Note: Net present value (NPV) is a measurement of the profitability of an undertaking that is calculated by subtracting the cash
outflows (including initial cost) from the present values of cash inflows over a period of time.
2
WTTx: New Fixed Broadband
Outdoor CPE
4
PTS Case Study: Vilhelmina
Type area A:
- The distance between the households in the area are typically 50-500 meters.
- Households located in clusters.
Type area B:
- The distances between households are typically 50-500 meters.
- Households are in a row, often along a water line or road.
Type area C:
- The distances between households is 100-3000 meters.
- A small number of households per area
Proposed Solution:
Using existing mobile network resource can help with 30Mbps fast deployment:
5
PTS Case Study: Multi Carrier Site Coverage Range
7
PTS Case Study: User Capacity per Site
Subscriber Number of
Cell Peak Huawei e2e
Offered Subscriber Cell Overload Supported
BW Technology Throughput Solution
Throughput Active Ratio Threshold Subscribers
(Mbps) Available
(Mbps) Per site
FDD 2.6G+ 1.8G 2CC+4*4 600 30 100% 80% 48 Ready
40M
FDD 800M/900M + 3CC+2*2 525 30 100% 80% 42 Ready
1.8G + 2.6G
10M+20M+40M
FDD 800M/900M + 3CC+4*4 1050 30 100% 80% 84 2017
1.8G + 2.6G
10M+20M+40M
TDD 3.5G 40MHz 2CC+4*4 440 30 100% 80% 35 Ready
8
WTTx Capacity: the Way to Gbps
6~8x
Spectral Efficiency
1Gbps
User Peak Tput
Carrier Aggregation
>4x 4x4 MIMO 3D-MIMO
TDD … 2x 5x of 8T8R
256QAM
1.3 x FDD …
eNB: 4T4R and above Soft Split
CPE: 4Rx
~1.7 x
8T8R