“ AUTOMATIC METRO TRAIN TO SHUTTLE BETWEEN TWO

STATIONS”

Prem chand bharti #1, Ratnesh pandey *2, Ashish mishra#3


Department of Electronics & Communication Department of Electronics & Communication Department of Electronics & Communiaction
P. I. G. C. E. Nagpur India, P.I.G.C.E Nagpur India, P.I.G.C.E NagpurIndia
prem501746@gmail.com rpbst.p@gmail.com
ashishkumarmishra 121@gmail.com
infrastructure, where the cases more remunrative which are used in
existing metro system is than constructing new lines most of the
Abstract:- This paper being modernized and or increasing platforms. progressing
illustrates the equipment used
equipped with automatic countries.
in metro train motion which
are used in most of the
train control and safety The thought to train 2. This train
progressed countries. In This system in order to make automation can be justified is equipped with a
automatic metro train we have them more productive. by their various benefits: controller that
provided a arduino based Driverless automated itenary of train operations enables the
controller that facilitates the concepts have been become more exact and automatic running
programmed stopping of the adopted, - timely, the frequentness of of the train from
train from one station to The intent of this project the trains can be improved, one station to
another station. This work is to drive the train especially in low traffic
presents the enhancement another.
automatically with the help hours, as more and trains 3. The
process of a framework for a
driverless train instigated of sensors and safety of can be inserted in traffic objective of the
using a arduino based passengers is the basic without the need for more proposed system is
controller. The hardware concern of our model based operational staff, and the an autonomous
circuits design, which are built prototype metro train. In augmented safety, where train and it
on circuit boards, are provided this project, part of this the element of human error eliminates the need
with various sensors for automation tasks are is taken out completely.
automation purposes. The of any driver. Thus,
considered, and a Arduino- Besides, mechanisation can any human error is
hardware is assembled in a based prototype is reduce the wear-and-tear of
toy-like train framework. ruled out. In this
Driverless trains are outfited
developed. work such as train by optimizing energy project ‘Aurdino
with a control system, which is running through a given consumption and 382’ has been used
programmed to make them path with predefined capacitavly reducing the as CPU.
follow a precise path. Stations stations, and sensing the operating costs through
on such a path, timings of the arrival at the station and more effective and regular
4. Whenever
train and distances between hence, proper stopping are train operation. In a fully the train arrives at
stations are all predefined. implemented in the automatic transit system, the station it stops
Messages and warnings are framework. Information care should be taken for all automatically, as
automatically generated and
that are synched with the the processes that are sensed by an IR
announced to the passengers. sensor. Then the
This paper presents the train's movement through normally requiring human
its path are announced to participation. The initial door opens so that
development process of a the passengers can
framework for a driverless passengers via a lcd display. train departure, trips
Moreover, alarm signals are between two stations, go inside the train.
train implemented using a
ATMEGA328p ARDUINO. produced as appropriate. timing of train stoppage at 5. It is
The hardware circuits, which Controlling of the doors in individual stations, and equipped with a
are built on handmade pcb terms of open and close and controlling the train doors passenger counting
board are interfaced with timings of such actions are are examples of such section, which
various sensors for automation counts the number
considered. processes. In addition, there
purposes. The arduinoC of passengers
programming language is used are normally various
activities that should be leaving and
for programming the arduino.
automated too. The safety entering the train.
systems represents There should be a
Introduction:- important activities that passenger limit for
renegade trains must have; example 20
Recent technological Driverless train like fire alarms with passengers is the
advancement are being implementation:- automatic fire fighting limit – after 20
asimilated in almost all systems, sensing of any passengers getting
point of our life including possible damage in the into the train the
transit transportation, The role of any train track and providing the doors will be
where a lot of upgradation conveyance system is to information to the next automatically
has been made. Railroad provide secure, consistent, train on the same track as closed.
transport, for fact, has efficient and high-quality well as to the base . 6. The door
undergone a huge service to passengers. As then closes and the
transformation, starting many transit lines run at or train starts after a
with the early steam near their capacity limits, Objectives:- prescribed time
operated engines to the automation is often the only (there will be a
most recent bullet train. way to maximize the time set already as
1. This
operative performance of a project is intended to how many
Many developments in train service system. minutes the train
to manifest the
transit transport has applied on prevailing lines, will stop at every
technology used in
utilized the existing mechanisation is in many station) set in the
metro train motion
controller by the more advanced by trains are equipped 382 as CPU. The
program. The displaying the with CPU, which motion of the train
passenger counts status of the train control the chain. is controlled by the
and the stations are over a larger The train is Stepper Motor, for
displayed on a display unit for the programmed for displaying message
LCD display convenience of the the specific path. in the train . In our
interfaced to the passengers. The Every station on project, we have
Aurdino 382 status of the train the path is defined; used IR sensors,
board. consists of the stoppage timing of where at proper
7. The parameters like, the train and locations with
movement of the expected arrival distance between respect to each
train is controlled and departure time the two stations is station, an IR
by a motor driver etc. passengers. predefined. The transmitter is
IC interfaced to The status of the 230 volts is situated. Whereas
the Aurdino. train consists of the attenuated by 9 the other part of
8. The train parameters like, volts by the IR sensor, the
incorporates a expected arrival transformer. Then receiver, is installed
buzzer to alert the and departure time it is rectified by the on the train.
passengers before etc. bridge rectifier Whenever a train
closing the door made up of diodes. travelling between
and also warn Methodology:- Then the 9 v is stations, decodes a
them before regulated by 7805. relevant IR signal,
Block diagram 1000 micro farad it will start its
staring. when the description :-
train reaches its capacitor is used to preparation to stop
next stop the filter the DC at the coming
process is being METRO TRAIN voltage. The LED station.
repeted to achieve PROTOTYPE is attached to it
its desired an arduino based checks the flow of
operation. device. It is used in power supply. In
driverless metro this project we try
9. 9. train, which is used to give the same
Further in most of framework for this
the project can be progressing type of trains. We
enhanced by countries. These are using arduino
making this system

POWER SUPPLY

LCD DISPLAY UNIT

TX

Door
DOOR 1
SENSOR MOTOR
RX CKT DRIVER

ARDUINO
Wheels

OBSTACLE TRAIN MOTOR


SENSOR

Fig :- Block Diagram of automatic metro train to shuttle between two stations
4. When the peoples Underground". The
enter in the train the Railway Magazine
sensor count the no of (London) 101 (648): 279–
people entering in the 281. April 1955.
train ,when counting [2] E. Fischer.
complete the train door "Justifying automation".
automatically closed or if Railway-Technology.com.
in the 30 second the 23 August 2011.
counting not completed [3] S. Cappaert-
the door will Blondelle. Metro
automatically closed. Automation Facts, Figues
5. Then the train and Trends. The
start to moving next International Association of
staion after either Public Transport (UITP).
completing the count of Technical report . Belgium.
20 people or after 30 Conclusion:- 2012.
second. [4] J.M. Erbina, and C.
The driverless train Soulasa. Twenty Years of
6. when the train framework that is Experiences with Driverless
arrivies at the presented in this paper is Metros in France. VWT 19
predefined destination our final year project. A proceedings. Dresden. 2003.
train stops automatically general conclusion that can [5] Transportation
and the door of the be said about such system division. The Dubai
train opens and then engineering projects is that Metro, the World’s Longest
with the help of sensor they are introducing Fully Automated Metro
again counting starts for students to an open horizon Network. Mitsubishi
the people who exit from of developments. Such Heavy Industries Technical
the train and then it also projects can only represent Review Vol. 49. No. 2 .June
Result:- checks the number of
An example of how a minor part of what the 2012.
people who enters in the future and technology [6] S. HAN, S. LEE,
embedded train and after checking. integration may look like W.KIM. Development of
technology is used the counting begins after for the modernization of Onboard Train Automatic
in application, 30 second and its again different service sectors Control System for Korean
move to next stations. 7 including transport. Standard EMU.
specifically in the .it also has an obsatacle
transport sector is Researching and Processing's of the ISIE
sensor which determines developing a working 2001 conference. 2001.
presented in this the obstacle immediately framework enhance self Pusan, KOREA.
paper stopping the train. confidence and assure that [7] H. Jun, and S. Choi.
it is possible to design a Development of a Multi-
1. This project is system and apply it for train Operation Simulator
working on aurdino. Its solving a particular with Interactive Human
a robotic train with problem by acquiring the Computer Interfaces.
sensors at both end. necessary information. International Conference
2. If the train comes Moreover, developing a on Hybrid Information
on to the station it stop prototype system can serve Technology (ICHIT'06).
automatically at the as a basis of a far more 2006. Cheju Island, Korea.
station with the help of sophisticated and advance [8] M. P. Georgescu.
IR sensor means that it form of control system such Driverless CBTC – specific
has got a automatic start as a real driverless train requirements for CBTC
and stop arrangement. system. systems to overcome
3. Then its count the operation challenges. WIT
number of peoples Transactions on The Built
entering in the train. for Environment, Vol 88. 2008.
eg. There is the counting pp. 401-409.
sensor which count [9] H. Yun, and K. Lee.
number of people Development of the Train
entering in the train with Control System Data
timing sensor (eg. sensor Transmission Technology
count 20 peoples and REFRENCES:- Using a Wi-Fi Mesh.
there is timing sensor Proceeding if the ICTC
with 30 second). [1] B.W.C. Cooke. 2011. Seoul . Sept 2011. Pp
"Proposed New London 406-410.
[10] M. Siemiatycki.
Message in a Metro:
Building Urban Rail
Infrastructure and Image
in Delhi, India.
International Journal of
Urban and Regional
Research, vol. 30, pp. 289-
92
. [11] M. Verle . PIC
Microcontrollers -
Programming in C.
mikroElektronika; 1st
edition .2009.