You are on page 1of 8

MATERIAL

ITEM QTY Discription


3-4-5 6-7-8-9-10-11
SMD #09 TO MUBAN # 02 1 35046' PIPE,LINE,COATED,FBE,4",0.282"WT,NO-SCH,X46 PSL2
API-5L,SMLS,BE
2 963 SLEEVE,WRAPAROUND,17.5"WIDE,248DegF/4"PIPE

3 02 FLANGE,4"600#,RF,WN,STD,ASTM A105

FROM 4 02 GASKET,4" 600#,RF,SS,SW


SMD# 09 5 08 BOLT,STUD,B7 7/8x6.50"CP
2 6 04 THDLET,DIA-3/4"X1-1/2"-36",6M,A105,FS

Water Course & Black Top Road CX # 01


7 04 Valve,Ball, 3/4"NPT,3000,FB,SS,TRIM,CS-Body/Bonnet

8 04 NIPPLE,3/4"x3",XXH,NPT,A106

9 04 VALVE,NEEDLE,1/2"NPT,MxF,6000#,SS

10 10 PLUG,HEX,1/2",NPT,6M,FS

Zardari Road & Baoli Wah CX #02


11 04 VALVE,NEEDLE,1/2"Fx3/4"M,6000
12-13-15-16 1 12 12' PLATE,MS,4' X 8' X 1/2"

13 23' BAR,FLAT,1"x10'x1/16",MS

Water Coursr CX # 03
14 1.5' BAR,ROUND,PLAIN,3/4"x10'LONG,MS

15 23' PIPE,LINE,BARE,4",0.237"WT,STD,GR.B
A106/A53,SMLS,BE
16 1'-2" PIPE,LINE,12",0.375"WT,STD,GR.B,A-106,SML,BARE,BE
COATING,EPOXY,LIQUID,3M-323,
4 17
#0
01 (A=2.67KG/B=1.27KG)/FBE PIPE

r CX 18 03 TAPE,35MIL,4"X50',POLYKEN
rs

Canal Crossing CX # 05
u 19 ELBOW,4",90D,3R,XS,0.337"WT,MSS-SP-75,WPHY-
Co 01
46,B/W
ter
a
W 20 0.5 SHEET,NEOPRENE,RUBBER,3/4"x12"Wx10'LONG

21 0.5 BITUMEN,BLACK SOLUTION (PRIMER),PEARL,4


LITER/CAN
22
Road Crossing CX # 06

41 TAPE,WARNING,3"x800',BLACK & YELLOW

23 10 CAP,PROTECTIVE,CADWELD

24 0.167 PAINT,CLIFTON SAND,CAMOFLAGE ENAMEL,20 LTR,TIN

25 01
PAINT,RED OXIDE,ZINC CHROMATE,DIPPING
PRIMER,3.64L
PIG,POLLY,REGULAR-DRYING,4",RBS-
26 01 4,5LB/CU.FT.,25MILES
Road Crossing CX # 07 27 01 PIG,POLLY,REGULAR-
WIPING,4",RCCT,5LB/CU.FT.,10MILES
PIG,POLLY,WIRE-BRUSH,RED CRISS-CROSS,4",RCC-WB,
6-7-8-9-10-11 28 01
5LB/CU.FT.,10MILES
29 01 MIO
30 01 Thiner

3-4-5 19 31
12-13-15-16
32

TO MUBAN # 02
AS BUILT 33
34
DWG 35
36
37
38
Laying of Flowlines for Paniro Muban Fuel Gas Prepared By: Arfan Ali Sheet 01 OF 01
Project: Project 4"Øx13KM Date: 2/7/2018
LINE#
Signature
CRF# 2017-10195994 AFE# 710238
MATERIAL
ITEM QTY Discription
6-7-8-9-10-11
SMD #09 TO MUBAN # 02 1 35046' PIPE,LINE,COATED,FBE,4",0.282"WT,NO-SCH,X46 PSL2
API-5L,SMLS,BE
2 963 SLEEVE,WRAPAROUND,17.5"WIDE,248DegF/4"PIPE
3-4-5
3 02 FLANGE,4"600#,RF,WN,STD,ASTM A105

4 02 GASKET,4" 600#,RF,SS,SW

5 8 BOLT,STUD,B7 7/8x6.50"CP

6 04 THDLET,DIA-3/4"X1-1/2"-36",6M,A105,FS

7 04 Valve,Ball, 3/4"NPT,3000,FB,SS,TRIM,CS-Body/Bonnet

FROM 8 04 NIPPLE,3/4"x3",XXH,NPT,A106
SMD# 09 9 04 VALVE,NEEDLE,1/2"NPT,MxF,6000#,SS

10 10 PLUG,HEX,1/2",NPT,6M,FS
2 11 04 VALVE,NEEDLE,1/2"Fx3/4"M,6000

Water Course & Black Top Road CX # 01

# 04
12 12' PLATE,MS,4' X 8' X 1/2"
1

X
13

sr C
23' BAR,FLAT,1"x10'x1/16",MS

Zardari Road & Baoli Wah CX #02


14

Water Coursr CX # 03

our
1.5' BAR,ROUND,PLAIN,3/4"x10'LONG,MS

er C
15 23' PIPE,LINE,BARE,4",0.237"WT,STD,GR.B
A106/A53,SMLS,BE

Wat
12-13-15-16 16 1'-2" PIPE,LINE,12",0.375"WT,STD,GR.B,A-106,SML,BARE,BE
COATING,EPOXY,LIQUID,3M-323,
17 01 (A=2.67KG/B=1.27KG)/FBE PIPE
18 03 TAPE,35MIL,4"X50',POLYKEN

19 01 ELBOW,4",90D,3R,XS,0.337"WT,MSS-SP-75,WPHY-
46,B/W

20 0.5 SHEET,NEOPRENE,RUBBER,3/4"x12"Wx10'LONG

05
21 BITUMEN,BLACK SOLUTION (PRIMER),PEARL,4

CX #
0.5
LITER/CAN
22 41 TAPE,WARNING,3"x800',BLACK & YELLOW

ssing
23 10 CAP,PROTECTIVE,CADWELD

l Cro
24 0.167 PAINT,CLIFTON SAND,CAMOFLAGE ENAMEL,20 LTR,TIN

Cana
25 01
PAINT,RED OXIDE,ZINC CHROMATE,DIPPING
PRIMER,3.64L
PIG,POLLY,REGULAR-DRYING,4",RBS-
6-7-8-9-10-11 26 01
4,5LB/CU.FT.,25MILES
PIG,POLLY,REGULAR-
27 01
WIPING,4",RCCT,5LB/CU.FT.,10MILES
PIG,POLLY,WIRE-BRUSH,RED CRISS-CROSS,4",RCC-WB,
Road Crossing CX # 06 28 01
5LB/CU.FT.,10MILES
29 01 MIO
3-4-5 30 01 Thiner
Ro
ad 31
C ros
sin
g
32
CX
TO MUBAN # 02 12-13-15-16 #0 33
19 7
34
AS BUILT 35

DWG 36
37
38
Laying of Flowlines for Paniro Muban Fuel Gas Prepared By: Arfan Ali Sheet 01 OF 01
Project: Project 4"Øx13KM Date: 2/7/2018
LINE#
Signature
CRF# 2017-10195994 AFE# 710238
MATERIAL

MUBAN # 02 TO MUBAN # 04 ITEM QTY


1 1488' PIPE,LINE,COATED,FBE,4",0.282"WT,NO-SCH,X46 PSL2
API-5L,SMLS,BE
2 43 SLEEVE,WRAPAROUND,17.5"WIDE,248DegF/4"PIPE

3 02 FLANGE,4"600#,RF,WN,STD,ASTM A105

6-7-8-9-10-11 4 02 GASKET,4" 600#,RF,SS,SW

5 08 BOLT,STUD,B7 7/8x6.50"CP

6 04 THDLET,DIA-3/4"X1-1/2"-36",6M,A105,FS

7 04 Valve,Ball, 3/4"NPT,3000,FB,SS,TRIM,CS-Body/Bonnet
3-4-5
8 04 NIPPLE,3/4"x3",XXH,NPT,A106

9 04 VALVE,NEEDLE,1/2"NPT,MxF,6000#,SS

10 08 PLUG,HEX,1/2",NPT,6M,FS
TO MUBAN # 04 11 04 VALVE,NEEDLE,1/2"Fx3/4"M,6000
12-13-15-16
12 12' PLATE,MS,4' X 8' X 1/2"

13 23' BAR,FLAT,1"x10'x1/16",MS

14 1.5' BAR,ROUND,PLAIN,3/4"x10'LONG,MS
PIPE,LINE,BARE,4",0.237"WT,STD,GR.B
15 23' A106/A53,SMLS,BE
PIPE,LINE,12",0.375"WT,STD,GR.B,A-106,SML,BARE,BE
16 1'-2"

2 17 01
COATING,EPOXY,LIQUID,3M-323,
(A=2.67KG/B=1.27KG)/FBE PIPE
18 0.5 TAPE,35MIL,4"X50',POLYKEN
ELBOW,4",90D,3R,XS,0.337"WT,MSS-SP-75,WPHY-
19 01
46,B/W

20 0.5 SHEET,NEOPRENE,RUBBER,3/4"x12"Wx10'LONG

21 0.5 BITUMEN,BLACK SOLUTION (PRIMER),PEARL,4


1 LITER/CAN

6-7-8-9-10-11 22 02 TAPE,WARNING,3"x800',BLACK & YELLOW

23 02 CAP,PROTECTIVE,CADWELD

24 0.167 PAINT,CLIFTON SAND,CAMOFLAGE ENAMEL,20 LTR,TIN

19 25 0.5
PAINT,RED OXIDE,ZINC CHROMATE,DIPPING
PRIMER,3.64L
3-4-5
26 01
PIG,POLLY,REGULAR-DRYING,4",RBS-
4,5LB/CU.FT.,25MILES
27 01 PIG,POLLY,REGULAR-
WIPING,4",RCCT,5LB/CU.FT.,10MILES
FROM MUBAN # 02 28 01 PIG,POLLY,WIRE-BRUSH,RED CRISS-CROSS,4",RCC-WB,
5LB/CU.FT.,10MILES
29 01 MIO
30 01 Thiner
AS BUILT 31
DWG 12-13-15-16 32
33
34
35
36
37
38
Laying of Flowlines for Paniro Muban Fuel Gas Prepared By: Arfan Ali Sheet 01 OF 01
Project: Project 4"Øx13KM Date:
LINE#
Signature
CRF# 2017-10195994 AFE# 710238
MATERIAL
ITEM QTY
MUBAN # 02 TO MUBAN # 01 1 1413' PIPE,LINE,COATED,FBE,4",0.282"WT,NO-SCH,X46 PSL2
API-5L,SMLS,BE
2 42 SLEEVE,WRAPAROUND,17.5"WIDE,248DegF/4"PIPE

6-7-8-9-10-11 3 02 FLANGE,4"600#,RF,WN,STD,ASTM A105

4 02 GASKET,4" 600#,RF,SS,SW
3-4-5
5 08 BOLT,STUD,B7 7/8x6.50"CP

6 04 THDLET,DIA-3/4"X1-1/2"-36",6M,A105,FS

7 04 Valve,Ball, 3/4"NPT,3000,FB,SS,TRIM,CS-Body/Bonnet

8 04 NIPPLE,3/4"x3",XXH,NPT,A106

TO MUBAN # 01 9 04 VALVE,NEEDLE,1/2"NPT,MxF,6000#,SS

10 10 PLUG,HEX,1/2",NPT,6M,FS

11 04 VALVE,NEEDLE,1/2"Fx3/4"M,6000

12-13-15-16 12 12' PLATE,MS,4' X 8' X 1/2"

13 23' BAR,FLAT,1"x10'x1/16",MS

14 1.5' BAR,ROUND,PLAIN,3/4"x10'LONG,MS
PIPE,LINE,BARE,4",0.237"WT,STD,GR.B
15 23' A106/A53,SMLS,BE
PIPE,LINE,12",0.375"WT,STD,GR.B,A-106,SML,BARE,BE
16 1'-2"
COATING,EPOXY,LIQUID,3M-323,
17 01
(A=2.67KG/B=1.27KG)/FBE PIPE
18 0.5 TAPE,35MIL,4"X50',POLYKEN
ELBOW,4",90D,3R,XS,0.337"WT,MSS-SP-75,WPHY-
1 19 01
46,B/W
6-7-8-9-10-11 20 0.5 SHEET,NEOPRENE,RUBBER,3/4"x12"Wx10'LONG
BITUMEN,BLACK SOLUTION (PRIMER),PEARL,4
21 0.5 LITER/CAN

2 22 02 TAPE,WARNING,3"x800',BLACK & YELLOW

3-4-5 23 02 CAP,PROTECTIVE,CADWELD

24 0.167 PAINT,CLIFTON SAND,CAMOFLAGE ENAMEL,20 LTR,TIN


PAINT,RED OXIDE,ZINC CHROMATE,DIPPING
25 0.5 PRIMER,3.64L
PIG,POLLY,REGULAR-DRYING,4",RBS-
26 01 4,5LB/CU.FT.,25MILES
FROM MUBAN # 02 PIG,POLLY,REGULAR-
27 01
WIPING,4",RCCT,5LB/CU.FT.,10MILES
PIG,POLLY,WIRE-BRUSH,RED CRISS-CROSS,4",RCC-WB,
28 01 5LB/CU.FT.,10MILES
29 01 MIO
30 01 Thiner

12-13-15-16 AS BUILT 31
32
DWG 33
34
35
36
37
38
Laying of Flowlines for Paniro Muban Fuel Gas Prepared By: Arfan Ali Sheet 01 OF 01
Project: Project 4"Øx13KM Date:
LINE#
Signature
CRF# 2017-10195994 AFE# 710238
MATERIAL

MUBAN # 01 TO MUBAN # 03 ITEM QTY


1 724' PIPE,LINE,COATED,FBE,4",0.282"WT,NO-SCH,X46 PSL2
API-5L,SMLS,BE
2 22 SLEEVE,WRAPAROUND,17.5"WIDE,248DegF/4"PIPE

3 02 FLANGE,4"600#,RF,WN,STD,ASTM A105
6-7-9-26
4 02 GASKET,4" 600#,RF,SS,SW

5 12 BOLT,STUD,B7 7/8x6.50"CP

6 04 THDLET,DIA-3/4"X1-1/2"-36",6M,A105,FS

7 04 Valve,Ball, 3/4"NPT,3000,FB,SS,TRIM,CS-Body/Bonnet
3-4-5 8 04 NIPPLE,3/4"x3",XXH,NPT,A106

9 04 VALVE,NEEDLE,1/2"NPT,MxF,6000#,SS

TO MUBAN # 03 10 10 PLUG,HEX,1/2",NPT,6M,FS

12-13-15-16 11 04 VALVE,NEEDLE,1/2"Fx3/4"M,6000

12 12' PLATE,MS,4' X 8' X 1/2"

13 23' BAR,FLAT,1"x10'x1/16",MS

14 1.5' BAR,ROUND,PLAIN,3/4"x10'LONG,MS

15 23' PIPE,LINE,BARE,4",0.237"WT,STD,GR.B
A106/A53,SMLS,BE
PIPE,LINE,12",0.375"WT,STD,GR.B,A-106,SML,BARE,BE
16 1'-2"
19 17 01
COATING,EPOXY,LIQUID,3M-323,
(A=2.67KG/B=1.27KG)/FBE PIPE

18 03 TAPE,35MIL,4"X50',POLYKEN

1 19 03 ELBOW,4",90D,3R,XS,0.337"WT,MSS-SP-75,WPHY-
46,B/W

20 0.5 SHEET,NEOPRENE,RUBBER,3/4"x12"Wx10'LONG

21 0.5
BITUMEN,BLACK SOLUTION (PRIMER),PEARL,4
LITER/CAN
19 22 41 TAPE,WARNING,3"x800',BLACK & YELLOW

23 10 CAP,PROTECTIVE,CADWELD

6-7-8-9-10-11
24 0.167 PAINT,CLIFTON SAND,CAMOFLAGE ENAMEL,20 LTR,TIN

25 0.5
PAINT,RED OXIDE,ZINC CHROMATE,DIPPING
PRIMER,3.64L
26 01 PIG,POLLY,REGULAR-DRYING,4",RBS-
19 4,5LB/CU.FT.,25MILES
27 01 PIG,POLLY,REGULAR-
WIPING,4",RCCT,5LB/CU.FT.,10MILES
2 28 01 PIG,POLLY,WIRE-BRUSH,RED CRISS-CROSS,4",RCC-WB,
5LB/CU.FT.,10MILES
3-4-5 29 01 MIO
30 01 Thiner

FROM MUBAN # 01 31

AS BUILT 32
33
DWG 34
35
12-13-15-16 36
37
38
Laying of Flowlines for Paniro Muban Fuel Gas Prepared By: Arfan Ali Sheet 01 OF 01
Project: Project 4"Øx13KM Date:
LINE#
Signature
CRF# 2017-10195994 AFE# 710238
MATERIAL
ITEM QTY

MUBAN # 03 TO MUBAN SOUTH # 01 1


2
1746'

48
PIPE,LINE,COATED,FBE,4",0.282"WT,NO-SCH,X46 PSL2
API-5L,SMLS,BE
SLEEVE,WRAPAROUND,17.5"WIDE,248DegF/4"PIPE

3 01 FLANGE,4"600#,RF,WN,STD,ASTM A105

4 01 GASKET,4" 600#,RF,SS,SW

5 08 BOLT,STUD,B7 7/8x6.50"CP

6 02 THDLET,DIA-3/4"X1-1/2"-36",6M,A105,FS

7 02 Valve,Ball, 3/4"NPT,3000,FB,SS,TRIM,CS-Body/Bonnet

8 02 NIPPLE,3/4"x3",XXH,NPT,A106

9 02 VALVE,NEEDLE,1/2"NPT,MxF,6000#,SS
MUBAN SOUTH # 01
10 6 PLUG,HEX,1/2",NPT,6M,FS
11 02 VALVE,NEEDLE,1/2"Fx3/4"M,6000
TIE-IN WITH EXISTING 12 6' PLATE,MS,4' X 8' X 1/2"
6-7-8-9-10-11 MUBAN SOUTH # 01
13 13' BAR,FLAT,1"x10'x1/16",MS

19 14 1.5' BAR,ROUND,PLAIN,3/4"x10'LONG,MS
2 15 11'-5" PIPE,LINE,BARE,4",0.237"WT,STD,GR.B
A106/A53,SMLS,BE
16 9" PIPE,LINE,12",0.375"WT,STD,GR.B,A-106,SML,BARE,BE
3-4-5 COATING,EPOXY,LIQUID,3M-323,
17 01 (A=2.67KG/B=1.27KG)/FBE PIPE
12-13-15-16
1 18 01 TAPE,35MIL,4"X50',POLYKEN
FROM MUBAN # 19 ELBOW,4",90D,3R,XS,0.337"WT,MSS-SP-75,WPHY-
01
03 46,B/W
20 0.5 SHEET,NEOPRENE,RUBBER,3/4"x12"Wx10'LONG
21 0.5
BITUMEN,BLACK SOLUTION (PRIMER),PEARL,4
LITER/CAN
22 2 TAPE,WARNING,3"x800',BLACK & YELLOW
23 02 CAP,PROTECTIVE,CADWELD

24 0.167 PAINT,CLIFTON SAND,CAMOFLAGE ENAMEL,20 LTR,TIN


25 0.5 PAINT,RED OXIDE,ZINC CHROMATE,DIPPING
PRIMER,3.64L
26 01 PIG,POLLY,REGULAR-DRYING,4",RBS-
4,5LB/CU.FT.,25MILES
27 01 PIG,POLLY,REGULAR-
WIPING,4",RCCT,5LB/CU.FT.,10MILES
28 01 PIG,POLLY,WIRE-BRUSH,RED CRISS-CROSS,4",RCC-WB,
5LB/CU.FT.,10MILES
29 01 MIO
30 01 Thiner

31
32
33
34
35
36
37
38
Laying of Flowlines for Paniro Muban Fuel Gas Prepared By: Arfan Ali Sheet 01 OF 01
Project: Project 4"Øx13KM Date:
LINE#
Signature
CRF# 2017-10195994 AFE# 710238
MATERIAL
6-7-8-9-10-11
PANIRO FACILITY TO PANIRO # 09 ITEM QTY
1 3186' PIPE,LINE,COATED,FBE,4",0.282"WT,NO-SCH,X46 PSL2
API-5L,SMLS,BE
2 86 SLEEVE,WRAPAROUND,17.5"WIDE,248DegF/4"PIPE

3 02 FLANGE,4"600#,RF,WN,STD,ASTM A105

3-4-5 4 02 GASKET,4" 600#,RF,SS,SW

5 12 BOLT,STUD,B7 7/8x6.50"CP

6 04 THDLET,DIA-3/4"X1-1/2"-36",6M,A105,FS

12-13-15-16 TO PANIRO # 09 7 Valve,Ball, 3/4"NPT,3000,FB,SS,TRIM,CS-Body/Bonnet


04

8 04 NIPPLE,3/4"x3",XXH,NPT,A106
9 04 VALVE,NEEDLE,1/2"NPT,MxF,6000#,SS

10 10 PLUG,HEX,1/2",NPT,6M,FS

11 04 VALVE,NEEDLE,1/2"Fx3/4"M,6000

12 12' PLATE,MS,4' X 8' X 1/2"

13 23' BAR,FLAT,1"x10'x1/16",MS

14 1.5' BAR,ROUND,PLAIN,3/4"x10'LONG,MS
PIPE,LINE,BARE,4",0.237"WT,STD,GR.B
15 11'-5" A106/A53,SMLS,BE

19 16 1'-2" PIPE,LINE,12",0.375"WT,STD,GR.B,A-106,SML,BARE,BE
COATING,EPOXY,LIQUID,3M-323,
17 01 (A=2.67KG/B=1.27KG)/FBE PIPE
18 03 TAPE,35MIL,4"X50',POLYKEN

19 03 ELBOW,4",90D,3R,XS,0.337"WT,MSS-SP-75,WPHY-
46,B/W
20 0.5 SHEET,NEOPRENE,RUBBER,3/4"x12"Wx10'LONG

21 0.5 BITUMEN,BLACK SOLUTION (PRIMER),PEARL,4


LITER/CAN
19 22 41 TAPE,WARNING,3"x800',BLACK & YELLOW

23 10 CAP,PROTECTIVE,CADWELD

6-7-8-9-10-11 24 0.167 PAINT,CLIFTON SAND,CAMOFLAGE ENAMEL,20 LTR,TIN

25 01
PAINT,RED OXIDE,ZINC CHROMATE,DIPPING
PRIMER,3.64L
19 26 01 PIG,POLLY,REGULAR-DRYING,4",RBS-
4,5LB/CU.FT.,25MILES

3-4-5 27 01
PIG,POLLY,REGULAR-
WIPING,4",RCCT,5LB/CU.FT.,10MILES
PIG,POLLY,WIRE-BRUSH,RED CRISS-CROSS,4",RCC-WB,
28 01
5LB/CU.FT.,10MILES
29 01 MIO
30
FROM PANIRO FACILITY
31
32
2
AS BUILT 33
34
DWG 12-13-15-16 35
36
37
38
Laying of Flowlines for Paniro Muban Fuel Gas Prepared By: Arfan Ali Sheet 01 OF 01
Project: Project 4"Øx13KM Date:
LINE#
Signature
CRF# 2017-10195994 AFE# 710238
MATERIAL
ITEM QTY
PANIRO FACILITY TO PANIRO # 09 1
2
3
RISER SUPPORT 4
5
6
7
8
9
10
11

6"
12
13
14
5"
15
16
17
00 18
1'-
19
20
21
22
6"

23
24
25
26

QUANTITY =02 AS BUILT


27
28
29
DWG 30
31
32
33
34
35
36
37
38
Laying of Flowlines for Paniro Muban Fuel Gas Prepared By: Arfan Ali Sheet 01 OF 01
Project: Project 4"Øx13KM Date:
LINE#
Signature
CRF# 2017-10195994 AFE# 710238