Costo Directo - 38,094,377.00 1,550,222.15 343,245.80 1,932,612.59 1,673,621.96 1,815,495.01 1,804,223.40 1,935,828.40 1,790,145.51 5,245,836.11
Gastos Generales 20.00% 7,618,875.40 310,044.43 68,649.16 386,522.52 334,724.39 363,099.00 360,844.68 387,165.68 358,029.10 1,049,167.22
Utilidad 10.00% 3,809,437.70 155,022.22 34,324.58 193,261.26 167,362.20 181,549.50 180,422.34 193,582.84 179,014.55 524,583.61
Valorizacion Mensual Sin IGV - 49,522,690.10 2,015,288.80 446,219.56 2,512,396.37 2,175,708.55 2,360,143.51 2,345,490.42 2,516,576.92 2,327,189.16 6,819,586.94
Resumen de Valorizaciones de la Obra Principal
Costo Directo - 38,094,377.00 5,075,487.30 3,419,815.94 2,894,375.15 2,526,228.95 3,343,854.16 845,712.48 886,575.26 310,845.12 -
Gastos Generales 20.00% 7,618,875.40 1,015,097.46 683,963.19 578,875.03 505,245.79 675,281.38 169,142.50 177,315.05 62,169.02 -
Utilidad 10.00% 3,809,437.70 507,548.73 341,981.59 289,437.51 252,622.90 334,385.42 84,571.25 88,657.53 31,084.52 -
Valorizacion Mensual Sin IGV - 49,522,690.10 6,598,133.49 4,445,760.72 3,762,687.69 3,284,097.64 4,353,520.96 1,099,426.23 1,152,547.84 404,098.66 -
Resumen de Valorizaciones de la Obra Principal
ACUMULADO
COSTO
ITEM DESCRIPCION UND. METRADO PARCIAL S/.
UNITARIO S/. METRADO VALORIZADO % DE AVANCE
COSTO Valorizacion N° 01
ITEM DESCRIPCION UND. METRADO UNITARIO PARCIAL S/. Ago-15
S/. METRADO PARCIAL
- 797.23 595.62
376.05 797.23 280.94 595.62
- 35,121.23 567.11
674.85 4,114.06
545.70 2,281.03 135.69 567.11
774.99 25,893.42
78.69 2,832.72
- 18,177.27 5,344.95
545.70 18,177.27 160.56 5,344.95
- 284,306.52 91,956.67
1,207.97 73,529.13 337.03 20,599.81
261.46 122,005.08 70.27 32,819.43
17,006.19 88,772.31 7,389.43 38,537.43
- 28,874.92
310.65 28,874.92
- 13,626.20
- - 171.37 543.24
- - 16.71 558.28
- - 85.69 3,797.78
- - 20.56 8,726.90
367,277.17 112,090.55
72,206.69 22,037.00
36,727.72 11,209.06
476,211.58 145,336.61
14.71% 4.49%
Resumen de Valorizaciones de la Variacion N° 04.
Valorizacion N° 15 ACUMULADO
Oct-16
METRADO PARCIAL METRADO VALORIZADO % DE AVANCE
- - 4,414.73 100.00%
- 2,082.42 4,414.73 100.00%
- - 269,849.47 100.00%
- 5,662.78 34,542.96 100.00%
- 3,541.43 14,803.18 100.00%
- 2,831.64 94,605.09 100.00%
- 3,484.59 125,898.24 100.00%
- - 117,965.03 100.00%
- 3,541.43 117,965.03 100.00%
- - 2,024,499.03 100.00%
- 8,648.73 526,448.20 100.00%
- 1,824.04 851,151.79 100.00%
- 123,927.02 646,899.04 100.00%
37,849.24 - 66,724.16 100.00%
407.20 37,849.24 717.85 66,724.16 100.00%
- - 13,626.20 100.00%
- 171.37 543.24 100.00%
- 16.71 558.28 100.00%
- 85.69 3,797.78 100.00%
- 20.56 8,726.90 100.00%
37,849.24
7,441.17
3,784.91
49,075.32
1.52%
Resumen de Valorizaciones de la Variacion N° 03.
ACUMULADO
COSTO
ITEM DESCRIPCION UND. METRADO PARCIAL S/. METRADO VALORIZADO % DE AVANCE
UNITARIO S/.
COSTO
ITEM DESCRIPCION UND. METRADO PARCIAL S/. Valorizacion N° 01 Valorizacion N° 02 Valorizacion N° 03 Valorizacion N° 04 Valorizacion N° 05 Valorizacion N° 06 Valorizacion N° 07 Valorizacion N° 08 Valorizac
UNITARIO S/. Nov-15 Dic-15 Ene-16 Feb-16 Mar-16 Abr-16 May-16 Jun-16 Jul
METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO
I PARTIDAS CONTRACTUALES
I.1 PARTIDAS DE EDIFICACIONES ########## 78,748.84 62,016.71 448,891.84 103,850.73 312,469.89 118,848.75 5,625.89
01 MOVIMIENTO DE TIERRAS 45,197.79 45,197.79
01.01 RELLENO COMPACTADO CON MATERIAL DE PR m3 1,111.33 40.67 45,197.79 1,111.33 45,197.79
02 TRANSPORTE 33,551.05 33,551.05
02.01 TRANSPORTE DE MATERIAL DE CANTERA P/RE m3 1,111.33 30.19 33,551.05 1,111.33 33,551.05
03 CONCRETO ARMADO ########## 62,016.71 448,891.84 103,850.73 312,469.89 118,848.75 5,625.89
03.01 LOSA DE CIMENTACION 44,554.39 11,254.95 26,180.41 1,493.14 5,625.89
03.01.01 ENCOFRADO Y DESENCOFRADO NORMAL LOSA m2 191.49 64.91 12,429.62 117.51 7,628.06 8.20 531.99 14.93 969.51 50.85 3,300.06
03.01.02 ACERO CORRUGADO FY=4200 KG/CM2 kg 6,154.17 5.22 32,124.77 694.73 3,626.89 4,913.74 25,648.42 100.40 523.63 445.30 2,325.83
3.02 COLUMNAS 638,468.71 10,129.51 321,261.57 73,829.47 185,474.52 47,773.64
03.02.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 CO m3 377.14 435.93 164,406.64 4.23 1,841.35 198.68 86,609.42 51.90 22,622.35 98.93 43,123.86 23.40 10,209.66
03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL COL m2 3,051.35 65.22 199,009.05 76.97 5,015.03 1,476.60 96,300.48 401.02 26,149.79 1,050.31 68,498.92 46.45 3,044.83
03.02.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 52,692.15 5.22 275,053.02 624.95 3,273.13 26,504.18 138,351.67 4,798.90 25,057.33 14,148.02 73,851.74 6,616.10 34,519.15
3.03 VIGAS 243,077.77 17,398.19 52,698.08 10,212.60 109,307.75 53,461.15
03.03.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 VI m3 162.93 435.93 71,026.07 12.62 5,504.52 31.51 13,736.44 12.77 5,568.44 81.23 35,413.60 24.80 10,803.07
03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL VIGA m2 1,192.84 64.89 77,403.39 91.28 5,921.36 224.26 14,551.84 44.77 2,902.63 608.71 39,498.95 223.82 14,528.61
03.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 18,131.86 5.22 94,648.31 1,144.29 5,972.31 4,676.35 24,409.80 333.64 1,741.53 6,588.37 34,395.20 5,389.21 28,129.47
03.04 LOSAS ALIGERADAS 58,983.99 23,234.06 16,808.05 9,080.41 9,130.85 730.62
03.04.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 LO m3 34.70 435.93 15,126.77 12.98 5,658.92 8.63 3,762.03 4.26 1,857.57 7.15 3,117.63 1.68 730.62
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA m2 360.43 64.85 23,373.89 153.08 9,926.89 103.87 6,736.36 50.08 3,246.63 53.40 3,464.01
03.04.03 LADRILLO ARCILLA PARA TECHO 15X30X30 CM und 2,998.00 2.61 7,824.78 1,242.00 3,241.81 967.00 2,523.49 524.50 1,368.55 264.50 690.93
03.04.04 ACERO CORRUGADO FY=4200 KG/CM2 kg 2,425.01 5.22 12,658.55 844.26 4,406.44 725.44 3,786.17 499.59 2,607.66 355.72 1,858.28
03.05 LOSAS MACIZAS 60,877.36 29,446.39 7,986.70 7,737.45 15,706.82
03.05.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 LO m3 92.44 426.49 39,424.74 35.81 15,273.14 6.13 2,613.86 13.67 5,830.92 36.83 15,706.82
03.05.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA m2 85.84 65.20 5,596.77 53.08 3,461.04 31.99 2,085.92 0.77 49.81
03.05.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 3,037.52 5.22 15,855.85 2,052.03 10,712.21 629.76 3,286.92 355.73 1,856.72
03.06 ESCALERA 5,741.59 2,497.34 1,248.41 819.32 1,176.52
03.06.01 CONCRETO PREMEZCLADO F'C=280 KG/CM2 CP m3 10.79 466.63 5,034.94 4.74 2,211.85 2.37 1,105.67 1.60 746.68 2.08 970.74
03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN E m2 10.89 64.89 706.65 4.40 285.49 2.20 142.74 1.12 72.64 3.17 205.78
I.2 PARTIDAS DE OBRAS EXTERIORES 979,925.28 809,974.32 142,997.37 26,953.59
04 MOVIMIENTO DE TIERRAS 173,420.47 117,509.71 47,043.52 8,867.24
04.01 RELLENO COMPACTADO CON MATERIAL DE PR m3 10,587.33 16.38 173,420.47 7,173.59 117,509.71 2,872.01 47,043.52 541.73 8,867.24
05 TRANSPORTE 353,722.70 239,682.50 95,953.85 18,086.35
05.01 TRANSPORTE DE MATERIAL DE PRESTAMO P/R m3 10,587.33 33.41 353,722.70 7,173.59 239,682.50 2,872.01 95,953.85 541.73 18,086.35
06 MUROS DE CONTENCION 452,782.11 452,782.11
06.01 OBRAS PRELIMINARES 759.15 759.15
06.01.01 TRAZO Y REPLANTEO C/EQUIPO m 358.09 2.12 759.15 358.09 759.15
06.02 MOVIMIENTO DE TIERRAS 25,091.18 25,091.18
06.02.01 EXCAV. MASIVA m3 608.79 6.10 3,713.62 608.79 3,713.62
06.02.02 NIVELACION DE TERRENO m2 248.30 4.18 1,037.89 248.30 1,037.89
06.02.03 TRANSPORTE DE MATERIAL EXCEDENTE A DM m3 608.79 33.41 20,339.67 608.79 20,339.67
06.03 CONCRETO SIMPLE 8,270.87 8,270.87
06.03.01 CONCRETO F'C=100 KG/CM2 SOLADOS E=4" m2 248.30 33.31 8,270.87 248.30 8,270.87
06.04 CONCRETO ARMADO 418,660.91 418,660.91
06.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN B m2 2,357.46 60.87 143,498.59 2,357.46 143,498.59
06.04.02 CONCRETO PREMEZCLADO F'C=280 KG/CM2 m3 509.67 466.63 237,827.31 509.67 237,827.31
06.04.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 7,152.30 5.22 37,335.01 7,152.30 37,335.01
II PARTIDAS NUEVAS-DE EDIFICACIONES ########## 1,033,824.52 498,964.96 239,322.69 39,908.70 14,733.26
07 CONCRETO ARMADO ########## 1,033,824.52 498,964.96 239,322.69 39,908.70 14,733.26
07.01 LOSA DE CIMENTACION ########## 1,033,824.52 494,376.34 239,322.69
07.01.01 CONCRETO PREMEZCLADO F'C=280 KG/CM2 LO m3 3,886.29 454.81 ########## 2,273.22 1,033,824.52 1,086.90 494,376.34 526.17 239,322.69
07.02 PLACAS DE CONCRETO ARMADO 39,908.70 39,908.70
07.02.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 PL m3 28.76 460.42 13,241.68 28.76 13,241.68
07.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PLAC m2 329.76 53.45 17,625.67 329.76 17,625.67
07.02.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 1,732.06 5.22 9,041.35 1,732.06 9,041.35
07.03 ZAPATAS AISLADAS 7,246.56 7,246.56
07.03.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 ZA m3 9.26 428.56 3,968.47 9.26 3,968.47
07.03.02 ENCOFRADO Y DESENCOFRADO NORMAL ZAPA m2 33.20 64.91 2,155.01 33.20 2,155.01
07.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 215.15 5.22 1,123.08 215.15 1,123.08
07.04 CIMIENTOS CORRIDOS 12,075.32 4,588.62 7,486.70
07.04.01 CONCRETO CICLOPEO 1:10(C:H) + 30% P.G.-CIM m3 75.85 159.20 12,075.32 28.82 4,588.62 47.03 7,486.70
1.2 Presupuesto de Obra: - ########## 1,922,547.68 560,981.67 688,214.53 143,759.43 312,469.89 118,848.75 157,730.63 32,579.48
- 19.66% - 377,972.87 110,289.00 135,302.98 28,263.10 61,431.58 23,365.66 31,009.84 6,405.13
- 10.00% - 192,254.77 56,098.17 68,821.45 14,375.94 31,246.99 11,884.88 15,773.06 3,257.95
Sub-Total de Obra - ########## 2,492,775.32 727,368.84 892,338.96 186,398.47 405,148.46 154,099.29 204,513.53 42,242.56
Servicio por revisión y rediseños de estructuras de edificaciones - 293,948.00 293,948.00 - - - - - - -
Sub-Total (Obra + Revision y Rediseños) - ########## 2,786,723.32 727,368.84 892,338.96 186,398.47 405,148.46 154,099.29 204,513.53 42,242.56
% DE AVANCE FISICO DE OBRA 51.62% 13.47% 16.53% 3.45% 7.50% 2.85% 3.79% 0.79%
Resumen de Valorizaciones de la Variacion N° 07.
COSTO ACUMULADO
ITEM DESCRIPCION UND. METRADO PARCIAL S/.cion N° 09 Valorizacion N° 10 Valorizacion N° 11
UNITARIO S/. -16 Ago-16 Set-16
METRADO VALORIZADO % DE AVANCE
PARCIAL METRADO PARCIAL METRADO PARCIAL
I PARTIDAS CONTRACTUALES - -
I.1 PARTIDAS DE EDIFICACIONES ########## 5,625.89 - 1,136,078.54 100.50%
01 MOVIMIENTO DE TIERRAS 45,197.79 - - 45,197.79 100.00%
01.01 RELLENO COMPACTADO CON MATERIAL DE PR m3 1,111.33 40.67 45,197.79 - 1,111.33 45,197.79 100.00%
02 TRANSPORTE 33,551.05 - - 33,551.05 100.00%
02.01 TRANSPORTE DE MATERIAL DE CANTERA P/RE m3 1,111.33 30.19 33,551.05 - 1,111.33 33,551.05 100.00%
03 CONCRETO ARMADO ########## 5,625.89 - 1,057,329.70 100.53%
03.01 LOSA DE CIMENTACION 44,554.39 5,625.89 - 50,180.28 112.63%
03.01.01 ENCOFRADO Y DESENCOFRADO NORMAL LOSA m2 191.49 64.91 12,429.62 50.85 3,300.06 242.34 15,729.68 126.55%
03.01.02 ACERO CORRUGADO FY=4200 KG/CM2 kg 6,154.17 5.22 32,124.77 445.30 2,325.83 6,599.47 34,450.60 107.24%
3.02 COLUMNAS 638,468.71 - 638,468.71 100.00%
03.02.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 CO m3 377.14 435.93 164,406.64 377.14 164,406.64 100.00%
03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL COL m2 3,051.35 65.22 199,009.05 3,051.35 199,009.05 100.00%
03.02.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 52,692.15 5.22 275,053.02 52,692.15 275,053.02 100.00%
3.03 VIGAS 243,077.77 - 243,077.77 100.00%
03.03.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 VI m3 162.93 435.93 71,026.07 162.93 71,026.07 100.00%
03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL VIGA m2 1,192.84 64.89 77,403.39 1,192.84 77,403.39 100.00%
03.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 18,131.86 5.22 94,648.31 18,131.86 94,648.31 100.00%
03.04 LOSAS ALIGERADAS 58,983.99 - 58,983.99 100.00%
03.04.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 LO m3 34.70 435.93 15,126.77 34.70 15,126.77 100.00%
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA m2 360.43 64.85 23,373.89 360.43 23,373.89 100.00%
03.04.03 LADRILLO ARCILLA PARA TECHO 15X30X30 CM und 2,998.00 2.61 7,824.78 2,998.00 7,824.78 100.00%
03.04.04 ACERO CORRUGADO FY=4200 KG/CM2 kg 2,425.01 5.22 12,658.55 2,425.01 12,658.55 100.00%
03.05 LOSAS MACIZAS 60,877.36 - 60,877.36 100.00%
03.05.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 LO m3 92.44 426.49 39,424.74 92.44 39,424.74 100.00%
03.05.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA m2 85.84 65.20 5,596.77 85.84 5,596.77 100.00%
03.05.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 3,037.52 5.22 15,855.85 3,037.52 15,855.85 100.00%
03.06 ESCALERA 5,741.59 - 5,741.59 100.00%
03.06.01 CONCRETO PREMEZCLADO F'C=280 KG/CM2 CP m3 10.79 466.63 5,034.94 10.79 5,034.94 100.00%
03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN E m2 10.89 64.89 706.65 10.89 706.65 100.00%
I.2 PARTIDAS DE OBRAS EXTERIORES 979,925.28 26,953.59 - 1,006,878.87 102.75%
04 MOVIMIENTO DE TIERRAS 173,420.47 8,867.24 - 182,287.71 105.11%
04.01 RELLENO COMPACTADO CON MATERIAL DE PR m3 10,587.33 16.38 173,420.47 541.73 8,867.24 11,129.06 182,287.71 105.11%
05 TRANSPORTE 353,722.70 18,086.35 - 371,809.05 105.11%
05.01 TRANSPORTE DE MATERIAL DE PRESTAMO P/R m3 10,587.33 33.41 353,722.70 541.73 18,086.35 11,129.06 371,809.05 105.11%
06 MUROS DE CONTENCION 452,782.11 - - 452,782.11 100.00%
06.01 OBRAS PRELIMINARES 759.15 - - 759.15 100.00%
06.01.01 TRAZO Y REPLANTEO C/EQUIPO m 358.09 2.12 759.15 - 358.09 759.15 100.00%
06.02 MOVIMIENTO DE TIERRAS 25,091.18 - - 25,091.18 100.00%
06.02.01 EXCAV. MASIVA m3 608.79 6.10 3,713.62 - 608.79 3,713.62 100.00%
06.02.02 NIVELACION DE TERRENO m2 248.30 4.18 1,037.89 - 248.30 1,037.89 100.00%
06.02.03 TRANSPORTE DE MATERIAL EXCEDENTE A DM m3 608.79 33.41 20,339.67 - 608.79 20,339.67 100.00%
06.03 CONCRETO SIMPLE 8,270.87 - - 8,270.87 100.00%
06.03.01 CONCRETO F'C=100 KG/CM2 SOLADOS E=4" m2 248.30 33.31 8,270.87 - 248.30 8,270.87 100.00%
06.04 CONCRETO ARMADO 418,660.91 - - 418,660.91 100.00%
06.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN B m2 2,357.46 60.87 143,498.59 - 2,357.46 143,498.59 100.00%
06.04.02 CONCRETO PREMEZCLADO F'C=280 KG/CM2 m3 509.67 466.63 237,827.31 - 509.67 237,827.31 100.00%
06.04.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 7,152.30 5.22 37,335.01 - 7,152.30 37,335.01 100.00%
II PARTIDAS NUEVAS-DE EDIFICACIONES ########## - - 1,826,754.13 100.00%
07 CONCRETO ARMADO ########## - - 1,826,754.13 100.00%
07.01 LOSA DE CIMENTACION ########## - - 1,767,523.55 100.00%
07.01.01 CONCRETO PREMEZCLADO F'C=280 KG/CM2 LO m3 3,886.29 454.81 ########## - 3,886.29 1,767,523.55 100.00%
07.02 PLACAS DE CONCRETO ARMADO 39,908.70 - - 39,908.70 100.00%
07.02.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 PL m3 28.76 460.42 13,241.68 - 28.76 13,241.68 100.00%
07.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PLAC m2 329.76 53.45 17,625.67 - 329.76 17,625.67 100.00%
07.02.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 1,732.06 5.22 9,041.35 - 1,732.06 9,041.35 100.00%
07.03 ZAPATAS AISLADAS 7,246.56 - - 7,246.56 100.00%
07.03.01 CONCRETO PREMEZCLADO F'C=210 KG/CM2 ZA m3 9.26 428.56 3,968.47 - 9.26 3,968.47 100.00%
07.03.02 ENCOFRADO Y DESENCOFRADO NORMAL ZAPA m2 33.20 64.91 2,155.01 - 33.20 2,155.01 100.00%
07.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 215.15 5.22 1,123.08 - 215.15 1,123.08 100.00%
07.04 CIMIENTOS CORRIDOS 12,075.32 - - 12,075.32 100.00%
07.04.01 CONCRETO CICLOPEO 1:10(C:H) + 30% P.G.-CIM m3 75.85 159.20 12,075.32 - 75.85 12,075.32 100.00%
COSTO ACUMULADO
ITEM DESCRIPCION UND. METRADO PARCIAL S/.
UNITARIO S/. METRADO VALORIZADO % DE AVANCE
01 PARTIDAS CONTRACTUALES
01.01 MUROS Y TABIQUES DE ALBAÑILERIA 91,146.90 - 91,146.90 100.00%
01.01.01 MURO LADR.K.K. DE SOGA MEZC.C:A 1:4, TIPO IV P.TARRAJ. m2 1,335.29 68.26 91,146.90 1,335.29 91,146.90 100.00%
01.02 REVOQUES Y ENLUCIDOS 89,281.57 - 89,281.57 100.00%
01.02.01 TARRAJEO MUROS INT.FROTACHADO MEZ.C:A 1:5,E=1.5 CM. m2 813.19 22.46 18,264.25 813.19 18,264.25 100.00%
01.02.02 TARRAJEO MUROS EXT.FROTACHADO MEZ.C:A 1:5,E=1.5 CM. m2 1,556.42 27.77 43,221.78 1,556.42 43,221.78 100.00%
01.02.03 TARRAJEO COLUMNAS MEZ.C:A 1:5,E=1.5 CM. m2 91.67 31.31 2,870.19 91.67 2,870.19 100.00%
01.02.04 TARRAJEO VIGAS MEZ.C:A 1:5,E=1.5 CM. m2 139.36 31.31 4,363.36 139.36 4,363.36 100.00%
01.02.05 CIELORASO CON MEZC.C:A 1:4 E=1.5 CM. m2 192.95 48.00 9,261.60 192.95 9,261.60 100.00%
01.02.06 VESTIDURA DE DERRAMES E=0.15M m 856.09 13.20 11,300.39 856.09 11,300.39 100.00%
01.03 PISOS Y PAVIMENTOS 3,867.41 - 3,867.41 100.00%
01.03.01 CONTRAPISO DE 40 MM m2 126.51 30.57 3,867.41 126.51 3,867.41 100.00%
01.04 ZOCALOS Y CONTAZOCALOS 1,780.81 - 1,780.81 100.00%
01.04.01 CONTRAZOCALO CEMENTO PULIDO H = 0.30 M MEZ. 1:5 m 106.19 16.77 1,780.81 106.19 1,780.81 100.00%
01.05 CUBIERTAS 56,910.82 - 56,910.82 100.00%
01.05.01 CUB. TIPO CALAMINO DR-6 O SIMILAR m2 226.89 250.83 56,910.82 226.89 56,910.82 100.00%
01.06 CERRAJERIA 1,229.52 - 1,229.52 100.00%
01.06.01 CERRADURA PARA PUERTAS EXTERIORES pza 3.00 110.60 331.80 3.00 331.80 100.00%
01.06.02 COLOCACION DE CERRADURAS pza 3.00 40.58 121.74 3.00 121.74 100.00%
01.06.03 BISAGRA CAPUCHINA 3/2"X3/2" pza 18.00 43.11 775.98 18.00 775.98 100.00%
01.07 PINTURA 41,626.11 - 41,626.11 100.00%
01.07.01 PINTURA MUROS INTERIORES C/LATEX (2 MANOS) m2 863.22 11.53 9,952.93 863.22 9,952.93 100.00%
01.07.02 PINTURA COLUMNAS C/LATEX (2 MANOS) m2 89.67 13.79 1,236.55 89.67 1,236.55 100.00%
01.07.03 PINTURA MUROS EXTERIORES C/LATEX (2 MANOS) m2 1,627.27 14.99 24,392.78 1,627.27 24,392.78 100.00%
01.07.04 PINTURA CIELORASOS C/LATEX (2 MANOS) m2 192.95 16.80 3,241.56 192.95 3,241.56 100.00%
01.07.05 PINTURA VIGAS C/LATEX (2 MANOS) m2 139.36 16.80 2,341.25 139.36 2,341.25 100.00%
01.07.06 PINTURA AL DUCO EN PUERTAS DE MADERA, DOS MANOS, CON IMPRIMANTE m2 13.82 33.36 461.04 13.82 461.04 100.00%
02.00 PARTIDAS NUEVAS 541,738.74 - 541,738.74 100.00%
02.01 MUROS Y TABIQUES DE ALBAÑILERIA 112,978.12 - 112,978.12 100.00%
02.01.01 MURO DE LADRILLO KK CABEZA 18 HUECOS m2 123.58 115.18 14,233.94 123.58 14,233.94 100.00%
02.01.02 CERCO TIPO UNI h = 2.40 m m 274.48 359.75 98,744.18 274.48 98,744.18 100.00%
02.02 PISOS Y PAVIMENTOS 5,465.23 - 5,465.23 100.00%
02.02.01 PISO DE CEMENTO SEMIPULIDO Y BRUÑADO E= 2" m2 126.51 43.20 5,465.23 126.51 5,465.23 100.00%
02.03 ZOCALOS Y CONTAZOCALOS 2,831.06 - 2,831.06 100.00%
02.03.01 CONTRAZOCALO DE CEMENTO TARRAJEADO H= 0.60 m E = 2 cm m 74.58 37.96 2,831.06 74.58 2,831.06 100.00%
02.04 CUBIERTAS 331,673.42 - 331,673.42 100.00%
02.04.01 IMPERMEABILIZACION DE TECHO m2 5,858.14 25.33 148,386.69 5,858.14 148,386.69 100.00%
02.04.02 CUB. TIPO CALAMINO DR-6 O SIMILAR, CON ESTRUCTURA METALICA LIVIANA m2 1,089.76 168.19 183,286.73 1,089.76 183,286.73 100.00%
02.05 CARPINTERIA METALICA Y HERRERIA 88,790.91 - 88,790.91 100.00%
02.05.01 BARANDA METALICA H=0.25 M m 541.83 24.62 13,339.85 541.83 13,339.85 100.00%
02.05.02 PUERTA DE FIERRO CON MALLA m2 95.06 179.65 17,077.53 95.06 17,077.53 100.00%
02.05.03 VENTANA DE FIERRO CON MALLA m2 23.40 197.35 4,617.99 23.40 4,617.99 100.00%
02.05.04 ESTRUCTURA METALICA PARA EXCLUSA und 16.00 757.81 12,124.96 16.00 12,124.96 100.00%
02.05.05 PUERTA DE FIERRO CON MALLA - CERCO TIPO UNI m2 97.54 169.18 16,501.82 97.54 16,501.82 100.00%
02.05.06 PUERTA DE CERCO METALICO m2 27.36 99.50 2,722.32 27.36 2,722.32 100.00%
02.05.07 CERCO METALICO h = 2.40 m m2 260.54 86.00 22,406.44 260.54 22,406.44 100.00%
Valorizacion N° 1 Valorizac
COSTO Nov-16 Dic
ITEM DESCRIPCION UND. METRADO PARCIAL S/.
UNITARIO S/. METRADO PARCIAL METRADO
01 PRESUPUESTO DE VARIACION Nº 05 - MODIFICACION DE ACCESOS AL CEBAF 975,776.89 849026.89
02.00 MOVIMIENTO DE TIERRAS 192,077.49 192077.49
02.01 CORTE DE MATERIAL SUELTO m3 1,485.51 4.58 6,803.64 1485.51 6803.64
02.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 11,310.98 16.38 185,273.85 11310.98 185273.85
03.00 TRANSPORTE 427,530.73 427530.73
03.01 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 1,485.51 33.41 49,630.89 1485.51 49630.89
03.02 TRANSPORTE DE MATERIAL DE PRESTAMO PARA RELLENO m3 11,310.98 33.41 377,899.84 11310.98 377899.84
04.00 MURO DE CONTENCION 89,180.77 89180.77
04.01 OBRAS PRELIMINARES 383.74 383.74
04.01.01 TRAZO Y REPLANTEO C/EQUIPO m 181.01 2.12 383.74 181.01 383.74
04.02 CONCRETO SIMPLE 5,218.68 5218.68
04.02.01 CONCRETO F'C=100 KG/CM2 SOLADOS E=4" m2 156.67 33.31 5,218.68 156.67 5218.68
04.03 CONCRETO ARMADO 80,771.26 80771.26
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN BASE m2 338.57 60.87 20,608.76 338.57 20608.76
04.03.02 CONCRETO PREMEZCLADO F'C=280 KG/CM2 m3 74.74 466.63 34,875.93 74.74 34875.93
04.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 4,844.17 5.22 25,286.57 4844.17 25286.57
04.04 JUNTAS 2,807.09 2807.09
04.04.01 JUNTA DE DILATACION E=5.00CM m 30.20 92.95 2,807.09 30.20 2807.09
05.00 VEREDAS 9,983.42 9983.42
05.01 BASE PARA VEREDAS E=0.10 M m2 200.43 7.61 1,525.27 200.43 1525.27
05.02 VEREDA DE CONCRETO F'C= 140 KG/CM2, INC. ENCOFRADOS m2 200.43 42.20 8,458.15 200.43 8458.15
06.00 SARDINELES 7,606.35 7606.35
06.01 EXCAVACION Y PERFILADO DE ZANJAS PARA SARDINELES m 73.01 3.17 231.44 73.01 231.44
06.02 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 4.38 33.41 146.34 4.38 146.34
06.03 ENCOFRADO Y DESENC. CARAVISTA SARDINELES m2 94.91 44.32 4,206.41 94.91 4206.41
06.04 CONCRETO F'C=210 KG/CM2 PARA SARDINELES m3 7.12 424.46 3,022.16 7.12 3022.16
07.00 PARTIDAS NUEVAS 246,251.38 119501.38
07.01 MOVIMIENTO DE TIERRAS 12,475.62 12475.62
07.01.01 CORTE DE MATERIAL SEMIROCOSO m3 713.30 17.49 12,475.62 713.30 12475.62
07.02 SEÑALIZACION 233,775.76 107025.76
07.02.01 AMORTIGUADOR DE IMPACTO und 2.00 63,375.00 126,750.00 0.00
07.02.02 BARRERA DE SEGURIDAD m 176.00 471.26 82,941.76 176.00 82941.76
07.02.03 TACHAS DE SEGURIDAD und 1,200.00 20.07 24,084.00 1200.00 24084.00
08.00 VARIOS 3,146.75 3146.75
07.02.01 PUERTA DE FIERRO C/MALLA - CERCO TIPO UNI m2 18.60 169.18 3,146.75 18.60 3146.75
cion N° 2 Valorizacion N° 3
COSTO c-16 Ene-17
ITEM DESCRIPCION UND. METRADO PARCIAL S/.
UNITARIO S/. PARCIAL METRADO PARCIAL
01 PRESUPUESTO DE VARIACION Nº 05 - MODIFICACION DE ACCESOS AL CEBAF 975,776.89
02.00 MOVIMIENTO DE TIERRAS 192,077.49
02.01 CORTE DE MATERIAL SUELTO m3 1,485.51 4.58 6,803.64
02.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 11,310.98 16.38 185,273.85
03.00 TRANSPORTE 427,530.73
03.01 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 1,485.51 33.41 49,630.89
03.02 TRANSPORTE DE MATERIAL DE PRESTAMO PARA RELLENO m3 11,310.98 33.41 377,899.84
04.00 MURO DE CONTENCION 89,180.77
04.01 OBRAS PRELIMINARES 383.74
04.01.01 TRAZO Y REPLANTEO C/EQUIPO m 181.01 2.12 383.74
04.02 CONCRETO SIMPLE 5,218.68
04.02.01 CONCRETO F'C=100 KG/CM2 SOLADOS E=4" m2 156.67 33.31 5,218.68
04.03 CONCRETO ARMADO 80,771.26
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN BASE m2 338.57 60.87 20,608.76
04.03.02 CONCRETO PREMEZCLADO F'C=280 KG/CM2 m3 74.74 466.63 34,875.93
04.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 4,844.17 5.22 25,286.57
04.04 JUNTAS 2,807.09
04.04.01 JUNTA DE DILATACION E=5.00CM m 30.20 92.95 2,807.09
05.00 VEREDAS 9,983.42
05.01 BASE PARA VEREDAS E=0.10 M m2 200.43 7.61 1,525.27
05.02 VEREDA DE CONCRETO F'C= 140 KG/CM2, INC. ENCOFRADOS m2 200.43 42.20 8,458.15
06.00 SARDINELES 7,606.35
06.01 EXCAVACION Y PERFILADO DE ZANJAS PARA SARDINELES m 73.01 3.17 231.44
06.02 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 4.38 33.41 146.34
06.03 ENCOFRADO Y DESENC. CARAVISTA SARDINELES m2 94.91 44.32 4,206.41
06.04 CONCRETO F'C=210 KG/CM2 PARA SARDINELES m3 7.12 424.46 3,022.16
07.00 PARTIDAS NUEVAS 246,251.38
07.01 MOVIMIENTO DE TIERRAS 12,475.62
07.01.01 CORTE DE MATERIAL SEMIROCOSO m3 713.30 17.49 12,475.62
07.02 SEÑALIZACION 233,775.76
07.02.01 AMORTIGUADOR DE IMPACTO und 2.00 63,375.00 126,750.00
07.02.02 BARRERA DE SEGURIDAD m 176.00 471.26 82,941.76
07.02.03 TACHAS DE SEGURIDAD und 1,200.00 20.07 24,084.00
08.00 VARIOS 3,146.75
07.02.01 PUERTA DE FIERRO C/MALLA - CERCO TIPO UNI m2 18.60 169.18 3,146.75
Valorizacion N° 4 Valorizac
COSTO Feb-17 Mar
ITEM DESCRIPCION UND. METRADO PARCIAL S/.
UNITARIO S/. METRADO PARCIAL METRADO
01 PRESUPUESTO DE VARIACION Nº 05 - MODIFICACION DE ACCESOS AL CEBAF 975,776.89
02.00 MOVIMIENTO DE TIERRAS 192,077.49
02.01 CORTE DE MATERIAL SUELTO m3 1,485.51 4.58 6,803.64
02.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 11,310.98 16.38 185,273.85
03.00 TRANSPORTE 427,530.73
03.01 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 1,485.51 33.41 49,630.89
03.02 TRANSPORTE DE MATERIAL DE PRESTAMO PARA RELLENO m3 11,310.98 33.41 377,899.84
04.00 MURO DE CONTENCION 89,180.77
04.01 OBRAS PRELIMINARES 383.74
04.01.01 TRAZO Y REPLANTEO C/EQUIPO m 181.01 2.12 383.74
04.02 CONCRETO SIMPLE 5,218.68
04.02.01 CONCRETO F'C=100 KG/CM2 SOLADOS E=4" m2 156.67 33.31 5,218.68
04.03 CONCRETO ARMADO 80,771.26
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN BASE m2 338.57 60.87 20,608.76
04.03.02 CONCRETO PREMEZCLADO F'C=280 KG/CM2 m3 74.74 466.63 34,875.93
04.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 4,844.17 5.22 25,286.57
04.04 JUNTAS 2,807.09
04.04.01 JUNTA DE DILATACION E=5.00CM m 30.20 92.95 2,807.09
05.00 VEREDAS 9,983.42
05.01 BASE PARA VEREDAS E=0.10 M m2 200.43 7.61 1,525.27
05.02 VEREDA DE CONCRETO F'C= 140 KG/CM2, INC. ENCOFRADOS m2 200.43 42.20 8,458.15
06.00 SARDINELES 7,606.35
06.01 EXCAVACION Y PERFILADO DE ZANJAS PARA SARDINELES m 73.01 3.17 231.44
06.02 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 4.38 33.41 146.34
06.03 ENCOFRADO Y DESENC. CARAVISTA SARDINELES m2 94.91 44.32 4,206.41
06.04 CONCRETO F'C=210 KG/CM2 PARA SARDINELES m3 7.12 424.46 3,022.16
07.00 PARTIDAS NUEVAS 246,251.38
07.01 MOVIMIENTO DE TIERRAS 12,475.62
07.01.01 CORTE DE MATERIAL SEMIROCOSO m3 713.30 17.49 12,475.62
07.02 SEÑALIZACION 233,775.76
07.02.01 AMORTIGUADOR DE IMPACTO und 2.00 63,375.00 126,750.00
07.02.02 BARRERA DE SEGURIDAD m 176.00 471.26 82,941.76
07.02.03 TACHAS DE SEGURIDAD und 1,200.00 20.07 24,084.00
08.00 VARIOS 3,146.75
07.02.01 PUERTA DE FIERRO C/MALLA - CERCO TIPO UNI m2 18.60 169.18 3,146.75
cion N° 5 Valorizacion N° 6
COSTO r-17 Abr-17
ITEM DESCRIPCION UND. METRADO PARCIAL S/.
UNITARIO S/. PARCIAL METRADO PARCIAL
01 PRESUPUESTO DE VARIACION Nº 05 - MODIFICACION DE ACCESOS AL CEBAF 975,776.89
02.00 MOVIMIENTO DE TIERRAS 192,077.49
02.01 CORTE DE MATERIAL SUELTO m3 1,485.51 4.58 6,803.64
02.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 11,310.98 16.38 185,273.85
03.00 TRANSPORTE 427,530.73
03.01 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 1,485.51 33.41 49,630.89
03.02 TRANSPORTE DE MATERIAL DE PRESTAMO PARA RELLENO m3 11,310.98 33.41 377,899.84
04.00 MURO DE CONTENCION 89,180.77
04.01 OBRAS PRELIMINARES 383.74
04.01.01 TRAZO Y REPLANTEO C/EQUIPO m 181.01 2.12 383.74
04.02 CONCRETO SIMPLE 5,218.68
04.02.01 CONCRETO F'C=100 KG/CM2 SOLADOS E=4" m2 156.67 33.31 5,218.68
04.03 CONCRETO ARMADO 80,771.26
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN BASE m2 338.57 60.87 20,608.76
04.03.02 CONCRETO PREMEZCLADO F'C=280 KG/CM2 m3 74.74 466.63 34,875.93
04.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 4,844.17 5.22 25,286.57
04.04 JUNTAS 2,807.09
04.04.01 JUNTA DE DILATACION E=5.00CM m 30.20 92.95 2,807.09
05.00 VEREDAS 9,983.42
05.01 BASE PARA VEREDAS E=0.10 M m2 200.43 7.61 1,525.27
05.02 VEREDA DE CONCRETO F'C= 140 KG/CM2, INC. ENCOFRADOS m2 200.43 42.20 8,458.15
06.00 SARDINELES 7,606.35
06.01 EXCAVACION Y PERFILADO DE ZANJAS PARA SARDINELES m 73.01 3.17 231.44
06.02 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 4.38 33.41 146.34
06.03 ENCOFRADO Y DESENC. CARAVISTA SARDINELES m2 94.91 44.32 4,206.41
06.04 CONCRETO F'C=210 KG/CM2 PARA SARDINELES m3 7.12 424.46 3,022.16
07.00 PARTIDAS NUEVAS 246,251.38
07.01 MOVIMIENTO DE TIERRAS 12,475.62
07.01.01 CORTE DE MATERIAL SEMIROCOSO m3 713.30 17.49 12,475.62
07.02 SEÑALIZACION 233,775.76
07.02.01 AMORTIGUADOR DE IMPACTO und 2.00 63,375.00 126,750.00
07.02.02 BARRERA DE SEGURIDAD m 176.00 471.26 82,941.76
07.02.03 TACHAS DE SEGURIDAD und 1,200.00 20.07 24,084.00
08.00 VARIOS 3,146.75
07.02.01 PUERTA DE FIERRO C/MALLA - CERCO TIPO UNI m2 18.60 169.18 3,146.75
Valorizacion N° 7 Valorizacion N° 8
COSTO May-17 Jun-17
ITEM DESCRIPCION UND. METRADO PARCIAL S/.
UNITARIO S/. METRADO PARCIAL METRADO PARCIAL
01 PRESUPUESTO DE VARIACION Nº 05 - MODIFICACION DE ACCESOS AL CEBAF 975,776.89 126750.00
02.00 MOVIMIENTO DE TIERRAS 192,077.49
02.01 CORTE DE MATERIAL SUELTO m3 1,485.51 4.58 6,803.64
02.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 11,310.98 16.38 185,273.85
03.00 TRANSPORTE 427,530.73
03.01 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 1,485.51 33.41 49,630.89
03.02 TRANSPORTE DE MATERIAL DE PRESTAMO PARA RELLENO m3 11,310.98 33.41 377,899.84
04.00 MURO DE CONTENCION 89,180.77
04.01 OBRAS PRELIMINARES 383.74
04.01.01 TRAZO Y REPLANTEO C/EQUIPO m 181.01 2.12 383.74
04.02 CONCRETO SIMPLE 5,218.68
04.02.01 CONCRETO F'C=100 KG/CM2 SOLADOS E=4" m2 156.67 33.31 5,218.68
04.03 CONCRETO ARMADO 80,771.26
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN BASE m2 338.57 60.87 20,608.76
04.03.02 CONCRETO PREMEZCLADO F'C=280 KG/CM2 m3 74.74 466.63 34,875.93
04.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 4,844.17 5.22 25,286.57
04.04 JUNTAS 2,807.09
04.04.01 JUNTA DE DILATACION E=5.00CM m 30.20 92.95 2,807.09
05.00 VEREDAS 9,983.42
05.01 BASE PARA VEREDAS E=0.10 M m2 200.43 7.61 1,525.27
05.02 VEREDA DE CONCRETO F'C= 140 KG/CM2, INC. ENCOFRADOS m2 200.43 42.20 8,458.15
06.00 SARDINELES 7,606.35
06.01 EXCAVACION Y PERFILADO DE ZANJAS PARA SARDINELES m 73.01 3.17 231.44
06.02 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 4.38 33.41 146.34
06.03 ENCOFRADO Y DESENC. CARAVISTA SARDINELES m2 94.91 44.32 4,206.41
06.04 CONCRETO F'C=210 KG/CM2 PARA SARDINELES m3 7.12 424.46 3,022.16
07.00 PARTIDAS NUEVAS 246,251.38 126750.00
07.01 MOVIMIENTO DE TIERRAS 12,475.62
07.01.01 CORTE DE MATERIAL SEMIROCOSO m3 713.30 17.49 12,475.62
07.02 SEÑALIZACION 233,775.76 126750.00
07.02.01 AMORTIGUADOR DE IMPACTO und 2.00 63,375.00 126,750.00 2.00 126750.00
07.02.02 BARRERA DE SEGURIDAD m 176.00 471.26 82,941.76
07.02.03 TACHAS DE SEGURIDAD und 1,200.00 20.07 24,084.00
08.00 VARIOS 3,146.75
07.02.01 PUERTA DE FIERRO C/MALLA - CERCO TIPO UNI m2 18.60 169.18 3,146.75
ACUMULADO
COSTO
ITEM DESCRIPCION UND. METRADO PARCIAL S/. METRADO VALORIZADO % DE AVANCE
UNITARIO S/.
01 PRESUPUESTO DE VARIACION Nº 05 - MODIFICACION DE ACCESOS AL CEBAF 975,776.89 0.00 975776.89 100.00%
02.00 MOVIMIENTO DE TIERRAS 192,077.49 0.00 192077.49 100.00%
02.01 CORTE DE MATERIAL SUELTO m3 1,485.51 4.58 6,803.64 1485.51 6803.64 100.00%
02.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 11,310.98 16.38 185,273.85 11310.98 185273.85 100.00%
03.00 TRANSPORTE 427,530.73 0.00 427530.73 100.00%
03.01 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 1,485.51 33.41 49,630.89 1485.51 49630.89 100.00%
03.02 TRANSPORTE DE MATERIAL DE PRESTAMO PARA RELLENO m3 11,310.98 33.41 377,899.84 11310.98 377899.84 100.00%
04.00 MURO DE CONTENCION 89,180.77 0.00 89180.77 100.00%
04.01 OBRAS PRELIMINARES 383.74 0.00 383.74 100.00%
04.01.01 TRAZO Y REPLANTEO C/EQUIPO m 181.01 2.12 383.74 181.01 383.74 100.00%
04.02 CONCRETO SIMPLE 5,218.68 0.00 5218.68 100.00%
04.02.01 CONCRETO F'C=100 KG/CM2 SOLADOS E=4" m2 156.67 33.31 5,218.68 156.67 5218.68 100.00%
04.03 CONCRETO ARMADO 80,771.26 0.00 80771.26 100.00%
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN BASE m2 338.57 60.87 20,608.76 338.57 20608.76 100.00%
04.03.02 CONCRETO PREMEZCLADO F'C=280 KG/CM2 m3 74.74 466.63 34,875.93 74.74 34875.93 100.00%
04.03.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 4,844.17 5.22 25,286.57 4844.17 25286.57 100.00%
04.04 JUNTAS 2,807.09 0.00 2807.09 100.00%
04.04.01 JUNTA DE DILATACION E=5.00CM m 30.20 92.95 2,807.09 30.20 2807.09 100.00%
05.00 VEREDAS 9,983.42 0.00 9983.42 100.00%
05.01 BASE PARA VEREDAS E=0.10 M m2 200.43 7.61 1,525.27 200.43 1525.27 100.00%
05.02 VEREDA DE CONCRETO F'C= 140 KG/CM2, INC. ENCOFRADOS m2 200.43 42.20 8,458.15 200.43 8458.15 100.00%
06.00 SARDINELES 7,606.35 0.00 7606.35 100.00%
06.01 EXCAVACION Y PERFILADO DE ZANJAS PARA SARDINELES m 73.01 3.17 231.44 73.01 231.44 100.00%
06.02 TRANSPORTE DE MATERIAL EXCEDENTE A DME m3 4.38 33.41 146.34 4.38 146.34 100.00%
06.03 ENCOFRADO Y DESENC. CARAVISTA SARDINELES m2 94.91 44.32 4,206.41 94.91 4206.41 100.00%
06.04 CONCRETO F'C=210 KG/CM2 PARA SARDINELES m3 7.12 424.46 3,022.16 7.12 3022.16 100.00%
07.00 PARTIDAS NUEVAS 246,251.38 0.00 246251.38 100.00%
07.01 MOVIMIENTO DE TIERRAS 12,475.62 0.00 12475.62 100.00%
07.01.01 CORTE DE MATERIAL SEMIROCOSO m3 713.30 17.49 12,475.62 713.30 12475.62 100.00%
07.02 SEÑALIZACION 233,775.76 0.00 233775.76 100.00%
07.02.01 AMORTIGUADOR DE IMPACTO und 2.00 63,375.00 126,750.00 2.00 126750.00 100.00%
07.02.02 BARRERA DE SEGURIDAD m 176.00 471.26 82,941.76 176.00 82941.76 100.00%
07.02.03 TACHAS DE SEGURIDAD und 1,200.00 20.07 24,084.00 1200.00 24084.00 100.00%
08.00 VARIOS 3,146.75 0.00 3146.75 100.00%
07.02.01 PUERTA DE FIERRO C/MALLA - CERCO TIPO UNI m2 18.60 169.18 3,146.75 18.60 3146.75 100.00%