0 0 0
Lease cost 5 $ 0 0 0 0 0 0 0 0 0 0
Total lease cost $ 0 0 0 0 0 0 0 0 0 0

Offshore operating cost summary


Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

Grand total operating cost $ 3,240,952,000 126,375,000 113,203,000 122,561,000 143,384,000 155,350,000 186,714,000 151,747,000 150,269,000 137,091,000
Direct costs
Operating personnel $ 448,344,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000
Inspection and maintenance $ 740,870,000 23,069,000 23,069,000 23,069,000 24,049,000 23,069,000 49,452,000 23,069,000 24,049,000 23,069,000
Logistics and consumables $ 512,901,000 19,659,000 18,376,000 19,190,000 20,590,000 21,740,000 21,721,000 21,562,000 21,195,000 20,786,000
Wells $ 147,915,000 588,000 1,177,000 1,610,000 5,150,000 5,739,000 4,755,000 5,739,000 9,527,000 6,575,000
Insurance $ 176,280,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000
Direct costs total $ 2,026,310,000 67,340,000 66,646,000 67,893,000 73,813,000 74,572,000 99,952,000 74,394,000 78,795,000 74,454,000
Field / project costs $ 585,003,000 19,851,000 19,678,000 19,990,000 21,470,000 21,659,000 28,004,000 21,615,000 22,715,000 21,630,000
Tariff costs $ 629,639,000 39,184,000 26,879,000 34,678,000 48,101,000 59,119,000 58,758,000 55,738,000 48,759,000 41,007,000
CO2 emissions tax $ 0 0 0 0 0 0 0 0 0 0
Lease costs $ 0 0 0 0 0 0 0 0 0 0
Operating personnel (excluding drill crew)
Shift rotation pattern
Days onsite 1 days 14
Days offsite 1 days 14
Days onsite 2 days 14
Days offsite 2 days 14

Cost per man $/yr 169,059

Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Topsides 1 number of men 51 51 51 51 51 51 51 51 51

Topsides 1 cost $ 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000

Total operating personnel cost $ 448,344,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000

Platform inspection & maintenance


Multiphase meters hrs/meter 100
Labour rate $/hr 228
DSV day rate $/day 247,209
Rotating equip changeout interval years 5
Rotating equip (% of equip & matls) % 8.00

Topsides Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Spares % of equip & matl cost % 1.00 9.00 1.00 1.00 1.00 1.00 9.00 1.00 1.00

Topsides 1
Dry weight te 13,332
Manhours for specialist maint. hrs 53,327 53,327 53,327 53,327 53,327 53,327 53,327 53,327 53,327
Labour cost $ 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344
Spares cost $ 3,297,820 29,680,380 3,297,820 3,297,820 3,297,820 3,297,820 29,680,380 3,297,820 3,297,820
Total $ 507,492,000 15,460,000 41,843,000 15,460,000 15,460,000 15,460,000 15,460,000 41,843,000 15,460,000 15,460,000

Jackets Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Spares % of material cost % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Jacket 1
DSV days days 17 17 17 17 17 17 17 17 17
DSV cost $ 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552
Spares cost $ 152,520 152,520 152,520 152,520 152,520 152,520 152,520 152,520 152,520
Total $ 113,230,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000

Total platform I&M cost $ 620,722,000 19,815,000 46,198,000 19,815,000 19,815,000 19,815,000 19,815,000 46,198,000 19,815,000 19,815,000

Pipelines inspection & maintenance


Survey vessel
Speed km/day 6.00
Day rate $/day 162,679

Intelligent pigging
Interval years 4
1st operation in year 4
Day rate $/day 36,683
Analysis $/km 1,675

Pipelines Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Oil pipeline (offshore 1)
Length km 30.00
Repair interval years 10
Year of first repair 10
Repair unit rate $/km 247,209
Survey cost $ 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794
Pigging cost $ 0 0 490,431 0 0 0 490,431 0 0
Repair cost $ 7,416,268 0 0 0 0 0 0 0 0
Total $ 60,074,000 9,043,000 1,627,000 2,117,000 1,627,000 1,627,000 1,627,000 2,117,000 1,627,000 1,627,000
Gas pipeline (offshore 2)
Length km 30.00
Repair interval years 10
Year of first repair 10
Repair unit rate $/km 247,209
Survey cost $ 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794
Pigging cost $ 0 0 490,431 0 0 0 490,431 0 0
Repair cost $ 7,416,268 0 0 0 0 0 0 0 0
Total $ 60,074,000 9,043,000 1,627,000 2,117,000 1,627,000 1,627,000 1,627,000 2,117,000 1,627,000 1,627,000

Total pipeline I&M cost $ 120,148,000 18,086,000 3,254,000 4,234,000 3,254,000 3,254,000 3,254,000 4,234,000 3,254,000 3,254,000

Inspection and maintenance


Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Platforms $ 620,722,000 19,815,000 46,198,000 19,815,000 19,815,000 19,815,000 19,815,000 46,198,000 19,815,000 19,815,000
Pipelines $ 120,148,000 18,086,000 3,254,000 4,234,000 3,254,000 3,254,000 3,254,000 4,234,000 3,254,000 3,254,000

Total inspection & maintenance cost $ 740,870,000 37,901,000 49,452,000 24,049,000 23,069,000 23,069,000 23,069,000 50,432,000 23,069,000 23,069,000

Logistics and consumables


Helicopter
Speed km/hr 200.00
Standing charge $/week 100,480
Seats 18
Distance to heliport km 120.00
Trip time hr 4.20
Cost $/hr 1,754
Usage weeks/yr 52
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Trips platforms 78 78 78 78 78 78 78 78 78
Trips offloading 0 0 0 0 0 0 0 0 0
Total helicopter cost $ 150,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000

Supply boat
Speed knot 8.00
Distance to supply base km 120.00
Trip time hr 24.20
Day rate $/day 14,354
Diesel fuel consumption te/day 25.00
Diesel rate $/te 701.75
Usage weeks/yr 52
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Trips per week 2 2 2 2 2 2 2 2 2
Total supply boat cost $ 86,970,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000

Rescue and recovery boat


Required Yes
Day rate $/day 15,152
Usage days/yr 365
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Days 365 365 365 365 365 365 365 365 365
Total rescue and recovery boat cost $ 143,780,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000

Fuel gas
Rate $/Mscf 1.44
Onstream days days 350
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Power requirements
Electrical load MW 11.70 10.60 9.59 8.67 8.15 7.81 7.48 7.20 6.97
Compressor lo MW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Water injection MW 10.59 10.59 10.59 10.59 10.59 10.59 10.59 10.59 10.59
Oil export load MW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Quantity Mscf/yr 1,691,073 1,607,467 1,531,145 1,460,882 1,421,430 1,395,697 1,370,727 1,349,670 1,331,977
Heating requirements
Heating mediu MW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Quantity Mscf/yr 0 0 0 0 0 0 0 0 0
Total
Quantity Mscf/yr 1,691,073 1,607,467 1,531,145 1,460,882 1,421,430 1,395,697 1,370,727 1,349,670 1,331,977
Total fuel gas cost $ 56,147,000 2,427,000 2,307,000 2,198,000 2,097,000 2,040,000 2,003,000 1,968,000 1,937,000 1,912,000

Diesel
Rate $/te 701.75
Onstream days days 350
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Topsides consumption te 41.30 37.41 33.86 30.59 28.75 27.56 26.40 25.42 24.59
Floaters consumption te 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Diesel profile te 41.30 37.41 33.86 30.59 28.75 27.56 26.40 25.42 24.59
Total diesel cost $ 622,000 29,000 26,000 24,000 21,000 20,000 19,000 19,000 18,000 17,000

Chemicals
Production dosage rate kg/bbl 0.0253
Water injection dosage rate kg/bbl 0.0254
Production wells dosage rate te/well 0.0000

Production unit cost $/te 1,563


Injection unit cost $/te 1,563
Well unit cost $/te 1,563
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Oil production flow Mbbl/day 77.44 64.81 53.29 42.67 36.72 32.83 29.06 25.88 23.21
Water injection flow Mbbl/day 161.44 161.44 161.44 161.44 161.44 161.44 161.44 161.44 161.44
Production well count 14 14 14 14 14 14 14 14 14
Oil production chemicals used te 686.70 574.73 472.52 378.42 325.59 291.13 257.69 229.49 205.79
Water injection chemicals used te 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39
Well treatment chemicals used te 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total chemicals cost $ 74,582,000 3,320,000 3,145,000 2,985,000 2,838,000 2,756,000 2,702,000 2,649,000 2,605,000 2,568,000

Total logistics & consumables cost $ 512,901,000 20,451,000 20,153,000 19,882,000 19,631,000 19,491,000 19,399,000 19,311,000 19,235,000 19,172,000

Well costs
Oil production onstream wells
Full platform rig Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Number of new wells 14 0 0 0 0 0 0 0 0 0
Number of onstream wells 14 14 14 14 14 14 14 14 14

Oil production non-routine maintenance


Materials cost per operation $ 258,373

Platform rig
Rig day rate $/day 103,668
Interval years 4
Rig duration per operation days/op 7
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Platform wells count 2 3 6 3 2 3 6 3 2
Platform wells cost $ 71,832,000 1,968,000 2,952,000 5,904,000 2,952,000 1,968,000 2,952,000 5,904,000 2,952,000 1,968,000

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 4
Rig duration per operation days/op 8
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0 0

Oil production routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 97,289
Manhours mhr/well/yr 250
Labour rate $/hr 228
Number of onstream wells 14 14 14 14 14 14 14 14 14
All well cost $ 51,840,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000

Gas production onstream wells


Full platform rig Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Number of new wells 0 0 0 0 0 0 0 0 0 0
Number of onstream wells 0 0 0 0 0 0 0 0 0

Gas production non-routine maintenance


Materials cost per operation $ 309,410

Platform rig
Rig day rate $/day 103,668
Interval years 4
Rig duration per operation days/op 8
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Platform wells count 0 0 0 0 0 0 0 0 0
Platform wells cost $ 0 0 0 0 0 0 0 0 0 0

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 4
Rig duration per operation days/op 9
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0 0

Gas production routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 105,263
Manhours mhr/well/yr 300
Labour rate $/hr 228
Number of onstream wells 0 0 0 0 0 0 0 0 0
All well cost $ 0 0 0 0 0 0 0 0 0 0

Water injection onstream wells


Full platform rig Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Number of new wells 5 0 0 0 0 0 0 0 0 0
Number of onstream wells 5 5 5 5 5 5 5 5 5

Water injection non-routine maintenance


Materials cost per operation $ 213,716

Platform rig
Rig day rate $/day 103,668
Interval years 8
Rig duration per operation days/op 6
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Platform wells count 1 1 1 0 0 0 1 1 1
Platform wells cost $ 9,196,000 836,000 836,000 836,000 0 0 0 836,000 836,000 836,000

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 8
Rig duration per operation days/op 7
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0 0

Water injection routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 79,745
Manhours mhr/well/yr 200
Labour rate $/hr 228
Number of onstream wells 5 5 5 5 5 5 5 5 5
All well cost $ 15,047,000 627,000 627,000 627,000 627,000 627,000 627,000 627,000 627,000 627,000

Gas injection onstream wells


Full platform rig Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Number of new wells 0 0 0 0 0 0 0 0 0 0
Number of onstream wells 0 0 0 0 0 0 0 0 0

Gas injection non-routine maintenance


Materials cost per operation $ 213,716

Platform rig
Rig day rate $/day 103,668
Interval years 8
Rig duration per operation days/op 6
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Platform wells count 0 0 0 0 0 0 0 0 0
Platform wells cost $ 0 0 0 0 0 0 0 0 0 0

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 8
Rig duration per operation days/op 7
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0 0

Gas injection routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 89,314
Manhours mhr/well/yr 250
Labour rate $/hr 228
Number of onstream wells 0 0 0 0 0 0 0 0 0
All well cost $ 0 0 0 0 0 0 0 0 0 0

Non-routine maintenance total $ 81,028,000 2,804,000 3,788,000 6,740,000 2,952,000 1,968,000 2,952,000 6,740,000 3,788,000 2,804,000
Routine maintenance total $ 66,887,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000

Total well cost $ 147,915,000 5,591,000 6,575,000 9,527,000 5,739,000 4,755,000 5,739,000 9,527,000 6,575,000 5,591,000

Insurance
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Drilling
Offshore drilling 1 $ 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000
Total CAPEX $ 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 40,976,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000

Topsides
Topsides 1 $ 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000
Total CAPEX $ 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 96,356,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000

Jackets
Jacket 1 $ 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000
Total CAPEX $ 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 21,554,000 829,000 829,000 829,000 829,000 829,000 829,000 829,000 829,000 829,000

Platform sub total $ 158,886,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000

Pipelines
Oil pipeline (offshore 1) $ 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000
Gas pipeline (offshore 2) $ 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000
Total CAPEX $ 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 17,394,000 669,000 669,000 669,000 669,000 669,000 669,000 669,000 669,000 669,000

Grand total insurance cost $ 176,280,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000

Field / project costs


Onshore admin (% of personnel costs) % 10.00
Operations support (% of direct costs) % 25.00
Supply base cost $ 1,291,866

Share factors
Logistics % 100.00
Supply base / warehousing % 100.00
Onshore control / comms. & support % 100.00

Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Onshore admin $ 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400
Supply base / warehousing $ 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866
Operations support $ 21,991,750 25,051,000 19,370,500 18,115,750 17,834,750 18,057,750 25,823,500 18,225,750 17,964,000
Special items $ 0 0 0 0 0 0 0 0 0

Total field / project cost $ 585,003,000 25,008,000 28,067,000 22,387,000 21,132,000 20,851,000 21,074,000 28,840,000 21,242,000 20,980,000

Tariffs paid
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Liquid production profile MMbbl/yr 27.10 22.68 18.65 14.94 12.85 11.49 10.17 9.06 8.12
Gas production profile Bscf/yr 13.69 11.46 9.42 7.54 6.49 5.80 5.14 4.57 4.10

Tariff rate
-- Oil / condensate -- $/bbl
Transportation Yes $ 0.9000 24,392,655 20,415,465 16,784,775 13,442,310 11,565,540 10,341,450 9,153,585 8,151,885 7,310,205
Processing No $ 1.5949 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 443,148,000 24,393,000 20,415,000 16,785,000 13,442,000 11,566,000 10,341,000 9,154,000 8,152,000 7,310,000

-- Gas -- $/Mscf
Transportation Yes $ 0.7500 10,265,242 8,591,508 7,063,593 5,656,972 4,867,165 4,352,027 3,852,134 3,430,585 3,076,378
Processing No $ 0.4785 0 0 0 0 0 0 0 0 0
Total gas $ 186,491,000 10,265,000 8,592,000 7,064,000 5,657,000 4,867,000 4,352,000 3,852,000 3,431,000 3,076,000

Total tariffs paid $ 629,639,000 34,658,000 29,007,000 23,849,000 19,099,000 16,433,000 14,693,000 13,006,000 11,583,000 10,386,000

Tariffs received
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Liquids received profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gas received profile Bscf/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tariff rate
-- Oil / condensate -- $/bbl
Transportation No $ 0.0000 0 0 0 0 0 0 0 0 0
Processing No $ 1.5949 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0 0 0 0

-- Gas -- $/Mscf
Transportation No $ 0.0000 0 0 0 0 0 0 0 0 0
Processing No $ 0.4785 0 0 0 0 0 0 0 0 0
Total gas $ 0 0 0 0 0 0 0 0 0 0

Total tariffs received $ 0 0 0 0 0 0 0 0 0 0


Tariffs
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18

Tariffs paid $ 629,639,000 34,658,000 29,007,000 23,849,000 19,099,000 16,433,000 14,693,000 13,006,000 11,583,000 10,386,000
Tariffs received $ 0 0 0 0 0 0 0 0 0 0

Tariffs total $ 629,639,000 34,658,000 29,007,000 23,849,000 19,099,000 16,433,000 14,693,000 13,006,000 11,583,000 10,386,000

CO2 Emissions
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18

Process fluids Mscf/yr 0 0 0 0 0 0 0 0 0


Fuel gas Mscf/yr 1,860,180 1,768,214 1,684,260 1,606,970 1,563,573 1,535,267 1,507,800 1,484,637 1,465,174
Diesel fuel Mscf/yr 2,531 2,293 2,075 1,875 1,762 1,689 1,618 1,558 1,507
Flare load Mscf/yr 1,792 1,500 1,233 988 850 760 673 599 537
Other CO2 emissions source 1 Mscf/yr 0 0 0 0 0 0 0 0 0
Other CO2 emissions source 2 Mscf/yr 0 0 0 0 0 0 0 0 0

Total volume CO2 released Mscf/yr 1,864,504 1,772,007 1,687,568 1,609,832 1,566,184 1,537,716 1,510,090 1,486,793 1,467,218
Total mass CO2 released te/yr 98,083 93,217 88,775 84,686 82,389 80,892 79,439 78,213 77,183

Include CO2 tax in OPEX No


CO2 tax $/te 15.95
Total CO2 tax $ 0 0 0 0 0 0 0 0 0 0

Leases
Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18
Lease cost 1 $ 0 0 0 0 0 0 0 0 0 0
Lease cost 2 $ 0 0 0 0 0 0 0 0 0 0
Lease cost 3 $ 0 0 0 0 0 0 0 0 0 0
Lease cost 4 $ 0 0 0 0 0 0 0 0 0 0
Lease cost 5 $ 0 0 0 0 0 0 0 0 0 0
Total lease cost $ 0 0 0 0 0 0 0 0 0 0

Offshore operating cost summary


Totals Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18

Grand total operating cost $ 3,240,952,000 147,633,000 157,278,000 123,718,000 112,694,000 108,623,000 107,998,000 145,140,000 105,728,000 103,222,000
Direct costs
Operating personnel $ 448,344,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000
Inspection and maintenance $ 740,870,000 37,901,000 49,452,000 24,049,000 23,069,000 23,069,000 23,069,000 50,432,000 23,069,000 23,069,000
Logistics and consumables $ 512,901,000 20,451,000 20,153,000 19,882,000 19,631,000 19,491,000 19,399,000 19,311,000 19,235,000 19,172,000
Wells $ 147,915,000 5,591,000 6,575,000 9,527,000 5,739,000 4,755,000 5,739,000 9,527,000 6,575,000 5,591,000
Insurance $ 176,280,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000
Direct costs total $ 2,026,310,000 87,967,000 100,204,000 77,482,000 72,463,000 71,339,000 72,231,000 103,294,000 72,903,000 71,856,000
Field / project costs $ 585,003,000 25,008,000 28,067,000 22,387,000 21,132,000 20,851,000 21,074,000 28,840,000 21,242,000 20,980,000
Tariff costs $ 629,639,000 34,658,000 29,007,000 23,849,000 19,099,000 16,433,000 14,693,000 13,006,000 11,583,000 10,386,000
CO2 emissions tax $ 0 0 0 0 0 0 0 0 0 0
Lease costs $ 0 0 0 0 0 0 0 0 0 0
Operating personnel (excluding drill crew)
Shift rotation pattern
Days onsite 1 days 14
Days offsite 1 days 14
Days onsite 2 days 14
Days offsite 2 days 14

Cost per man $/yr 169,059

Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26


Topsides 1 number of men 51 51 51 51 51 51 51 51

Topsides 1 cost $ 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000

Total operating personnel cost $ 448,344,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000

Platform inspection & maintenance


Multiphase meters hrs/meter 100
Labour rate $/hr 228
DSV day rate $/day 247,209
Rotating equip changeout interval years 5
Rotating equip (% of equip & matls) % 8.00

Topsides Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Spares % of equip & matl cost % 1.00 1.00 9.00 1.00 1.00 1.00 1.00 1.00

Topsides 1
Dry weight te 13,332
Manhours for specialist maint. hrs 53,327 53,327 53,327 53,327 53,327 53,327 53,327 53,327
Labour cost $ 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344 12,162,344
Spares cost $ 3,297,820 3,297,820 29,680,380 3,297,820 3,297,820 3,297,820 3,297,820 3,297,820
Total $ 507,492,000 15,460,000 15,460,000 41,843,000 15,460,000 15,460,000 15,460,000 15,460,000 15,460,000

Jackets Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Spares % of material cost % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Jacket 1
DSV days days 17 17 17 17 17 17 17 17
DSV cost $ 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552 4,202,552
Spares cost $ 152,520 152,520 152,520 152,520 152,520 152,520 152,520 152,520
Total $ 113,230,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000 4,355,000

Total platform I&M cost $ 620,722,000 19,815,000 19,815,000 46,198,000 19,815,000 19,815,000 19,815,000 19,815,000 19,815,000

Pipelines inspection & maintenance


Survey vessel
Speed km/day 6.00
Day rate $/day 162,679

Intelligent pigging
Interval years 4
1st operation in year 4
Day rate $/day 36,683
Analysis $/km 1,675

Pipelines Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Oil pipeline (offshore 1)
Length km 30.00
Repair interval years 10
Year of first repair 10
Repair unit rate $/km 247,209
Survey cost $ 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794
Pigging cost $ 0 490,431 0 0 0 490,431 0 0
Repair cost $ 0 7,416,268 0 0 0 0 0 0
Total $ 60,074,000 1,627,000 9,533,000 1,627,000 1,627,000 1,627,000 2,117,000 1,627,000 1,627,000
Gas pipeline (offshore 2)
Length km 30.00
Repair interval years 10
Year of first repair 10
Repair unit rate $/km 247,209
Survey cost $ 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794 1,626,794
Pigging cost $ 0 490,431 0 0 0 490,431 0 0
Repair cost $ 0 7,416,268 0 0 0 0 0 0
Total $ 60,074,000 1,627,000 9,533,000 1,627,000 1,627,000 1,627,000 2,117,000 1,627,000 1,627,000

Total pipeline I&M cost $ 120,148,000 3,254,000 19,066,000 3,254,000 3,254,000 3,254,000 4,234,000 3,254,000 3,254,000

Inspection and maintenance


Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Platforms $ 620,722,000 19,815,000 19,815,000 46,198,000 19,815,000 19,815,000 19,815,000 19,815,000 19,815,000
Pipelines $ 120,148,000 3,254,000 19,066,000 3,254,000 3,254,000 3,254,000 4,234,000 3,254,000 3,254,000

Total inspection & maintenance cost $ 740,870,000 23,069,000 38,881,000 49,452,000 23,069,000 23,069,000 24,049,000 23,069,000 23,069,000

Logistics and consumables


Helicopter
Speed km/hr 200.00
Standing charge $/week 100,480
Seats 18
Distance to heliport km 120.00
Trip time hr 4.20
Cost $/hr 1,754
Usage weeks/yr 52
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Trips platforms 78 78 78 78 78 78 78 78
Trips offloading 0 0 0 0 0 0 0 0
Total helicopter cost $ 150,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000 5,800,000

Supply boat
Speed knot 8.00
Distance to supply base km 120.00
Trip time hr 24.20
Day rate $/day 14,354
Diesel fuel consumption te/day 25.00
Diesel rate $/te 701.75
Usage weeks/yr 52
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Trips per week 2 2 2 2 2 2 2 2
Total supply boat cost $ 86,970,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000 3,345,000

Rescue and recovery boat


Required Yes
Day rate $/day 15,152
Usage days/yr 365
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Days 365 365 365 365 365 365 365 365
Total rescue and recovery boat cost $ 143,780,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000 5,530,000

Fuel gas
Rate $/Mscf 1.44
Onstream days days 350
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Power requirements
Electrical load MW 6.44 6.29 6.15 6.04 5.94 5.86 5.79 5.76
Compressor lo MW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Water injection MW 10.59 10.59 10.59 10.59 10.59 10.59 10.59 10.59
Oil export load MW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Quantity Mscf/yr 1,291,842 1,280,181 1,270,037 1,261,270 1,253,913 1,248,020 1,242,358 1,240,186
Heating requirements
Heating mediu MW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Quantity Mscf/yr 0 0 0 0 0 0 0 0
Total
Quantity Mscf/yr 1,291,842 1,280,181 1,270,037 1,261,270 1,253,913 1,248,020 1,242,358 1,240,186
Total fuel gas cost $ 56,147,000 1,854,000 1,838,000 1,823,000 1,810,000 1,800,000 1,791,000 1,783,000 1,780,000

Diesel
Rate $/te 701.75
Onstream days days 350
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Topsides consumption te 22.73 22.18 21.71 21.30 20.96 20.69 20.42 20.32
Floaters consumption te 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Diesel profile te 22.73 22.18 21.71 21.30 20.96 20.69 20.42 20.32
Total diesel cost $ 622,000 16,000 16,000 15,000 15,000 15,000 15,000 14,000 14,000

Chemicals
Production dosage rate kg/bbl 0.0253
Water injection dosage rate kg/bbl 0.0254
Production wells dosage rate te/well 0.0000

Production unit cost $/te 1,563


Injection unit cost $/te 1,563
Well unit cost $/te 1,563
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Oil production flow Mbbl/day 17.15 15.39 13.85 12.53 11.42 10.53 9.67 9.35
Water injection flow Mbbl/day 161.44 161.44 161.44 161.44 161.44 161.44 161.44 161.44
Production well count 14 14 14 14 14 14 14 14
Oil production chemicals used te 152.05 136.43 122.85 111.10 101.25 93.36 85.78 82.87
Water injection chemicals used te 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39 1,437.39
Well treatment chemicals used te 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total chemicals cost $ 74,582,000 2,484,000 2,460,000 2,439,000 2,420,000 2,405,000 2,393,000 2,381,000 2,376,000

Total logistics & consumables cost $ 512,901,000 19,029,000 18,989,000 18,952,000 18,920,000 18,895,000 18,874,000 18,853,000 18,845,000

Well costs
Oil production onstream wells
Full platform rig Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Number of new wells 14 0 0 0 0 0 0 0 0
Number of onstream wells 14 14 14 14 14 14 14 14

Oil production non-routine maintenance


Materials cost per operation $ 258,373

Platform rig
Rig day rate $/day 103,668
Interval years 4
Rig duration per operation days/op 7
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Platform wells count 3 6 3 2 3 6 0 0
Platform wells cost $ 71,832,000 2,952,000 5,904,000 2,952,000 1,968,000 2,952,000 5,904,000 0 0

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 4
Rig duration per operation days/op 8
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0

Oil production routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 97,289
Manhours mhr/well/yr 250
Labour rate $/hr 228
Number of onstream wells 14 14 14 14 14 14 14 14
All well cost $ 51,840,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000 2,160,000

Gas production onstream wells


Full platform rig Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Number of new wells 0 0 0 0 0 0 0 0 0
Number of onstream wells 0 0 0 0 0 0 0 0

Gas production non-routine maintenance


Materials cost per operation $ 309,410

Platform rig
Rig day rate $/day 103,668
Interval years 4
Rig duration per operation days/op 8
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Platform wells count 0 0 0 0 0 0 0 0
Platform wells cost $ 0 0 0 0 0 0 0 0 0

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 4
Rig duration per operation days/op 9
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0

Gas production routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 105,263
Manhours mhr/well/yr 300
Labour rate $/hr 228
Number of onstream wells 0 0 0 0 0 0 0 0
All well cost $ 0 0 0 0 0 0 0 0 0

Water injection onstream wells


Full platform rig Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Number of new wells 5 0 0 0 0 0 0 0 0
Number of onstream wells 5 5 5 5 5 5 5 5

Water injection non-routine maintenance


Materials cost per operation $ 213,716

Platform rig
Rig day rate $/day 103,668
Interval years 8
Rig duration per operation days/op 6
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Platform wells count 1 1 0 0 0 1 0 0
Platform wells cost $ 9,196,000 836,000 836,000 0 0 0 836,000 0 0

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 8
Rig duration per operation days/op 7
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0

Water injection routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 79,745
Manhours mhr/well/yr 200
Labour rate $/hr 228
Number of onstream wells 5 5 5 5 5 5 5 5
All well cost $ 15,047,000 627,000 627,000 627,000 627,000 627,000 627,000 627,000 627,000

Gas injection onstream wells


Full platform rig Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Number of new wells 0 0 0 0 0 0 0 0 0
Number of onstream wells 0 0 0 0 0 0 0 0

Gas injection non-routine maintenance


Materials cost per operation $ 213,716

Platform rig
Rig day rate $/day 103,668
Interval years 8
Rig duration per operation days/op 6
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Platform wells count 0 0 0 0 0 0 0 0
Platform wells cost $ 0 0 0 0 0 0 0 0 0

Jackup / TSV rig


Rig day rate $/day 282,297
Interval years 8
Rig duration per operation days/op 7
Mob / demob days 7
Jackup / TSV well count 0 0 0 0 0 0 0 0
Jackup / TSV wells cost $ 0 0 0 0 0 0 0 0 0

Gas injection routine maintenance (Full rig, TLP or spar only)


Material cost $/well/yr 89,314
Manhours mhr/well/yr 250
Labour rate $/hr 228
Number of onstream wells 0 0 0 0 0 0 0 0
All well cost $ 0 0 0 0 0 0 0 0 0

Non-routine maintenance total $ 81,028,000 3,788,000 6,740,000 2,952,000 1,968,000 2,952,000 6,740,000 0 0
Routine maintenance total $ 66,887,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000 2,787,000

Total well cost $ 147,915,000 6,575,000 9,527,000 5,739,000 4,755,000 5,739,000 9,527,000 2,787,000 2,787,000

Insurance
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Drilling
Offshore drilling 1 $ 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000
Total CAPEX $ 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000 315,164,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 40,976,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000 1,576,000

Topsides
Topsides 1 $ 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000
Total CAPEX $ 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000 741,242,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 96,356,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000 3,706,000

Jackets
Jacket 1 $ 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000
Total CAPEX $ 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000 165,703,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 21,554,000 829,000 829,000 829,000 829,000 829,000 829,000 829,000 829,000

Platform sub total $ 158,886,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000 6,111,000

Pipelines
Oil pipeline (offshore 1) $ 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000 70,043,000
Gas pipeline (offshore 2) $ 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000 63,765,000
Total CAPEX $ 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000 133,808,000
Insurance rate % of CAPEX % 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Insurance cost $ 17,394,000 669,000 669,000 669,000 669,000 669,000 669,000 669,000 669,000

Grand total insurance cost $ 176,280,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000

Field / project costs


Onshore admin (% of personnel costs) % 10.00
Operations support (% of direct costs) % 25.00
Supply base cost $ 1,291,866

Share factors
Logistics % 100.00
Supply base / warehousing % 100.00
Onshore control / comms. & support % 100.00

Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26


Onshore admin $ 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400 1,724,400
Supply base / warehousing $ 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866 1,291,866
Operations support $ 18,174,250 22,855,250 24,541,750 17,692,000 17,931,750 19,118,500 17,183,250 17,181,250
Special items $ 0 0 0 0 0 0 0 0

Total field / project cost $ 585,003,000 21,191,000 25,872,000 27,558,000 20,708,000 20,948,000 22,135,000 20,200,000 20,198,000

Tariffs paid
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Liquid production profile MMbbl/yr 6.00 5.38 4.85 4.39 4.00 3.68 3.39 3.27
Gas production profile Bscf/yr 3.03 2.72 2.45 2.21 2.02 1.86 1.71 1.65

Tariff rate
-- Oil / condensate -- $/bbl
Transportation Yes $ 0.9000 5,400,990 4,846,275 4,363,695 3,946,635 3,596,670 3,316,320 3,046,995 2,943,675
Processing No $ 1.5949 0 0 0 0 0 0 0 0
Total oil / condensate $ 443,148,000 5,401,000 4,846,000 4,364,000 3,947,000 3,597,000 3,316,000 3,047,000 2,944,000

-- Gas -- $/Mscf
Transportation Yes $ 0.7500 2,272,917 2,039,474 1,836,388 1,660,876 1,513,599 1,395,618 1,282,277 1,238,797
Processing No $ 0.4785 0 0 0 0 0 0 0 0
Total gas $ 186,491,000 2,273,000 2,039,000 1,836,000 1,661,000 1,514,000 1,396,000 1,282,000 1,239,000

Total tariffs paid $ 629,639,000 7,674,000 6,885,000 6,200,000 5,608,000 5,111,000 4,712,000 4,329,000 4,183,000

Tariffs received
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Liquids received profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gas received profile Bscf/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tariff rate
-- Oil / condensate -- $/bbl
Transportation No $ 0.0000 0 0 0 0 0 0 0 0
Processing No $ 1.5949 0 0 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0 0 0

-- Gas -- $/Mscf
Transportation No $ 0.0000 0 0 0 0 0 0 0 0
Processing No $ 0.4785 0 0 0 0 0 0 0 0
Total gas $ 0 0 0 0 0 0 0 0 0

Total tariffs received $ 0 0 0 0 0 0 0 0 0


Tariffs
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26

Tariffs paid $ 629,639,000 7,674,000 6,885,000 6,200,000 5,608,000 5,111,000 4,712,000 4,329,000 4,183,000
Tariffs received $ 0 0 0 0 0 0 0 0 0

Tariffs total $ 629,639,000 7,674,000 6,885,000 6,200,000 5,608,000 5,111,000 4,712,000 4,329,000 4,183,000

CO2 Emissions
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26

Process fluids Mscf/yr 0 0 0 0 0 0 0 0


Fuel gas Mscf/yr 1,421,026 1,408,199 1,397,041 1,387,397 1,379,304 1,372,822 1,366,594 1,364,205
Diesel fuel Mscf/yr 1,393 1,359 1,330 1,305 1,284 1,268 1,252 1,245
Flare load Mscf/yr 397 356 321 290 264 244 224 216
Other CO2 emissions source 1 Mscf/yr 0 0 0 0 0 0 0 0
Other CO2 emissions source 2 Mscf/yr 0 0 0 0 0 0 0 0

Total volume CO2 released Mscf/yr 1,422,816 1,409,915 1,398,692 1,388,992 1,380,853 1,374,333 1,368,069 1,365,666
Total mass CO2 released te/yr 74,848 74,169 73,578 73,068 72,640 72,297 71,968 71,841

Include CO2 tax in OPEX No


CO2 tax $/te 15.95
Total CO2 tax $ 0 0 0 0 0 0 0 0 0

Leases
Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26
Lease cost 1 $ 0 0 0 0 0 0 0 0 0
Lease cost 2 $ 0 0 0 0 0 0 0 0 0
Lease cost 3 $ 0 0 0 0 0 0 0 0 0
Lease cost 4 $ 0 0 0 0 0 0 0 0 0
Lease cost 5 $ 0 0 0 0 0 0 0 0 0
Total lease cost $ 0 0 0 0 0 0 0 0 0

Offshore operating cost summary


Totals Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 26

Grand total operating cost $ 3,240,952,000 101,562,000 124,178,000 131,925,000 97,084,000 97,786,000 103,321,000 93,262,000 93,106,000
Direct costs
Operating personnel $ 448,344,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000 17,244,000
Inspection and maintenance $ 740,870,000 23,069,000 38,881,000 49,452,000 23,069,000 23,069,000 24,049,000 23,069,000 23,069,000
Logistics and consumables $ 512,901,000 19,029,000 18,989,000 18,952,000 18,920,000 18,895,000 18,874,000 18,853,000 18,845,000
Wells $ 147,915,000 6,575,000 9,527,000 5,739,000 4,755,000 5,739,000 9,527,000 2,787,000 2,787,000
Insurance $ 176,280,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000 6,780,000
Direct costs total $ 2,026,310,000 72,697,000 91,421,000 98,167,000 70,768,000 71,727,000 76,474,000 68,733,000 68,725,000
Field / project costs $ 585,003,000 21,191,000 25,872,000 27,558,000 20,708,000 20,948,000 22,135,000 20,200,000 20,198,000
Tariff costs $ 629,639,000 7,674,000 6,885,000 6,200,000 5,608,000 5,111,000 4,712,000 4,329,000 4,183,000
CO2 emissions tax $ 0 0 0 0 0 0 0 0 0
Lease costs $ 0 0 0 0 0 0 0 0 0